- Article
Full-Scale Prefabrication and Non-Destructive Quality Monitoring of Novel Bridge Substructure for “Pile-Column Integration”
- Longlin Wang,
- Hua Wang,
- Kailv Yang,
- Shuzhi Xie,
- Gangrong Wei,
- Ruijiao Li and
- Wensheng Wang
The assembly process of “pile-column integration” is proposed in this study and applied in the engineering with the characteristics that most of the pile foundations are end-bearing piles, which is conducive to returning to the normal ope...