Exact and Heuristic Scheduling Algorithms

A special issue of Algorithms (ISSN 1999-4893).

Deadline for manuscript submissions: closed (15 November 2019) | Viewed by 44224

Printed Edition Available!
A printed edition of this Special Issue is available here.

Special Issue Editors


E-Mail Website
Guest Editor
Faculty of Mathematics, Otto-von-Guericke-University, P.O. Box 4120, D-39016 Magdeburg, Germany
Interests: scheduling, in particular development of exact and approximate algorithms; stability investigations is discrete optimization; scheduling with interval processing times; complexity investigations for scheduling problems; train scheduling; graph theory; logistics; supply chains; packing; simulation and applications
Special Issues, Collections and Topics in MDPI journals

E-Mail
Co-Guest Editor
United Institute of Informatics Problems, National Academy of Sciences of Belarus, Surganova Street 6, 220012 Minsk, Belarus
Interests: discrete optimization; scheduling; graph theory; uncertainty

E-Mail Website
Co-Guest Editor
1. CICESE Research Center, carr. Tijuana-Ensenada 3918, Ensenada 22860, BC, Mexico
2. Ivannikov Institute for System Programming, RAS Moskow, Alexander Solzhenitsyn Street, 25, 109004 Moskow, Russia
Interests: multi-objective resource optimization; security, uncertainty, dynamic scheduling; adaptive resource allocation

Special Issue Information

Dear colleagues,

We invite you to submit your latest research in the area of the development of scheduling algorithms to this Special Issue, “Exact and Heuristic Scheduling Algorithms”. We are looking for new and innovative approaches for solving scheduling problems exactly or approximately. High-quality papers are solicited to address both theoretical and practical issues of scheduling algorithms. Submissions are welcome both for traditional scheduling problems and new applications. Potential topics include, but are not limited to, single-criterion and multi-criteria scheduling problems with additional constraints such as setup times/costs, precedence constraints, batching/lot sizing, resource constraints, as well as scheduling algorithms for problems arising in emerging applications, such as healthcare, transport, and energy management.

Prof. Dr. Frank Werner
Dr. Larysa Burtseva
Prof. Dr. Yuri Sotskov
Guest Editors

Manuscript Submission Information

Manuscripts should be submitted online at www.mdpi.com by registering and logging in to this website. Once you are registered, click here to go to the submission form. Manuscripts can be submitted until the deadline. All submissions that pass pre-check are peer-reviewed. Accepted papers will be published continuously in the journal (as soon as accepted) and will be listed together on the special issue website. Research articles, review articles as well as short communications are invited. For planned papers, a title and short abstract (about 100 words) can be sent to the Editorial Office for announcement on this website.

Submitted manuscripts should not have been published previously, nor be under consideration for publication elsewhere (except conference proceedings papers). All manuscripts are thoroughly refereed through a single-blind peer-review process. A guide for authors and other relevant information for submission of manuscripts is available on the Instructions for Authors page. Algorithms is an international peer-reviewed open access monthly journal published by MDPI.

Please visit the Instructions for Authors page before submitting a manuscript. The Article Processing Charge (APC) for publication in this open access journal is 1600 CHF (Swiss Francs). Submitted papers should be well formatted and use good English. Authors may use MDPI's English editing service prior to publication or during author revisions.

Keywords

  • enumerative scheduling algorithms
  • approximate scheduling algorithms
  • scheduling heuristics and metaheuristics
  • evolutionary algorithms
  • complexity of scheduling algorithms
  • algorithms for multi-criteria scheduling
  • scheduling algorithms for supply chains
  • scheduling algorithms for problems in logistics, transport, timetabling, healthcare, engineering, and energy management
  • algorithms for resource-constrained project scheduling problems
  • just-in-time scheduling
  • assembly line balancing and scheduling
  • railway scheduling
  • agent-based scheduling
  • real-time scheduling
  • scheduling under uncertainty

Benefits of Publishing in a Special Issue

  • Ease of navigation: Grouping papers by topic helps scholars navigate broad scope journals more efficiently.
  • Greater discoverability: Special Issues support the reach and impact of scientific research. Articles in Special Issues are more discoverable and cited more frequently.
  • Expansion of research network: Special Issues facilitate connections among authors, fostering scientific collaborations.
  • External promotion: Articles in Special Issues are often promoted through the journal's social media, increasing their visibility.
  • e-Book format: Special Issues with more than 10 articles can be published as dedicated e-books, ensuring wide and rapid dissemination.

Further information on MDPI's Special Issue polices can be found here.

Published Papers (9 papers)

Order results
Result details
Select all
Export citation of selected articles as:

Editorial

Jump to: Research

4 pages, 171 KiB  
Editorial
Special Issue on Exact and Heuristic Scheduling Algorithms
by Frank Werner, Larysa Burtseva and Yuri N. Sotskov
Algorithms 2020, 13(1), 9; https://doi.org/10.3390/a13010009 - 25 Dec 2019
Cited by 7 | Viewed by 3752
Abstract
This special issue of Algorithms is a follow-up issue of an earlier one, entitled ‘Algorithms for Scheduling Problems’. In particular, the new issue is devoted to the development of exact and heuristic scheduling algorithms. Submissions were welcome both for traditional scheduling problems as [...] Read more.
This special issue of Algorithms is a follow-up issue of an earlier one, entitled ‘Algorithms for Scheduling Problems’. In particular, the new issue is devoted to the development of exact and heuristic scheduling algorithms. Submissions were welcome both for traditional scheduling problems as well as for new practical applications. In the Call for Papers, we mentioned topics such as single-criterion and multi-criteria scheduling problems with additional constraints including setup times (costs), precedence constraints, batching (lot sizing), resource constraints as well as scheduling problems arising in emerging applications. Full article
(This article belongs to the Special Issue Exact and Heuristic Scheduling Algorithms)

Research

Jump to: Editorial

15 pages, 349 KiB  
Article
A Generalized MILP Formulation for the Period-Aggregated Resource Leveling Problem with Variable Job Duration
by Ilia Tarasov, Alain Haït and Olga Battaïa
Algorithms 2020, 13(1), 6; https://doi.org/10.3390/a13010006 - 23 Dec 2019
Cited by 7 | Viewed by 4038
Abstract
We study a resource leveling problem with variable job duration. The considered problem includes both scheduling and resource management decisions. The planning horizon is fixed and separated into a set of time periods of equal length. There are several types of resources and [...] Read more.
We study a resource leveling problem with variable job duration. The considered problem includes both scheduling and resource management decisions. The planning horizon is fixed and separated into a set of time periods of equal length. There are several types of resources and their amount varies from one period to another. There is a set of jobs. For each job, a fixed volume of work has to be completed without any preemption while using different resources. If necessary, extra resources can be used at additional costs during each time period. The optimization goal is to minimize the total overload costs required for the execution of all jobs by the given deadline. The decision variables specify the starting time of each job, the duration of the job and the resource amount assigned to the job during each period (it may vary over periods). We propose a new generalized mathematical formulation for this optimization problem. The formulation is compared with existing approaches from the literature. Theoretical study and computational experiments show that our approach provides more flexible resource allocation resulting in better final solutions. Full article
(This article belongs to the Special Issue Exact and Heuristic Scheduling Algorithms)
Show Figures

Figure 1

30 pages, 576 KiB  
Article
Simple Constructive, Insertion, and Improvement Heuristics Based on the Girding Polygon for the Euclidean Traveling Salesman Problem
by Víctor Pacheco-Valencia, José Alberto Hernández, José María Sigarreta and Nodari Vakhania
Algorithms 2020, 13(1), 5; https://doi.org/10.3390/a13010005 - 21 Dec 2019
Cited by 11 | Viewed by 5486
Abstract
The Traveling Salesman Problem (TSP) aims at finding the shortest trip for a salesman, who has to visit each of the locations from a given set exactly once, starting and ending at the same location. Here, we consider the Euclidean version of the [...] Read more.
The Traveling Salesman Problem (TSP) aims at finding the shortest trip for a salesman, who has to visit each of the locations from a given set exactly once, starting and ending at the same location. Here, we consider the Euclidean version of the problem, in which the locations are points in the two-dimensional Euclidean space and the distances are correspondingly Euclidean distances. We propose simple, fast, and easily implementable heuristics that work well, in practice, for large real-life problem instances. The algorithm works on three phases, the constructive, the insertion, and the improvement phases. The first two phases run in time O ( n 2 ) and the number of repetitions in the improvement phase, in practice, is bounded by a small constant. We have tested the practical behavior of our heuristics on the available benchmark problem instances. The approximation provided by our algorithm for the tested benchmark problem instances did not beat best known results. At the same time, comparing the CPU time used by our algorithm with that of the earlier known ones, in about 92% of the cases our algorithm has required less computational time. Our algorithm is also memory efficient: for the largest tested problem instance with 744,710 cities, it has used about 50 MiB, whereas the average memory usage for the remained 217 instances was 1.6 MiB. Full article
(This article belongs to the Special Issue Exact and Heuristic Scheduling Algorithms)
Show Figures

Figure 1

45 pages, 620 KiB  
Article
Two-Machine Job-Shop Scheduling Problem to Minimize the Makespan with Uncertain Job Durations
by Yuri N. Sotskov, Natalja M. Matsveichuk and Vadzim D. Hatsura
Algorithms 2020, 13(1), 4; https://doi.org/10.3390/a13010004 - 20 Dec 2019
Cited by 11 | Viewed by 5963
Abstract
We study two-machine shop-scheduling problems provided that lower and upper bounds on durations of n jobs are given before scheduling. An exact value of the job duration remains unknown until completing the job. The objective is to minimize the makespan (schedule length). We [...] Read more.
We study two-machine shop-scheduling problems provided that lower and upper bounds on durations of n jobs are given before scheduling. An exact value of the job duration remains unknown until completing the job. The objective is to minimize the makespan (schedule length). We address the issue of how to best execute a schedule if the job duration may take any real value from the given segment. Scheduling decisions may consist of two phases: an off-line phase and an on-line phase. Using information on the lower and upper bounds for each job duration available at the off-line phase, a scheduler can determine a minimal dominant set of schedules (DS) based on sufficient conditions for schedule domination. The DS optimally covers all possible realizations (scenarios) of the uncertain job durations in the sense that, for each possible scenario, there exists at least one schedule in the DS which is optimal. The DS enables a scheduler to quickly make an on-line scheduling decision whenever additional information on completing jobs is available. A scheduler can choose a schedule which is optimal for the most possible scenarios. We developed algorithms for testing a set of conditions for a schedule dominance. These algorithms are polynomial in the number of jobs. Their time complexity does not exceed O ( n 2 ) . Computational experiments have shown the effectiveness of the developed algorithms. If there were no more than 600 jobs, then all 1000 instances in each tested series were solved in one second at most. An instance with 10,000 jobs was solved in 0.4 s on average. The most instances from nine tested classes were optimally solved. If the maximum relative error of the job duration was not greater than 20 % , then more than 80 % of the tested instances were optimally solved. If the maximum relative error was equal to 50 % , then 45 % of the tested instances from the nine classes were optimally solved. Full article
(This article belongs to the Special Issue Exact and Heuristic Scheduling Algorithms)
Show Figures

Figure 1

21 pages, 572 KiB  
Article
Linking Scheduling Criteria to Shop Floor Performance in Permutation Flowshops
by Jose M. Framinan and Rainer Leisten
Algorithms 2019, 12(12), 263; https://doi.org/10.3390/a12120263 - 7 Dec 2019
Cited by 6 | Viewed by 3794
Abstract
The goal of manufacturing scheduling is to allocate a set of jobs to the machines in the shop so these jobs are processed according to a given criterion (or set of criteria). Such criteria are based on properties of the jobs to be [...] Read more.
The goal of manufacturing scheduling is to allocate a set of jobs to the machines in the shop so these jobs are processed according to a given criterion (or set of criteria). Such criteria are based on properties of the jobs to be scheduled (e.g., their completion times, due dates); so it is not clear how these (short-term) criteria impact on (long-term) shop floor performance measures. In this paper, we analyse the connection between the usual scheduling criteria employed as objectives in flowshop scheduling (e.g., makespan or idle time), and customary shop floor performance measures (e.g., work-in-process and throughput). Two of these linkages can be theoretically predicted (i.e., makespan and throughput as well as completion time and average cycle time), and the other such relationships should be discovered on a numerical/empirical basis. In order to do so, we set up an experimental analysis consisting in finding optimal (or good) schedules under several scheduling criteria, and then computing how these schedules perform in terms of the different shop floor performance measures for several instance sizes and for different structures of processing times. Results indicate that makespan only performs well with respect to throughput, and that one formulation of idle times obtains nearly as good results as makespan, while outperforming it in terms of average cycle time and work in process. Similarly, minimisation of completion time seems to be quite balanced in terms of shop floor performance, although it does not aim exactly at work-in-process minimisation, as some literature suggests. Finally, the experiments show that some of the existing scheduling criteria are poorly related to the shop floor performance measures under consideration. These results may help to better understand the impact of scheduling on flowshop performance, so scheduling research may be more geared towards shop floor performance, which is sometimes suggested as a cause for the lack of applicability of some scheduling models in manufacturing. Full article
(This article belongs to the Special Issue Exact and Heuristic Scheduling Algorithms)
Show Figures

Figure 1

12 pages, 630 KiB  
Article
Some Results on Shop Scheduling with S-Precedence Constraints among Job Tasks
by Alessandro Agnetis, Fabrizio Rossi and Stefano Smriglio
Algorithms 2019, 12(12), 250; https://doi.org/10.3390/a12120250 - 25 Nov 2019
Cited by 5 | Viewed by 3896
Abstract
We address some special cases of job shop and flow shop scheduling problems with s-precedence constraints. Unlike the classical setting, in which precedence constraints among the tasks of a job are finish–start, here the task of a job cannot start before the task [...] Read more.
We address some special cases of job shop and flow shop scheduling problems with s-precedence constraints. Unlike the classical setting, in which precedence constraints among the tasks of a job are finish–start, here the task of a job cannot start before the task preceding it has started. We give polynomial exact algorithms for the following problems: a two-machine job shop with two jobs when recirculation is allowed (i.e., jobs can visit the same machine many times), a two-machine flow shop, and an m-machine flow shop with two jobs. We also point out some special cases whose complexity status is open. Full article
(This article belongs to the Special Issue Exact and Heuristic Scheduling Algorithms)
Show Figures

Figure 1

11 pages, 362 KiB  
Article
Modeling and Solving Scheduling Problem with m Uniform Parallel Machines Subject to Unavailability Constraints
by Jihene Kaabi
Algorithms 2019, 12(12), 247; https://doi.org/10.3390/a12120247 - 21 Nov 2019
Cited by 5 | Viewed by 4122
Abstract
The problem investigated in this paper is scheduling on uniform parallel machines, taking into account that machines can be periodically unavailable during the planning horizon. The objective is to determine planning for job processing so that the makespan is minimal. The problem is [...] Read more.
The problem investigated in this paper is scheduling on uniform parallel machines, taking into account that machines can be periodically unavailable during the planning horizon. The objective is to determine planning for job processing so that the makespan is minimal. The problem is known to be NP-hard. A new quadratic model was developed. Because of the limitation of the aforementioned model in terms of problem sizes, a novel algorithm was developed to tackle big-sized instances. This consists of mainly two phases. The first phase generates schedules using a modified Largest Processing Time ( L P T )-based procedure. Then, theses schedules are subject to further improvement during the second phase. This improvement is obtained by simultaneously applying pairwise job interchanges between machines. The proposed algorithm and the quadratic model were implemented and tested on variously sized problems. Computational results showed that the developed quadratic model could optimally solve small- to medium-sized problem instances. However, the proposed algorithm was able to optimally solve large-sized problems in a reasonable time. Full article
(This article belongs to the Special Issue Exact and Heuristic Scheduling Algorithms)
Show Figures

Figure 1

28 pages, 489 KiB  
Article
On Neighborhood Structures and Repair Techniques for Blocking Job Shop Scheduling Problems
by Julia Lange and Frank Werner
Algorithms 2019, 12(11), 242; https://doi.org/10.3390/a12110242 - 12 Nov 2019
Cited by 12 | Viewed by 4660
Abstract
The job shop scheduling problem with blocking constraints and total tardiness minimization represents a challenging combinatorial optimization problem of high relevance in production planning and logistics. Since general-purpose solution approaches struggle with finding even feasible solutions, a permutation-based heuristic method is proposed here, [...] Read more.
The job shop scheduling problem with blocking constraints and total tardiness minimization represents a challenging combinatorial optimization problem of high relevance in production planning and logistics. Since general-purpose solution approaches struggle with finding even feasible solutions, a permutation-based heuristic method is proposed here, and the applicability of basic scheduling-tailored mechanisms is discussed. The problem is tackled by a local search framework, which relies on interchange- and shift-based operators. Redundancy and feasibility issues require advanced transformation and repairing schemes. An analysis of the embedded neighborhoods shows beneficial modes of implementation on the one hand and structural difficulties caused by the blocking constraints on the other hand. The applied simulated annealing algorithm generates good solutions for a wide set of benchmark instances. The computational results especially highlight the capability of the permutation-based method in constructing feasible schedules of valuable quality for instances of critical size and support future research on hybrid solution techniques. Full article
(This article belongs to the Special Issue Exact and Heuristic Scheduling Algorithms)
Show Figures

Figure 1

19 pages, 1537 KiB  
Article
A Heuristic Algorithm for the Routing and Scheduling Problem with Time Windows: A Case Study of the Automotive Industry in Mexico
by Marco Antonio Juárez Pérez, Rodolfo Eleazar Pérez Loaiza, Perfecto Malaquias Quintero Flores, Oscar Atriano Ponce and Carolina Flores Peralta
Algorithms 2019, 12(5), 111; https://doi.org/10.3390/a12050111 - 25 May 2019
Cited by 8 | Viewed by 6688
Abstract
This paper investigates a real-world distribution problem arising in the vehicle production industry, particularly in a logistics company, in which cars and vans must be loaded on auto-carriers and then delivered to dealerships. A solution to the problem involves the loading and optimal [...] Read more.
This paper investigates a real-world distribution problem arising in the vehicle production industry, particularly in a logistics company, in which cars and vans must be loaded on auto-carriers and then delivered to dealerships. A solution to the problem involves the loading and optimal routing, without violating the capacity and time window constraints for each auto-carrier. A two-phase heuristic algorithm was implemented to solve the problem. In the first phase the heuristic builds a route with an optimal insertion procedure, and in the second phase the determination of a feasible loading. The experimental results show that the purposed algorithm can be used to tackle the transportation problem in terms of minimizing total traveling distance, loading/unloading operations and transportation costs, facilitating a decision-making process for the logistics company. Full article
(This article belongs to the Special Issue Exact and Heuristic Scheduling Algorithms)
Show Figures

Figure 1

Back to TopTop