Skip to Content
  • Proceeding Paper
  • Open Access

17 August 2026

12 Pages

Implementation of Lean Manufacturing to Minimize Waste in the Fire Ring Production Process †

,
and
1
Department of Industrial Engineering, Faculty of Engineering, Universitas Muhammadiyah Surakarta, Surakarta 57169, Indonesia
2
Faculty of Mechanical and Manufacturing Engineering, Universiti Tun Hussein Onn Malaysia, Batu Pahat 86400, Malaysia
*
Author to whom correspondence should be addressed.
†
Presented at the 9th Mechanical Engineering, Science and Technology International Conference (MEST 2025), Samarinda, Indonesia, 11–12 December 2025.

Abstract

Enggal Jaya MSME is a small-scale enterprise specializing in metal casting and the production of fire rings, with a monthly capacity exceeding 15,000 units. Currently, its production process exhibits significant inefficiencies across the seven wastes of lean manufacturing: overproduction, defects, inventory, motion, transportation, overprocessing, and waiting. This study aims to map the information and production workflows for fire ring components, analyze the types and root causes of waste, and propose actionable solutions to improve shop-floor efficiency. Value Stream Mapping (VSM) and the Waste Assessment Model (WAM) were utilized as the primary methodologies. The current-state VSM revealed a Process Cycle Efficiency (PCE) of 69%, whereas the proposed future-state VSM demonstrates an improved PCE of 73%. Furthermore, Waste Assessment Questionnaire (WAQ) calculations identified five major types of critical waste: overproduction (19.2%), defects (18.0%), inventory (16.1%), motion (15.2%), and transportation (13.3%). Proposed countermeasures include systematically recording production activities, developing Standard Operating Procedures (SOPs), integrating appropriate material handling tools, and implementing rigorous production forecasting and scheduling.

1. Introduction

In the highly competitive modern manufacturing landscape, Micro, Small, and Medium Enterprises (MSMEs) face mounting pressure to enhance productivity, capacity, and product quality. To maintain viability, MSMEs must cultivate competitive advantages through superior quality, competitive pricing, timely delivery, and operational flexibility [1], thereby generating greater economic value than their competitors. The evolution of the manufacturing sector, particularly in metal casting, necessitates production optimization, increased value addition, and strict cost efficiency [2]. Consequently, many companies are driven toward adopting lean manufacturing principles [1,3,4].
Lean manufacturing is a simple, well-structured, and continuous approach to eliminating waste, which encompasses both material wastage and non-value-added activities [5,6,7]. Because consumers do not subsidize process inefficiencies, eliminating these wastes is crucial for minimizing costs and maximizing customer value [7]. This approach is highly adaptable, allowing companies to implement it according to their specific capabilities and resources to achieve greater efficiency [8].
The first step in a lean transformation involves identifying and mapping operational workflows to detect inefficient, waste-generating activities [9,10,11]. Value Stream Mapping (VSM), pioneered by the Toyota Motor Corporation [12], is a dynamic tool used to visualize the entire production system, from raw material procurement to final product distribution [1]. A primary advantage of VSM is its ability to illustrate both material and information flows. This comprehensive visibility enables practitioners to analyze the underlying logic of the production system, allowing them to focus on systemic process improvements rather than isolated product modifications [13,14,15].
Numerous studies have demonstrated the versatility of VSM across a wide array of industries. In the service sector, it has been successfully applied to map material and information flows [2] as well as to identify waste and improve service processes in shoes care enterprises [16]. Within the apparel and footwear manufacturing sectors, researchers have utilized VSM alongside Process Activity Mapping (PAM) to minimize the seven types of waste in shoe production [11]. Similarly, VSM has been deployed to address suboptimal production targets and eliminate non-value-added activities in the manufacturing of golf gloves [17] and sports shoes [18].
The applicability of VSM extends to broad manufacturing and food production environments. For example, productivity enhancements in small and medium-sized enterprises (SMEs) have been achieved by integrating VSM with Kaizen methodologies, as demonstrated in the batik industry [15]. Furthermore, VSM has been utilized to streamline operations in the production of aluminum pans [5], snack food industry [19] and in a four-wheel vehicle manufacturing company [20]. Collectively, these studies demonstrate that VSM-driven improvements not only enhance production efficiency but also maximize customer responsiveness and build sustainable competitive advantages [21]. Consequently, VSM is widely recognized as a highly effective operational tool within the manufacturing industry [22].
In addition to VSM, complementary methodologies such as the Waste Assessment Model (WAM) are frequently employed. WAM is an analytical method used to identify operational waste [13]. As a lean manufacturing tool, it consists of the Seven Waste Relationship (SWR) [13], followed by the Waste Relationship Matrix (WRM) and the Waste Assessment Questionnaire (WAQ). The primary advantage of the WAM method is its simple, standardized matrix and questionnaire, which yield highly accurate results when identifying critical waste [15,23]. Following this identification, further waste analysis is typically conducted using fishbone diagrams, the 5W + 1H framework [24], and Failure Mode and Effects Analysis (FMEA) [25].
This research was conducted at Enggal Jaya MSME. Established in 1991, the enterprise manufactures various metal equipment products. Its highest-volume product is the Fire Ring, which has a production capacity of 15,000 pieces per month. Preliminary observations revealed several unrecognized sources of waste on the shop floor. These include poor layout design (specifically, the excessive distance between the molds and the melting station), a lack of dedicated storage for raw materials and finished goods, defective products requiring reprocessing, delays during the melting and hardening stages, and insufficient material handling equipment that exacerbates waiting times.
To address these inefficiencies, this study implements lean manufacturing principles using VSM tools. The primary goal is to identify current waste on the Fire Ring production floor and propose targeted improvements to minimize it. Reducing this waste is expected to subsequently increase both production capacity and overall company profitability. Furthermore, a root-cause analysis will be conducted using fishbone diagrams to ensure the proposed solutions facilitate a more efficient production process.

2. Research Methods

2.1. Object and Time of Research

This research was conducted at the Enggal Jaya MSME in Central Java, Indonesia, from January to March 2024. The study observed the entire production process. Data was collected by distributing questionnaires to two owners and one operator, while process time measurements were recorded by observing five operators.

2.2. Research Stages

The research consisted of five primary stages, utilizing the following methodologies [13]: (1) Value Stream Mapping (VSM): Mapping the production and information flow to identify both value-added and non-value-added activities at the total production level [8]. (2) Value Stream Analysis Tools (VALSAT): Mapping waste in detail within the value stream, focusing on the value-adding process [16]. (3) Waste Relationship Matrix (WRM): Analysing measurement criteria to evaluate the relationships between different types of waste [13]. (4) Waste Assessment Questionnaire (WAQ): Identifying and allocating waste occurring on the production floor [23]. (5) Process Activity Mapping (PAM): Mapping all activities in detail to eliminate waste, inconsistency, and irrationality in the workplace, ultimately aiming to improve product quality, accelerate processes, and reduce costs [13].

3. Research and Discussion

3.1. Production Process

The fire ring production process consists of five main activities. First is the mold-making process, which involves creating patterns and pouring sand into the mold, taking 2–3 weeks. This is followed by the smelting process, where raw materials (metal and charcoal) are melted in a cupola furnace for 6–7 h until ready for pouring. The third step is pouring the liquid metal into the mold using a cintung—a specialized tool designed to withstand high temperatures—which takes 6–7 h.
The subsequent stage is the demolding phase. The liquid metal requires 2 h to harden, after which the mold is dismantled using an iron rod over a period of 6–7 h. The product is then left to rest for 24 h until fully solidified. The final step is finishing, which takes 7 days and involves cutting the fire ring into four sections and smoothing the edges with a grinder to achieve the required precision. An image of the finished fire ring is shown in Figure 1.
Figure 1. Fire Ring Product.
Observations of process time were conducted using a stopwatch. Table 1 presents the cycle times from five observations of 20 activities carried out across five Fire Ring manufacturing workstations.
Table 1. Fire Ring Production Process Time.
Work in process (WIP) refers to the inventory of semi-finished materials on the production line awaiting further processing. Table 2 shows the quantity of WIP at each Fire Ring manufacturing workstation. The WIP data, number of operators per workstation, and available working time are the data required to construct the VSM.
Table 2. Work in Process Inventory, Number of Operators, and Available Time.

3.2. Data Sufficiency and Uniformity Tests

In this study, the data sufficiency test employed a confidence level of 95% and an accuracy level of 5%; that is, a 5% risk of rejecting a correct hypothesis was accepted, with 95% confidence in the decision, and data were deemed sufficient if N′ < N. The data uniformity test used the same accuracy and confidence levels to determine the upper control limit (UCL) and lower control limit (LCL). Table 3 presents the results of the data sufficiency and uniformity tests, which confirm that the production time data are both sufficient and uniform.
P r o c e s s   C y c l e   E f f i c i e n c y = V a l u e   A d d e d L e a d   T i m e × 100 % = 4864 7026.0058 % = 69 %
Table 3. Recapitulation of Data Sufficiency and Uniformity Test Calculations.
The current VSM yields a value added of 4864 min and a lead time of 7026.0058 min, giving a PCE of 69%. The higher the PCE percentage, the more efficient the production process.

3.3. Waste Assessment Model (WAM) Evaluation

The WAM evaluation was derived from discussions and completed questionnaires from the owner and operators. After determining the Waste Relationship Matrix (WRM) scores, the WRM questionnaire results were processed by converting the input into the output in the WRM table. Table 4 presents the WRM calculation. The weightings were obtained from the respondents’ answers to determine the relationships between waste types, ranging from absolutely necessary to unimportant.
Table 4. Weighting of Waste Relationship Matrix Questionnaire Answers.
These answers were then processed and converted into relationship strength symbols. The conversion ranges were as follows: 17–20: absolutely necessary (symbol A, value 10); 13–16: especially important (symbol E, value 8); 9–12: important (symbol I, value 6); 5–8: ordinary closeness (symbol O, value 4); 1–4: unimportant (symbol U, value 2); 0: no relationship (symbol X, value 0) [13]. The symbols were subsequently converted into numerical values with reference to A = 10, E = 8, I = 6, O = 4, U = 2, and X = 0. The WRM conversion into numerical values is shown in Table 5.
Table 5. Waste Matrix Value of Fire Ring Product.
According to the WRM questionnaire calculation, the waste from overproduction (19%) had the highest percentage, indicating that this waste exerts the greatest influence on other wastes. Meanwhile, the waste to inventory column (18%) had the highest percentage value, meaning that inventory waste is the waste type most frequently caused by other wastes. Following the WRM calculation, the Waste Assessment Questionnaire (WAQ) was calculated. The initial step of the WAQ is grouping the questionnaire items, as presented in Table 6.
Table 6. WAQ Question Grouping.
Based on the 80/20 Pareto principle, five waste types require prioritisation, namely overproduction, defects, inventory, motion, and transportation. Their cumulative percentages are: overproduction 19%, defects 35%, inventory 53%, motion 69%, and transportation 82%. These wastes were therefore selected for further analysis and improvement (see in Table 7).
Table 7. WAQ Calculation Percentage.
From the VALSAT tool calculations, PAM achieved the highest total score; consequently, PAM was selected for a more detailed investigation of waste (see Table 8).
Table 8. Valsat Tools for Fire Ring Product.
The overproduction waste observed is attributed to the absence of production forecasting, resulting in a lack of certainty regarding the quantity of products to be manufactured within a given period. Furthermore, overproduction waste arises from the implementation of a make-to-stock production system, which, when combined with limited space, leads to inefficient utilisation of storage areas (warehouses). The necessary steps include proper production forecasting to determine production scheduling. The SME should: (1) record all production activities, including order quantities, quantities produced, sales data, income data, and employee wage data; (2) develop a Standard Operating Procedure (SOP) for the production process so that operators have guidelines for each production activity, as also recommended in [13,26] through product recapitulation records.
Defect waste arises primarily from insufficient operator precision during the mould-making process. For instance, inadequate sand compaction can create cavities that lead to leakage, while substandard pouring of molten metal may result in density inconsistencies during solidification. Furthermore, improper material handling can cause physical damage to the final product.
To address these issues, several improvements are recommended: (1) the establishment and strict implementation of standard operating procedures (SOPs) covering mould quality, pouring processes, dismantling, finishing, and material handling; and (2) the adoption of semi-automatic machinery to enhance product consistency and improve production efficiency. In addition, prior research [27] emphasises the importance of conducting routine maintenance and ensuring proper machine settings to minimise defects.
Inventory waste stems from the lack of a dedicated space for raw materials and finished goods, causing the pathways between production lines to become narrow. Moreover, large quantities of WIP are not immediately dismantled. Proposed improvements are: (1) providing a dedicated area for raw materials and finished goods in accordance with production capacity; (2) re-laying out the facility so that space can be adjusted to needs; (3) reducing WIP to avoid delays between activities; (4) reducing the accumulation of finished goods through direct delivery processes. According to [13], applying forecasting can minimise inventory waste, while [27] adds the creation of a list of items to be used, proper inventory management, and the application of 5S techniques. Furthermore, reducing or eliminating non-value-added (NVA) activity time [28] can decrease waiting time and increase the Value Added (VA) Ratio from 16.24% to 29.42% [29].
Motion waste primarily results from the disorganised placement of tools, such as hoes and cintung, as well as from an inefficient production layout that creates excessive distances between workstations. Several improvements are therefore recommended: (1) arranging production equipment in clearly designated locations to ensure ease of access; (2) labelling each tool to indicate its proper storage location after use; (3) reconfiguring the workspace layout so that all tasks can be performed within convenient reach; and (4) developing visual displays of company rules and policies to guide employee practices.
Ineffective factory layout, identified through Focus Group Discussions (FGD) [30], has been recognised as a significant source of waste. In line with [27], appropriate solutions include designing an organised raw material storage layout and establishing a systematic raw material display. Furthermore, research by [31] employing VSM demonstrated improvements in the line balancing rate and a substantial increase in line productivity, from 1500 units per week to 3000 units per week.
Material transfer occurs primarily during the demolition and finishing processes; for example, the transport from demolition to finishing takes approximately 5.21 min. Another issue is the absence of material handling tools, so movement is performed manually and repeatedly, resulting in long durations, risk of injury, and operator fatigue. The proposed improvements are: (1) repairing the production floor by casting cement and widening the material handling pathways; (2) providing tools such as wheelbarrows or hand trucks (see Figure 2). The improvement steps taken by [17] include the application of 5S and the enhancement of material handling facilities for optimal performance.
Figure 2. Material Handling (a) Wheelbarrows, (b) Hand Truck.

3.4. PAM Improvements

Activities within the Process Activity Map (PAM) are classified into three categories: value-added (VA), non-value-added (NVA), and necessary non-value-added (NNVA). To optimize production efficiency, VA activities must be enhanced while NVA and NNVA activities are minimized. An analysis of the current PAM revealed several redundant NVA and NNVA tasks. Consequently, the process must be improved by eliminating or consolidating these inefficiencies. Applying Kaizen principles can effectively facilitate the reduction of these NVA activities [32].
Table 9 presents the improved PAM for the Fire Ring product, comprising 38 activities, and distinguishes between activities that can be eliminated and those that can be combined. It also indicates whether each activity is VA, NVA, or NNVA. Table 10 then summarises the number of repair activities and post-repair activities related to operation, transportation, inspection, storage, delay, VA, NVA, and NNVA.
Table 9. PAM Fire Ring Product Improvements.
Table 10. Recapitulation of Results Before and After PAM Improvement.

3.5. Preparation of Future Value Stream Mapping

Following the description of the current VSM and the identification of waste, the activities requiring improvement can be determined so that the production system aligns with the lean manufacturing concept (see Figure 3).
P r o c e s s   C y c l e   E f f i c i e n c y = V a l u e   A d d e d L e a d   T i m e × 100 % = 4984 6841.556 % = 73 %
Figure 3. Future Value Stream Mapping of Fire Ring Production.
The Process Cycle Efficiency (PCE) result compares a Value-Added (VA) time of 4964 min to a total lead time of 6841.56 min. The Future Value Stream Mapping (VSM) indicates a PCE of 73%, reflecting a 4% improvement over the Current VSM. This higher PCE percentage demonstrates that the process is running more efficiently. Based on the Pareto chart analysis, the primary wastes requiring further investigation and mitigation are overproduction, defects, inventory, motion, and transportation.
To address these inefficiencies at the Enggal Jaya SME, the following improvements are recommended: (1) Recording and accounting for all production activities; (2) Developing Standard Operating Procedures (SOPs) for all workstations to establish uniform operational standards; (3) Employing semi-automatic machines and integrating additional material handling tools; (4) Providing warehouses for raw materials and finished products that match current production capacity; (5) Modifying the production floor layout to optimize workflow efficiency (6) Levelling the production floor and widening material handling pathways to ensure safe and efficient transit.

4. Conclusions

Waste identification using the WRM indicates that overproduction yields the highest ‘from’ percentage (19%), signifying that it exerts the greatest influence on other waste categories. Conversely, inventory shows the highest ‘to’ percentage (18%), indicating that it is the waste most frequently generated by other factors. Furthermore, WAQ calculations identify the five most dominant waste types as overproduction (19.2%), inventory (18.0%), defects (16.1%), motion (15.2%), and transportation (13.3%). To mitigate these issues, several operational improvements are recommended: recording and accounting for all production activities, creating standard operating procedures, redesigning the facility layout to optimise material handling, reducing work-in-process, transitioning to semi-automatic machinery, providing additional material-handling tools such as wheelbarrows or hand trucks, establishing formal production scheduling, and accurately forecasting consumer demand to prevent overproduction.

Author Contributions

Conceptualization, formal analysis, writing—review and editing I.P.; resources, data curation, software, writing—original draft preparation Y.M.D.; methodology M.N.A.R. All authors have read and agreed to the published version of the manuscript.

Funding

Research funding for this project was provided by the Universitas Muhammadiyah Surakarta, Hibah Integrasi Tridarma (HIT), Contract Number: 079/A.3-III/FT/III/2021.

Institutional Review Board Statement

The study was conducted in accordance with the Declaration of Helsinki and approved by the Institutional Review Board (or Ethics Committee) of Universitas Muhammadiyah Surakarta.

Data Availability Statement

The data presented in this study are available on request from the corresponding author due to the presence of personal information.

Conflicts of Interest

The authors declare no conflicts of interest.

Abbreviations

The following abbreviations are used in this manuscript:
VSMValue Stream Mapping
WAMWaste Assessment Model
PCEProcess Cycle Efficiency
WAQWaste Assessment Questionnaire

References

  1. Fauziah, Y.; Wijaya, E.O.; Setiawan, I.; Nugroho, B.H. Improving the efficiency of material transfer system using Value Stream Mapping (VSM): A case study in the shoe industry. J. Ind. Serv. 2022, 8, 181–186. [Google Scholar] [CrossRef] [Scilit]
  2. Setiawan, I.; Tumanggor, O.S.P.; Purba, H.H. Value Stream Mapping: Literature Review and Implications for Service Industry. Qual. Innov. Prosper. 2022, 8, 155–166. [Google Scholar] [CrossRef] [Scilit]
  3. Setiawan, I.; Kurnia, H.; Wahid, M.; Purba, H.H. Implementasi Metode Value Stream Mapping Pada Industri: Tinjauan Literatur Sistematis. Ina. J. Ind. Qual. Eng. 2022, 10, 103–116. [Google Scholar] [CrossRef] [Scilit]
  4. Indriati, M.Y.; Rasi, R.Z.; Setiaji, B.; Hadiwinata, S.D. Identifying and Eliminating Waste in a Coal Mining Industry: The Value Stream Mapping Analysis. Int. J. Sustain. Constr. Eng. Technol. 2023, 14, 290–304. [Google Scholar] [CrossRef] [Scilit]
  5. Komariah, I. Penerapan Lean Manufacturing Untuk Mengidentifikasi Pemborosan (Waste) Pada Produksi Wajan Menggunakan Value Stream Mapping (Vsm) Pada Perusahaan Primajaya Alumunium Industri Di Ciamis. J. Media Teknol. 2022, 8, 109–118. [Google Scholar] [CrossRef] [Scilit]
  6. Pratiwi, I.; Romadhoni, R.F. Analysis of Worker Posture on the Crosscut Machine Using the RULA Method in the Raw Material Division at CV. Valasindo Sentra Usaha. Eng. Proc. 2025, 84, 79. [Google Scholar] [CrossRef] [Scilit]
  7. Che Ani, M.N.; Razali, M.A.; Rhaffor, K.A. The effectiveness of Value Stream Mapping (VSM) as an improvement tool for the manufacturing operation. Appl. Mech. Mater. 2014, 575, 905–909. [Google Scholar] [CrossRef] [Scilit]
  8. Antonio, T.; Anggara, S.S.; Sedubun, E.; Nurhaliza, S.F.; Setiawan, R.; Setiawan, I.; Azzahra, S. Literature review using the concept of Value Stream Mapping in the manufacturing industry. J. Ind. Serv. 2023, 9, 37. [Google Scholar] [CrossRef] [Scilit]
  9. Langstrand, J. An Introduction to Value Stream Mapping and Analysis; Linköping University: Linköping, Sweden, 2016; pp. 1–28. [Google Scholar]
  10. Amal, M.I.; Mahbubah, N.A. Integrating Lean Implementation and Relayout Design for Efficiency Improvement. J. Ilm. Tek. Ind. 2022, 21, 240–252. [Google Scholar] [CrossRef] [Scilit]
  11. Zulfikar, A.M.; Rachman, T. Penerapan Value Stream Mapping Dan Process Activity Mapping Untuk Identifikasi Dan Minimasi 7 Waste Pada Proses Produksi Sepatu X Di Pt. Pai. J. Inovisi 2020, 16, 13–24. [Google Scholar]
  12. Osterling, M.; Martin, K. Value Stream Mapping-How to Visualize Work and Align Leadership for Organizational Transformation; Mc Graw Hill Education: New York, NY, USA, 2014. [Google Scholar]
  13. Satria, T. Perancangan Lean Manufacturing dengan Menggunakan Waste Assessment Model (WAM) dan VALSAT untuk Meminimumkan Waste (Studi Kasus: PT. XYZ). J. Rekayasa Sist. Ind. 2018, 7, 55. [Google Scholar] [CrossRef] [Scilit][Green Version]
  14. Nurlaelah. Implementasi Value Stream Mapping Pada Perumahan Sederhana Di Indonesia; Penerbit Institut Teknologi Kalimantan (ITK) Press: Balikpapan, Indonesia, 2023. [Google Scholar]
  15. Pradana, A.Y. Peningkatan Produktivitas Produksi Kain Batik Menggunakan Metode Lean Dan Kaizen Di Umkm Sanggar Batik Jumputan Maharani. J. Disprotek 2020, 11, 1–6. [Google Scholar] [CrossRef] [Scilit]
  16. Tambunan, R.A.; Handayani, N.U.; Puspitasari, D. Penerapan Lean Manufacturing menggunakan Value Stream Mapping (VSM) untuk Identifikasi Waste & Performance Improvement Pada UKM ‘Shoes and Care’. Ind. Eng. Online J. 2017, 6, 1–6. [Google Scholar]
  17. Alfiansyah, R.; Kurniati, N. Identifikasi Waste dengan Metode Waste Assessment Model dalam Penerapan Lean Manufacturing untuk Perbaikan Proses Produksi (Studi Kasus pada Proses Produksi Sarung Tangan). J. Tek. ITS 2018, 7, 1–6. [Google Scholar] [CrossRef] [Scilit]
  18. Andri, A.; Sembiring, D. Penerapan Lean Manufacturing Dengan Metode VSM (Value Sream Mapping) untuk Mengurangi Waste Pada Proses Produksi Pt.XYZ. Fakt. Exacta 2019, 11, 303. [Google Scholar] [CrossRef] [Scilit]
  19. Lubis, D.A.; Pujangkoro, S.; Hidayati, J. Lean Approach to Minimize Waste in Biscuit Production Process Using Value Stream Mapping Method at PT. XYZ. J. Sist. Tek. Ind. 2024, 26, 120–127. [Google Scholar] [CrossRef] [Scilit]
  20. Setiawan, S.; Setiawan, I.; Jaqin, C.; Prabowo, H.A.; Purba, H.H. Integration of waste assessment model and lean automation to improve process cycle efficiency in the automotive industry. Qual. Innov. Prosper. 2021, 25, 48–64. [Google Scholar] [CrossRef] [Scilit]
  21. Kiatcharoenpol, T.; Chaosamthong, K.; Rawirangsun, P.; Klongboonjit, S. A lean manufacturing approach to waste minimization: A case of industrial rack plant. Edelweiss Appl. Sci. Technol. 2024, 8, 7750–7763. [Google Scholar] [CrossRef] [Scilit]
  22. Subandi; Darunanto, D.; Sumirahwati; Wahyuni, R.E.; Saidah, D.; Binarti, I. Implementation of the Lean Manufacturing Concept to Reduce Waste in Spare Part Repair Activities at PT. X. Int. J. Sci. Soc. 2023, 5, 10–18. [Google Scholar] [CrossRef] [Scilit]
  23. Irawan, A.; Putra, B.I. Identifikasi Waste Kritis Pada Proses Produksi Pallet Plastik Menggunakan Metode WAM (Waste Assessment Model) Di PT. XYZ. J. SENOPATI Sustain. Ergon. Optim. Appl. Ind. Eng. 2021, 3, 20–29. [Google Scholar] [CrossRef] [Scilit]
  24. Mauluddin, Y.; Marwah, S. Reducing Manufacturing Lead Time with Lean Manufacturing Approach Case Study: CV Suho Garmindo. Jhss J. Humanit. Soc. Stud. 2023, 7, 97–101. [Google Scholar] [CrossRef] [Scilit]
  25. Fatinnisa, G.A.; Saifuddin, J.A. Analysis of Value Stream Mapping (VSM) in the Application of Lean Manufacturing to Minimize Waste at PT. Karya Indah Medika. Ind. J. Ind. Eng. Manag. 2024, 5, 234–243. [Google Scholar] [CrossRef] [Scilit]
  26. Fajriah, N.; Mahfud, H. Analysis and Minimization of Waste in the Production Area of PT. XYZ with Lean Manufacturing Approach and System Simulation Seven Waste Questionnaire Ranking and. J. Ilm. Tek. Ind. 2023, 22, 229–233. [Google Scholar]
  27. Anugrah, M.; Emsosfi, R.Z. Usulan Pengurangan Waste Proses Produksi Menggunakan Waste Asessment Model Dan Value Stream Mapping Di Pt. X. J. Online Inst. Teknol. Nas. 2016, 4, 110–120. [Google Scholar]
  28. Fernando, Y.C. Optimasi Lini Produksi dengan Value Stream Mapping dan Value Stream Analysis Tools. J. Ilm. Tek. Ind. 2014, 13, 125–133. [Google Scholar]
  29. Nugroho, D.S.; Nandiroh, S. Analisis Penerapan Lean manufacturing Sepeda Listrik di Perusahaan X Menggunakan Metode VSM dan VALSAT; Simp. Nas. RAPI XXI-2023 FT UMS; Universitas Muhammadiyah Surakarta: Sukoharjo, Indonesia, 2023; pp. 265–273. [Google Scholar]
  30. Aprianto, T.; Nuryono, A.; Setiawan, I.; Kurnia, H.; Purba, H.H. Waste Analysis in the Speaker Box Assy Process to Reduce Lead Time in the Electronic Musical Instrument Industry. Qual. Innov. Prosper. 2022, 26, 53–65. [Google Scholar] [CrossRef] [Scilit]
  31. Ganesan, J.; Subramaniyan, S.K.; Ibrahim, M.R.; Fu, H. Implementation of Lean Manufacturing to Improve Production Efficiency: A Case Study of Electrical and Electronic Company in Malaysia. J. Sustain. Manuf. Transp. 2023, 2, 56–65. [Google Scholar] [CrossRef] [Scilit]
  32. Pasha, V.S.; Chin, J. Combination of value stream mapping (VSM) method and kanban system to reduce time waste in the production process of making parts for the four-wheel vehicle industry. Oper. Excell. J. Appl. Ind. Eng. 2024, 16, 76–89. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.