Skip to Content

4 Results Found

  • Article
  • Open Access
11 Citations
2,914 Views
21 Pages

8 July 2022

The proportion of universal segment in tunnel construction is constantly increasing. A key factor affecting the quality of tunnel construction is the selection of the shield segment assembly points. Nevertheless, the quality and efficiency of the cur...

(This article belongs to the Topic Pipeline and Underground Space Technology)
  • Article
  • Open Access
108 Views
18 Pages

The Decision-Making Method for the Assembly Point of Universal Segments in Shield Tunnel

  • Dehai Lin,
  • Zhihao Zhang,
  • Jiasheng Lian,
  • Xuezhen Wu and
  • Zhenchang Guan

10 November 2026

To support rational assembly-point selection for universal segmental rings during shield tunneling, a geometric model was established to describe the ring pose. The effects of assembly-point selection on alignment deviation, thrust-cylinder stroke di...

  • Article
  • Open Access
2 Citations
1,608 Views
20 Pages

Passive Climate Adaptation of Heritage Arcades: Field Evidence on the Geometry–Radiation–Thermal Comfort Chain and Orientation Effects

  • Yaolong Wang,
  • Jiarui Xu,
  • Tingfeng Liu,
  • Xiao Hu and ,
  • Shouhan Liu,
  • Hao Xu and
  • Zefa Wang
  • + 2 authors+ 0 author

2 January 2026

Historic arcades in shaded street canyons may act as passive microclimate infrastructure. We monitored paired arcade–open points along two arcaded streets in Haikou, China, under clear summer conditions, recording hourly microclimate from 09:00...

(This article belongs to the Special Issue Trends and Prospects in Indoor Environment of Buildings)
  • Review
  • Open Access
7 Citations
2,442 Views
44 Pages

A Review of Grout Diffusion Mechanisms and Quality Assessment Techniques for Backfill Grouting in Shield Tunnels

  • Chi Zhu,
  • Jinyang Fu,
  • Haoyu Wang,
  • Yiqian Xia and ,
  • Junsheng Yang and
  • Shuying Wang
  • + 1 author+ 0 author

25 December 2025

Ground settlement is readily induced by shield–tail gaps formed during tunneling, where soil loss must be compensated through backfill grouting. However, improper grouting control may trigger tunnel uplift, segment misalignment, and, after soli...

(This article belongs to the Section Building Structures)