You are currently on the new version of our website. Access the old version .

6,786 Results Found

  • Article
  • Open Access
10 Citations
2,098 Views
20 Pages

11 September 2023

There are problems with an inadequate quality assurance system and non-standard construction organization and administration while creating prefabricated buildings. There are currently fewer quality assessments employing prefabricated component combi...

  • Article
  • Open Access
3 Citations
6,022 Views
23 Pages

23 March 2020

The definition of the success of research projects implemented at public universities is far from being unequivocal. The success of a research project has to be in line with both the public university’s and the funding institution’s polic...

  • Article
  • Open Access
1 Citations
6,115 Views
24 Pages

18 July 2016

During a construction project life cycle, project costs and time estimations contribute greatly to baseline scheduling. Besides, schedule risk analysis and project control are also influenced by the above factors. Although many papers have offered es...

  • Article
  • Open Access
23 Citations
4,923 Views
21 Pages

12 March 2020

Choosing an appropriate project delivery system (PDS) directly affects the achievement of performance goals, and at the same time it is of great significance for sustainable construction project management (SCPM). This paper took the PDS of construct...

  • Article
  • Open Access
19 Citations
5,399 Views
31 Pages

21 April 2020

More and more construction projects are closed before they ever start. Among the most significant reasons for project failures is cost risk. Construction companies have many problems with reliable cost management. Rising demands of the key market pla...

  • Article
  • Open Access
20 Citations
8,005 Views
25 Pages

30 July 2019

Payment is the lifeblood of construction projects. However, steady fund flow is rare in construction projects. This paper focused on a quantitative evaluation of the impact of payment delays at the two links (i.e., from owner to general contractor an...

  • Article
  • Open Access
35 Citations
11,932 Views
19 Pages

Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System

  • Georgios K. Koulinas,
  • Alexandros S. Xanthopoulos,
  • Thomas T. Tsilipiras and
  • Dimitrios E. Koulouriotis

In this paper, we present a simulation-based approach for effectively estimating delay risks in project schedules and predicting the possibilities of in-time project completion for various deadlines. The main contribution of this study is the develop...

  • Article
  • Open Access
1 Citations
5,458 Views
17 Pages

Design of a High-Frame-Rate and Large-Grayscale Simulation Projection System Based on Digital Micromirror Devices

  • Lingxuan Meng,
  • Yongqiang Yang,
  • Hongyu Li,
  • Yanfu Tang,
  • Zhongming Li,
  • Ying Qu,
  • Min Zhao and
  • Junlin Li

26 August 2024

With the increasing acquisition speed of image sensors, it has become necessary to provide image sources with higher frame rates and grayscale in order to meet testing requirements. In the field of semi-physical simulation projection, digital micromi...

  • Article
  • Open Access
7 Citations
3,271 Views
13 Pages

21 May 2021

Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to...

  • Article
  • Open Access
2 Citations
3,605 Views
20 Pages

3 July 2025

Some construction projects in Indonesia have been experiencing frequent major delays, and there is an urgent need to perform a comprehensive schedule forecast to anticipate them. This study aims to enhance the forecast of the project-completion sched...

  • Article
  • Open Access
1,176 Views
19 Pages

14 August 2025

This study investigates the integration of LTspice simulations and structured reflective practices within a project-based learning (PBL) framework in a Microelectronic Circuits course. The course was designed to improve students’ conceptual und...

  • Article
  • Open Access
40 Citations
11,446 Views
35 Pages

20 January 2022

In this article, we present our own construction process model consisting of 16 stages and eight phases, which is particularly applicable to large investment projects. In the context of each project phase, we examine how the appropriate way of schedu...

  • Article
  • Open Access
34 Citations
6,961 Views
19 Pages

Combining Monte Carlo Simulation and Bayesian Networks Methods for Assessing Completion Time of Projects under Risk

  • Ali Namazian,
  • Siamak Haji Yakhchali,
  • Vahidreza Yousefi and
  • Jolanta Tamošaitienė

In this study, Monte Carlo simulation and Bayesian network methods are combined to present a structure for assessing the aggregated impact of risks on the completion time of a construction project. Construction projects often encounter different risk...

  • Article
  • Open Access
6 Citations
2,115 Views
19 Pages

10 December 2022

Construction projects are often delayed. Their budgets are being exceeded. This is partly because construction project models rarely take human factors into account. The article focuses on the repetitive multi-unit projects that are often found in co...

  • Article
  • Open Access
9 Citations
4,942 Views
25 Pages

27 December 2023

Effective cash flow management has become crucial for projects and stakeholders given the wide payment-related problems and financial risks encountered in the construction industry worldwide. Previous studies mostly addressed cash flow and payments f...

  • Article
  • Open Access
5 Citations
3,408 Views
15 Pages

This teaching research paper presents a novel idea that combines fundamental scientific problems in practical engineering with the construction of the “Engineering System Modeling and Simulation” course. A large amount of mathematical mod...

  • Article
  • Open Access
2,264 Views
13 Pages

Dynamic Simulation Study on Water-Supply Volume of the Hanjiang-to-Weihe River Water Diversion Project

  • Qiang Hui,
  • Jungang Luo,
  • Xiaozhou Du,
  • Xiaofeng Song,
  • Jiancang Xie and
  • Na Wei

5 February 2023

The calculation of water supply is affected by many factors, such as water requirements, water-supply capacity, etc., which change with time and the environment. The traditional calculation methods are generally used under several fixed operating sit...

  • Article
  • Open Access
1,260 Views
23 Pages

14 March 2025

To address the water-use conflicts between the original water-receiving areas of the lower Hongze, Luoma, and Nansihu lakes and the receiving areas of the East Route of the South-to-North Water Diversion (ESNWD) project, a multi-objective simulation-...

  • Proceeding Paper
  • Open Access
3 Citations
2,030 Views
6 Pages

Greece is located over a climate-change-prone region. The aim of this study is to investigate the projection of cloud cover fraction and surface relative humidity during the period from 1970 to 2099. In this analysis, we use six high-resolution regio...

  • Article
  • Open Access
2 Citations
3,030 Views
24 Pages

29 July 2021

The transient process is the key for the design, operation and maintenance of the pipeline network system of the water supply project. This paper aims to study and develop a new type of visual numerical simulation software for the transient process o...

  • Article
  • Open Access
6 Citations
2,612 Views
20 Pages

15 December 2023

Power construction projects (PCPs) consume a large amount of energy and contribute significantly to carbon emissions. There is relatively little research on carbon emission reduction in PCPs, especially in predicting carbon emission reduction from a...

  • Article
  • Open Access
218 Views
18 Pages

3 January 2026

This study creates and refines a risk–effectiveness–integrated dynamic simulation framework that brings together risk and effectiveness factors affecting qualified workforce allocation in multi-project contexts, specifically in the constr...

  • Article
  • Open Access
4 Citations
2,964 Views
15 Pages

Selection of Production Reliability Indicators for Project Simulation Model

  • László Péter Pusztai,
  • Lajos Nagy and
  • István Budai

16 May 2022

Due to technological enhancements, traditional, qualitative decision-making methods are usually replaced by data-driven decision-making even in smaller companies. Process simulation is one of these solutions, which can help companies avoid costly fai...

  • Article
  • Open Access
7 Citations
4,737 Views
20 Pages

20 October 2022

Despite the significant influence of organizational elements on the performance of construction projects, these elements are regarded as fixed, or reflected in an implicit manner, in current project management techniques. This study investigated how...

  • Article
  • Open Access
7 Citations
3,462 Views
20 Pages

8 June 2020

Dredging engineering projects are complex because they involve greater uncertainty from the natural environment, social needs, government policy and many stakeholders. Engineering companies submit tenders that draw on similar cases undertaken in rece...

  • Article
  • Open Access
20 Citations
7,492 Views
20 Pages

Urban Growth Modeling and Future Scenario Projection Using Cellular Automata (CA) Models and the R Package Optimx

  • Yongjiu Feng,
  • Zongbo Cai,
  • Xiaohua Tong,
  • Jiafeng Wang,
  • Chen Gao,
  • Shurui Chen and
  • Zhenkun Lei

Cellular automata (CA) is a spatially explicit modeling tool that has been shown to be effective in simulating urban growth dynamics and in projecting future scenarios across scales. At the core of urban CA models are transition rules that define lan...

  • Article
  • Open Access
1 Citations
1,588 Views
12 Pages

Stereoscopic Projection Policy Optimization Method Based on Deep Reinforcement Learning

  • Jing An,
  • Guang-Ya Si,
  • Lei Zhang,
  • Wei Liu and
  • Xue-Chao Zhang

29 November 2022

Based on the good performance of deep reinforcement learning (DRL) in policy optimization, a stereoscopic projection policy optimization method is proposed, which combines the simulation experiment method with the DRL method. On the basis of policy o...

  • Article
  • Open Access
1 Citations
3,728 Views
16 Pages

Projects are exposed to risks that may hinder their success regarding cost, schedule, and quality/content. After identifying these risks, the project manager must select a subset for mitigation, constrained by a limited risk response budget. The prob...

  • Article
  • Open Access
3 Citations
3,443 Views
33 Pages

26 January 2025

Scheduling is essential in managing projects. ‘Schedula Anima’ is a new software designed to provide a comprehensive view of schedules between early and late dates for construction project managers. Capturing the dynamic nature of project...

  • Article
  • Open Access
3 Citations
3,512 Views
18 Pages

23 December 2021

In this paper, we propose an angular momentum-based advection technique that can express the turbulent foam effect. The motion of foam particles, which are strongly bound to the motion of the underlying fluid, is viscous, and sometimes clumping probl...

  • Article
  • Open Access
10 Citations
3,230 Views
16 Pages

13 April 2021

Recent ecological stream restoration projects have focused on expanding the water-friendly space of streams, promoting the health of aquatic ecosystems, and restoring various habitats, which raise the need for relevant research. Applying integrated e...

  • Article
  • Open Access
2 Citations
3,941 Views
14 Pages

1 February 2019

In this research, the concept of Duration with a new application in project management has been defined. The Duration of each project provides the project manager with a combined measure containing concepts of return, cost and time of the project. Fu...

  • Article
  • Open Access
4 Citations
3,204 Views
17 Pages

30 June 2018

Statistical models for hydrologic simulation are a common choice among researchers particularly when catchment information is limited. In this study, we adopt a new statistical approach, namely Bayesian regression with multivariate linear spline (BML...

  • Article
  • Open Access
4 Citations
2,476 Views
16 Pages

Time–Cost Schedules and Project–Threats Indication

  • Frantisek Kuda,
  • Petr Dlask,
  • Marek Teichmann and
  • Vaclav Beran

28 February 2022

One of the most common disciplines in a business or economic project is timing and resource review. Despite the frequency of use, the level of sophistication is not high enough to maintain its level of importance. Exceeding deadlines and non-complian...

  • Review
  • Open Access
15 Citations
5,316 Views
23 Pages

Quo Vadis Business Simulation Games in the 21st Century?

  • Mirjana Pejić Bach,
  • Tamara Ćurlin,
  • Ana Marija Stjepić and
  • Maja Meško

13 March 2023

Business simulation games have become popular in higher education and business environments. The paper aims to identify the primary research trends and topics of business simulation games research using a systematic and automated literature review wi...

  • Article
  • Open Access
840 Views
25 Pages

6 June 2025

Traditional off-the-job training is becoming ineffective in high-end equipment research and development (R&D) projects due to the contradiction between rapid technological progress and the slow growth of newcomers, calling for “on-the-job m...

  • Article
  • Open Access
25 Citations
4,324 Views
21 Pages

Quantitative Assessment of Impact of the Proposed Poyang Lake Hydraulic Project (China) on the Habitat Suitability of Migratory Birds

  • Siyang Yao,
  • Xinyu Li,
  • Chenglin Liu,
  • Dongyang Yuan,
  • Longhui Zhu,
  • Xiangyu Ma,
  • Jie Yu,
  • Gang Wang and
  • Weiming Kuang

8 August 2019

Poyang Lake is the largest wintering habitat for migratory birds in Asia. In the last decade, the lake has experienced an early-occurring and prolonged dry season that has deteriorated the lake’s ecological status. To tackle this issue, the Chi...

  • Article
  • Open Access
5 Citations
4,954 Views
15 Pages

1 September 2021

Water quality assurance is the primary factor for the successful operation of water diversion projects across river basins. The rapid prediction of water pollution is the basis for timely and effective emergency control and disposal measures. In Chin...

  • Article
  • Open Access
8 Citations
3,904 Views
20 Pages

13 December 2020

Project Planning and Control (PPC) problems with stochastic job processing times belong to the problem class of Stochastic Resource-Constrained Multi-Project Scheduling Problems (SRCMPSP). A practical example of this problem class is the industrial d...

  • Article
  • Open Access
7 Citations
4,211 Views
16 Pages

Construction project cost overrun is a common problem in the construction industry. The cost of construction projects is thought to have increased by approximately 33% on average. Several types of research on construction project cost overrun have be...

  • Article
  • Open Access
691 Views
15 Pages

Mitigating Model Biases in Arid Region Precipitation over Northwest China Through Dust–Cloud Microphysical Interactions

  • Anqi Wang,
  • Xiaoning Xie,
  • Zhibao Dong,
  • Xiaoyun Li,
  • Ke Shang,
  • Xiaokang Liu and
  • Zhijing Xue

Accurate projection of future climate trends in arid regions critically depends on reliable precipitation simulations. However, most Coupled Model Intercomparison Project Phase 6 (CMIP6) models exhibit systematic overestimations of precipitation in N...

  • Article
  • Open Access
12 Citations
6,600 Views
34 Pages

This paper presents an eye gaze controlled projected display that can be used in aviation and automotive environment as a head up display. We have presented details of the hardware and software used in developing the display and an algorithm to impro...

  • Article
  • Open Access
5 Citations
4,542 Views
20 Pages

5 October 2022

Improvisation is the decision-making process addressing unexpected obstacles in a spontaneous but rational manner. Although undesirable, as it indicates deviation from plans, improvisation is unavoidable in construction to address issues related to u...

  • Article
  • Open Access
7 Citations
3,898 Views
14 Pages

12 January 2021

This article presents the resource-constrained project scheduling problem with the discounted cash flow maximization criterion from the perspective of a contractor. Cash flows are considered as the contractor’s expenses related to the execution...

  • Brief Report
  • Open Access
3 Citations
2,168 Views
12 Pages

Engineering requires solid mathematical knowledge in addition to hands-on experience. At the same time, finding the right balance between mathematics and applications is challenging. This paper presents the implementation of virtual and real experime...

  • Article
  • Open Access
28 Citations
5,631 Views
16 Pages

28 March 2020

This paper presents an attempt to the valuation of the operational flexibility of the energy investment project based on the example of combined cycle gas turbine (CCGT). For this purpose, the real options approach (ROA), net present value (NPV) meth...

  • Article
  • Open Access
2 Citations
2,791 Views
25 Pages

18 September 2023

The integration of building information modeling (BIM) and the integrated project delivery (IPD) mode effectively promotes collaboration among project members and enhances project profitability. However, the issue of profit sharing significantly impa...

  • Article
  • Open Access
9 Citations
9,576 Views
21 Pages

Major steel-making companies in Korea have recently been trying to advance into international markets for better profitability and new market shares. Even with strategic partnerships with local organizations, the Korean steel companies are facing and...

  • Article
  • Open Access
9 Citations
2,735 Views
12 Pages

Influence of Different Freezing Modes on the Base Slab Displacement of an Upper Structure

  • Lei Wang,
  • Yanting Wang,
  • Fangzheng Li,
  • Zhiqiang Liu and
  • Chunsheng Lu

18 December 2019

The high risk of metro tunnels that are underneath buildings in a water-rich layer has received much attention. The base slab of an upper structure deforms due to frost heave and settlement, which needs to be predicted before freezing and excavation....

  • Article
  • Open Access
7 Citations
4,547 Views
13 Pages

Groundwater Recharge Modeling under Water Diversion Engineering: A Case Study in Beijing

  • Mingyan Zhao,
  • Xiangbo Meng,
  • Boxin Wang,
  • Dasheng Zhang,
  • Yafeng Zhao and
  • Ruyi Li

21 March 2022

The influence of surface water resource exploitation and utilization projects on groundwater has been widely studied. Surface water diversion projects lead to a reduction in river discharge, which changes the recharge of groundwater systems. In this...

of 136