Skip to Content
NetworkNetwork
  • Article
  • Open Access

13 October 2026

24 Pages

Geometry-Aware Robust Scheduling for HAPS-to-Vehicle Links: Decision Validity Under Mobility and Feasible Load in Corridor Deployments

,
,
,
,
and
1
Department of Computer Science, Dyson Institute of Engineering and Technology, Malmesbury SN16 0RP, UK
2
Department of Computing, University of Greater Manchester, Manchester M15 6LR, UK
3
School of Engineering, Department of Electrical Engineering, Coventry University, Coventry CV1 5FB, UK
*
Author to whom correspondence should be addressed.

Abstract

A high-altitude platform station (HAPS) can serve an extended motorway corridor from a single aperture, but stratospheric attitude disturbance introduces a pointing error that degrades the isolation between closely spaced beams. Robust user selection addresses this by requiring an explicit angular separation between co-scheduled beams, yet existing formulations are evaluated at a single scheduling instant over compact footprints. This paper asks how long a scheduling decision remains valid once the served vehicles move, and how footprint geometry bounds the number of vehicles that can be co-scheduled. A corridor mobility model is developed; the pairwise separation requirement is enforced by max–min angular dispersion, for which the chance-constrained separation margin acts as a feasibility certificate; and the margin is extended to the age of the decision. Monte Carlo evaluation at 28 GHz with zero-forcing precoding shows that the scheduling geometry evolves about 5×104 times more slowly than the small-scale fading, so that outage is statistically unchanged at a decision age of 100 ms and rises by 30% at 1 s. On the corridor, max–min selection yields lower outage than capped-sum angle-aware selection, channel-aware selection and random selection at every load from K=4 to K=12, at the cost of a 5% lower cell-edge spectral efficiency at intermediate load. Widening the margin to absorb angular drift gives no significant benefit at a realistic candidate-pool size and increases outage 2.7-fold at K=10, so decision age is better bounded through the scheduling interval than compensated through margin inflation.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.