Construction Time Estimation Function for Canadian Utility Scale Power Plants

,
,
,
,
and
Department of Mechanical and Aerospace Engineering, Carleton University, Ottawa, ON K1S 5B6, Canada
*
Author to whom correspondence should be addressed.
†
These authors contributed equally to this work.
This article belongs to the Section C: Energy Economics and Policy

Abstract

Construction time and time overruns for infrastructure projects have been frequently studied; however, the construction time of power plants has not been studied. This lack of study is problematic, as more renewable energy power plants, such as wind and solar, are planned for many jurisdictions. Accurately estimating the construction time of a power plant will assist construction planning, budget estimates, and policy development encouraging the use of more renewable sources. The construction times of utility scale power plants in Canada were studied using publicly available data. Multiple linear regression analysis techniques were applied to the data to generate construction time estimation functions for all power plants together, and for individual technologies. The analyses reveal that construction time is sensitive to jurisdiction and the decade of construction, indicating that decisions made by individual Canadian provincial governments at different times had statistically significant impacts on construction time. The analyses also indicated that construction time is a strong function of installed capacity, independent of technology. This finding suggests that large solar or wind energy facilities will encounter longer construction times similar to large hydroelectric facilities.