Skip to Content

47 Results Found

  • Article
  • Open Access
1 Citations
580 Views
35 Pages

Multi-Agent Deep Reinforcement Learning for Dynamic Cost Overrun Mitigation in Smart Grid Construction Projects

  • Yongjie Li,
  • Xin Niu,
  • Peng Li,
  • Hua Liu and ,
  • Ruoxi Dong,
  • Nan Li and
  • Zhongfu Tan
  • + 2 authors+ 0 author

2 July 2026

This study develops a cooperative multi-agent deep reinforcement learning (MARL) framework for simulation-based cost-overrun mitigation in smart grid construction projects under dynamic engineering uncertainty. Modern smart grid construction involves...

(This article belongs to the Topic Toward Smart and Sustainable Energy Systems Enabled by Artificial Intelligence, Optimization, and Resilience)
  • Article
  • Open Access
36 Citations
14,700 Views
26 Pages

9 February 2024

The formidable need for building projects places greater pressure on stakeholders to deliver these projects on time, within the budget, and with high quality. However, many building projects have experienced extensive cost overruns despite extensive...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
22 Citations
19,323 Views
16 Pages

Analysis of Causes of Delays and Cost Overruns as Well as Mitigation Measures to Improve Profitability and Sustainability in Turnkey Industrial Projects

  • Antonio Héctor Álvarez-Pozo,
  • Miguel Ignacio Parma-García,
  • Isabel Ortiz-Marcos,
  • Luis Fernando Bautista and
  • Evangelina Atanes-Sánchez

8 February 2024

Delays and cost overruns in turnkey projects can lead to significant economic losses, disputes and even project abandonment. These facts negatively impact the environmental, social and governance (ESG) policies of companies involved in the project. I...

(This article belongs to the Special Issue Using Project Management as a Way to Sustainability)
  • Article
  • Open Access
23 Citations
9,559 Views
22 Pages

29 December 2023

The persistent decline in infrastructure spending, notably within the transportation sector, raises concerns about governments’ capacity to meet the demands of a sustainable growing economy. The incorporation of risk assessment in the analysis...

  • Feature Paper
  • Review
  • Open Access
83 Citations
28,858 Views
28 Pages

BIM and Digital Tools for State-of-the-Art Construction Cost Management

  • Samad M. E. Sepasgozar,
  • Aaron M. Costin,
  • Reyhaneh Karimi,
  • Sara Shirowzhan and ,
  • Ezatollah Abbasian and
  • Jinyun Li
  • + 1 author+ 0 author

Cost overrun has remained a key risk of construction projects that can be prevented by utilizing new technologies. This paper aims to identify the gap in the literature, which can potentially be addressed by using digital tools and technologies, by r...

(This article belongs to the Collection Construction Management – Future Innovations, Methods, Techniques and Technologies)
  • Article
  • Open Access
3 Citations
2,307 Views
21 Pages

14 February 2026

Avoiding highway infrastructure construction cost overruns and reducing associated claims and disputes continues to be a challenge in many countries. Research is needed in identifying notable project planning and management deficiencies that are like...

(This article belongs to the Section Urban, Economy, Management and Transportation Engineering)
  • Article
  • Open Access
15 Citations
4,761 Views
14 Pages

3 March 2023

One common problem in the construction industry is project cost overrun. Cost overrun can have significant impacts on financial profitability, project completion, project quality, and stakeholder satisfaction. The average percentage of construction p...

(This article belongs to the Section Economic and Business Aspects of Sustainability)
  • Article
  • Open Access
5 Citations
4,532 Views
18 Pages

30 December 2024

Public construction projects in Kingdom of Saudi Arabia (KSA), particularly in the Makkah region, are important for the infrastructure and economic growth of the country. However, these projects often face challenges from change orders (COs), which l...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
1 Citations
4,608 Views
14 Pages

3 March 2025

The coexistence of the winner’s curse and cost overruns in the construction industry implies a cost pendulum in which the winning bid is undervalued, whereas the final payment to the contractor is overvalued. We posit that this results from a s...

(This article belongs to the Section Applied Game Theory)
  • Review
  • Open Access
92 Citations
20,744 Views
25 Pages

Cost Overrun Causative Factors in Road Infrastructure Projects: A Frequency and Importance Analysis

  • Rodrigo F. Herrera,
  • Omar Sánchez,
  • Karen Castañeda and
  • Hernán Porras

9 August 2020

Road infrastructure projects are essential for a country’s economic and social development. Due to the magnitude, the projects are associated with considerable economic investments that in the case of failure can seriously affect regions’...

(This article belongs to the Section Civil Engineering)
  • Article
  • Open Access
20 Citations
18,148 Views
19 Pages

28 February 2025

Cost overruns are prevalent in global construction industries, propelled by the swift expansion of the construction sector. To tackle this difficulty, it is essential to comprehend the primary elements leading to these overruns. This research examine...

(This article belongs to the Section Sustainable Engineering and Science)
  • Article
  • Open Access
11 Citations
7,237 Views
18 Pages

Building Information Modeling Impact on Cost Overrun Risk Factors and Interrelationships

  • Aljawharah A. Alnaser,
  • Khalid S. Al-Gahtani and
  • Naif M. Alsanabani

19 November 2024

Building Information Modeling (BIM) has arisen as a promising technology that can enhance construction project outcomes through cost reduction when compared to conventional practices. More studies need to be conducted to examine the influence of BIM...

(This article belongs to the Special Issue Advances in BIM-Based Architecture and Civil Infrastructure Systems)
  • Article
  • Open Access
11 Citations
3,634 Views
23 Pages

23 September 2024

In large-scale projects, such as transport infrastructures, the cost-planning phase stands out as one of the most crucial for the project’s success. Cost and time overruns, during the construction phase, are often the cause of project failure....

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
6 Citations
7,855 Views
24 Pages

31 January 2025

The current research investigates cost overrun factors in structural projects, focusing on the Middle East and North Africa (MENA) region using Egypt as a model. A systematic literature review was conducted, analyzing 405 research papers published be...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
5 Citations
3,315 Views
23 Pages

14 April 2023

Building Information Modelling (BIM) has become a widely used concept in high-rise buildings in the United Arab Emirates (UAE). However, the risks associated with the design phase of multi-story high-rise building projects have, to date, not been add...

(This article belongs to the Special Issue Sustainable Development of Pavement Materials, Design, and Road Construction Technologies)
  • Article
  • Open Access
3,029 Views
33 Pages

This study aims to explore the transformative potential of Artificial Intelligence (AI) in enhancing cost planning and control within Qatar’s construction industry. By examining both opportunities and challenges associated with the adoption of...

  • Article
  • Open Access
16 Citations
2,244 Views
22 Pages

13 September 2024

Road infrastructure plays a crucial role in the development of countries, significantly influencing economic growth, social progress, and environmental sustainability. Major infrastructure projects are frequently challenged by substantial risks and u...

  • Article
  • Open Access
5 Citations
5,187 Views
37 Pages

A Demand Forecasting Strategy Based on a Retrofit Architecture for Remote Monitoring of Legacy Building Circuits

  • Rubens A. Fernandes,
  • Raimundo C. S. Gomes,
  • Carlos T. Costa,
  • Celso Carvalho and ,
  • Neilson L. Vilaça,
  • Lennon B. F. Nascimento,
  • Fabricio R. Seppe,
  • Israel G. Torné and
  • Heitor L. N. da Silva
  • + 4 authors+ 0 author

18 July 2023

Energy demand forecasting is crucial for planning and optimizing the use of energy resources in building facilities. However, integrating digital solutions and learning techniques into legacy buildings presents significant challenges due to limited o...

(This article belongs to the Collection Sustainable Buildings and Energy Performance)
  • Article
  • Open Access
20 Citations
6,918 Views
21 Pages

27 February 2019

The main subject of this research is to develop a forecast and mitigation model of schedule and cost performance during a detailed engineering stage of offshore engineering, procurement and construction (EPC) projects. The weight factors of major ele...

(This article belongs to the Collection Advanced Methodologies for Sustainability Assessment: Theory and Practice)
  • Article
  • Open Access
19 Citations
7,310 Views
18 Pages

16 June 2019

This paper focuses on the influence of detailed engineering maturities on offshore engineering, procurement, and construction (EPC) project procurement and construction cost performance. The authors propose a detailed engineering completion rating in...

(This article belongs to the Special Issue Applications of Engineering Digitalization and Construction IT for Energy Projects)
  • Article
  • Open Access
11 Citations
9,120 Views
20 Pages

25 October 2024

Cost overruns represent a continuous challenge within the construction industry, frequently affecting the success of projects. This study explores the factors influencing cost during the construction phase in Saudi Arabia, utilizing data from a surve...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
3 Citations
3,098 Views
17 Pages

Peru faces critical challenges in the development and maintenance of its national road infrastructure, comprising over 32,000 km, of which only 26% are classified as being in good condition. This infrastructural deficit significantly elevates logisti...

(This article belongs to the Special Issue Machine Learning for Sustainable Planning and Modelling in Future Smart Transportation System)
  • Article
  • Open Access
11 Citations
3,561 Views
20 Pages

Vulnerability Analysis to Maximize the Resilience of Power Systems Considering Demand Response and Distributed Generation

  • Darin Jairo Mosquera Palacios,
  • Edwin Rivas Trujillo and
  • Jesús María López-Lezama

Electric power systems are subject to failures, due to both deliberate and fortuitous events. This paper addresses the first case in which a disruptive agent aims at maximizing the damage to the network (expressed through the total cost of operation)...

(This article belongs to the Special Issue Power System Simulation with Renewable Power: Protection, Optimization and Control)
  • Systematic Review
  • Open Access
5 Citations
5,628 Views
36 Pages

This study presents a systematic literature review of critical risk factors affecting the time and cost performance of highway construction projects. Drawing from 83 peer-reviewed studies across multiple geographic regions, the paper identifies recur...

  • Article
  • Open Access
1 Citations
1,376 Views
15 Pages

Making Informed Choices: AHP and SAW for Optimal Formwork System Selection

  • Ivan Marović,
  • Martina Šopić,
  • Matija Jurčević and
  • Rebeka Radojčić

8 October 2025

The selection of an appropriate formwork system represents a critical decision in the planning of reinforced concrete multi-story buildings. While this decision has traditionally been deferred to the construction phase, increasing evidence of time an...

(This article belongs to the Special Issue New Applications in Multiple Criteria Decision Analysis, 3rd Edition)
  • Article
  • Open Access
23 Citations
12,143 Views
25 Pages

Potential Application of BIM in RFI in Building Projects

  • Francisca Morales,
  • Rodrigo F. Herrera,
  • Felipe Muñoz-La Rivera,
  • Edison Atencio and
  • Manuel Nuñez

29 January 2022

Requests for information (RFIs) are frequently used by the architecture, engineering, construction, and operation (AECO) industry to resolve doubts and inaccuracies and to request complimentary information. However, they can be inefficient due to the...

(This article belongs to the Collection Construction Management – Future Innovations, Methods, Techniques and Technologies)
  • Article
  • Open Access
62 Citations
17,522 Views
19 Pages

Delay and cost overrun in construction projects are two widespread problems that arouse practitioners’ and scholars’ concern. Therefore, the objective of this study was to identify Key Performance Indicators (KPIs) in each of Engineering,...

  • Article
  • Open Access
6 Citations
7,225 Views
20 Pages

2 June 2022

Time is money, and it is crucial to accelerate road construction to improve the accessibility and connectivity of infrastructure. Prolonged periods of project implementation lead to delays and cost overruns, and further delays could destabilize the c...

  • Article
  • Open Access
2 Citations
1,237 Views
17 Pages

Cluster Voltage Control of Active Distribution Networks Considering Power Deficit and Resource Allocation

  • Xinglin Wan,
  • Peipei Meng,
  • Dongguo Zhou,
  • Jinrui Tang and ,
  • Jianqiang Xiong and
  • Yongle Zou
  • + 1 author+ 0 author

Aiming at the problems of frequent voltage overruns in distribution networks and difficulties in centralized optimal dispatch due to the uncertainties of distributed renewable energy sources and bus loads, this paper proposes a dynamic cluster voltag...

  • Article
  • Open Access
9 Citations
6,990 Views
28 Pages

The construction sector of the Kingdom of Saudi Arabia (KSA), valued at USD 152 billion and employing 2.54 million people by 2023, is crucial to its economy. However, it faces challenges such as delays, disputes, and cost overruns. This study aims to...

(This article belongs to the Special Issue BIM Application in Construction Management)
  • Article
  • Open Access
9 Citations
13,076 Views
36 Pages

26 June 2025

This study critically examines the rapid proliferation of megaprojects across the Arab region, with a focus on the Gulf Cooperation Council (GCC) countries, where large-scale developments are strategically deployed to reshape global economic influenc...

  • Article
  • Open Access
15 Citations
6,381 Views
31 Pages

4 February 2024

The construction industry in the Kingdom of Saudi Arabia (KSA) is a significant sector in the Middle East, with annual expenditures exceeding USD 120 billion. It employs 15% of the workforce and consumes more than 14% of the country’s energy re...

(This article belongs to the Special Issue BIM Application in Construction Management)
  • Article
  • Open Access
10 Citations
5,082 Views
26 Pages

BIM Uses for Mitigating Deficiencies in Road Scheduling Planning

  • Karen Castañeda,
  • Omar Sánchez,
  • Carlos A. Peña,
  • Rodrigo F. Herrera and
  • Guillermo Mejía

19 March 2025

Efficient scheduling is essential for successful and sustainable road construction projects. However, conventional planning approaches often lack adaptability, visualization, and integration with modern technologies, leading to schedule deficiencies...

(This article belongs to the Special Issue Transportation and Infrastructure for Sustainability)
  • Article
  • Open Access
19 Citations
4,754 Views
15 Pages

Dynamic Progress Monitoring of Masonry Construction through Mobile SLAM Mapping and As-Built Modeling

  • Mohammad Hashim Ibrahimkhil,
  • Xuesong Shen,
  • Khalegh Barati and
  • Cynthia Changxin Wang

Traditional progress monitoring can be inaccurate and time-consuming, potentially causing time delay and cost overrun in construction projects. With development in technology, tools such as cameras, laser scanners, and building information modelling...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Feature Paper
  • Review
  • Open Access
93 Citations
10,020 Views
31 Pages

20 April 2020

Near real-time tracking of construction operations and timely progress reporting are essential for effective management of construction projects. This does not only mitigate potential negative impact of schedule delays and cost overruns but also help...

(This article belongs to the Special Issue Recent Advances in Indoor Localization Systems and Technologies)
  • Article
  • Open Access
1 Citations
11,770 Views
34 Pages

A Strategic AHP-Based Framework for Mitigating Delays in Road Construction Projects in the Philippines

  • Jolina Marie O. Pedron,
  • Divina R. Gonzales,
  • Dante L. Silva,
  • Bernard S. Villaverde and ,
  • Edgar M. Adina,
  • Jerome G. Gacu and
  • Cris Edward F. Monjardin
  • + 2 authors+ 0 author

Delays in road construction projects pose significant challenges in the Philippines, resulting in increased costs, project overruns, and unmet infrastructure goals. Common causes include poor financial management, inadequate subcontractor performance...

  • Article
  • Open Access
26 Citations
9,606 Views
32 Pages

21 August 2019

The profitability of most construction projects critically depends on construction productivity, which can lead to project cost overruns and schedule delays if not fully addressed. Although a literature review provides numerous worldwide examples of...

  • Article
  • Open Access
12 Citations
6,117 Views
25 Pages

Minimizing Liability of the COVID-19 Pandemic on Construction Contracts—A Structural Equation Model for Risk Mitigation of Force Majeure Impacts

  • Aaron Anil Chadee,
  • Sihara Gallage,
  • Hector Hugh Martin,
  • Upaka Rathnayake and ,
  • Indrajit Ray,
  • Bimlesh Kumar and
  • Parveen Sihag
  • + 2 authors+ 0 author

28 December 2022

A pandemic is a force majeure event, and contracting parties can invoke conditions under force majeure to minimize liability for unforeseen, uncontrollable, and unavoidable circumstances. This study develops a conceptual model to assist in the manage...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
3 Citations
4,780 Views
29 Pages

10 April 2025

Construction projects in Saudi Arabia are frequently plagued by cost overruns and time delays, with change orders being a major contributing factor. These modifications, which can occur at various stages throughout the project lifecycle, tend to nega...

(This article belongs to the Special Issue Data-Driven Project Planning and Control: Advancing Cost, Schedule, and Risk Management)
  • Article
  • Open Access
6 Citations
3,968 Views
25 Pages

30 December 2022

Construction, one of the largest global economic sectors, has been severely challenged by the economic uncertainties brought on by COVID-19. Since 2020, pandemic-related disruptions and remedial measures have made its historically low performance eve...

(This article belongs to the Special Issue Value Co-Creation in Sustainable Project Society)
  • Article
  • Open Access
26 Citations
6,367 Views
29 Pages

3 February 2022

The COVID-19 pandemic has made the world face a whole new reality, and the measures taken for slowing the spread of the disease included social distancing, as well as national, regional, or local lockdowns and restrictions regarding the movement of p...

(This article belongs to the Special Issue Advancing Digitalisation in Construction: Responding to New and Emerging Drivers and Changes)
  • Article
  • Open Access
4 Citations
4,690 Views
19 Pages

26 April 2025

Although earlier studies had connected material scarcity and price fluctuation to cost overruns and delays in Qatar’s building projects, the root causes of this volatility had not been investigated. To close this crucial gap, this study looked...

(This article belongs to the Section B. Building Materials, and Repair & Renovation)
  • Article
  • Open Access
31 Citations
15,665 Views
22 Pages

31 May 2018

Engineering, Procurement, and Construction (EPC) of oil and gas megaprojects often experience cost overruns due to substantial schedule delays. One of the greatest causes of these overruns is the mismanagement of the project schedule, with the piping...

(This article belongs to the Special Issue Circular Economy, Ethical Funds, and Engineering Projects)
  • Article
  • Open Access
8 Citations
5,037 Views
20 Pages

Knowledge as an Organizational Asset for Managing Complex Projects: The Case of Naval Platforms

  • Alberto Cerezo-Narváez,
  • Andrés Pastor-Fernández,
  • Manuel Otero-Mateo,
  • Pablo Ballesteros-Pérez and
  • Francisco Rodríguez-Pecci

17 January 2021

Knowledge management (KM) involves learning from past experiences to avoid or correct scope misalignments, quality deviations, safety problems, time delays and/or cost overruns. KM is frequently materialized as a risk management (RM) plan. An RM plan...

(This article belongs to the Special Issue Dealing with Projects in a Dynamic Scenario: New Managing Approaches and User-Centered Tools)
  • Systematic Review
  • Open Access
3 Citations
1,828 Views
24 Pages

Dispute Management in the Digital Era: The Role of Artificial Intelligence and Emerging Technologies

  • Mathusha Francis,
  • Srinath Perera,
  • Wei Zhou and
  • Samudaya Nanayakkara

9 February 2026

Disputes become an accepted reality of construction projects, often resulting in serious consequences, including time and cost overruns, and broader macroeconomic impacts on the national economy. Disputes need to be managed effectively to reduce thei...

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
23 Citations
11,074 Views
29 Pages

Many studies have been conducted on the poor performance of the construction industry. Nigeria’s construction industry has been linked to project delays and cost overruns, leading to many abandoned construction projects throughout the country....

(This article belongs to the Section E. Construction Management, and Computers & Digitization)
  • Article
  • Open Access
18 Citations
7,646 Views
26 Pages

21 December 2021

Major overhauls, outages, shutdowns and turnarounds (MoOSTs) are significant maintenance interventions needed on a periodic basis to optimise the performance of physical industrial assets (PIAs). However, uncertainties in the forms of emergent and di...

(This article belongs to the Special Issue Sustainability in Operations Management)