Skip to Content

1,460 Results Found

  • Article
  • Open Access
2 Citations
2,502 Views
12 Pages

5 September 2022

One of the most common health problems that threaten the transportation infrastructure construction workers in Hong Kong is heat stress. An effective way to reduce this problem is to design a proper work–rest schedule, and the key issue is pred...

  • Article
  • Open Access
12 Citations
4,066 Views
13 Pages

20 April 2021

Predicting the duration of construction projects with acceptable accuracy is a problem for contractors and researchers. Numerous researchers and tools are involved in sorting out this problem. The aim of the study is to predict the construction durat...

  • Article
  • Open Access
1,631 Views
22 Pages

13 February 2025

Reliable project management during planning stages of a building project is a meticulous process typically requiring sufficient precedencies. Typical construction duration estimation is based on previous cases of similar projects used to validate con...

  • Article
  • Open Access
18 Citations
3,239 Views
17 Pages

2 January 2020

Construction duration and schedule robustness are of great importance to ensure efficient construction. However, the current literature has neglected the importance of schedule robustness. Relatively little attention has been paid to schedule robustn...

  • Article
  • Open Access
5,038 Views
14 Pages

26 March 2024

Ancient texts dedicating or commemorating temples that can be associated with archaeological remains such as architecture and inscriptions, along with identifiable kings who built or commemorated those temples and the specification of the elapsed num...

  • Article
  • Open Access
1 Citations
2,487 Views
21 Pages

26 October 2023

Failure to meet the deadlines for the implementation of investment-construction projects is a problem in all countries of the world and leads to unstable activity of construction companies. This article studies the most important destabilizing factor...

  • Article
  • Open Access
24 Citations
4,673 Views
19 Pages

Influence of the Construction Risks on the Cost and Duration of a Project

  • Azariy Lapidus,
  • Dmitriy Topchiy,
  • Tatyana Kuzmina and
  • Otari Chapidze

Recent years have witnessed active construction of multi-storey residential buildings. The scale of construction, its timing and limitations in financing contribute to the emergence of risk factors affecting the key parameters of cost and duration of...

  • Article
  • Open Access
11 Citations
4,346 Views
11 Pages

This study adopts the flow shop concept used in industrial production to schedule repetitive non-linear construction projects, where specialized groups of workers execute processes in work zones (buildings) in a predefined order common to all groups....

  • Article
  • Open Access
15 Citations
3,352 Views
19 Pages

Artificial Neural Network Model to Predict Final Construction Contract Duration

  • Abdullah M. Alsugair,
  • Khalid S. Al-Gahtani,
  • Naif M. Alsanabani,
  • Abdulmajeed A. Alabduljabbar and
  • Abdulmohsen S. Almohsen

11 July 2023

Forecasting the final construction contract duration at an early stage plays a vital role in the progress of a project. An inaccurate project duration prediction may lead to the project’s benefits being lost. It is essential to precisely predic...

  • Article
  • Open Access
679 Views
27 Pages

2 January 2026

The integrated platform provides a safe operating environment for high-rise residential construction and enables the simultaneous advancement of main structural works and facade operations. However, the construction workflow based on an integrated pl...

  • Article
  • Open Access
2 Citations
2,313 Views
26 Pages

30 April 2024

One of the most pressing issues in the implementation of construction projects is the extension of planned deadlines, significantly impacting project costs. This situation often arises due to inaccurate estimation of construction durations, which rel...

  • Article
  • Open Access
7 Citations
6,607 Views
20 Pages

Duration and Labor Resource Optimization for Construction Projects—A Conditional-Value-at-Risk-Based Analysis

  • Fan Ding,
  • Min Liu,
  • Simon M. Hsiang,
  • Peng Hu,
  • Yuxiang Zhang and
  • Kewang Jiang

19 February 2024

The complexity and uncertainty of construction projects contribute to low efficiency in the construction industry. This research applied the Takt-time planning method to optimize the construction working process, and proposed a risk control framework...

  • Article
  • Open Access
854 Views
26 Pages

Predicting the Forest Fire Duration Enriched with Meteorological Data Using Feature Construction Techniques

  • Constantina Kopitsa,
  • Ioannis G. Tsoulos,
  • Andreas Miltiadous and
  • Vasileios Charilogis

22 October 2025

The spread of contemporary artificial intelligence technologies, particularly machine learning, has significantly enhanced the capacity to predict asymmetrical natural disasters. Wildfires constitute a prominent example, as machine learning can be em...

  • Article
  • Open Access
12 Citations
5,985 Views
12 Pages

18 April 2017

Precise and accurate prediction models for duration and cost enable contractors to improve their decision making for effective resource management in terms of sustainability in construction. Previous studies have been limited to cost-based estimation...

  • Article
  • Open Access
24 Citations
11,149 Views
18 Pages

20 February 2019

Modular construction, which involves factory-based modular unit manufacturing followed by installation at a construction site, has been recognized as one of the sustainable construction methods. Its advantages are known to be implemented through (1)...

  • Article
  • Open Access
12 Citations
7,382 Views
22 Pages

Forecasting the Project Duration Average and Standard Deviation from Deterministic Schedule Information

  • Pablo Ballesteros-Pérez,
  • Alberto Cerezo-Narváez,
  • Manuel Otero-Mateo,
  • Andrés Pastor-Fernández,
  • Jingxiao Zhang and
  • Mario Vanhoucke

16 January 2020

Most construction managers use deterministic scheduling techniques to plan construction projects and estimate their duration. However, deterministic techniques are known to underestimate the project duration. Alternative methods, such as Stochastic N...

  • Article
  • Open Access
26 Citations
10,536 Views
23 Pages

8 December 2022

Earned value management (EVM) is widely used when monitoring and estimating operations related to construction projects. As the scope and complexity of construction projects expand, traditional EVM is sometimes ineffective and even results in conclus...

  • Review
  • Open Access
65 Citations
10,763 Views
44 Pages

11 January 2021

Ensuring soil strength, as well as preliminary construction cost and duration prediction, is a very crucial and preliminary aspect of any construction project. Similarly, building strong structures is very important in geotechnical engineering to ens...

  • Article
  • Open Access
9 Citations
3,438 Views
19 Pages

1 May 2023

Network topology construction plays an important role in the application of large-scale unmanned aerial vehicle (UAV) swarm. Current researches usually perform the topology construction in terms of criteria of nodes energy consumption, transmission d...

  • Article
  • Open Access
3 Citations
3,465 Views
20 Pages

25 March 2021

Remodeling underground structures requires careful construction planning, including consideration of costs and scheduling. Therefore, this study aims to analyze and compare the effects of four methods for vertically extending the underground spaces o...

  • Article
  • Open Access
10 Citations
2,598 Views
24 Pages

A Novel Feature Set for Low-Voltage Consumers, Based on the Temporal Dependence of Consumption and Peak Demands

  • Robbert Claeys,
  • Hakim Azaioud,
  • Rémy Cleenwerck,
  • Jos Knockaert and
  • Jan Desmet

29 December 2020

This paper proposes a novel feature construction methodology aiming at both clustering yearly load profiles of low-voltage consumers, as well as investigating the stochastic nature of their peak demands. These load profiles describe the electricity c...

  • Article
  • Open Access
11 Citations
2,812 Views
14 Pages

12 November 2020

Both the construction clients and the contractors want their projects delivered on time. Construction schedules, usually tight from the beginning, tend to expire as the progress of works is disturbed by materializing risks. As consequence, the projec...

  • Article
  • Open Access
3 Citations
5,443 Views
9 Pages

Factorial and Construct Validity of Sit-Up Test of Different Durations to Assess Muscular Endurance of Police Students

  • Filip Kukić,
  • Robin Orr,
  • Milan Marković,
  • J. Jay Dawes,
  • Aleksandar Čvorović and
  • Nenad Koropanovski

21 October 2022

Background: The number of completed sit-ups in a given period of time is a commonly used assessment to measure trunk endurance in tactical populations. This study investigated factorial and construct validity of three different durations of a sit-up...

  • Article
  • Open Access
14 Citations
7,407 Views
15 Pages

22 October 2018

To date, Korea has built four 1000 MW gross-power ultra-critical coal-fired power plants. With the introduction of this new power plant type, there is a need for the development of best practices and lessons learned associated with its construction....

  • Article
  • Open Access
8 Citations
4,043 Views
29 Pages

15 October 2018

Accurate classification of drought-severity is one of the most challenging issues in designing regional monitoring and control plans, especially in developing countries, where resources are scarce and must be carefully optimized to maximize social be...

  • Article
  • Open Access
14 Citations
4,457 Views
18 Pages

Accurately predicting construction costs during the initial planning stages is crucial for the successful completion of construction projects. Recent advancements have introduced various machine learning-based methods to enhance cost estimation preci...

  • Article
  • Open Access
9 Citations
3,381 Views
15 Pages

30 April 2021

Construction quality is one of the primary management objectives relating to duration and cost for construction projects. Project managers struggle with minimizing duration and cost while maximizing quality for construction projects. In construction...

  • Feature Paper
  • Article
  • Open Access
15 Citations
5,845 Views
18 Pages

Integrated EDM and 4D BIM-Based Decision Support System for Construction Projects Control

  • Hassan Mohamed Ayman,
  • Sameh Youssef Mahfouz and
  • Ahmed Alhady

Project schedule monitoring and controlling are critical challenges of construction project management that are not adequately implemented, likely due to the predominance of earned value management and the lack of utilizing technology, such as BIM to...

  • Article
  • Open Access
7 Citations
3,406 Views
13 Pages

21 May 2021

Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to...

  • Article
  • Open Access
1 Citations
2,178 Views
32 Pages

Dynamic Optimization of Tunnel Construction Scheduling in a Reverse Construction Scenario

  • Jianying Wei,
  • Yuming Liu,
  • Xiaochun Lu,
  • Rong Zhao and
  • Gan Wang

27 February 2025

Tunnel construction, a critical aspect of railway engineering, is a repetitive process with distinct linear characteristics. While the Linear Scheduling Method (LSM) is widely used for scheduling optimization in linear projects, it struggles to accom...

  • Article
  • Open Access
4 Citations
2,754 Views
17 Pages

10 October 2024

The development of a suitable set of input ground motions is crucial for dynamic time history analyses. The US Nuclear Regulatory Commission (NRC) requires that these motions generate response spectra closely matching the plant’s design spectru...

  • Article
  • Open Access
7 Citations
3,541 Views
20 Pages

8 June 2020

Dredging engineering projects are complex because they involve greater uncertainty from the natural environment, social needs, government policy and many stakeholders. Engineering companies submit tenders that draw on similar cases undertaken in rece...

  • Article
  • Open Access
4 Citations
2,909 Views
17 Pages

In project network planning, the correlation complexity of the processes is not only related to the immediately preceding and following processes, but also closely related to indirect adjacent processes. In the existing relevant studies, many scholar...

  • Article
  • Open Access
22 Citations
3,551 Views
18 Pages

14 April 2022

Eye movement has become a new behavioral feature for biometric authentication. In the eye movement-based authentication methods that use temporal features and artificial design features, the required duration of eye movement recordings are too long t...

  • Article
  • Open Access
17 Citations
8,338 Views
24 Pages

Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach

  • Sayyid Ali Banihashemi,
  • Mohammad Khalilzadeh,
  • Jurgita Antucheviciene and
  • Jonas Šaparauskas

31 August 2021

The increasing number of construction projects together with the limited resources of organizations led to tough competition for achieving project goals. Time, cost, and quality have been known as the project iron triangle. Project managers attempt t...

  • Article
  • Open Access
1 Citations
875 Views
20 Pages

11 July 2025

The construction of a dam significantly alters downstream flow characteristics, often analyzed through changes in flow–duration curves before and after construction. Typically, post-dam flow–duration curves exhibit increased probabilities...

  • Article
  • Open Access
43 Citations
12,355 Views
16 Pages

Depressive symptoms are a common mental health problem among adolescents, which may affect their physical and mental health development and impose heavy burdens on individual families and society. This study aimed to examine the associations between...

  • Article
  • Open Access
5 Citations
4,115 Views
9 Pages

22 March 2019

Global warming has been on the agenda over the past few years. Solutions to global warming and energy efficiency problems have brought with them the need for green building market. Leadership in Energy and Environmental Design (LEED) is a certificati...

  • Article
  • Open Access
8 Citations
3,993 Views
23 Pages

Concrete Construction: How to Explore Environmental and Economic Sustainability in Cold Climates

  • Shiwei Chen,
  • Weizhuo Lu,
  • Thomas Olofsson,
  • Mohammad Dehghanimohammadabadi,
  • Mats Emborg,
  • Jonny Nilimaa,
  • Yaowu Wang and
  • Kailun Feng

In many cold regions around the world, such as northern China and the Nordic countries, on-site concrete is often cured in cold weather conditions. To protect the concrete from freezing or excessively long maturation during the hardening process, con...

  • Article
  • Open Access
19 Citations
9,813 Views
24 Pages

The Impact of Climate Change on Construction Activity Performance

  • Sertac Oruc,
  • Huseyin Attila Dikbas,
  • Berkin Gumus and
  • Ismail Yucel

31 January 2024

There are specific construction operations that require weather forecast data to make short-term decisions regarding construction; however, most resource-related decision making and all project management plans must be carried out to anticipate weath...

  • Feature Paper
  • Article
  • Open Access
7 Citations
3,280 Views
21 Pages

26 April 2019

We study a single-machine scheduling problem to minimize the total completion time of the given set of jobs, which have to be processed without job preemptions. The lower and upper bounds on the job duration is the only information that is available...

  • Article
  • Open Access
4 Citations
3,830 Views
13 Pages

29 March 2021

The frame construction of an apartment complex that consists of multiple buildings encounters various uncertainties, owing to the complex relationships between units of work. Currently, the period of such a construction is calculated based on the num...

  • Article
  • Open Access
1 Citations
2,530 Views
13 Pages

An Isolated CNN Architecture for Classification of Finger-Tapping Tasks Using Initial Dip Images: A Functional Near-Infrared Spectroscopy Study

  • Muhammad Umair Ali,
  • Amad Zafar,
  • Karam Dad Kallu,
  • M. Atif Yaqub,
  • Haris Masood,
  • Keum-Shik Hong and
  • Muhammad Raheel Bhutta

This work investigates the classification of finger-tapping task images constructed for the initial dip duration of hemodynamics (HR) associated with the small brain area of the left motor cortex using functional near-infrared spectroscopy (fNIRS). D...

  • Article
  • Open Access
1 Citations
2,190 Views
16 Pages

23 August 2023

Natural disasters and warfare lead to the destruction of city buildings and infrastructure, leaving large numbers of people homeless. The rebuilding of destroyed cities needs to be carried out promptly while maintaining a balance between construction...

  • Article
  • Open Access
7 Citations
2,971 Views
25 Pages

Predictive Methodology for the Quantification of Environmental Aspects in Urban Infrastructures

  • Adolpho Guido de Araújo,
  • Arnaldo Manoel Pereira Carneiro and
  • Rachel Perez Palha

16 September 2020

The interest in sustainability in the construction industry arose in the 1990s, and current studies have created models to predict environmental aspects. Previous quantitative research to investigate environmental aspects was based on the perception...

  • Article
  • Open Access
10 Citations
4,923 Views
24 Pages

Impact of Curing Time and Temperature on Bond Performance of Epoxy Resin Adhesives for Steel Bridge Decks

  • Chuanbin Fan,
  • Huanyong Chen,
  • Feng Lin,
  • Weixiong Li,
  • Xuetang Xiong,
  • Bo Chen and
  • Huayang Yu

9 April 2025

The bonding performance of epoxy resin adhesives plays a critical role in ensuring interlayer adhesion and long-term durability in steel bridge deck pavements. However, the construction environment temperature and curing time significantly influence...

  • Article
  • Open Access
13 Citations
3,639 Views
20 Pages

12 July 2023

Time–space conflicts are one of the most common issues facing construction practices, impacting safety and productivity in several negative ways at construction sites. Therefore, implementing and developing methods to reduce the frequency of su...

  • Article
  • Open Access
4 Citations
2,742 Views
17 Pages

Eco-Economic Performance Estimation Method for Pretensioned Spun High-Strength Concrete Pile Installation

  • Chang-Yong Yi,
  • Jin-Young Park,
  • Chan-Young Park,
  • Jun-Cheol Lee and
  • Young-Jun Park

22 September 2022

Pile installation has an environmental impact through its various processes ranging from raw material extraction to construction. In addition, the environmental performance, productivity, and cost of pile installation depend on the construction plan....

  • Article
  • Open Access
3 Citations
2,902 Views
15 Pages

Copula-Based Drought Monitoring and Assessment According to Zonal and Meridional Temperature Gradients

  • Abudureymjang Otkur,
  • Dian Wu,
  • Yin Zheng,
  • Jong-Suk Kim and
  • Joo-Heon Lee

20 August 2021

Drought is one of the most severe natural disasters. However, many of its characteristic variables have complex nonlinear relationships. Therefore, it is difficult to construct effective drought assessment models. In this study, we analyzed regional...

  • Article
  • Open Access
4 Citations
5,254 Views
16 Pages

Healthy-Sustainable Housing Index: A Pilot Study to Link Architecture and Public Health in a Semi-Urban Community in Mexico

  • Pamela Zúñiga-Bello,
  • Astrid Schilmann,
  • Eunice Félix-Arellano,
  • Gerardo Gama-Hernández and
  • Urinda Alamo-Hernández

The aim of this pilot study was to evaluate the link between housing and children´s respiratory symptoms, through the construction of an index (HSHI) based on the definition of healthy-sustainable housing criteria, in a semi-urban community fro...

of 30