Optimization of Zoned Excavation and Servo Strut Systems for Deep Excavation Groups Adjacent to Historic Buildings in Soft Soil

,
,
,
and
1
Ningbo Haicheng Investment Development Co., Ltd., Ningbo 315010, China
2
Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Tongji University, Shanghai 201804, China
3
Zhejiang Construction Engineering Group Co., Ltd., Hangzhou 310030, China
*
Author to whom correspondence should be addressed.
This article belongs to the Section Building Structures

Abstract

Deep excavation groups in soft soil can endanger adjacent historic buildings. This paper presents a 3D finite element analysis of a project in Ningbo, employing the HSS constitutive model. Three excavation schemes were compared. The small-zone staged excavation from near to far proved optimal: relative to the conventional large-block scheme, it reduced maximum wall displacement on the heritage-building side by 37.0% and building tilt by 54.0%; servo struts were then introduced in the critical sub-excavation and optimized via response surface methodology. A layered control hierarchy was revealed—wall bulging is governed by the third and fourth struts (F3 ≈ F4 > F2), and mean settlement by the third strut (F3 > F2 ≈ F4). Building tilt control relies on synergistic action of all three struts (F3 > F2 > F4), with significant antagonistic interactions among struts at high force levels. The optimal combination (F2 = 1200 kN, F3 = 1800 kN, F4 = 1550 kN) limits maximum tilt to 0.380‰, well below the 1.0‰ code limit, and remains robust under various weighting scenarios.

1. Introduction

The rapid development of underground space in coastal cities has increased the number of deep excavations in soft soils. These soils typically exhibit high water content, high compressibility, and low strength [1,2]. When such excavations are located next to historic masonry or brick–timber buildings, they pose a high risk of damage from wall deflection, ground settlement, and differential movement. This risk is particularly acute because these aged structures have limited tensile capacity and poor deformation tolerance [3,4]. Understanding and mitigating these impacts is therefore a critical challenge at the intersection of urban construction and heritage conservation.
When multiple excavations are conducted in close proximity, the mechanical behavior of the soil-retaining system differs fundamentally from that of a single isolated excavation. In an excavation group, the unloading of one pit not only deforms its own retaining structure but also alters the in situ stress state of the soil surrounding adjacent pits. This mutual interaction causes stress superposition and cumulative deformation effects that are not observed in isolated excavations [5,6]. As excavation proceeds sequentially across different zones, the soil mass experiences repeated, asynchronous loading and unloading cycles along distinct stress paths. These asynchronous spatial–temporal effects can lead to progressive stiffness degradation and the development of continuous plastic shear bands extending beneath nearby foundations [7]. Such behavior is particularly pronounced in soft soils. In these soils, the tangent stiffness degrades rapidly with accumulated shear strain, and the influence zone of each excavation is substantially larger than in stiff soils [8,9]. For a deep excavation group located immediately adjacent to historic buildings, the deformation and damage risk cannot be predicted by simply superimposing the effects of individual pits. Instead, the sequence-dependent redistribution of stresses across the entire group must be explicitly addressed through careful zoning and staged excavation strategies.
In parallel with construction organization, active support systems—particularly servo strut with self-compensating axial force capabilities—have emerged as an effective measure for limiting excavation-induced deformations. By maintaining a predetermined axial force despite stress relaxation and construction disturbances, servo struts outperform conventional passive struts in controlling wall deflection and ground settlement [10,11]. The deformation behavior of excavations supported by servo strut systems has been investigated through both field case studies and three-dimensional finite element analyses, confirming their effectiveness in reducing wall displacement and protecting adjacent structures [12]. Comparative studies have further established that multi-level servo strut control provides superior deformation control over single-level configurations [13,14]. Model tests and field studies have also demonstrated that the control performance of servo struts is highly dependent on their installation level, axial-force threshold, and active control strategy; excessive axial force may induce local ground heave or unfavorable interactions between adjacent strut levels [15].
Despite these advances, two key gaps remain. First, few studies have systematically integrated zoned excavation strategies with multi-level servo strut optimization. Second, although multi-level servo strut control has been shown to outperform single-level control, a quantitative hierarchy that distinguishes the contributions of individual strut levels to wall deflection, settlement, and building tilt has yet to be established. These gaps are especially consequential for heritage buildings, where structural integrity can be threatened by transient deformation surges as much as by final settlement.
This study addresses both gaps through a field project adjacent to protected historic buildings and corresponding numerical simulations. The main contributions are twofold: (1) We demonstrate that small-zone staged excavation from near to far outperforms conventional schemes by suppressing continuous shear band propagation, thereby substantially reducing wall deflection and building tilt. (2) We reveal the layered control hierarchy of servo struts and determine an optimal, robust multi-strut configuration. The analytical framework and methodology presented herein provide a direct reference for heritage protection in similar soft-soil environments.

2. Project Overview and Site Conditions

2.1. Project Overview and Excavation Layout

The project is located in the urban core of Ningbo, China. The excavation group covers approximately 25,652 m2 and is divided into six primary zones (A1, A2, A3, B1, B2, C1). Zone A2 is further subdivided into A2-1, A2-2, and A2-3. The excavation depth increases from west to east. The western zones (A1, B1) are approximately 9.1 m deep, and the eastern zones (A2, A3, B2, C1) are approximately 12.7 m deep.

2.2. Sensitive Surroundings and Deformation-Control Requirements

As shown in Figure 1, a provincial-level protected mosque is located immediately east of Zone A2. The Former Residence is adjacent to the south side of Zone A3. The entire excavation group is surrounded by 11 historic building complexes. The analysis focuses on the responses of these two most critical receptors, because excessive total or differential settlement directly threatens their structural integrity.
Figure 1. Plan layout of the excavation zones and adjacent protected historic buildings.

2.3. Engineering Geology and Hydrogeological Conditions

The site is located in a typical marine soft-soil area of Ningbo. Within the investigated depth, the stratigraphy from top to bottom comprises the following: mixed fill, clay, mucky clay, silty clay, mucky clay, medium sand, and silty clay. The third and fifth layers are mucky clay. These layers serve as the main compressible strata. They exhibit high water content, high compressibility, low strength, and high sensitivity—all typical of Ningbo soft soil. The groundwater is in direct hydraulic connection with the surrounding surface-water system. As a result, excavation dewatering is prone to inducing consolidation settlement, which is unfavorable for heritage buildings.

3. Three-Dimensional Finite-Element Modeling and Excavation-Scheme Design

3.1. Numerical Model and Boundary Conditions

A refined three-dimensional numerical model was established using Midas GTS NX 2022 R1. According to excavation-design practice, the model boundaries were taken as three to five times the excavation influence range. The final model dimensions were 700 m in length, 500 m in width, and 90 m in depth. These dimensions effectively minimize boundary effects on the calculated results, as shown in Figure 2 and Figure 3. Full displacement constraints were applied at the base. Normal displacement constraints were imposed on the lateral boundaries, and the top surface was modeled as free.
Figure 2. Overall finite element model.
Figure 3. Finite element model of the retaining and support system.
To ensure engineering reliability, the calculated wall deflections and ground settlement were subsequently compared with field monitoring data. This validation approach, which combines numerical simulation with in situ monitoring, is commonly adopted in recent excavation studies [16]. The overall finite element model and the support-structure model are shown in Figure 2 and Figure 3.
Excavations A1 and B2 adopt two concrete strut levels. Excavations A2-1 and A2-2 adopt one concrete strut level followed by three steel strut levels. Excavations A2-3, A3, B1, and C1 adopt three concrete strut levels, as shown in Figure 4.
Figure 4. Typical cross-sections of the excavation zones.

3.2. Design of Excavation Zoning and Sequencing Schemes

To clarify how excavation zoning and construction sequence affect disturbance to the excavation group and adjacent heritage buildings, three excavation schemes were designed based on the concept of spatiotemporal effects. All schemes keep the total excavation area unchanged, but differ in zoning scale and construction sequence, as described below.
(1)
Scheme 1: Large-zone conventional sequential excavation.
This scheme adopts a conventional large-block excavation pattern. The excavation is divided into six primary zones and excavated sequentially in the order A1 → A2 → B1 → B2 → C1. Each zone is excavated to the final depth in one operation before construction of the permanent structure, as shown in Figure 5a.
Figure 5. Excavation-sequence layouts for the three schemes.
(2)
Scheme 2: Small-zone staged excavation from near to far.
In the area adjacent to the protected buildings, the excavation is further refined into secondary subzones. The subzones closest to the heritage buildings are excavated first in the order A1 → A2-1, A2-2, and A2-3→ A3→ B1 → B2 → C1. In the A2 subzones adjacent to the mosque, excavation and bottom-slab casting are completed at an early stage. This allows a closed stiffness system to form near the protected buildings, as shown in Figure 5b.
(3)
Scheme 3: Small-zone staged excavation from far to near.
This scheme uses the same spatial subdivision as Scheme 2 but a different construction sequence, namely A1 → C1 → A2-1, A2-2, and A2-3 → A3 → B1 → B2. The C1 zone is farther from the heritage buildings and is excavated first. In contrast, the A2 subzones and A3 zone are adjacent to the heritage buildings and are excavated last, as shown in Figure 5b.

3.3. Simulation of Construction Stages

The staged excavation and support-installation process was simulated using the birth-and-death element technique. The groundwater level inside the excavation was maintained 1 m below the excavation surface. Scheme 2 is taken as an example. Its entire construction process was decomposed into 44 consecutive calculation stages, as detailed in Appendix A (Table A1). The stages encompass initial geo-stress equilibrium, staged soil excavation with corresponding support installation and removal, and sequential slab casting across all excavation zones.

3.4. Constitutive Model and Material Parameters

3.4.1. Material Parameter Calibration

The retaining and structural components were modeled according to the actual engineering sections and material properties. Diaphragm walls and bored piles were represented by plate elements with thicknesses taken from the design drawings. The diaphragm wall was assigned C35 concrete, and the bored piles were assigned C30 concrete. The bottom slab, middle slab, and top slab were also simulated using plate elements and assigned C35 concrete properties. Columns, struts, and wales were modeled using beam elements. The columns were assigned C25 concrete. The first concrete strut level was assigned C30 concrete, and the second to fourth concrete strut levels were assigned C35 concrete. The steel struts had an elastic modulus of 206 GPa. The wales were assigned C30 concrete.
The conventional Mohr–Coulomb model is elastic-perfectly plastic. It cannot capture the differences between loading and unloading stiffness, the small-strain stiffness characteristics, or the strain-hardening behavior of soft soil during excavation-induced unloading. As a result, it often underestimates wall deflection and ground settlement. The Hardening Soil model with small-strain stiffness (HSS) was therefore adopted to represent the nonlinear mechanical behavior more realistically. This model captures the high initial stiffness at small strains and the subsequent stiffness degradation with increasing strain [17].
For the HSS model, the strength parameters—effective cohesion c ′ and effective friction angle φ ′ —were directly adopted from the consolidated-drained triaxial tests provided in the site investigation report. The at-rest earth pressure coefficient K 0 was estimated using Jaky’s formula K 0 = 1 − sin φ ′ , which is applicable to normally consolidated clays. The remaining parameters ( m , R f , ν u r , γ 0.7 ) were taken from the recommended values for soft clays [18]. For the stiffness parameters, the site investigation report only provided the oedometric compression modulus E s 1 – 2 . Therefore, the calibration followed the methodology proposed by Wang et al. [19]. In this method, the HSS reference stiffness parameters are derived from E s 1 – 2 . A similar approach has also been adopted in recent HSS parameter studies for Hangzhou soft clays [20].
Existing studies [19,20,21] give the following ratio ranges for HSS stiffness parameters: E o e d r e f / E s 1 – 2 ≈ 0.63–1.3, E 50 r e f / E o e d r e f ≈ 0.5–1.7, E u r r e f / E 50 r e f ≈ 1.4–11.6, and G 0 r e f / E u r r e f ≈ 0.8–4.9. Shen et al. [22] confirmed that most HSS model parameters for Ningbo soft soils fall within the statistical range reported for other soft clay areas. An inverse analysis approach similar to that of Hsiung [23] was adopted. The stiffness ratios were iteratively calibrated against the measured diaphragm wall deflections within the above ranges. The final parameter set was E s 1 – 2 : E o e d r e f : E 50 r e f : E u r r e f : G 0 r e f =1:1:1:3:10. This set yielded close agreement between the simulations and field measurements and satisfied the engineering accuracy requirements. The calibrated physical and mechanical parameters of the soil layers are summarized in Table 1.
Table 1. Physical and mechanical properties of the soil layers.

3.4.2. Validation of the Numerical Model

Scheme 2 was adopted in the actual project. The numerical model was validated against field measurements. Figure 6 compares the measured and calculated horizontal displacements at diaphragm-wall monitoring points D1 and D2.
Figure 6. Comparison of measured and simulated horizontal displacement profiles of the diaphragm wall at monitoring points D1 and D2. The solid lines with markers denote measured data (Meas.), while the dashed lines denote simulated data (Sim.).
At Stage 13, the computed peak displacement at D1 is 15.12 mm, while the measured peak value is 14.95 mm, yielding an error of only 1.1%. At D2, the final computed peak displacement is 22.48 mm, compared to the measured 20.89 mm, giving an error of 7.8%. These results indicate that the model achieves satisfactory accuracy in predicting displacement magnitudes.
However, a discrepancy is observed in the depth of the peak displacement at both monitoring points. At D1, the simulated peak depth shifts upward from the measured 15.5 m to 11.0 m. At D2, it shifts from 12.0 m to 10.5 m. Three factors may contribute to this offset. First, the actual soil strata exhibit inherent spatial variability rather than the uniform horizontal layering assumed in the model. Local weak interlayers or fluctuations in soil parameters can readily alter the location of the peak displacement. Second, the HSS parameters for the bottom reinforcement zone were derived from limited laboratory tests. They may not fully reflect the in situ strength of the treated soil, potentially overestimating the restraint on the middle-to-lower portion of the wall. Third, localized grout leakage or non-uniform mixing during deep soil mixing construction could reduce the actual stiffness of the reinforced zone. These factors may collectively influence the distribution of wall deformation with depth.
Despite the local discrepancy in peak depth, the overall deformation profiles at D1 and D2 throughout the excavation sequence agree reasonably well with the field measurements. The displacement magnitudes, the inward-bulging shape of the wall, and the variation trend with depth are all consistently reproduced. It should be noted that this study aims to compare the engineering performance of different construction schemes. All schemes were simulated using the same soil parameters and modeling assumptions. Thus, the computed results are valid in a relative comparative sense, and the discrepancy in peak depth does not affect the ranking of the schemes. Therefore, the established three-dimensional finite-element model and the corresponding HSS parameter set provide a reliable basis for subsequent analysis.

3.4.3. Sensitivity Analysis of Soil Parameters

To further examine the robustness of the parameter calibration, a systematic sensitivity analysis was conducted on the key parameters of the HSS model. The deformation of deep excavations in soft soil is primarily governed by soil stiffness and strength parameters. Therefore, 10 parameter variation cases were designed. These cases cover five categories of variation modes: global stiffness, stiffness ratio, small-strain stiffness, secant stiffness ratio, and strength parameters. Detailed information is provided in Appendix A (Table A2). All parameter variations are referenced to the baseline values.
The maximum lateral wall deflections at monitoring points D1 and D2 at Stage 13 were taken as the response indicators. The calculated results for each case and their comparisons with the field measurements are summarized in Table 2.
Table 2. Sensitivity analysis of wall deflection at monitoring points D1 and D2.
As shown in Table 2, the baseline case agrees well with the field measurements. The error at D1 is only 1.14% and that at D2 is 7.32%. The baseline case ranks as optimal or near-optimal among all 10 sensitivity cases. This indicates that the baseline parameter set matches the engineering reality reasonably well. Among the parameters, G 0 r e f exhibits the most significant independent influence. It directly controls the high initial stiffness at small strains and the rate of stiffness degradation. Therefore, it governs the magnitude and distribution of deformation during the early stages of unloading. E o e d r e f also appears sensitive, partly because the remaining stiffness parameters are proportionally scaled with E o e d r e f in the calibration process.
The strength parameters c ′ and φ ′ display a pronounced asymmetric sensitivity. A simultaneous 30% reduction increases the D1 deflection by 21.69%, whereas an equal-magnitude increase reduces it by only 3.04%. This asymmetry occurs because excavation unloading drives the soil stress path toward the critical state line. When the strength parameters decrease, the yield surface contracts. The soil then enters a plastic yielding state, the stiffness drops sharply, and the deformation increases dramatically. In contrast, when the strength parameters increase, the yield surface expands only to a limited extent. The soil still responds primarily through elastic unloading, and the reduction in displacement is minimal. This characteristic highlights the importance of reliably obtaining the lower-bound values of the strength parameters during calibration.
The sensitivity analysis demonstrates two points. First, the model is robust within a reasonable range of parameter uncertainty. Second, parameter deviations are unlikely to reverse the ranking of excavation schemes. However, this study assumes each soil layer to be homogeneous and neglects the inherent spatial variability of soil parameters. Consequently, the model cannot capture localized deformation concentrations in weaker zones. The predicted distribution of building differential settlement may therefore deviate from actual conditions. Future studies could incorporate random field theory. This would integrate the spatial variability of parameters into a probabilistic analysis framework to quantify the risk of excessive deformation.

4. Numerical Results and Comparative Evaluation of Excavation Schemes

4.1. Maximum Shear Strain in Soil Adjacent to the Excavation

Figure 7 shows the contours of maximum shear strain in the soil at section B–B. In this study, a maximum shear strain of approximately 0.5% is adopted as an engineering indicator. This threshold marks the onset of pronounced nonuniform deformation and localized shear concentration. Under the HSS constitutive framework, once the accumulated shear strain exceeds this small-strain threshold, the tangent shear stiffness of the soft soil degrades rapidly.
Figure 7. Contours of maximum shear strain in the soil mass adjacent to the excavation at section B–B.
Figure 7 shows that both Scheme 1 and Scheme 3 produce a through-going shear band exceeding 0.5%. This shear band extends beneath the heritage buildings. In Scheme 1, the large-block excavation generates this continuous band in a single unloading step. In Scheme 3, the early excavation of the far-side Zone C1 first induces significant shear strain accumulation in the soil behind the A3 wall. The subsequent excavation of Zone A3 then propagates this band further toward the heritage buildings.
By contrast, Scheme 2 does not form a continuous shear band. The zone where the shear strain exceeds the threshold is confined to the soil immediately surrounding the excavation. In Scheme 2, the excavations adjacent to the buildings and their floor slabs are completed early. These elements form stiffened structural modules that interrupt the lateral stress transfer from the subsequent excavation of Zone C1, thereby preventing the shear band from propagating. At the final stage, Scheme 1 exhibits the widest shear-band distribution, followed by Scheme 3. Scheme 2 has the smallest influence range.

4.2. Deformation of Retaining Structures and Mechanistic Interpretation

The deformation-control performance of the three excavation schemes was compared using two representative sections. Monitoring point Q1 is located in Zone A2 near the mosque, and monitoring point Q2 is located in Zone A3 near the Former Residence.
Figure 8 shows the horizontal displacement contours of the diaphragm walls in excavations A2, A3, and B2. In all three schemes, the walls exhibit a characteristic bulging deformation mode in the middle–lower portion. Scheme 2 consistently yields the smallest overall movements and the smoothest deformation profiles at all monitored sections.
Figure 8. Contours of horizontal displacement of the diaphragm walls in excavations A2, A3, and B2 after completion of excavation.
Figure 9 presents the final maximum wall deflections at monitoring point Q1 in excavation A2. The values are 29.958 mm for Scheme 1, 27.419 mm for Scheme 2, and 29.409 mm for Scheme 3. Scheme 2 reduces the peak value by 8.5% compared with Scheme 1 and by 6.8% compared with Scheme 3. Figure 10 shows the corresponding results at monitoring point Q2 in excavation A3. The deflections are 65.893 mm for Scheme 1, 41.504 mm for Scheme 2, and 52.822 mm for Scheme 3. Scheme 2 achieves reductions of 37.0% relative to Scheme 1 and 21.4% relative to Scheme 3. In Scheme 3, the early excavation of Zone C1 causes the walls at both Q1 and Q2 to develop significant initial displacement before their own excavation begins.
Figure 9. Time–history curves of diaphragm-wall displacement at monitoring point Q1 in excavation A2.
Figure 10. Time–history curves of diaphragm-wall displacement at monitoring point Q2 in excavation A3.
Under Scheme 2, the maximum wall deflections in excavations A2 and A3 are 0.216%H and 0.327%H, respectively (H = excavation depth). These values are lower than the statistical mean of 0.4%H reported by Wang et al. [24] from approximately 300 case histories in Shanghai soft clay. They also fall within the lower range of the international soft-soil excavation database compiled by Moormann [25]. This indicates that the wall deformations in Scheme 2 are well controlled compared with similar soft-soil projects.
The above differences in deformation correspond directly to the shear-band configurations presented in Section 4.1. In Schemes 1 and 3, the through-going shear band segments the soil behind the wall into a sliding block. This block resembles an active limit state. The accompanying strain softening and stiffness degradation cause the active earth pressure acting on the wall to increase continuously. As a result, the final deflections are significantly larger than those in Scheme 2.

4.3. Comparison of Ground Surface Settlement

The settlement trough curves at representative sections A–A and B–B are shown in Figure 11. The trough geometry changes abruptly upon entering the influence zone of the protected buildings. This indicates that the building foundation stiffness has a strong influence on the settlement distribution. Scheme 2 produces the shallowest and most localized settlement trough.
Figure 11. Ground-surface settlement troughs at sections A–A and B–B.
At section B–B, the final maximum settlements are 45.927 mm for Scheme 1, 29.021 mm for Scheme 2, and 36.390 mm for Scheme 3. The peak settlement is located approximately 0.68H from the excavation edge, which is consistent with the conventional empirical range of 0.5–1.0H for soft-soil excavations [26]. At section A–A, the maximum settlements are 26.883 mm for Scheme 1, 21.476 mm for Scheme 2, and 25.183 mm for Scheme 3. The peak settlement extends to 1.16H because of the superimposed unloading effects of excavations A2 and B1. Compared with Scheme 1, Scheme 2 reduces the maximum settlement by 20.1% at section A–A and by 36.8% at section B–B. Compared with Scheme 3, the reductions are 14.7% at section A–A and 20.3% at section B–B. Under Scheme 2, the maximum settlements at sections A–A and B–B are 0.169%H and 0.229%H, respectively. Both values are significantly lower than the statistical mean of 0.42%H reported by Wang et al. [24] for Shanghai soft clay.
In Scheme 1, the through-going shear band extends continuously from behind the wall to beneath the building foundation. The sliding block displaces into the excavation, causing concentrated ground loss. This manifests at the surface as a deep and wide settlement trough. In Scheme 3, the development of the plastic zone lies between those of Schemes 1 and 2. The trough depth is therefore intermediate. In Scheme 2, the shear band is confined to the soil around the excavation. The plastic zone does not propagate beneath the building foundation, and the ground loss is minimal. Consequently, the settlement trough is the shallowest and narrowest.

4.4. Comparison of Maximum Building Tilt

For heritage buildings, differential settlement is more critical than average settlement. Accordingly, the ground surface settlement points at the mosque and the Former Residence were extracted from the numerical model. The maximum building tilt values reached during construction are summarized in Figure 12.
Figure 12. Maximum tilt of the adjacent buildings under the three excavation schemes.
The maximum tilt values of the mosque are 0.646‰ for Scheme 1, 0.543‰ for Scheme 2, and 0.659‰ for Scheme 3. For the Former Residence, the maximum tilt values are 1.055‰, 0.486‰, and 0.887‰, respectively. Compared with Scheme 1, Scheme 2 reduces the maximum tilt of the mosque by 16.0%. Compared with Scheme 3, the reduction is 17.6%. For the Former Residence, Scheme 2 reduces the tilt by 54.0% relative to Scheme 1 and by 45.2% relative to Scheme 3.
Existing research [27] proposes a damage threshold of 2.0‰ for masonry structures. The heritage buildings protected in this project have poor deformation resistance, and with reference to the study by Prosperi et al. [28] on the probability of slight damage to shallow-foundation masonry buildings, this paper adopts a tilt control target of 1.0‰. Scheme 2 limits the tilts of the mosque and the Former Residence to 0.543‰ and 0.486‰, respectively—approximately half of this target—thereby providing an ample safety margin.
Building tilt is directly governed by the differential settlement between the near-pit and far-pit sides of the foundation. In Scheme 1, the through-going shear band extends from the wall to beneath the near-pit side of the foundation. The near-pit side sits on the sliding block and settles significantly as the block moves into the excavation. In contrast, the far-pit side lies outside the sliding zone. This produces the largest differential settlement and tilt. Scheme 2 confines the shear band to the soil around the excavation. This results in a shallow settlement trough with a gentle transverse gradient and the smallest tilt. In Scheme 3, the early excavation of Zone C1 first disturbs the soil behind the A3 wall. The subsequent excavation of A3 then disturbs the same zone again. Both disturbances cause larger settlement on the near-pit side than on the far-pit side. Their superposition further amplifies the differential settlement. Consequently, the tilt level lies between those of Schemes 1 and 2.

4.5. Mechanism Analysis of Differential Deformation

The performance differences among Schemes 1–3 are fundamentally governed by the spatial continuity and temporal evolution of the plastic shear band. This continuity and evolution are in turn controlled by the excavation zoning and construction sequence.
Scheme 1 adopts a large-block excavation. In a single unloading step, the shear strain in the soil behind the wall simultaneously exceeds the small-strain threshold. This forms a through-going shear band that extends continuously from the retaining wall to beneath the building foundation. The mechanism is analogous to progressive failure. Once a slip surface becomes continuous, large-scale soil mass movement can occur under minimal additional stress. As a result, all three deformation indicators reach their maximum values.
Schemes 2 and 3 both employ zoned staged excavation, yet their performances differ markedly. The critical distinction lies in the timing of the stiffening of the subzones adjacent to the buildings. In Scheme 2, the zones immediately adjacent to the buildings (A2 and A3) are excavated first and their bottom slabs are cast. This establishes a stiffened zone on the near-structure side before the far-side Zone C1 is unloaded. This stiffened zone effectively interrupts the stress transfer from the subsequent far-side unloading. It confines the plastic shear band to a limited region around the excavation. Consequently, all deformation indicators are minimized.
In Scheme 3, the far-side Zone C1 is excavated first. This subjects the soil on the near-structure side to shear pre-strain and stiffness degradation before the adjacent excavations begin. This observation is consistent with the stress-path dependency of soft clays reported by Ng et al. [29]. When excavations A2 and A3 are subsequently opened, the soil is mechanically weakened. As a result, it becomes more susceptible to the development of a plastic shear band that propagates beneath the building foundation.
Previous studies on excavation groups in soft soil have largely focused on superposing the ground movements caused by individually analyzed pits [5,6]. These studies established that pit spacing and relative position influence cumulative settlement. The present study extends this understanding. It demonstrates that two factors jointly determine the deformation pattern: the temporal order of stiffening within the zoned layout and the zoning geometry. These factors control whether the pattern is governed by progressive shear-band propagation or by localized, sequentially contained plastic zones. This finding is consistent with Yin et al. [7], who similarly showed that excavation sequencing and spacing configuration are critical coupled factors in the deformation control of pit groups.
The above comparison reveals two core design principles: first, the excavation must be zoned finely enough to prevent the formation of a through-going plastic shear band; second, the zones adjacent to the buildings must be excavated and stiffened before far-side unloading pre-conditions the soil.

5. Servo Strut Axial-Force Optimization and Coordinated Control Mechanisms

5.1. Experimental Design for Servo Strut Optimization

Previous studies have shown that servo struts can reduce wall deflection and ground settlement in deep soft-soil excavations. They achieve this by actively compensating axial force and suppressing prestress loss. Compared with conventional passive struts, servo struts offer clear advantages in maintaining axial-force stability and improving deformation control. However, excessive axial force may induce local ground heave or unfavorable interaction between strut levels [10]. To quantify the control mechanism of servo struts on the retaining system and the surrounding environment, excavation A2-2 was selected as the target subexcavation, and its conventional steel struts were replaced with servo struts.
Based on the optimal excavation Scheme 2, the first strut level in excavation A2-2 was kept as a concrete strut. The second, third, and fourth steel strut levels were replaced by servo struts. In the numerical model, the self-compensating axial-force behavior of the servo strut system was simulated by constant concentrated forces activated at the relevant construction stages. This simplification is justified for two reasons. First, field observations and experimental studies indicate that once the target force is reached and the control system stabilizes, the axial force in a servo strut remains within a narrow band around the set point during subsequent stages [30]. Second, previous numerical studies have shown that representing servo struts as constant axial forces captures the dominant effect on wall displacement and ground settlement [7]. However, this approach neglects transient axial-force fluctuations. This could lead to a marginal underestimation of local deformation peaks at intermediate stages. Nonetheless, given the servo strut system’s rapid restabilization, the overall deformation patterns and the optimal configurations are expected to be insensitive to these effects.
The axial forces of the second, third, and fourth servo strut levels were selected as design variables. They are denoted F2, F3, and F4. Three response variables were chosen: the maximum wall deflection, the mean settlement of the mosque, and the maximum tilt of the mosque. This choice reflects that sub-excavation A2-2 is adjacent to the mosque. A face-centered central composite design with 30 numerical experiments was adopted. The factor ranges were determined from a preliminary single-factor sensitivity analysis and the practical limits of the hydraulic servo strut system. The factor levels and design matrix are presented in Table 3. The complete design matrix is provided in Appendix A (Table A3). The maximum wall displacement and mean settlement were taken from Stage 13. The maximum tilt was taken as the largest value observed from Stages 9 to 13.
Table 3. Factors and levels used for servo strut axial-force optimization.

5.2. Response Surface Modeling and Validation

5.2.1. Identification of Multicollinearity

To isolate the independent effect of each strut, simple and partial correlation analyses were conducted for 30 design cases, with the results presented in Table 4.
Table 4. Simple and partial correlation coefficients between servo strut axial forces and response indicators.
The analysis shows that the independent contribution of F2 is easily underestimated. In the simple correlation analysis, F2 is not significant for any of the three response indicators. However, after controlling for F3 and F4, its partial correlation coefficient with wall deformation reaches −0.941. This occurs because the effect of F2 is masked by the simultaneous variation in F3 and F4. Once the confounding is removed, F2 exhibits strong and significant contributions to wall deformation, settlement, and tilt.
Furthermore, all three struts have a significant independent effect on each response indicator. Therefore, the three servo struts must be jointly included in the optimization model.

5.2.2. Development and Validation of the Response Surface Models

Quadratic response surface models were established using normalized factor levels as explanatory variables. These models include linear, quadratic, and interaction terms, as shown in Equation (1). Detailed rankings of the standardized coefficients are provided in Appendix A (Figure A1). This modeling strategy is widely used within the framework of central composite design. It enables the characterization of coupled multi-factor behavior and the optimization of design parameters with a limited number of simulations or experiments [31].
Y = β 0 + β 1 F 2 + β 2 F 3 + β 3 F 4 + β 11 F 2 2 + β 22 F 3 2 + β 33 F 4 2 + β 12 F 2 F 3 + β 13 F 2 F 4 + β 23 F 3 F 4
In Equation (1), Y denotes the response variable; β 0 is the intercept; β 1 , β 2 , β 3 are the linear coefficients; β 11 , β 22 , β 33 are the quadratic coefficients; and β 12 , β 13 , β 23 are the interaction coefficients.
The model fit and predictive capability were evaluated using two metrics: the coefficient of determination R2 and the leave-one-out cross-validation coefficient Q2. The results are shown in Figure 13. The wall-deformation model yields R2 = 0.9996 and Q2 = 0.9991. The building-tilt model yields R2 = 0.9800 and Q2 = 0.9261. Both values are well above 0.9, indicating excellent fit and strong out-of-sample predictive performance. The mean-settlement model gives R2 = 0.9031 and Q2 = 0.7307. This is acceptable for engineering prediction, but it indicates weaker predictive power. The result implies that settlement is more sensitive to factors such as soil heterogeneity that are not explicitly included in the model. The residual analysis shows that all standardized residuals fall within the ±2 σ limits. There are no obvious signs of heteroscedasticity or non-normality. This indicates that overfitting is not evident.
Figure 13. Validation of the response surface models and standardized residual diagnostics based on R2 and Q2. (Note: (a–c) Comparison between predicted and simulated values for each response indicator; (d–f) standardized residuals plotted against fitted values, with dashed lines indicating ±2 σ control limits).

5.3. Main Effects of Individual Servo Strut Forces

The independent influence of each strut-force level on the response indicators was quantified as follows. The other two factors were fixed at their center values, and main-effect curves were plotted, as shown in Figure 14. The response surface prediction curves were superimposed on the partial-regression residuals. These residuals are defined by Equation (2):
e i , p a r t i a l = ( y i − y ^ i ) + y ^ ( F k , i , F ¯ ∼ k )
Figure 14. Main effects of individual strut forces (F2, F3, and F4) on excavation-response indicators at Stage 13. (Note: For each panel, the other factor is fixed at their center levels (F2 = 1000 kN, F3 = 1425 kN, and F4 = 1225 kN). Lines denote response-surface predictions and points denote simulation data adjusted by partial-regression residuals).
In Equation (2), e i , p a r t i a l denotes the partial residual, y i is the numerical simulation value of the response indicator for the i-th sample, y ^ i is the fitted value from the full response surface model, and y ^ ( F k , i , F ¯ ∼ k ) is the response surface prediction obtained by setting the k-th target factor to its actual value F k , i for the i-th sample, while fixing the other two factors at their central levels.
As shown in Figure 14, all curves decrease monotonically with increasing strut axial force. This confirms that all three struts play a positive role in deformation control. For maximum wall deformation, the influence of F3 and F4 is approximately 2.3 times that of F2. This indicates that the middle and lower strut levels dominate the deformation control of the diaphragm wall. This outcome is mechanically intuitive. In excavation engineering, the lower portion of the diaphragm wall is subjected to greater earth and water pressures. Increasing the stiffness and preload axial force of the middle and lower struts can therefore effectively offset the peak bending moment and lateral earth pressure. Previous theoretical analyses and full-scale tests have also demonstrated that increasing the stiffness and prestress of the middle and lower struts can reduce lateral wall displacement [32].
For building settlement, the middle strut F3 plays a dominant role. Its effect is more than twice that of the upper strut F2 and the deep strut F4. However, the control effects of F3 and F4 on the maximum lateral wall displacement are not significantly different. This phenomenon is similar to the findings of Li et al. [10]. Model tests by Wei et al. [31] further confirmed that the middle strut provides better control of ground surface settlement than the deep strut. A likely reason for this difference is as follows. The restraining effect of the middle strut acts directly on the soil deformation zone closely associated with the ground surface settlement trough. In contrast, the deep strut primarily influences the stress field at the excavation base and provides limited lateral restraint to the overlying soil.
The effectiveness of the struts in controlling building tilt ranks as F3 > F4 > F2. Compared with its performance in the previous two indicators, the contribution of F2 to tilt is significantly enhanced. This is because F2 is located closer to the upper part of the wall and can restrain the rotation of the wall top. This effectively suppresses the ground surface settlement near the excavation. The study by Hsieh and Ou [32] also confirmed that cantilever deformation at the wall top can create a “cantilever-type” settlement profile with a steep slope near the wall. Such a profile leads to large angular distortion of the building. By suppressing these adverse settlement patterns, F2 can effectively reduce the differential settlement between the two ends of the building.

5.4. Two-Factor Interaction Effects

To reveal the synergistic or antagonistic interactions between struts at different elevations, two-factor interaction curves were plotted, as shown in Figure 15. The poorer the parallelism of the curves, the stronger the interaction between the two factors.
Figure 15. Interaction matrix of strut forces (F2, F3, and F4) for excavation-response indicators at Stage 13. (Note: For each panel, the other factor is fixed at their center levels (F2 = 1000 kN, F3 = 1425 kN, and F4 = 1225 kN). Lines denote response-surface predictions and points denote simulation data adjusted by partial-regression residuals).
In the wall deformation model, noticeable antagonistic interactions exist among the struts in the high axial force range. This occurs for the following reason. When multiple struts simultaneously apply high axial forces, the soil behind the wall is gradually compressed and densified. Its stiffness then increases sharply. As a result, the soil resistance that must be overcome to push the wall back increases nonlinearly. This leads to a synchronous decline in the marginal control efficiency of each strut’s axial force increment.
In the building settlement model, only the linear terms are significant. The strut factors act largely independently, as shown by the nearly parallel curves. This occurs because the struts control settlement primarily by controlling ground loss. However, part of the variability in settlement response is not explained solely by ground loss. It is also constrained by other factors, such as vertical wall displacement and seepage consolidation [10]. These external factors are superimposed onto the independent contributions of each strut. This further masks the interaction effects among the struts.
In the building tilt model, the spacing between curves narrows to the greatest extent. This indicates the most significant antagonistic interactions. It suggests that tilt control relies more heavily on the coordinated regulation of all struts. Simply increasing a single strut force can hardly achieve the desired effect. The reason is that the three struts form a coupling relationship in tilt control. If the axial force of one strut is increased alone, the wall deformation mode will change locally. This can transform the settlement trough from a concave shape into a more unfavorable form, thereby exacerbating the differential settlement at the two ends of the building.
As shown in Figure 15h, when F2 is fixed at 1320 kN, F4 achieves the best control of building tilt at approximately 1450 kN; further increasing F4 actually worsens the tilt. This can be explained as follows: at a high F2 level, the settlement of the building on the near-excavation side is already smaller than that on the far side, resulting in a higher elevation near the excavation and a lower one away from it. Further increasing the F4 axial force intensifies this differential settlement, thereby further increasing the building tilt. This phenomenon once again confirms that the strut forces must be jointly optimized.

5.5. Multi-Objective Optimization and Optimal Axial-Force Determination

5.5.1. Optimization Framework

In engineering practice, different sites place different priorities on wall deformation, building settlement, and building tilt. The optimal solution under a single weighting pattern may therefore be highly sensitive to the selected weights and lack robustness. To address this issue, a weighted comprehensive-scoring method was adopted. Sensitivity analysis was carried out under seven different weighting scenarios. The goal was to identify the most robust axial-force configuration among the 30 candidate cases.
Each indicator was first normalized linearly to a score in the range [0, 1], where a higher score denotes better control performance, as defined in Equation (3), in which f i is the normalized score of a single indicator, Y i is the simulated value of the i-th indicator, and Y m a x and Y m i n represent the maximum and minimum sample values of the corresponding indicator, respectively.
f i = Y m a x − Y i Y m a x − Y m i n
A weighted comprehensive score D was then calculated as the weighted sum of the normalized scores of retaining wall deformation, mean building settlement, and maximum building tilt, as shown in Equation (4), where w 1 , w 2 , and w 3 are the corresponding weight coefficients for the above three indicators, satisfying the constraint w 1 + w 2 + w 3 = 1 .
D = w 1 f 1 + w 2 f 2 + w 3 f 3
The seven weighting scenarios listed in Table 5 cover a range of practical control priorities commonly encountered in engineering design.
Table 5. Weighting scenarios used for the multi-objective optimization.

5.5.2. Selection of the Optimal Scheme and Robustness Evaluation

The comprehensive scores and robustness rankings under the seven weighting scenarios are shown in Figure 16. Case G4 ranks first in four of the seven weighting scenarios. It achieves an average rank of 1.43 and a win rate of 57.1%. This demonstrates substantially better overall robustness than the other candidate cases. Case G4 is therefore recommended as the optimal servo strut configuration, corresponding to F2 = 1200 kN, F3 = 1800 kN, and F4 = 1550 kN. Under this configuration, the maximum building tilt is 0.380‰, which is below the code limit of 1.0‰. The maximum wall deflection is 11.77 mm, representing a reduction of approximately 35–42% relative to the worst case in the design space. The mean building settlement is 0.522 mm, representing a reduction of approximately 60–70%.
Figure 16. Multi-objective decision results at Stage 13. (Note: Panel (a) compares candidate schemes under seven weighting scenarios, and panel (b) identifies the most robust solution. The bars in panel (b) denote the number of first-place rankings, and the dashed line denotes the mean rank).
In contrast, under non-servo control, the corresponding passive strut forces are F2 = 1149 kN, F3 = 1271 kN, and F4 = 581 kN. Under these conditions, the maximum wall deflection reaches 22.2 mm, the mean building settlement is 1.59 mm, and the maximum building tilt is 0.453‰. This comparison clearly demonstrates that the servo strut system, through active compensation, significantly increases the effective axial forces of all strut levels. In particular, the forces in struts F3 and F4—which play a critical role in deformation control—are markedly enhanced. As a result, the system substantially improves the control of excavation-induced deformation.
The optimal force distribution pattern is consistent with the earlier main-effect analysis. F3 has the highest force to resist the peak lateral pressure. F4 is moderately high and assists F3 in restraining toe kick-out. F2 is medium and controls upper-wall rotation and tilt. All top-ranked configurations exhibit this distribution pattern. This confirms that the middle and deep struts dominate wall deflection and settlement, while the shallow strut plays an important role in controlling tilt.

5.6. Summary of Servo Strut Optimization

The servo strut optimization analysis quantitatively establishes a layered control hierarchy among the three strut levels, revealing distinct dominant mechanisms for different response indicators.
For maximum diaphragm-wall deflection, the third and fourth struts are the dominant factors, exerting approximately 2.3 times the influence of the second strut. The overall effect hierarchy is F3 ≈ F4 > F2, indicating that the middle and lower strut levels govern the bulging deformation of the retaining wall.
In the case of mean building settlement, the third strut plays the overwhelmingly dominant role. Its effect is more than twice that of either F2 or F4, resulting in a hierarchy of F3 > F2 ≈ F4. This reflects the direct restraint the middle strut provides to the soil deformation zone most closely associated with the ground surface settlement trough.
For building tilt, control relies on the coordinated action of all three strut levels. The effect hierarchy is F3 > F2 > F4. Notably, the contribution of F2 is significantly enhanced relative to the other two indicators, because its position near the top of the wall effectively restrains wall-top rotation and the steep settlement gradient that develops close to the excavation.
Interaction analyses further reveal contrasting behaviors among the response indicators. Wall deflection and building tilt exhibit strong antagonistic interactions among the struts in the high axial-force range. This indicates diminishing marginal benefits when multiple struts are simultaneously preloaded to high levels. In contrast, the strut effects on building settlement are largely independent. The interaction terms show limited significance.
Multi-weight robust optimization across seven weighting scenarios consistently identifies F2 = 1200 kN, F3 = 1800 kN, and F4 = 1550 kN as the optimal axial-force configuration. Under this configuration, the maximum building tilt is limited to 0.380‰, which is well below the 1.0‰ code limit. The solution also remains stable under varying engineering priorities. These results confirm the effectiveness and practical robustness of the proposed active support strategy for heritage-building protection in soft-soil excavation groups.

6. Limitations

The proposed strategy of zoned excavation and servo strut optimization provides a robust framework for controlling deformations in soft-soil excavation groups. However, its application is still subject to several inherent limitations. These limitations, in turn, point toward meaningful directions for future research.
First, the numerical representation of the servo strut system is idealized. The three-dimensional finite element model simplifies the self-compensating mechanism as constant concentrated forces. These forces are activated at specified construction steps. In contrast, actual hydraulic servo struts operate via dynamic feedback control loops. Their behavior involves threshold-dependent responses and transient pressure fluctuations during jacking and relaxation. This static stepwise simulation can capture the dominant effects on wall displacement and ground settlement. However, it cannot reproduce the time evolution of axial forces during active compensation. It also cannot reflect the short-term surges in wall displacement that may occur.
Second, stratigraphic uncertainty remains a critical challenge. In this study, the HSS model assumes horizontal homogeneity of each soil layer. It does not account for the inherent spatial variability of soft soil mechanical parameters. Local weak zones in the actual strata can cause deviations between numerical simulations and field measurements.
Third, the assessment of historic buildings is based on macroscopic deformation indicators—namely, mean settlement and maximum tilt. These geometric quantities have a sound statistical correlation with damage in masonry structures. However, they cannot directly reveal the meso-structural health condition of aged brick–timber assemblies. For example, they cannot reflect stress concentrations around window openings, propagation of initial cracks in mortar joints, or differential deformation among structural components.
Fourth, the conclusions of this study are derived from the typical soft clay of Ningbo and the corresponding HSS parameter ratios. In hard clay, dense sand, or weathered rock, the shear strain induced by unloading decreases significantly. Consequently, a continuous plastic shear band is unlikely to form. For this reason, the quantitative improvement indicators reported in this paper cannot be directly extrapolated. The proposed zoning principle and construction logic, however, still offer qualitative reference value for deformation control. Their universal optimality under non-soft-soil conditions requires specific verification. Similarly, the layered control relationship of the servo struts needs to be recalibrated according to the specific ground conditions. Overall, the methodological framework established in this paper is transferable. The optimal distribution of strut forces, however, will vary with geological conditions.
Based on the above limitations, future research can be pursued in the following directions: (1) incorporating the real control characteristics of servo strut systems to quantify the influence of transient axial force fluctuations; (2) accounting for the spatial variability of soil parameters to conduct probabilistic deformation risk assessment; (3) establishing a refined geotechnical–structural coupled model to predict damage initiation and propagation.

7. Conclusions

The main conclusions of this study are as follows:
(1)
Among the three excavation schemes, the near-to-far small-zone staged excavation scheme provides the best deformation control. Compared with the conventional large-block scheme, it reduces the maximum wall deflection on the Former Residence side by 37.0% and the maximum building tilt by 54.0%. For the mosque, the corresponding reductions are 8.5% in wall deflection and 16.0% in tilt. Zoning scale exerts a stronger influence on excavation-induced deformation than excavation sequence alone.
(2)
The HSS constitutive model was calibrated using site investigation data, regional experience, and back-analysis. It predicts wall-deflection peaks with errors within 10%. This provides a reliable numerical basis for comparative evaluation of excavation schemes in sensitive environments.
(3)
Servo steel struts at different elevations exhibit a layered control hierarchy. For maximum wall deflection, the third and fourth strut levels are the dominant factors, with an effect hierarchy of F3 ≈ F4 > F2. For mean building settlement, the third strut level plays the dominant role, following F3 > F2 ≈ F4. For building tilt, the control effect relies on the joint action of all three strut levels, with a hierarchy of F3 > F2 > F4.
(4)
The multi-weight robust optimization procedure identifies the optimal axial-force combination for the second, third, and fourth servo struts as 1200 kN, 1800 kN, and 1550 kN, respectively. Under this configuration, the maximum building tilt is limited to 0.380‰. This value is well below the 1.0‰ code limit. The solution also remains stable across multiple weighting scenarios. This result provides a useful reference for active support design in comparable soft-soil sensitive environments.
(5)
This study makes two main contributions. First, it quantitatively establishes a layered control hierarchy among multi-level servo struts for different deformation indicators. Second, it reveals that the near-to-far small-zone excavation effectively suppresses the propagation of continuous plastic shear bands beneath sensitive buildings. Building on these findings, the study integrates the zoned construction sequence with robustly optimized servo strut forces. This integration yields a deformation control methodology that can serve as a reference for deep excavation groups adjacent to heritage buildings in soft soils.

Author Contributions

Conceptualization, C.C. and H.D.; methodology, H.X.; software, H.X. and P.W.; validation, C.C., S.G. and H.D.; formal analysis, H.X. and P.W.; investigation, C.C. and S.G.; resources, C.C., P.W. and S.G.; data curation, H.X.; writing—original draft preparation, H.X. and C.C.; writing—review and editing, H.D.; visualization, H.X.; supervision, H.D.; project administration, C.C. and H.D.; funding acquisition, H.D. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the General Program of the Shanghai Natural Science Foundation, grant number 20ZR1459900.

Data Availability Statement

The data supporting the findings of this study are contained within the article. Additional processed data are available from the corresponding author upon reasonable request.

Conflicts of Interest

Authors Chunxiao Chen and Pengfei Wang were employed by Ningbo Haicheng Investment Development Co., Ltd. Author Shixin Guo was employed by Zhejiang Construction Engineering Group Co., Ltd. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest. The funders had no role in the design of the study; in the collection, analyses, or interpretation of data; in the writing of the manuscript; or in the decision to publish the results.

Appendix A

Table A1. Simulated construction stages for the excavation group.
Table A2. Parameter configurations for the sensitivity analysis of the HSS model.
Table A3. Face-centered central composite design matrix for servo strut axial-force optimization.
Figure A1. Standardized coefficient ranking of the response surface models for (a) maximum wall deflection, (b) mean building settlement, and (c) maximum building tilt. (Note: Blue and red bars denote beneficial ( β < 0) and detrimental ( β > 0) effects, respectively. Significance levels: *** p < 0.001, ** p < 0.01, * p < 0.05, ns = not significant).

References

  1. Maleki, J.; Pak, A.; Yousefi, M.; Aghakhani, N. A comprehensive FE study for design of anchored wall systems for deep excavations. Tunn. Undergr. Space Technol. 2022, 122, 104340. [Google Scholar] [CrossRef] [Scilit]
  2. Li, S.; Wang, F.; Le, Y.; Que, Q.; Su, Y.; Lin, H. Design and deformation pattern simulation of deep excavation support structures. Front. Earth Sci. 2024, 12, 1416957. [Google Scholar] [CrossRef] [Scilit]
  3. Ou, C.Y.; Teng, F.; Li, C.W. A simplified estimation of excavation-induced ground movements for adjacent building damage potential assessment. Tunn. Undergr. Space Technol. 2020, 106, 103561. [Google Scholar] [CrossRef] [Scilit]
  4. Li, Z.; Han, M.; Liu, L.; Li, Y.; Yan, S. Corner and partition wall effects on the settlement of a historical building near a supported subway excavation in soft soil. Comput. Geotech. 2020, 128, 103805. [Google Scholar] [CrossRef] [Scilit]
  5. Lei, H.; Zhan, B.; Feng, S.; Amin, M. Influence of foundation pit groups’ excavation on the deformation characteristics of adjacent railway subgrade and protection measures. Geotech. Geol. Eng. 2023, 41, 3877–3895. [Google Scholar] [CrossRef] [Scilit]
  6. Xiao, Y.G.; Liu, X.M.; He, X.P.; Zheng, C.; Bai, Q.Q.; Zhang, Y. Case study on the mutual influence of simultaneous construction of adjacent deep foundation pit with cover-excavation reverse method. Adv. Civ. Eng. 2024, 2024, 5197973. [Google Scholar] [CrossRef] [Scilit]
  7. Yin, Z.; Jin, R.; Guan, S.; Chen, Z.; Dai, G.; Zhu, W. Research on construction sequencing and deformation control for foundation pit groups. Appl. Sci. 2025, 15, 7719. [Google Scholar] [CrossRef] [Scilit]
  8. Ying, H.W.; Cheng, K.; Zhang, L.S.; Ou, C.Y.; Yang, Y.W. Evaluation of excavation-induced movements through case histories in Hangzhou. Eng. Comput. 2020, 37, 1993–2016. [Google Scholar] [CrossRef] [Scilit]
  9. Li, G.; Qin, F.; Yan, N.; Qiao, X.; Si, L.; Zhao, S. Surface deformation characteristics and influencing factors in deep foundation pit excavations for subway projects in Ningbo’s soft soil area. Buildings 2025, 15, 1229. [Google Scholar] [CrossRef] [Scilit]
  10. Li, M.; Demeijer, O.; Chen, J. Effectiveness of servo struts in controlling excavation-induced wall deflection and ground settlement. Acta Geotech. 2020, 15, 2575–2590. [Google Scholar] [CrossRef] [Scilit]
  11. Xu, L.; Li, W.; Liu, L.; Wu, F.; Fan, Z.; Chen, R. Deformation analysis of a deep excavation with a servo control system adjacent to an existing foundation pit: A case study in Shenzhen. Tunn. Undergr. Space Technol. 2026, 170, 107374. [Google Scholar] [CrossRef] [Scilit]
  12. Zhao, P.; Qiu, Y.; Liu, F.; Wang, Z.; Guo, P. Investigation on performance of steel strut servo system braced deep excavation adjacent to existing buildings: A case study. Sci. Rep. 2025, 15, 37550. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  13. Di, H.; Jin, Y.; Zhou, S.; Zhang, X.; Wu, D.; Guo, H. Experimental study on the adjustments of servo steel struts in deep excavations. Acta Geotech. 2023, 18, 6615–6629. [Google Scholar] [CrossRef] [Scilit]
  14. Nangulama, H.K.; Jian, Z. Deformation control monitoring of basement excavation at field construction site: A case of hydraulic servo steel enhancement geotechnology. Adv. Civ. Eng. 2022, 2022, 6234581. [Google Scholar] [CrossRef] [Scilit]
  15. Jin, Y.Y.; Di, H.G.; Zhou, S.H.; Liu, H.; Wu, D.; Guo, H.J. Effects of active axial force adjustment of struts on support system during pit excavation: Experimental study. J. Geotech. Geoenviron. Eng. 2024, 150, 04024027. [Google Scholar] [CrossRef] [Scilit]
  16. Li, Y.; Liu, Z. Excavation deformation analysis of subway foundation pits based on finite element analysis. AIP Adv. 2024, 14, 125316. [Google Scholar] [CrossRef] [Scilit]
  17. Chen, Y.; Shen, D.; Luo, M.; Huang, J.; Shen, P. Experimental research and application of small-strain soil hardening model parameters in a major project in Hangzhou. Transp. Res. Rec. 2024, 2678, 1939–1949. [Google Scholar] [CrossRef] [Scilit]
  18. Brinkgreve, R.B.J.; Broere, W. Plaxis Material Models Manual; PLAXIS BV: Delft, The Netherlands, 2006. [Google Scholar]
  19. Wang, W.; Li, Q.; Xu, Z.; Zong, L.; Li, Y. Investigation and Application of Small-Strain Model Parameters for Soft Clay Deposits. Chin. J. Undergr. Space Eng. 2023, 19, 844–855. [Google Scholar] [CrossRef]
  20. Zheng, X.; Wang, X.; Shen, K.; Gu, X. Determination of HSS Model Parameters for Soft Clays in Hangzhou: Statistical Analysis and Engineering Validation. Buildings 2025, 15, 3886. [Google Scholar] [CrossRef] [Scilit]
  21. Liang, F.; Jia, Y.; Ding, Y.; Huang, M. Experimental study on parameters of HSS model for soft soils in Shanghai. Chin. J. Geotech. Eng. 2017, 39, 269–278. [Google Scholar] [CrossRef]
  22. Shen, D.; Chen, Y.; Luo, M.; Huang, J. Experimental research on parameter selection of HSS model for Ningbo shallow soft soil. Chin. J. Geotech. Eng. 2023, 45, 114–118. [Google Scholar] [CrossRef]
  23. Hsiung, B.-C.B. A case study on the behaviour of a deep excavation in sand. Comput. Geotech. 2009, 36, 665–675. [Google Scholar] [CrossRef] [Scilit]
  24. Wang, J.H.; Xu, Z.H.; Wang, W.D. Wall and ground movements due to deep excavations in Shanghai soft soils. J. Geotech. Geoenviron. Eng. 2010, 136, 985–994. [Google Scholar] [CrossRef] [Scilit]
  25. Moormann, C. Analysis of wall and ground movements due to deep excavations in soft soil based on a new worldwide database. Soils Found. 2004, 44, 87–98. [Google Scholar] [CrossRef] [Scilit]
  26. Peck, R.B. Deep excavations and tunneling in soft ground. In Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering, Mexico City, Mexico, 25–29 August 1969; State-of-the-Art Volume, pp. 225–290. [Google Scholar]
  27. Boscardin, M.D.; Cording, E.J. Building response to excavation-induced settlement. J. Geotech. Eng. 1989, 115, 1–21. [Google Scholar] [CrossRef] [Scilit]
  28. Prosperi, A.; Korswagen, P.A.; Korff, M.; Schipper, R.; Rots, J.G. Empirical fragility and ROC curves for masonry buildings subjected to settlements. J. Build. Eng. 2023, 72, 106094. [Google Scholar] [CrossRef] [Scilit]
  29. Ng, C.W.W.; Hong, Y.; Liu, G.B.; Liu, T. Ground deformations and soil–structure interaction of a multi-propped excavation in Shanghai soft clays. Géotechnique 2012, 62, 907–921. [Google Scholar] [CrossRef] [Scilit]
  30. Xu, X.B.; Liang, Y.H.; Hu, Q.; Yao, H.L.; Shen, W.M. Effect of assembled H-shaped steel struts with servo strut system on the safe excavation of a subway station. Proc. Inst. Civ. Eng.–Geotech. Eng. 178, 164–181. [CrossRef] [Scilit]
  31. Wei, G.; Feng, W.; Wu, X.; Wu, P.; Chang, K.; Li, H.; Ye, S.; Wang, Z. Model tests of the influence of excavation unloading and servo loading on subway foundation pits. Buildings 2025, 15, 2054. [Google Scholar] [CrossRef] [Scilit]
  32. Hsieh, P.G.; Ou, C.Y. Shape of ground surface settlement profiles caused by excavation. Can. Geotech. J. 1998, 35, 1004–1017. [Google Scholar] [CrossRef]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.