Skip to Content
You are currently on the new version of our website. Access the old version .

1,454 Results Found

  • Article
  • Open Access
2 Citations
2,808 Views
14 Pages

23 July 2020

Planning delay time is a ubiquitous but under-researched land use regulation method. The aim of this study is to link planning delay time with the loss of urban locally provided ecosystem services (ULPES) caused by land development. Our main hypothes...

(This article belongs to the Special Issue Urban Economics, City Development and Future Social Challenges)
  • Article
  • Open Access
3 Citations
3,000 Views
20 Pages

Temporal Governance and the Politics of Time Beyond Delay in Spatial Planning

  • Jorge Gonçalves,
  • Beatriz Condessa and
  • Sofia Bizarro

This article examines how governance structures and procedural timing influence the effectiveness of Territorial Management Instruments (TMIs) in Portugal. Anchored in a comparative analysis of two key legal reforms (Decree-Law No. 380/1999 and Decre...

  • Article
  • Open Access
649 Views
18 Pages

Although the expected future impacts of climate change on the construction sector are significant and commonly accepted, the prospect and viability of contractual solutions to mitigate such effects lack investigation. Scenario planning enables leader...

(This article belongs to the Special Issue Selected Papers from the CIB WBC 2025—Sustainable Development and the Built Environment: Legal Challenges and Opportunities)
  • Article
  • Open Access
23 Citations
5,019 Views
22 Pages

5 June 2020

This paper presents new motion planning and robust coordinated control schemes for trajectory tracking of the underwater vehicle-manipulator system (UVMS) subjected to model uncertainties, time-varying external disturbances, payload and sensory noise...

(This article belongs to the Special Issue Modelling and Control of Mechatronic and Robotic Systems)
  • Article
  • Open Access
3 Citations
6,558 Views
23 Pages

19 September 2024

This article aims to determine the causes of the delays in South African construction project planning, discussing the centralised hierarchical planning system factors, multiple agencies/spheres of government regarding building-permit approval factor...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Article
  • Open Access
3 Citations
7,067 Views
13 Pages

Application Issues of Impacted As-Planned Schedule for Delay Analysis

  • Kyong Ju Kim,
  • Bonghee Han,
  • Min Seo Park,
  • Kyoungmin Kim and
  • Eu Wang Kim

13 September 2022

Most construction projects are delayed, and many are subject to claims or disputes. Therefore, delay analysis is a critical component of any construction project to determine who is responsible for delays. This research examines four different techni...

(This article belongs to the Topic Advances in Construction and Project Management)
  • Article
  • Open Access
10 Citations
6,752 Views
21 Pages

2 April 2021

The analysis of the planning activities of industrial construction projects can help to evaluate some of the causes that have an impact on the variation of execution times and can also contribute to identifying those activities and components that ar...

(This article belongs to the Special Issue The Contribution of the Project Management to the Sustainable Development Goals (SDGs))
  • Article
  • Open Access
228 Views
34 Pages

11 October 2026

In this paper, a delay-informed multi-agent twin delayed deep deterministic policy gradient (DI-MATD3) approach is proposed for multi-UAV formation trajectory planning subject to communication delays. Specifically, a timestamped per-link communicatio...

  • Article
  • Open Access
10 Citations
2,813 Views
17 Pages

26 March 2024

This paper proposes a path planning framework that combines the experience replay mechanism from deep reinforcement learning (DRL) and rapidly exploring random tree star (RRT*), employing the DRL-RRT* as the path planning method for the manipulator....

(This article belongs to the Special Issue Recent Advances in Robotics and Intelligent Robots Applications)
  • Article
  • Open Access
14 Citations
4,733 Views
25 Pages

16 August 2022

A parafoil delivery system has usually been used in the fields of military and civilian airdrop supply and aircraft recovery in recent years. However, since the altitude of the unpowered parafoil is monotonically decreasing, it is limited by the init...

(This article belongs to the Topic Artificial Intelligence Models, Tools and Applications)
  • Article
  • Open Access
79 Citations
10,755 Views
20 Pages

8 February 2019

Population aging is creating serious challenges for the sustainability of China’s pension system. To mitigate the adverse impact of the demographic shift, China has recently introduced fertility and retirement policy reforms. The research prese...

  • Article
  • Open Access
1 Citations
4,968 Views
38 Pages

Journey Planning Algorithms for Massive Delay-Prone Transit Networks

  • Mattia D’Emidio,
  • Imran Khan and
  • Daniele Frigioni

18 December 2019

This paper studies the journey planning problem in the context of transit networks. Given the timetable of a schedule-based transportation system (consisting, e.g., of trains, buses, etc.), the problem seeks journeys optimizing some criteria. Specifi...

  • Article
  • Open Access
13 Citations
3,279 Views
25 Pages

25 November 2023

Unmanned combat aerial vehicle (UCAV) trajectory planning to avoid radar detection threats is a complicated optimization problem that has been widely studied. The rapid changes in Radar Cross Sections (RCSs), the unknown cruise trajectory of airborne...

(This article belongs to the Topic Target Tracking, Guidance, and Navigation for Autonomous Systems)
  • Article
  • Open Access
838 Views
18 Pages

Robust Multi-Agent Path Finding Method for Obstacles and Environmental Changes in Factory Environments

  • Seihoon Park,
  • Jinwon Lee,
  • Geonhyeok Park,
  • Ikhyeon Cho and ,
  • Seongjoon Moon and
  • Woojin Chung
  • + 1 author+ 0 author

1 July 2026

Multi-Agent Path Finding (MAPF) is a core technology for logistics automation in factories and warehouses. Guidance-based approaches that reflect the structural properties of factory environments have been widely adopted for computational efficiency...

(This article belongs to the Special Issue Sensing Technologies for Object Detection and Path Control in Autonomous Vehicles)
  • Article
  • Open Access
7 Citations
6,837 Views
24 Pages

5 June 2024

One of the primary concerns and challenges encountered in the construction industry is the emergence of crucial factors instigating project delays throughout the construction project lifecycle (CPL). The critical delay factors (CDFs) are the signific...

(This article belongs to the Special Issue Risk Management in Project Management—How Two Major Dimensions (Relational and Processual) Influence Risk Management in Project Management)
  • Article
  • Open Access
4 Citations
1,423 Views
14 Pages

Background: Timely access to radiotherapy is crucial for optimal cancer treatment outcomes, as delays in receiving treatment can lead to disease progression and decreased chances of survival. Healthcare systems need to prioritise efficient scheduling...

(This article belongs to the Special Issue Health Equity and Universal Health Coverage)
  • Article
  • Open Access
644 Views
46 Pages

13 August 2026

In make-to-order (MTO) manufacturing, customer-side issues involving payment, documentation, logistics, or site readiness may postpone shipment after order acceptance, increasing finished-goods inventory, capital tie-up, and capacity inefficiency. Al...

(This article belongs to the Section Applied Industrial Technologies)
  • Article
  • Open Access
447 Views
22 Pages

29 June 2026

With the gradual improvement of residential electricity reliability, the lower design strength of the distribution network makes it more prone to large-scale power outages in resisting natural disasters. Among them, the cold load start-up effect will...

(This article belongs to the Special Issue Process Analysis and Optimal Control of the Power Conversion Systems)
  • Article
  • Open Access
431 Views
26 Pages

Dynamic Toxic Exposure Assessment for Vulnerable Populations: Incorporating Evacuation Delay into Hazard Analysis

  • Jovana Simić,
  • Tanja Vranić,
  • Cveta Lazić,
  • Željko Zeljković and
  • Srđan Popov

25 August 2026

Conventional exposure assessments for toxic release events often rely on spatial hazard representations that provide limited information on how exposure evolves while evacuation is underway. This study proposes a dynamic exposure assessment framework...

  • Article
  • Open Access
5 Citations
2,824 Views
15 Pages

21 December 2022

Green manufacturing (especially the right production scale) and optimization of logistics transportation (especially logistics transportation to ensure economic benefits) have become challenging issues. This paper focuses on production planning and s...

(This article belongs to the Section Green Sustainable Science and Technology)
  • Article
  • Open Access
4 Citations
5,616 Views
22 Pages

Planform Change and Its Delayed Response to Discharge in an Active Braided River Reach: Majuli Island Reach of the Brahmaputra River

  • Qiange Xue,
  • Li He,
  • Qiuhong Tang,
  • Ximeng Xu and ,
  • Dong Chen,
  • Nigel G. Wright,
  • G. M. Tarekul Islam,
  • Binod Baniya,
  • A. K. M. Saiful Islam and
  • Yaoying Tang
  • + 6 authors+ 1 author

7 March 2025

As the threat of unstable braided river geomorphology to the resilience of local communities grows, a better understanding of the morphological changes in a river subject to climate is essential. However, little research has focused on the long-term...

(This article belongs to the Special Issue New Advancements in the Field of Remote Sensing in Land Surface Processes)
  • Article
  • Open Access
14 Citations
2,817 Views
16 Pages

EETO-GA: Energy Efficient Trajectory Optimization of UAV-IoT Collaborative System Using Genetic Algorithm

  • M M Hafizur Rahman,
  • Mohammed Al-Naeem,
  • Anuradha Banerjee and
  • Abu Sufian

16 February 2023

Unmanned aerial vehicle (UAVs) is capable of adding significant potential to the internet of thing (IoT) devices and hence smart UAV–IoT collaborative system has attracted the attention of many researchers. This system has to be energy efficien...

(This article belongs to the Special Issue Advances in Computer Network Security and Information Retrieval Technology)
  • Article
  • Open Access
4 Citations
2,162 Views
21 Pages

Congested airspace conflict resolution during terminal operations is a common air traffic management issue that may produce cascading delays. Vehicles needing emergency clearance to land, at either traditional airports or vertiports, would require ot...

(This article belongs to the Section Air Traffic and Transportation)
  • Article
  • Open Access
1,158 Views
21 Pages

Rapidly expanding power demand in economically developing regions significantly amplifies the operational risks associated with the delayed commissioning of planned substations. This study proposes a data–physics fusion framework integrating an...

  • Article
  • Open Access
4 Citations
2,279 Views
25 Pages

14 November 2024

The combination of software-defined networking (SDN) and satellite–ground integrated networks (SGINs) is gaining attention as a key infrastructure for meeting the granular quality-of-service (QoS) demands of next-generation mobile communication...

(This article belongs to the Section Communications)
  • Article
  • Open Access
93 Citations
9,846 Views
15 Pages

13 January 2020

In order to enhance performance of robot systems in the manufacturing industry, it is essential to develop motion and task planning algorithms. Especially, it is important for the motion plan to be generated automatically in order to deal with variou...

(This article belongs to the Collection Advances in Automation and Robotics)
  • Article
  • Open Access
7 Citations
2,825 Views
18 Pages

5 July 2023

Unmanned Aerial Vehicle (UAV) path planning research refers to the UAV automatically planning an optimal path to the destination under the corresponding environment, while avoiding collision with obstacles in this process. In order to solve the probl...

  • Article
  • Open Access
24 Citations
4,881 Views
18 Pages

Path Planning of Unmanned Aerial Vehicle in Complex Environments Based on State-Detection Twin Delayed Deep Deterministic Policy Gradient

  • Danyang Zhang,
  • Zhaolong Xuan,
  • Yang Zhang,
  • Jiangyi Yao and ,
  • Xi Li and
  • Xiongwei Li
  • + 1 author+ 0 author

13 January 2023

This paper investigates the path planning problem of an unmanned aerial vehicle (UAV) for completing a raid mission through ultra-low altitude flight in complex environments. The UAV needs to avoid radar detection areas, low-altitude static obstacles...

(This article belongs to the Topic Design, Simulation and New Applications of Unmanned Aerial Vehicles)
  • Article
  • Open Access
9 Citations
6,344 Views
17 Pages

19 November 2023

Fast-track construction has recently become the prevailing construction approach globally. It enables owners and developers to make rapid returns on investment through shortened construction periods. This strategy has many effects on the industry; th...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Feature Paper
  • Article
  • Open Access
18 Citations
6,789 Views
24 Pages

A Comparative Study of Multi-Rotor Unmanned Aerial Vehicles (UAVs) with Spectral Sensors for Real-Time Turbidity Monitoring in the Coastal Environment

  • Ha Linh Trinh,
  • Hieu Trung Kieu,
  • Hui Ying Pak,
  • Dawn Sok Cheng Pang and ,
  • Wai Wah Tham,
  • Eugene Khoo and
  • Adrian Wing-Keung Law
  • + 2 authors+ 0 author

5 February 2024

Complex coastal environments pose unique logistical challenges when deploying unmanned aerial vehicles (UAVs) for real-time image acquisition during monitoring operations of marine water quality. One of the key challenges is the difficulty in synchro...

(This article belongs to the Special Issue Unconventional Drone-Based Surveying 2nd Edition)
  • Article
  • Open Access
15 Citations
3,632 Views
14 Pages

Delayed Colorectal Cancer Diagnosis during the COVID-19 Pandemic in Alberta: A Framework for Analyzing Barriers to Diagnosis and Generating Evidence to Support Health System Changes Aimed at Reducing Time to Diagnosis

  • Emily Walker,
  • Yunting Fu,
  • Daniel C. Sadowski,
  • Douglas Stewart and ,
  • Patricia Tang,
  • Bethany Kaposhi,
  • Heather Chappell,
  • Paula Robson and
  • Sander Veldhuyzen van Zanten
  • + 4 authors+ 0 author

The frequency of colorectal cancer (CRC) diagnosis has decreased due to the COVID-19 pandemic. Health system planning is needed to address the backlog of undiagnosed patients. We developed a framework for analyzing barriers to diagnosis and estimatin...

(This article belongs to the Special Issue Cancer Surveillance and Intelligence: Use in Health Services Research and Policy)
  • Article
  • Open Access
1 Citations
4,019 Views
16 Pages

Construction Time Estimation Function for Canadian Utility Scale Power Plants

  • Herve Kabanda,
  • Alex Romard,
  • Fuze Yurtsever,
  • Anjali Wadhera and ,
  • Joshua Andrews and
  • Craig Merrett
  • + 1 author+ 0 author

31 August 2021

Construction time and time overruns for infrastructure projects have been frequently studied; however, the construction time of power plants has not been studied. This lack of study is problematic, as more renewable energy power plants, such as wind...

(This article belongs to the Section C: Energy Economics and Policy)
  • Article
  • Open Access
5 Citations
5,029 Views
28 Pages

Dynamic Model of Contingency Flight Crew Planning Extending to Crew Formation

  • Vojtech Graf,
  • Dusan Teichmann,
  • Michal Dorda and
  • Lenka Kontrikova

2 September 2021

The creation of a flight schedule and the associated crew planning are clearly among the most complicated tasks in terms of traffic preparation. Even with a relatively small number of pilots and aircraft, numerous specific constraints arising from re...

(This article belongs to the Special Issue Optimization Theory and Applications)
  • Article
  • Open Access
53 Citations
5,201 Views
23 Pages

17 April 2021

In unmanned aerial vehicle (UAV)-aided wireless sensor networks (UWSNs), a UAV is employed as a mobile sink to gather data from sensor nodes. Incorporating UAV helps prolong the network lifetime and avoid the energy-hole problem faced by sensor netwo...

(This article belongs to the Section Sensor Networks)
  • Review
  • Open Access
9 Citations
6,799 Views
41 Pages

Diagnostic Delay in Soft Tissue Sarcomas: A Review

  • Juan Ángel Fernández,
  • Beatriz Gómez,
  • Daniel Díaz-Gómez,
  • Irene López and ,
  • Pablo Lozano,
  • Paula Muñoz,
  • Francisco Cristóbal Muñoz-Casares,
  • Vicente Olivares-Ripoll,
  • Hugo Vasques and
  • José Manuel Asencio-Pascual
  • + 5 authors+ 0 author

31 May 2025

Background/Objectives: To review the problem of diagnostic delay in soft tissue sarcomas with the aim of identifying its causes and consequences, understanding how to clinically suspect and refer them, and evaluating the main limitations of the refer...

(This article belongs to the Topic Soft Tissue Sarcomas: From Laboratory to Clinical Practice)
  • Article
  • Open Access
1 Citations
745 Views
18 Pages

As typical underactuated systems, overhead cranes are widely utilized in heavy-load transportation. However, their strong nonlinear coupling and underactuated characteristics complicate precise positioning and payload swing suppression. Furthermore,...

  • Article
  • Open Access
863 Views
27 Pages

29 October 2025

With the growing significance of hydrogen in the global energy transition, research on its pricing mechanisms has become increasingly crucial. Focusing on hydrogen markets predominantly supplied by electrolytic production, this study proposes a nodal...

(This article belongs to the Section F1: Electrical Power System)
  • Article
  • Open Access
14 Citations
9,840 Views
23 Pages

11 September 2013

Construction project delays emanates from multiplicity of different sources of risk events. This, combined with high uncertainty in cause-effect relationships between the events and their impacts on project completion dates, have created immense diff...

  • Review
  • Open Access
55 Citations
12,304 Views
35 Pages

Effects of Preconception Care and Periconception Interventions on Maternal Nutritional Status and Birth Outcomes in Low- and Middle-Income Countries: A Systematic Review

  • Zohra S. Lassi,
  • Sophie G. E. Kedzior,
  • Wajeeha Tariq,
  • Yamna Jadoon and ,
  • Jai K. Das and
  • Zulfiqar A. Bhutta
  • + 1 author+ 0 author

26 February 2020

Pregnancy in adolescence and malnutrition are common challenges in low- and middle-income countries (LMICs), and are associated with many complications and comorbidities. The preconception period is an ideal period for intervention as a preventative...

(This article belongs to the Special Issue What Works? Evidence Based Maternal, Child and Adolescent Nutrition Interventions)
  • Article
  • Open Access
16 Citations
4,649 Views
18 Pages

18 November 2020

The article deals with the influence of the infrastructure for public transport on the delay time of private and public transport in the city. The study employed the methods of simulation, mathematical modeling and field research. Imitation microscop...

(This article belongs to the Special Issue Methods for Improving Sustainability of Passenger and Freight Transport)
  • Article
  • Open Access
5 Citations
4,038 Views
16 Pages

19 January 2020

Usually, the rational polynomial coefficient (RPC) model of spaceborne synthetic aperture radar (SAR) is fitted by the original range Doppler (RD) model. However, the radar signal is affected by two-way atmospheric delay, which causes measurement err...

(This article belongs to the Section Remote Sensors)
  • Article
  • Open Access
1 Citations
1,934 Views
16 Pages

Collaborative Allocation Method of En-Route Network Resources Based on Stackelberg Game Model

  • Wen Tian,
  • Xuefang Zhou,
  • Ying Zhang,
  • Qin Fang and
  • Mingjian Yang

15 December 2023

To further enhance fairness in the allocation of en-route space–time resources in the collaborative trajectory selection program, a study on the plan preferences between air traffic control (ATC) and airlines in the selection process of the fin...

  • Article
  • Open Access
1 Citations
2,872 Views
18 Pages

Fuzzy Optimization Model for Decision-Making in Single Machine Construction Project Planning

  • Nilthon Arce Fernández,
  • Flabio Gutiérrez Segura,
  • Manuel Emilio Milla Pino,
  • Jose Manuel Palomino Ojeda and ,
  • Alfredo Lázaro Ludeña Gutiérrez and
  • River Chávez Santos
  • + 1 author+ 0 author

4 April 2024

Scheduling for a construction project with a limited number of machines is a critical and well-studied problem. Most studies assume that task processing times are exact; in practice, delays frequently occur, rendering the initial work plan invalid. T...

(This article belongs to the Section D2: Operations Research and Fuzzy Decision Making)
  • Article
  • Open Access
7 Citations
2,051 Views
18 Pages

25 February 2025

In this paper, a novel fractional-order chaotic system equipped with symmetric attractors was proposed for the full-coverage path-planning problem of mobile robots, especially in application scenarios where path privacy needs to be protected. By coup...

(This article belongs to the Section A: Computer Science)
  • Article
  • Open Access
48 Citations
10,194 Views
14 Pages

3 October 2022

Adaptive traffic signal control (ATSC) is an effective method to reduce traffic congestion in modern urban areas. Many studies adopted various approaches to adjust traffic signal plans according to real-time traffic in response to demand fluctuations...

(This article belongs to the Section Internet of Things)
  • Article
  • Open Access
1 Citations
1,907 Views
19 Pages

Modeling Infrastructure Delays and Congestion for Large-Scale Power Systems

  • Joan Fuentes,
  • Sebastian Zapata,
  • Enrique Angel,
  • Camila Ochoa and
  • Valentina Betancur

9 June 2025

This paper analyzes the electricity dispatch process and the importance of predicting infrastructure construction delays and network congestion using a system dynamics methodology. Two scenarios of renewable energy integration within Colombia are exa...

  • Article
  • Open Access
4 Citations
4,005 Views
33 Pages

Background: Disruptions in freight transportation—such as service delays, infrastructure failures, and labor strikes—pose significant challenges to the reliability and efficiency of intermodal networks. To address these challenges, this s...

  • Article
  • Open Access
10 Citations
3,774 Views
19 Pages

12 August 2021

Compared with the ordinary merchant ship building, the concentralized distribution in cruise building is more complex. Plan change is a common phenomenon in cruise building, and it is easy to lead to mismatch between production and logistics, resulti...

(This article belongs to the Special Issue Optimization Algorithms Applied to Sustainable Production Processes)
  • Article
  • Open Access
9 Citations
2,302 Views
8 Pages

How Long Can You Delay? Curve Progression While Awaiting Vertebral Body Tethering Surgery

  • Christina Regan,
  • M. Bryant Transtrum,
  • Bharadwaj Jilakara,
  • Todd A. Milbrandt and
  • A. Noelle Larson

11 April 2024

Background: The implications of delaying surgical intervention for patients with adolescent idiopathic scoliosis (AIS) wishing to undergo vertebral body tethering (VBT) have not yet been explored. It is important to understand how these delays can im...

(This article belongs to the Special Issue Scoliosis and Spinal Deformity: Current Diagnosis, Treatment and Clinical Management)
  • Article
  • Open Access
1 Citations
2,584 Views
21 Pages

16 February 2023

In order to abstract away a network model from some real-world networks, such as navigation satellite networks and mobile call networks, we proposed an Isochronal-Evolution Random Matching Network (IERMN) model. An IERMN is a dynamic network that evo...

(This article belongs to the Section Complexity)

of 30