- Article
Fast Cut Back Thermal Power Plant Load Rejection and Black Start Field Test Analysis
- Kaiwen Zeng,
- Jinyu Wen,
- Longpeng Ma,
- Shijie Cheng,
- En Lu and
- Ning Wang
Fast and reliable black start plays a key role in improving the ability of the power system to resist the risk of large-scale blackouts. For a black start with high voltage and long-distance transmission lines, it is much easier to cause phenomena s...