2,072 Results Found

  • Article
  • Open Access
3 Citations
3,637 Views
32 Pages

Dynamic Optimization of Tunnel Construction Scheduling in a Reverse Construction Scenario

  • Jianying Wei,
  • Yuming Liu,
  • Xiaochun Lu,
  • Rong Zhao and
  • Gan Wang

27 February 2025

Tunnel construction, a critical aspect of railway engineering, is a repetitive process with distinct linear characteristics. While the Linear Scheduling Method (LSM) is widely used for scheduling optimization in linear projects, it struggles to accom...

(This article belongs to the Special Issue Optimization-Based Decision-Making Models in Rail Systems Engineering)
  • Article
  • Open Access
1 Citations
1,479 Views
19 Pages

Causal Reasoning in Construction Process Scheduling

  • Magdalena Rogalska,
  • Zdzisław Hejducki and
  • Paulina Kostrzewa-Demczuk

24 December 2025

This paper introduces an advanced framework for modeling and scheduling construction processes using causal inference techniques, with particular emphasis on capturing complex technological and organizational interdependencies. By integrating causal...

  • Article
  • Open Access
24 Citations
8,935 Views
19 Pages

Resilient Scheduling as a Response to Uncertainty in Construction Projects

  • Martina Milat,
  • Snježana Knezić and
  • Jelena Sedlar

14 July 2021

Complex construction projects are developed in a dynamic environment, where uncertainty conditions have a great potential to affect project deliverables. In an attempt to efficiently deal with the negative impacts of uncertainty, resilient baseline s...

(This article belongs to the Special Issue Technology and Management Applied in Construction Engineering Projects)
  • Article
  • Open Access
68 Citations
9,976 Views
21 Pages

15 June 2021

Prefabricated buildings are the direction of the future development of the construction industry and have received widespread attention. The effective execution of prefabricated construction project scheduling should consider resource constraints and...

(This article belongs to the Special Issue Digital Engineering for a Sustainable Built Environment)
  • Article
  • Open Access
10 Citations
5,490 Views
18 Pages

15 February 2022

During the execution of construction projects, uncertain events, such as delays, prolongations and disruptions of project activities, have the potential to cause a significant deviation between the planned and realized state of a project. As a result...

  • Article
  • Open Access
12 Citations
3,726 Views
31 Pages

Linear Project-Scheduling Optimization Considering a Reverse Construction Scenario

  • Ze Yu,
  • Chuxin Wang,
  • Yuanyuan Zhao,
  • Zhiyuan Hu and
  • Yuanjie Tang

18 August 2023

The linear scheduling method (LSM) for optimization in linear projects has been the focus of numerous academic studies over the years. However, research on incorporating reverse construction activities and other practical scenarios, such as flexible...

(This article belongs to the Special Issue Railway Infrastructures Engineering: Latest Advances and Prospects)
  • Article
  • Open Access
43 Citations
17,264 Views
18 Pages

Generation of Construction Scheduling through Machine Learning and BIM: A Blueprint

  • Mazen A. Al-Sinan,
  • Abdulaziz A. Bubshait and
  • Zainab Aljaroudi

Recent advancements in machine learning (ML) applications have set the stage for the development of autonomous construction project scheduling systems. This study presents a blueprint to demonstrate how construction project schedules can be generated...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
216 Citations
25,145 Views
16 Pages

Investigating the Use of ChatGPT for the Scheduling of Construction Projects

  • Samuel A. Prieto,
  • Eyob T. Mengiste and
  • Borja García de Soto

Generative Pre-Trained Transformer (GPT) language models such as ChatGPT have the potential to revolutionize the construction industry by automating repetitive and time-consuming tasks. This paper presents a study in which ChatGPT was used to generat...

(This article belongs to the Topic Digital Innovation for Realizing the Goals of Construction 5.0)
  • Article
  • Open Access
61 Citations
13,987 Views
18 Pages

22 April 2020

Construction scheduling, in practice, commonly relies on the usage of commercial project management tools (PMT) without specific optimization features. To obtain optimal schedules, planners often need to develop separate optimization models with spec...

(This article belongs to the Special Issue Sustainability Issues in Civil Engineering and Management)
  • Article
  • Open Access
34 Citations
6,722 Views
18 Pages

23 April 2023

The emergence of immersive technologies, such as virtual reality (VR) headsets, has revolutionized the way we experience the physical world by creating a virtual, interactive environment. In the field of education, this technology has immense potenti...

(This article belongs to the Special Issue Selected Papers from the 45th Australasian Universities Building Education Association (AUBEA 2022))
  • Article
  • Open Access
3 Citations
2,176 Views
12 Pages

27 November 2024

This study proposes a robust precast concrete (PC) production scheduling model for PC construction projects with schedule uncertainty by adopting a proactive scheduling approach. The proposed model consists of a PC production simulation module that s...

  • Review
  • Open Access
11 Citations
5,919 Views
17 Pages

23 March 2022

This article reviews the accomplishments of studies in which optimization tools were used to develop energy-efficient and sustainable construction schedules. With the increase in global awareness of environmental issues, the construction industry has...

(This article belongs to the Topic Sustainable Built Environment)
  • Article
  • Open Access
5 Citations
2,678 Views
19 Pages

Eco-Friendly Scheduling Model for Construction Projects Utilizing Genetic Algorithms

  • Islam Elmasoudi,
  • Emad Elbeltagi,
  • Wael Alattyih and
  • Hossam Wefki

19 December 2024

An assessment of construction activities related to pollution needs to be conducted during the planning of a given project. Such an assessment is essential to ensure that the resulting pollution does not surpass the environmental threshold limits. Th...

  • Article
  • Open Access
2 Citations
2,445 Views
25 Pages

The construction of artificial islands is a complex engineering challenge requiring precise scheduling to optimize resource utilization, manage costs, ensure safety, and minimize environmental impacts in dynamic marine settings. In this paper, we pre...

(This article belongs to the Special Issue Advances in Recent Marine Engineering Technology)
  • Article
  • Open Access
5 Citations
4,131 Views
16 Pages

1 December 2023

Earthwork scheduling (during the planning phase of road construction) is an important task that directly affects the cost and time of a project. However, the current scheduling methods are not performed at a detailed level and carry forward gaps from...

(This article belongs to the Special Issue Advances in Civil Infrastructures Engineering)
  • Review
  • Open Access
10 Citations
6,599 Views
27 Pages

This study presents a comprehensive review of risk assessment and scheduling techniques in highway construction, addressing the complex interplay between uncertainty, project planning, and decision-making. The research critically reviews key risk ass...

  • Article
  • Open Access
1 Citations
1,502 Views
16 Pages

Nonlinear Multifactor Safety Index (NMF-SI) for Construction Scheduling: Definition and Hybrid Optimization

  • David Arruga,
  • Miguel Ángel Castán-Lascorz,
  • Fabiola Tovar-Lasheras and
  • Jorge Arroyo

2 November 2025

Construction sites present intrinsically hazardous conditions characterized by dynamic and complex operational environments which persistently contribute to elevated rates of occupational injuries. While conventional safety management emphasizes cont...

(This article belongs to the Special Issue AI in Construction: Automation, Optimization, and Safety)
  • Technical Note
  • Open Access
2 Citations
6,057 Views
17 Pages

7 October 2023

Construction activities in healthcare settings potentially expose building occupants to life-threatening waterborne pathogens, including Legionella. The lack of a building water quality commissioning (BWQC) process has been identified as a substantia...

(This article belongs to the Special Issue Advances in Project Management in Construction)
  • Article
  • Open Access
3 Citations
2,047 Views
29 Pages

7 November 2024

Artificial island construction is a multifaceted engineering endeavor that demands precise scheduling to optimize resource allocation, control costs, ensure safety, and minimize environmental impact within dynamic marine environments. This study intr...

(This article belongs to the Special Issue Advances in Recent Marine Engineering Technology)
  • Article
  • Open Access
30 Citations
3,234 Views
21 Pages

25 September 2022

The agile earth observation satellite scheduling problem (AEOSSP), as a time-dependent and arduous combinatorial optimization problem, has been intensively studied in the past decades. Many studies have proposed non-iterative heuristic construction a...

  • Article
  • Open Access
2 Citations
946 Views
26 Pages

17 January 2026

The rapidly evolving business landscape, driven by stringent energy conservation policies, compels construction firms to adopt energy-efficient project-centric structures, particularly in modern construction projects. These firms face a complex, mult...

(This article belongs to the Special Issue Advanced Research on Intelligent Building Construction and Management)
  • Article
  • Open Access
21 Citations
9,816 Views
24 Pages

Trading off Time–Cost–Quality in Construction Project Scheduling Problems with Fuzzy SWARA–TOPSIS Approach

  • Sayyid Ali Banihashemi,
  • Mohammad Khalilzadeh,
  • Jurgita Antucheviciene and
  • Jonas Šaparauskas

31 August 2021

The increasing number of construction projects together with the limited resources of organizations led to tough competition for achieving project goals. Time, cost, and quality have been known as the project iron triangle. Project managers attempt t...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
472 Views
39 Pages

25 September 2026

Construction robots for repetitive trades have moved beyond demonstration, yet fleet size and task assignment are still decided by rule of thumb. This study formulates the human–robot collaborative resource-constrained project scheduling proble...

(This article belongs to the Section Civil Engineering)
  • Article
  • Open Access
485 Views
30 Pages

Sustainable Integrated Project Control for Prefabricated Construction: A Synchronization-Loss Metric Linking Multi-Stage Scheduling, Cost, and Delivery Risk

  • Jinghua Tang,
  • Wensheng Liang,
  • Chinara Adamkulova,
  • Xindong Chang and ,
  • Hanwen Cui and
  • Hao Fu
  • + 1 author+ 0 author

17 August 2026

Prefabricated construction couples factory production, buffer storage, transportation, on-site installation, and workforce resources. Desynchronization across these stages creates waiting, idle labor, standby, and buffer pressure—non-value-addi...

(This article belongs to the Section B. Building Materials, and Repair & Renovation)
  • Article
  • Open Access
8 Citations
6,970 Views
22 Pages

7 February 2022

Given the growing number of development projects, proper project planning and management are crucial. The purpose of this paper is to introduce a heuristic algorithm for scheduling a power plant project construction and project resource management to...

  • Article
  • Open Access
111 Views
41 Pages

4 November 2026

Urban construction sites require timely delivery of lightweight tools, sensors, components, and maintenance parts. We study a three-objective scheduling model that balances fleet mission duration, interval energy consumption, and soft receiving-windo...

(This article belongs to the Section B. Building Materials, and Repair & Renovation)
  • Article
  • Open Access
1 Citations
698 Views
38 Pages

Knowledge-Driven Interval Multi-Objective Scheduling for Green Construction Under Time-Varying Carbon Emission Factors

  • Yajuan Deng,
  • Zhang Feng,
  • Weilun Tao,
  • Qian Meng and ,
  • Chongying Ling and
  • Hanwen Cui
  • + 1 author+ 0 author

Reducing carbon emissions during construction is essential for meeting dual carbon targets. Current green scheduling methods assume fixed emission factors, overlooking time-dependent variations driven by grid peak-valley patterns. Under interval dura...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
8 Citations
4,450 Views
22 Pages

8 January 2021

In the literature on the scheduling of construction projects it is difficult to find a justification for adopting the criteria for evaluating work schedules based explicitly on the preferences of those who develop them. This article tries to fill thi...

(This article belongs to the Special Issue Technology, Organisation and Management in Sustainable Construction)
  • Article
  • Open Access
193 Views
41 Pages

13 November 2026

Resource-efficient construction planning requires coordination of schedules, material replenishment, limited storage and crew deployment. This study develops CoSPACE, a four-layer chromosome and seven-stage engineering decoder that jointly evaluates...

  • Article
  • Open Access
28 Citations
7,093 Views
23 Pages

13 July 2021

Construction project schedule delay is a worldwide concern and especially severe in the Ethiopian construction industry. This study developed a Construction Schedule Risk Assessment Model (CSRAM) and a management strategy for foreign general contract...

  • Article
  • Open Access
6 Citations
3,076 Views
19 Pages

23 May 2022

The construction of urban rail transit (URT) guides and promotes urban development. Different URT line construction schedule, including construction sequence (priority order of line construction) and construction timing (when to build), will have dif...

  • Article
  • Open Access
10 Citations
8,231 Views
18 Pages

11 December 2021

The development of road infrastructure is closely related to national competitiveness and presents significant socioeconomic impacts. However, road construction involves a large budget and is vulnerable to political, economic, social, and project-spe...

(This article belongs to the Special Issue Sustainability and Industry 4.0 in Civil and Infrastructure Engineering)
  • Article
  • Open Access
7 Citations
3,491 Views
17 Pages

Optimization of Tunnel Construction Schedule Considering Soft Logic

  • Jianying Wei,
  • Yuming Liu,
  • Xiaochun Lu,
  • Yu Feng and
  • Yadi Wang

19 March 2024

Tunnel construction projects are a classic type of repetitive project, and hold a crucial position in the construction industry. The linear scheduling method (LSM) has been in the spotlight in scheduling optimization for repetitive construction proje...

(This article belongs to the Special Issue Advances in Tunnel and Underground Construction)
  • Article
  • Open Access
13 Citations
7,389 Views
25 Pages

16 October 2019

Construction projects have faced serious schedule delays caused by rework risks. However, it appears that traditional methods are of limited value in developing applicable project schedules. This study presents an analysis on construction projects sc...

(This article belongs to the Special Issue Scheduling Problems in Sustainability)
  • Article
  • Open Access
13 Citations
5,774 Views
18 Pages

12 October 2024

To enhance the application of building information modeling (BIM) in schedule management for engineering projects, improve spatial planning capabilities, and minimize subjective factors in schedule preparation, this paper presents a framework and met...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
617 Views
34 Pages

11 September 2026

Construction progress monitoring is essential for controlling schedule deviations and supporting efficient resource management. Conventional field inspections remain indispensable in construction management; however, BIM-integrated Augmented Reality...

  • Article
  • Open Access
12 Citations
3,155 Views
14 Pages

12 November 2020

Both the construction clients and the contractors want their projects delivered on time. Construction schedules, usually tight from the beginning, tend to expire as the progress of works is disturbed by materializing risks. As consequence, the projec...

(This article belongs to the Special Issue The Latest Scientific Problems Related to the Implementation and Diagnostics of Construction Objects)
  • Article
  • Open Access
539 Views
24 Pages

Simulation Modeling and Schedule Optimization for Arch Dam Construction in High-Altitude Regions with Severe Temperature Variations

  • Chunju Zhao,
  • Zhiyu Liu,
  • Fang Wang,
  • Yihong Zhou and ,
  • Jun He,
  • Huawei Zhou,
  • Zhipeng Liang and
  • Lei Lei
  • + 3 authors+ 0 author

28 May 2026

In the construction of conventional concrete high arch dams in high-altitude regions with large temperature variations, the prolonged and cold winters often force the suspension of concrete pouring, severely constraining the overall schedule. To addr...

(This article belongs to the Special Issue Advances and Challenges in Rock Mechanics and Rock Engineering, 2nd Edition)
  • Article
  • Open Access
22 Citations
3,573 Views
17 Pages

Optimization of Construction Duration and Schedule Robustness Based on Hybrid Grey Wolf Optimizer with Sine Cosine Algorithm

  • Mengqi Zhao,
  • Xiaoling Wang,
  • Jia Yu,
  • Lei Bi and ,
  • Yao Xiao and
  • Jun Zhang
  • + 1 author+ 0 author

2 January 2020

Construction duration and schedule robustness are of great importance to ensure efficient construction. However, the current literature has neglected the importance of schedule robustness. Relatively little attention has been paid to schedule robustn...

(This article belongs to the Section G: Energy and Buildings)
  • Article
  • Open Access
6 Citations
5,976 Views
20 Pages

3 July 2025

Some construction projects in Indonesia have been experiencing frequent major delays, and there is an urgent need to perform a comprehensive schedule forecast to anticipate them. This study aims to enhance the forecast of the project-completion sched...

(This article belongs to the Section Civil Engineering)
  • Article
  • Open Access
8 Citations
5,425 Views
20 Pages

9 September 2022

The Korean government implemented a 52-h workweek policy for employees’ welfare. Consequently, companies face workforce availability reduction with the same number of employees. That is, labor-dependent companies suffer from workforce shortage. To ha...

(This article belongs to the Special Issue Scheduling: Algorithms and Applications)
  • Article
  • Open Access
4 Citations
3,693 Views
27 Pages

Multi-project staff scheduling optimization is a critical challenge in engineering management. However, traditional methods often overlook employee welfare, resulting in scheduling solutions that lack a people-centered approach. This study develops a...

(This article belongs to the Topic Building a Sustainable Construction Workforce, 2nd Edition)
  • Article
  • Open Access
198 Views
14 Pages

18 November 2026

Prefabricated construction relies on tightly coupled component production, transportation, and on-site installation. Local disruptions may affect project schedules via exposure, infection, recovery, and renewed susceptibility, yet the underlying dyna...

(This article belongs to the Special Issue Advances in Modular and Prefabricated Concrete Construction)
  • Article
  • Open Access
3 Citations
2,418 Views
50 Pages

16 October 2025

The construction of nuclear power plants (NPPs) involves complex and long-duration projects where schedule delays critically affect project performance. To overcome this challenge, Advanced Work Packaging (AWP) has emerged as a promising alternative...

(This article belongs to the Special Issue Advanced Technologies in Construction and Infrastructure: Theory, Methods and Applications—2nd Edition)
  • Article
  • Open Access
724 Views
41 Pages

4 August 2026

Construction schedule compression requires balancing project-duration reduction against direct, indirect, and risk-related cost increases under uncertain activity performance. Many construction time–cost trade-off models still rely on determini...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
3 Citations
2,477 Views
19 Pages

1 October 2024

For building projects, the manager is responsible for coordinating the work of subcontractors at the construction site. This includes operations, material flows, and storage. In summary, one of their main roles is to ensure smooth team rotation, main...

(This article belongs to the Special Issue Construction Scheduling, Quality and Risk Management)
  • Article
  • Open Access
4 Citations
3,396 Views
27 Pages

20 July 2021

Dynamic lotsizing and scheduling on multiple lines to meet the customer due dates is significant in multi-line production environments. Therefore, this study investigates dynamic lotsizing and scheduling problems in multiple flexible machining lines...

  • Article
  • Open Access
11 Citations
3,561 Views
10 Pages

20 January 2022

Shinagawa and Iwata are considered quantum security for the sum of Even–Mansour (SoEM) construction and provided quantum key recovery attacks by Simon’s algorithm and Grover’s algorithm. Furthermore, quantum key recovery attacks are...

(This article belongs to the Topic Quantum Information and Quantum Computing)
  • Article
  • Open Access
15 Citations
7,466 Views
31 Pages

Construction projects are complexity, multidisciplinary, have thousands of activities and details, and involve many participants. This intricate and fragmented nature of construction projects coupled with tight budgets and limited resources makes the...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
19 Citations
8,518 Views
26 Pages

3 January 2023

Construction projects play a vital role in shaping the built environment and have a significant impact on the natural environment and economies around the world. The decisions made during the planning and execution stages of a project can have long-l...

(This article belongs to the Special Issue Sustainable Building Design, Technological Innovation and Green Project Management)