Skip to Content

3 Results Found

  • Article
  • Open Access
431 Views
20 Pages

1 September 2026

This study addresses the Multi-Skill Resource-Constrained Project Scheduling Problem (MSRCPSP) by investigating the simultaneous effects of workforce skill proficiency (depth) and skill versatility (breadth) on project makespan reduction. Two state-o...

(This article belongs to the Special Issue Advances in Planning and Scheduling Theory)
  • Article
  • Open Access
15 Citations
4,621 Views
25 Pages

26 February 2024

This paper addresses a novel multi-skill resource-constrained project scheduling problem with flexible resource profiles (F-MSRCPSP), in which the resource allocation of each activity consists of a certain number of discrete resources and is allowed...

(This article belongs to the Section Mechanical Engineering)
  • Article
  • Open Access
992 Views
24 Pages

This paper introduces the ETMS-RCPSP (Earliness–Tardiness Multi-Skill Resource-Constrained Scheduling Problem)—a novel problem derived from the MS-RCPSP by adding constraints on project completion time or actual production contracts. The...

(This article belongs to the Special Issue Smart Manufacturing in the AI Era)