Highlights
What are the main findings?
- Bed shear stress shows a very strong correlation with maximum local scour depth (r ≈ 0.93).
- Near-bed velocity shows a weak and non-significant correlation (r ≈ 0.26; ρs ≈ −0.11).
- Mean velocity and Froude number show moderate (r ≈ 0.63–0.73) and nonlinear relationships with scour depth.
- Including bed shear stress parameters improves hydraulic structure safety assessments.
- The combined field and laboratory approach provides a reliable method for river engineering.
- Improved understanding of erosion mechanisms enhances the prediction of local scour development.
Abstract
The structural integrity of hydraulic structures is frequently weakened by local scour processes downstream of weirs. This study investigates the relationship between hydraulic parameters and erosion patterns to improve the predictability of bed deformation. The research methodology integrates detailed field measurements from the Radomka River in Piaseczno with laboratory experiments using a 1:30 physical scale model of the existing weir. Bed shear stress demonstrated the strongest correlation with maximum scour depth (r ≈ 0.93; RMSE ≈ 0.0032), as it directly represents the tangential force acting on sediment particles at the bed surface, which controls their entrainment, transport capacity, and ultimately the intensity of local scour development, whereas near-bed velocity showed weak and non-significant dependence (r ≈ 0.26; ≈ −0.11). This weak dependence reflects the dominance of turbulence-induced velocity fluctuations and localized vortical structures in the near-bed region, which obscure the relationship between mean velocity and sediment mobilization. The relationships between mean velocity, Froude number, and scour depth were moderate (r ≈ 0.63–0.73) and showed nonlinear characteristics, confirmed by HSIC values up to 9.1 × 10−3, due to the complex interaction between flow structures and evolving bed morphology. This nonlinearity results from the interaction between turbulent flow structures, jet-induced vortices, and the dynamically evolving bed morphology, combined with the threshold-controlled and nonlinear response of sediment transport to hydraulic forcing. Among all tested parameters, bed shear stress ranked as the dominant predictor of scour depth, outperforming velocity-based indicators. These findings imply that including bed shear stress parameters significantly improves hydraulic structure safety assessments. This study based on 11 experimental runs concludes that a combined field and laboratory approach provides a robust framework for river engineering. Finally, an improved understanding of erosion mechanisms, as presented in this work, enhances the prediction of local scour development and supports the design of more resilient hydraulic infrastructure.
1. Introduction
The bed of water reservoirs, specifically the sediment layer accumulated on it, is subjected to shear stresses induced by the flow. Bed shear stress represents the unit frictional force exerted by the moving water parallel to the bed surface, accounting for the resistance offered by alluvial sediments [1,2] and is widely recognized as the primary parameter controlling sediment motion and transport processes in open-channel flows [2,3]. This parameter is the principal hydraulic quantity governing the mobilization and transport of bed material, and consequently, the processes of erosion and scouring. During the consideration of sediment motion, it is observed that transport initiates gradually, due to the progressive increase in hydrodynamic forces acting on sediment particles and the variability of critical shear stress conditions across the bed. This gradual initiation is associated with the spatial heterogeneity of the bed surface and the inherently unsteady character of near-bed turbulent flow. Sediment particles are subjected to highly fluctuating instantaneous hydrodynamic forces, which locally and intermittently exceed the critical conditions for motion. Consequently, the entrainment process does not occur uniformly over the entire bed surface, but starts in localized areas where particle stability is reduced, such as zones of weaker packing, protruding grains, or locally enhanced flow exposure. In addition, variations in grain size, shape, and degree of embedding within the bed matrix result in different resistance to mobilization, which further contributes to the progressive and non-uniform onset of sediment transport [3].
Particles remain resting on the bed until a critical threshold, dependent on the sediment grain size, is exceeded. Once this threshold is surpassed, particles begin to move, gradually rolling and sliding. Sediment transport can be classified into two main modes: bedload transport, in which particles roll or slide in close contact with the bed, primarily driven by gravitational forces and flow-induced forces; and suspended sediment transport, characterized by irregular particle motion within the water column under the influence of turbulence-induced drag forces [4,5].
The grain size distribution of the bed has a significant influence on sediment transport [1]. In the case of heterogeneous sediments, transport is more demanding because larger particles are included into motion more slowly, hindering the movement of finer particles [6]. Bed shear stress is not uniformly distributed across the channel cross-section; its values vary depending on channel geometry, local flow accelerations, and the presence of obstacles such as structures or vegetation [7,8]. Nevertheless, at extremely small distances above the bed, the distribution of shear stress can be considered necessarily constant [9,10]. Beyond its role in the flux of sediment transported as bed load, the bed load layer acts as an interface between the bed and the overlying suspended sediment; the upward sediment flux at the upper boundary of the bed load layer defines the boundary condition for suspended sediment transport computations. Once sediment particles begin to move and slide along the bed, saltation typically becomes the dominant mode of bed load transport over a range of bed shear stresses. At higher boundary shear stresses, the surface layer of the bed may deform and behave as a granular flow [11,12].
The development of local scour downstream of a weir results from the intense interaction between the high-velocity jet issuing from the gate or crest and the erodible bed material. In this zone, a complex vortex system is present, including the bed striking jet, roller vortices, and recirculation zones, which initiate and sustain the erosion process. The temporal evolution and the maximum scour depth depend strongly on whether there is bed material supply from the upstream reach (live-bed conditions) or whether the bed upstream is initially at rest (clear-water conditions) [9,13,14].
In clear-water conditions when the approach flow velocity upstream of the weir is below the critical threshold for sediment motion, scour development is driven solely by the jet impact and vortex system generated in the stilling basin [1,15]. During the initial phase, rapid removal of material occurs at the point of jet impact, leading to fast deepening of the scour hole [9,15,16]. As the scour hole enlarges, its geometry evolves: its bottom deepens and shifts downstream, causing a reduction in the jet energy reaching the bed and a gradual decrease in the erosion rate. The maximum scour depth under clear-water conditions is reached after a longer period of time and depends mainly on the energy of the jet (commonly expressed through its Froude number), the flow characteristics over the weir, and the grain-size distribution of the bed material (Figure 1) [17]. In live-bed conditions, when sediment transport occurs in the approach flow, the scour process begins immediately after the release of water, because the bed material is already in motion or near the threshold of motion. The scour hole develops more rapidly, and its bottom is continuously subjected to additional sediment supply, resulting in alternating phases of deposition and erosion [9,18,19]. This leads to a more dynamic scour evolution. The maximum scour depth under live-bed conditions is typically greater than under clear-water conditions and is reached in a shorter time [17].
Figure 1.
Evolution of scour depth over time with and without sediment transport (in live-bed and clear-water conditions).
Bed shear stress has long been recognized as a fundamental parameter governing sediment mobilization and transport in open-channel flows and is therefore widely used in the analysis and prediction of local scour processes. Classical approaches are typically based on the concept of critical shear stress for incipient motion, often expressed through the Shields parameter, and form the basis for numerous empirical and semi-empirical scour prediction formulas. In the context of hydraulic structures, bed shear stress is commonly linked to flow intensity and energy dissipation, and has been used to estimate erosion potential downstream of weirs, gates, and spillways. However, many existing studies focus primarily on threshold conditions for sediment motion or on simplified relationships derived under controlled laboratory settings, often neglecting the spatial variability of hydraulic parameters and the complex, highly turbulent flow structures characteristic of scour zones. In addition, velocity-based indicators, such as mean flow velocity or near-bed velocity, are frequently used as proxies for erosion potential, despite their sensitivity to local turbulence and measurement uncertainty, particularly in regions affected by hydraulic jumps and recirculation. In addition to experimental studies, numerical and hydrodynamic modeling approaches have also been increasingly used to analyze flow behavior and related processes in river systems [20].
Although shear-stress-based approaches are widely applied in scour prediction, most existing studies focus on threshold conditions or simplified empirical relationships, without systematically comparing their predictive performance against velocity-based indicators or accounting for nonlinear dependencies. This study advances existing shear-stress-based approaches by quantitatively evaluating their predictive performance against velocity-based parameters using multiple statistical metrics, including nonlinear dependence measures (HSIC), and by integrating field observations with controlled laboratory experiments.
The objective of this study is to quantitatively assess and compare the predictive capability of selected hydraulic parameters, including bed shear stress, mean flow velocity, near-bed velocity, and Froude number, in describing maximum local scour depth downstream of a weir.
2. Materials and Methods
2.1. Field Studies
In 2022 and 2024, several inspections were carried out on a damming weir located in the village of Piaseczno in central Poland, on the small lowland river Radomka (Figure 2). Total catchment area of Radomka River is 2000 km2 and length is 100 km. The structure is a monolithic reinforced concrete dock-type weir. Its passage is divided into three spans by two intermediate pillars. Key technical parameters include: 5.00 m for the weir opening width, 16.50 m for the weir plate width, 4.45 m for the footbridge width, 1.00 m for the communication footbridge width, 0.80 m for the pillar width, and 6.35 m for the pillar length. The hydraulic structure was located on a straight section of the river approximately 100 m in length. The study area, including the village and the weir, is surrounded by arable fields, defined as agricultural land used for crop cultivation, typically consisting of tilled soil with limited surface stabilization as well as forested areas. The valley is mainly composed of sands and alluvial soils. The terrain is mostly flat, which is a characteristic feature of this part of the Mazovia region (Poland) [21].
Figure 2.
Weir on the Radomka River in Piaseczno: (a) view from the tailwater; (b) view from the headwater; (c) section of a topographic map from National Geoportal (geoportal.gov.pl); (d) cross-section through the valley above the weir, where Qw—water flow.
The primary objectives of the weir construction included water retention during drought periods, enabling water abstraction for irrigation systems, providing flood protection through floodwater retention, and enhancing environmental conditions within the river valley. Additionally, the structure serves as a local transport link between the neighboring villages of Piaseczno and Marcelów. Within the analyzed area, no significant flood risk has been identified in the event of failure or damage to the damming structure. The detailed technical specifications and in situ characteristics of the full-scale structure served as the basis for the design and construction of a scaled physical model, which allowed further, more controlled investigations under simulated laboratory conditions.
2.2. Laboratory-Scale Model
Laboratory-scale testing was performed using simplified, idealized geometry representing field conditions. The physical model of the weir was designed and constructed at a geometric scale of 1:30 (Table 1). The model’s geometry, including the piers, weir spans, and foundation, reflects the prototype dimensions of the structure in Piaseczno. The model was fabricated using transparent plexiglass to allow for flow visualization and coated with a sand–lacquer mixture to ensure hydraulic roughness consistency with the field conditions. The completed model was installed in a laboratory flume (Figure 3), enabling controlled simulation of flow–sediment interactions under steady-state conditions.
Table 1.
Weir elements and dimensions.
Figure 3.
Physical model of the weir installed in the laboratory flume: (a) view from the headwater station; (b) view from the tailwater station.
2.3. Experiment Setup Conditions
During the laboratory experiments, water flow through a model of a weir with closed sluice gates was simulated, representing impoundment conditions typically observed in real hydraulic structures, where flow is stopped during low-water periods or to raise the upstream water level for storage purposes. Once a steady flow regime was established and water depth in the downstream reach was measured, the monitoring of morphological changes within the channel and the recording of the duration of each test series commenced which ensured full control over hydraulic and morphological boundary conditions.
The introduction of the sluice gate into the laboratory channel model induced significant alterations in the flow regime. In the downstream reach, where the bed was composed of sandy material, local scour development was observed, driven by intensified hydraulic forces acting on the substrate, including increased flow velocity and jet concentration in the zone downstream of the obstruction (Figure 4). The bed erosion progressed gradually, deepening over time. At a certain distance downstream of the hydraulic jump, where its influence diminishes, stabilization of the velocity profile occurs and the velocity distribution approaches that of an undisturbed flow. The plotted velocity profiles allow for clear identification of regions affected by flow acceleration, turbulent mixing and sediment mobilization, highlighting the spatial variability of hydraulic processes along the channel.
Figure 4.
Schematic representation of the weir model with velocity distribution profiles, where HW—upstream water level; TW—downstream water level; vA—upstream flow velocity; vB—downstream flow velocity; A—upstream reach of the weir model; B—scour initiation zone; C—local bed scour in the downstream reach; D—area not influenced by the hydraulic jump.
The closure of the sluice gate also modified the velocity distribution in the downstream reach, where localized vortices and recirculation zones developed, creating a non-uniform velocity field and enhancing sediment transport. Such secondary flow structures promote intermittent shear stress peaks at the bed surface, which in turn facilitate sediment mobilization and contribute to the spatially variable morphology observed during the experiment.
A characteristic accompanying phenomenon was the hydraulic jump, which formed at a certain distance downstream of the gate, resulting in an abrupt transition from supercritical to subcritical flow, and thereby promoting energy dissipation and intensified water mixing.
2.4. Hydraulic Parameters
A total of 11 measurement series were conducted during the laboratory experiments. All experimental runs were explicitly conducted under subcritical flow conditions, ensuring that the Froude number remained below unity (Fr < 1) throughout the test section. In addition, the experiments were performed under clear-water scour conditions, meaning that the bed shear stress in the approach flow was maintained below the critical threshold for the initiation of sediment motion. This ensured that the development of the local scour hole was not influenced by the sediment supply from the upstream reach. Each series lasted Tz = 6 h. Prior to the beginning of each run, key initial conditions were carefully established, including the downstream water level and the discharge Qw in the flume (Table 2). The experiments were conducted under steady-flow conditions, with discharge values ranging from 0.00774 to 0.01211 m3/s. Water depths varied from 0.167 to 0.187 m in the upstream reach (hA) and from 0.034 to 0.080 m in the downstream reach (hB). The Froude number outside the influence zone of the jet passing over the sluice gate was consistently less than 1 in all cases, indicating that the flow under investigation was subcritical, dominated by gravitational forces. Local scour developed under clear-water conditions, meaning that the approaching stream velocity was below the critical threshold for the initiation of sediment motion, so the scour is driven by localized flow intensification and turbulence structures generated by hydraulic interference, with no upstream sediment supply. The experiments were conducted under steady-state flow conditions to ensure stable hydraulic parameters and repeatable measurements. The discharge range was selected to generate measurable scour while maintaining controlled laboratory conditions. Froude similarity was not strictly applied, as the aim was not full dynamic similarity with a prototype, but rather to examine relationships between hydraulic parameters and scour depth. The analysis focuses on relative dependencies between variables rather than direct prototype scaling.
Table 2.
Hydraulic characteristics of the measurement series.
2.5. Measurement Instruments and Techniques
Data acquisition at each experimental time step consisted of measurements of the bed elevation, water surface level, and point flow velocity, using three primary measurement instruments: a plate probe, a point gauge, and a PEMS-E30 velocity meter (Delft Hydraulics, Delft, The Netherlands). The first data reading in each series was taken 30 min after the initiation of flow through the channel (first time step), the next one 1.5 h later (second time step), and the final one 4 h after the previous measurement (third time step).
The plate probe was used to measure the bed elevation. Each measurement series began with leveling the channel bed using a special sand-leveling frame, followed by compaction with a manual soil compactor providing an energy of approximately 5 J. The prepared bed was measured using the plate probe and described in terms of coordinates within a normalized measurement grid. This initial surface served as a reference level for subsequent measurements of the developing local scour along the bed. The measurement grid consisted of 56 points in total, arranged along 7 longitudinal axes and 8 cross-sections of the experimental channel. The spatial resolution of the bed morphology measurements was established using a 5 cm × 5 cm grid in the area of the scour hole, which ensured a detailed representation of the erosion process. The morphology of the bed surface was investigated at 56 points distributed along the entire length of the downstream reach of the laboratory flume. The measurement grid covered an area of 0.58 m × 2.72 m and consisted of 8 cross-sections with 7 measurement points in each section. The smallest spacing between cross-sections was applied immediately downstream of the weir model (0.06–0.10 m) and was then gradually increased to 0.20 and 0.25 m, and finally to 1 m in the area not affected by local bed erosion. In each cross-section, 7 measurement points were located at spacing intervals of 0.02–0.145 m. The individual parameters were measured with the following resolution and uncertainty:
- Discharge: 0.0001 m3 s−1; ±1%.
- Linear dimensions (width, length, thickness of the sand layer): 0.001 m; ±0.0005 m.
- Water surface elevation, bed elevation, water depth: 0.0001 m; ±0.0005 m.
- Time: 1 s; ±0.5 s.
- Grain diameter: 0.00001 m; ±0.000005 m.
Based on the collected point cloud, it was possible to determine the geometric parameters of the local scour, including its maximum depth zmax, after the assumed experiment duration Tz (Figure 5). A 3D visualization of the measured point cloud (56 points) was acquired with the plate probe and the interpolated surface of the local scour in the experimental flume.
Figure 5.
Three-dimensional visualization of local scour based on a 56-point measurement grid in a research channel.
The water surface elevation was measured using point gauges, both movable and fixed, at selected locations along the channel axis. This arrangement allowed for determining the water surface profile and its longitudinal slope along the channel. The gauge needle was lowered until it just touched the water surface, after which the value was read from the scale. These measurements were taken at characteristic locations, such as transition zones between bed materials of different roughness or at the site of hydraulic jump formation.
The PEMS-E30 meter (Figure 6) enables the measurement of the longitudinal velocity component ±Vx and the transverse component ±Vy, as well as the resultant velocity magnitude Ve and the deviation angle αPEMS relative to the positive direction of the Vx axis. The measuring device consists of a rod with a diameter of 10 mm in its upper part and 6 mm in the lower part, and a total length of 80 cm. A disk-shaped probe, measuring 33 × 11 mm, is mounted at its lower end.
Figure 6.
Experimental setup, measurement system, and instrumentation layout: (a) Liquid Velocity Meter PEMS-E30 and the coordinate system; (b) probe geometry and external view; (c) location of measurement points along the hydrometric verticals, where HW—the headwater; TW—the tailwater; Qw—water discharge; A–A, B–B, C–C, D–D—vertical cross-sections.
The measurement of velocity components in the 2V system is performed on the Z/H plane, defined for the measurement point at a vertical position Z. The minimum sampling time of the instrument is 0.1 s, and the velocity measurement accuracy is ±0.01 m·s−1. The device allows programming of data acquisition and operation modes directly via its control panel or through a computer interface. The meter is connected to the experimental system via an RS232 interface [22].
Velocity measurements were conducted at four designated hydrometric verticals (A, B, C, and D). Vertical A was located in the upstream section, where velocity was measured at three points: 1 cm and 3 cm below the water surface, and 1 cm above the bed. Verticals B, C, and D were located in the downstream section, and in each of them measurements were taken at two points: 1 cm below the water surface and 1 cm above the bed. Collected data from the PEMS-E30 meter were continuously transmitted to the computer and recorded in real time.
2.6. Einstein’s Division of Velocity Fields
Hans Einstein, based on the analysis of turbulent velocity distributions in rectangular channels, proposed a model in which the velocity field is considered as the sum of two components: one induced by the bed shear resistance and the other generated by the sidewall resistance [23]. Bed roughness significantly shapes the velocity field within the near-bed region by modifying the flow profile and the distribution of shear stresses, which forms a fundamental basis for Einstein’s analysis of sediment transport processes. In Einstein’s approach, the overall velocity distribution across the channel cross-section can be approximated by the superposition of velocity fields characteristic of two hypothetical flows:
Flow limited solely by the bed, where the sidewalls are assumed to be smooth and offer no resistance, and the velocity distribution in the cross-section corresponds to the classical vertical profile. Flow limited solely by the sidewalls, where the bed is assumed to be smooth, and the velocity distribution is modeled exclusively as a result of lateral resistance, which in practice leads to the development of a velocity gradient in the transverse direction.
The velocity distribution in a real channel is thus the sum of the effects of both mechanisms, enabling an analytical separation of the influence of bed roughness from that of the sidewall roughness on flow resistance. This approach is particularly important in the design and operation of channels with different surface finishes (e.g., concrete bed and natural banks) and in the calculation of hydraulic resistance coefficients [23].
Einstein’s [23] hypothesis proposes that the entire cross-sectional area is divided into distinct regions, where flow resistance is clearly differentiated and linked to the varying roughness of the bed and banks (or to the glass panels in a laboratory flume). This method is based on the assumption that in the designated parts of the channel (Figure 7), the mean velocity vs in the wall influence zone and the mean velocity vb in the bed influence zone are equal to the mean velocity v across the entire cross-section:
Figure 7.
Diagram of the division of the cross-section based on the velocity distribution in the laboratory channel cross-section according to Einstein’s method, where As—flow area associated with the walls, with wetted perimeter Os and hydraulic resistance coefficient λs; Ab—flow area associated with the bed, with wetted perimeter Ob and hydraulic resistance coefficient λb.
Expressing the mean velocity using the Darcy–Weisbach equation, it can be written as:
where —total resistance coefficient, [-]; —bank resistance coefficient, [-]; —bed resistance coefficient, [-]; Rh—total hydraulic radius, [m]; Rhb—hydraulic radius of the cross-sectional part of the channel associated with the bed, [m]; Rhs—hydraulic radius of the cross-sectional part of the channel associated with the banks, [m]; J—water surface gradient, [-].
The next step in the calculations was to determine the unknown values of the hydraulic radius Rhs and Rhb. For this purpose, an iterative procedure using successive approximations was applied to select values of Rhs and Rhb so that the following relationships were met [24]:
and the total flow area was equal to:
The division of velocity fields proposed by Hans Einstein is widely applied in engineering and research practice. It allows us to separate the effects of bed and bank roughness on flow resistance, which allows for more accurate calculations of energy losses, hydraulic slope, and resistance properties, such as the Manning or Strickler coefficients [25]. This approach is particularly useful in the design and analysis of channels with complex geometries, especially narrow channels, where the contribution of lateral resistance is significant and may lead to considerable distortions of the classical velocity distribution [26]. The division of velocity fields is also used in the calibration of numerical flow models, enabling a better representation of actual velocities within the cross-section, as well as in sediment transport studies, where precise determination of shear forces acting on the bed is crucial for predicting erosion and deposition processes [25,26]. Finally, this method supports the interpretation of field measurement results, allowing for the correction of velocity profiles recorded in channels with variable roughness [27].
2.7. Bed Shear Stress Calculation
Water reservoir and river beds, and specifically the sediment deposited on them, are exposed to shear stresses. These are forces exerted by the flowing water on the bed surface. Their magnitude is influenced by numerous factors and parameters that lead to the motion of particles and their transport along with the river current. The application of Einstein’s velocity field division in this study enables the separation of bed-related and wall-related flow resistance, which is necessary for the accurate determination of the hydraulic radius associated with the bed (Rhb). This parameter directly influences the calculation of bed shear stress, which is further analyzed in relation to the observed local scour development. Therefore, the adopted approach provides a theoretical basis for linking flow structure with sediment response in the experimental channel.
Einstein [24] provided that mean bed shear stress τb is dependent on hydraulic radius Rhb of the part of cross section, in which stream velocity is connected with bottom flow resistance and could be calculated as:
where τb—bed shear stress, [Pa], ρw—water density (kg·m−3), g—acceleration of gravity (m·s−2), Rhb—hydraulic radius of the part of cross section, in which stream velocity is connected with bottom flow resistance, [m]; I—hydraulic gradient, [-]. Dimensionless form of bed shear stress θ is represented by the following equation [9]:
where —density of bedload, ρb = 2650 kg/m3; d50—median grain diameter, d50 = 0.00091 m; ρw—density of water; ρb = 1000 kg/m3.
If the bed shear stress exceeds a critical value (the Shields parameter), the first grains begin to move, initiating the sediment transport process—particles start to roll and slide gradually. The value of the Shields parameter is influenced by the shape, size, and arrangement of the grains, as well as by the hydraulic conditions acting near the bed. In the case of multi-grain (polydisperse) sediments, larger particles are set in motion much more slowly, hindering the transport of finer ones [6,9].
3. Results
3.1. Local Scour Temporal Evolution
During the conducted research, phenomena related to changes in bed morphology were observed, such as the formation of local scour holes with shapes evolving over time, specifically deepening and elongating. In this study, the maximum depth of scour observed during all 11 measurement series was analyzed. Table 3 and Figure 8 present the maximum local scour depths for each measurement series. Figure 9 shows the temporal evolution of maximum scour depth for all measurement series. A rapid increase in scour depth is observed during the initial phase, followed by a gradual stabilization. This behavior indicates a decrease in erosion intensity over time, resulting from the progressive reduction in hydraulic forces acting on the bed as the scour hole develops. A higher variability observed for trial 5 at medium discharge may be attributed to transitional flow conditions and local measurement uncertainty, and was not consistently observed in other experimental series.
Table 3.
Maximum local scour depths for each measurement series.
Figure 8.
Evolution of maximum local scour depths over time for each measurement series, where z—maximum scour depth at a given time step; zmax—maximum local scour depth after 6 h of experiment; T—time; Tz—time to reach maximum local scour depth, Tz = 6 h.
Figure 9.
Increments of maximum scour depths for individual measurement series.
Table 4 demonstrates the evolution of the scour hole depth at successive time steps. The scour depth tends to reach its maximum value, usually attained (in 10 out of 11 series) at the end of the experiment. The scour deepening process typically follows the patterns observed under clear-water conditions. At the onset, immediately after introducing the obstacle into the flow, erosion intensity is highest—during the first few hours, the scour depth increases rapidly. Over time, the process slows down, and the depth growth curve gradually flattens out (Figure 9). This behavior reflects the progressive dissipation of jet energy as the scour hole develops, which reduces the intensity of bed shear stress acting on the bed surface and consequently limits further erosion. However, the duration of the study appears to be too short to definitively state that an equilibrium state and stabilization of the scour depth have been achieved—the trend of the curve indicates a continued deepening of the scour hole, although at a much slower rate than observed during the initial time steps of the experiment. Figure 9 illustrates the increments of scour depth over time. The highest increments occur during the initial stage of the experiment, confirming that the most intensive erosion takes place shortly after flow initiation. The decreasing increments in later stages reflect the reduction in sediment transport capacity as the flow structure adjusts to the evolving bed morphology.
Table 4.
Increments of maximum scour depths as a function of time for individual measurement series.
3.2. Characteristics of Near-Bed Flow Velocity in the Scour Zone
In Table 5, the results of the laboratory investigations are presented, including the estimated hydraulic radius of the channel section associated with the bed roughness, determined according to the Einstein velocity field division procedure, based on an iterative approach following the Darcy equation. v1cm denotes the point velocity measured 1 cm above the bed in cross-section B-B (in the zone of intensive bed scour). The v1cm velocity measurement taken particularly in the cross-section, which was experiencing intensive bed scour, has certain implications. The foremost among them is the pronounced local variability—at such proximity to the bed, the flow velocity is highly sensitive to local vortices and turbulent fluctuations. This high variability is associated with the presence of turbulent vortices and flow recirculation in the scour zone, which results in rapidly changing local flow conditions and reduces the representativeness of point velocity measurements as indicators of sediment transport processes. The bed shear stress values analyzed in this study were derived using the hydraulic radius associated with the bed (Rhb), determined according to Einstein’s velocity field division method. This approach allows for a more physically consistent estimation of shear stress by isolating the contribution of bed resistance from sidewall effects. As a result, the observed strong relationship between bed shear stress and maximum scour depth reflects not only hydraulic forcing but also the effectiveness of the adopted theoretical framework in capturing the relevant flow–sediment interaction mechanisms.
Table 5.
Summary of the calculated hydraulic parameters.
3.3. Correlation and Dependence Analysis of Scour Depth
To quantify the relationship between the independent variable zmax and the four dependent variables (, v1cm, v, and Fr), a set of complementary statistical measures was employed. The aim was not only to assess the strength of linear relationships but also to examine potential monotonic and nonlinear dependencies. The following indicators were considered:
- MSE (Mean Squared Error) and RMSE (Root Mean Squared Error)—measure the average prediction error of a linear regression model; lower values indicate better fit. The RMSE is defined as:where —the observed values of scour depth; —the values predicted by the regression model; n—the number of observations.
- Chi2 (residual-based)—evaluates the agreement between observed and predicted values; smaller values indicate that deviations are minor; the Chi2 statistic was calculated according to the following formula:
- HSIC (Hilbert–Schmidt Independence Criterion)—a kernel-based dependence measure sensitive to both linear and nonlinear associations; positive values indicate dependence. In this study, linear relationships are understood as those that can be approximated by a linear regression model, while nonlinear relationships refer to dependencies that cannot be adequately described by a straight line and may involve curvature, thresholds, or saturation effects.
- Pearson correlation coefficient r—measures the strength of linear dependence, ranging from −1 (perfect negative correlation) to +1 (perfect positive correlation).
- Spearman’s rank correlation coefficient ρs—evaluates monotonic relationships, regardless of linearity (Table 6).
Table 6.
Compilation of correlation metrics between maximum scour depth and selected experimental parameters.
Figure 10 shows a linear regression illustrating the relationship between the independent variables (, v1cm, v, and Fr) and the dependent variable (zmax). It demonstrates a clear positive relationship between bed shear stress and maximum scour depth, indicating that increasing shear stress leads to more intensive sediment mobilization and deeper scour formation. In contrast, the relationship between near-bed velocity and scour depth shows high scatter, reflecting the strong influence of local turbulence and flow variability in the scour zone. The relationship between mean flow velocity and scour depth is less pronounced, indicating that average flow conditions do not fully represent the hydraulic processes occurring near the bed. The nonlinear pattern observed for the Froude number suggests that this parameter does not directly correspond to the local hydraulic conditions governing sediment transport.
Figure 10.
Analysis of the dependence of maximum scour depth zmax on selected physical variables.
To effectively present the comprehensive statistical analysis of the relationships between maximum scour depth and the investigated parameters, a composite heatmap graph was employed (Figure 11). The heatmap presents a comparative analysis of the considered models using multiple statistical metrics. The numerical values displayed within the cells correspond to the original (non-transformed) metric values. To enable a consistent visual comparison, all metrics were normalized to the range [0, 1]. Error-based measures (MSE and Chi2) were inverted prior to normalization so that higher normalized values indicate better model performance. In contrast, HSIC, as well as correlation coefficients (r and ), were used in their original form, since larger values naturally correspond to stronger dependence. It is worth noting that HSIC captures general (including nonlinear) dependence structures, whereas r and primarily reflect linear and monotonic relationships, respectively. Therefore, differences between these metrics may indicate varying levels of complexity in the underlying relationships rather than inconsistencies in model quality.
Figure 11.
Heatmap of correlation between local scour maximum depth and chosen hydraulic parameters and dependence measures.
demonstrates the lowest prediction errors (MSE ≈ 1.0 × 10−5, RMSE ≈ 0.0032) and the smallest Chi2 value (≈0.009). The Pearson coefficient (≈0.93) and Spearman coefficient (≈0.84) both confirm a very strong association with zmax. HSIC is small but positive, indicating no substantial nonlinear component. Therefore it can be concluded that is the variable most strongly and linearly related to zmax. This strong relationship can be physically explained by the fact that bed shear stress directly represents the force exerted by the flow on sediment particles, controlling their mobilization and transport capacity, which leads to increased scour depth with increasing shear stress.
Considering correlations of maximum scour depth zmax with the point velocity measured 1 cm above the bed in cross-section B-B v1cm, errors are relatively high (MSE ≈ 0.0033, RMSE ≈ 0.057). Pearson correlation is weak (≈0.26), and Spearman’s coefficient is slightly negative (≈−0.11), suggesting no monotonic trend. HSIC is close to zero, confirming the absence of meaningful nonlinear dependence. v1cm shows no significant relationship with zmax. The lack of a clear relationship between near-bed velocity and scour depth results from the highly localized and turbulent nature of the flow in the scour region, where instantaneous fluctuations dominate over mean values.
The prediction error of zmax-to-v relation is moderate (MSE ≈ 0.0028, RMSE ≈ 0.053). Pearson correlation (≈0.68) indicates a moderate linear dependence, while Spearman correlation (≈0.73) suggests a stronger monotonic association. HSIC (≈0.0091) points to the presence of nonlinear components. v is clearly related to zmax, with the relationship being stronger in monotonic rather than strictly linear terms. The moderate relationship between mean flow velocity and scour depth indicates that average velocity does not sufficiently reflect the hydraulic conditions near the bed, where sediment transport processes are initiated.
Froude number Fr correlation to maximum scour depth shows the highest error values (MSE ≈ 0.0202, RMSE ≈ 0.142). Pearson correlation (≈0.63) indicates a moderate linear dependence, while Spearman correlation (≈0.72) suggests a stronger monotonic trend. HSIC (≈0.0067) further supports the presence of nonlinear effects. Fr is moderately associated with zmax, with monotonic relationships better capturing the dependence than linear models. The observed nonlinear relationship with the Froude number reflects the fact that it represents overall flow conditions, which do not directly correspond to the local hydraulic forces acting at the bed.
4. Discussion
The results obtained in this study clearly demonstrate that bed shear stress is the most reliable hydraulic parameter for describing the development of local scour downstream of a weir. The strong relationship between shear stress and maximum scour depth confirms that sediment mobilization and transport are primarily governed by the forces acting directly on the bed surface. This finding is consistent with previous studies, which identify bed shear stress as the key parameter controlling sediment motion and scour processes in hydraulic systems [20,28].
In contrast, velocity-based parameters show weaker or less consistent relationships with scour depth. The near-bed velocity shows high variability and limited predictive capability, which can be attributed to the highly turbulent flow conditions in the scour zone. Under such conditions, instantaneous flow structures and turbulence play a dominant role in sediment transport, reducing the representativeness of point velocity measurements [29,30]. Similarly, the moderate relationship observed for mean flow velocity indicates that average flow characteristics do not fully represent the hydraulic conditions acting at the bed level.
The nonlinear relationship identified for the Froude number further supports this interpretation. Although the Froude number reflects flow conditions and energy distribution, it does not directly correspond to the forces responsible for sediment mobilization. This limitation has also been discussed in studies addressing complex flow–sediment interactions, where deviations from simplified relationships were observed under highly turbulent conditions [31,32]. Therefore, parameters based on general flow characteristics may not adequately capture the mechanisms governing local scour development.
An important aspect of this study is the use of Einstein’s velocity field division to determine the hydraulic radius associated with the bed. This approach enables a more accurate estimation of bed shear stress by separating the influence of bed and wall resistance. The importance of correctly estimating bed shear stress in open-channel flows has been emphasized in classical and modern hydraulic studies [33,34]. The strong relationship observed in this study confirms that physically consistent estimation of shear stress significantly enhances the interpretation of scour processes.
The temporal evolution of scour depth observed in this study also aligns with findings reported in the literature. The rapid initial increase in scour depth followed by gradual stabilization reflects the progressive adjustment of the flow structure and a reduction in the hydraulic forces acting on the bed. Similar temporal patterns have been widely documented in studies of local scour downstream of hydraulic structures [35,36].
From an engineering perspective, the results highlight the importance of selecting appropriate hydraulic parameters for scour prediction. Many existing approaches rely on velocity-based indicators, which may lead to inaccurate assessments under complex flow conditions. Modern sediment transport frameworks emphasize the need to include parameters that directly represent near-bed processes and sediment dynamics [37]. The findings of this study support this approach, demonstrating that bed shear stress provides a more reliable basis for predicting scour depth.
Overall, this study contributes to a better understanding of the relative importance of different hydraulic parameters in scour prediction. The results confirm that bed shear stress plays a dominant role in controlling local scour, while velocity-based parameters should be applied with caution, particularly in highly turbulent flow conditions.
5. Conclusions
The conducted analysis demonstrated that among the considered hydraulic parameters, the bed shear stress shows the strongest and most consistent relationship with the maximum scour depth zmax with a correlation coefficient of approximately r ≈ 0.93. This confirms that bed shear stress is the primary controlling factor governing the development of local scour. In contrast, the near-bed velocity v1cm shows negligible correlation with zmax (r ≈ 0.26), while the mean flow velocity v and the Froude number Fr reveal moderate relationships (r ≈ 0.63–0.73), which are better described as monotonic or nonlinear rather than purely linear. These results underline the importance of combining classical correlation measures with more advanced statistical tools when investigating sediment transport processes. These results are based on the analysis of 11 experimental series and provide a quantitative comparison of the predictive capability of the analyzed parameters.
The obtained relationships indicate that bed shear stress can serve as a reliable basis for the development of predictive approaches for maximum scour depth under controlled hydraulic conditions. Such a relationship could initially be formulated for laboratory conditions and later extended to field applications, possibly including scale-dependent coefficients related to hydraulic structures. This type of formulation would provide a valuable engineering tool, enabling quantitative prediction of maximum scour depth based solely on flow parameters, which directly assists in the hydraulic infrastructure design process by providing more reliable boundary conditions for bed protection layers. In this context, it is important to note that, for a constant channel geometry, bed shear stress can be directly related to measurable hydraulic quantities such as flow depth, which simplifies its practical application. The use of Einstein’s velocity field division proved to be necessary for obtaining reliable estimates of bed shear stress, which in turn enabled a meaningful interpretation of local scour development.
The near-bed velocity v1cm measured in cross-section B-B should be interpreted primarily as an indicator of local flow disturbances rather than a parameter directly governing scour depth. Its weak relationship with zmax confirms its limited applicability as a predictive parameter under the investigated conditions. Measurements taken at 1 cm above the bed in the zone of intensive scour reflect highly dynamic flow conditions, including strong turbulence, local accelerations, and vortex structures responsible for sediment mobilization. This results in increased variability of measured values, which reduces their usefulness in quantitative prediction.
Additionally, the reliability of near-bed velocity measurements is sensitive to experimental conditions, including probe positioning and flow disturbances caused by sediment transport. These factors introduce additional uncertainty into the dataset and should be considered when interpreting velocity-based parameters.
The observed nonlinear relationships between selected hydraulic parameters and scour depth result from the complex feedback between flow structure and evolving bed morphology, where progressive deepening of the scour hole alters the local velocity field, turbulence intensity, and shear stress distribution. In addition, sediment transport responds nonlinearly to hydraulic forcing once the critical threshold for particle motion is exceeded, leading to disproportionate increases in erosion intensity under relatively small changes in flow conditions.
The engineering relevance of these findings lies in the shift from velocity-based to shear-stress-based design criteria for hydraulic structures. Traditionally, many engineering standards rely on near-bed velocity as a primary indicator of erosion risk. However, our results demonstrate that velocity-based predictions can be misleading, potentially leading to underestimation of scour depth and structural instability. By adopting the bed shear stress as a key diagnostic parameter, engineers can more accurately predict the maximum depth of local scour, allowing for a more optimized and cost-effective design of the downstream apron and bed protection. From a practical standpoint, these findings imply that relying solely on near-bed velocity can lead to the underestimation of scour depth, whereas adopting shear-stress-based criteria enables more robust safety factors and material savings. This approach enhances the overall resilience of the weir infrastructure, reducing the risk of foundation undermining and ensuring long-term operational safety under varying hydraulic conditions.
Despite these insights, certain research limitations must be acknowledged, such as the idealized laboratory geometry and the specific 1:30 scale of the model. Future research directions should focus on validating these relationships across a wider range of sediment gradations and complex weir types, integrating long-term field monitoring with numerical simulations.
Author Contributions
Conceptualization, M.K. and J.G.; methodology, M.K.; software, M.K.; validation, B.Ż., A.M. and B.F.-P.; formal analysis, M.K.; investigation, J.G.; resources, M.K., B.Ż., A.M. and B.F.-P.; data curation, J.G.; writing—original draft preparation, M.K. and J.G.; writing—review and editing, M.K.; visualization, M.K. and J.G.; supervision, M.K.; project administration, M.K.; funding acquisition, M.K., B.Ż., A.M. and B.F.-P. All authors have read and agreed to the published version of the manuscript.
Funding
This research received no external funding.
Data Availability Statement
The raw data supporting the conclusions of this article will be made available by the authors on request.
Conflicts of Interest
The authors declare no conflicts of interest.
References
- Kleinhans, M.; Rijn, L. Stochastic prediction of sediment transport in sand-gravel bed rivers. J. Hydraul. Eng. 2002, 128, 412–425. [Google Scholar] [CrossRef] [Scilit]
- Brown, R.; Stieve, J.; Sellheim, K.; Merz, J. Relative sediment supply and excess shear stress drives the evolution of restored side channels in a regulated river. Earth Surf. Process. Landf. 2025, 50, e70165. [Google Scholar] [CrossRef] [Scilit]
- Minor, M.; Lague, D.; Howarth, J.; Davy, P. Improving a multi-grain-size total sediment load model through a new standardized reference shear stress for incipient motion and an adjusted saltation height description. Earth Surf. Dyn. 2025, 13, 1229–1248. [Google Scholar] [CrossRef] [Scilit]
- Van Rijn, L.C. Simple General Formulae for Sand Transport in Rivers, Estuaries and Coastal Waters. 1993. Available online: http://www.leovanrijn-sediment.com (accessed on 20 January 2026).
- Sumer, B.; Chua, L.; Cheng, N.-S.; Fredsøe, J. Influence of turbulence on bed load sediment transport. J. Hydraul. Eng. 2003, 129, 585–596. [Google Scholar] [CrossRef] [Scilit]
- Kiraga, M.; Popek, Z. Geometry description of local scouring process in various laboratory water structure models. In Free Surface Flows and Transport Processes; Kalinowska, M., Mrokowska, M., Rowiński, P., Eds.; Springer: Cham, Switzerland, 2018; pp. 245–258. [Google Scholar] [CrossRef] [Scilit]
- Huthoff, F. Evaluation of a simple hydraulic resistance model using flow measurements collected in vegetated waterways. Open J. Mod. Hydrol. 2013, 3, 28–37. [Google Scholar] [CrossRef]
- Dallan, E.; Bottacin-Busolin, A.; Sabokrouhiyeh, N.; Tregnaghi, M.; Marion, A. Numerical study of sedimentation in uniformly vegetated wetlands. In Free Surface Flows and Transport Processes; Kalinowska, M., Mrokowska, M., Rowiński, P., Eds.; Springer: Cham, Switzerland, 2018; pp. 167–180. [Google Scholar] [CrossRef] [Scilit]
- Graf, W.H.; Altinakar, M.S. Fluvial Hydraulics: Flow and Transport Processes in Channels of Simple Geometry; Wiley: Chichester, UK; New York, NY, USA, 1998. [Google Scholar]
- Garcia, M. Processes, measurements, modeling, and practice. In Sedimentation Engineering: Processes, Measurements, Modeling, and Practice; Garcia, M., Ed.; ASCE: Reston, VA, USA, 2008; pp. 21–163. [Google Scholar] [CrossRef] [Scilit]
- Wilson, K.C. Analysis of bed-load motion at high shear stress. J. Hydraul. Eng. 1987, 113, 97–103. [Google Scholar] [CrossRef] [Scilit]
- Lee, M.; Park, Y.; Lee, M.; Song, Y.-S.; Park, C. Estimation of friction factor and bed shear stress considering bedform effect in rivers. Earth Surf. Process. Landf. 2024, 49, 4154–4167. [Google Scholar] [CrossRef] [Scilit]
- Brandimarte, L.; Paron, P.; Di Baldassarre, G. Bridge pier scour: A review of processes, measurements and estimates. Environ. Eng. Manag. J. 2012, 11, 975–989. [Google Scholar] [CrossRef] [Scilit]
- Widyastuti, I.; Arsyad, M.; Lopa, R.; Hatta, M. Dam-break energy of porous structure for scour countermeasure at bridge abutment. Civ. Eng. J. 2022, 8, 3939–3951. [Google Scholar] [CrossRef] [Scilit]
- Guan, D.; Liu, J.; Chiew, Y.-M.; Zhou, Y. Scour evolution downstream of submerged weirs in clear water scour conditions. Water 2019, 11, 1746. [Google Scholar] [CrossRef] [Scilit]
- Zhang, W.; Nie, R.; Liu, X.; Yang, S.; Wang, L. Clear-water scour depth at rock weirs under unsteady flows. J. Hydrol. 2025, 654, 132889. [Google Scholar] [CrossRef] [Scilit]
- Barbhuiya, A.K.; Dey, S. Local scour at abutments: A review. Sadhana 2004, 29, 449–476. [Google Scholar] [CrossRef] [Scilit]
- Guan, D.; Melville, B.W.; Friedrich, H. Bed load influence on scour at submerged weirs. In Proceedings of the 35th IAHR World Congress, Chengdu, China, 8–13 September 2013; pp. 1–9. [Google Scholar]
- Guan, D.; Melville, B.; Friedrich, H. Live-bed scour at submerged weirs. J. Hydraul. Eng. 2015, 141, 04014071. [Google Scholar] [CrossRef] [Scilit]
- Wu, J.; He, K.; Yang, T. Numerical modelling of local scour around pile foundations: A hydrodynamic–geotechnical review. Mar. Georesources Geotechnol. 2025, 1–27. [Google Scholar] [CrossRef] [Scilit]
- Kiraga, M.; Chyliński, F.; Fornal-Pieniak, B.; Ollik, M.; Staar, A. The water flow regime in the weir area for vascular and rush plant species composition. Water 2023, 15, 3189. [Google Scholar] [CrossRef] [Scilit]
- Bajkowski, S. Current measuring techniques of water laboratories. Infrastruct. Ecol. Rural Areas 2010, 8, 1063–1079. [Google Scholar]
- Einstein, H.A. The bed-load function for sediment transportation in open channel flows. Tech. Bull. 1950, 1026, 1–74. [Google Scholar]
- Kubrak, J.; Nachlik, E. Hydrauliczne Podstawy Obliczania Przepustowości Koryt Rzecznych; Wydawnictwo SGGW: Warszawa, Poland, 2003; p. 317. [Google Scholar]
- Nezhad, H.; Mohammadi, M.; Ghaderi, A.; Bagherzadeh, M.; Ricardo, A.; Kuriqi, A. Flow resistance and velocity distribution in a smooth triangular channel. Water Supply 2022, 22, 5253–5264. [Google Scholar] [CrossRef] [Scilit]
- Pähtz, T.; Chen, Y.; Xie, J.; Monthiller, R.; Maurin, R.; Tholen, K.; Ho, H.-C.; Hu, P.; He, Z.; Durán, O. Resolving bedload flux variability. In Proceedings of the EGU General Assembly 2024, Vienna, Austria, 14–19 April 2024. [Google Scholar] [CrossRef] [Scilit]
- Patel, A.; Boersma, B.J.; Pecnik, R. The influence of near-wall density and viscosity gradients on turbulence in channel flows. J. Fluid Mech. 2016, 809, 793–820. [Google Scholar] [CrossRef] [Scilit]
- Melville, B.W.; Coleman, S.E. Bridge Scour; Water Resources Publications: Highlands Ranch, CO, USA, 2000. [Google Scholar]
- Diplas, P.; Dancey, C.L.; Celik, A.O.; Valyrakis, M.; Greer, K.; Akar, T. The role of impulse on the initiation of particle movement under turbulent flow conditions. Science 2008, 322, 717–720. [Google Scholar] [CrossRef] [Scilit]
- Aberle, J.; Nikora, V. Statistical properties of armored gravel beds. Water Resour. Res. 2006, 42, W11414. [Google Scholar] [CrossRef] [Scilit]
- Sumer, B.M.; Fredsøe, J. The Mechanics of Scour in the Marine Environment; Word Scientific: Singapore, 2002. [Google Scholar]
- Ettema, R.; Kirkil, G.; Muste, M. Similitude of large-scale turbulence in experiments on local scour at cylinders. J. Hydraul. Eng. 2006, 132, 33–40. [Google Scholar] [CrossRef] [Scilit]
- Knight, D.W.; Demetriou, J.D.; Hamed, M.E. Boundary shear in smooth rectangular channels. J. Hydraul. Eng. 1984, 110, 405–422. [Google Scholar] [CrossRef] [Scilit]
- Chiew, Y.M.; Melville, B.W. Local scour at bridge piers. J. Hydraul. Res. 1987, 25, 15–26. [Google Scholar] [CrossRef] [Scilit]
- Melville, B.W.; Chiew, Y.M. Time scale for local scour at bridge piers. J. Hydraul. Eng. 1999, 125, 59–65. [Google Scholar] [CrossRef] [Scilit]
- Pagliara, S.; Palermo, M. Rock grade control structures and stepped gabion weirs: Scour analysis and flow features. Acta Geophys. 2013, 61, 126–150. [Google Scholar] [CrossRef] [Scilit]
- García, M.H. Sedimentation Engineering: Processes, Measurements, Modeling, and Practice; ASCE: Reston, VA, USA, 2008. [Google Scholar]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.