278 Results Found

  • Article
  • Open Access
20 Citations
6,850 Views
21 Pages

27 February 2019

The main subject of this research is to develop a forecast and mitigation model of schedule and cost performance during a detailed engineering stage of offshore engineering, procurement and construction (EPC) projects. The weight factors of major ele...

(This article belongs to the Collection Advanced Methodologies for Sustainability Assessment: Theory and Practice)
  • Article
  • Open Access
62 Citations
17,380 Views
19 Pages

Delay and cost overrun in construction projects are two widespread problems that arouse practitioners’ and scholars’ concern. Therefore, the objective of this study was to identify Key Performance Indicators (KPIs) in each of Engineering,...

  • Article
  • Open Access
3 Citations
904 Views
24 Pages

19 November 2025

Prefabricated construction has emerged as a key strategy to enhance productivity and quality in infrastructure projects. Yet, construction scheduling for prefabricated infrastructure projects often suffers from persistent discrepancies between planne...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Article
  • Open Access
20 Citations
10,179 Views
31 Pages

14 July 2018

Engineering, Procurement, and Construction (EPC) contractors with lump-sum turnkey contracts have recently been suffering massive profit losses due to re-works and schedule delays in offshore oil and gas EPC megaprojects. The main objective of this r...

(This article belongs to the Special Issue Optimization and Big Data Analytics to Improve Profitability and Sustainability of the Oil and Gas Industry)
  • Article
  • Open Access
30 Citations
7,981 Views
23 Pages

In rapidly developing countries such as the Kingdom of Saudi Arabia (KSA), where the construction of buildings and supporting infrastructure is critical to achieving strategic developmental milestones, delays to capital projects can derail other sect...

(This article belongs to the Topic Advances in Construction and Project Management)
  • Article
  • Open Access
1 Citations
1,305 Views
29 Pages

17 April 2026

Rework continues to be a critical issue in construction projects, contributing to cost escalation, schedule delays, and compromised quality. While earlier studies have identified isolated causes such as design deficiencies, communication failures, an...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Article
  • Open Access
158 Views
23 Pages

23 October 2026

In Saudi Arabia, the sequential Design–Bid–Build (DBB) method dominates capital construction procurement. This exploratory study compares fifteen completed Saudi DBB projects from one public client portfolio with ten published internation...

(This article belongs to the Special Issue Challenges of Intelligent Management Approaches in Construction Engineering)
  • Article
  • Open Access
683 Views
20 Pages

Front-End Planning (FEP) is the very early stage of delivering megaprojects, during which strategic decisions are made that can dictate the project’s overall costs and timelines over the lifetime of the project. While existing FEP frameworks pr...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Article
  • Open Access
10 Citations
8,154 Views
18 Pages

11 December 2021

The development of road infrastructure is closely related to national competitiveness and presents significant socioeconomic impacts. However, road construction involves a large budget and is vulnerable to political, economic, social, and project-spe...

(This article belongs to the Special Issue Sustainability and Industry 4.0 in Civil and Infrastructure Engineering)
  • Article
  • Open Access
9 Citations
4,731 Views
17 Pages

24 February 2022

Electrical contractors encounter problems such as limited construction sites, schedule interference, and inefficient communication with other contractors when they typically subcontract with general contractors. Electrical projects require effective...

(This article belongs to the Special Issue Research and Practice of Sustainable Construction Project Management)
  • Article
  • Open Access
4 Citations
4,052 Views
16 Pages

1 December 2023

Earthwork scheduling (during the planning phase of road construction) is an important task that directly affects the cost and time of a project. However, the current scheduling methods are not performed at a detailed level and carry forward gaps from...

(This article belongs to the Special Issue Advances in Civil Infrastructures Engineering)
  • Article
  • Open Access
8 Citations
6,851 Views
16 Pages

Timely and informed decision-making is essential for the successful execution of construction projects, where delays and cost overruns frequently pose significant risks. Earned value analysis (EVA) provides a robust, integrated framework that combine...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Article
  • Open Access
1,187 Views
30 Pages

12 February 2026

Across the United States, growing reinvestment needs, aging assets, and rising service expectations are placing increasing pressure on how water and wastewater projects are delivered. Traditional Design–Bid–Build (DBB) has been widely use...

(This article belongs to the Topic Construction Project Management and Infrastructure Sustainability)
  • Article
  • Open Access
11 Citations
5,574 Views
13 Pages

29 October 2019

Many construction projects suffer from schedule delays that ultimately lead to considerable cost overruns and defeat the purpose of low-cost housing (LCH), which is to support low-income earners. It is, therefore, vital that the schedule delays and c...

  • Article
  • Open Access
31 Citations
22,838 Views
14 Pages

19 March 2020

One of the key tasks of an investor and a contractor at the stage of planning and implementing construction works is to measure the progress of execution with regard to the planned deadlines and costs. During the execution of construction works, the...

(This article belongs to the Special Issue The Latest Scientific Problems Related to the Implementation and Diagnostics of Construction Objects)
  • Article
  • Open Access
2 Citations
2,408 Views
25 Pages

The construction of artificial islands is a complex engineering challenge requiring precise scheduling to optimize resource utilization, manage costs, ensure safety, and minimize environmental impacts in dynamic marine settings. In this paper, we pre...

(This article belongs to the Special Issue Advances in Recent Marine Engineering Technology)
  • Proceeding Paper
  • Open Access
455 Views
20 Pages

Fixed-bottom or floating offshore structures are the foundations, platforms, and associated infrastructure that allow for oil and gas production systems, offshore wind turbines, and cabling. The remote nature of these structures and the harsh environ...

(This article belongs to the Proceedings of The 1st International Online Conference on Designs)
  • Article
  • Open Access
1 Citations
1,611 Views
18 Pages

6 March 2026

Construction projects generate large volumes of schedule and cost data throughout their lifecycle, requiring systematic integration for effective performance control. Despite the increasing adoption of BIM and Earned Value Management System (EVMS), e...

(This article belongs to the Special Issue Applied Computer Methods in Building Engineering)
  • Article
  • Open Access
1,223 Views
14 Pages

17 July 2025

With the increasing demand for electricity in modern society, the scale of substation construction projects has greatly expanded, and the ever-increasing technical requirements have led to rising project costs year by year. Effective cost management...

  • Article
  • Open Access
20 Citations
7,913 Views
22 Pages

Multidimensional Construction Planning and Agile Organized Project Execution—The 5D-PROMPT Method

  • David Leicht,
  • Daniel Castro-Fresno,
  • Joaquìn Dìaz and
  • Christian Baier

6 August 2020

Although tremendous technological and strategic advances have been developed and implemented in the construction sector in recent years, there is substantial room for improvement in the areas of productivity growth, project performance, and schedule...

(This article belongs to the Special Issue Technology and Management for Sustainable Buildings and Infrastructures)
  • Article
  • Open Access
613 Views
41 Pages

4 August 2026

Construction schedule compression requires balancing project-duration reduction against direct, indirect, and risk-related cost increases under uncertain activity performance. Many construction time–cost trade-off models still rely on determini...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Article
  • Open Access
51 Citations
10,155 Views
18 Pages

Construction Planning and Scheduling of a Renovation Project Using BIM-Based Multi-Objective Genetic Algorithm

  • Pornpote Nusen,
  • Wanarut Boonyung,
  • Sunita Nusen,
  • Kriengsak Panuwatwanich and ,
  • Paskorn Champrasert and
  • Manop Kaewmoracharoen
  • + 1 author+ 0 author

21 May 2021

Renovation is known to be a complicated type of construction project and prone to errors compared to new constructions. The need to carry out renovation work while keeping normal business activities running, coupled with strict governmental building...

(This article belongs to the Section Civil Engineering)
  • Article
  • Open Access
6 Citations
6,304 Views
18 Pages

Does the Modular Construction Project Outperform the Traditional One? A Comparative Life Cycle Analysis Study in Hong Kong

  • Ying Wang,
  • Siu-Kei Lam,
  • Zezhou Wu,
  • Lulu Gong and ,
  • Heng Li and
  • Mingyang Jiang
  • + 1 author+ 0 author

8 August 2025

Hong Kong faces critical construction challenges, including workforce aging, land shortages, and near-capacity waste disposal. Modular Integrated Construction (MiC) offers a promising solution. As Hong Kong has just recently adopted the MiC, quantita...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Article
  • Open Access
642 Views
25 Pages

Research on the Evaluation of Prefabricated MEP Systems for Energy Stations Based on the AHP–Entropy–Fuzzy Model

  • Yuxuan Liu,
  • Fan Zhang,
  • Shuqiang Gui,
  • YungHao Loh and ,
  • Myzatul Aishah Kamarazaly and
  • Jiaji Zhang
  • + 1 author+ 0 author

23 June 2026

Prefabricated mechanical, electrical, and plumbing (MEP) systems have been increasingly adopted in energy station projects; however, systematic evaluation frameworks capable of integrating construction performance, cost constraints, and uncertain mul...

(This article belongs to the Special Issue Emerging Technologies, Tools, and Methods for Enabling Safer, Healthier, and More Productive Work Settings in Construction Project Management)
  • Article
  • Open Access
9 Citations
5,226 Views
16 Pages

15 December 2022

Automated container terminals have been constructed to reduce emissions and labor cost. Resource allocation problems in automated container terminals have a critical effect on handling efficiency and cost. This paper addresses this problem with quay...

(This article belongs to the Special Issue Sustainable, Resilient and Smart Mobility)
  • Article
  • Open Access
662 Views
20 Pages

Public building projects in the United States continue to face challenges related to cost escalation and schedule delays, prompting increased interest in alternative project delivery methods. Although Design–Bid–Build (DBB) remains the mo...

(This article belongs to the Special Issue Sustainability in Construction Project Management and Infrastructure)
  • Article
  • Open Access
505 Views
23 Pages

Optimization of Multi-Building Tower Crane Scheduling for Lean Prefabricated Construction

  • Chao Zou,
  • Jiwei Zhu,
  • Xingyu Quan,
  • Zhanfeng Wang and ,
  • Qirui Wang,
  • Zhenyu Mei and
  • Kui Zhou
  • + 2 authors+ 0 author

25 June 2026

Tower cranes (TCs) as essential lifting equipment in construction engineering, play a critical role in prefabricated buildings (PBs). However, current construction scheduling primarily relies on manual observation and operator experience to execute r...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Article
  • Open Access
896 Views
17 Pages

12 February 2026

Dynamic scheduling of public transit is crucial for enhancing comprehensive operational benefits such as service quality and operating costs. However, uncertain passenger demands and the uncontrolled block effects of signalized intersections can lead...

(This article belongs to the Section Actuators for Surface Vehicles)
  • Article
  • Open Access
15 Citations
4,710 Views
17 Pages

Research on Demand-Based Scheduling Scheme of Urban Low-Altitude Logistics UAVs

  • Honghai Zhang,
  • Shixin Wu,
  • Ouge Feng,
  • Tian Tian and ,
  • Yuting Huang and
  • Gang Zhong
  • + 1 author+ 0 author

25 April 2023

Aiming at the problem of the scheduling scheme of urban low-altitude logistics unmanned aerial vehicles (UAVs), this paper establishes a demand-based UAV scheduling scheme model using an improved simulated annealing algorithm, taking minimizing the c...

(This article belongs to the Special Issue Advances in Unmanned Aerial Vehicle (UAV) System)
  • Article
  • Open Access
1 Citations
765 Views
20 Pages

A BIM-Based Framework for Assessing Change Order Impacts on Time and Cost in Saudi Construction

  • Saeed Alaw,
  • Altayeb Qasem,
  • Sultan Suayqir,
  • Waleed Alabaidi and ,
  • Amer Alasaibia and
  • Abdulaziz Almohassen
  • + 1 author+ 0 author

26 June 2026

Change orders in construction projects frequently lead to disputes, schedule delays, and cost overruns, particularly in the rapidly expanding construction sector of Saudi Arabia. Traditional techniques for resolving claims like litigation and arbitra...

(This article belongs to the Special Issue Application of Building Information Modelling in Construction Management)
  • Article
  • Open Access
20 Citations
4,626 Views
22 Pages

Improving Project Estimates at Completion through Progress-Based Performance Factors

  • Filippo Maria Ottaviani,
  • Alberto De Marco,
  • Timur Narbaev and
  • Massimo Rebuglio

29 February 2024

From a managerial perspective, project success hinges on estimates at completion as they allow tailoring response actions to cost and schedule overruns. While the literature is moving towards sophisticated approaches, standard methodologies, such as...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Article
  • Open Access
242 Views
27 Pages

21 September 2026

Active distribution networks (ADNs) with high penetration of renewable energy face the difficulty of coordinating source-side generation, load-side response, and storage-side regulation. An improved-harmony search optimization (improved-HSO) based co...

(This article belongs to the Special Issue Symmetry with Power Systems: Control and Optimization)
  • Article
  • Open Access
10 Citations
3,572 Views
23 Pages

20 October 2024

As the value and importance of urban air mobility (UAM) are being recognized, there is growing attention towards UAM. To ensure that urban air traffic can serve passengers to the greatest extent while ensuring safety and generating revenue, there is...

(This article belongs to the Special Issue Future Airspace and Air Traffic Management Design)
  • Article
  • Open Access
2 Citations
2,074 Views
24 Pages

19 October 2025

Prefabricated building projects represent industrialized and intelligent construction through factory production, standardized design, and mechanized assembly. This study presents a multi-agent simulation approach to model the prefabricated construct...

(This article belongs to the Special Issue Advanced Research on Intelligent Building Construction and Management)
  • Article
  • Open Access
5 Citations
4,312 Views
18 Pages

30 December 2024

Public construction projects in Kingdom of Saudi Arabia (KSA), particularly in the Makkah region, are important for the infrastructure and economic growth of the country. However, these projects often face challenges from change orders (COs), which l...

(This article belongs to the Section Construction Management, and Computers & Digitization)
  • Article
  • Open Access
4 Citations
1,774 Views
9 Pages

Research on the Resource-Allocation-Optimization Strategy for Offshore Wind Power Construction Considering Complex Influencing Factors

  • Ning Wu,
  • Rongrong He,
  • Chunwei Jin,
  • Yuan Xu and ,
  • Guobing Pan and
  • Lianzhen Qi
  • + 1 author+ 0 author

28 November 2024

The construction process of offshore wind farms involves multiple complexities, which is very complex to be scheduled manually, and the coordinating and optimized scheduling not only decreases project construction costs but also increases the constru...

(This article belongs to the Section A3: Wind, Wave and Tidal Energy)
  • Article
  • Open Access
5 Citations
2,797 Views
22 Pages

Dynamic BIM-Driven Framework for Adaptive and Optimized Construction Projects Scheduling Under Uncertainty

  • Mohammad Esmaeil Gandomkar Armaki,
  • Ali Akbar Shirzadi Javid and
  • Shahrzad Omrani

24 August 2025

Conventional project scheduling techniques often rely on manual trial-and-error methods, which can lead to inaccurate evaluations. This study presents a dynamic scheduling framework to dynamically adjust scheduling decisions based on real-time produc...

(This article belongs to the Special Issue Data-Driven Project Planning and Control: Advancing Cost, Schedule, and Risk Management)
  • Article
  • Open Access
569 Views
32 Pages

Joint Port–Lock Scheduling Optimization Under the Direct Transshipment Mode Between Seagoing and River Vessels

  • Shuaiqi Wang,
  • Yong Zhang,
  • Jian Li,
  • Jiayi Shi and ,
  • Jiashan Yuan and
  • Ying Yang
  • + 1 author+ 0 author

22 July 2026

This study addresses the problems of vessel congestion and inefficient resource utilization caused by the independent scheduling of port berths and locks in river–sea intermodal transport. Moreover, this study explores the joint scheduling opti...

  • Article
  • Open Access
2 Citations
3,493 Views
15 Pages

2 December 2024

The efficiency and quality of the manufacturing industry are greatly influenced by production scheduling, which makes it a crucial aspect. A well-designed production scheduling scheme can significantly enhance manufacturing efficiency and reduce ente...

(This article belongs to the Section Mathematical Analysis)
  • Article
  • Open Access
23 Citations
6,072 Views
18 Pages

System Dynamics Modeling Strategy for Civil Construction Projects: The Concept of Successive Legislation Periods

  • Wang Jing,
  • Hafeth Ibrahem Naji,
  • Raquim Nihad Zehawi,
  • Zainab Hasan Ali and ,
  • Nadhir Al-Ansari and
  • Zaher Mundher Yaseen
  • + 1 author+ 0 author

16 May 2019

Cost and time performance are considered to be the most important aspects in the construction industry. The exceptional conditions that took place in Iraq since the beginning of the third millennia had a huge vicious impact on the cost and time perfo...

  • Article
  • Open Access
8 Citations
11,641 Views
19 Pages

17 March 2019

Korean oil and gas contractors have recently incurred significant losses due to improper engineering performance on EPC (engineering procurement and construction) projects in overseas markets. Several previous studies have verified the significant im...

  • Article
  • Open Access
4 Citations
2,930 Views
16 Pages

9 November 2020

Since the inherent intermittency and uncertainty of renewable energy resources complicates efficient Microgrid operations, a Demand Response (DR) scheme is implemented for customers in the grid to alter their power-usage patterns. However, for a real...

(This article belongs to the Section A1: Smart Grids and Microgrids)
  • Article
  • Open Access
18 Citations
5,330 Views
19 Pages

Automatic guided vehicles (AGVs) in the horizontal area play a crucial role in determining the operational efficiency of automated container terminals (ACTs). To improve the operational efficiency of an ACT, it is essential to decrease the impact of...

(This article belongs to the Special Issue Recent Advances in Intelligent Port Logistics)
  • Article
  • Open Access
3 Citations
3,455 Views
14 Pages

20 April 2023

There are many unpredictable circumstances during the implementation process of a water conservancy project, which often cause financial loss, increased construction costs and schedule delays. This paper investigates the influence factors for water c...

(This article belongs to the Section Sustainable Water Management)
  • Article
  • Open Access
3 Citations
3,342 Views
26 Pages

Green Building Information Modeling Framework for Sustainable Residential Development in Egypt

  • Mohamed Nabawy,
  • Ahmed Gouda Mohamed,
  • Israa Awad and
  • Ahmed Osama Daoud

24 March 2025

Rapid urbanization and environmental challenges necessitate innovative construction solutions in Egypt. This study presents a 6D Green Building Information Modeling (BIM) framework designed to enhance sustainability, reduce costs, and optimize constr...

(This article belongs to the Special Issue Building Information Modeling (BIM): Recent Application and Future Perspective)
  • Article
  • Open Access
9 Citations
6,065 Views
15 Pages

21 December 2022

The correct planning of investment costs and the effective monitoring of implementation process are significant problems in the management of investment projects. At the stage of construction works, it is worth determining the trend of the performed...

(This article belongs to the Special Issue Costs and Cost Analysis in Construction Project Management)
  • Article
  • Open Access
3 Citations
1,348 Views
23 Pages

A Two-Stage Sustainable Optimal Scheduling Strategy for Multi-Contract Collaborative Distributed Resource Aggregators

  • Lei Su,
  • Wanli Feng,
  • Cao Kan,
  • Mingjiang Wei and ,
  • Rui Su,
  • Pan Yu and
  • Ning Zhang
  • + 2 authors+ 0 author

25 July 2025

To address the challenges posed by the instability of renewable energy output and load fluctuations on grid operations and to support the low-carbon sustainable development of the energy system, this paper integrates artificial intelligence technolog...

(This article belongs to the Special Issue AI-Driven Low-Carbon Sustainable Energy Systems: System Design, Computational Strategies, and Emerging Innovations)
  • Article
  • Open Access
7 Citations
3,384 Views
16 Pages

9 January 2025

A well-planned schedule is essential to any organization’s growth. Thus, it is important for the literature to cover a more comprehensive range of scheduling problems. In this paper, energy-efficient hybrid flow shop (EEHFS) scheduling problems...

(This article belongs to the Section Process Control, Modeling and Optimization)
  • Article
  • Open Access
1,092 Views
28 Pages

5 February 2026

Construction management plays a fundamental role in the sustainability of construction projects, as its primary objective is to enhance cost-effectiveness and efficient resource utilization. One of the main challenges encountered at the early stages...

(This article belongs to the Special Issue Construction Management and Sustainable Development)
  • Article
  • Open Access
4 Citations
5,970 Views
23 Pages

19 September 2018

Under the background of the unbalanced supply and demand of medical diagnostic equipment and rising health care costs, this study aims to optimize the service scheduling for medical diagnostic equipment so as to improve patient satisfaction by ensuri...

(This article belongs to the Special Issue Challenges on the Asian Models and Values for the Sustainable Development)

of 6