Abstract
Overtopping is the leading cause of earthen levee failure, and reinforcement that keeps a levee stable during overtopping is needed. This study proposes a composite reinforcement in which a riprap layer (D50 = 2.5 cm, 15 cm thick) bonded with a castor-oil-derived biopolymer adhesive is embedded in a biopolymer-treated layer, and evaluates it in a 180-min overtopping test on a full-scale levee (height 3.0 m, crest width 4.0 m, landside slope 1V:2H) under overtopping depths increased from 0.05 to 0.31 m. Unlike previous studies in which biopolymer-treated soil was exposed directly to the flow, the biopolymer is used here as a binder for riprap, and the hydraulic load and the response of the reinforcement are analysed on a common time axis. STIV-based surface velocities on 20 lines each on the crest and slope were used to derive the unit discharge, slope flow depth, mean boundary shear stress and the momentum-flux index hV2. The mean slope surface velocity increased from 1.42 to 3.47 m/s (maximum 4.05 m/s), with a 26% increase between 100 and 110 min. The mean boundary shear stress on the slope peaked at 430 Pa at 140 min (387 Pa when the unit discharge was estimated by the broad-crested weir equation). The composite layer remained functionally intact for 180 min, with fewer than 10 surface stones dislodged and no exposure of the treated layer or the embankment. The experimentally established lower-bound resistance of the composite layer (at least 430 Pa) exceeds the literature-based critical shear stresses of conventional linings up to fully vegetated turf reinforcement mats (383 Pa); these literature values are indicative thresholds and were not obtained under identical test conditions. A bounding analysis indicates that bonding increased the resistance of the 2.5-cm stones by roughly one order of magnitude (about 35 times) relative to unbonded stones of the same size.
1. Introduction
As climate change increases the frequency and intensity of localized heavy rainfall, river stages increasingly exceed the design flood levels of levees, and the risk of levee failure by overtopping is rising accordingly. Analyses of the failure causes of earthen levees and embankment dams show that overtopping is the leading cause, accounting for about 34% of all failures, followed by structural defects (30%) and piping (28%) [1,2]. In Korea, more than 75% of levee failures have been attributed to overtopping and piping [3]. Once overtopping begins, high-velocity flow develops over the crest and down the landside slope, surface erosion starts, and the progressive loss of the cross-section leads to breaching within a short time [4]. Because such failures leave little time for evacuation and emergency repair, reinforcement techniques that keep a levee structurally stable for a sufficient period even during overtopping are required.
Protective linings such as riprap, concrete blocks and vegetative covers have been widely used to prevent erosion of levee slopes. Riprap is the most common choice because of its constructability, low cost and permeability; however, under conditions in which strong shear stress acts along a steep slope, as in overtopping flow, individual stones are easily dislodged, and the loss of a few stones can trigger progressive failure of the protective layer. Consequently, ensuring riprap stability under overtopping requires much larger stones and thicker layers [5]. Vegetative covers are environmentally friendly but offer limited protection under high-velocity, long-duration overtopping [6], whereas concrete linings provide high rigidity but entail carbon emissions from cement use, disconnection from the river ecosystem, and cracking due to differential settlement. A new reinforcement method that combines high erosion resistance with environmental compatibility is therefore needed. Bonding the stones offers a way to overcome this limitation: in polyurethane-bonded aggregate (PBA) revetments, crushed stones are bonded into a highly porous, thin layer, which has been tested at large scale under wave loading [7]. Such binders are, however, petroleum-based, and the performance of bonded aggregate under the steady, high-velocity overflow on the landside slope of river levees has received little attention.
In response, soil treatment using biopolymers—microbially derived polysaccharides—has attracted attention in geotechnical engineering. Biopolymers such as xanthan gum and gellan gum form hydrogels at dosages of only about 1% of the soil mass, bind soil particles together, and markedly increase the cohesion, shear strength and surface strength of soil [8,9,10]. The erosion-reducing effect of biopolymer-treated soil has also been confirmed at various scales. In open-channel flume tests, biopolymer-treated model levees retained their shape against overtopping and piping far longer than untreated levees [11], and in a field-scale embankment test the onset of failure by internal erosion was delayed [12]. In full-scale overtopping tests on levees surface-reinforced with biopolymers, the time to failure was extended by a factor of about 2.7–7 compared with unreinforced levees [3], and numerical models simulating the overtopping breach of biopolymer-treated embankments are being developed [13]. Recent laboratory studies have further shown that xanthan gum reduces the erodibility of sand and slows breach development in overtopped embankments, with the failure time increasing with biopolymer content [14]; that treatment with 1% xanthan gum markedly raises the critical velocity of sand [15]; and that cation-crosslinked xanthan gum reduces the erodibility coefficient of sand by several orders of magnitude [16]. Biopolymer treatment has also been combined with structural elements to improve the stability of I-wall levees against overtopping erosion [17].
However, conventional biopolymer-based soil treatment is essentially a surface-protection concept that relies on interparticle bonding and increased surface strength, and its stability as a high-strength reinforcement method is insufficient. Although treated soil is far more erosion resistant than untreated soil, the strength and self-weight of the treated layer are lower than those of riprap or concrete linings. As the overtopping depth, flow velocity and shear stress on the slope increase, the treated layer may therefore peel off or be locally scoured, and once it is damaged, the underlying untreated soil is exposed and erodes rapidly. Indeed, previous experiments observed erosion progressing along the boundary between the treated and untreated layers [11]. In short, biopolymer surface treatment is effective in delaying failure but is limited in its ability to guarantee levee safety under large-scale overtopping. Moreover, most of these studies were conducted at laboratory scale, and the few full-scale tests evaluated performance mainly in terms of the delay of failure, without quantifying the hydraulic load to which the reinforcement was exposed.
To overcome these limitations, the present study uses the biopolymer not as a surface treatment for soil but as a binder for riprap. When riprap is mixed with a biopolymer adhesive and its base is embedded in a biopolymer-treated layer, the bonding strength of the adhesive is added to the self-weight and interlocking of the stones, forming an integrated, permeable reinforcement layer that is analogous to bonded aggregate revetments [7] but uses a bio-based binder. This is expected to suppress the dislodgement of individual stones by overtopping flow and to prevent exposure and scour of the underlying soil. Because the adhesive used here is derived from castor oil, a renewable raw material, the method is also expected to impose a smaller environmental burden than cement-grouted riprap; its environmental performance and long-term durability, however, were not evaluated in this study and are discussed as limitations (Section 5). Quantitative full-scale data relating the hydraulic load on the landside slope to the response of such a bonded riprap layer are still lacking. Small-scale experiments cannot reproduce the velocity and shear stress of real overtopping flow together with the size effect of riprap, and full-scale experiments are increasingly used to study landside-slope erosion and to verify reinforcement techniques without scale effects [18].
This study therefore proposes a biopolymer–riprap composite reinforcement and evaluates its overtopping resistance in a full-scale experiment on a 3.0-m-high levee, in which the overtopping depth was increased stepwise to 0.31 m over 180 min. The novelty and contributions of the study are threefold. First, surface-velocity fields measured by space-time image velocimetry (STIV) on the crest and landside slope were converted into a time history of hydraulic load (unit discharge, slope flow depth, mean boundary shear stress and the momentum-flux index hV2), including an assessment of the uncertainty of the discharge and depth estimates. Second, the response of the composite layer was analysed on the same time axis as the load and compared with the behaviour of an unprotected levee tested in the same facility in a previous study [3]. Third, because the composite layer did not fail, its performance is expressed as an experimentally established lower-bound resistance. This is compared with the literature-based critical shear stresses of conventional linings, which are treated as indicative thresholds rather than directly comparable test results, and the bonding effect is bounded relative to unbonded stones of the same size.
2. Materials and Methods
2.1. Full-Scale Levee and Reinforcement Method
The novelty of this study lies in combining a biopolymer (BASF Co., Ltd., Seoul, Republic of Korea)-treated layer and a riprap protection layer into a single composite surface-reinforcement system and in analysing the hydraulic load and the behaviour of the reinforcement on a common time axis while overtopping depths of up to 0.31 m are applied progressively to a 3-m-high full-scale levee. Previous biopolymer-based levee reinforcement studies mainly addressed conditions in which a treated soil surface is directly exposed to the flow, and evaluated performance in terms of overtopping duration or delay of failure. In the composite layer of this study, by contrast, the two components play different roles. The biopolymer-treated layer suppresses the loss of fines beneath the riprap and at the riprap–soil interface through interparticle bonding, while the overlying riprap layer distributes and absorbs the shear stress and turbulent impact that would otherwise act directly on the treated layer. In other words, the riprap protects the treated layer from hydraulic loading and the treated layer prevents the riprap from being dislodged by scour of its foundation, so a complementary effect between the two components is expected. Because this effect emerges only when the velocity, depth and turbulence of real overtopping flow act together with the size effect of the riprap, it was verified by a full-scale experiment. The objectives of the experiment were as follows. In this paper, “biopolymer adhesive” denotes the castor-oil-derived binder itself, “biopolymer-treated layer” denotes the lower layer constructed with the adhesive beneath the riprap, and “biopolymer–riprap composite reinforcement” (composite layer) denotes the entire reinforcement system consisting of the treated layer and the bonded riprap layer.
- To reproduce a river-disaster scenario with a maximum overtopping depth of about 0.30 m on a full-scale levee and to quantify the hydraulic response (velocity, depth and flow regime) on the crest and landside slope.
- To evaluate the integrity of the composite layer, local damage, riprap dislodgement and suppression of embankment erosion as the overtopping depth increases.
- To quantify the strength level and bonding effect of the proposed method by comparing the hydraulic loads with the critical shear stresses of conventional linings.
- To propose evaluation indices and essential reporting variables for field design and performance certification.
The experiment was conducted in the full-scale levee test area of the Andong River Experiment Center of the Korea Institute of Civil Engineering and Building Technology (KICT). The facility is a full-scale river test infrastructure in which near-prototype levee models can be built and overtopping, seepage and breaching can be reproduced through discharge supply and water-level control. The levee test area is about 100 m long and 50 m wide and can accommodate levee models up to 3 m high and 30 m wide [3]. This study used the discharge supply and recirculation system and the safety management system of the facility to reproduce a progressively increasing overtopping load (Figure 1). Because an actual levee has no sidewalls, secondary currents induced by the sidewalls of the test facility are not part of the problem studied; the analysis therefore focused on the part of the section in which the sidewall influence was small, as identified from the transverse distribution of the surface velocities on the 20 analysis lines. The flow over the levee is dominated by the one-dimensional flow from the crest down the landside slope, and the large reservoir upstream of the levee (Figure 1) provided calm approach-flow conditions that minimized secondary currents. The reservoir was about 3–4 m deep, so that the approach-flow Froude number remained below 0.05 for all overtopping depths and the influence of the approach flow was negligible.
Figure 1.
Levee test area of the Andong River Experiment Center.
The test levee was built 3.0 m high, with a 4.0-m crest width and a length of 30 m, and with a landside slope of 1V:2H (θ = 26.6°), to reproduce hydraulic and gravitational conditions close to those of actual river levees (Figure 2 and Table 1). The crest width was chosen so that the overtopping flow would be fully developed on the crest before entering the slope, and the slope gradient was chosen to reproduce flow accelerating down the slope and acting on the protection. Of the 30-m levee length, the central part, excluding both ends affected by the lateral boundaries, was designated as the test section.
Figure 2.
Cross-section of the test levee and concept of the composite reinforcement layer (not to scale).
Table 1.
Main dimensions of the test levee and overtopping conditions.
The embankment was built of sand and loess mixed at a mass ratio of 7:3 and compacted to 90% of the maximum dry density. This satisfies the Korean river design standard [19], which calls for well-graded, low-permeability soil, and the standard specification for river works, which requires levee fill to be compacted to at least 90% of the maximum dry density. At the same time, the fines of the loess compensate for the high permeability and erosion susceptibility of a pure-sand embankment, so that the embankment represents typical sandy Korean river levees while allowing a conservative evaluation of the reinforcement. Because the experiment was conducted at prototype scale, no similitude scaling was applied. The study focuses on failure caused by surface erosion of the landside slope under overtopping; variables governing seepage-induced instability, such as initial suction and the permeability contrast between the geotextile and the subbase, were outside its scope and were not measured.
The reinforcement used in this study is a levee surface-reinforcing material produced by mixing a biopolymer adhesive with aggregate. The binder is a biopolymer adhesive derived from castor oil, a bio-based raw material. During mixing, the binder coats the aggregate surfaces, and the coated particles form multi-point bonds with neighbouring particles, producing a multilayer porous structure with irregular, continuous voids (Figure 3). Because the bonded aggregate resists loads as a single body, the structure suppresses aggregate dislodgement and erosion of the surface soil even under the high water pressure and high flow velocity of floods, thereby protecting the embankment. As the material is placed as a cover over the existing embankment, it can also be applied to the rehabilitation of aging levees.
Figure 3.
Reinforcement specimens of biopolymer adhesive mixed with aggregate (by aggregate type and size).
The irregular, continuous voids within the material dissipate flow energy; they also preserve permeability and provide space for vegetation to establish, so that erosion resistance may increase further once vegetation has taken root. The material can be shaped to fit the levee geometry, and sections requiring additional protection can easily be reinforced by varying the cover thickness. As shown in Figure 3, aggregates that can be mixed with the adhesive range from 13-mm crushed stone and granite to 25 mm gravel and 70 mm crushed stone; riprap with D50 = 2.5 cm was used as the aggregate in this experiment. The aggregate size of D50 = 2.5 cm was selected considering constructability and the uniform coating of the stones by the adhesive. A small size was also chosen deliberately: unbonded stones of this size have a low critical shear stress (about 19 Pa [20]), so that the resistance gained by bonding can be identified clearly. The layer thickness of 15 cm corresponds to about 6D50, which exceeds the minimum thickness of 1.5–2D50 usually recommended for riprap [5]. The influence of the layer roughness on the slope flow is reflected in the friction coefficient discussed in Section 4.
The composite layer was placed over the entire crest and landside slope and consisted of a lower biopolymer-treated layer and an upper riprap protection layer. The treated layer was constructed with the castor-oil-derived biopolymer adhesive, and the riprap layer was placed to a thickness of 15 cm after mixing riprap of D50 = 2.5 cm with the same adhesive. The riprap was placed before the treated layer had hardened so that the base of the riprap was embedded in the treated layer, ensuring bonding and continuity at the interface between the riprap and the treated layer. The material cures within 6 h of placement, and testing can be performed at any time after 1 day. Before overtopping, the thickness and surface condition of the treated layer and the arrangement of the riprap were recorded in a field survey and used as the baseline for the post-test damage survey.
Reference for the unreinforced condition. An unprotected levee with the same geometry and fill material was tested in the same facility in a previous study [3]. Its erosion was largely consistent with the critical shear stress and critical velocity given by Shields-type criteria for the grain size of the fill. No additional unprotected test was therefore conducted in this study; these criteria, together with the slope-dependent critical Shields stress of Lamb et al. [21], are used as the reference for the unreinforced and unbonded conditions.
2.2. Measurements and Data Processing
The measured quantities and their locations are listed in Table 2. The overtopping depth was derived from the upstream water level, which was measured continuously by image analysis. The surface velocities on the crest and landside slope were obtained by analysing images from fixed CCTV cameras with space-time image velocimetry (STIV). Twenty observation lines were set in each region, and surface velocities along each line were computed at 18 times at 10-min intervals from 10 to 180 min after the onset of overtopping, yielding 720 values in total. The images were geo-rectified using ground control points surveyed on site, and the analysis lines were located with reference to these points. Damage to and deformation of the reinforcement were recorded with the fixed-camera images and a post-test visual and ground-penetrating radar (GPR) survey. No independent velocity measurements were made during the test. In aerated flow, bubbles and surface disturbances provide clear tracer patterns for STIV, whereas splashes and surface waves may introduce errors; this uncertainty is noted as a limitation in Section 5.
Table 2.
Measured quantities and locations.
STIV is a non-contact, image-based surface-velocity measurement technique that has been developed and improved along with advances in camera and computer performance. Fujita and Komura [22] proposed a method for measuring surface velocity by analysing images taken from a riverbank with a correlation technique and examined its potential for discharge measurement. Fujita et al. [23] developed an aerial STIV system that obtains spatial surface-velocity distributions from images taken by compact, high-performance drones (UAVs), applied it to actual rivers and evaluated its validity. Instead of computing the cross-correlation of entire image frames, STIV extracts only the brightness values along searching lines set in the flow direction (Figure 4). Stacking the brightness values of a searching line extracted from successive frames in time order produces a space-time image (STI), in which inclined stripes corresponding to the flow velocity appear as surface tracer patterns move. The surface velocity V is computed from the stripe angle φ, the real distance per pixel along the searching line Sx and the frame interval St as V = (Sx/St)tanφ; a small φ indicates slow flow and a larger φ faster flow.
Figure 4.
Principle of STIV analysis.
In this experiment, 20 searching lines (observation lines) were set in each region of the CCTV images covering the crest and landside slope from the onset of overtopping, and the surface velocities were computed. The flow depth on the slope, where high-velocity supercritical flow develops, was not obtained directly by STIV but was computed by continuity from the crest discharge and the slope surface velocity, as in Equations (3) and (4).
For each time, the regional mean = ΣUi/20 and the maximum Umax = max(Ui) of the surface velocities Ui at the analysis lines were computed. Zero values in the raw data (slope, 10–80 min, 15 values in total) were retained as recorded because no flag distinguished stagnation, non-overtopped areas or analysis failure. These zeros occurred only in the early stage (10–80 min), when the slope was not yet fully covered by high-velocity flow, whereas the maximum loads and the exceedance of the higher critical values are governed by the period after 90 min, in which no zero values occurred; their influence on the evaluation is therefore minor. For the 140-min crest mean, the value in the measurement summary sheet (1.053 m/s) was found to be a transcription error, and the value recomputed from the individual data (1.087 m/s) was used consistently in all analyses, including the shear stress. A total of 720 STIV values were derived. The analysis lines were located with reference to the ground control points.
The overtopping depth h0 was defined as the difference between the upstream water level Hu and the crest elevation Zc, and, treating the crest as a broad-crested weir, the unit overtopping discharge can be estimated by Equation (2) [24].
h0 = Hu − Zc
q ≈ 1.70 h03/2
Overtopping began at 12:22. The overtopping depth was 0.05 m at 10 min, increased by about 0.025 m per 10 min up to 70 min (0.20 m) and by about 0.01 m per 10 min thereafter, reaching 0.30 m at 160 min and 0.31 m at 170–180 min (Figure 5a). The elapsed time t was counted from the start of overtopping, and the data were analysed up to t = 180 min, by which time the maximum overtopping depth had been reached; this depth was then maintained until overtopping ended at 16:00. The experiment proceeded in the following order: (1) construction of the embankment and reinforcement; (2) curing and initial survey; (3) zeroing of instruments and image geo-rectification; (4) start of overtopping; (5) increase of overtopping depth; (6) holding of the maximum overtopping depth; and (7) post-test survey of damage and deformation. The facility, including filling before and drainage after overtopping, was operated for about 6 h; neither exposure of the embankment body nor failure occurred.
Figure 5.
Overtopping load history: (a) overtopping depth; (b) measured unit discharge and broad-crested weir estimate.
The unit discharge on the crest was obtained from the overtopping depth and the mean crest surface velocity Vc, and the slope flow depth hs was computed by continuity from the mean slope surface velocity Vs. Continuity was used because direct measurement of depth in high-velocity supercritical flow is difficult; if the same coefficient for converting surface velocity to depth-averaged velocity is applied to both regions, it cancels out in Equation (4). Here h0 is the upstream overtopping depth, which is not identical to the actual flow depth on the crest where the velocity was measured (close to the critical depth, about 2h0/3, near the downstream edge of the crest). Equation (3) therefore gives a reference discharge rather than a direct measurement, and it was checked against the broad-crested weir Equation (2) (Figure 5b). The coefficient α relating surface velocity to depth-averaged velocity may differ between the subcritical crest flow and the aerated supercritical slope flow; there is no universal threshold Froude number for the onset of air entrainment, which depends also on slope, roughness, turbulence intensity and surface tension. The shear stresses were therefore evaluated for αs/αc = 0.9–1.1, which changes them by ±10%. As a further sensitivity check, the shear stresses were recomputed using the unit discharge from Equation (2) instead of Equation (3).
q = h0 Vc
hs = q/Vs
The mean shear stress τ acting on the reinforcement on the slope was computed by Equation (5), where ρ is the density of water, g is the gravitational acceleration, hs is the flow depth normal to the slope and θ is the slope angle (1V:2H, sinθ = 0.447). Because hs obtained by continuity is the depth normal to the slope, the streamwise gravity component sinθ was used rather than the slope gradient tanθ (=0.5), which would overestimate the shear stress by about 11% on this steep slope. The term “boundary shear stress” is used because the stress acts on the inclined reinforced slope rather than on a channel bed.
τ = ρ g hs sinθ
To represent the dynamic component of the hydraulic load in addition to the shear stress, the momentum-flux index I = hV2 was used. For flow with depth h and velocity V, the momentum flux per unit width is M = ρhV2 = ρqV, which is proportional to the drag force per unit width on an element exposed over the full flow depth, FD = ½ρCDhV2 [25]. This index has been reported to correlate more strongly with inundation damage than depth or velocity alone [26,27]. In this study, the index on the crest is defined as the overtopping intensity index Ic and that on the slope as the flow intensity index Is. In this study, however, the index was not calibrated against measured forces on the stones; it is used only as a supplementary loading index representing the momentum flux of the flow, not as a direct measure of the drag acting on the reinforcement.
Ic = h0Vc2, Is = hsVs2, Is/Ic = Vs/Vc
However, because erosion resistance is generally assessed on the basis of shear stress or excess velocity [6,28], both indices were computed. The flow regime is represented by the Froude number Fr = V/√(gh) and the flow energy by the unit stream power ω = τVs = ρgq·sinθ [29].
The performance of the proposed method was evaluated by relating the hydraulic load to the behaviour of the reinforcement. Because the Korean river design standard does not specify permissible shear stresses or test methods for individual revetment linings [30], the computed shear-stress history was compared with the critical (permissible) shear stresses of linings given in FHWA HEC-15 [31] and by Fischenich [29]. The linings compared were bare soil, unbonded gravel of the same size as the proposed method (D50 = 25 mm), three grades of grass, turf reinforcement mats (TRMs), four riprap sizes, gabions and concrete. Since lining dislodgement and erosion of the underlying embankment begin when the applied shear stress exceeds the critical value, the time at which the computed shear stress first exceeded each literature value was defined as the exceedance time and regarded as an indicative (estimated) failure onset time. Because the literature values were obtained under different test protocols, durations and failure criteria, the exceedance times are indicative and are not experimentally confirmed failure times. Exceedance times were computed by linear interpolation between the 10-min measurements, assuming τ = 0 at t = 0.
Next, to quantify the bonding effect of the proposed method, the size of unbonded riprap required to withstand the same load was back-calculated using the Shields equation (τc = 0.047(γs − γ)D50, Gs = 2.65) with the side-slope stability reduction factor K = cosθ√(1 − tan2θ/tan2φ) [31], and using the velocity-based Isbash equation (V = C√(2g(Gs − 1)D), C = 0.86) [32]. Damage to the reinforcement was evaluated in terms of the damage onset time at each location, the area ratio of dislodged riprap, the exposed area of the treated layer, and the maximum erosion depth and volume. Because the critical Shields stress of unbonded stones on a steep slope is uncertain, the resistance ratio relative to unbonded stones of the same size was also bounded using Shields coefficients of 0.03–0.06, the side-slope factor K and the slope-dependent critical Shields stress of Lamb et al. [21] (θc = 0.15S0.25).
3. Results
Figure 5 shows the histories of overtopping depth and unit discharge. The measured discharge increased from 0.009 m3/s/m at 10 min to a maximum of 0.329 m3/s/m at 170 min. The discharge coefficient obtained by dividing the measured discharge by h01.5 was 1.48–2.09 after 20 min, within −13% to +23% of the theoretical broad-crested weir value of 1.70, confirming that the surface-velocity-based discharge estimate lies within a physically reasonable range. After 110 min, however, the coefficient rose to 1.8–2.1, above the theoretical value, probably reflecting an increase in the approach velocity head or the difference between surface and depth-averaged velocities; the loads in this period may therefore be somewhat overestimated. As a sensitivity check, the shear stresses were recomputed with the unit discharge from Equation (2); the maximum mean shear stress was then 387 Pa (at 100 min) instead of 430 Pa, and the conclusions below hold for both estimates.
Table 3 summarizes the hydraulic quantities at key times. The mean crest surface velocity increased from 0.183 m/s at 10 min to 1.087 m/s at 140 min and then levelled off at 1.049–1.062 m/s during 150–180 min. The mean slope surface velocity increased from 1.415 m/s to 3.466 m/s at 170 min and exceeded the crest velocity throughout, with a maximum surface velocity of 4.048 m/s at 170 min. The mean slope velocity rose by 26.0% from 2.128 m/s at 100 min to 2.680 m/s at 110 min, the largest increase between adjacent times. The slope Froude number indicated supercritical flow of 2.29–3.59 after 20 min and increased to 3.0–3.6 after 110 min, whereas the crest Froude number remained subcritical at 0.47–0.67.
Table 3.
Hydraulic quantities on the crest and slope at key times.
Figure 6 and Figure 7 show the velocity distributions by analysis line in each region. Because the velocities differed greatly between regions, separate colour ranges were used: 0–1.5 m/s for the crest and 0–4.2 m/s for the slope. On the crest, a convex distribution with the highest velocities around lines 10–13, decreasing toward both sides, persisted throughout, and after 90 min all maxima occurred at lines 11–13. The ratio between the means of lines 1–5 and 6–20 was 2.2–3.6 during 20–100 min, but the distribution flattened gradually over 100–140 min, and the coefficient of variation (CV) decreased from 0.34 to 0.20 and to 0.14–0.16 at 170–180 min. The crest of the central analysis area was intentionally constructed about 10 cm lower than the ends so that the overtopping flow concentrated on the analysis area, away from the sidewalls; this explains the convex distribution, and the loads were evaluated in this area of concentrated flow.
Figure 6.
Surface-velocity distribution on the crest: (a) temporal variation by analysis line; (b) distribution by analysis line at key times.
Figure 7.
Surface-velocity distribution on the slope: (a) temporal variation by analysis line; (b) distribution by analysis line at key times.
On the slope, the distribution was step-like up to 100 min, with lines 1–5 remaining in a low-velocity zone of 0–0.95 m/s and lines 6–20 in the range 2.0–3.2 m/s. Line 14 showed a local low velocity of 1.30–1.59 m/s during 20–100 min. At 110 min, lines 1–5 rose to 1.03–1.81 m/s and line 14 to 2.99 m/s, weakening the low-velocity zone, and the CV dropped from 0.46 to 0.27 within a single time step. Thereafter, the number of lines exceeding 3.5 m/s increased to 12 at 160 min and 13 at 170–180 min, and at 170 min all lines 8–20 exceeded 3.5 m/s. Whereas the crest distribution flattened gradually, the slope distribution changed abruptly at 110 min, and whereas the crest velocity levelled off after 140 min, the high-velocity zone on the slope continued to expand until 170 min. The local low velocity at line 14 is interpreted with caution, because it may reflect local surface features of the slope as well as the flow itself.
The same changes are evident in the original analysis images in Figure 8. On the crest, only part of the observation-line area was covered by shallow flow at 10 min, but the water surface covered all lines as time passed. On the slope, white aerated flow was confined to part of the observation lines during 10–100 min, spread over all lines after 110 min, and turbulence on the downstream water surface became pronounced during 140–180 min. The images serve as qualitative supporting evidence; the analysis lines were located with reference to the ground control points.
Figure 8.
Original analysis images at key times (10, 60, 100, 110, 140 and 180 min): crest (a1–f1) and slope (a2–f2).
Figure 9 shows the temporal variation in the momentum-flux indices. Based on the trends, three stages were identified: Stage I (0–70 min, dominated by increasing overtopping depth), Stage II (70–110 min, slower increase in depth and increasing crest velocity) and Stage III (110–180 min, high-velocity supercritical flow on the slope). The crest overtopping intensity index Ic increased from 0.002 m3/s2 to a maximum of 0.349 m3/s2 at 170 min and converged after 140 min as the crest velocity levelled off. Ic can be decomposed as Fr2 g h02: in Stage I, Frc was nearly constant at 0.47–0.56 while the overtopping depth quadrupled, so the increase was governed by depth; during 70–140 min, Frc increased from 0.48 to 0.67 and the contribution of the velocity component grew. With subcritical flow, the crest imposed only a small direct load on the lining and acted as a supply-and-control section determining the momentum delivered to the slope (ρIc up to 349 N/m).
Figure 9.
Temporal variation of (a) the crest overtopping intensity index and (b) the slope flow intensity index.
The slope flow intensity index Is increased 87-fold, from 0.013 m3/s2 to a maximum of 1.140 m3/s2 at 170 min (1.555 m3/s2 based on the maximum velocity), and the amplification ratio relative to the crest (Is/Ic = Vs/Vc) was 2.6–3.8 after 20 min. In Stages I–II, Is increased by about 0.04 per 10 min owing to the increase in slope depth; at 110 min it jumped by 43%, from 0.399 to 0.572, owing to the sharp increase in slope velocity; and in Stage III it increased by about 0.095 per 10 min owing to the increasing velocity while the slope depth remained nearly constant at 0.080–0.098 m. Of the cumulative load obtained by integrating Is over time, 74% was concentrated in Stage III.
Figure 10 shows the temporal variation in the mean shear stress on the slope. The shear stress increased with overtopping depth to 100 Pa at 20 min, 258 Pa at 60 min and 386 Pa at 100 min. At 110 min, it decreased temporarily by 10% to 349 Pa as the slope flow thinned with the increase in velocity, and then increased again to a maximum of 430 Pa at 140 min. The mean over 120–180 min was 413 Pa. Because the flow intensity index increased by 43% at the same time (110 min), the period after 110 min is regarded as a stage in which the velocity increase became distinct and the dynamic component proportional to the square of velocity played a larger role than the depth-based shear stress. The concurrent spread of aerated flow over all slope lines (Figure 8), the disappearance of the low-velocity zone at lines 1–5 and the small increase in overtopping depth (0.01 m) suggest that this change reflects a change in the extent of the slope flow rather than in the imaging conditions; however, the 10-min data cannot resolve the transition in detail. The friction coefficient Cf = τ/(ρVs2) obtained from the shear stress and velocity also decreased from 0.085 at 100 min to 0.048 at 110 min and 0.035 at 170 min.
Figure 10.
Temporal variation in the mean shear stress on the slope and critical shear stresses of linings.
Table 4 lists, for each lining, the indicative failure onset time, defined as the time at which the computed shear stress first exceeds the literature-based critical value, and the cumulative time thereafter during which the load exceeds that value. The critical values of bare soil and unbonded gravel of the same size as the proposed method (19 Pa) would be exceeded within 7 min of overtopping, those of poor and fair grass within 21 min and that of D50 = 0.15 m riprap at 29 min. The critical values of good grass (177 Pa) and D50 = 0.30 m riprap (227 Pa) would be exceeded at 47 and 55 min, after which the load stays above them for 133 and 125 min, respectively. Even those of the relatively strong D50 = 0.46 m riprap and fully vegetated TRM would be exceeded at 94 and 99 min. The critical values of gabions, D50 = 0.61 m riprap and concrete were not exceeded; the maximum shear stress reached about 90% of those of gabions and D50 = 0.61 m riprap. These times are indicative only, because the critical values were obtained under different test protocols and durations.
Table 4.
Indicative failure onset time (exceedance of the literature-based critical shear stress) and duration above the critical value for conventional linings (180 min of overtopping).
The biopolymer–riprap composite layer remained functionally intact over the entire crest and landside slope for 180 min: no bond failure, exposure of the treated layer or exposure of the embankment occurred, and fewer than 10 stones were dislodged from the surface. In other words, the proposed method withstood without damage a load history under which the literature-based critical values of all linings in Table 4 up to the fully vegetated TRM were exceeded. In the post-test survey, the few dislodged stones were confined to local spots on the surface. A ground-penetrating radar (GPR) survey of the composite layer after the test indicated no internal defects; the detailed GPR results will be reported in a separate paper. Figure 11 shows the condition of the reinforcement before and after the test.
Figure 11.
Condition of the biopolymer–riprap composite layer (a) before and (b) after the overtopping test.
4. Discussion
The load withstood by the proposed method was severe in both magnitude and duration. The slope shear stress exceeded 350 Pa, a threshold for high-strength linings, for 88 min and 400 Pa for 50 min; the time-averaged shear stress over the 180 min was 290 Pa, and the cumulative load (∫τdt) was about 3130 kPa·s. The unit stream power reached a maximum of 1441 W/m2 at 170 min. Most critical values for linings in the literature were obtained from short-duration tests, and resistance decreases when flow persists for several hours [29]. The overtopping resistance of grass covers also decreases markedly with duration and cumulative load [6,33,34]. Furthermore, 74% of the cumulative flow intensity was concentrated in Stage III, so the high-velocity period late in the overtopping was the most severe condition for the reinforcement. The absence of damage under shear stresses above the high-strength threshold for about 90 min therefore indicates not only instantaneous strength but also durability against prolonged overtopping.
Figure 12 compares the lower-bound resistance of the proposed method (430 Pa) with the critical shear stresses of conventional methods. The proposed method corresponds to 2.43 times good grass, 1.90 times D50 = 0.30 m riprap, 1.18 times D50 = 0.46 m riprap and 1.12 times the fully vegetated TRM, and to about 90% of gabions, 89% of D50 = 0.61 m riprap and 72% of concrete. Here, 430 Pa is a demonstrated lower-bound resistance obtained from a no-damage result rather than a failure test, so the ultimate strength of the composite layer may be higher, whereas the values for the other methods are literature-based critical values obtained under different protocols. The comparison therefore shows that the proposed method withstood a load exceeding the critical values of conventional linings up to the fully vegetated TRM; its relation to gabions and large riprap cannot be determined until its failure threshold has been identified.
Figure 12.
Lower-bound strength of the biopolymer–riprap composite layer and critical shear stresses of conventional linings.
The bonding effect is most evident in comparison with unbonded gravel of the same size. The critical shear stress of D50 = 25 mm gravel is 19 Pa on a horizontal bed [22], a level exceeded within 7 min of overtopping. In contrast, the layer in which riprap of the same size was bonded with the biopolymer withstood at least 430 Pa. Because no unbonded-riprap control was tested, this ratio (22.6) was bounded: with Shields coefficients of 0.03–0.06 the critical shear stress of the unbonded stones is 12–24 Pa, the side-slope reduction (K = 0.72) lowers it to about 14 Pa, and the higher critical Shields stress on steep slopes (θc ≈ 0.13 for S = 0.5 [27]) raises it to about 51 Pa. The resistance of the bonded stones is therefore about 8–35 times that of unbonded stones of the same size, i.e., roughly one order of magnitude. The previous test on an unprotected levee in the same facility [3] confirms that the unreinforced embankment erodes at far lower loads, but the contribution of bonding could not be separated from that of the treated layer, because neither unbonded riprap nor a treated layer without riprap was tested. In terms of velocity, the critical velocity of D = 2.5 cm riprap from the Isbash equation is about 0.77 m/s, whereas the mean and maximum slope surface velocities reached 3.47 and 4.05 m/s, i.e., 4.5–5.2 times the critical velocity (20–27 times in terms of dynamic pressure).
To withstand the same load with unbonded riprap, the Shields equation gives D50 = 0.57 m on a horizontal bed, and applying the stability reduction factor for a 1:2 slope (K = 0.72, φ = 40°) gives D50 ≈ 0.79 m. This corresponds to large stones of about 680 kg each, assuming spheres. The Isbash equation likewise requires D ≈ 0.50 m for the mean velocity of 3.47 m/s and D ≈ 0.69 m for the maximum velocity of 4.05 m/s, in the same range as the shear-stress-based result. In other words, biopolymer bonding converted small 2.5-cm riprap into a reinforcement layer equivalent to unbonded large riprap 0.5–0.8 m in size (20–32 times larger). Because large riprap requires heavy equipment for transport and placement and a layer thickness of at least 1.5D50, the proposed method is also advantageous in terms of levee cross-section and construction cost.
The high resistance of the proposed method is interpreted as resulting from the complementary mechanism between the two components anticipated in Section 2. In unbonded riprap, each particle resists drag and lift only through its own weight and interlocking, so small stones are easily dislodged. In contrast, riprap embedded in and bonded to the treated layer resists loads as a single integrated layer, while the treated layer prevents the loss of fines beneath and around the stones, blocking progressive dislodgement caused by scour of the riprap foundation. At the same time, the riprap layer protects the surface of the treated layer from direct shear and turbulent impact. This interpretation is consistent with the absence of damage, but because the mechanism itself was not measured directly in this experiment, further verification, for example by strength tests of the treated layer–riprap interface, is needed.
In particular, the velocity-dominated load after 110 min is a severe condition for particulate linings. The drag and lift forces on individual stones are proportional to the square of velocity; after 110 min, the depth-based shear stress levelled off, but the square of the slope velocity increased to 2.6 times its value at 100 min. Unbonded riprap would have experienced larger dislodging forces in this stage than the shear-stress evaluation suggests. That the proposed method withstood this period for 70 min without damage suggests that bonding converted the drag resistance of individual particles into the resistance of the entire layer. This result suggests that the hV2 index may usefully supplement the shear stress in evaluating the overtopping performance of riprap-type reinforcement.
Environmental performance and durability. The biopolymer adhesive is derived from castor oil, a renewable raw material, and is expected to impose a smaller environmental burden than cement-based binders. However, its production impacts, degradation behaviour and possible effects on water quality during prolonged submergence were not evaluated in this study, so these benefits should be regarded as expectations to be verified. In actual levees, the adhesive bonds will be exposed to repeated wetting and drying, temperature changes, ultraviolet radiation and ageing, which may reduce the bond strength over time; biodegradability, while environmentally desirable, may also conflict with long-term durability. Durability tests and field monitoring are planned to address these issues before field implementation, and the conclusions of this study are limited to short-term continuous overtopping.
To use the results of full-scale overtopping experiments for design and performance certification, loads and resistance must be recorded and compared on the same basis. Based on the experience of this study, the essential reporting variables in Table 5 are proposed. In particular, direct measurement of slope depth and local velocity, validity flags for surface-velocity values and management of the topographic coordinates of observation lines increased the interpretive uncertainty in this experiment and should be included in future experiments.
Table 5.
Proposed essential reporting variables for evaluating overtopping reinforcement.
This study has the following limitations. First, the strength of 430 Pa is a lower bound based on the absence of damage in a single experiment; the actual critical shear stress and failure mode were not identified, and variability due to construction quality (adhesive content and penetration), material distribution and hydraulic conditions could not be quantified. Second, the shear stress and indices are cross-sectional averages computed from surface velocities and continuity and do not reflect local load concentrations at the crest–slope transition and the slope toe (about 1.5 times the mean [20]). Third, 10-min data cannot pinpoint the time of abrupt changes between measurements, and because the 20 observation values are not independent replicates, no claim of statistical significance is made. Fourth, the failure onset times of conventional linings are judgements based on literature critical values, not results of direct experiments under the same conditions. Fifth, because the results pertain to a single overtopping event, the long-term durability of the biopolymer under wetting–drying cycles, UV exposure and microbial degradation requires separate verification. Sixth, the unit discharge and slope depth rely on equal surface-to-depth-averaged velocity coefficients on the crest and slope; the resulting uncertainty in shear stress is about ±10%, and using the weir equation instead of Equation (3) reduces the maximum shear stress to 387 Pa. Failure tests at greater overtopping depths, control tests with unbonded riprap and with a treated layer without riprap, and long-term durability tests are needed to establish a design critical shear stress.
5. Conclusions
This study proposed a biopolymer–riprap composite reinforcement and demonstrated its stability through a 180-min overtopping experiment on a 3.0-m-high full-scale levee in which the overtopping depth was increased progressively to 0.31 m. The main conclusions are as follows.
- The mean crest surface velocity increased from 0.18 to 1.09 m/s and levelled off after 140 min; the crest carried subcritical flow (Froude number 0.47–0.67) and acted as a supply-and-control section determining the momentum delivered to the slope. The mean slope surface velocity increased from 1.42 to 3.47 m/s (maximum 4.05 m/s), with a sharp 26.0% increase between 100 and 110 min that reorganized the distribution.
- The slope flow intensity index increased 87-fold and was amplified to about three times the crest value; after 110 min, the slope load shifted to a stage governed by the square of velocity rather than by the depth-based shear stress. Of the cumulative flow intensity, 74% was concentrated in this stage.
- The mean boundary shear stress on the slope reached a maximum of 430 Pa at 140 min (387 Pa with the weir-based discharge). Under this load history, the literature-based critical values of unbonded gravel of the same size, good grass, D50 = 0.30 m riprap and the fully vegetated TRM would be exceeded at about 7, 47, 55 and 99 min, respectively; these times are indicative rather than experimentally confirmed.
- The biopolymer–riprap composite layer remained functionally intact for 180 min, demonstrating a lower-bound resistance of at least 430 Pa. The resistance of the bonded 2.5-cm stones is estimated to be about 8–35 times that of unbonded stones of the same size and exceeds the literature-based critical values of conventional linings up to the fully vegetated TRM; its relation to gabions and large riprap requires failure tests.
- Withstanding the same load with unbonded riprap would require D50 of about 0.79 m (about 680 kg per stone) on a 1:2 slope. Biopolymer bonding converts small riprap of D50 = 2.5 cm into a high-strength overtopping-resistant layer equivalent to large riprap and is a promising cement-free alternative, subject to verification of its long-term durability and environmental performance.
Author Contributions
Conceptualization, J.K. and D.L.; methodology, J.K., H.-K.A., M.L. and D.L.; validation, J.K. and D.L.; formal analysis, J.K.; data curation, D.L.; writing—original draft preparation, J.K.; writing—review and editing, D.L.; visualization, M.L.; supervision, H.-K.A.; project administration, J.K.; funding acquisition, J.K. All authors have read and agreed to the published version of the manuscript.
Funding
This work was supported by Korea Environment Industry & Technology Institute (KEITI) through Research and Development on the Technology for Securing the Water Resources Stability in Response to Future Change Program, funded by Korea Ministry of Climate, Energy and Environment (MCEE) (RS-2024-00332877).
Data Availability Statement
The original contributions presented in this study are included in the article. Further inquiries can be directed to the corresponding author.
Acknowledgments
The authors thank the staff of the Andong River Experiment Center, KICT, for their assistance with the construction and instrumentation of the full-scale levee overtopping experiment.
Conflicts of Interest
Author Minsun Lee and Dongjin Lee were employed by the company Hydro Technology Institute Co., Ltd. Korea. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as potential conflicts of interest.
References
- Costa, J.E. Floods from Dam Failures; Open-File Report 85-560; U.S. Geological Survey: Denver, CO, USA, 1985.
- ASCE/EWRI Task Committee on Dam/Levee Breaching. Earthen embankment breaching. J. Hydraul. Eng. 2011, 137, 1549–1564. [Google Scholar] [CrossRef] [Scilit]
- Kang, W.; Ko, D.; Kang, J. Erosion resistance performance of surface-reinforced levees using novel biopolymers investigated via real-scale overtopping experiments. Water 2021, 13, 2482. [Google Scholar] [CrossRef] [Scilit]
- Briaud, J.-L.; Chen, H.-C.; Govindasamy, A.V.; Storesund, R. Levee erosion by overtopping in New Orleans during the Katrina Hurricane. J. Geotech. Geoenviron. Eng. 2008, 134, 618–632. [Google Scholar] [CrossRef] [Scilit]
- Abt, S.R.; Johnson, T.L. Riprap design for overtopping flow. J. Hydraul. Eng. 1991, 117, 959–972. [Google Scholar] [CrossRef] [Scilit]
- Hewlett, H.W.M.; Boorman, L.A.; Bramley, M.E. Design of Reinforced Grass Waterways; CIRIA Report 116; Construction Industry Research and Information Association: London, UK, 1987. [Google Scholar]
- Oumeraci, H.; Staal, T.; Pfoertner, S.; Kudella, M.; Schimmels, S.; Verhagen, H.J. Hydraulic performance of elastomeric bonded permeable revetments and subsoil response to wave loads. In Proceedings of the 32nd International Conference on Coastal Engineering (ICCE 2010), Shanghai, China, 30 June–5 July 2010. [Google Scholar]
- Chang, I.; Im, J.; Prasidhi, A.K.; Cho, G.-C. Effects of Xanthan gum biopolymer on soil strengthening. Constr. Build. Mater. 2015, 74, 65–72. [Google Scholar] [CrossRef] [Scilit]
- Chang, I.; Im, J.; Cho, G.-C. Introduction of microbial biopolymers in soil treatment for future environmentally-friendly and sustainable geotechnical engineering. Sustainability 2016, 8, 251. [Google Scholar] [CrossRef] [Scilit]
- Chang, I.; Cho, G.-C. Shear strength behavior and parameters of microbial gellan gum-treated soils: From sand to clay. Acta Geotech. 2019, 14, 361–375. [Google Scholar] [CrossRef] [Scilit]
- Chang, I.; Lee, S.; Kwon, Y.-M.; Lee, M.; Cho, G.-C. Experimental study on the external and internal erosion behaviors of biopolymer-treated earthen levee structures assessed via open channel hydraulic flume apparatus. In Proceedings of the 20th International Conference on Soil Mechanics and Geotechnical Engineering (ICSMGE), Sydney, Australia, 1–5 May 2022. [Google Scholar]
- Kwon, Y.-M.; Moon, J.-H.; Cho, G.-C.; Kim, Y.-U.; Chang, I. Xanthan gum biopolymer-based soil treatment as a construction material to mitigate internal erosion of earthen embankment: A field-scale. Constr. Build. Mater. 2023, 389, 131716. [Google Scholar] [CrossRef] [Scilit]
- Elalfy, E.; Czapiga, M.J.; Viparelli, E.; Chaudhry, M.H. Modeling breaching of biopolymer treated earthen dams due to overtopping. In Proceedings of the 15th International Conference on Hydroinformatics (HIC 2024), IAHR, Beijing, China, 27–31 May 2024. [Google Scholar]
- Czapiga, M.J.; Kotey, E.; Elalfy, E.; Nkiri, O.N.; Viparelli, E.; Chaudhry, M.H. Laboratory investigation on the breaching of biopolymer-treated dams and embankments. In World Environmental and Water Resources Congress 2024; ASCE: Milwaukee, WI, USA, 2024; pp. 802–807. [Google Scholar] [CrossRef] [Scilit]
- Lamsal, A.; Sasar, M.; Abdelaziz, S.L. Biopolymer-induced stabilization of sandy soils for enhanced erosion resistance. In Proceedings of the 2025 International Conference on Bio-Mediated and Bio-Inspired Geotechnics (ICBBG2025), Tempe, AZ, USA, 18 May–20 May 2025. [Google Scholar] [CrossRef]
- Lee, M.; Chang, I.; Cho, G.-C. Hydraulic erosion mitigation in sandy soil using cation-crosslinked gelation biopolymer. Acta Geotech. 2025, 20, 3563–3580. [Google Scholar] [CrossRef] [Scilit]
- Kim, I.; Eun, J.; Song, C. Enhancement of I-wall levee stability against overtopping erosion with biopolymer treatment and a strip structure. Comput. Geotech. 2025, 188, 107543. [Google Scholar] [CrossRef] [Scilit]
- Ebrahimi, M.; van Damme, M.; van Hemert, H.; Soares-Frazão, S. Close-range photogrammetry application to monitor levee erosion in case of wave overtopping. J. Hydraul. Eng. 2025, 151, 04024057. [Google Scholar] [CrossRef] [Scilit]
- KDS 51 50 05; Korean Design Standard -River Levee-. Korea Construction Standards Center: Goyang-si, Republic of Korea, 2018.
- Kilgore, R.T.; Cotton, G.K. Design of Roadside Channels with Flexible Linings, 3rd ed.; Hydraulic Engineering Circular No. 15 (HEC-15); FHWA-IF-05-114; Federal Highway Administration: Washington, DC, USA, 2005.
- Lamb, M.P.; Dietrich, W.E.; Venditti, J.G. Is the critical Shields stress for incipient sediment motion dependent on channel-bed slope? J. Geophys. Res. Earth Surf. 2008, 113, F02008. [Google Scholar] [CrossRef] [Scilit]
- Fujita, I.; Komura, S. Application of video image analysis for measurements of river-surface flows. Proc. Hydraul. Eng. JSCE 1994, 38, 733–738. (In Japanese) [Google Scholar] [CrossRef] [Scilit]
- Fujita, I.; Notoya, Y.; Shimono, M. Development of UAV-based river surface velocity measurement by STIV based on high-accurate image stabilization techniques. In Proceedings of the 36th IAHR World Congress, The Hague, The Netherlands, 28 June–3 July 2015. [Google Scholar]
- Chow, V.T. Open-Channel Hydraulics; McGraw-Hill: New York, NY, USA, 1959. [Google Scholar]
- Yeh, H. Maximum fluid forces in the tsunami runup zone. J. Waterw. Port Coast. Ocean Eng. 2006, 132, 496–500. [Google Scholar] [CrossRef] [Scilit]
- Wijetunge, J.J. Use of momentum flux of tsunami overland flow as an indicator of potential damage to buildings. J. Natl. Sci. Found. Sri Lanka 2010, 38, 45–57. [Google Scholar] [CrossRef] [Scilit]
- Kreibich, H.; Piroth, K.; Seifert, I.; Maiwald, H.; Kunert, U.; Schwarz, J.; Merz, B.; Thieken, A.H. Is flow velocity a significant parameter in flood damage modelling? Nat. Hazards Earth Syst. Sci. 2009, 9, 1679–1692. [Google Scholar] [CrossRef] [Scilit]
- Dean, R.G.; Rosati, J.D.; Walton, T.L.; Edge, B.L. Erosional equivalences of levees: Steady and intermittent wave overtopping. Ocean Eng. 2010, 37, 104–113. [Google Scholar] [CrossRef] [Scilit]
- Fischenich, C. Stability Thresholds for Stream Restoration Materials; ERDC TN-EMRRP-SR-29; U.S. Army Engineer Research and Development Center: Vicksburg, MS, USA, 2001.
- Kim, M.G.; Kang, K.; Oh, J.O.; Park, J.H. A study on shear stress distribution in an open channel. In Proceedings of the Korea Water Resources Association Conference; Korea Water Resources Association: Seoul, Republic of Korea, 2016; Volume 445. (In Korean) [Google Scholar]
- Lane, E.W. Design of stable channels. Trans. ASCE 1955, 120, 1234–1279. [Google Scholar] [CrossRef] [Scilit]
- Isbash, S.V. Construction of dams by depositing rock in running water. In Proceedings of the Transactions 2nd Congress on Large Dams, Washington, DC, USA, 7–12 September 1936; pp. 123–136. [Google Scholar]
- Hughes, S.A.; Thornton, C.I. Tolerable time-varying overflow on grass-covered slopes. J. Mar. Sci. Eng. 2015, 3, 128–145. [Google Scholar] [CrossRef] [Scilit]
- Hoffmans, G.; Akkerman, G.J.; Verheij, H.; Van Hoven, A.; Van der Meer, J. The erodibility of grassed inner dike slopes against wave overtopping. In Proceedings of the 31st International Conference on Coastal Engineering (ICCE 2008), Hamburg, Germany, 31 August–5 September 2008. [Google Scholar]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |