You are currently on the new version of our website. Access the old version .

113 Results Found

  • Article
  • Open Access
1 Citations
3,783 Views
15 Pages

Design of a Quick-Pressing and Self-Locking Temporary Fastener for Easy Automatic Installation and Removal

  • Wei Tang,
  • Jie He,
  • Yunya Xiao,
  • Weiwei Qu,
  • Jiying Ye,
  • Hui Long and
  • Chaolin Liang

26 February 2023

In the traditional pre-joining technology of aircraft panels, bolts are generally employed for pre-joining. Due to the length and width of panels, bilateral manual operations are required to operate bolts. In this case, there are problems such as low...

  • Project Report
  • Open Access
2 Citations
5,813 Views
17 Pages

The Canopy: A Lightweight Spatial Installation Informed by Graphic Statics

  • Shuaizhong Wang,
  • Federico Bertagna,
  • Patrick Ole Ohlbrock and
  • Davide Tanadini

This paper illustrates the design and fabrication process of the temporary installation The Canopy, developed as part of the fib Symposium on Conceptual Design of Structures 2021. The geometry of the perforated hanging membrane that forms The Canopy...

  • Article
  • Open Access
470 Views
28 Pages

Temporary Seismic Array Installation in the Contursi Terme Hydrothermal System: A Step Toward Geothermal Assessment

  • Vincenzo Serlenga,
  • Ferdinando Napolitano,
  • Serena Panebianco,
  • Giovannina Mungiello,
  • Tony Alfredo Stabile,
  • Valeria Giampaolo,
  • Massimo Blasone,
  • Marianna Balasco,
  • Angela Perrone and
  • Ortensia Amoroso
  • + 4 authors

19 December 2025

How can the interaction between the seismological community and society contribute to the exploitation and usage of renewable energy resources? We try to provide an answer by describing the seismic experiment realized in March–April 2025 in the...

  • Article
  • Open Access
32 Citations
12,603 Views
20 Pages

3 July 2020

A singular and modest activist action, a temporary park created in San Francisco, grew into the global urban Park(ing) Day (PD) phenomenon. This tactical urbanism event not only expanded to be annually celebrated in thousands of parking lots all over...

  • Proceeding Paper
  • Open Access
2,261 Views
7 Pages

The planning for major international sporting events such as the Olympic Games and Commonwealth Games require the use of a range of Field of Play facilities. Often these are required to be temporary overlay installations due to the cost of constructi...

  • Article
  • Open Access
6 Citations
7,357 Views
24 Pages

At construction sites, various types of temporary equipment and structures are used for safety and work efficiency. However, various temporary equipment-related accidents frequently occur for many reasons, including inappropriate installation, usage,...

  • Article
  • Open Access
49 Citations
8,966 Views
28 Pages

25 October 2019

While temporary streams account for more than half of the global discharge, high spatiotemporal resolution data on the three main hydrological states (dry streambed, standing water, and flowing water) of temporary stream remains sparse. This study pr...

  • Article
  • Open Access
1,302 Views
17 Pages

31 January 2025

This study proposes a method for observing the inside of a temporary structure covered with a construction safety net using an image processing technique and 3D modeling. Images of the temporary structures were obtained using unmanned aerial vehicles...

  • Article
  • Open Access
8 Citations
3,755 Views
14 Pages

27 January 2022

The free cantilever method (FCM) is a bridge construction method in which the left and right segments are joined in sequence from a pier without using a bottom strut. To support the imbalance of the left and right moments during construction, tempora...

  • Article
  • Open Access
5 Citations
4,036 Views
26 Pages

9 November 2022

In the construction project, the temporary work is the construction work, which is installed temporarily for the construction of main structure and removed after its completion. Even though it is a temporary facility used and demolished only during t...

  • Article
  • Open Access
9 Citations
4,671 Views
20 Pages

20 July 2018

The aim of this research, carried out in collaboration with Maco Technology Inc., was to analyse the energy performance of temporary textile structures that are often used to host itinerant events. This paper illustrates the dynamic simulations carri...

  • Article
  • Open Access
144 Views
20 Pages

Evaluation of the Efficiency of a Speed Monitoring Display (SMD) in a Very Short-Term Roadwork Zone

  • Itziar Gurrutxaga,
  • Miren Isasa,
  • José Manuel Baraibar and
  • Heriberto Pérez-Acebo

Roadwork zones are high-risk environments where sudden geometric changes, narrowed lanes, and driver unfamiliarity frequently lead to inappropriate speeds. Ensuring safe vehicle speeds in roadwork zones remains a priority due to drivers’ limite...

  • Article
  • Open Access
15 Citations
6,708 Views
14 Pages

Indoor Thermal Environment of Temporary Mobile Energy Shelter Houses (MeSHs) in South Korea

  • Jeong-Gook Kim,
  • Junghun Lee,
  • Byung-Lip Ahn,
  • Hwayeon Shin,
  • Seunghwan Yoo,
  • Cheol-Yong Jang,
  • Doosam Song and
  • Jonghun Kim

7 October 2015

Temporary housing must be developed to support the long-term residence needs of disaster victims. The present study assesses a temporary housing unit, the so-called Mobile Energy Shelter House (MeSH), incorporating the “Korean Dwelling Insulation Sta...

  • Article
  • Open Access
300 Citations
29,080 Views
25 Pages

The outbreak of an epidemic disease may pose significant treats to human beings and may further lead to a global crisis. In order to control the spread of an epidemic, the effective management of rapidly increased medical waste through establishing a...

  • Article
  • Open Access
2 Citations
2,827 Views
13 Pages

12 September 2021

Aircraft panel assembly mainly includes the pre-joining process and the riveting process. In addition, the traditional pre-joining process is mainly executed by bolts, which has problems such as the large tightening torque, inconvenient bilateral tig...

  • Article
  • Open Access
3 Citations
3,726 Views
15 Pages

29 May 2019

Retaining walls are generally used for temporary installations during the excavation process of a construction project. They are also utilized to construct embankments in order to extend a railway facility. In this case, a retaining wall is installed...

  • Article
  • Open Access
12 Citations
4,099 Views
14 Pages

HCH Removal in a Biochar-Amended Biofilter

  • Aday Amirbekov,
  • Aigerim Mamirova,
  • Alena Sevcu,
  • Roman Spanek and
  • Pavel Hrabak

1 December 2021

This study evaluated the efficiency of two biofilter systems, with and without biochar chambers installed, at degrading and removing HCH and its isomers in natural drainage water. The biochar biofilter proved to be 96% efficient at cleaning HCH and i...

  • Article
  • Open Access
6 Citations
3,117 Views
25 Pages

Configuration Optimization for Sustainable Temporary Houses Employing BIM Procedure

  • Viviana Tirella,
  • Carmen Fabbricatore,
  • Cristina Carpino,
  • Natale Arcuri and
  • Francesco Barreca

29 October 2023

Building information modeling (BIM) is a process for managing the construction information model. The possibility of managing very complex construction orders using information processes has made the work of designers both easier and more productive....

  • Article
  • Open Access
1 Citations
3,010 Views
19 Pages

31 October 2023

This article explores mechanisms to enhance the efficient utilization of renewable energy sources (RES), with a particular emphasis on photovoltaic installations. One such strategy involves implementing a customized electricity rate system for indivi...

  • Proceeding Paper
  • Open Access
1,966 Views
9 Pages

Restoration of Old Olympias Arsenopyrites Concentrate Storage Area (Former METBA Plot)

  • Vithleem Gazea,
  • Dimitris Dimitriadis and
  • Anastasia Galatsianou

The area of the old arsenopyrites concentrate storage area is located at the Olympias Mining Facilities. The area was formed in the 1970s as a temporary storage area for the produced concentrate of gold-bearing arsenopyrite of Olympias. The total are...

  • Article
  • Open Access
6 Citations
5,259 Views
17 Pages

17 December 2021

This paper examines the thermal comfort of temporary shelters under Taiwan’s subtropical summer conditions. The temperature within the tent was higher compared to the standard configuration of the temporary shelter, but its relative humidity wa...

  • Article
  • Open Access
2 Citations
2,890 Views
18 Pages

Lessons Learnt from Monitoring the Etna Volcano Using an IoT Sensor Network through a Period of Intense Eruptive Activity

  • Laurent Royer,
  • Luca Terray,
  • Maxime Rubéo-Lisa,
  • Julien Sudre,
  • Pierre-Jean Gauthier,
  • Alexandre Claude,
  • Salvatore Giammanco,
  • Emilio Pecora,
  • Paolo Principato and
  • Vincent Breton

29 February 2024

This paper describes the successes and failures after 4 years of continuous operation of a network of sensors, communicating nodes, and gateways deployed on the Etna Volcano in Sicily since 2019, including a period of Etna intense volcanic activity t...

  • Article
  • Open Access
3 Citations
3,200 Views
9 Pages

Histomorphometric Analysis of Osseointegrated Grade V Titanium Mini Transitional Implants in Edentulous Mandible by Backscattered Scanning Electron Microscopy (BS-SEM)

  • Víctor Beltrán,
  • Benjamín Weber,
  • Ricardo Lillo,
  • María-Cristina Manzanares,
  • Cristina Sanzana,
  • Nicolás Fuentes,
  • Pablo Acuña-Mardones and
  • Ivan Valdivia-Gandur

22 December 2020

The purpose of this study is to assess the use of grade V titanium mini transitional implants (MTIs) immediately loaded by a temporary overdenture. For this, a histomorphometric analysis of the bone area fraction occupancy (BAFO) was performed by bac...

  • Communication
  • Open Access
14 Citations
4,979 Views
13 Pages

10 April 2022

As digital workflows are gaining popularity, novel treatment options have also arisen in orthodontics. By using selective laser melting (SLM), highly customized 3D-printed appliances can be manufactured and combined with preformed components. When co...

  • Article
  • Open Access
1 Citations
1,764 Views
18 Pages

Virtual Reality as a Tool for Enhancing Understanding of Tactical Urbanism

  • Italo Seghetto,
  • Ricardo Lopes,
  • Fernando Lima,
  • Marco Boffi,
  • Nicola Rainisio,
  • Gabriele Stancato and
  • Barbara Ester Adele Piga

Tactical urbanism (TU) and Virtual Reality (VR) both aim to reimagine physical spaces, with TU utilizing rapid, temporary, scalable, and cost-effective physical interventions to test and refine urban design, while VR offers immersive virtual environm...

  • Article
  • Open Access
1 Citations
879 Views
18 Pages

9 September 2025

The dynamic development of energy storage technologies makes it possible to solve many problems related to the negative impact of renewable sources and fluctuating loads on the power and voltage quality parameters at their point of connection to the...

  • Article
  • Open Access
1 Citations
1,286 Views
18 Pages

28 November 2024

This study explores reinforcement learning algorithms combined with graph embedding methods to optimize the assembly sequence of complex single-layer reticulate shells. To minimize the number of temporary support brackets during installation, the str...

  • Article
  • Open Access
2,655 Views
12 Pages

6 September 2022

The project involved designing, constructing and commissioning a cathodic protection system for a selected spiral classifier operating at the KGHM Polska Miedź S.A. Ore Concentration Plant (O/ZWR). The authors developed a concept and assumptions...

  • Feature Paper
  • Article
  • Open Access
22 Citations
7,644 Views
24 Pages

16 September 2019

The installation of smart meters in the industry to monitor induction motors (IMs) provides easy access to the measurements of the electrical and mechanical variables, which improves the installation process. Using smart meters in industry requires t...

  • Review
  • Open Access
13 Citations
5,822 Views
14 Pages

Mechanical Circulatory Support Devices for the Treatment of Cardiogenic Shock Complicating Acute Myocardial Infarction—A Review

  • Sharon Bruoha,
  • Chaim Yosefy,
  • Louay Taha,
  • Danny Dvir,
  • Mony Shuvy,
  • Rami Jubeh,
  • Shemy Carasso,
  • Michael Glikson and
  • Elad Asher

5 September 2022

Cardiogenic shock complicating acute myocardial infarction is a complex clinical condition associated with dismal prognosis. Routine early target vessel revascularization remains the most effective treatment to substantially improve outcomes, but mor...

  • Article
  • Open Access
6 Citations
8,075 Views
17 Pages

Use of Finite Elements Analysis for a Weigh-in-Motion Sensor Design

  • Rigobert Opitz,
  • Viorel Goanta,
  • Petru Carlescu,
  • Paul-Doru Barsanescu,
  • Nicolae Taranu and
  • Oana Banu

25 May 2012

High speed weigh-in-motion (WIM) sensors are utilized as components of complex traffic monitoring and measurement systems. They should be able to determine the weights on wheels, axles and vehicle gross weights, and to help the classification of vehi...

  • Article
  • Open Access
7 Citations
2,792 Views
18 Pages

15 February 2021

In this study, the cyclic responses of an offshore wind turbine with a tripod foundation installed on an actual site were evaluated in a centrifuge. To understand the behavior of the turbine at the site, the site soil conditions, environmental loads,...

  • Article
  • Open Access
4,752 Views
17 Pages

26 January 2022

In 1992, artist David Lamelas installed Quand le ciel bas et lourd at the temporary exhibition America: Bride of the Sun—500 Years of Latin-America and the Low Countries at the Royal Museum of Fine Arts Antwerp (KMSKA), a show that explored the...

  • Article
  • Open Access
1 Citations
2,568 Views
19 Pages

16 January 2023

The operating license of Kori units 3 and 4 are to be expired in 2024 and 2025. If the plants are decided to be decommissioned, the spent nuclear fuels in the spent fuel storage pool (SFP) have to be removed from the site. However, no proper storage...

  • Article
  • Open Access
852 Views
18 Pages

Development of Hydrological Criteria for the Hydraulic Design of Stormwater Pumping Stations

  • Alfonso Arrieta-Pastrana,
  • Oscar E. Coronado-Hernández and
  • Vicente S. Fuertes-Miquel

19 October 2025

For the design of stormwater pumping stations, there is often uncertainty regarding the selection of an appropriate rainfall event to determine the required pumping capacity and temporary storage volume for managing extreme events of a given magnitud...

  • Article
  • Open Access
2 Citations
2,580 Views
16 Pages

8 March 2023

Environmental concerns and economic constraints have led to increasing installations of mixed conductor circuits comprising underground cables (UGCs) and overhead transmission lines (OHLs). Faults on the OHL sections of such circuits are usually temp...

  • Communication
  • Open Access
19 Citations
4,261 Views
17 Pages

Comparing Direct Observation of Torsion with Array-Derived Rotation in Civil Engineering Structures

  • Philippe Guéguen,
  • Frédéric Guattari,
  • Coralie Aubert and
  • Theo Laudat

28 December 2020

In this article, we analyze the rotation rates in a building derived from a network of translation sensors and recorded by a rotation sensor. The building is Grenoble city hall, a reinforced concrete structure with permanent accelerometric translatio...

  • Article
  • Open Access
34 Citations
3,459 Views
16 Pages

11 October 2020

This paper compares two acoustical projects, applied to the S. Dominic church of Foligno and Imola, which are subject to a permanent and temporary conversion respectively, to places dedicated for listening to live music. Sets of measurements have bee...

  • Article
  • Open Access
2,132 Views
14 Pages

Structural Evaluation on the Floating Production Storage and Offloading Large Flow Gas Processing Module Based on FEM Analysis

  • Ming Qiu,
  • Yanping He,
  • Yibin Lyu,
  • Zhengang Wang,
  • Mingzhi Li,
  • Zhijie Zhou,
  • Yongkang Zhang and
  • Chaohui Lin

6 October 2024

The floating hoisting of floating production storage and offloading (FPSO) production modules introduces substantial challenges due to the propensity for excessive deformation within the typical tubular truss structures during operations. This resear...

  • Article
  • Open Access
43 Citations
7,382 Views
22 Pages

4D-BIM-Based Workspace Planning for Temporary Safety Facilities in Construction SMEs

  • Kieu-Trang Pham,
  • Duc-Nghia Vu,
  • Phuc Le Hieu Hong and
  • Chansik Park

Temporary safety facilities (TSFs) are an essential support system providing necessary protection to workers during construction activities, which are targeted towards preventing the occurrence of incidents and accidents at the construction site; how...

  • Article
  • Open Access

23 January 2026

On 18 March 2025, a moderate earthquake with moment magnitude Mw 4.2 struck the Basilicata region in Southern Italy. The event occurred at 09:01:25 UTC with an epicentre located approximately 4 km northeast of the city of Potenza (PZ). The earthquake...

  • Feature Paper
  • Article
  • Open Access
53 Citations
13,579 Views
28 Pages

The installation of smart meters in smart cities to monitor streetlights (SLs) provides easy access to measurements of electrical variables and lighting levels, which improves the operation of installation. The use of smart meters in cities requires...

  • Article
  • Open Access
20 Citations
3,946 Views
18 Pages

Deep Learning-Based Object Detection for Unmanned Aerial Systems (UASs)-Based Inspections of Construction Stormwater Practices

  • Billur Kazaz,
  • Subhadipto Poddar,
  • Saeed Arabi,
  • Michael A. Perez,
  • Anuj Sharma and
  • J. Blake Whitman

17 April 2021

Construction activities typically create large amounts of ground disturbance, which can lead to increased rates of soil erosion. Construction stormwater practices are used on active jobsites to protect downstream waterbodies from offsite sediment tra...

  • Article
  • Open Access
12 Citations
2,213 Views
14 Pages

22 August 2023

Due to rising energy costs, there is a trend to return to conventional heating systems powered by solid fuel. A rise in the combination of new and old energy sources is creating unintended dual-fuel heating systems. These systems combine an old solid...

  • Article
  • Open Access
555 Views
18 Pages

The Magnitude of Stress in the Prop Depending on Its Manual Tightening

  • Milan Švolík,
  • Peter Makýš,
  • Patrik Šťastný,
  • Ján Hlina and
  • Marek Ďubek

20 August 2025

Ensuring the stability of monolithic concrete slabs during construction represents a crucial safety challenge in monolithic reinforced concrete buildings. Theoretical models and structural analyses often assume ideal conditions of supporting props. H...

  • Article
  • Open Access
8 Citations
3,356 Views
18 Pages

A Possible Neutron-Antineutron Oscillation Experiment at PF1B at the Institut Laue Langevin

  • Vladimir Gudkov,
  • Esben Klinby,
  • Bernhard Meirose,
  • David Milstead,
  • Valery V. Nesvizhevsky,
  • Konstantin V. Protasov,
  • Nicola Rizzi,
  • Valentina Santoro,
  • William Michael Snow and
  • Sze-Chun Yiu
  • + 1 author

3 December 2021

We consider a possible neutron–antineutron (n−n¯) oscillation experiment at the PF1B instrument at Institut Laue Langevin. It can improve the best existing constraint on the transition rate and also allow the testing of the methods a...

  • Article
  • Open Access
5 Citations
2,885 Views
16 Pages

20 September 2022

This article aims to explore the relationship between social innovation and opportunities for innovation in public services, focusing on a range of initiatives intended to improve services and infrastructure for pedestrians in the city of São...

  • Article
  • Open Access
1 Citations
2,046 Views
16 Pages

Monitoring Pilot Study of Temporary Permeable Structures for Mangrove Restoration

  • Alejandra Gijón Mancheño,
  • Bagus Maulana,
  • Ad J. H. M. Reniers,
  • Silke A. J. Tas,
  • Tom Wilms,
  • Sri Rejeki,
  • Restiana W. Ariyati and
  • Lestari L. Widowati

14 February 2025

Temporary permeable structures of bamboo and brushwood have been implemented for mangrove restoration along retreating coastlines worldwide. However, deriving lessons from previous studies is inhibited by their lack of morphodynamic context, with mis...

  • Article
  • Open Access
4 Citations
2,284 Views
26 Pages

20 January 2025

In the construction industry, ensuring the proper installation, retention, and dismantling of temporary structures, such as jack supports, is critical to maintaining safety and project timelines. However, inconsistencies between on-site data and cons...

  • Article
  • Open Access
585 Views
19 Pages

10 November 2025

This study aims to analyze the wind-induced effects and vibration control of a long-span cable-stayed bridge with a steel truss girder under strong marine wind conditions during its maximum single-cantilever state. During the cantilever construction...

of 3