Perturb-and-Observe PTO Force Control for Grid-Connected Wave Energy Converters with BESS-Based Power Smoothing

and
1
Electrical, Computer and Biomedical Engineering Department, Abu Dhabi University, Al Ain P.O. Box 112612, United Arab Emirates
2
Electrical and Communication Engineering Department, United Arab Emirates University, Al Ain P.O. Box 15551, United Arab Emirates
*
Author to whom correspondence should be addressed.

Abstract

Wave energy converters (WECs) must simultaneously maximize the energy absorbed from an irregular sea and deliver it to the grid as a smooth, standards-compliant power flow—two objectives that conventional PTO controllers address only partially. This paper proposes an adaptive perturb-and-observe (P&O) power-take-off (PTO) force-control strategy for a grid-connected, battery-supported heaving point-absorber WEC, and evaluates it within a complete wave-to-grid model. Unlike damping-only P&O schemes, the proposed coordinated dual-objective algorithm adaptively tunes both the PTO damping and the reactive stiffness coefficient online, using a Hilbert-envelope-based absorbed-power objective and a normalized excitation-force–velocity alignment metric, thereby retuning the device towards resonance without requiring hydrodynamic impedance information for PTO parameter optimization or wave-force prediction. The machine-side converter, a DC link with an integrated battery energy storage system (BESS), and a grid-side converter complete the wave-to-grid chain. The proposed dual-parameter P&O (DP-PO) strategy is benchmarked against damping-only P&O (D-PO), FLL-based resistive loading (FLL-RL), and scaled approximate complex-conjugate (S-ACC) control across three JONSWAP sea states. DP-PO attains the highest capture width ratio in SS1 and SS2 (up to 0.380) and achieves comparable performance to S-ACC in SS3 (0.253 versus 0.257), at the cost of higher peak PTO force, buoy excursion, and storage utilization, while the BESS-supported system achieves a power smoothing index of 0.855–0.925 under DP-PO across the investigated sea states. The results quantify a clear, multi-criteria trade-off and show that model-assisted PTO parameter adaptation can achieve competitive energy capture relative to a scaled model-based reactive-control benchmark within a grid-connected system.

1. Introduction

Ocean waves are among the largest and most consistent untapped renewable resources, offering a high, comparatively predictable energy density relative to wind and solar [1]. Despite its estimated power potential of approximately 0.5 TW [2], wave energy remains pre-commercial, constrained by a levelized cost still well above that of competing technologies [3]. Two coupled challenges dominate the path to competitiveness: maximizing the energy captured from an irregular, broadband sea, and delivering it to the grid as a stable, standards-compliant power flow [4]. The oscillatory, highly variable nature of wave power makes the second challenge acute, since unmitigated fluctuations degrade power quality and complicate grid compliance [5].
Among device concepts, the heaving point absorber with a direct-drive permanent-magnet linear generator (PMLG) has attracted sustained interest for its structural simplicity and the elimination of intermediate hydraulic stages [6,7,8]. In such devices, the extracted energy is governed almost entirely by control of the PTO, which must actively shape the reaction force to match the device dynamics to the prevailing sea state [9]. A broad spectrum of PTO control strategies has been investigated [10,11]. Passive (resistive) loading extracts power through pure damping—simple and robust, but capturing only a fraction of the available energy off-resonance [12]. Reactive, complex-conjugate or impedance-matching control adds a stiffness term that retunes the device towards resonance and can maximize capture [13,14], but its performance hinges on an accurate hydrodynamic model and, in non-causal form, on knowledge of the future wave excitation. Optimization-based schemes such as latching and model predictive control (MPC) achieve near-optimal capture [15,16,17,18], at the price of a reliable internal model, short-term wave-force prediction and appreciable online computation.
These limitations motivate model-free, self-optimizing controllers that adjust the PTO parameters online without a plant model or wave forecast. Extremum-seeking and perturb-and-observe (P&O) maximum power point tracking schemes, well established in photovoltaic and wind systems, have been adapted to wave energy [19,20]. Most reported implementations, however, adjust only the damping coefficient: They can maximize absorption for a given phase but cannot correct the excitation–velocity phase mismatch that dominates capture away from resonance. Extending such schemes to jointly tune both the damping and the reactive stiffness terms—relying only on measurable or estimated quantities such as the buoy velocity and the wave excitation force [21]—remains comparatively unexplored, and is rarely examined together with the downstream electrical conversion and grid interface.
Perturb-and-observe (P&O)-based control has been investigated for several wave energy converter principles. Adaptive energy-extraction control for a pivoted absorber is demonstrated in [22], while variable-step perturbations and steady-state detection for a gyroscopic WEC are investigated in [23]. In [24,25], P&O-based electrical load control strategies for hydraulic and direct-mechanical PTO systems are proposed, respectively. A rectifier-voltage-based P&O strategy with position protection is developed in [26], whereas a P&O algorithm for resonance tuning through adjustable sloshing dynamics is deployed in [27]. These studies demonstrate the versatility of P&O control in various WEC configurations, although their optimization objectives and manipulated variables differ from those of coordinated damping and stiffness control used in direct-drive heaving WECs. A more closely related recent study is [28], in which variable-step maximum power point tracking (MPPT) control to alternately adjust PTO damping and stiffness using mean generated electrical power as a common optimization objective is deployed. While this establishes the feasibility of dual-parameter adaptive reactive control, distinguishing the effects of damping and stiffness perturbations on WEC power capture remains challenging, particularly under irregular wave environments. Using generated electrical power as a common optimization objective for both coefficients combines the effects of hydrodynamic energy capture and electromechanical conversion, potentially complicating the interpretation of parameter perturbations under irregular wave excitation.
On the grid side, the pulsating power of even a well-controlled device must be conditioned before injection. Battery energy storage systems (BESSs), long used to smooth photovoltaic and wind output [29], are increasingly combined with WECs to buffer wave-to-wave fluctuations and present a smooth flow at the point of common coupling [30,31]. The grid-side converter performing this injection must remain synchronized under variable, potentially weak-grid conditions; the second-order generalized integrator with a frequency-locked loop (SOGI–FLL) provides robust, PLL-free synchronization and frequency estimation well suited to this role [32]. A single wave-to-grid architecture unifying adaptive PTO tuning, electrical conversion, storage-based smoothing and robust synchronization has, to date, received limited attention [33,34].
The proposed coordinated dual-objective P&O law adaptively and sequentially tunes the PTO damping and reactive stiffness online, using a Hilbert-envelope-based absorbed-power objective and a normalized excitation-force–velocity alignment metric, thereby retuning the device towards resonance without requiring hydrodynamic impedance information for PTO parameter optimization or wave-force prediction. The term adaptive is used in the self-optimizing, extremum-seeking sense. Although the developed P&O algorithm does not explicitly demand the identification of hydrodynamic impedance coefficients, the overall control method is model-assisted because an extended Kalman filter (EKF) is required to estimate the hydrodynamic excitation force and buoy heave velocity in real time using electrical measurements. The strategy is embedded in, and evaluated as part of, a complete wave-to-grid chain. The main contributions are as follows:
  • A coordinated dual-objective P&O algorithm that sequentially and adaptively tunes the PTO damping and stiffness coefficients online, tracking the resonance condition without requiring hydrodynamic impedance information for PTO parameter optimization or wave-force prediction.
  • A complete grid-connected wave-to-wire model coupling the PMLG and its machine-side converter to a grid-synchronized grid-side converter through a DC link with an integrated BESS, enabling grid-quality power delivery.
  • A comprehensive, multi-criteria benchmark of the proposed dual-parameter P&O (DP-PO) against damping-only P&O (D-PO), FLL-based resistive loading (FLL-RL), and scaled approximate complex-conjugate (S-ACC) control across three JONSWAP sea states, quantifying energy capture, efficiency, power quality, mechanical loading and storage utilization.
The remainder of the paper is organized as follows. Section 2 develops the wave-to-grid model. Section 3 presents the control architecture, and Section 4 details the adaptive P&O PTO strategy. Section 5 reports the results across the three sea states, Section 6 discusses them, and Section 7 concludes.

2. Wave-to-Grid Model

In this study, a single-body heaving wave energy converter (WEC) with a submerged hemispherical buoy and a seabed-mounted PTO is modeled, as visualized in Figure 1. The PTO system consists of a PMLG, corresponding power converters drivetrain, and a BESS unit. The forces acting on the WEC’s buoy are described using the Cummins equation as follows [35]:
F e ( t ) − F r ( t ) − F b ( t ) − F s ( t ) − F d ( t ) + F c ( t ) = m a b ( t ) ,
where F e ( t ) , F r ( t ) , F b ( t ) , F s ( t ) , F d ( t ) , and F c ( t ) are the wave excitation, radiation, hydrostatic buoyancy, restoring, viscous drag and PTO control forces, respectively. Here, m and a b ( t ) are the combined mass of the buoy and PMLG translator and the buoy heave acceleration, respectively.
Figure 1. Conceptual drawing of the system.
The d- and q-axis synchronous reference frame model of the PMLG is described as shown below [33]:
d i s d ( t ) d t = − R s L s i s d ( t ) + π v b ( t ) p w i s q ( t ) + 1 L s v s d ( t ) ,
d i s q ( t ) d t = − R s L s i s q ( t ) − π v b ( t ) p w i s d ( t ) + ψ p m L s + 1 L s v s q ( t ) ,
where i s d ( t ) and i s q ( t ) represent the d–q axis components of the PMLG’s stator current and v s d ( t ) and v s q ( t ) are the d–q axis components of the stator’s terminal voltage. The parameters R s , L s , ψ p m , and p w are the stator resistance, stator inductance, permanent-magnet flux linkage, and armature pole width, respectively. The PMLG’s controlled electromagnetic force F c ( t ) is a function of the q-axis component of the stator current [5]:
F c ( t ) = 3 π ψ p m 2 p w i s q ( t ) .
The WEC’s buoy–wave interaction and the PMLG dynamics can be lumped into a more compact form using a multi-input, multi-output (MIMO) state-space representation. Here, x ( t ) = [ z b ( t ) , v b ( t ) , l ( t ) , i s d ( t ) , i s q ( t ) ] ⊤ ∈ R 8 is the system’s state vector, u ( t ) = [ v s d ( t ) , v s q ( t ) ] ⊤ ∈ R 2 is the system’s input vector, and y ( t ) = [ z b ( t ) , v b ( t ) , i s d ( t ) , i s q ( t ) ] ⊤ ∈ R 4 is the output vector. Therefore, the system’s state-space representation in the matrix form is
x ˙ ( t ) = A x ( t ) + B u ( t ) + W ( x ( t ) ) ,
y ( t ) = C x ( t ) .
Here, the state-space matrices A ∈ R 8 × 8 , B ∈ R 8 × 2 , and C ∈ R 4 × 8 define the nominal linear dynamics, whereas the function W : R n → R n captures the system’s nonlinear dynamics and external disturbances (i.e., wave excitation force F e ( t ) ). Here, K r denotes the mechanical restoring spring stiffness of the buoy–PMLG assembly, while K h = ρ g π R b 2 represents the hydrostatic restoring stiffness of the buoy. The state matrices A r ∈ R 4 × 4 , B r ∈ R 4 × 1 , and C r ∈ R 1 × 4 represent the radiation force model [36].   
A = 0 1 0 1 × 14 0 0 − ( π ρ g R b 2 + K r ) m + m i n f 0 − C r m + m i n f 0 3 π ψ p m 2 p w ( m + m i n f ) 0 B r A r 0 0 0 0 0 1 × 4 − R s L s 0 0 − π ψ p m L s p w 0 1 × 4 0 − R s L s , B = 0 0 0 0 0 4 × 1 0 4 × 1 1 L s 0 0 1 L s , W ( x ( t ) ) = 0 F e ( t ) − 0.5 π ρ R b 2 D d | x 2 ( t ) − v s | ( x 2 ( t ) − v s ) m + m i n f 0 4 × 1 π x 2 ( t ) x 5 ( t ) p w − π x 2 ( t ) x 4 ( t ) p w , C = 1 0 0 1 × 4 0 0 0 1 0 1 × 4 0 0 0 0 0 1 × 4 1 0 0 0 0 1 × 4 0 1 .
The converted PMLG electrical real power P s ( t ) and reactive power Q s ( t ) are evaluated using the d–q axis variables as follows [33]:
P s ( t ) = 3 2 v s d ( t ) i s d ( t ) + v s q ( t ) i s q ( t ) ,
Q s ( t ) = 3 2 v s d ( t ) i s q ( t ) − v s q ( t ) i s d ( t ) .

2.1. Grid-Side System Model

The WEC injects the captured wave energy into the grid by means of a two-level, three-phase voltage-source converter (VSC), referred to in this paper as the grid-side converter (GSC). In this work, the GSC functions in a grid-following (GFL) model, where a phase-locked loop (PLL) is deployed to synchronize the GSC with the grid. Therefore, the grid governs the frequency and voltage at the point of common coupling (PCC). Apart from real power exchange, the GSC is also responsible for regulating the DC-link capacitor voltage. The d–q synchronous-frame model of the GFL-VSC is represented as [34]
d i g d ( t ) d t = − R g L g i g d ( t ) + ω g i g q ( t ) + e g d ( t ) L g − 1 L g v g d ( t ) ,
d i g q ( t ) d t = − R g L g i g q ( t ) − ω g i g d ( t ) − 1 L g v g q ( t ) ,
where i g d ( t ) and i g q ( t ) are the GSC output direct and quadrature current components. Meanwhile, v g d ( t ) , v g q ( t ) , and e g d ( t ) are GSC output direct voltage, quadrature voltage, and the grid direct voltage component, respectively. The parameters R g , L g , and ω g represent the grid-side resistance, inductance, and angular frequency at the PCC, respectively. Assuming the GSC is operating at unity power factor (i.e., i g q ( t ) = 0 ), the real and reactive powers fed into the grid as a function of GSC d–q voltage and current components are
P g ( t ) = 3 2 e g d ( t ) i g d ( t ) ,
Q g ( t ) = 0 .
Current control loops govern power injection, while the grid voltage serves as the reference to maintain synchronization and operational stability, which is a fundamental trait of grid-following VSCs.

2.2. DC-Link and BESS Model

The real power balance equation at the DC-link capacitance is
P d c ( t ) = P s ( t ) − P g ( t ) + P b e s s ( t ) ,
where P d c ( t ) and P b e s s ( t ) are the instantaneous DC-link and BESS powers. The real power exchange between the BESS and the system’s back-to-back converter is expressed as
P b e s s ( t ) = v d c ( t ) i b e s s , d c ( t ) ,
where i b e s s , d c ( t ) represents the DC-link side BESS current. The power balance equation can be further decomposed as follows [34]:
d v d c ( t ) d t = 3 2 C d c v d c ( t ) ( v s d ( t ) i s d ( t ) + v s q ( t ) i s q ( t ) − v g d ( t ) i g d ( t ) − v g q ( t ) i g q ( t ) ) + i bess , dc ( t ) C d c .
The battery state of charge ( S O C ) at time t is computed as
S O C ( t ) = S O C ( t o ) − η Q r ∫ t o t i b e s s ( τ ) d τ ,
where S O C 0 , Q r , and η are the battery initial state of charge, battery rated capacity in Ah, and battery charging/discharging efficiency, respectively [29]. The parameter η is given by
η = 0.9 , on charging 1.1 , on discharging
The motion of the PMLG’s translator, and hence of the WEC buoy, is actively manipulated by means of the machine-side converter (MSC), which is a three-phase, three-leg voltage-source converter. The three-phase voltages at the PMLG stator circuit terminals are synthesized as a function of the DC-link voltage V d c ( t ) .

3. Control Strategy Design

The proposed control strategy is a hierarchical control architecture that is organized into four coordinated layers that together convert the incoming reciprocating wave power into a smooth grid-friendly power injection (Figure 2). At the PMLG side, a two-level VSC acts as the machine-side converter (MSC), where the DC-link voltage is synthesized into three-phase PMLG terminal voltages, which in turn regulate the electromagnetic PTO force F c ( t ) , actively altering the WEC’s buoy velocity. The reference signal for this control force is issued by the proposed adaptive P&O PTO tuning layer, discussed in Section 4, which sets the instantaneous damping and stiffness coefficients required for the MSC to produce the desired reactive PTO force.
Figure 2. Overall configuration and control architecture of the WEC.
A supervisory estimation layer provides the feedback that the tuning layer needs without additional sensors, as the buoy velocity and the wave excitation force are estimated from electrical and motion measurements by means of an extended Kalman filter (EKF). From these estimates, the velocity envelope V env (an absorbed-power proxy) and the normalized excitation-force–velocity correlation C F v (a phase-alignment metric) are derived. The motion of the PMLG’s translator, and hence of the WEC buoy, is actively manipulated by means of the stator-side converter, which is a three-phase, three-leg voltage-source converter. The three-phase voltages at the PMLG stator circuit terminals can be synthesized as a function of the DC-link voltage V d c . A three-phase, two-level voltage-source converter (2L-VSC) is deployed as an MSC to control the PMLG, which in turn controls the motion of the WEC buoy as shown in Figure 2. Buoy reciprocating frequency is estimated using a second-order generalized integrator with a frequency-locked loop (SOGI–FLL) using the estimated outputs of the extended Kalman filter (EKF), as described in Section 4.5. At the grid side, a three-phase GSC is utilized to transfer the WEC’s instantaneous captured power to the grid at unity power factor (i.e., a grid-following converter scheme), while simultaneously regulating the DC-link voltage. Finally, the battery energy storage system (BESS) is interfaced with the DC-link voltage through a bidirectional DC-DC converter to compensate for the instantaneous mismatch between the reciprocating WEC-captured power and the scheduled grid power, resulting in a smoothed-out power delivery at the grid’s point of common coupling (PCC).

4. Control Strategies and Implementation

4.1. Coordinated Dual-Parameter P&O Formulation

For a heaving point-absorber WEC, the PTO force is, in the purely dissipative case, synthesized as a linear damping force,
F c ( t ) = − B v b ( t ) ,
where B is the PTO damping coefficient (N·s/m) and v b ( t ) is the buoy heave velocity (m/s). The instantaneous mechanical power extracted by the PTO is
P ( t ) = − F c ( t ) v b ( t ) = B v b 2 ( t ) .
The average WEC-absorbed power over a time interval T is therefore
P ¯ = 1 T ∫ 0 T B v b 2 ( t ) d t .
Accordingly, maximizing absorbed power requires consideration of both the PTO damping coefficient and the resulting buoy velocity response. To facilitate phase correction, the PTO force is expressed in damping–stiffness form,
F c ( t ) = − B v b ( t ) + K z b ( t ) ,
where − B v b ( t ) represents the dissipative component responsible for energy extraction from the incoming waves, while K z b ( t ) represents the reactive component providing stiffness compensation for phase tuning. Within the proposed control framework, adjusting B and K aims at maximizing an envelope-based absorbed-power objective and improving excitation-force–velocity alignment, respectively.
The velocity envelope V env , employed in the damping optimization loop, is obtained from the Hilbert transform of the EKF-estimated buoy velocity. For a velocity signal v ( t ) , the Hilbert transform H { v } ( t ) and the analytic signal of the input are evaluated as follows:
H { v } ( t ) = 1 π p . v . ∫ − ∞ ∞ v ( τ ) t − τ d τ , v a ( t ) = v ( t ) + j H { v } ( t ) = V env ( t ) e j φ v ( t ) ,
so that the instantaneous envelope and phase are
V env ( t ) = | v a ( t ) | = v 2 ( t ) + H { v } 2 ( t ) , φ v ( t ) = arg v a ( t ) .
For a locally harmonic velocity response, the squared envelope is related to the mean squared velocity through v 2 ¯ ≈ V env 2 / 2 . Accordingly, the damping optimization objective is reformulated as
J B ( t ) = 1 2 B ( t ) V env 2 ( t ) .
The deployed objective function explicitly accounts for the damping coefficient and therefore provides a physically grounded approximation of absorbed mechanical power. Furthermore, the Hilbert-envelope representation suppresses the inherent intra-cycle oscillations associated with the reciprocating velocity, providing a smoother feedback quantity for supervisory P&O adaptation. Under irregular wave excitation, the objective is evaluated over a finite observation interval to reduce sensitivity to stochastic amplitude fluctuations.
The reactive stiffness adaptation is governed by a normalized force–velocity alignment objective. This approach evaluates the normalized zero-lag correlation between the estimated excitation force F e and buoy velocity v b :
C F v ( t ) = ∫ t − T c t F e ( τ ) v b ( τ ) d τ ∫ t − T c t F e 2 ( τ ) d τ ∫ t − T c t v b 2 ( τ ) d τ ,
where T c is the correlation observation window, set to 35 s in the present implementation. The corresponding stiffness objective is defined as
J K ( t ) = 1 − C F v ( t ) ,
which is minimized to improve excitation-force–velocity alignment and reduce the effective reactive mismatch [14]. The normalized correlation provides a broadband alignment indicator rather than a unique time-delay or frequency-resolved phase estimate.
The proposed coordinated dual-parameter P&O (DP-PO) framework (Algorithm 1) provides an adaptive approach for real-time PTO coefficient tuning by alternately optimizing B and K. Power maximization is implemented through the damping loop, where the controller perturbs B and evaluates the resulting envelope-based power objective J B , maintaining the perturbation direction when the objective increases and reversing it otherwise. Similarly, the reactive stiffness loop perturbs K and evaluates the force–velocity alignment objective J K , maintaining the perturbation direction when the objective decreases and reversing it otherwise.
Algorithm 1 Coordinated Dual-Parameter P&O-Based Adaptive PTO Tuning
Require: 
V env ( k ) , J K ( k ) , ω ^ ( k ) , T s
Require: 
Δ B , Δ K , N B , N K , N set , N avg , coefficient bounds
Ensure: 
B opt , K opt
  1:
Initialize B ← B 0 , K ← K 0
  2:
Initialize d B , d K ← + 1
  3:
Set optimization phase ← B
  4:
while system is operating do
  5:
  J B ( k ) ← 1 2 B V env 2 ( k )
  6:
 if  ω ^ ( k ) > 0.2 and finite then
  7:
   T ^ w ← min ( 12 , max ( 3 , 2 π / ω ^ ( k ) ) )
  8:
 else
  9:
   T ^ w ← 7 s
10:
 end if
11:
  T set ← N set T ^ w
12:
  T avg ← N avg T ^ w
13:
 if phase = B  then
14:
  Hold K constant
15:
   J prev ← Evaluate ( J B , T set , T avg )
16:
  for  i = 1 to N B  do
17:
    B ← BoundedPerturb ( B , d B Δ B )
18:
    J curr ← Evaluate ( J B , T set , T avg )
19:
   if  J curr < J prev  then
20:
     d B ← − d B
21:
   end if
22:
    J prev ← J curr
23:
  end for
24:
  phase ← K
25:
 else
26:
  Hold B constant
27:
   J prev ← Evaluate ( J K , T set , T avg )
28:
  for  i = 1 to N K  do
29:
    K ← BoundedPerturb ( K , d K Δ K )
30:
    J curr ← Evaluate ( J K , T set , T avg )
31:
   if  J curr > J prev  then
32:
     d K ← − d K
33:
   end if
34:
    J prev ← J curr
35:
  end for
36:
  phase ← B
37:
 end if
38:
  B opt ← B
39:
  K opt ← K
40:
end while
To mitigate the interaction between damping and stiffness adaptation, the revised algorithm employs a coordinated alternating optimization scheme rather than two independently operating search loops. During damping adaptation, K remains fixed, whereas during stiffness adaptation, B remains fixed. Each perturbation follows a settling and averaging procedure before the objective is compared with its previous value. The settling and averaging intervals are determined from the dominant wave period estimated by the frequency-locked loop (FLL), allowing the observation duration to adapt to changing wave conditions. In the implemented controller, five estimated wave periods are allocated for settling, followed by three periods for objective averaging.
The optimization alternates between six damping perturbations and three stiffness perturbations, with a new objective baseline established at the beginning of each phase. Bounded updates maintain the PTO coefficients within [ B min , B max ] and [ K min , K max ] , respectively, to moderate actuator (i.e., PMLG + MSC) loading and excessive buoy oscillations. The perturbation step sizes and observation intervals are selected to balance adaptation speed, sensitivity to stochastic wave fluctuations, and steady-state oscillations around favorable operating conditions. The resulting coordinated dual-objective strategy aims to improve absorbed-power performance while maintaining stable reactive stiffness adaptation under varying sea states.
In Algorithm 1, Evaluate ( · ) denotes the objective evaluation after the prescribed settling interval and subsequent averaging period, whereas BoundedPerturb ( · ) applies a signed parameter perturbation subject to the specified coefficient bounds. A new objective baseline is established at the beginning of each damping or stiffness optimization phase.
It is important to distinguish between the completely model-free nature of the P&O searching algorithm in the proposed DP-PO control strategy and the model-based estimation stage deployed to estimate the excitation force and buoy heave velocity by means of an extended Kalman filter (EKF). These estimates are then used to evaluate the DP-PO optimization objectives.

4.2. PTO Control

Whatever machine-side strategy is used, its output is a desired PTO force F c * ( t ) that the machine-side converter (MSC) must realize on the PMLG translator. For the proposed strategy, this force is produced by the adaptive P&O algorithm described in Section 4.1, F c * ( t ) = − B ( t ) v ( t ) + K ( t ) z ( t ) , where B ( t ) and K ( t ) are updated online by Algorithm 1. As formulated in Equation (4), the PTO force command is mapped to a q-axis current reference as
i s q * ( t ) = 2 p w 3 π ψ p m F c * ( t ) , i s d * ( t ) = 0 ,
where the d-axis current reference is set to zero, signaling that the full PMLG stator current is devoted to electromagnetic force production, resulting in maximum force per ampere and minimum copper losses [34].
The two current commands are tracked in the synchronous d–q frame by proportional–integral (PI) current regulators augmented with cross-coupling decoupling and a motional back-EMF feed-forward, as shown in Figure 2. With the PMLG’s stator current errors defined as e s d = i s d * − i s d and e s q = i s q * − i s q , the stator terminal voltage commands are
v s d ( t ) = K p d s 1 + 1 τ d s s e s d ( t ) − π p w v b ( t ) L s q i s q ( t ) ,
v s q ( t ) = K p q s 1 + 1 τ q s s e s q ( t ) + π p w v b ( t ) L s d i s d ( t ) + π ψ p m p w v b ( t ) ,
where K p d s , K p q s are the proportional gains, τ d s , τ q s the integral time constants, v b ( t ) the translator (buoy) velocity, and L s d , L s q the d–q inductances. The terms π p w v b L s q i s q and π p w v b L s d i s d cancel the speed-dependent cross-coupling between the axes in Equations (2) and (3), while π ψ p m p w v b compensates the motional back-EMF. With these terms, each axis reduces to a decoupled first-order plant 1 / ( L s s + R s ) , so the PI regulators can be tuned independently; choosing τ d s = τ q s = L s / R s cancels the electrical pole and yields a first-order closed-loop current response whose bandwidth is set by the proportional gain. The regulated voltages are synthesized by the two-level MSC through pulse-width modulation, so that i s q tracks i s q * and the PMLG delivers the commanded PTO force.

4.3. Grid-Side Converter Control

The grid-side converter (GSC) performs two functions: It regulates the DC-link voltage and controls the active power injected into the grid. An outer DC-link voltage loop compares V d c ( t ) with its reference V d c * and, through a PI controller, sets the d-axis grid current reference i g d * ( t ) that balances the power exchanged with the DC link; because the injected active power satisfies P g = 3 2 e g d ( t ) i g d ( t ) under grid-voltage orientation, this loop directly governs the power delivered to the PCC. The q-axis reference is set to i g q * = 0 to enforce near-unity power factor (i.e., grid-following mode). Two inner PI current loops track i g d * and i g q * , with decoupling terms ± ω g L g i g q , g d and grid-voltage feed-forward e g d to reject cross-coupling and disturbances, producing the GSC voltage commands. To provide the reference frame required for grid synchronization and dq-axis current control, a standard phase-locked loop (PLL) is deployed to estimate the grid phase angle ( θ g ) and angular frequency ( ω g ) from the measured three-phase PCC voltages. Since the BESS absorbs the instantaneous generation–delivery mismatch at the DC link, the GSC d-axis reference can be held close to a slowly varying set point, which is what renders the injected current, and hence P g , smooth.
The BESS-based power smoothing strategy adopts the adaptive power dispatch approach reported in [34]. Rather than imposing a fixed grid-power reference, the strategy dynamically generates the reference as a scaled version of the moving-average absorbed mechanical power:
P g * ( t ) = Θ ( t ) P ¯ m ( t ) ,
where P ¯ m ( t ) is the moving-average mechanical power and Θ ( t ) is an adaptive scaling factor determined by the BESS state of charge (SOC):
Θ ( t ) = a + b 1 + exp [ − λ ( SOC ( t ) − 0.5 ) ] ,
where a and b determine the scaling range and λ controls the steepness of the sigmoid function. Accordingly, higher SOC values permit greater power dispatch to the grid, whereas lower SOC values reduce the grid-power reference to limit battery discharge. The corresponding BESS power command is calculated as
P bess * ( t ) = P g * ( t ) − P e ( t ) ,
where P e ( t ) is the converted electrical power. The BESS absorbs excess converted power when P e > P g * and supplies the deficit when P e < P g * , thereby mitigating the inherent power fluctuations associated with irregular wave excitation. An SOC-dependent curtailment mechanism is additionally employed to prevent excessive charging and discharging, as detailed in [34].

4.4. Benchmark Control Strategies

To benchmark the developed P&O MSC control strategies, two non-search-based, wave-frequency-dependent control strategies are deployed: frequency-locked-loop-based resistive loading (FLL-RL) and scaled approximate complex-conjugate (S-ACC) control. Both strategies are based on the principle of impedance matching, where the controlled PMLG force is generally expressed as
F c ( t ) = − Z i * ( ω ) v b ( t ) ,
where Z i ( ω ) is the frequency-dependent intrinsic impedance of the wave-buoy system, expressed as [37]
Z i ( ω ) = B r ( ω ) + j ω m + M a ( ω ) − K h + K r ω 2 ,
where B r ( ω ) , M a ( ω ) , and K h denote the frequency-dependent radiation damping, added mass, and buoyancy stiffness coefficient, respectively. The hydrodynamic coefficients B r ( ω ) and M a ( ω ) are obtained for the investigated buoy geometry using WAMIT [38].
For the FLL-RL strategy, the intrinsic impedance is modified to realize a purely resistive PTO response, thereby avoiding the excessive buoy excursions and actuator force demands potentially associated with unconstrained reactive control. The modified impedance is expressed as
Z RL ( ω ) = | Z i ( ω ) | ,
where
| Z i ( ω ) | = B r 2 ( ω ) + ω ( m + M a ( ω ) ) − K h + K r ω 2 .
To provide an additional model-based reactive-control benchmark, the S-ACC strategy is introduced. Unlike FLL-RL, S-ACC incorporates both damping and reactive stiffness components, with their coefficients calculated as
B S - ACC ( ω ) = min B max A C C , max B min A C C , α B B r ( ω ) ,
K S - ACC ( ω ) = min K max A C C , max K min A C C , − α K ω 2 [ m + M a ( ω ) ] − K h − K r ,
where α B = 25 and α K = 0.5 represent the damping augmentation and reactive stiffness attenuation factors, respectively. The S-ACC damping and stiffness coefficients are constrained to B S - ACC ∈ [ 2 × 10 4 , 2 × 10 5 ] N·s/m and K S - ACC ∈ [ − 3 × 10 5 , 3 × 10 5 ] N/m, respectively. The resulting PTO force is given by
F c ( t ) = − B S - ACC ( ω ) v b ( t ) + K S - ACC ( ω ) z b ( t ) .
The scaling factors were manually tuned through preliminary simulations to moderate the aggressive response associated with conventional complex-conjugate control. Specifically, the coefficients were adjusted to maintain acceptable buoy excursions and PTO force demands consistent with the operating capabilities of the PMLG, power converters, and BESS, while facilitating smooth power delivery to the grid under the tested sea states. This arrangement also aims to reduce excessive bidirectional reactive-power exchange and the associated peak power-handling requirements. Accordingly, S-ACC serves as an empirically scaled, model-based reactive-control benchmark rather than a theoretically optimal impedance-matching controller.
For polychromatic sea states, the wave frequency is nonstationary, and consequently the hydrodynamic coefficients B r ( ω ) and M a ( ω ) vary with time. In both benchmark strategies, the combination of an extended Kalman filter (EKF) and a second-order generalized integrator with a frequency-locked loop (SOGI–FLL) is employed to estimate the dominant buoy-motion frequency as a proxy for the wave excitation frequency, as described in Section 4.5. For S-ACC, the estimated angular frequency is constrained to the range 0.4–1.5 rad/s, while the resulting damping and stiffness coefficients are restricted to their prescribed bounds.

4.5. Second-Order Generalized Integrator with Frequency-Locked Loop (SOGI–FLL)

The second-order generalized integrator with a frequency-locked loop (SOGI–FLL) is deployed to extract the fundamental component of the reciprocating mechanical motion and estimate its dominant frequency. In the present system, the input to the SOGI–FLL is the displacement of the buoy-coupled permanent-magnet linear generator (PMLG) translator, as estimated by an extended Kalman filter (EKF) using electrical measurements [39]. For regular or narrowband wave conditions, the dominant translator oscillation frequency closely tracks the dominant incoming-wave frequency, ω m . The estimated frequency is required to evaluate the frequency-dependent hydrodynamic radiation coefficients (i.e., B r ( ω m ) and M a ( ω m ) ) and calculate the desired power-take-off (PTO) force using the resistive loading strategy. The SOGI structure generates two orthogonal components of the EKF-estimated buoy displacement signal, while the FLL adaptively estimates the dominant angular frequency of the buoy’s reciprocating motion. In contrast to conventional phase-locked-loop schemes, the SOGI–FLL does not require explicit phase detection and provides robust frequency estimation under frequency variations, measurement noise, and distorted reciprocating motion.
The input signal is assumed to be the estimated PMLG translator/buoy displacement, expressed as
z b ( t ) = Z b sin θ m ( t ) , θ ˙ m ( t ) = ω m ( t ) ,
where ( Z b ) is the amplitude of the buoy/translator displacement, ( θ m ( t ) ) is the mechanical oscillation phase, and ( ω m ( t ) ) denotes the time-varying angular frequency of the buoy–translator reciprocating motion. The SOGI dynamics are described by two state variables, q 1 ( t ) and q 2 ( t ) , representing the in-phase and quadrature components of the estimated fundamental signal [32,40]:
q 1 ( t ) = z ^ α ( t ) , q 2 ( t ) = z ^ β ( t ) ω ^ m ( t ) .
The continuous-time state-space representation of the SOGI is given by
q ˙ 1 ( t ) = − k ω ^ m ( t ) q 1 ( t ) − ω ^ m 2 ( t ) q 2 ( t ) + k ω ^ m ( t ) z ( t ) , q ˙ 2 ( t ) = q 1 ( t ) ,
where k denotes the SOGI gain and ω ^ m ( t ) is the estimated angular frequency. The orthogonal SOGI outputs are obtained as
z ^ α ( t ) = q 1 ( t ) , z ^ β ( t ) = ω ^ m ( t ) q 2 ( t ) .
The frequency-locked loop adapts the estimated frequency by minimizing the estimation error between the input signal and the SOGI in-phase output, defined as
e ( t ) = z b ( t ) − q 1 ( t ) .
The FLL adaptation law is expressed as
ω ^ ˙ m ( t ) = γ e ( t ) q 2 ( t ) ,
where γ is the FLL adaptation gain determining the convergence speed and noise sensitivity of the frequency estimation process. When the SOGI dynamics are combined with the FLL adaptation law, the complete nonlinear time-domain state-space model of the SOGI–FLL estimator can be written as
q ˙ 1 ( t ) = − k ω ^ m ( t ) q 1 ( t ) − ω ^ m 2 ( t ) q 2 ( t ) + k ω ^ m ( t ) z b ( t ) , q ˙ 2 ( t ) = q 1 ( t ) , ω ^ ˙ m ( t ) = γ z b ( t ) − q 1 ( t ) q 2 ( t ) .
This formulation represents a nonlinear estimator due to the multiplicative coupling between the estimated frequency and the state variables. In practice, the SOGI gain is commonly selected as k = 2 to achieve a compromise between dynamic response and filtering capability, while the FLL gain γ must be carefully tuned to ensure fast frequency tracking without amplifying measurement noise. In this study, γ is set to −0.05. Owing to its simplicity, robustness, and natural state-space representation, the SOGI–FLL estimator has been extensively employed in grid synchronization, power quality monitoring, and renewable energy conversion systems [40].

5. Results

5.1. Simulation Setup

The simulations were conducted in MATLAB/Simulink R2024b with a fixed sampling time of 2 ms and a simulation duration of 2800 s, on a personal computer with an Intel Core i7-13800H processor and 32 GB of RAM. The developed coordinated dual-parameter P&O (DP-PO) control strategy was benchmarked against three control strategies. The first is the damping-only P&O (D-PO) strategy, which is essentially the DP-PO strategy without the reactive stiffness component. The second benchmark is the scaled approximate complex-conjugate (S-ACC) strategy, which represents a modified impedance-matching-based reactive-control approach. The third is the frequency-locked-loop-based resistive loading (FLL-RL) strategy, which also represents a damping-only force-control strategy similar in nature to D-PO. For a fair comparison, all benchmark strategies (i.e., D-PO, S-ACC, and FLL-RL) were carefully tuned to achieve favorable power-capture performance under the investigated sea states, with their respective operating constraints taken into account. The simulation duration was extended to 2800 s to accommodate the relatively slow adaptation dynamics of the proposed coordinated P&O control strategy under irregular sea states, allowing multiple damping and stiffness optimization cycles to evolve. For visual clarity of the WEC hydrodynamic and PTO electric time-domain responses, a representative 800 s window is shown along with a further zoomed 320–400 s interval. In contrast, the PTO coefficient adaptation and cumulative energy profiles are displayed across the full 2800 s. Three polychromatic sea states (Table 1) were used to evaluate the performance of the WEC system under the investigated control strategies. The deployed polychromatic sea states are modeled using the JONSWAP spectrum [41]:
S ( ω ) = α g 2 ω 5 exp − 5 4 ω p ω 4 γ w exp − ( ω − ω p ) 2 2 σ 2 ω p 2 ,
where ω represents the angular frequency in rad/s, while the parameters ω p , γ w , α , σ , and g are the wave peak angular frequency, peak-enhancement factor, Phillips constant, spectral-width parameter, and gravitational acceleration, respectively.
Table 1. Wave sea state classification.

5.2. Performance Evaluation Metrics

To comprehensively evaluate the effectiveness of the proposed coordinated dual-parameter perturb-and-observe (DP-PO) PTO force-control strategy for the grid-connected wave energy converter (WEC) integrated with a battery energy storage system (BESS), several power-based performance metrics were utilized. These metrics quantify the energy-extraction capability of the WEC, the effectiveness of the electromechanical conversion stages, the role of the BESS in mitigating power fluctuations, and the quality of power delivered to the utility grid. The excitation power, denoted by P e x , represents the instantaneous mechanical power transferred to the buoy by the wave excitation force and is calculated using the excitation force and buoy velocity. The absorbed mechanical power P m quantifies the useful mechanical power captured by the PTO system through the interaction between the PTO control force and buoy velocity, accounting for both dissipative and reactive force components. Comparing P m with P e x provides insight into the effectiveness of the proposed adaptive P&O force-control strategy in improving wave energy absorption, although excitation power is not equivalent to the total incident wave power.
The converted electrical power P e is evaluated at the generator-side converter using the synchronous d q -frame electrical quantities. This metric reflects the effectiveness of the electromechanical conversion process and the associated converter control system. Meanwhile, the BESS power P b e s s is determined from the DC-link voltage and battery current, allowing the charging and discharging behavior of the energy storage system to be assessed. Positive values of P b e s s correspond to battery discharging operation, whereas negative values indicate charging operation.
The final useful power delivered to the utility grid is represented by the grid power P g , which is computed from the grid-side converter quantities in the synchronous reference frame. This metric is essential for evaluating the stability and smoothness of the exported power under fluctuating wave conditions. Since the BESS can contribute to or absorb power over the simulation interval, the delivered grid power is assessed alongside the converted electrical power and net BESS energy exchange to distinguish wave-generated energy from stored-energy contributions.
In addition to instantaneous power analysis, cumulative energy metrics were employed to evaluate the long-term energy transfer characteristics of the system. The cumulative energy associated with any power quantity P x ( t ) can generally be expressed as
E x ( t ) = ∫ 0 t P x ( τ ) d τ
where E x ( t ) denotes the accumulated energy corresponding to the selected power component P x ( t ) . Accordingly, the cumulative excitation energy, absorbed mechanical energy, converted electrical energy, net BESS energy exchange, and delivered grid energy were evaluated by integrating their respective instantaneous power quantities over the simulation interval of 2800 s. These energy-based metrics provide a comprehensive assessment of the overall energy flow through the system, from hydrodynamic excitation to final grid delivery, while also enabling quantitative evaluation of the proposed adaptive control strategy and BESS-based power smoothing approach across the four investigated control strategies. The mathematical definitions of the key performance indicators (KPIs) used in the comparative assessment are summarized in Table 2. The parameters used in the MATLAB/Simulink wave-to-grid model and control system are summarized in Table 3.
Table 2. Definitions of the key performance indicators used for comparing the investigated PTO control strategies.
Table 3. Parameters used in the MATLAB/Simulink wave-to-grid model and control system.

5.3. Time-Domain Performance

The complete wave-to-grid operation of the WEC under the proposed DP-PO control strategy, with the WEC excited by upper moderate sea state SS2 ( H s = 2 m and T p = 7 s ), is demonstrated in Figure 3, Figure 4, Figure 5, Figure 6 and Figure 7. This extends from the wave-buoy hydrodynamic response, through the WEC PTO and the underlying coordinated online control-parameter adaptation, to the grid-side electrical interface at the point of common coupling (PCC), supported by the BESS for smooth power delivery to the electric grid. Combined, they demonstrate how the reciprocating power of an irregular sea is mechanically absorbed, electrically captured, conditioned and injected into the grid as a useful high-quality energy flow.
Figure 3. Buoy heave response for the DP-PO strategy in sea state SS2 ( H s = 2.0 m, T p = 7 s): (a) displacement z [m] over an 800 s window of the full record; (b) the corresponding zoomed window; (c) velocity z ˙ [m/s] over an 800 s window of the full record; and (d) the corresponding zoomed window. The dashed rectangle in (a,c) indicates the interval shown zoomed in (b,d).
Figure 4. PTO force generation and control-parameter adaptation for the DP-PO strategy in sea state SS2 ( H s = 2.0 m, T p = 7 s): (a) wave excitation force F e x and PTO force F u [kN] over an 800 s window of the full record and (b) the corresponding zoomed window.
Figure 5. Grid-side converter (GSC) d q -axis voltage and current components for the DP-PO strategy in sea state SS2 ( H s = 2.0 m, T p = 7 s): (a) the d q -axis grid voltage components V g d and V g q over an 800 s window of the full record; (b) the corresponding zoomed window (320–400 s); (c) the d q -axis grid current components I g d and I g q over an 800 s window of the full record; and (d) the corresponding zoomed window (320–400 s).
Figure 6. Power-flow and storage behavior for the WEC system in sea state SS2 ( H s = 2.0 m, T p = 7 s): (a) the instantaneous power components—excitation power P e x , mechanical (PTO) power P m , generator/electrical power P e , grid power P g , and storage power P b e s s —over an 800 s window of the full record; (b) the corresponding zoomed window (320–400 s); (c) the battery energy storage system (BESS) state of charge (SOC); and (d) BESS SOC in the corresponding zoomed window (320–400 s).
Figure 7. Long-term adaptive PTO control and cumulative energy transfer under the proposed DP-PO strategy in sea state SS2 ( H s = 2.0 m, T p = 7 s): (a) evolution of the PTO damping coefficient B and reactive stiffness coefficient K and (b) cumulative excitation, absorbed mechanical, converted electrical, and grid-delivered energies over the 2800 s simulation period.
The hydrodynamic response is summarized in Figure 3. The buoy heave displacement z exhibits a distinct amplitude and time-varying phase relationship with the incident wave elevation η (Figure 3a,b). Although their amplitudes are broadly comparable, the buoy does not follow the free-surface elevation one-to-one, reflecting the combined influence of the hydrodynamic response, restoring stiffness, and PTO control action under irregular wave excitation. The buoy velocity response and its EKF-based estimate are compared in Figure 3c,d. The estimated velocity closely tracks the actual buoy velocity throughout the illustrated interval, reproducing the irregular oscillations with negligible visible phase lag and amplitude deviation. This is crucial as these estimates are utilized in generating the velocity envelope and the normalized correlation used in the proposed coordinated P&O control strategy. The commanded PTO force F c is large and of comparable magnitude to the wave excitation force F e , and in the zoomed window, it is clearly phase-shifted relative to F e (Figure 4b). This bidirectional, reactive forcing is the mechanism by which the proposed strategy adjusts the effective resonance of the buoy towards the dominant wave period and thereby improves capture, at the price of higher instantaneous mechanical loading. The grid-side interface is characterized in Figure 5. The synchronized grid-side converter (GSC) maintains a stable synchronous-frame interface: The d-axis voltage v g d is regulated at approximately 450 V with a small q-axis component v g q (Figure 5a,b), consistent with grid-voltage orientation. The grid current is delivered almost entirely on the d-axis, with the q-axis current i g q ≈ 0 (Figure 5c,d), so the converter injects active power at close to unity power factor. After the initial start-up transient, i g d settles to a low-ripple, quasi-steady value that tracks the delivered active power; indeed, P g ≈ 3 2 e g d I g d recovers the corresponding delivered grid power. The clean, essentially flat zoomed traces confirm that the grid injection remains stable and of high quality even while the upstream captured power fluctuates strongly.
The payoff of the architecture is made explicit in Figure 6. The instantaneous power components (Figure 6a,b) reveal the strongly pulsating nature of wave power: The excitation, mechanical and converted powers ( P e x , P m , and P e ) exhibit large positive peaks and negative excursions within each wave group, whereas the delivered grid power P g remains substantially smoother. The battery absorbs or supplies power P b e s s to compensate for the instantaneous mismatch, so that the volatile generation is decoupled from the smoother grid delivery—the core smoothing function of the BESS, and the reason for the high power smoothing index obtained for this case. The grid-power reference is adaptively determined from the moving-average absorbed mechanical power and an SOC-dependent scaling factor, allowing the power dispatch to respond to the available wave energy and battery energy level.
One important observation about the results shown in Figure 6 concerns the relationship between the delivered energy E g , converted energy E e , and excitation energy E e x . The delivered energy may exceed the converted energy over the finite simulation window, which at first sight appears inconsistent. The explanation lies in the storage: The battery can provide a net energy contribution over the analysis interval, as reflected in the corresponding state-of-charge evolution (Figure 6d). The smooth grid output may therefore be sustained partly by drawing down stored energy rather than by instantaneous generation alone. Consequently, the converted power P e should be regarded as the electrical generation associated with the WEC, while the delivered power P g additionally reflects the contribution of the BESS and intervening conversion losses. Over a longer, charge-neutral horizon, the storage would need to be periodically replenished for a sustained delivery level to be maintained; the SOC trajectory thus provides a direct indication of the energy-management and battery-sizing requirements associated with the smoothing objective.
Figure 7 illustrates the long-term behavior of the proposed DP-PO strategy over the complete 2800 s simulation period. As shown in Figure 7a, the PTO damping and reactive stiffness coefficients evolve through successive perturbation steps, reflecting the coordinated alternating optimization process under irregular wave excitation. The gradual coefficient adjustments highlight the relatively slow adaptation dynamics of the proposed controller and motivate the extended simulation duration. Meanwhile, Figure 7b presents the cumulative energy transfer through the wave-to-grid conversion chain. The increasing energy trajectories demonstrate sustained energy absorption, electrical conversion, and grid delivery throughout the simulation, while the differences between the energy components reflect the conversion stages and the contribution of the BESS to grid-side power management.
In summary, the SS2 results demonstrate a coherent wave-to-grid operation under the DP-PO strategy: state estimation enables a coordinated, reactive, self-tuning PTO force that improves capture; the electrical conversion and grid-synchronized GSC deliver this power to the grid stably and at near-unity power factor; and the BESS smooths the intrinsically pulsating wave power through adaptive SOC-dependent power dispatch, with the associated storage participation defining the energy-management requirements.

5.4. Multi-Criteria Performance Comparison

Figure 8 traces the mean power through successive stages of the wave-to-wire chain—absorbed, converted and delivered—for the four control strategies in each sea state over a 2800 s simulation run. The proposed DP-PO strategy achieves the highest absorbed power in SS1 and SS2 (13.0 and 23.5 kW, respectively), compared with 5.8 and 9.4 kW for D-PO, 9.0 and 18.8 kW for S-ACC, and 5.4 and 10.4 kW for FLL-RL. In SS3, S-ACC achieves a marginally higher absorbed power (41.0 kW) than DP-PO (40.3 kW), while both substantially outperform the damping-only strategies. The step from absorbed to converted power is relatively small for all four strategies, corresponding to an electromechanical conversion efficiency of approximately 84– 90 % . The strategies therefore differ chiefly in their hydrodynamic capture rather than their electrical conversion: The reactive stiffness component in DP-PO and S-ACC improves the effective impedance match and facilitates greater mechanical power absorption. The drivetrain subsequently converts the absorbed power with comparable effectiveness across the benchmark controllers.
Figure 8. Mean power at successive stages of the wave-to-wire conversion chain—absorbed, converted and delivered—for the four control strategies (DP-PO, D-PO, S-ACC, and FLL-RL) in each sea state: (a) SS1 ( H s = 1.5 m, T p = 6 s); (b) SS2 ( H s = 2.0 m, T p = 7 s); and (c) SS3 ( H s = 3.0 m, T p = 7 s).
A notable feature of the cascade is that the absorbed power increases with the significant wave height, with the energetic sea state SS3 yielding the highest absolute power for all four strategies. Nevertheless, the increase in absorbed power is not proportional to the available incident wave energy, reflecting the strong frequency dependence of the buoy response. The device operates under three sea states with peak periods of T p = 6 –7 s, where the interaction between the incident wave spectrum and the tunable device dynamics governs the achievable power capture. Although SS1 has the lowest significant wave height, its shorter peak period (6 s) provides a more favorable frequency match, resulting in the highest capture width ratio for the proposed DP-PO strategy (CWR = 0.380 ). In SS2 and SS3, where the peak period increases to 7 s, the corresponding CWR decreases to 0.331 and 0.253 , respectively, despite the higher absolute absorbed power. Reactive control mitigates the frequency mismatch by adjusting the effective stiffness and shifting the buoy response towards the dominant wave period. Consequently, DP-PO maintains a substantial capture advantage over the damping-only strategies, while S-ACC provides a competitive model-based reactive benchmark, particularly in SS3. Captured power is thus governed by both the available wave energy and the match between the sea-state spectrum and the tunable device dynamics—an important consideration when sizing and tuning the converter for a target deployment site.
Finally, the relationship between converted and delivered power varies across the sea states and control strategies, reflecting the contribution of the BESS over the analysis window. In SS1, delivered power exceeds converted power for all four strategies, indicating a net contribution from stored energy after accounting for the intervening power exchanges and losses. In SS2 and SS3, the relationship is less uniform, with some strategies exhibiting delivered power below the converted power. The converted power therefore provides a more direct indication of the electrical generation associated with each PTO strategy, whereas the delivered power additionally reflects BESS charging/discharging, conversion losses and the adopted grid-side power-management strategy. Accordingly, comparisons of wave-energy capture are primarily based on absorbed mechanical power and CWR rather than mean grid power alone.
Figure 9 synthesizes the multi-criteria performance of the four machine-side control strategies—dual-parameter P&O (DP-PO), damping-only P&O (D-PO), scaled approximate complex-conjugate control (S-ACC), and FLL-based resistive loading (FLL-RL)—across the three JONSWAP sea states, with the corresponding magnitudes collected in Table 4. Every radar axis is normalized within each sea state so that an outward position, and hence a larger polygon, denotes better performance; the five cost-oriented axes (peak PTO force, peak heave displacement, PTO peak-to-average force ratio, SOC excursion and peak BESS power) are reversed accordingly.
Figure 9. Eight-axis KPI radar comparison of the four machine-side control strategies for the following three sea states, with an outward position on any given axis denoting better performance: (a) SS1 ( H s = 1.5 m, T p = 6 s); (b) SS2 ( H s = 2.0 m, T p = 7 s); and (c) SS3 ( H s = 3.0 m, T p = 7 s).
Table 4. Actual values of the eight performance metrics visualized in the radar of Figure 9. Arrows denote the preferred direction. CWR is the capture width ratio; P ¯ g is the mean power delivered to the grid; F ^ P T O , z ^ and P ^ b e s s are the peak PTO force, heave displacement and BESS power; PARF is the PTO peak-to-average force ratio; SI is the power smoothing index; and ΔSOC is the state-of-charge excursion.
Across SS1 and SS2, DP-PO attains the largest capture width ratio (CWR) and the highest mean grid power, demonstrating the effectiveness of coordinated damping and reactive stiffness adaptation in improving wave-energy capture. The margin is particularly evident in SS1, where DP-PO reaches a CWR of 0.380 and delivers 12.5 kW, against 0.169 / 8.0 kW for D-PO, 0.263 / 10.2 kW for S-ACC, and 0.157 / 7.1 kW for FLL-RL. In SS2, DP-PO maintains the highest CWR ( 0.331 ), followed by S-ACC ( 0.265 ), FLL-RL ( 0.147 ), and D-PO ( 0.133 ). As the sea state becomes more energetic, the capture width ratio decreases for every strategy, reaching 0.253 for DP-PO and 0.257 for S-ACC in SS3. In this sea state, S-ACC marginally outperforms DP-PO in both CWR and absorbed power, while also achieving a slightly higher mean grid power ( 29.1 versus 28.5 kW). Nevertheless, both reactive strategies consistently outperform the damping-only benchmarks in mechanical energy capture (Table 4).
The radar makes equally clear that the enhanced capture achieved by the reactive strategies carries a mechanical and storage penalty. DP-PO generally drives the buoy through larger excursions and demands higher peak PTO forces and BESS power than the damping-only strategies. In SS1, its peak heave displacement of 1.315 m is approximately 2.8 times that of FLL-RL ( 0.469 m), while its peak BESS power of 170.3 kW is approximately four times that of FLL-RL ( 41.8 kW). The same general trend is observed in SS2 and SS3, where DP-PO reaches peak heave excursions of 1.821 and 2.549 m, respectively. The corresponding peak PTO forces increase from 241.8 kN in SS1 to 377.1 and 423.1 kN in SS2 and SS3. By comparison, S-ACC achieves lower peak excursions and PTO forces than DP-PO in all three sea states, while retaining competitive energy-capture performance. This reflects the moderated reactive response introduced through its scaled damping and stiffness coefficients. For the investigated WEC configuration, a maximum allowable PMLG translator displacement of ± 3 m is assumed as a mechanical design constraint. The maximum simulated heave displacement under the proposed DP-PO strategy is 2.549 m in SS3, remaining within the assumed stroke limit. The corresponding peak displacements in SS1 and SS2 are 1.315 and 1.821 m, respectively.
The operating constraints of the investigated WEC system were assessed against the assumed PMLG, mechanical, and BESS ratings summarized in Table 3. The maximum allowable q-axis stator current was set to 200 A, corresponding to an electromagnetic PTO force capability of approximately 457 kN. Under the proposed DP-PO strategy, the maximum simulated PTO force reached 423.1 kN in SS3 (i.e., almost 93% utilization of the allowable PTO force capacity). This force is equivalent to a peak q-axis current of approximately 185.2 A. Furthermore, a maximum buoy displacement of 2.549 m was recorded under the same operating conditions and remained below the assumed ± 3 m translator stroke limit. Meanwhile, a maximum BESS power demand of 171.9 kW was observed and remained below the BESS’s ± 200 kW rating. These results demonstrate that the reported peak demands remained below the assumed design ratings across the investigated control strategies and sea environments. Nevertheless, detailed hardware-level verification, including thermal and converter operating constraints, remains necessary for practical implementation.
The benchmark strategies occupy different regions of the trade-off space. FLL-RL, applying a purely dissipative force, consistently produces the lowest peak heave displacement, reaching 0.469 , 0.686 , and 1.009 m in SS1–SS3, respectively, but generally captures the least mechanical energy. D-PO provides the most conservative PTO force loading, achieving the lowest peak PTO force in every sea state ( 74.6 , 106.4 , and 117.9 kN), because its damping-only action avoids the additional reactive force demands. S-ACC provides an intermediate operating point, combining substantial reactive energy capture with lower peak mechanical loading than DP-PO. Its peak PTO force ranges from 149.8 kN in SS1 to 367.1 kN in SS3, compared with 241.8 – 423.1 kN for DP-PO. Notably, S-ACC also achieves the lowest SOC excursion in SS3 ( 0.111 ), while maintaining the highest absorbed power and CWR in that sea state.
The power smoothing index and PTO peak-to-average force ratio exhibit comparatively smaller differences among the strategies. The SI ranges from 0.686 to 0.892 in SS1, 0.789 to 0.925 in SS2, and 0.855 to 0.915 in SS3. DP-PO achieves the highest SI in SS1 and SS2 ( 0.892 and 0.925 ), whereas FLL-RL achieves the highest value in SS3 ( 0.915 ). Meanwhile, the PTO peak-to-average force ratio remains within approximately 3.2 – 4.7 across the investigated cases. These results indicate that grid-side power smoothing depends on the interaction between the machine-side strategy and BESS operation, rather than on the PTO controller alone. The differences in SOC excursion and peak BESS power further highlight the importance of considering storage participation when assessing grid-side performance.
Taken together, these results show that the choice of machine-side control strategy is a multi-objective decision rather than a search for a single dominant solution. The proposed DP-PO strategy offers the highest mechanical energy capture in SS1 and SS2 and maintains competitive performance in SS3, demonstrating the effectiveness of coordinated damping and stiffness adaptation. However, this advantage is accompanied by higher peak mechanical and storage demands, particularly under energetic sea conditions. The S-ACC benchmark provides a more moderated model-based reactive alternative, achieving comparable or slightly higher capture performance in SS3 with reduced peak PTO force and buoy excursion. Where mechanical stress, storage sizing or capital cost dominates the design objective, the damping-only strategies offer more conservative operating points at a quantifiable penalty in captured energy. The observed peak demands must therefore be assessed against the specified PTO, PMLG, converter and BESS ratings to establish physical feasibility. Read together with the tabulated magnitudes, the radar allows these trade-offs to be assessed transparently on a per-sea-state basis.

6. Discussion

The results support the central hypothesis of the paper: that a model-assisted PTO adaptation strategy can recover much of the capture benefit conventionally associated with model-based reactive control, provided it is allowed to tune the reactive as well as the dissipative part of the PTO force. The comparison with the scaled approximate complex-conjugate (S-ACC) benchmark further demonstrates the competitiveness of the proposed dual-parameter P&O (DP-PO) strategy under varying sea conditions. Three findings deserve emphasis.
First, the advantage of DP-PO over the damping-only strategies is primarily a hydrodynamic one, realized upstream of the electrical chain. Because the absorbed-to-converted step remains relatively consistent (≈84– 90 % ) across the four controllers, the gains in converted power largely track the gains in mechanical capture, which in turn reflect the reactive term’s ability to retune the device towards resonance. This is consistent with impedance-matching and complex-conjugate control theory [14,37], but is obtained here without requiring a hydrodynamic model to analytically determine the optimal PTO coefficients or a wave-force forecast. Instead, the proposed controller employs an envelope-based absorbed-power objective and a normalized excitation-force–velocity alignment index, both evaluated online using estimated signals. Although the EKF-based estimation layer relies on the WEC/PMLG model, the PTO parameter adaptation itself does not require explicit hydrodynamic impedance identification. The device therefore behaves as an adaptively tuned absorber while retaining a model-free PTO optimization mechanism—the practical distinction that motivates the approach relative to MPC and non-causal reactive control [15,16]. Notably, DP-PO achieves higher mechanical capture than S-ACC in SS1 and SS2, while S-ACC marginally outperforms DP-PO in SS3, demonstrating that the proposed strategy remains competitive with a moderated model-based reactive benchmark.
Second, the strong frequency dependence of capture—with absorbed power increasing from SS1 to SS3 while the capture width ratio decreases—underlines that, for a resonant point absorber, both the available wave energy and the match between the sea-state period and the tunable device dynamics govern the achievable performance. Although the energetic sea state SS3 yields the highest absolute absorbed power, SS1 provides the highest capture width ratio for DP-PO ( 0.380 ), compared with 0.331 and 0.253 in SS2 and SS3, respectively. With the device operating away from its uncontrolled heave resonance under the investigated sea states, its performance is influenced by the degree of frequency mismatch and the available reactive tuning authority. This has a concrete design implication: Capture is maximized not simply by sizing for the most energetic sea state but by tuning the device—and the reactive control authority—to the period band that dominates the target deployment site. Reactive control can broaden the effective frequency range over which useful capture is achieved, which is precisely where a model-free adaptive PTO tuning scheme is attractive, since the optimal coefficients need not be known a priori.
Third, the benefits come with quantified costs, and the multi-criteria view makes the trade-off explicit rather than hiding it behind a single figure of merit. DP-PO generally imposes the largest peak PTO force and buoy excursion, together with substantial SOC excursions and peak BESS power demands, because enforcing the reactive stiffness term requires larger bidirectional forces and buoy motion, and can increase the energy exchanged through the storage system. The choice of machine-side strategy is therefore a multi-objective decision: DP-PO is attractive when maximizing energy yield is the priority and the drivetrain, converter and battery are adequately rated for the associated peak loads. In the present simulations, DP-PO reaches peak PTO forces of up to 423.1 kN, buoy excursions of 2.549 m, and peak BESS power demands of approximately 172 kW, with SOC excursions ranging from 0.131 to 0.243 . The S-ACC strategy provides a more moderated reactive operating point, achieving comparable capture performance with lower peak PTO forces and buoy excursions, whereas the damping-only strategies offer more conservative mechanical loading at a quantifiable penalty in captured energy. These results highlight the need to assess the achievable capture gains alongside the physical PTO and power-conversion constraints.
A crucial system-level observation is that delivered-power quality depends strongly on the BESS smoothing controller, although the machine-side PTO strategy also influences the power fluctuations and storage demands. The smoothing index varies across controllers within each sea state, ranging from 0.686 to 0.892 in SS1, 0.789 to 0.925 in SS2, and 0.855 to 0.915 in SS3. This interaction is an important design consideration—it suggests that capture and power quality can be addressed through coordinated but distinct control layers, with the PTO layer enhancing energy absorption and the storage layer regulating grid-power fluctuations [29,31]. It also highlights the potential storage implications of reactive tuning: Larger instantaneous mechanical power variations may increase the power-handling requirements of the BESS, so PTO tuning and BESS sizing should be co-designed [30]. Furthermore, the delivered power reflects both converted WEC generation and battery participation; therefore, mean grid power alone cannot be used to rank the energy-capture effectiveness of the PTO strategies. The SOC drawdown observed over the analysis window is a manifestation of this coupling and a direct indicator of the energy-management horizon over which charge neutrality should be enforced.
The study has limitations that also frame future work. The comparison remains simulation-based, and the reactive advantage should be confirmed against additional constraint-aware model-based benchmarks and, ultimately, in wave-tank or field tests. Although S-ACC provides a model-based reactive reference, its scaling coefficients were selected empirically to moderate excessive mechanical and electrical demands and therefore do not represent an unconstrained theoretical optimum. Similarly, the DP-PO perturbation step sizes and observation intervals were tuned empirically and would benefit from a systematic convergence and stability analysis. The coordinated alternating adaptation reduces simultaneous perturbation interference but does not guarantee global optimality under broadband stochastic excitation. Finally, as discussed earlier, the DP-PO control framework is more of a model-assisted P&O control strategy than a genuine model-free search-based P&O algorithm, due to the fact that an extended Kalman filter (EKF) is deployed to estimate the buoy heave velocity and excitation force.

7. Conclusions

This paper proposed and evaluated an adaptive perturb-and-observe PTO force-control strategy for a grid-connected, BESS-supported heaving point-absorber WEC, within a complete wave-to-grid model. The distinguishing feature of the strategy is that it adaptively and coordinately tunes both the PTO damping and the reactive stiffness online—using a Hilbert-envelope-based absorbed-power objective and a normalized excitation-force–velocity alignment metric—and thereby retunes the device towards resonance without requiring hydrodynamic impedance information for PTO parameter optimization or wave-force prediction. Benchmarked against damping-only P&O, FLL-based resistive loading, and scaled approximate complex-conjugate (S-ACC) control across three JONSWAP sea states, the proposed dual-parameter P&O (DP-PO) attained the highest capture width ratio in SS1 and SS2 (up to 0.380 ), while achieving comparable performance to S-ACC in SS3 ( 0.253 versus 0.257 ). These gains over the damping-only strategies arose primarily from improved hydrodynamic capture, with the electromechanical conversion efficiency remaining relatively consistent across strategies. The improvement carried a quantified penalty in peak PTO force, buoy excursion, SOC excursion and peak BESS power, making the choice of machine-side strategy a multi-objective decision rather than a search for a single dominant solution. Finally, delivered-power quality was found to depend strongly on the BESS smoothing controller, while also being influenced by the PTO strategy and associated storage participation, highlighting the need for coordinated energy-capture and grid-side power management. Future work will address additional constraint-aware and experimental benchmarking, a formal convergence and stability analysis of the coordinated dual-objective P&O dynamics, and an energy-management layer enforcing long-horizon charge neutrality.

Author Contributions

Conceptualization, M.A.J. and A.W.; methodology, M.A.J.; software, M.A.J.; validation, M.A.J. and A.W.; formal analysis, M.A.J. and A.W.; investigation, M.A.J. and A.W.; resources, M.A.J.; writing—original draft preparation, M.A.J.; writing—review and editing, M.A.J.; visualization, M.A.J.; and supervision, M.A.J. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

The raw data supporting the conclusions of this article will be made available by the authors on request.

Acknowledgments

During the preparation of this manuscript, the authors used Anthropic’s Claude Opus 5 to improve the clarity, readability, and language of the manuscript. The authors have reviewed and edited the content as needed and take full responsibility for the content of this publication.

Conflicts of Interest

The authors declare no conflicts of interest.

Abbreviations

The following abbreviations are used in this manuscript:
2L-VSCTwo-level voltage-source converter
ACAlternating current
BESSBattery energy storage system
CWRCapture width ratio
DCDirect current
DP-PODual-parameter perturb-and-observe
D-PODamping-only perturb-and-observe
EKFExtended Kalman filter
EMFElectromotive force
FLLFrequency-locked loop
FLL-RLFrequency-locked-loop-based resistive loading
GFLGrid-following
GSCGrid-side converter
JONSWAPJoint North Sea Wave Project (spectrum)
KPIKey performance indicator
MIMOMulti-input, multi-output
MPCModel predictive control
MSCMachine-side converter
PARFPTO peak-to-average force ratio
PCCPoint of common coupling
P&OPerturb and observe
PIProportional–integral
PLLPhase-locked loop
PMLGPermanent-magnet linear generator
PTOPower take-off
RLResistive loading
S-ACCScaled approximate complex conjugate
SIPower smoothing index
SOCState of charge
SOGISecond-order generalized integrator
SOGI–FLLSecond-order generalized integrator with frequency-locked loop
VSCVoltage-source converter
W2GWave-to-grid
WECWave energy converter

References

  1. Satymov, R.; Bogdanov, D.; Dadashi, M.; Lavidas, G.; Breyer, C. Techno-economic assessment of global and regional wave energy resource potentials and profiles in hourly resolution. Appl. Energy 2024, 364, 123119. [Google Scholar] [CrossRef] [Scilit]
  2. Wahyudie, A.; Susilo, T.B.; Alaryani, F.; Nandar, C.S.A.; Jama, M.A.; Daher, A.; Shareef, H. Wave power assessment in the middle part of the southern coast of Java Island. Energies 2020, 13, 2633. [Google Scholar] [CrossRef] [Scilit]
  3. Guo, C.; Sheng, W.; De Silva, D.G.; Aggidis, G. A Review of the Levelized Cost of Wave Energy Based on a Techno-Economic Model. Energies 2023, 16, 2144. [Google Scholar] [CrossRef] [Scilit]
  4. Said, H.A.; Ringwood, J.V. Grid integration aspects of wave energy—Overview and perspectives. IET Renew. Power Gener. 2021, 15, 3045–3064. [Google Scholar] [CrossRef] [Scilit]
  5. Said, H.A.; García-Violini, D.; Ringwood, J.V. Wave-to-grid (W2G) control of a wave energy converter. Energy Convers. Manag. X 2022, 14, 100190. [Google Scholar] [CrossRef] [Scilit]
  6. Guo, B.; Wang, T.; Jin, S.; Duan, S.; Yang, K.; Zhao, Y. A Review of Point Absorber Wave Energy Converters. J. Mar. Sci. Eng. 2022, 10, 1534. [Google Scholar] [CrossRef] [Scilit]
  7. Ahamed, R.; McKee, K.; Howard, I. A Review of the Linear Generator Type of Wave Energy Converters’ Power Take-Off Systems. Sustainability 2022, 14, 9936. [Google Scholar] [CrossRef] [Scilit]
  8. Zhang, J.; Yu, H.; Chen, M. Direct-Drive wave energy conversion with linear generator: A review of research status and challenges. IET Renew. Power Gener. 2023, 17, 1020–1034. [Google Scholar] [CrossRef] [Scilit]
  9. Penalba, M.; Ringwood, J.V. A Review of Wave-to-Wire Models for Wave Energy Converters. Energies 2016, 9, 506. [Google Scholar] [CrossRef] [Scilit]
  10. Maria-Arenas, A.; Garrido, A.J.; Rusu, E.; Garrido, I. Control Strategies Applied to Wave Energy Converters: State of the Art. Energies 2019, 12, 3115. [Google Scholar] [CrossRef] [Scilit]
  11. Wahyudie, A.; Jama, M.A.; Assi, A.; Noura, H. Sliding mode and fuzzy logic control for heaving wave energy converter. In Proceedings of the 52nd IEEE Conference on Decision and Control, Florence, Italy, 10–13 December 2013; pp. 1671–1677. [Google Scholar]
  12. Ringwood, J.V.; Zhan, S.; Faedo, N. Empowering wave energy with control technology: Possibilities and pitfalls. Annu. Rev. Control 2023, 55, 18–44. [Google Scholar] [CrossRef] [Scilit]
  13. Vervaet, T.; Quartier, N.; Moreno, E.C.; Fernandez, G.V.; Ferri, F.; Stratigaki, V.; Troch, P. System identification and centralised causal impedance matching control of a row of two heaving point absorber wave energy converters. Ocean Eng. 2024, 309, 118399. [Google Scholar] [CrossRef] [Scilit]
  14. Gonzalez-Esculpi, A.; Verde, C.; Maya-Ortiz, P. Nonlinear impedance matching control for a submerged wave energy converter. IET Control Theory Appl. 2024, 18, 465–478. [Google Scholar] [CrossRef] [Scilit]
  15. Zhang, M.; Yu, S.R.; Zhao, G.W.; Dai, S.S.; He, F.; Yuan, Z.M. Model predictive control of wave energy converters. Ocean Eng. 2024, 301, 117430. [Google Scholar] [CrossRef] [Scilit]
  16. Demonte Gonzalez, T.; Anderlini, E.; Yassin, H.; Parker, G. Nonlinear Model Predictive Control of Heaving Wave Energy Converter with Nonlinear Froude–Krylov Forces. Energies 2024, 17, 5112. [Google Scholar] [CrossRef] [Scilit]
  17. Jama, M.; Wahyudie, A.; Assi, A.; Noura, H. Function-based model predictive control approach for maximum power capture of heaving wave energy converters. In ICREGA’14-Renewable Energy: Generation and Applications; Springer: Berlin/Heidelberg, Germany, 2014; pp. 299–313. [Google Scholar]
  18. Qin, H.; Su, H.; Wen, Z.; Liang, H. Latching control of a point absorber wave energy converter in irregular wave environments coupling computational fluid dynamics and deep reinforcement learning. Appl. Energy 2025, 396, 126282. [Google Scholar] [CrossRef] [Scilit]
  19. Dong, F.; Pan, S.; Gong, J.; Cai, Y. Maximum power point tracking control strategy based on frequency and amplitude control for the wave energy conversion system. Renew. Energy 2023, 215, 118973. [Google Scholar] [CrossRef] [Scilit]
  20. Yue, X.; Zhang, J.; Meng, F.; Liu, J.; Chen, Q.; Geng, D. Multi-Timescale Lookup Table Based Maximum Power Point Tracking of an Inverse-Pendulum Wave Energy Converter: Power Assessments and Sensitivity Study. Energies 2023, 16, 6195. [Google Scholar] [CrossRef] [Scilit]
  21. Davis, A.F.; Fabien, B.C. Wave excitation force estimation of wave energy floats using extended Kalman filters. Ocean Eng. 2020, 198, 106970. [Google Scholar] [CrossRef] [Scilit]
  22. Brando, G.; Coiro, D.P.; Coppola, M.; Dannier, A.; Del Pizzo, A.; Spina, I. Perturb and Observe Control for an Embedded Point Pivoted Absorber. Energies 2016, 9, 939. [Google Scholar] [CrossRef] [Scilit]
  23. Pei, Z.; Jing, H.; Tang, Z. Modeling and test results of an innovative gyroscope wave energy converter. Appl. Sci. 2021, 11, 4359. [Google Scholar] [CrossRef] [Scilit]
  24. Roh, C. Maximum power control algorithm for power take-off system based on hydraulic system for floating wave energy converters. J. Mar. Sci. Eng. 2022, 10, 603. [Google Scholar] [CrossRef] [Scilit]
  25. Ugaz Peña, J.C.; Medina Rodríguez, C.L.; Guarniz Avalos, G.O. Study of a new wave energy converter with perturb and observe maximum power point tracking method. Sustainability 2023, 15, 10447. [Google Scholar] [CrossRef] [Scilit]
  26. Wang, H.; Wu, W.; Fan, G.; Cui, L.; Blaabjerg, F. Maximum power point tracking control strategy for built-in direct-drive wave energy converter. Energy 2025, 329, 136692. [Google Scholar] [CrossRef] [Scilit]
  27. De Santo, A.; Vallone, A.; Leone, S.; Lago, F.; Selami, A.; Singh, H.; Romeo, G.; Mazzuca, P.M.; Carbone, G. Design and experimental validation of a novel passively tuned sloshing wave energy converter. Appl. Ocean Res. 2026, 176, 105277. [Google Scholar] [CrossRef] [Scilit]
  28. Elamin, A.Y.; Hashfi, T.B.; Mohamed, O.M.; Wahyudie, A.; Cahyadi, A.I.; Jama, M.A.; Laghari, M.S.; Khalil, R.A.; Mekhilef, S.; Abdrabou, A. A Control Architecture for Energy Management and Battery Integration in a Stand-Alone Heaving Wave Energy Converter. IEEE Access 2026, 14, 62618–62641. [Google Scholar] [CrossRef] [Scilit]
  29. Li, X.; Hui, D.; Lai, X. Battery Energy Storage Station (BESS)-Based Smoothing Control of Photovoltaic (PV) and Wind Power Generation Fluctuations. IEEE Trans. Sustain. Energy 2013, 4, 464–473. [Google Scholar] [CrossRef] [Scilit]
  30. Barelli, L.; Bidini, G.; Ciupageanu, D.A.; Ottaviano, A.; Pelosi, D.; Gallorini, F.; Alessandri, G.; Cruz, M.A. An effective solution to boost generation from waves: Benefits of a hybrid energy storage system integration to wave energy converter in grid-connected systems. Open Res. Eur. 2023, 2, 40. [Google Scholar] [CrossRef] [Scilit]
  31. Blanco, M.; Mazorra, L.; Villalba, I.; Navarro, G.; Nájera, J.; Lafoz, M. Power Smoothing in a Wave Energy Conversion Using Energy Storage Systems: Benefits of Forecasting-Enhanced Filtering for Reduction in Energy Storage Requirements. Appl. Sci. 2025, 15, 11106. [Google Scholar] [CrossRef] [Scilit]
  32. Xu, J.; Qian, H.; Hu, Y.; Bian, S.; Xie, S. Overview of SOGI-based single-phase phase-locked loops for grid synchronization under complex grid conditions. IEEE Access 2021, 9, 39275–39291. [Google Scholar] [CrossRef] [Scilit]
  33. Huang, X.; Lin, Z.; Chen, K.; Zhou, J.; Xiao, X. Improving Wave-to-Wire Efficiency of Direct-Drive Wave Energy Converters With Loss-Aware Model Predictive Control and Variable DC Voltage Control. IEEE Trans. Ind. Electron. 2025, 72, 1561–1570. [Google Scholar] [CrossRef] [Scilit]
  34. Jama, M.; Wahyudie, A.; Shareef, H.; Haque, M.E. Wave-to-grid hierarchical coordinated control with energy storage and management for point absorber wave energy converters. Energy Convers. Manag. X 2025, 27, 101125. [Google Scholar] [CrossRef] [Scilit]
  35. Penalba, M.; Ringwood, J.V. A high-fidelity wave-to-wire model for wave energy converters. Renew. Energy 2019, 134, 367–378. [Google Scholar] [CrossRef] [Scilit]
  36. Faedo, N.; Peña-Sanchez, Y.; Ringwood, J.V. Finite-order hydrodynamic model determination for wave energy applications using moment-matching. Ocean Eng. 2018, 163, 251–263. [Google Scholar] [CrossRef] [Scilit]
  37. Faedo, N.; Olaya, S.; Ringwood, J.V. Optimal control, MPC and MPC-like algorithms for wave energy systems: An overview. IFAC J. Syst. Control 2017, 1, 37–56. [Google Scholar] [CrossRef] [Scilit]
  38. WAMIT, Inc. WAMIT User Manual, version 7.4; WAMIT, Inc.: Chestnut Hill, MA, USA, 2020. Available online: http://www.wamit.com (accessed on 10 January 2020).
  39. Jama, M.; Wahyudie, A.; Mekhilef, S. Wave Excitation Force Estimation Using an Electrical-Based Extended Kalman Filter for Point Absorber Wave Energy Converters. IEEE Access 2020, 8, 49823–49836. [Google Scholar] [CrossRef] [Scilit]
  40. Cao, W.; Liu, K.; Kang, H.; Wang, S.; Fan, D.; Zhao, J. Resonance Detection Strategy for Multi-Parallel Inverter-Based Grid-Connected Renewable Power System Using Cascaded SOGI-FLL. Sustainability 2019, 11, 4839. [Google Scholar] [CrossRef] [Scilit]
  41. Zheng, X.; Lai, W.; Li, J.; Jing, F.; Rong, S.; Cui, L.; Yang, H. Inertia-driven wave energy converter for Marine buoy power supply: Motion response and energy conversion characteristics. Appl. Ocean Res. 2026, 172, 105120. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.