Lifecycle Value and Tariff Impact Assessment of Voltage Support and System Strength Technologies in Weak High-PV Power Systems

and
Discipline of Electrical, Electronic and Computer Engineering, University of KwaZulu-Natal, Durban 4001, KwaZulu-Natal, South Africa
*
Author to whom correspondence should be addressed.
This article belongs to the Section F1: Electrical Power System

Abstract

High levels of photovoltaic penetration and synchronous generator decommissioning are weakening grid strength and increasing voltage support requirements, yet most studies still assess support technologies primarily based on technical performance rather than full lifecycle utility value. The key gap is the absence of a consistent framework that links technical performance to lifecycle cost, tariff impact and investment outcomes across competing technologies. This study addresses that gap by developing a transparent utility-oriented assessment framework to compare Static Var Compensator (SVC), Static Synchronous Compensator (STATCOM), Synchronous Condenser (SC) and grid-forming BESS (BESS-GFM) options in a weak high-PV penetration network. Quasi-dynamic simulations on an IEEE 9-bus system were used to quantify technical benefits, which were then converted into lifecycle financial metrics within a total expenditure (TOTEX)-based model and combined with practical decision criteria through multi-criteria decision analysis (MCDA). The results show that while all four technologies improve system performance, their overall value differs once cost, tariff impact, risk and flexibility are considered. Under the adopted assumptions, STATCOM provides the best overall balance and ranks highest.

1. Introduction

Continuous displacement of synchronous generation by inverter-based renewable energy sources is changing the operating characteristics of modern power systems. In transmission systems, high levels of PV penetration can reduce short-circuit current strength, increase voltage sensitivity to disturbances, prevent large customer connections due to low voltages and reduce reactive headroom. Electrical power utilities are increasingly required to justify network support technologies in relation to lifetime cost and tariff impact under constrained capital budgets and imposed regulatory requirements [1,2].
Several reactive support devices can be deployed to mitigate weak grid stability, voltage resilience and system strength which include shunt FACTS devices (SVC and STATCOM), SCs and grid-forming battery energy storage systems (BESS-GFMs). These technologies differ fundamentally in controllability, dynamic voltage support, fault current support and operational flexibility. These technologies differ significantly in lifecycle cost whilst the SC, SVC and STATCOM typically have high capital costs and relatively fixed maintenance patterns, and BESS-GFM introduces degradation dependent on battery cycles and performance degradation over time which can impact the total expenditure over its lifecycle. In the absence of this financial understanding, utilities risk either undervaluing technologies that provide critical system services or selecting technologies that may provide adequate technical support but add long-term cost implications [2,3,4].
Most of the published literature typically benchmark device dynamics without closing the loop to full lifecycle costs, and economic studies focus on a single asset class. With regard to technical viability, detailed dynamic voltage support comparisons exist for classical solutions; for example, Bao et al. compare SCs versus STATCOM whilst Svensson compares SCs versus SVC and PSCAD-based studies benchmark STATCOM versus SVC performance across fault types and varying grid conditions [5,6]. Inverter-based technologies, including recent work on grid-forming BESS, concentrate mainly on stability and sizing controls but do not extend to a utility business case with consistent TOTEX (total expenditure over the assessment horizon) treatment across competing technologies [7,8]. In conjunction with financial assessments, valuation guidance such as DOE/OE-0029 structures storage value streams and modeling approaches, whilst tariff recovery is usually addressed separately via cost-of-service methodologies as illustrated in the NERSA Cost of Supply Framework [3,9]. The key gap is the absence of an end-to-end, utility-ready framework that: (i) quantifies full life-cycle TOTEX consistently across SVC, STATCOM, SC and BESS-GFM; (ii) quantifies the financial implication of measurable technical loss, curtailment reductions and reliability via VoLL (value of lost load) and (iii) reports outcomes in both investment metrics net present value (NPV)/Internal Rate of Return (IRR)/benefit–cost ratio (BCR) and cost-of-service terms, consistent with Cost–Benefit Analysis (CBA) governance [10,11].
This paper proposes a structured utility financial assessment framework for comparing SVC, STATCOM, SC and BESS-GFM options for weak grid applications. The approach used is in line with established CBA principles and cost-of-service logic and is implemented as a transparent spreadsheet tool in Microsoft Excel, linking study-derived technical parameters to annualized cashflows, lifecycle replacements, end-of-life decommissioning and tariff impact. A multi-criteria decision analysis (MCDA) layer is then applied to incorporate non-financial criteria such as implementation risk and operational flexibility whilst using financial results to make decisions [3,11].

2. Methodology

This section defines the technical study system used to generate engineering inputs for the financial assessment. It first introduces the modified IEEE 9-bus benchmark network and identifies the bus at which the PV plant and grid support technologies are connected. The seasonal PV profiles and synchronous generator dispatch patterns are then described to show how increasing PV output displaces conventional generation during the day. The seasonal load profiles are also introduced because they determine the operating points, line flows and loss behavior used in the quasi-dynamic simulations. The section then defines the voltage support technologies, their ratings and their common voltage control assumptions so that the comparison is made on a consistent basis. Finally, the line and device parameters are summarized before the paper moves to the financial model that converts the technical outputs into lifecycle cost and tariff-impact results.

2.1. Power System Simulation

The system is intended to compare high-voltage line technical losses associated with various grid support technologies under increasing photovoltaic (PV) penetration. The resulting loss differentials serve as a direct input to the proposed financial modeling tool.
The analysis is performed on the IEEE 9-bus benchmark system as depicted in Figure 1, which comprises nine buses, three synchronous generators, nine transmission lines and three loads. In this configuration, a 320 MW PV plant is connected to Bus 5 at the 230 kV point of coupling (PCC) which is the same as Load A (the largest load in the system). This arrangement intentionally places the additional generation at the most voltage-sensitive node in the network, allowing the impact of increasing PV penetration on system losses and voltage performance to be assessed under stressed operating conditions.
Figure 1. IEEE 9-bus system.
The IEEE 9-bus benchmark system is used to simulate the gradual replacement of three coal-fired synchronous generators with solar PV generation. The analysis quantifies transmission line losses across all four seasons. For each season, the simulated daily loss values are scaled by the corresponding number of days per season in South Africa to obtain seasonal energy and annual energy losses. This is repeated for each grid support technology under consideration.
Figure 2 illustrates the seasonal PV output profiles derived from the JRC PVGIS database for South Africa, based on average half-hourly production data. The plant has an installed capacity of 320 MW; however, the observed seasonal peaks range between 179 MW in winter and 234 MW in spring. This corresponds to an effective operating point of up to 73% of rated capacity, which is consistent with average irradiance modeling rather than clear-sky maximum conditions.
Figure 2. Seasonal PV plant solar output.
The generation profile begins ramping up shortly after 5.30 to 06:00, increasing steeply between 07:00 and 10:00 and reaching its seasonal maximum around 10:00 to 11:00. The output thereafter declines and returns to zero between 17:00 and 18:00 h. While the plant is rated at 320 MW, the averaged seasonal profiles do not reach this value because they represent statistically smooth production rather than clear-sky conditions.
The bulk of generation occurs within a 4 to 5 h window around solar noon; the daily energy output ranges from 1829 MWh in summer to 1152 MWh in winter. Whilst the 320 MW represents the technical installed capacity, the seasonal curves reflect a realistic annual operational scenario which is more relevant for system planning, energy yield estimation and stability studies than instantaneous peak clear-sky output.
Figure 3 presents the generators’ seasonal output profiles within the IEEE 9-bus system in response to an increase in PV penetration on the system. The profiles illustrate the operational impact of increasing PV penetration on synchronous generation dispatch under realistic seasonal loading conditions.
Figure 3. Seasonal synchronous generator output profiles: (a) winter, (b) autumn, (c) summer and (d) spring.
Prior to sunrise, when the PV plant output is zero, the three synchronous generators operate under their base levels:
  • Hydro pumped storage unit (G1)—72 MW.
  • Large hard coal unit (G2)—162 MW.
  • Small hard coal unit (G3)—84 MW.
As PV generation begins ramping after 06:00 to 08:00 (season-dependent), the system controller progressively reduces synchronous generation to maintain power balance. The most significant displacement occurs between 09:00 and 14:00 which coincides with peak solar injection. This operational dip demonstrated the displacement effect caused by high-PV penetration.
From 15:00 to 16:00 onward, the PV penetration rapidly declines and the synchronous generation fleet is then ramped back up to meet the increasing demand as solar production falls whilst the evening demand increases. Winter exhibits sharper ramps due to both reduced PV output and more pronounced seasonal load peaks.
The instances of the morning ramp-up and evening ramp-down of PV introduce significant net load ramps. These operational characteristics highlight a need for reactive power compensation technologies to maintain system stability and energy balance. The electrical data for the three generators and the reactive compensation devices are summarized in Table 1.
Table 1. Generator and PV plant data.
The IEEE 9-bus system as depicted in Figure 1 originates from Power System Control and Stability by P.M. Anderson and A.A. Fouad and has become one of the most widely adopted benchmark models in power system research and education. The system represents a simplified section of the Western System Coordinating Council (WSCC) network and consists of nine buses, three synchronous machines, nine transmission lines and three aggregated loads [12].
Despite its compact structure, the model preserves the fundamental electrical and dynamic characteristics of a real transmission network. It captures the generator electromechanical dynamics, excitation system behavior, power angle relationships and load representation whilst maintaining electrical connectivity between generators and load centers. The configuration allows for meaningful analysis of voltage stability, transient response, frequency behavior and power flow impact under varying operating conditions.
The IEEE 9-bus system remains an effective platform for demonstrating methodological developments while ensuring that the results remain technically relevant to practical power system operation.
The load profiles applied to load A, B and C within the IEEE 9-bus system were developed through a structured calibration process to ensure alignment with real utility operating conditions rather than relying on synthetic or demand assumptions as represented in Figure 4.
Figure 4. Seasonal load profiles for Load A, Load B and Load C: (a) autumn, (b) spring, (c) winter and (d) summer.
Each load was seasonally adjusted using measured high-voltage (HV) line loading trend data obtained from an operational transmission feeder. The purpose of this approach is to replicate the actual demand load profile shape on the network, thereby embedding realistic demand dynamics into the benchmark system. The HV feeder data provided the time-varying trend which was then normalized and scaled to the base power levels of the IEEE 9-bus loads.
For each season, the following approach was taken:
  • The raw HV line loading profile was extracted over a two-year period, extracting a seasonal sample that clearly shows a common trend.
  • The trend was then normalized to per-unit values relative to the seasonal peak.
  • The IEEE-bus base load values for load A, B and C were proportionally scaled using this normalized seasonal profile.
  • The resulting seasonal load curves depict:
    o 
    The actual ramping characteristics observed in the transmission system.
    o 
    The timing of morning demand increases.
    o 
    The evening peak demand.
    o 
    The reduced off-peak loading.
This process ensures that the IEEE 9-bus system reflects realistic demand behavior typical of a South African utility network, where summer and spring profiles show a broader daytime demand and higher midday loading. Winter exhibits a more profound evening peak, while autumn presents an intermediate profile between summer and winter conditions.
This approach improves the loss analysis by ensuring that the line loading and congestion behavior reflect practical network conditions, ramping requirements during PV injection and withdrawal are accurately represented and reactive power demand variation follows true seasonal demand patterns. By implementing loads representative of actual HV feeder data, the model represents a utility network that enhances the comparative technology assessments (STATCOM, SVC, SC, and BESS-GFM).
Reactive grid support within the IEEE 9-bus model is provided by four technologies evaluated independently at Bus 5 (STATCOM, SVC, SC and BESS-GFM). Each device is connected individually to the same bus to ensure a controlled, consistent comparison of dynamic and steady-state behavior as renewable penetration increases.
All devices operate in voltage control mode with a setpoint of 1.035 p.u. at the device’s POC. This setpoint lies within steady-state voltage limits specified in NRS 048 and reflects a practical operating margin used in transmission systems to maintain adequate reactive power headroom and voltage stability [13].
The SVC is configured with six discrete 10 MVAr capacitor banks which enable stepwise reactive power injection or absorption. Its response is therefore quantized, providing incremental voltage correction as system conditions vary. Both the STATCOM and the SC provide continuous reactive power modulation. The STATCOM achieves this through fast electronic switching and current control, enabling rapid dynamic voltage support. The SC supplies reactive power through electromagnetic excitation control and contributes additional rotational inertia to the system.
The BESS-GFM unit is sized and controlled to operate within its inverter current limits. Its reactive power capability is therefore constrained by apparent power rating and current magnitude when delivering bidirectional reactive support. In grid-forming mode, the BESS also contributes to frequency support and short-term stability through voltage source behavior. The detailed technical specifications are summarized in Table 2.
Table 2. Reactive power generation device specifications.
The modeled lines have a length of 2 km, as summarized in Table 3:
Table 3. Line parameters.
While the preceding sections establish the technical performance behavior of each reactive support technology under increasing renewable energy penetration, system planning decisions cannot be made on technical merit alone. Utilities must evaluate whether the operational stability benefits translate into a defensible economic value over the asset lifecycle. The next section transitions from an electrical modeling introduction to a structured financial assessment framework.
To support the financial analysis, a dedicated financial modeling tool was developed to quantify the full lifecycle of cost implications of each technology and to express the results using standard investment metrics and a ranking system. The tool integrates capital expenditure, operating and maintenance costs, replacement schedules, efficiency impacts and quantified technical benefits into a TOTEX framework. From this basis, various financial indices include net present value (NPV), Internal Rate of Return (IRR), benefit–cost ratio (BCR) and related maintenance indicators.
This enables a direct linkage between technical system support performance and long-term economic viability, ensuring that the comparative assessment reflects both engineering effectiveness and financial justification within a utility planning context.

2.2. Financial Model

Extensive literature evaluates grid support technologies primarily from a technical performance perspective, focusing on transient stability, voltage control, inertia contribution and dynamic response. However, fewer studies provide a structured lifecycle-based economic comparison suitable for regulated utility decision-making. Foundational stability modeling frameworks are established in Anderson and Fouad’s Power System Control and Stability [12].
More recent renewable integration literature and systems strength studies by IEEE publications and grid integration assessments emphasize operational performance, hosting capacity and voltage compliance, but often treat economic analysis in isolation. This often limits assessments to capital cost comparisons or high-level cost indicators without embedding full lifecycle total expenditure, degradation, replacement schedules and cost-of-service implications [14,15,16,17,18,19,20].
A clear gap therefore exists in methodologies that:
  • Quantify full lifecycle TOTEX consistently across competing voltage support and system strength technologies.
  • Translate measurable technical parameters (loss reduction and curtailment avoidance) into a monetary value.
  • Present the outcomes using standard utility investment metrics such as NPV, IRR and BCR to effectively rank devices within a regulated planning framework.
To address this gap, a structured financial modeling tool was developed to integrate simulation outputs within lifecycle economic assessment principles aligned with regulated utility investment practice. This framework enables a defensible comparison of reactive support technologies under uniform financial assumptions, thereby bridging the gap between engineering performance evaluation and investment-grade financial decision criteria.
The financial modeling framework represented in Figure 5 depicts the building blocks of the financial assessment undertaken for the reactive generation technologies explored in this study and is structured as a sequential decision-making framework linking engineering simulation outputs, lifecycle cost assumptions, discounted cashflow calculations and comparative financial indications. This methodology is further depicted in Figure 6.
Figure 5. Financial model flow diagram.
Figure 6. Simplified flow diagram.
The architecture of the model ensures traceability from engineering outputs to investment-grade financial metrics; this bridges the engineering economics divide often present in grid support literature [12]. The lifecycle investment evaluation follows cashflow principles consistent with corporate finance theory and utility practice [21]. The blocks as represented in Figure 5 are explained below:
The input block defines all the primary quantitative variables required to construct the lifecycle financial model. These include capital expenditure (CAPEX), operational expenditure (OPEX), replacement cycles, discount rate assumptions (WACC), energy price forecasts and the monetized technical input derived from the simulated results.
CAPEX represents the initial investment required for procurement, installation, integration and commissioning of the reactive support technology. OPEX captures recurring annual costs such as maintenance, auxiliary consumption and service contracts. Replacement cycles account for major refurbishments or inverter replacements where applicable. These discrete future capital-intensive scenarios are included within the model’s lifecycle.
In the base-case assessment reported here, the technical input to the financial model is annual loss reduction (MWh/year) obtained from the power system simulations described in the previous section. This quantity is monetized using the assumed energy price to convert the technical benefit into annual financial savings, as shown in Equation (1). In the base case, only the reduction in technical losses is monetized directly because it is the technical output obtained consistently from every seasonal PowerFactory simulation case. Other benefits are not ignored. Voltage control performance, system strength contribution, implementation risk and operational flexibility are carried into the MCDA layer as separate decision criteria. PV curtailment reduction and EENS reduction are retained in the financial framework as optional monetized terms, but they are set to zero in the base case because the present simulation set does not include a chronological curtailment dispatch model or a probabilistic reliability study. This treatment avoids assigning unsupported monetary values while still allowing these benefits to be included when project-specific curtailment or reliability data are available.
B i , t L O S S = Δ E i , t L O S S × π t E
where B i , t L O S S is the monetary value of avoided technical losses for technology i in year t [R/year], Δ E i , t L O S S is the annual avoided technical-loss energy for technology i in year t [MWh/year] and π t E is the applicable avoided energy price in year t [R/MWh].
This ensures a traceable link between engineering and simulation output and financial evaluation. The discount rate represented by the WACC determines the present value of future cashflows and reflects the regulated utility’s cost of capital.
For the BESS-GFM case, the financial framework includes additional market-based value streams through energy arbitrage and ancillary services participation. The literature dictates that battery economics are frequently driven by stacked value streams rather than by single application alone, provided that the physical constraints of rated power, energy capacity, availability and service allocation are respected [3,22,23,24,25].
The assumption block defines the economic and operational environment within the financial evaluation criteria. These assumptions establish the structural parameters governing asset life, analysis horizon, inflation or escalation, discount rate, replacement timing, augmentation timing, degradation, availability, utilization and any residual or terminal value.
Asset life duration determines the analysis horizon over which costs and benefits are evaluated. This period reflects the service life expectations of the technology under study. Inflation and escalation rates project future growth in operating costs and energy prices. This ensures consistency between nominal and real cashflow modeling approaches.
Degradation assumptions account for potential performance decline over time, which may affect loss reduction savings in inverter-based or electrochemical systems because declining usable energy, efficiency, or availability can reduce future benefit realization. Residual value represents the remaining economic worth of the asset at the end of the analysis period and is treated as a terminal cash inflow.
The availability and utilization assumptions define the operational consistency of the asset and the impact on annual savings. These assumptions are particularly relevant when technical savings are dependent on effective operation. For the BESS-GFM technology, these assumptions are important because energy arbitrage and ancillary service venues depend on operational availability, dispatch frequency and sustained energy capability [25].
These assumptions ensure that the model reflects lifecycle realism rather than static cost comparison which aligns with established discounted cashflow principles in infrastructure finance [21].
The discounted cashflow model forms the analytical core of the financial tool. For each technology, the base case cashflow converts annual loss reduction into a monetary saving and then subtracts operating, augmentation and replacement costs over the assessment horizon. The general form also retains optional terms for curtailment reduction, reliability improvement and BESS stacked revenues, but only terms supported by the simulated or assumed dataset are activated in the base case. In its expanded form, the annual cashflow for each technology is represented by Equation (2) [21,22,23,24,25].
C F i , t = B i , t t e c h + R i , t a r b + R i , t a n c − O i , t − A u g i , t − R e p i , t − W C i , t
where B i , t t e c h is the monetized technical benefit, R i , t a r b is energy arbitrage revenue, R i , t a n c is ancillary service revenue, O i , t is annual operating expenditure, A u g i , t , t is augmentation expenditure, R e p i , t is replacement expenditure and W C i , t is any working capital allowance.
For the non-storage technologies, the dominant benefit term remains the monetized technical saving, while the BESS case may additionally realize stacked market value streams. For each year of the evaluation (t) the net cashflow is represented by Equation (3), and the yearly cashflows are then discounted to present value using the selected discount rate described by Equation (4).
C F i , t = B i , t − O i , t − R e p i , t − A u g i , t − W C i , t
where C F i , t is the net cashflow for technology i in year t [R/year], B i , t is the total monetized benefit [R/year], O i , t is operating expenditure [R/year], R e p i , t is replacement expenditure [R/year], A u g i , t is augmentation expenditure [R/year] and W C i , t is the working-capital allowance [R/year].
N P V = ∑ t = 0 N i C F i , t 1 + r t
where C F i , t is the net cashflow in year t, r is the discount rate (WACC), and N i is the asset life in years for each technology i .
The DCF framework reflects the time value of money and ensures future savings and costs are expressed in present value terms, consistent with corporate finance and regulated investment methodology [21,22]. The chosen approach is widely recognized as the most robust framework for evaluating long-term capital-intensive energy infrastructure projects.
To cater for the commercially relevant value streams, the BESS financial model includes separate annual terms for energy arbitrage and ancillary services. Energy arbitrage revenue is represented by Equation (5).
R t a r b = E t u s e n t ∗ 365 A t a r b ∗ Δ p t
where E t u s e is the usable discharged energy per cycle; n t is the number of cycles per day; A t a r b is the arbitrage availability factor and Δ p t is the net price spread after accounting for charging cost, round trip efficiency and any variable dispatch cost.
Ancillary service revenue is represented as Equation (6).
R t a n c = P t r e s H t π t a n c A t a n c ϕ t
where P t r e s is the reserved service capacity, H t is the annual service participation time, π t a n c is the ancillary service price, A t a n c is the availability factor and ϕ t is a performance factor. This formulation captures the simplified payment logic commonly used in early-stage storage valuation, where service value depends on committed capacity, participation time and qualification or performance assumptions.
Due to a single BESS unit not being able to fully allocate the same power and energy capacity to multiple services simultaneously, the framework includes an allocation constraint depicted in Equation (7) to avoid double counting.
α t a r b + α t a n c ≤ 1
where α t a r b and α t a n c are the fractions of BESS capability allocated to arbitrage and ancillary services, respectively.
The financial block translates the discounted cashflow outputs into decision metrics used for investment appraisal and comparative ranking.
There is an array of financial indices utilized in the modeling tool, which include:
  • NPV measures total value creation after accounting for discounted future cashflows. A positive NPV indicates that the project generates value above the cost of capital. NPV is widely considered the primary decision metric in capital budgeting theory [21].
  • Internal Rate of Return (IRR) is the discount rate that sets the NPV equal to zero. It represents the project’s effective rate of return and is useful for comparative assessment.
  • Benefit–cost ratio (BCR) expresses the value-for-money relationship between discounted benefits and discounted costs and is useful when comparing technologies with different cost magnitudes, as represented by Equation (8).
B C R i = ∑ t = 1 N i B i , t t e c h   +   R i , t a r b   +   R i , t a n c ( 1   +   r ) t I i , 0   +   ∑ t = 1 N i O i , t   +   A u g i , t   +   R e p i , t   +   W C i , t ( 1   +   r ) t
where I i , 0 is the initial capital investment. A BCR greater than unity indicates that discounted benefits exceed discounted costs.
  • Payback period estimates the time required to recover the investment, while revenue requirement determines the annual income needed to sustain the investment under regulated cost-of-service frameworks. This is expressed as the earliest year T as per Equation (9).
∑ t = 0 T C F i , t ≥ 0
where C F i , t denotes the annual net cashflow for technology i in year t ; t is the discrete period measured in years; T is the payback year, defined as the earliest year for which cumulative net cashflow is zero or positive and i identifies the technology being assessed.
Revenue requirement represents the annual income needed to recover operating costs and provide a return on invested capital from a regulated cost-of-service perspective. In simplified form, the annual revenue requirement is represented by Equation (10).
R R i , t = O i , t + D e p i , t + r ⋅ R B i , t
where D e p i , t is depreciation and R B i , t is the undepreciated rate base. This formulation aligns with the standard regulatory concept that annual charges must recover the cost of service plus a reasonable return on capital.
The output and Ranking block consolidates financial indicators into a structured comparative assessment across technologies.
TOTEX consolidates capital, operational and replacement expenditures over the asset’s lifecycle. Annualized cost distributes lifecycle expenditure across years which supports benchmarking a tariff analysis. Total expenditure over the modeled asset life is depicted by Equation (11).
T O T E X i = I i , 0 + ∑ t = 1 N i O i , t + A u g i , t + R e p i , t
where T O T E X i is the total lifecycle expenditure of technology i , I i , 0 is the initial capital investment at year 0, O i , t is the operating expenditure in year t , A u g i , t is the augmentation expenditure in year t , R e p i , t is the replacement expenditure in year t , N i is the analysis life applicable to technology i , t is the year index and i denotes the technology under evaluation.
Technology ranking is performed primarily on financial performance metrics such as the highest NPV and lowest lifecycle cost, with IRR and BCR serving as supporting indicators. Technical feasibility is treated as a prerequisite constraint rather than a ranking variable, as loss reduction is monetized and incorporated within the DCF model. For the BESS-GFM, inclusion of arbitrage and ancillary service revenue allows the assessment to reflect additional value streams that are commercially relevant in practice.
In summary, the financial modeling framework provides a structured mechanism for translating technical simulation outputs into defensible economic decision metrics. The financial tool quantifies the long-term financial implications of deploying each grid technology by integrating lifecycle cost inputs, economic assumptions and a discounted cashflow methodology. The monetization of loss reduction benefits ensures that technical performance improvements are directly reflected in annual cashflows, which are then evaluated using indices such as NPV, IRR and BCR. The chosen approach enables a transparent and consistent comparison of competing technologies under uniform financial metrics, allowing the most economically viable option to be identified based on lifecycle cost efficiency and value creation. The framework bridges the gap between technical system performance and investment-grade financial evaluation which supports planning decisions for grid support infrastructure under increasing renewable penetration.

3. Simulation Inputs, Financial Assumptions and MCDA Method

Quasi-dynamic simulations were undertaken in DIgSILENT PowerFactory 2023 SP5 to generate the technical loss results required for the financial model. The simulations were structured to quantify transmission line losses for each grid support technology under realistic seasonal PV generation and load profiles. For each season, the daily simulated losses were consolidated and scaled using the corresponding number of days in the South African seasonal calendar to obtain seasonal and annual energy loss values for each technology case. These annualized loss values form the direct engineering output of the study.
From the financial modeling perspective, the key result obtained from the power system simulation is the annual loss reduction MWh/year for each technology relative to the baseline case. This value is then monetized using the assumed energy price and incorporated into the discounted cashflow framework as an annual technical benefit. The simulation results section serves as the bridge between engineering performance and economic evaluation. The quasi-dynamic network behavior under varying PV and load conditions is converted into a financial input that supports lifecycle cost comparison, investment ranking and overall technology selection.

3.1. Technology Cost and Lifecycle Assumptions

The selected cost inputs were based on adopted public benchmark figures as depicted in Table 4. The average of each benchmark is used as a reference and retained as the final planning input. This approach avoids relying on a single published estimate while still associating each technology with the nearest normalized public benchmarks. Some of the published costs are rarely quoted on the same basis, with some sources representing more equipment-focused values and others including a broader EPC scope such as site works, buildings, transformers and grid connection assets. It is for this reason that the public benchmark band was treated as a useful midpoint indicator and the final selected planning input was selected with reference to scope consistency and comparability across technologies [25,26,27,28,29].
Table 4. Grid support technology cost.
The average of the public benchmark was calculated as the arithmetic midpoint as per Equation (12) of the lower and upper benchmark values. The central screening point was selected as a smaller planning range within the broader benchmark band based on the relative comparability of the required project scope.
Average   of   benchmark   band = Lower   bound + Upper   bound 2
For the SVC, the public benchmark cost ranged from R192M to R399M, with an average of R295.5M. The selected planning value is in line with the dedicated unit anchor MISO transmission cost guide, which provides a $/MVAr benchmark for SVCs. The higher-end reference values in the adopted range reflect broader international planning references and generic dynamic reactive support envelopes rather than a single like-for-like equipment quote [28,30].
For STATCOM, the public benchmark range of R272M to R420M gives an average of R346M. The adopted central screening range of R330M to R380M is close to the midpoint, implying that marginal adjustment was required. This is consistent with benchmark data which places the STATCOM above the SVC in terms of normalized cost [27].
For the BESS-GFM, the benchmark was costed against a 170 MVA plant which is equivalent to 136 MW at a 0.8 power factor with a 4 h duration and an energy capacity of 544 MWh. The public benchmark range of R3.02B to R3.96B results in an average of R3.49B which aligns with the adopted central value of R3.5B [26].
In terms of the SC, the public benchmark range of R756M to R1.56B provides an average of R1.158B. The adopted central screening range of R800M to R1.1B was maintained below this midpoint because some higher published values include a much broader project scope such as site works, transformers, buildings and additional infrastructure. The selected range was intended to reflect a more balanced screening value for comparison purposes [26].
Table 4 presents the adopted public benchmark ranges together with their averages and central screening values used in this comparative financial costing assessment, with all currencies converted to South African rand on the mid-market Forex basis.
Because the technologies have different economic lives, the comparison is not based on a simple unadjusted lifetime total. The financial model uses a common planning horizon for decision comparison and treats each technology with its own replacement, augmentation and residual-value assumptions within that horizon. In addition, lifecycle costs are expressed through annualized cost and tariff uplift so that technologies with 15-year, 25-year and 30-year service lives can be compared on a consistent yearly cost recovery basis as depicted in Table 5. NPV is therefore interpreted together with equivalent annual value, annualized cost and tariff impact rather than as a standalone lifetime total measure. SVC and STATCOM, being converter-based reactive support technologies, have a 25-year economic life as the long-term financial horizon is governed by the durability of the power electronic, control and protection systems, even though parts of the primary plant and civil works may remain in service beyond this period. The SC is assigned a 30-year life due to it being a rotating machine technology that typically remains serviceable for longer periods under normal utility maintenance and overhaul practice [3,31,32].
Table 5. Economic device lifecycle.
The BESS is treated separately with a 15-year lifecycle; this reflects faster degradation and renewal cycles associated with battery-based assets. The BESS includes defined investment events which entail battery augmentation every 10 years at 35% of the initial CAPEX and PCS replacement every 12 years at 15% of the initial BESS CAPEX. Since both these intervals fall within the 15-year project lifecycle, the tool permits only one battery augmentation event and one PCS event during the evaluation period. This ensures that the BESS treatment reflects practical maintenance and renewal needs without overstating long-term residual capability [33,34].
The fixed O&M factors used in this tool as depicted in Table 6 are represented as planning assumptions as opposed to fixed industry constants. The referenced literature supports the relative ordering used in this study. The SVC is a robust thyristor-based compensator that is typically manufactured using thyristor-controlled reactors and fixed capacitors and is described in technical literature as having low operating costs and high reliability. These characteristics maintain their O&M expenditure towards the lower end. STATCOM is a VSC-based installation with reactors, capacitor banks, transformers, auxiliary transformers, busbars, cooling equipment and dedicated maintenance cycles. The maintenance literature cites that STATCOM maintenance costs are relatively high. On this notion, this device uses a slightly higher annual fixed O&M allowance compared to the SVC [31,35,36].
Table 6. Fixed O&M (% of CAPEX).
The SC is assigned the highest fixed O&M factor due to the rotating plant, not the static plant. Regulatory and utility sources describe that SCs experience additional mechanical and thermal stresses from rotating components, cooling systems, and insulation aging, with major service intervals commonly tied to overhaul cycles on the order of 12 years. This positions the SCs O&M above the STATCOMs O&M. That makes 3% of CAPEX allowance reasonable as a conservative screening value. The BESS makes use of a 1.5% O&M value as the augmentation costs are catered for separately [37,38,39].

3.2. Technical Performance Inputs from PowerFactory

To provide a compact technical input for the financial model, the seasonal line loss results obtained from DIgSILENT PowerFactory 2023 SP5 quasi-dynamic simulations were consolidated into a single device-specific loss reduction factor for each technology. For the SVC, STATCOM, SC and BESS-GFM, the line loss totals were obtained for autumn, spring, summer and winter. This was then aggregated and compared against the corresponding baseline case. The resulting percentage represents the relative reduction in simulated transmission line losses achieved by each technology with respect to the baseline over the seasonal operating scenarios.
The adopted formulation provides a practical way of reducing the full seasonal simulation dataset into a comparative indicator that serves as an input into the financial assessment. The resulting loss reduction percentages relating to the baseline are depicted in Table 7 and Figure 7. The loss reduction results should be interpreted as a monetized base-case benefit rather than as the sole technical basis for selecting one technology over another. The calculated reductions are close, ranging from 3.04% to 3.12%, which is expected because all technologies are evaluated on the same IEEE 9-bus network, at the same connection point and on an equivalent reactive support basis. The results therefore show that each technology provides a comparable reduction in simulated transmission losses under the adopted operating assumptions.
Table 7. Technical loss calculations.
Figure 7. Loss reduction (%) per technology.
Although the percentage differences are small, they remain financially relevant because loss savings are applied to a high annual energy delivery base and recur throughout the planning horizon. A small percentage change in losses can therefore translate into a material avoided energy cost when evaluated over multiple years. For this reason, loss reduction is retained as a consistent monetized input to the financial model. It is not treated as the dominant selection criterion. The final technology ranking is instead driven by the combined lifecycle financial and MCDA assessment, where loss savings are considered together with tariff impact, voltage control effectiveness, system strength contribution, implementation risk and operational flexibility.
These percentages are used as technical impact factors for use in the financial model and should therefore be interpreted as comparative indicators relative to the baseline. The formal derivation of these loss reduction factors is presented in Appendix C.
System strength at the 230 kV point of common coupling (PCC) was evaluated in DIgSILENT PowerFactory using the initial symmetrical three-phase short-circuit level, S k s s together with the corresponding short-circuit current I k s s . The assessment was conducted for the baseline, SVC, STATCOM, SC and BESS-GFM cases at 09:00, 13:30 and 18:30 in each season of the four seasonal models. In order to obtain a single input suitable for the financial model, the PCC fault-level results were averaged within each season and then combined using the adopted seasonal day weighting. In practice, the simulated PCC fault levels remained unchanged across the selected daily scenarios with minimal changes noted between the seasons; the annualized fault levels are effectively the same as the representative seasonal values.
The baseline PCC fault level is depicted in Table 8 and Figure 8 for all technologies. Relative to the baseline, the SC provides the largest improvement in system strength, increasing the Bus 5 fault level to 1854.39 MVA, which is 28.93% over the baseline. The STATCOM and BESS-GFM provide similar intermediate improvements, increasing the fault level to around 8.34% over baseline. The SVC produces no material increase in fault level. For the financial model purposes, these results are best represented as device-specific fault-level uplift relative to baseline.
Table 8. System strength.
Figure 8. System strength uplift vs. base (%).

3.3. Financial Valuation Assumptions

For the energy price/avoided marginal cost, a time-of-use weighted cost from the South African utility ESKOM for the 2025/26 tariff structure was used. In this approach, the avoided loss of energy in each simulation interval is multiplied by the applicable Eskom active energy charge for the corresponding season and time-of-use period, and the annual monetized benefit is obtained by summation across all intervals. The equivalent avoided marginal cost is then calculated as the ratio of total annual monetized benefit to total annual loss reduction. For the transmission connected benchmark used in this study, a Megaflex nonlocal authority tariff basis at voltages greater than 132 kV, consistent with the 230 kV study system. Where interval level loss-saving exports are not yet available, a calendar based on the Eskom 2025/26 TOU structure gives an equivalent avoided cost of R1457.64/MWh for Zone 0, VAT excluded. The tariff inputs, benchmark derivation and zone sensitivity are summarized in Table 9, Table 10 and Table 11, with the detailed formulation provided in Appendix A [40,41,42].
Table 9. Eskom 2025/26 TOU tariff lookup adopted for the transmission-connected benchmark.
Table 10. Calendar-weighted avoided marginal cost benchmark.
Table 11. Transmission zone sensitivity of the equivalent avoided marginal cost.
Table 9, Table 10 and Table 11 summarize the tariff basis and benchmark conversion used to derive the avoided marginal energy cost applied in the financial model. Table 9 presents the Eskom 2025/26 TOU active energy charges adopted for the selected transmission-connected benchmark. Table 10 shows the resulting seasonal and annual calendar-weighted benchmark values derived from the weekly TOU hour allocation. Table 11 provides a transmission zone sensitivity check, demonstrating that the equivalent avoided cost varies only moderately across Eskom transmission distance bands.
The energy price assumption is aligned with the currency basis of the discounted cashflow model. Although South African energy prices have risen sporadically over time, including a 175% increase over the last decade as noted by NERSA with an approved Eskom average tariff increase of 12.74% for 2025/26, these historical outcomes reflect both inflation and regulatory cost recovery effects and do not provide a stable basis for a real escalation assumption. Where the financial model is expressed in real terms, the energy price escalation is set to 3%, so that the 2025/26 Eskom TOU weighted avoided cost remains in constant rand terms and is consistent with South Africa’s revised inflation target of 3% with a ±1% tolerance band [43,44,45].
In the South African context, a grid emissions factor of 0.93 tCO2/MWh is chosen. This remains slightly conservative relative to the 2022 available reports from the Department of Forestry, Fisheries and the Environment. A national generation grid emission factor (NGGEF) of 0.931 tCO2e/MWh and a domestic generation grid emission factor (DGGEF) of 0.960 tCO2e/MWh [46].
The forecast annual energy sales for Year 1 were derived directly from the calibrated seasonal load model used in the IEEE 9-bus simulations as described under the simulation section. In supporting Excel calculations, the half-hourly seasonal demand traces for Load A, Load B and Load C were converted into daily seasonal energy values by summing the interval energy over a 24 h period for each season. These daily totals were then annualized using the South African seasonal day allocations adopted in the study. These were 90 days for summer, 92 days for autumn, 92 days for winter and 91 days for spring; this provides a total year 1 forecast annual energy sales of 3 038 850.851 MWh. This means that the annual sales denominator used in the financial model is not an arbitrary external assumption but is fully consistent with the same seasonally calibrated load profiles that were developed from measured HV feeder trends and applied in the quasi-dynamic technical assessment, with the details included in Appendix B.
Ancillary service revenue for the BESS-GFM case was calculated internally within the stacked revenue model rather than entered as a fixed annual value. In the base case, 50% of available BESS capability was allocated to ancillary services and 50% to arbitrage, with ancillary revenue determined from the assumed service hours, service price and availability, subject to the constraint that the combined allocation did not exceed the unit’s available capability. The other technologies were assigned zero ancillary service revenue.
A value of lost load (VOLL) of 116,570 rands/MWh was adopted for the reliability monetization parameter; this is aligned with the national average cost of unserved energy benchmark reported by CSIR for South Africa. In the financial model, this value is used as an exogenous planning assumption to monetize the reduction in expected energy not served (EENS) as opposed to being a project-specific value [43,47].
In the financial model, the BESS stacked revenue streams were set to conservative utility-scale lithium-ion values, with an arbitrage discharge duration of 2 h and a usable energy factor of 90%, annual degradation of 2% and availability factor of 95% for both ancillary and arbitrage provision. The 2 h duration is consistent with NREL’s current utility-scale battery representations and lies within the broader 2 to 6 h commercial range identified for short-duration grid batteries. The 90% usable energy factor corresponds to a 90% depth of discharge operating window. The 2% annual degradation was adopted here as a conservative screening derate. NREL’s SPECs model treats total battery fade as the combined effect of calendar life and cycle life degradation, with a 1% per year default calendar life loss and additional cycling-related fade, so the 2% per year value used here should be interpreted as a simple planning allowance for gradual capacity reduction over time. The 95% availability factors were used to represent a high but realistic annual service availability for the BESS; this allows for limited downtime due to maintenance, outages, testing and operating constraints. This avoids overstating the revenue case by assuming continuous full-year service delivery. A balanced service stacking assumption was adopted by allocating 50% of the available BESS capability to arbitrage and 50% to ancillary services, with arbitrage represented by 0.5 cycles per day at a net spread of R500/MWh and ancillary services represented by 1000 service hours per year at R250/MW·h while ensuring that the combined service allocation did not exceed the unit’s available capability [23,48,49,50].

3.4. MCDA Criteria and Weighting Method

In the Financial assessment, the criterion weights were selected as a study-specific preference set as opposed to fixed industry constants. This is consistent with established MCDA practice in electricity planning, where normalized criteria are combined using a weighted sum method, the weights sum to one and different weight combinations are used to reflect different priorities based on a utility’s preference across economic, technical and other planning objectives. Recent NREL work treats both system cost and retail electricity rate as explicit economic criteria and varies their weights across alternative preference scenarios [51]. The objective was to convert a large set of simulation outputs and financial model inputs into a reduced set of six decision criteria that can be applied consistently across all candidate technologies.
The six criteria adopted in the present study are:
  • NPV.
  • Tariff uplift.
  • Voltage control effectiveness.
  • System strength contribution.
  • Implementation risk.
  • Operational flexibility.
The criteria were selected to ensure that the ranking reflects not only lifecycle financial performance, but also the technical capability of each device to support weak grid operation under high photovoltaic (PV) penetration, as well as practical deployment and operational considerations.
The MCDA structure is hierarchical. At the lowest level, detailed simulation and input assumptions are evaluated within the technical, tariff and cashflow models. These lower-level inputs are then aggregated into the six MCDA criteria, which are finally combined through a weighted linear scoring model. The building blocks of the six criteria are summarized as follows.
Within this framework, NPV was assigned a weight of 0.35 because discounted profitability remains the clearest single indicator of whether an electricity sector investment is economically attractive over its life, with a positive NPV directly associated with a profitable investment. The annual benefits comprise monetized technical and operational benefits obtained from the simulation framework, including:
  • Reduction in technical losses.
  • Reduction in PV curtailment.
  • Reduction in expected energy not served (EENS).
  • Ancillary service revenue where applicable.
  • Carbon value benefits associated with avoided energy losses.
  • Additional stacked service revenue for BESS-GFM was represented.
These annual benefits are offset by technology-specific capital expenditure (CAPEX), fixed operation and maintenance (O&M) costs and replacement/lifecycle assumptions embedded in the financial model. Accordingly, the NPV criterion acts as a compact economic summary of the full cashflow model. The reduction in PV curtailment and the reduction in expected energy not served (EENS) were set to zero for the base model.
Tariff uplift represents the incremental increase in the average electricity tariff required to recover the annual cost-of-service revenue requirement associated with each technology, expressed on a Rand per megawatt hour basis. In the financial model, it is calculated by dividing the annual revenue requirement by the forecast Year 1 energy sales, such that lower values indicate a lower cost burden on customers. Tariff uplift was assigned a value of 0.15 to reflect how customer affordability and electricity price impacts remain visible in the ranking, which is consistent with South African tariff-setting principles that emphasize affordability, stable prices, cost reflectivity, and customer and public interest [52,53]. It is derived from the revenue requirement model and therefore captures the combined effects of:
  • Initial capital cost.
  • Annual O&M expenditure.
  • Economic life.
  • Allowed return on the regulated asset base.
  • Working capital allowance.
  • Year 1 energy sales used to allocate the annual revenue requirement.
This criterion therefore expresses the affordability impact of the candidate technology from a utility tariff perspective.
The two principal technical criteria, voltage control effectiveness with a value of 0.15 and system strength contribution with a value of 0.15, were weighted equally because both are fundamental to secure operation in weak and inverter-dominated networks. NECR notes that inverter-based resource performance depends on terminal voltage behavior and that system strength is directly related to how sensitive terminal voltage and angle are to inverter current injection, whilst AEMO’s current system strength assessment identifies near-term shortfalls unless adequate services or investment are provided. On this basis, these two technical criteria were weighted equally and therefore have an equal and material influence on the overall score [1,2,15].
The implementation complexity was assigned a lower weight of 0.1 to reflect practicality in infrastructure deployment. This is consistent with power planning literature from the World Bank, which cautions that deterministic least-cost planning can overlook differential project risk and recommends that risk and trade-offs be considered when comparing alternatives. Stacked services were also assigned a value of 0.1 to capture the added option value of technologies capable of providing multiple grid services or revenue streams, which energy storage literature identifies as an important contributor to project viability and revenue maximization. Overall, the selected weights therefore prioritize economic viability whilst preserving material influence from technical performance, delivery risk and service flexibility [54,55,56,57]. It is assigned as an expert-informed score and captures the combined effects of factors such as:
  • Technology maturity.
  • Integration complexity.
  • Delivery and construction uncertainty.
  • Maintenance burden.
  • Plant footprint and installation requirements.
  • Utility familiarity with the technology and its protection/control interfaces.
Accordingly, this criterion allows practical implementation considerations to be represented alongside purely financial and technical measures.
The operational flexibility criterion reflects the extent to which a technology can provide multiple grid support functions and adapt its operation across varying system conditions. This score captures factors such as:
  • Dynamic reactive support capability.
  • Controllability and response speed.
  • Ability to support multiple operating modes or services.
  • Potential for service stacking.
  • Broader operational adaptability beyond a single fixed support function.
This criterion is particularly important for distinguishing devices that may offer similar core voltage support performance but differ substantially in their ability to deliver additional system value.
The adopted weights shown in Table 12 are treated as a utility planning preference set rather than as universal constants. The weighting structure assigns 50% of the decision emphasis to economic criteria, represented by NPV and tariff uplift, and 50% to technical and practical delivery criteria, represented by voltage control, system strength, implementation risk and operational flexibility. This structure reflects the central purpose of the study, which is to compare technologies on both investment feasibility and weak grid support capability. A technically effective option may not be preferred if it imposes an excessive lifecycle or tariff burden, while the lowest cost option may not be suitable if it provides insufficient voltage control, system strength contribution or operational flexibility. To test whether the preferred option depends strongly on the selected preference set, a Monte Carlo weighting analysis is included to assess ranking robustness under alternative decision maker priorities.
Table 12. MCDA criterion.
The weights sum to unity. In aggregate, the weighting assigns 50% of the decision emphasis to financial criteria (NPV and tariff uplift) and 50% to technical and practical deployment criteria (voltage, strength, risk and flexibility). This provides a balanced decision basis for utility planning, where both cost recovery and technical adequacy must be considered simultaneously.
To combine these criteria, all the quantities were normalized to a dimensionless interval and aggregated using a weighted linear additive model. Benefit type criteria were normalized such that higher values are preferred, whereas cost type criteria were inversely normalized. The final score for technology i is therefore given by Equation (13).
S i = ∑ k = 1 6   w k x ^ i , k   s u b j e c t   t o   ∑ k = 1 6   w k = 1   a n d   w k   ≥   0
where S i is the final MCDA score for technology i, w k is the weighting assigned to criterion k and x ^ i , k is the normalized score of technology i for criterion k. The six criteria are NPV, tariff uplift, voltage control effectiveness, system strength contribution, implementation risk and operational flexibility.

3.5. Weight-Sensitivity Method

Because the MCDA weights used in this study represent a study-specific preference set rather than fixed physical constants, an additional Monte Carlo weight sensitivity assessment was performed to evaluate the robustness of the final technology ranking to reasonable changes in decision maker priorities. The intention of this analysis was not to replace the adopted base-case weighting, but to determine whether the observed ranking remains stable when the relative emphasis placed on economic, technical, risk and flexibility criteria is varied across a wide feasible range. In this procedure, the underlying criterion scores for each technology were held fixed, while the weight vector was repeatedly re-sampled subject to the standard MCDA constraints that all the weights remain non-negative and sum to unity. For each sampled weight set, the weighted score of every technology was recalculated and the technologies were re-ranked. Repeating this process over many trials makes it possible to quantify the rank frequency of each technology, the probability that a technology achieves first place and the probability that the original base-case ranking is retained. This provides a direct measure of ranking robustness under preference uncertainty and therefore strengthens the interpretation of the MCDA results beyond a single deterministic weighting case.
A Monte Carlo framework is particularly appropriate here because the six criteria do not represent equally objective physical quantities. They combine model-derived financial and technical outputs with structured judgment-based criteria such as implementation risk and operational flexibility. Accordingly, the sampled weight analysis provides a transparent check on whether the preferred technology remains dominant only under the selected base-case weights or whether it remains competitive across a broader range of admissible planning preferences. The full algorithm and supporting equations used for the Monte Carlo re-weighting procedure are provided in Appendix G.

4. Results, MCDA Final Scoring and Sensitivity Analysis

This section presents the main comparative results obtained from the technical, financial and MCDA assessment. It first reports the lifecycle financial results, including NPV, annual revenue requirement, tariff uplift and benefit–cost ratio, so that the economic implications of each candidate technology are visible before the final ranking is discussed. The technical performance inputs are then interpreted, including loss reduction and PCC fault-level uplift, because these values define the measurable engineering differences between the four technologies. The MCDA scoring subsections explain how the voltage-control, system strength, implementation risk and operational flexibility scores are constructed and applied. The final MCDA ranking is then presented to show how the financial, technical and practical criteria combine into an overall planning decision. Finally, the Monte Carlo weight sensitivity results are used to test whether the preferred ranking remains stable when the decision maker’s priorities change.

4.1. Lifecycle Financial Results and Tariff Impact

The lifecycle financial outputs are summarized in Table 13. These results provide the economic basis that feeds into the financial criteria of the MCDA, particularly NPV and tariff uplift. The results show that all four technologies have negative standalone NPVs under the base-case monetized benefit assumptions. This is expected because the base case directly monetizes only avoided technical losses and selected BESS stacked revenues, while broader system support benefits such as voltage resilience, system strength and operational flexibility are represented separately in the MCDA rather than fully monetized in the cashflow model.
Table 13. Lifecycle financial comparison of candidate technologies.
From a pure financial perspective, the SVC has the least negative NPV, the lowest annual cost-of-service revenue requirement and the lowest tariff uplift. This reflects its lower capital cost and relatively modest operating cost when compared with the other options. The STATCOM is more expensive than the SVC but remains within a comparatively moderate financial range, with a Year-1 tariff uplift of R19.57/MWh and a lower financial penalty than the Synchronous Condenser and BESS-GFM. The Synchronous Condenser has a substantially higher cost burden, mainly because of its larger capital cost and higher annual O&M requirement, although this must be interpreted together with its superior system strength contribution. The BESS-GFM has the largest financial penalty in the base case because of its high capital cost, shorter economic life and explicit augmentation and replacement requirements.
These financial results therefore show why a purely economic ranking would favor the SVC, followed by the STATCOM, Synchronous Condenser and BESS-GFM. However, the financial ranking alone does not fully reflect the broader technical and operational contribution of each device. The SVC has the strongest affordability position but provides limited system strength improvement and lower operational flexibility. Conversely, the Synchronous Condenser and BESS-GFM provide stronger or broader technical services but at a materially higher lifecycle and tariff cost. The MCDA is therefore required to combine the financial outputs in Table 13 with the technical and practical criteria discussed in the following subsections.

4.2. Voltage Control Criterion Justification

The voltage control scores in the MCDA were derived with reference to the benchmark study titled “FACTS, Synchronous Condensers and Grid-Forming BESS for High-PV Stability” by Pather L and Sarma R. That study provides a like-for-like comparison of the SVC, STATCOM, SC and BESS-GFM on the IEEE 9-bus system using common operating assumptions, common voltage control mode, common voltage setpoints and comparative reactive capability and therefore provides a defensible external basis for relative voltage performance scoring. In the benchmark paper, the STATCOM is identified as the strongest voltage regulation option, the SC as near comparable, the BESS-GFM as strong and the SVC as the weakest of the four under stressed-voltage conditions [58].
The Benchmark paper itself did not publish direct MCDA scores; the present study converts the reported qualitative and quantitative voltage regulation findings into a normalized composite voltage index. The index was formulated to weight three attributes, with the greatest emphasis placed on the ability of each technology to maintain the target bus voltage. Applying this structured translation yielded voltage control effectiveness scores of 10 for the STATCOM, 9 for the SC, 8 for the BESS-GFM and 6 for the SVC. These values preserve the ranking reported by Pather L and Sarma R while expressing it in a transparent form suitable for MCDA implementation with the detailed algorithms included in Appendix E [58].
To address reproducibility, the technical inputs taken from the companion papers were limited to the criteria that depend on prior technical simulation outcomes, namely voltage control effectiveness and operational flexibility. The financial criteria, tariff uplift, implementation risk and system strength score are not derived from the companion papers. The system strength score is calculated in the present paper from the PCC short-circuit uplift, while the companion papers are used only to support the voltage-control and flexibility scoring.
The companion paper inputs were transferred into the MCDA in two steps. First, the voltage control score was based on three reported voltage performance behaviors from the companion voltage stability study, the ability of each device to hold the controlled bus close to the 1.035 p.u. setpoint, the smoothness and speed of the dynamic voltage response and the ability to sustain support under depressed-voltage or stressed-network conditions. These three inputs correspond respectively to the setpoint tracking component, the dynamic response component and the low voltage support component used in Appendix E.
Second, the operational flexibility score was based on the functional and disturbance-response outcomes reported across the two companion studies. The inputs used were active power support capability, reactive power and voltage control capability, dynamic response agility, supplementary stability service capability and energy or service stacking capability. These are the five sub-scores used in the additive flexibility model in Table 14. The first companion paper supplies the functional device characteristics, including reactive support role, fault current contribution, inertia contribution, converter limits and grid-forming active/reactive support capability. The second companion paper supplies the disturbance response evidence, including post fault voltage recovery behavior, DVRI/FDRI trends, current limit behavior and frequency support behavior. These inputs are then converted into the ordinal flexibility sub-scores shown in Table 14.
Table 14. Operational flexibility scores.

4.3. Implementation Risk Criterion Justification

The implementation risk criterion was entered in the decision tool as an assigned score ranging from 0 to 10. Higher values indicate lower practical implementation risk. The purpose of this criterion is to translate well established differences in technology maturity, integration complexity, plant complexity and operational uncertainty into a comparative score [59,60].
A simple additive penalty model was adopted:
R i = 10 − P M , i P I , i P P , i P O , i
where R i is the final implementation risk score for technology i , P M , i is the maturity penalty, P I , i is the integration and controls penalty, P P , i is the plant and deployment complexity penalty and P O , i is the operational uncertainty penalty. Each penalty is assigned on an ordinal scale from 0 to 3, where 0 denotes low-risk contribution and 3 denotes high-risk contribution. The total penalty is therefore subtracted from 10 so that technologies with lower implementation burden receive higher MCDA scores. This produces a simple but traceable scoring structure that is suitable for comparative planning studies where the available evidence is largely qualitative with grounded literature [59,60].
The 4 penalty components are defined as follows: The maturity penalty reflects the commercial track record, standardization and use in industry. The plant complexity penalty reflects the equipment footprint, auxiliaries, mechanical systems and construction complexity. The operational uncertainty penalty reflects the maintenance obligation, performance uncertainty and long-term operating complexity. The selected dimensions effectively represent the main practical differences highlighted across literature for SVCs, STATCOMs, SCs and BESS-GFM [61,62,63].
Table 15 below illustrates the selected values for the four penalty components and the final risk score that feeds into the financial tool.
Table 15. Implementation criteria scores.
The SVC had the highest score of 7; this is in line with the literature which describes it as a comparatively mature and simpler thyristor-based technology. Recent comparative work notes that SVCs use a simpler topology based on thyristor-controlled/switched elements, with lower heat dissipation requirements, lower failure rates and lower control-algorithm complexity than STATCOMs. This supports a zero maturity penalty and only modest penalties for integration, plant complexity and operations [61].
The STATCOM achieved a risk score of 6 which is slightly below the SVC; this is due to the literature indicating a more complex converter-based implementation. Compared with the SVC, the STATCOM requires PWM-based converter control, vector control, tighter electromagnetic compatibility considerations and more demanding integration of fast power electronic control systems. However, it does offer superior dynamic performance; the minor drawback is the higher practical implementation complexity [61,64].
The SC was assigned the lowest score of 4 due to the practical burden associated with rotating plant, auxiliaries and delivery complexity which is materially higher than static devices. Recent industry and technical sources describe SCs as complex and expensive machines with long procurement lead times and utility equipment strategies show that they require substantial auxiliary systems such as lubrication, cooling, braking, monitoring, filters and backup oil pump arrangements. These features justify a high plant complexity penalty and a moderate operational penalty even though the underlying synchronous machine technology itself is well established [38,39,62].
The BESS-GFM resulted in a score of 5. Several recent studies report that BESS-GFM can operate reliably, provide strong stability support and in some applications reduce the need for SCs or network upgrades. However, AEMO explicitly notes that GFM inverter contributions are not formally recognized for minimum system strength purposes and that industry understanding of their capabilities and limitations is still developing. Recent research also emphasizes that GFM operation introduces additional challenges linked to overcurrent limiting, control behavior under disturbance and the interaction between fast grid-forming service provision and internal battery physics and degradation. Collectively, this supports a higher maturity penalty for BESS-GFM compared to SVC/STATCOM but a lower plant complexity penalty than the SC due to BESS-GFM avoiding large rotating auxiliaries and heavy mechanical structure [65,66,67,68].

4.4. Operational Flexibility Criterion Justification

The operational flexibility scores were assigned using a structured rubric anchored directly to the outcomes of the two companion studies by Pather L and Sarma R. In “FACTS, Synchronous Condensers and Grid-Forming BESS for High-PV Stability”, the four technologies are differentiated in terms of their steady-state reactive power role, voltage-control behavior, fault-level contribution, inertia contribution and stated functional advantages and limitations. In “Unified Stability Metrics for Grid Support Technologies in a PV-Dominated IEEE 9-bus Test System”, these same technologies are further differentiated through explicit capability descriptors and disturbance outcomes, including converter current limits, fault current behavior and the DVRI/FDRI ranking trends. On this basis, operational flexibility was defined as the breadth of technically credible services available from each technology, combining active power support capability, reactive control capability, dynamic response agility, supplementary stability services and energy or service stacking capability. This framework justifies the adopted scores of 3 for SVC, 4 for STATCOM, 2 for the SC and 9 for BESS-GFM, reflecting the progression from narrow shunt VAR functionality to broad multi service grid-forming support [69,70,71,72].
A simple additive capability model was adopted:
F i = f A P , i + f Q V , i + f D R , i + f S S , i + f E S , i
where F i is the flexibility score of technology i , with each sub-score assigned on an ordinal basis. Here, f A P is active-power support capability, f Q V is reactive power and voltage control capability, f D R is dynamic response agility, f S S is a supplementary stability service capability such as inertia, fault-current support, frequency support, or grid-forming operation and f E S is energy/restoration/service stacking capability. Using a 0–2 scale for each term gives a maximum score of 10 and reproduces your Excel values exactly. The key point is that the score is built from service breadth, not from cost or voltage performance alone. Paper I establishes the underlying functional roles of the devices, while Paper II shows which of those roles remain practically usable under faults and PV switching through the reported capability descriptions and DVRI/FDRI outcomes [58,71,73,74,75,76].
As per the scores in Table 14, the SVC achieved a flexibility score of 3 because, across both companion studies, it is consistently shown to be a reactive power compensation technology with a comparatively narrow service envelope rather than a broad multi service platform. In paper 1 “FACTS, SCs and Grid-Forming BESS for High-PV Stability”, the SVC is described as a thyristor-based shunt compensator used primarily for voltage regulation and dynamic reactive support, with limited short-circuit contribution and slower response than converter-based alternatives. In paper 2, “Unified Stability Metrics for Grid Support Technologies in a PV-Dominated IEEE 9-bus Test System”, this narrower operating scope is reinforced by the dynamic results, where the SVC improves steady-state regulation but becomes less effective during severe voltage depression because its reactive power output is voltage-dependent. The broader literature remains consistent with this interpretation, generally identifying the SVC as a useful and mature voltage-support device, but not an active power resource and not a technology associated with energy shifting, black start, or broad service stacking. On this basis, the SVC receives full credit for reactive support f Q V 2 , partial credit for dynamic controllability f D R 1 and zero for active-power service, multi-mode operation and energy shifting capability [58,69,72,75,76].
The STATCOM produced a flexibility score of 4 because the two companion studies show that it remains primarily a reactive support device, but one with materially greater dynamic capability and controllability than the SVC. In the first paper, the STATCOM is characterized as a converter-based shunt compensator that provides fast, continuous VAR control, maintains voltage close to the setpoint and outperforms the SVC in dynamic voltage regulation. In the second paper, this distinction becomes stronger, with the STATCOM producing the best DVRI and the fastest, most controllable post fault voltage recovery under severe disturbances, even though its functionality remains dominated by voltage restoration duty and bounded by converter current limits. The wider literature similarly describes the STATCOM as a shunt VSC-based technology with superior response speed and more stable reactive output than thyristor-based SVCs, but with no inherent active-power or energy shifting capability unless storage is added. Accordingly, the STATCOM receives the same full reactive support credit as the SVC f Q V 2 , but a higher dynamic response score f D R 2 , while active-power service, multi-mode operation and energy/time shifting capability remain zero for a plain STATCOM configuration [58,74,75,76].
The SC achieved the lowest flexibility score of 2. Although both companion studies show that it is technically valuable for system strength and stability, they also show that its practical service envelope remains narrower and less robust than the converter-based options. In the first paper, the SC is distinguished by its ability to provide reactive power, rotational inertia and fault-level support, which illustrates benefits in system strength and protection performance. In the second paper, those same strengths are confirmed dynamically through its increased short-circuit contribution and strong frequency disturbance performance, but the results also show slower post fault restoration and greater exposure to negative-sequence current under unbalanced conditions. Supporting literature aligns with this interpretation by consistently describing the SC as a rotating synchronous machine without a prime mover that can support voltage, inertia and fault current, but cannot provide active-power services or fast converter-like reconfiguration. Accordingly, the SC receives limited credit for reactive support f Q V 1 , one point for its additional non-reactive support mode through inertia and fault current contribution f S S 1 and zero for active-power service, fast dynamic reconfiguration and energy shifting capability [58,70,76].
The grid-forming BESS produced a flexibility score of 9, which is the highest of the four technologies, because the two companion studies jointly identify it as the broadest service platform among the assessed options. In the first paper, the BESS-GFM is explicitly differentiated from the other technologies by its ability to provide both active and reactive support, together with grid-forming operation, synthetic inertia, frequency support and black start capability. In the second paper, that broader service envelope is substantiated under dynamic conditions. The BESS-GFM is shown to provide strong positive-sequence support, near-zero negative-sequence current in unbalanced faults and frequency disturbance performance second only to the SC, while also retaining both active and reactive support capability within the converter envelope. The wider literature supports this view by repeatedly characterizing grid-forming storage as a multi service asset capable of combining voltage support, fast frequency response, restoration support and energy-based service stacking. For that reason, the BESS-GFM receives full scores for active-power service f A P 2 , reactive/voltage control f Q V 2 , dynamic response f D R 2 and multi-mode operation f S S 2 . One point rather than two was assigned for f E to avoid overstating unconstrained flexibility, since paper 2 by Pather L and Sarma R and the broader storage literature make it clear that practical service stacking remains bounded by converter apparent power limits, current limits, stored energy, duration and control priorities [58,71,73,76,77].

4.5. System Strength Criterion Justification

The system strength criterion was based on the annualized average PCC three-phase short-circuit strength, S k s s , obtained from the IEC 60909 fault-level assessment for each technology case as described earlier in this manuscript. The baseline case was first used as the reference and the incremental contribution of each technology was calculated as the uplift in PCC fault level relative to the baseline. This uplift was then normalized to a 0–10 scale, with the lowest uplift assigned a score of 0 and the highest uplift assigned a score of 10 and the resulting normalized values were used directly in the MCDA scoring and included as part of the scoring for the financial assessment as depicted in Table 16. On this basis, the SC received the highest strength score because it produced the largest increase in PCC fault level and therefore the greatest improvement in network stiffness, while the STATCOM and BESS-GFM produced similar intermediate converter-limited improvements and the SVC produced no material increase in PCC fault level. The full formulation is given in Appendix F.
Table 16. System strength scoring.

4.6. Final MCDA Score Interpretation

The final MCDA score represents the weighted combination of the six normalized criteria, specifically NPV, tariff uplift, voltage control effectiveness, system strength contribution, implementation risk and operational flexibility. Under the adopted weighting structure, the final scores were 0.7799 for the STATCOM, 0.7386 for the SC, 0.6900 for the SVC and 0.3189 for the BESS-GFM, giving a final ranking of STATCOM first, SC second, SVC third and BESS-GFM fourth as depicted in Figure 9. This outcome is consistent with the two supporting technical studies by Pather L and Sarma R. The steady-state study shows the relative differences in voltage regulation, transfer capability and fault-level contribution, while the dynamic study shows how these capabilities translate into post fault voltage recovery, frequency disturbance performance and usable support under stressed operating conditions. The final weighted score should be interpreted not as a measure of technical merit alone, but as a technology-specific decision score reflecting the collective economic and technical impact.
Figure 9. Final MCDA scoring comparison.
The SVC produced a final weighted score of 0.6900, which reflects strong financial performance but a narrower technical contribution than the leading options. Within the financial model, the SVC benefits from the most favorable NPV and tariff uplift position, which strengthens its overall ranking under a framework that gives 50% of the total weight to economic criteria. However, this financial advantage is offset by weaker technical scoring in voltage support, system strength and flexibility. In the steady-state study, the SVC improves Bus 5 voltage regulation and provides a useful increase in power transfer capability, but it does not significantly increase the PCC fault level and its operating behavior remains fundamentally that of a stepwise shunt VAR device with a voltage-dependent output. The practical impact of this score is that the SVC remains a financially attractive option where affordability and basic voltage support are prioritized, but it is less convincing when system strength enhancement, disturbance resilience and broader operational value are central planning requirements [58,76].
The STATCOM attained the highest final weighted score of 0.7799, indicating the best overall balance between economic viability and technical performance under the adopted MCDA structure. Although it is not the lowest cost option, its economic performance remains sufficiently competitive to avoid large penalties on the NPV and tariff criteria, while its technical performance is consistently strong across both companion studies by Pather L and Sarma R. In the steady-state paper, the STATCOM is shown to provide excellent voltage regulation, fast and smooth converter-based reactive support and a moderate improvement in fault level relative to the baseline. In the dynamic paper, it emerges as the strongest voltage support device under severe fault conditions, achieving the best DVRI and the fastest, most controllable post fault voltage restoration. This combination of good economic performance, strong voltage capability, intermediate strength improvement and acceptable flexibility explains why it ranks first overall despite not being dominant in every individual category. The practical implication is that the STATCOM is the strongest all-round candidate when the planning objective is to obtain robust voltage resilience and good system support without incurring the full economic penalty associated with the more capital-intensive technologies [58,76].
The SC obtained a final weighted score of 0.7386, ranking second overall. This score reflects a technology that is technically very strong but is capital intensive. Its highest contributions come from the voltage and system strength criteria, particularly the latter, where it achieves the strongest uplift because it provides the largest increase in PCC fault level and the greatest improvement in network stiffness. The steady-state companion study illustrates that the SC provides the greatest fault-level improvement and performs strongly in transfer margin enhancement, while the dynamic study confirms its value through inherent short-circuit contribution, inertia and the strongest frequency disturbance performance. However, the same studies also show that its dynamic voltage recovery is slower than that of the STATCOM, and its practical deployment burden is higher because it is a rotating machine with greater capital intensity and operational complexity. These limitations are reflected in the lower financial, risk and flexibility components of the MCDA, which suppress the total score despite its excellent technical capability. The practical impact of this result is that the SC becomes especially attractive in planning cases where system strength, protection sensitivity, inertia and frequency performance are the dominant concerns, but it is less favorable when economic efficiency and broader service flexibility are weighted more heavily [58,76].
The BESS-GFM produced the lowest final weighted score of 0.3189, which indicates that its broad technical service capability is outweighed by its financial penalty under the present assumptions and weightings. Across the two supporting papers, the BESS-GFM is consistently identified as the broadest functional platform, capable of providing active and reactive support, grid-forming operation, strong voltage support and useful frequency-related services. In the dynamic study, it performs well in several disturbance scenarios, including strong positive sequence support under unbalanced faults and frequency disturbance performance second only to the SC. However, both papers also show that its practical behavior remains bounded by converter current limits, apparent-power limits and control priorities, so its broad capability does not always translate into superior performance in every fault case. More importantly, in the financial model, it is heavily penalized on NPV and tariff uplift and because the economic criteria jointly account for half of the total MCDA weight, those penalties dominate the final score. The practical implication is that the BESS-GFM is not a poor technology in technical terms. However, it is a high-capability but presently high-cost option whose ranking would improve materially under different cost and revenue assumptions [58,76].
The Monte Carlo re-weighting results as depicted in Table 17 and Figure 10 indicate that the deterministic ranking is moderately sensitive to variation in the criterion weights, although the leading technology remains comparatively robust. The exact base-case ranking was reproduced in 22.2% of sampled trials. Nevertheless, the STATCOM remained the most probable top-ranked option, attaining first place in 53% of trials, compared with 37.1% for the SC, 6% for the BESS-GFM and 3.9% for the SVC. Although the deterministic base-case ranking places the SC second, the Monte Carlo rank frequency results show that second place is occupied most often by the STATCOM at 43.4% of trials, whereas the SC most frequently alternates between first and third place rather than stabilizing in second position. This demonstrates that the full rank order is not completely insensitive to preference uncertainty but also confirms that the STATCOM retains the strongest overall ranking robustness within the feasible MCDA weight space.
Table 17. Monte Carlo weight sampling.
Figure 10. Monte Carlo final ranking per device.

5. Conclusions

This study developed and demonstrated a utility-oriented framework for comparing voltage support and system strength technologies in weak high-PV power systems. The main conclusions are as follows.
A common technical and financial comparison framework was established. The modified IEEE 9-bus system, seasonal PV profiles, calibrated load profiles and common Bus 5 connection point provided a consistent basis for comparing the SVC, STATCOM, Synchronous Condenser and grid-forming BESS. The PowerFactory simulations supplied the technical inputs, while the financial model translated selected outputs into lifecycle and tariff impact metrics.
Loss reduction was useful as a monetized base-case input, but it was not a sufficient standalone decision criterion. All four technologies reduced aggregate simulated transmission losses, but the spread was narrow, ranging from 3.04% to 3.12%. This confirms that avoided losses should be treated as one component of value rather than the main basis for selecting a technology.
System strength performance created a clearer technical distinction between technologies. The Synchronous Condenser produced the largest PCC fault-level uplift because of its inherent synchronous machine behavior. The STATCOM and BESS-GFM provided intermediate converter-limited contributions, while the SVC did not materially increase the PCC fault level. This distinction is important for weak-grid planning where voltage support alone does not fully describe network strength.
Lifecycle cost and tariff impact materially changed the technology ranking. The BESS-GFM offered the broadest service capability, but its high capital cost, augmentation requirement and shorter economic life created a significant financial penalty under the base-case assumptions. The SVC remained attractive from an affordability perspective, but its lower system strength and flexibility scores limited its overall ranking.
The STATCOM provided the best overall balance under the adopted assumptions. It combined strong voltage control performance, moderate system strength contribution, acceptable implementation risk and more favorable lifecycle economics than the higher-cost alternatives. It therefore achieved the highest final MCDA score, followed by the Synchronous Condenser, SVC and BESS-GFM.
The sensitivity analysis confirmed that the ranking is preference-dependent but that the STATCOM remains the most robust leading option. The Monte Carlo weighting showed that the full rank order can change when decision maker priorities shift, especially between technical strength and cost-related criteria. However, the STATCOM had the highest probability of ranking first across the sampled weight space.
The framework is intended as a transparent planning tool rather than a universal technology prescription. Different utilities may obtain different rankings if local cost data, curtailment exposure, reliability benefits, ancillary service revenues, carbon values or system strength requirements differ. The value of the proposed framework is that these assumptions can be changed explicitly while preserving a consistent comparison structure.

Author Contributions

Conceptualization, L.P.; methodology, L.P.; software, L.P.; validation, L.P. and R.S.; formal analysis, L.P.; investigation, L.P.; resources, L.P.; data curation, L.P.; writing—original draft preparation, L.P.; writing—review and editing, L.P.; visualization, L.P.; supervision, R.S.; project administration, L.P.; funding acquisition, R.S. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

The original contributions presented in this study are included in the article’s material. Further inquiries can be directed to the corresponding author.

Acknowledgments

The author gratefully acknowledges the support and encouragement of his colleague Shabnum Behari during this work. The author also sincerely acknowledges the support of his wife, Mitisha Naidu, whose understanding and encouragement contributed to the completion of this study.

Conflicts of Interest

The authors declare no conflicts of interest.

Appendix A. Time-of-Use Weighted Avoided Marginal Cost Formulation

The avoided marginal energy cost was derived from the Eskom 2025/26 time-of-use tariff structure. For each simulation interval, avoided loss energy is multiplied by the applicable active energy tariff for the relevant season and TOU period. The annual avoided-loss benefit is then obtained by summing the interval values over the study horizon.
The avoided energy loss for technology case k in simulation interval t is defined as
Δ E k , t = P loss , t base P loss , t k Δ t
where Δ E k , t = avoided loss of energy for technology k during interval t MWh , P loss , t base = baseline network loss in interval t MW , P loss , t k = network loss for technology k in interval t MW , and Δ t = simulation time step h .
The annual monetized benefit for technology k is then given by
B k = ∑ t Δ E k , t π t
where B k = annual monetized loss saving benefit for technology k   R / year and π t = Eskom active energy tariff applicable in interval t R / MWh .
The equivalent avoided marginal cost for technology k is defined as
π ˉ k = ∑ t Δ E k , t π t ∑ t Δ E k , t
where π ˉ k = equivalent TOU weighted avoided marginal cost for technology k R / MWh .
Where interval-level exports are not yet available, a calendar-weighted approximation may be used. In this study, the weekly TOU allocation adopted for the benchmark was 25 peak hours, 64 standard hours and 79 off-peak hours per week. The seasonal calendar-weighted benchmark tariff is therefore calculated as
π ˉ s = H p π s , p + H st π s , st + H op π s , op 168
where π ˉ s = average tariff for season s c / kWh   or   R / MWh , H p = weekly peak hours, H st = weekly standard hours, H op = weekly off-peak hours, π s , p = tariff for season s during peak hours, π s , st = tariff for season s during standard hours, and π s , op = tariff for season s during off-peak hours.
The annual calendar-weighted benchmark is then obtained by weighing the seasonal averages by the number of days in each Eskom season:
π ˉ ann = D HD π ˉ HD + D LD π ˉ LD D HD + D LD
where π ˉ ann = annual equivalent avoided marginal cost c / kWh   or   R / MWh , D HD = number of high-demand days, D LD = number of low-demand days, π ˉ HD = high-demand seasonal average tariff, and π ˉ LD = low-demand seasonal average tariff.
For the selected Zone 0, >132 kV, Megaflex non-local-authority, VAT-excluded benchmark, the seasonal averages were 186.08 c/kWh for the high-demand season and 132.18 c/kWh for the low-demand season, giving an annual calendar-weighted benchmark of 145.76 c/kWh, equivalent to R1457.64/MWh.

Appendix B. Forecast Annual Energy Sales and Tariff Uplift Formulation

Year-1 annual energy sales were derived from the calibrated half-hourly seasonal load traces used in the quasi-dynamic simulations. Each MW value was converted to interval energy, summed to obtain daily seasonal energy and annualized using the adopted South African seasonal day allocation.
The half-hour simulation interval is defined as
Δ t = t i + 1 − t i × 24
where Δ t = simulation interval duration h and t i = time stamp at interval i day   fraction .
For the workbook used in this study, Δ t = 0.5 h.
The interval energy for load l in season s at interval i is then
E s , l , i = P s , l , i Δ t
where E s , l , i = interval energy for season s , load l , interval i in MWh, P s , l , i = half-hourly demand for season s , load l , interval i in MW.
The daily seasonal energy for each load is obtained by summing the 48 half-hour intervals:
E s , l day = ∑ i = 1 48 E s , l , i
where E s , l day = total daily energy for load l in season s MWh / day .
The total daily energy for each season is then
E s day = ∑ l ∈ A , B , C E s , l day
where E s day = total benchmark system daily energy for season s in MWh/day.
Using the seasonal day allocations adopted in the study, the Year 1 forecast annual energy sales are calculated as
E sales , 1 = 90 E summer day + 92 E autumn day + 92 E winter day + 91 E spring day
where E sales , 1 = forecast annual energy sales in Year 1 in MWh/year, E summer day = total daily summer energy I in MWh/day, E autumn day = total daily autumn energy in MWh/day, E winter day = total daily winter energy in MWh/day, and E spring day = total daily spring energy in MWh/day.
For this study, the seasonal daily totals obtained from the Excel workbook were
E summer day = 9676.936 ,   E autumn day = 7278.844 ,   E winter day = 7642.189 ,   E spring day = 8738.369
all in MWh / day , giving
E sales , 1 = 3,038,850.851   MWh
where annual energy sales are escalated beyond Year 1 in the workbook, the recursive form is
E sales , y = E sales , y − 1 1 + g
where E sales , y = forecast annual energy sales in year y MWh/year and g = annual sales growth assumption.
In the present workbook, g = 0.05 .
Once the forecast annual energy sales are established, the tariff uplift is computed by converting the annual amount to be recovered into an equivalent unit energy charge:
Δ T k , y = R R k , y E sales , y
where Δ T k , y = tariff uplift for technology k in year y in R/MWh or c/KWh, R R k , y = annual revenue requirement or annual recoverable cost for technology k in year y R/year, and E sales , y = forecast annual energy sales in year y in MWh/year.
This formulation ensures that tariff uplift is calculated using the same seasonal demand basis applied in the technical simulations.

Appendix C. Derivation of Device-Specific Loss Reduction Factors

Device-specific loss reduction factors were calculated from the seasonal PowerFactory line loss summary. For each technology, autumn, spring, summer and winter loss totals were summed and compared with the corresponding baseline aggregate.
For technology k , the aggregate seasonal loss total is defined as
L k agg = ∑ s ∈ Autumn , Spring , Summer , Winter L s , k
where L k agg = aggregate seasonal loss total for technology and L s , k = representative line loss total for season s and technology k .
The aggregate seasonal loss total for the baseline case is
L base agg = ∑ s ∈ Autumn , Spring , Summer , Winter L s , base
where L base agg = aggregate seasonal loss total for the baseline case and L s , base = representative line loss total for season s in the baseline case.
The device-specific loss reduction factor is then calculated as
η k = L base agg − L k agg L base agg × 100
where η k = percentage loss reduction for technology k relative to the baseline case in %.
Using the same summary workbook, the aggregate totals are:
L base agg = 2145.497057
L SVC agg = 2080.221553
L STATCOM agg = 2079.892051
  L SC agg = 2079.689851
L BESS-GFM agg = 2078.639549
Substituting these values into (A16) gives
η SVC = 2145.497057 − 2080.221553 2145.497057 × 100 = 3.04 %
η STATCOM = 2145.497057 − 2079.892051 2145.497057 × 100 = 3.06 %
η SC = 2145.497057 − 2079.689851 2145.497057 × 100 = 3.07 %
η BESS-GFM = 2145.497057 − 2078.639549 2145.497057 × 100 = 3.12 %
The resulting loss reduction factors are 3.04% for SVC, 3.06% for STATCOM, 3.07% for the Synchronous Condenser and 3.12% for BESS-GFM. These values are used as device-specific technical impact factors in the financial model.

Appendix D. Full MCDA Formulation and Criterion Building Blocks

The MCDA score is calculated using a weighted additive formulation. The six criteria are NPV, tariff uplift, voltage control effectiveness, system strength contribution, implementation risk and operational flexibility. Detailed inputs are first normalized and then combined using the adopted criterion weights.

Appendix D.1. General MCDA Structure

For each candidate technology i , the final MCDA score is calculated using a weighted additive formulation:
S i = w N P V N P V ^ i + w T T ^ i + w V V ^ i + w S S ^ i + w R R ^ i + w F F ^ i
subject to
w N P V + w T + w V + w S + w R + w F = 1
where S i is the final MCDA score for technology i ; w N P V , w T , w V , w S , w R and w F are the criterion weights; and N P V ^ i , T ^ i , V ^ i , S ^ i , R ^ i and F ^ i are the normalized scores for NPV, tariff uplift, voltage control, system strength, implementation risk and flexibility, respectively.
The adopted criterion weights are:
w N P V = 0.35 ,   w T = 0.15 ,   w V = 0.15 ,   w S = 0.15 ,   w R = 0.10 ,   w F = 0.10

Appendix D.2. Criterion 1: Net Present Value (NPV)

The NPV criterion is a benefit-type criterion and is normalized as
N P V ^ i = N P V i − m i n N P V m a x N P V − m i n N P V
where N P V i is the net present value of technology i .
The NPV itself is calculated from discounted annual net cashflows over an analysis horizon of N years:
N P V i = ∑ t = 0 N C F i , t 1 r ) t
where C F i , t is the net cashflow of technology i in year t , r is the nominal discount rate.
The annual net cashflow may be expressed generally as
C F i , t = B i , t − C i , t
where B i , t is the annual benefit and C i , t is the annual cost.
The annual benefit term is constructed from the following lower-level building blocks:
B i , t = B i , t l o s s + B i , t c u r t + B i , t E E N S + B i , t a n c + B i , t C O 2 + B i , t s t a c k
where B i , t l o s s = value of loss reduction, B i , t c u r t = value of avoided PV curtailment, B i , t E E N S = reliability benefit associated with EENS reduction, B i , t a n c = ancillary service revenue, B i , t C O 2 = carbon value benefit associated with avoided losses, and B i , t s t a c k = additional stacked service revenue, applicable where represented (e.g., BESS).
These may be expanded as
B i , t l o s s = Δ P i l o s s ⋅ L F ⋅ 8760 ⋅ c t E
B i , t c u r t = Δ E i c u r t ⋅ c t E
B i , t E E N S = Δ E E N S i ⋅ V O L L t
B i , t C O 2 = Δ P i l o s s ⋅ L F ⋅ 8760 ⋅ E F ⋅ c t C O 2
where Δ P i l o s s = reduction in technical losses attributable to technology i , L F = loss load factor, 8760 = hours per year, c t E = energy value in year t , Δ E i c u r t = avoided PV curtailment, Δ E E N S i = reduction in expected energy not served, V O L L t = value of lost load in year t , E F = emissions factor, and c t C O 2 = carbon price in year t .
The annual cost term is represented generally by
C i , t = C i , t c a p e x + C i , t O & M + C i , t r e p l
where the building blocks are capital cost, annual fixed operation and maintenance cost and any replacement/lifecycle cost assumptions.
Thus, the NPV criterion is not a primitive input; rather, it is an aggregate financial criterion built from loss reduction, curtailment reduction, reliability benefit, ancillary revenue, carbon value, stacked revenue, CAPEX, O&M, discounting and lifecycle assumptions.

Appendix D.3. Criterion 2: Tariff Uplift

Tariff uplift is a cost-type criterion and is normalized using inverse min-max scaling:
T ^ i = m a x T − T i m a x T − m i n T
where T i is the tariff uplift associated with technology i .
The tariff uplift is calculated as
T i = R R i E y 1 s a l e s
where R R i is the annual revenue requirement for technology i , E y 1 s a l e s is the Year 1 energy sales used to allocate cost recovery.
The annual revenue requirement is constructed from
R R i = D e p i + R e t i + O & M i + T a x i + W C i
where D e p i = annual depreciation allowance; R e t i = allowed return on the regulated asset base; O & M i = annual operation and maintenance allowance; T a x i = tax allowance, if applicable; and W C i = working capital allowance.
For the present model structure, the relevant building blocks are therefore capital cost, economic life, annual O&M, allowed return, working capital allowance and Year 1 energy sales. Hence, tariff uplift represents the consumer-facing affordability dimension of the investment.

Appendix D.4. Criterion 3: Voltage Control Effectiveness

The voltage criterion is represented by an expert-informed score V i on a 0 to 10 scale and normalized as
V ^ i = V i 10
The assigned score is based on the technology’s comparative voltage support behavior observed in the dynamic simulation studies. The building blocks informing this score are:
  • Voltage depression mitigation.
  • Post disturbance voltage recovery behavior.
  • Steady-state and dynamic reactive support effectiveness.
  • Controllability at the weak bus/PV connection point.
Accordingly, V i is a condensed representation of multiple voltage performance attributes rather than a direct single-output simulation variable.

Appendix D.5. Criterion 4: System Strength Contribution

The system-strength criterion is a benefit-type criterion based on the uplift in annualized average PCC short-circuit strength relative to the baseline case. For each technology, the uplift is calculated as
Δ S k s s , i = S k s s , i − S k s s , b a s e
where Δ S k s s , i is the short-circuit strength uplift of technology i , S k s s , i is the annualized average PCC short-circuit strength for technology i , and S k s s , b a s e is the baseline PCC short-circuit strength.
The system-strength score is then normalized as
S ^ i = Δ S k s s , i − m i n Δ S k s s m a x Δ S k s s − m i n Δ S k s s
This criterion is therefore constructed directly from the PCC fault-level uplift calculated in the present study rather than from the companion papers.
The building blocks of this criterion are therefore the strength improvement identified in the technical studies and the effective device size represented in the model.

Appendix D.6. Criterion 5: Implementation Risk

The implementation risk criterion is represented by an expert-informed score R i on a 0 to 10 scale and normalized as
R ^ i = R i 10
This score is built from practical deployment considerations, including:
  • Technology maturity.
  • Integration and controls complexity.
  • Construction and commissioning difficulty.
  • Maintenance burden.
  • Utility familiarity and implementation uncertainty.
Accordingly, implementation risk captures non-financial project exposure that is not fully represented in the NPV or tariff models.

Appendix D.7. Criterion 6: Operational Flexibility

The operational flexibility criterion is represented by an expert-informed score F i on a 0 to 10 scale and normalized as
F ^ i = F i 10
Its building blocks include:
  • Response speed and controllability.
  • Range of operating modes.
  • Ability to provide multiple services.
  • Service stacking capability.
  • Broader operational adaptability under varying network conditions.
This criterion is used to distinguish technologies that may offer similar primary support performance but differ in their ability to deliver additional system value.

Appendix D.8. Interpretation of the Hierarchical Structure

The MCDA structure is hierarchical. Detailed technical and financial inputs are first consolidated into six normalized criteria and then combined using the weighted additive formulation. The criterion building blocks are summarized as follows:
  • NPV: Loss reduction, curtailment reduction, EENS reduction, ancillary revenue, carbon benefit, stacked revenue, CAPEX, O&M, discounting and lifecycle assumptions.
  • Tariff uplift: CAPEX, economic life, O&M, allowed return, working capital and Year 1 energy sales.
  • Voltage: Voltage support and recovery performance from the companion voltage simulations.
  • Strength: PCC short-circuit strength uplift, Δ S k s s , normalized relative to the baseline case.
  • Risk: Maturity, complexity and delivery/integration uncertainty.
  • Operational flexibility: Controllability, response speed, supplementary stability service capability and service-stacking capability.

Appendix E. External Reference Voltage Control Scoring Method

The voltage control score was obtained by translating the comparative voltage performance findings of the companion benchmark study into a numerical index. Three components were used: setpoint tracking, dynamic response and support under depressed-voltage conditions.
A composite voltage effectiveness index was defined as
I V , i = w T T i + w D D i + w L L i
subject to
w T + w D + w L = 1
and the final MCDA voltage score was obtained from
S V , i = round 10 I V , i
where I V , i is the normalized composite voltage index for technology i ; S V , i is the final voltage control effectiveness score on a 0–10 scale; T i is the setpoint tracking index; D i is the dynamic response and control smoothness index; L i is the depressed-voltage effectiveness index and w T , w D and w L are the weighting coefficients assigned to those three components.
In this study, the adopted weighting coefficients were
w T = 0.60 , w D = 0.25 , w L = 0.15
where w T gives the dominant weight to the ability to hold the regulated bus close to the target setpoint, w D captures the comparative influence of response speed and control smoothness and w L captures the relative ability of each technology to sustain voltage support under depressed-voltage or stressed-network conditions.
The setpoint tracking T i , dynamic response D i and low-voltage support L i components were derived from the companion study’s reported voltage regulation, response speed, control smoothness and depressed-voltage performance. The component values were then assigned on a normalized basis to reflect the comparative voltage performance hierarchy reported in that benchmark.
The normalized component values adopted in the present study were:
T S T A T C O M = 1.00 , T S C = 0.90 , T B E S S = 0.80 , T S V C = 0.60
D S T A T C O M = 1.00 , D S C = 0.85 , D B E S S = 0.95 , D S V C = 0.55
L S T A T C O M = 1.00 , L S C = 0.95 , L B E S S = 0.80 , L S V C = 0.45
The component values in Equations (A50)–(A52) reproduce the voltage regulation hierarchy reported in the companion study. STATCOM receives the highest score because it provides the strongest regulated bus voltage control, followed by the SC and BESS-GFM with slightly lower scores. The SVC receives the lowest score because of its larger setpoint deviations, stepwise response and weaker support under depressed-voltage conditions.
Substituting Equations (A49)–(A52) into Equation (A46) and then using Equation (A48), gives:
S V , S T A T C O M = round 10 0.60 1.00 + 0.25 1.00 + 0.15 1.00 = r o u n d 10.00 = 10
S V , S C = round 10 0.60 0.90 + 0.25 0.85 + 0.15 0.95 = r o u n d 8.95 = 9
S V , BESS-GFM = round 10 0.60 0.80 + 0.25 0.95 + 0.15 0.80 = r o u n d 8.38 = 8
S V , S V C = round 10 0.60 0.60 + 0.25 0.55 + 0.15 0.45 = r o u n d 5.65 = 6
Hence, the voltage control effectiveness scores used in the MCDA were:
S V , S T A T C O M = 10 , S V , S C = 9 , S V , BESS-GFM = 8 , S V , S V C = 6
Equation (A57) therefore converts the external benchmark ranking reported by Pather L and Sarma R into a transparent, auditable and reproducible scoring method for use in the present MCDA framework.

Appendix F. System Strength Score Formulation

The device-specific uplift in system strength relative to the baseline case is defined as
Δ S k s s , i = S k s s , i − S k s s , b a s e
where Δ S k s s , i is the short-circuit strength uplift of technology i relative to the baseline case in MVA, S k s s , i is the annualized average PCC short-circuit strength for technology i in MVA, and S k s s , b a s e is the annualized average PCC short-circuit strength for the baseline case in MVA.
The raw normalized system strength score is then calculated using min-max normalization as
S s t r , i r a w = 10 Δ S k s s , i − Δ S k s s , m i n Δ S k s s , m a x − Δ S k s s , m i n
where S s t r , i r a w is the raw normalized strength score for technology i on a 0–10 scale, Δ S k s s , i is the short-circuit strength uplift of technology i in MVA, Δ S k s s , m i n is the minimum uplift observed across all technologies in MVA and Δ S k s s , m a x is the maximum uplift observed across all technologies in MVA.
The normalized system strength score was used directly in the MCDA matrix to preserve scoring resolution:
S s t r , i = S s t r , i r a w
where S s t r , i is the final system strength score for technology i used in the MCDA matrix, on a 0–10 scale, S s t r , i r a w is the raw normalized strength score.

Appendix G. Monte Carlo Weight Sensitivity Assessment for MCDA Ranking Robustness

To evaluate the sensitivity of the final MCDA ranking to uncertainty in the selected criterion weights, a Monte Carlo weight sampling procedure was applied. In this assessment, the normalized criterion scores for each technology were kept fixed and only the criterion weights were allowed to vary across repeated trials.
Let the normalized score vector for technology i be written as
x i = x ^ i , 1 x ^ i , 2 x ^ i , 3 x ^ i , 4 x ^ i , 5 x ^ i , 6
where x ^ i , k is the normalized score of technology i for criterion k , with the six criteria corresponding to NPV, tariff uplift, voltage control effectiveness, system strength contribution, implementation risk and operational flexibility.
For each Monte Carlo trial m , a random weight vector was generated as
w m = w 1 m w 2 m w 3 m w 4 m w 5 m w 6 m
subject to
∑ k = 1 6 w k m = 1 , w k m ≥ 0
where w m is the sampled MCDA weight vector for trial m and w k m is the sampled weight assigned to criterion k in that trial.
In this study, the admissible weight vectors were sampled from a Dirichlet distribution,
w m ∼ D i r α 1 α 2 α 3 α 4 α 5 α 6
where D i r ⋅ denotes the Dirichlet distribution and α k are the concentration parameters governing the relative spread of the sampled weights. When all α k are equal, the procedure samples feasible weight combinations without bias toward any single criterion and preserves the simplex constraint in (A63).
For each technology i and Monte Carlo trial m , the weighted MCDA score was recalculated as
S i m = ∑ k = 1 6 w k m x ^ i , k
where S i m is the weighted score of technology i under the sampled weight vector for trial m .
The technologies were then ranked in descending order of S i m for each trial. Let r i m denote the rank position of technology i in trial m , with r i m = 1 representing first place.
The empirical probability that technology i attains rank position q was estimated as
P r i = q = 1 M ∑ m = 1 M I r i m q
where P r i = q is the estimated rank frequency for technology i at rank q , M is the total number of Monte Carlo trials and I ⋅ is the indicator function, equal to 1 when the condition is true and 0 otherwise.
The probability that technology i is top ranked was therefore evaluated as
P r i = 1 = 1 M ∑ m = 1 M I r i m 1
where P r i = 1 is the probability that technology i achieves first place across the sampled weight space.
To assess whether the original deterministic MCDA result remains unchanged under re-weighting, the baseline ranking vector r b a s e was compared with the ranking vector obtained in each Monte Carlo trial. The retention probability of the base-case ranking was computed as
P r e t a i n = 1 M ∑ m = 1 M I r m r b a s e
where P r e t a i n is the probability that the full ranking order from the deterministic base case is reproduced exactly in trial m , r m is the ranking vector obtained under the sampled weights in trial m and r b a s e is the ranking vector under the adopted deterministic weight set.
The algorithm uses the normalized criterion scores as fixed inputs, samples feasible weight vectors using (A64), recalculates the weighted scores using (A65) and re-ranks the technologies for each trial. Rank frequencies, top rank probabilities and base ranking retention are then calculated using (A66)–(A68), providing a repeatable measure of ranking robustness under varying MCDA weight preferences.

References

  1. North American Electric Reliability Corporation. Integrating Inverter-Based Resources into Low Short Circuit Strength Systems: Reliability Guideline; North American Electric Reliability Corporation: Atlanta, GA, USA, 2017. [Google Scholar]
  2. Australian Energy Market Operator. 2024 System Strength Report: A Report for the National Electricity Market; Australian Energy Market Operator: Melbourne, VIC, Australia, 2025; Available online: https://www.aemo.com.au (accessed on 10 February 2026).
  3. Siberry, V.; Wu, D.; Wang, D.; Ma, X. Energy Storage Valuation: A Review of Use Cases and Modeling Tools; DOE/OE-0029; U.S. Department of Energy: Washington, DC, USA, 2022. Available online: https://www.energy.gov (accessed on 10 January 2026).
  4. Cappers, P. Basics of Cost-of-Service Ratemaking; Lawrence Berkeley National Laboratory: Berkeley, CA, USA, 2024. [Google Scholar]
  5. Bao, L.; Fan, L.; Miao, Z. Comparison of Synchronous Condenser and STATCOM for Wind Farms in Weak Grids. In 2020 52nd North American Power Symposium (NAPS); IEEE: Tempe, AZ, USA, 2021; pp. 1–6. [Google Scholar] [CrossRef] [Scilit]
  6. Teleke, S.; Abdulahovic, T.; Thiringer, T.; Svensson, J. Dynamic performance comparison of synchronous condenser and SVC. IEEE Trans. Power Deliv. 2008, 23, 1606–1612. [Google Scholar] [CrossRef] [Scilit]
  7. Khan, R.A.; Mekhilef, S.; Shah, N.M.; Mubin, M.; Akter, M.P. Strategic sizing of grid-forming BESS for reliable wind farm integration in weak grids. Energy Rep. 2025, 14, 5286–5297. [Google Scholar] [CrossRef] [Scilit]
  8. Nuhic, M.; Kkuni, K.V.; Yang, G.; Ramachandran, J. Comparative Study of Hybrid Synchronous Condenser Incorporating Battery Energy Storage System for Ancillary Service Provision. In Proceedings of the 19th Wind Integration Workshop, Dublin, Ireland, 3–12 November 2020. [Google Scholar]
  9. National Energy Regulator of South Africa. Cost of Supply Framework; NERSA: Pretoria, South Africa, 2020. [Google Scholar]
  10. Schröder, T.; Kuckshinrichs, W. Value of lost load: An efficient economic indicator for power supply security? A literature review. Front. Energy Res. 2015, 3, 55. [Google Scholar] [CrossRef] [Scilit]
  11. European Network of Transmission System Operators for Electricity. ENTSO-E Guideline for Cost Benefit Analysis of Grid Development Projects; European Network of Transmission System Operators for Electricity: Brussels, Belgium, 2015. [Google Scholar]
  12. Anderson, P.M.; Fouad, A.A. Power System Control and Stability, 2nd ed.; Wiley-IEEE Press: Hoboken, NJ, USA, 2003. [Google Scholar] [CrossRef] [Scilit]
  13. NRS 048-2:2025; Electricity Supply-Quality of Supply, Part 2: Voltage Characteristics, Compatibility Levels, Limits and Assessment Methods, 5th ed. NERSA: Pretoria, South Africa, 2025.
  14. Hatziargyriou, N.; Milanovic, J.; Rahmann, C.; Ajjarapu, V.; Canizares, C.; Erlich, I.; Hill, D.; Hiskens, I.; Kamwa, I.; Pal, B.; et al. Definition and Classification of Power System Stability—Revisited and Extended. IEEE Trans. Power Syst. 2021, 36, 3271–3281. [Google Scholar] [CrossRef] [Scilit]
  15. North American Electric Reliability Corporation. Reliability Guideline: BPS-Connected Inverter-Based Resource Performance; North American Electric Reliability Corporation: Atlanta, GA, USA, 2018. [Google Scholar]
  16. Matevosyan, J.; Badrzadeh, B.; Prevost, T.; Quitmann, E.; Ramasubramanian, D.; Urdal, H.; Achilles, S.; MacDowell, J.; Huang, S.H.; Vital, V.; et al. Grid-Forming Inverters: Are They the Key for High Renewable Penetration? IEEE Power Energy Mag. 2019, 17, 89–98. [Google Scholar] [CrossRef] [Scilit]
  17. Vorwerk, J.; Markovic, U.; Aristidou, P.; Vrettos, E.; Hug, G. Modelling of variable-speed refrigeration for fast-frequency control in low-inertia systems. IET Smart Grid 2020, 3, 924–936. [Google Scholar] [CrossRef] [Scilit]
  18. International Energy Agency Photovoltaic Power Systems Programme. Annual Report 2022; International Energy Agency: Paris, France, 2022. [Google Scholar]
  19. International Renewable Energy Agency. Innovation Landscape for a Renewable-Powered Future: Solutions to Integrate Variable Renewables; International Renewable Energy Agency: Abu Dhabi, United Arab Emirates, 2019. [Google Scholar]
  20. Energy Systems Integration Group. Grid-Forming Technology in Energy Systems Integration, High Share of Inverter-Based Generation Task Force; Energy Systems Integration Group: Reston, VA, USA, 2022. [Google Scholar]
  21. Brealey, R.A.; Myers, S.C.; Allen, F.; Edmans, A. Principles of Corporate Finance, 14th ed.; McGraw Hill: New York, NY, USA, 2025. [Google Scholar]
  22. Simpkins, T.; Anderson, K.; Cutler, D.; Olis, D.; Elgqvist, E.; Walker, A. Optimizing Energy Storage Economics; National Renewable Energy Laboratory: Golden, CO, USA, 2016. [Google Scholar]
  23. Casillas, C.; Sandler, S.; Cliburn, J. SPECs Early-Stage Decision Model: User Manual; NREL/SR-7A40-90018, 2394637, MainId:91796; National Renewable Energy Laboratory: Golden, CO, USA, 2021. [Google Scholar] [CrossRef] [Scilit]
  24. Bowen, T.; Chernyakhovskiy, I.; Denholm, P. Grid-Scale Battery Storage: Frequently Asked Questions; NREL/TP-6A20-74426; National Renewable Energy Laboratory: Golden, CO, USA, 2019. [Google Scholar] [CrossRef] [Scilit]
  25. Viswanathan, V.; Mongird, K.; Franks, R.; Li, X.; Sprenkle, V. 2022 Grid Energy Storage Technology Cost and Performance Assessment; U.S. Department of Energy: Washington, DC, USA, 2022. [Google Scholar]
  26. Australian Energy Market Operator. 2025 Electricity Network Options Report: For the Integrated System Plan; Australian Energy Market Operator: Melbourne, VIC, Australia, 2025. [Google Scholar]
  27. Midcontinent Independent System Operator. Transmission Cost Estimation Guide for MTEP24; MISO: Carmel, IN, USA, 2024. [Google Scholar]
  28. California Independent System Operator. Suncrest 230 kV 300 MVAr Dynamic Reactive Power Support Description and Functional Specifications for Competitive Solicitation; California Independent System Operator: Folsom, CA, USA, 2014. [Google Scholar]
  29. GreenCape. Large-Scale Renewable Energy Market Intelligence Report 2024; GreenCape: Cape Town, South Africa, 2024. [Google Scholar]
  30. Mason, T.; Curry, T.; Wilson, D. Capital Costs for Transmission and Substations: Recommendations for WECC Transmission Expansion Planning; prepared for Western Electricity Coordinating Council; Black & Veatch: Kansas City, MO, USA, 2012. [Google Scholar]
  31. McMahon, N.; Notkevich, L.; Cowap, N.; Corcoran, A.; Blanchfield, R. 400 kV and 220 kV Static Synchronous Compensator (STATCOM) Functional Specification; Document Ref. OFS-SSS-416-R2; EirGrid: Dublin, Ireland, 2023; Available online: https://www.eirgrid.ie (accessed on 10 January 2026).
  32. GE Grid Solutions. Asset Lifecycle Management: Flexible Services Optimizing Grid Asset Management Strategies; GE Grid Solutions: Boulogne-Billancourt, France, 2018. [Google Scholar]
  33. National Renewable Energy Laboratory. Annual Technology Baseline 2024: Utility-Scale PV-Plus-Battery Data; National Renewable Energy Laboratory: Golden, CO, USA, 2024. Available online: https://atb.nrel.gov (accessed on 6 January 2026).
  34. U.S. Energy Information Administration. Characteristics for Utility-Scale Electric Power Generating Technologies; U.S. Department of Energy: Washington, DC, USA, 2024. Available online: https://www.eia.gov (accessed on 5 January 2026).
  35. Alvarez-Alvarado, M.S.; Jayaweera, D. Smart Maintenance Model for Operational Planning of Static Synchronous Compensators. In 2019 IEEE Milan PowerTech; IEEE: Milan, Italy, 2019; pp. 1–6. [Google Scholar] [CrossRef] [Scilit]
  36. Lee, S.-Y.; Wu, C.-J. Combined compensation structure of a static Var compensator and an active filter for unbalanced three-phase distribution feeders with harmonic distortion. Electr. Power Syst. Res. 1998, 46, 243–250. [Google Scholar] [CrossRef] [Scilit]
  37. SP Energy Networks. PHOENIX: Report on GB Road Map for Roll Out of H-SC; SP Energy Networks: Glasgow, UK, 2023; Available online: https://www.spenergynetworks.co.uk (accessed on 10 January 2026).
  38. Powerlink Queensland. Equipment Strategy for Synchronous Condensers & Auxiliaries; Document No. ASM-STR-A5760875, ver. 1.0; Powerlink Queensland: Brisbane, QLD, Australia, 2025; Available online: https://www.powerlink.com.au (accessed on 5 January 2026).
  39. GHD Group. ElectraNet Synchronous Condenser Asset Life Review; GHD Group: Brisbane, QLD, Australia, 20 March 2017. [Google Scholar]
  40. Eskom. Schedule of Standard Prices for Eskom Tariffs: Applicable from 1 April 2025 to 31 March 2026 (Non-Local Authority Supplies) and 1 July 2025 to 30 June 2026 (Local Authority Supplies); Eskom: Johannesburg, South Africa, 2025; Available online: https://www.eskom.co.za/distribution/wp-content/uploads/2025/03/20250401-Schedule-of-standard-prices-2025_26.pdf (accessed on 25 April 2026).
  41. Eskom. FY2026 Eskom Standard Tariffs. In Connect: A Newsletter for Eskom Customers; Eskom: Johannesburg, South Africa, 2025; Available online: https://www.eskom.co.za/distribution/wp-content/uploads/2025/03/Connect-2025_26-1.pdf (accessed on 10 January 2026).
  42. Eskom. Megaflex Gen Schedule of Standard Prices for Non-Local Authority Supplies, 1 April 2025 to 31 March 2026; Eskom: Johannesburg, South Africa, 2025; Available online: https://www.eskom.co.za/distribution/wp-content/uploads/2025/03/Megaflex-Gen-schedule-2025-26.pdf (accessed on 10 January 2026).
  43. National Energy Regulator of South Africa. Decision and Reasons for Decision: Eskom’s Application for the 2025/26 Financial Year Eskom Retail Tariff and Structural Adjustment; National Energy Regulator of South Africa: Pretoria, South Africa, 2025; Available online: https://www.nersa.org.za/file/5862 (accessed on 10 January 2026).
  44. National Treasury of South Africa. Announcement of the New Inflation Target for South Africa; Media Statement; National Treasury of South Africa: Pretoria, South Africa, 2025. Available online: https://www.treasury.gov.za/comm_media/press/2025/2025111201%20Announcement%20of%20the%20new%20inflation%20target%20for%20South%20Africa.pdf (accessed on 28 January 2026).
  45. National Energy Regulator of South Africa. Principles to Determine Prices in the Electricity Supply Industry; National Energy Regulator of South Africa: Pretoria, South Africa, 2021; Available online: https://www.nersa.org.za/files/files/2022/01/Principles-to-determine-prices-in-the-Electricity-Supply..pdf (accessed on 12 January 2026).
  46. Department of Forestry, Fisheries and the Environment. South Africa’s 2022 Grid Emission Factors. In Government Gazette; no. 51495; Department of Forestry, Fisheries and the Environment: Pretoria, South Africa, 2024. Available online: https://www.dffe.gov.za (accessed on 5 January 2026).
  47. CSIR Energy Research Centre. Utility-Scale Power Generation Statistics in South Africa: 2024, 1 January 2024–31 December 2024; CSIR Energy Research Centre: Pretoria, South Africa, 2025; Available online: https://www.csir.co.za (accessed on 2 January 2026).
  48. Augustine, C.; Blair, N. Storage Futures Study: Storage Technology Modeling Input Data Report; NREL/TP-5700-78694, 1785959, MainId:32611; National Renewable Energy Laboratory: Golden, CO, USA, 2021. [Google Scholar] [CrossRef] [Scilit]
  49. U.S. Department of Energy. Battery Energy Storage System Evaluation Method; Federal Energy Management Program: Washington, DC, USA, 2023. Available online: https://www.energy.gov/femp (accessed on 10 April 2026).
  50. PJM Interconnection. PJM Manual 11: Energy & Ancillary Services Market Operations; Rev. 127; PJM Interconnection: Valley Forge, PA, USA, 2023; Available online: https://www.pjm.com/-/media/DotCom/documents/manuals/m11.pdf (accessed on 1 April 2026).
  51. Goforth, T.; Nock, D.; Brown, M.; Ghosh, T.; Lamers, P. Exploring equality and sustainability trade-offs of energy transition outcomes in the United States in 2050. Appl. Energy 2024, 367, 123376. [Google Scholar] [CrossRef] [Scilit]
  52. Drury, E.; Denholm, P.; Margolis, R. Impact of Different Economic Performance Metrics on the Perceived Value of Solar Photovoltaics; NREL/TP-6A20-52197, 1028528; National Renewable Energy Laboratory: Golden, CO, USA, 2011. [Google Scholar] [CrossRef] [Scilit]
  53. Mai, T.; Mowers, M.; Eurek, K. Competitiveness Metrics for Electricity System Technologies; NREL/TP-6A20-72549, 1765599, MainId:6148; National Renewable Energy Laboratory: Golden, CO, USA, 2021. [Google Scholar] [CrossRef] [Scilit]
  54. World Bank. Incorporating Risk and Uncertainty in Power System Planning; Energy Series Paper No. 17; World Bank: Washington, DC, USA, 1989. [Google Scholar]
  55. Electric Power Research Institute. Electricity Storage Valuation Framework: Assessing System Value and Ensuring Project Viability; EPRI: Palo Alto, CA, USA, 2020; Available online: https://www.epri.com (accessed on 1 March 2026).
  56. U.S. Department of Energy; Office of Energy Analysis. The Value of Energy Storage for Grid Applications; NREL/TP-6A20-58465; National Renewable Energy Laboratory: Golden, CO, USA, 2013. [Google Scholar] [CrossRef] [Scilit]
  57. Clean Energy Ministerial. Battery Storage Unlocked: Lessons Learned from Emerging Economies; Supercharging Battery Storage Initiative; Clean Energy Ministerial: Paris, France, 2024; Available online: https://www.cleanenergyministerial.org (accessed on 25 January 2026).
  58. Pather, L.; Sarma, R. FACTS, synchronous condensers, and grid-forming BESS for high-PV stability. Energies 2026, 19, 1896. [Google Scholar] [CrossRef] [Scilit]
  59. Hertzmark, D. Risk Assessment Methods for Power Utility Planning; Renewable Energy Special Report, Energy Sector Management Assistance Program; World Bank: Washington, DC, USA, 2007; Available online: https://documents.worldbank.org (accessed on 10 March 2026).
  60. Yu, L.; Meng, K.; Zhang, W.; Zhang, Y. An Overview of System Strength Challenges in Australia’s National Electricity Market Grid. Electronics 2022, 11, 224. [Google Scholar] [CrossRef] [Scilit]
  61. Wang, Y.; Guo, Y.; Ning, H.; Li, P.; Cen, B.; Zhao, H.; Zou, H. Research on Power Quality Control Methods for Active Distribution Networks with Large-Scale Renewable Energy Integration. Processes 2025, 13, 1469. [Google Scholar] [CrossRef] [Scilit]
  62. Siew, H. Edify Energy and Federation Asset Management Flagship Report: System Strength Remediation—Darlington Point Energy Storage System. 2025. Available online: https://edifyenergy.com/ (accessed on 5 January 2026).
  63. Terrace, A. Grid Forming BESS: Fault Current Contribution Study Scope; Amplitude Consultants, Document No. PAU0490-REPT-002, Rev. 0; Amplitude: San Francisco, CA, USA, 2025. [Google Scholar]
  64. Badran, E.; Abulanwar, S. Dynamic Performance Comparison between STATCOM and SVC. MEJ Mansoura Eng. J. 2020, 36, 11–17. [Google Scholar] [CrossRef] [Scilit]
  65. Baeckeland, N.; Chatterjee, D.; Lu, M.; Johnson, B.; Seo, G.-S. Overcurrent Limiting in Grid-Forming Inverters: A Comprehensive Review and Discussion. IEEE Trans. Power Electron. 2024, 39, 14493–14517. [Google Scholar] [CrossRef] [Scilit]
  66. Chen, Y.; Zheng, K.; Feng, C.; Huang, J.; Guo, H.; Zhong, H. Optimal grid-forming BESS management incorporating internal battery physics. Appl. Energy 2025, 385, 125448. [Google Scholar] [CrossRef] [Scilit]
  67. Lin, Y.; Eto, J.H.; Johnson, B.B.; Flicker, J.D.; Lasseter, R.H.; VillegasPico, H.N.; Seo, G.-S.; Pierre, B.J.; Ellis, A. Research Roadmap on Grid-Forming Inverters; National Renewable Energy Laboratory: Golden, CO, USA, 2020. Available online: https://www.nrel.gov/ (accessed on 5 December 2025).
  68. Quint, R.; Isaacs, A.; Jahyaie, F.; Unruh, L.; Matevosyan, J.; Baker, C. Grid-Forming Battery Energy Storage Systems: A Call to Action for a Stable Energy Transition; Energy Systems Integration Group: Reston, VA, USA; GridLab: Berkeley, CA, USA, 2025; Available online: https://www.esig.energy/ (accessed on 10 October 2025).
  69. Khadatkar, R.P.; Waghmare, D.B. A Review on Static Synchronous Compensator and Its Modulation Techniques. Int. J. Recent Eng. Sci. 2017, 4, 36–42. Available online: https://ijresonline.com/archives/ijres-v4i6p108 (accessed on 20 December 2025).
  70. Lee, J.; Jo, H.; Kim, S. Optimal Determination of Synchronous Condenser Placement and Voltage Setting for Enhancing Power System Stability. Energies 2025, 18, 6474. [Google Scholar] [CrossRef] [Scilit]
  71. Yin, S.; Wang, J.; Lin, Y.; Fang, X.; Tan, J.; Yuan, H. Practical Operations of Energy Storage Providing Ancillary Services: From Day-Ahead to Real-Time. In 2020 52nd North American Power Symposium (NAPS); IEEE: Tempe, AZ, USA, 2021; pp. 1–6. [Google Scholar] [CrossRef] [Scilit]
  72. ABB. SVC: Static Var Compensator—An Insurance for Improved Grid System Stability and Reliability. Available online: https://new.abb.com/ (accessed on 12 December 2025).
  73. RES4Africa Foundation. Regulatory Assessment of Battery Energy Storage Systems in South Africa. 2023. Available online: https://res4africa.org/ (accessed on 5 January 2026).
  74. Carbonara, A.; Sessa, S.D.; L’Abbate, A.; Sanniti, F.; Chiumeo, R. Comparison of Advanced Flexible Alternating Current Transmission System (FACTS) Devices with Conventional Technologies for Power System Stability Enhancement: An Updated Review. Electronics 2024, 13, 4262. [Google Scholar] [CrossRef] [Scilit]
  75. Dang, J.; Tang, F.; Wang, J.; Yu, X.; Deng, H. A Differentiated Dynamic Reactive Power Compensation Scheme for the Suppression of Transient Voltage Dips in Distribution Systems. Sustainability 2023, 15, 13816. [Google Scholar] [CrossRef] [Scilit]
  76. Pather, L.; Sarma, R. Unified Stability Metrics for Grid-Support Technologies in a PV-Dominated IEEE 9-Bus Test System. Energies 2026, 19, 1906. [Google Scholar] [CrossRef] [Scilit]
  77. Bahrani, B.; Ravanji, M.H.; Kroposki, B.; Ramasubramanian, D.; Guillaud, X.; Prevost, T.; Cutululis, N.-A. Grid-Forming Inverter-Based Resource Research Landscape: Understanding the Key Assets for Renewable-Rich Power Systems. IEEE Power Energy Mag. 2024, 22, 18–29. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.