Abstract
Distribution system state estimation (DSSE) under limited real-time observability relies on pseudo-measurements, whose uncertainty is usually set through generic, fixed assumptions. This simulation study derives the pseudo-measurement uncertainty from the coefficient of variation (CV) of consumption trajectories characterized in previous work from real advanced metering infrastructure (AMI) data. Loads are assigned Dirichlet-distributed mixtures of these trajectories, and a dominant-trajectory model, a mixture-weighted model, and a fixed 10% baseline are compared within a weighted least squares estimator on three real Colombian medium-voltage feeders over a representative weekday, with 20–60% of buses metered at random, ten random seeds, and synthetic errors calibrated from AMI statistics. Relative to the 10% baseline, the mixture-weighted model reduced the voltage root mean squared error by 18–53% with ideal voltage measurements and by 13–15% in two feeders with noisy ones, with no gain in the feeder with many small loads. A fixed CV equal to the population average performed within 0.5% of the load-specific model, so the benefit comes mainly from the level of the assumed uncertainty. These conclusions held under pseudo-measurement errors independent of the assumed CV, more heterogeneous loads, correlated and non-Gaussian errors, and photovoltaic generation of up to 80% of the feeder peak demand, where knowing the sky condition mattered more than modeling the photovoltaic variance. The gain depends on the feeder and on weighting voltage measurements according to their actual accuracy. Validation with measured voltages remains pending.
1. Introduction
Active distribution networks face persistent challenges in achieving reliable state estimation due to limited instrumentation, unbalanced operation, and high resistance-to-reactance (R/X) ratios [1,2]. Active distribution networks increasingly integrate electric vehicles, prosumers, and peer-to-peer energy trading, which makes their operation and monitoring more demanding [3]. Unlike transmission systems, distribution feeders often lack sufficient real-time measurements, making pseudo-measurements necessary for observability [4]. Conventional approaches typically rely on average load profiles or probabilistic models, which fail to capture the behavioral diversity of consumers and often assign generic uncertainty levels [5,6].
Recent contributions have sought to overcome these limitations through advanced statistical and machine learning techniques. Game-theoretic frameworks based on relevance vector machines have been proposed to generate weighted pseudo-measurements and exploit seasonal variability in advanced metering infrastructure (AMI) data [5]. Attention-enhanced recurrent neural networks have been introduced to capture temporal correlations in load series and improve pseudo-measurement accuracy under dynamic conditions [6]. Stochastic optimization models have been developed to characterize pseudo-measurements for demand-response enabled loads [7]. Graph neural networks have been explored to incorporate structural information of distribution systems into state estimation [8], while optimal meter placement strategies have emphasized the role of measurement allocation in enhancing observability [4]. Collectively, these studies highlight the diversity of pseudo-measurement generation methods but also reveal a common limitation: uncertainty is modeled through generic assumptions rather than consumer-specific variability.
Parallel to these developments, demand flexibility has been extensively studied as a resource for peak reduction, voltage regulation, and loss reduction [9,10,11,12], and AMI data have been used to build load models for volt-VAR optimization [13]. Consumer behavior has been characterized from AMI data through load profile clustering and the analysis of consumption dynamics [14,15], while statistical measures such as the coefficient of variation and entropy have been used to quantify the variability and disorder of electrical signals [16]; building on these ideas, our previous work identified representative flexibility trajectories [17]. In our previous work, these trajectories were used to simulate demand redistribution scenarios and to quantify their impact on reliability indicators [17] and on voltage profiles and technical losses [18], in line with studies that use flexible loads for voltage regulation in distribution systems [19,20].
In addition, consumer flexibility characterization has been shown to benefit from preprocessing and dimensionality reduction techniques. Data cleaning and temporal completeness filtering [21,22,23], followed by Non-negative Matrix Factorization (NMF) rather than Principal Component Analysis (PCA) to preserve non-negativity and physical interpretability [24,25], provide a reproducible pipeline for extracting representative latent functions. This methodology, described in detail in our previous study [17], identified four trajectories (A–D) that summarize heterogeneous consumption behaviors. In the present work, these trajectories are not used to simulate demand-shifting scenarios, but rather to generate pseudo-measurements for Distribution System State Estimation (DSSE), with their coefficient of variation used to set the standard deviation of each pseudo-measurement within a weighted least squares (WLS) estimator.
Building on this foundation, the present work proposes a trajectory-based pseudo-measurement framework for DSSE. The trajectories are those of our previous work [17], where they were characterized in terms of consumer flexibility (flexibility trajectories); here, only their day-to-day consumption variability is used, and we refer to them simply as consumption trajectories. To evaluate the approach, we compare trajectory-informed uncertainty models, including a dominant-trajectory approximation and a full-mixture weighted formulation, against a conventional fixed-uncertainty baseline. Setting the uncertainty from historical error statistics is a plausible alternative to generic assumptions; our aim is to examine whether the variability of AMI-derived consumption trajectories provides an appropriate level of uncertainty, and whether assigning it load by load adds value over a single feeder-wide value. Additional fixed-uncertainty levels are used to separate the effect of the level of the assumed uncertainty from that of its load-to-load heterogeneity. The methodology is tested on three real Colombian feeders (C1–C3) under limited observability conditions. This contribution links the AMI-based trajectory characterization of our previous work to distribution system monitoring, offering a simple, data-driven way to set pseudo-measurement uncertainty from AMI records.
2. Materials and Methods
The consumption trajectories characterized in our previous work constitute the foundation for the pseudo-measurement framework developed in this study. Rather than using these trajectories to simulate demand redistribution, as in our earlier analysis, this work exploits their statistical properties, specifically, the coefficient of variation associated with each trajectory, to inform the uncertainty assigned to pseudo-measurements within a Distribution System State Estimation (DSSE) framework.
Unlike previous data-driven approaches, which estimate pseudo-measurements from historical load data with machine learning models [5,6], the proposed methodology establishes a direct link between AMI-based consumption trajectories and state estimation under limited observability. Figure 1 illustrates the overall framework, which comprises four main stages: (1) recovery of the four consumption trajectories and their associated coefficients of variation from our previous characterization, (2) stochastic assignment of trajectory mixtures to individual loads within each real distribution network (C1–C3), (3) generation of power pseudo-measurements with three competing uncertainty models (dominant-trajectory, full-mixture weighted, and fixed baseline), and (4) Weighted Least Squares state estimation across a sweep of real-time meter penetration levels, evaluated via voltage RMSE against ground-truth power-flow solutions. A complementary experiment adds behind-the-meter PV generation to assess the robustness of these results.
Figure 1.
Methodological framework linking AMI-based consumption trajectories to DSSE pseudo-measurement uncertainty modeling, including the PV generation scenarios.
Figure 2 details the simulation procedure step by step, including its inputs and outputs, the loops over feeders, seeds, meter penetration levels, models, and hours, and the variants of the PV and robustness experiments.
Figure 2.
Flowchart of the simulation study: inputs, loops over feeders and seeds and over meter penetration levels, models, and hours, and the variants of the PV and robustness experiments.
2.1. Distribution Network Description
The electrical networks considered in this study are three real medium-voltage radial distribution feeders operated by a Colombian utility. For confidentiality reasons, the feeders are anonymized and referred to as Circuit 1 (C1), Circuit 2 (C2), and Circuit 3 (C3). These feeders supply a mix of rural and semi-urban consumers and exhibit diverse loading conditions and voltage profiles, providing a realistic and contrasting testbed for evaluating the proposed pseudo-measurement framework under limited observability.
Each feeder model was constructed from the utility’s geographic information system (GIS) and supervisory control and data acquisition (SCADA) databases, including actual line lengths, conductor types, transformer ratings, and load locations. Table 1 summarizes the main physical characteristics of the three feeders. Figure 3 presents the corresponding single-line diagrams, where bus colors indicate the voltage levels present in each network.
Table 1.
Physical characteristics of the three real distribution feeders.
Figure 3.
Single-line diagrams of the three distribution feeders.
In this study, the total nominal demand of each feeder is redistributed across its individual loads according to a stochastically sampled mixture over the four consumption trajectories characterized in our previous work [17] (Section 2.2 and Section 2.3 of this paper), rather than through a uniform allocation. This finer-grained, load-level demand representation constitutes the basis for the pseudo-measurement generation and state estimation framework presented in the following sections.
2.2. Consumption Trajectory Characterization
The consumption trajectories (called flexibility trajectories in that work) are taken from our previous work [17], where 48 months of hourly AMI data were cleaned, filtered for temporal completeness, and analyzed using NMF and clustering, yielding four representative trajectories (A–D). Each trajectory is described by a normalized hourly demand shape and a coefficient of variation (CV), which measures the day-to-day dispersion of consumption at each hour and is summarized into a single value per trajectory. In this study, the trajectories are not used to simulate demand redistribution, as in our earlier work, but as the basis for generating pseudo-measurements for state estimation: the hourly shapes define the expected demand of each load, and the CV parameterizes the uncertainty of its pseudo-measurements. Here, the CV is used solely as a measure of the day-to-day dispersion of consumption, and therefore as an indicator of the uncertainty of each load’s demand; it is not used as a measure of a consumer’s capacity to shift load.
The four trajectories do not correspond to tariff classes. In our previous work, they were obtained by applying NMF and clustering to the hourly CV and normalized entropy of regulated users of all categories, including residential users of all socioeconomic strata and commercial, industrial, and official users [17]. Each trajectory therefore groups users by the shape and regularity of their consumption rather than by their customer class. Trajectory A concentrates demand in a rigid evening peak (19:00–22:00) and is the most regular (); trajectory B has a bimodal morning and evening pattern (); trajectory C has a dominant evening peak with minor morning activity (); and trajectory D shows dispersed peaks throughout the day and the largest day-to-day variability (). In practice, the mixture of a load point can be estimated from the AMI histories of the customers it serves. For customers without AMI history, the natural default is the base mixture , which yields a CV of about 0.36 for every load, that is, Model 3b, whose accuracy was practically identical to that of Model 2 in all the experiments.
Table 2 reports the CV of each trajectory and its share of the aggregate peak demand.
Table 2.
Coefficient of variation (CV) of the four consumption trajectories [17] and their share of the aggregate peak demand [18].
2.3. Load-to-Trajectory Mixture Assignment
Each load in the network model is assigned a stochastic mixture over the four trajectories, , drawn from a Dirichlet distribution:
where is the share of each trajectory in the aggregate peak demand of the feeders [18], and controls the concentration of the sampled mixtures around . The peak-demand shares were adopted as the base mixture because the voltage drops that the estimator must reconstruct are largest at peak hours, so the load composition at those hours is the most relevant for the estimation.
The Dirichlet distribution was chosen because it is the standard model for random proportions: its samples are nonnegative and sum to one, its mean equals , so the simulated feeders keep the composition observed in the AMI data, and a single parameter, , sets how heterogeneous the loads are. With , the variance of each share is , which is equivalent to each load point behaving as a sample of about eight representative customers. Since the heterogeneity of the loads is a modeling choice rather than a measured quantity, Section 3.8 repeats the comparison with , 1, and 0.5 and with each load assigned to a single trajectory, which triples the dispersion of across loads.
For each load i, a full demand curve is obtained as the weighted combination of the four trajectory shapes:
A corresponding mixture-weighted coefficient of variation is computed for each load:
Equation (3) is a heuristic uncertainty assignment rather than the exact CV of the combined demand, which in general also depends on the mean of each component and on the covariances between their fluctuations. It is exact when the fluctuations of the components are perfectly correlated and their means are similar, and it is an upper bound otherwise. If the components fluctuated independently and had similar means, the CV of the combined demand would be , about 0.22 on average instead of 0.36. Equation (3) therefore assigns a conservative level of uncertainty to each load. The effect of this choice is examined in Section 3.7 by generating the pseudo-measurement noise with the independent-component CV while the estimator keeps Equation (3).
For comparison, a dominant-trajectory approximation is defined in which each load is represented only by its dominant trajectory , that is, by its demand curve and its coefficient of variation .
2.4. Pseudo-Measurement Generation and Uncertainty Models
For every load, active and reactive power pseudo-measurements are generated at each simulated hour by perturbing the load’s expected demand with Gaussian noise scaled by its true mixture-weighted CV:
Here, is the expected demand of load i, obtained from its full mixture curve in Models 2 and 3 and from its dominant-trajectory curve in Model 1, each scaled by the average demand of the load.
The injected noise is scaled by the load’s true weighted CV, rather than by a fixed generic value, so that the simulated uncertainty follows the variability of each load’s trajectory mixture. The CV values of the four trajectories (Table 2) come from our previous characterization of real AMI data and were not tuned for this study; however, because the same CV generates the noise in the simulations and sets the weights of Model 2, the experiments are not an independent validation of that magnitude as a model of actual pseudo-measurement errors. The reactive power pseudo-measurement is obtained from the expected demand, assuming a constant power factor of 0.95, with its own noise term of the same scale:
where is independent of . In this way, the active and reactive pseudo-measurement errors are uncorrelated and each has a relative standard deviation equal to , which is consistent with the diagonal covariance matrix of the WLS estimator and with the standard deviation assigned to each pseudo-measurement below.
Independently, the standard deviation assigned to each active-power pseudo-measurement within the state estimator is defined as , where is the coefficient of variation assumed by the estimator for load i and MW is a lower bound that prevents null weights at very low demand.
The standard deviation is computed from the pseudo-measurement rather than from the expected demand because the pseudo-measurement is the only value available to the operator, for whom it plays the role of the demand forecast. As a consequence, pseudo-measurements reduced by the noise receive slightly higher weights. To verify that this choice does not drive the results, the main comparison was repeated with the standard deviation computed from the expected demand, . The mean RMSE changed by less than 0.6% with noisy voltage measurements and by less than 4.5% with ideal ones, and the ranking of the models was the same.
The standard deviation of the reactive-power pseudo-measurement is defined analogously using , since the reactive pseudo-measurement can take negative values. When several loads are connected to the same bus, their pseudo-measurements are added and their variances are combined, so that the bus-level standard deviation is the square root of the sum of the individual variances. The three competing models are defined as follows:
Model 1 (Dominant): expected demand and .
Model 2 (Weighted): .
Model 3 (Fixed, baseline): , representative of conventional fixed-uncertainty pseudo-measurement practice.
The three models were chosen to isolate the effect of the uncertainty assigned to the pseudo-measurements. Model 3 represents the common practice of assigning the same generic relative uncertainty to every pseudo-measurement [5,6]. In DSSE studies, load pseudo-measurements are usually assigned a maximum error between 10% and 50% of their value, which corresponds to standard deviations between about 3.3% and 16.7% under the usual three-sigma convention [26,27,28,29]; the standard deviation of 10% adopted here lies within this range. Because this value is well below the population-average CV of the trajectories, its poorer performance partly reflects a systematically low assumed level; for this reason, Section 3.5 also evaluates fixed CVs of 0.20, 0.36, and 0.50, so that the effect of the level can be separated from that of the load-by-load assignment. Model 1 represents the simplest use of AMI data, in which each load is labeled with its dominant consumption trajectory. Dynamic estimators based on Kalman filtering, which can estimate unknown inputs together with the state [30], are an alternative, but they require a dynamic model of the loads. The standard WLS estimator was kept for all models because it is the standard formulation in DSSE [1,2] and because its weights are the inverse of the assigned variances, so any difference between the models can be attributed to the assumed uncertainty. More advanced pseudo-measurement generation methods, such as machine-learning load forecasts or probabilistic load models, mainly improve the expected value of the pseudo-measurement; they still require a standard deviation to weight it, and the AMI-based calibration studied here can be applied to them without change.
For Models 2 and 3, the pseudo-measurements are generated by the same process (same expected demand and same true noise scale), so their comparison isolates the effect of the uncertainty assumed by the estimator. Model 1 also changes the expected demand, so its difference with respect to Model 2 combines both effects.
Crucially, active- and reactive-power pseudo-measurements are generated for all load buses at every hour, regardless of whether that bus is also equipped with a real-time voltage meter. A voltage measurement therefore complements rather than replaces the corresponding power pseudo-measurement, preserving the power-injection information used by the estimator to infer voltage at electrically neighboring buses.
2.5. State Estimation Framework
State estimation is performed using the Weighted Least Squares (WLS) algorithm implemented in the pandapower library (version 3.4.0) [31], with a flat-start initialization. All simulations were implemented in Python 3.13.2 and executed within the PyCharm environment (Community Edition 2024.3.5). The estimator minimizes
where is the measurement vector, relates the state vector to the expected measurements, and is the measurement covariance matrix [32]. The measurement set at each simulated hour comprises: (i) real voltage magnitude measurements at the substation bus and a variable-size subset of additional buses; (ii) power pseudo-measurements, generated as described in Section 2.4, at all load buses; and (iii) zero-injection pseudo-measurements (zero active and reactive power, with a standard deviation of MW) at buses with no connected load. The zero-injection option of pandapower (no_inj_bus) was also enabled.
2.6. Experimental Design and Evaluation Metric
The three uncertainty models are compared across a sweep of real-time meter penetration levels (20–60%, in 10-percentage-point increments). Metered buses are selected at random, rather than through an optimal placement strategy: for each seed, a random ordering of the buses is drawn, and the metered buses at each penetration level are the first buses of that ordering (the substation bus is always metered), so the metered sets are nested across penetration levels and common to the three models. This choice isolates the effect of the pseudo-measurement uncertainty model, the focus of this study, from the confounding effect of measurement placement optimization, which constitutes a separate and well-established research problem [4].
The ground-truth voltages are obtained from a power flow in which each load follows its full mixture demand curve , scaled by the average demand of the load. For each penetration level and model, state estimation is performed for all 24 h of a representative weekday, and accuracy is quantified via the root mean squared error (RMSE) between estimated and ground-truth voltage magnitudes across all buses and evaluated hours:
To account for variability across random realizations, the full pipeline (trajectory mixture sampling, ground-truth generation, meter placement, and estimation) is repeated across 10 independent random seeds, and results are reported as the mean and standard deviation of RMSE across seeds. Within each seed, all models share the load mixtures, the ground-truth voltages, the metered buses, and the same realizations of the pseudo-measurement and voltage measurement noise, so the comparisons between models are paired case by case. The paired RMSE reduction of a model with respect to another is computed as the mean over the paired cases of . Besides the voltage RMSE, the maximum absolute voltage error, the RMSE of the voltage angles, the RMSE of the active power flow in each line, the error in total losses, and the identification of buses below 0.95 p.u. are reported for the main comparison. An estimation that does not converge is excluded from the metrics rather than replaced by another value; no convergence failures occurred in any experiment.
To assess the sensitivity of Model 2 to inaccuracies in the assumed CV, the standard deviation used by the estimator was scaled by a misspecification factor , applied as , while the noise injected into the pseudo-measurements was kept unchanged, so that only the uncertainty assumed by the estimator was perturbed.
To separate the effect of the level of the assumed uncertainty from that of its load-to-load heterogeneity, Model 2 was also compared against fixed-CV baselines in which every load is assigned the same assumed coefficient of variation, , with . The value 0.10 is the level of Model 3, and 0.36 corresponds to the weighted average of the trajectory CVs in Table 2, (hereafter Model 3b). These baselines differ from Model 2 only in how the standard deviation of the pseudo-measurements is assigned: a common CV for all loads, versus the load-specific .
All models and variants were evaluated both with ideal voltage measurements and with zero-mean Gaussian noise of standard deviation 0.001 p.u. added to every real voltage measurement, the same value assigned to them in the WLS weighting. The voltage noise was drawn once per seed for each hour and bus, so that nested meter sets share it across penetration levels and models. Models 1 to 3 and the fixed CVs of 0.20, 0.36, and 0.50 were evaluated at the five penetration levels, while the factors and the alternative standard deviation computed from the expected demand (Section 2.4) were evaluated at 20, 40, and 60%. This main experiment required 73,440 WLS estimations: 24 h variant–penetration combinations × 2 voltage-noise conditions × 10 seeds × 3 feeders. The main simulation parameters are summarized in Table 3.
Table 3.
Main simulation parameters.
2.7. Robustness Experiments
Five additional experiments test whether the conclusions depend on the assumptions of the main experiment. All of them use the same feeders, seeds, load mixtures, and 24 h, Gaussian noise of 0.001 p.u. in the real voltage measurements unless stated otherwise, and the same noise realizations for all the models compared in each case. Unless stated otherwise, they compare Model 2, Model 3, and Model 3b at meter penetrations of 20, 40, and 60%.
Voltage noise and accuracy mismatch. The standard deviation of the voltage measurement noise was set to 0.0005, 0.001, 0.002, and 0.005 p.u., and the standard deviation assigned to the voltage measurements in the WLS weighting was set to 0.5, 1, and 2 times the actual one, which represents an operator who overestimates or underestimates the accuracy of the meters. This experiment required 77,760 WLS estimations.
Pseudo-measurement noise independent of the assumed CV. To remove the advantage that Model 2 could obtain by construction, the pseudo-measurement noise was generated with a CV different from the one assumed by the estimator, which kept Equation (3). Six alternatives were tested: the CV of Equation (3) multiplied by a random lognormal factor per load with a standard deviation of 0.3 or 0.5 in logarithmic scale and unit mean; the CV of the combined demand under independent components, ; a CV drawn uniformly between 0.15 and 0.65 for each load, unrelated to its mixture; and the CV of Equation (3) scaled by 0.7 and by 1.3. An oracle model that knows the actual CV of each load was added as a reference. This experiment required 60,480 WLS estimations.
Load heterogeneity. To test feeders with more heterogeneous loads, the mixtures were drawn with , 1, and 0.5 in addition to , and in a further case each load was assigned a single trajectory drawn with probabilities . Since the mean CV of the loads changes slightly in each realization, a fixed CV equal to that mean was added as the best possible common value. This experiment required 43,200 WLS estimations.
Meter placement. The random placement was compared with a greedy placement based on the uncertainty of the voltage estimates. The sensitivities of the bus voltages to the active and reactive power of each load bus, and , were obtained by finite differences at the peak hour, and the prior covariance of the voltages was computed as , where and are the standard deviations assumed for the pseudo-measurements. Meters were then added one at a time at the bus that most reduced the trace of after a measurement update with a standard deviation of 0.001 p.u., which yields nested meter sets. The greedy placement was computed with the standard deviations of Model 2 and with those of Model 3, to assess whether the placement interacts with the assumed uncertainty. This experiment required 19,440 WLS estimations.
Non-ideal errors. The estimator still assumed independent Gaussian errors, while the pseudo-measurement errors were made correlated across loads through a common hourly factor with a correlation of 0.3 or 0.6, asymmetric with a lognormal distribution of the same mean and standard deviation, or heavy-tailed with a Student t distribution with three degrees of freedom scaled to the same standard deviation. In two further cases, the estimator used line resistances and reactances with random errors of 10% and 20% (standard deviation), while the ground truth used the correct values. This experiment required 45,360 WLS estimations.
2.8. Photovoltaic Generation Scenarios
Since distributed PV generation is increasingly integrated into distribution networks, where it can cause voltage fluctuations and reverse power flows [33,34,35], a complementary experiment was performed to assess whether the previous conclusions hold when part of the demand is offset by behind-the-meter photovoltaic (PV) generation. Hourly global horizontal irradiance for 2025 was obtained from the NASA POWER database [36], in local solar time, for a tropical Andean location at about N representative of the region served by the three feeders. Each of the 365 days was classified by its daily clearness index , where H is the daily irradiation computed from the hourly data and is the daily extraterrestrial irradiation on a horizontal surface [37]. Days with were labeled clear, days with partly cloudy, and days with overcast, which yielded 39, 222, and 104 days, respectively, with empirical probabilities of 0.11, 0.61, and 0.28. The thresholds were set from the distribution of daily at the site, whose median is 0.43 and whose 10th and 90th percentiles are 0.36 and 0.55, so that the clear class corresponds approximately to the top decile of days; higher thresholds would leave too few clear days to estimate stable hourly profiles. For each day type k and hour h, the mean and the standard deviation of the irradiance across days were computed. Figure 4 shows the resulting mean profiles and their variability: the three day types share the same daylight window, from 05:00 to 17:00, but differ markedly in magnitude, with mean peaks at 11:00 of about 864, 654, and 538 W/m2 for clear, partly cloudy, and overcast days, respectively, and a between-day standard deviation of about 70 W/m2 at the peak in all three cases.
Figure 4.
Mean hourly global horizontal irradiance by day type, obtained from NASA POWER data for 2025; the shaded bands indicate standard deviation across days of each type, and n and p denote the number of days and the empirical probability of each type.
The PV output per unit of installed capacity was then obtained as , with standard deviation , where and is the performance ratio of the PV system.
In each seed, PV systems were assigned to 30% of the loads, selected at random with a random number stream independent of the one used in the main experiment, so that the load mixtures, the metered buses, and the pseudo-measurement noise remain identical to those described above. The total installed capacity was set to 20, 40, or 80% of the feeder peak demand (the maximum hourly aggregate demand of the feeder in the representative day) and was distributed among the PV loads in proportion to their average demand, so that load i receives a capacity . Because this capacity is concentrated in 30% of the loads, the installed capacity of each PV load is about 0.97, 1.93, and 3.87 times its average demand for PV levels of 20, 40, and 80%, respectively, with differences below 0.05 among feeders. As a result, at 11:00 no PV load exports power at the 20% level, whereas at the 80% level all of them do on every day type. The PV systems operate at unity power factor and therefore modify only the active power. For the ground truth, each PV load injects , where is the per-unit profile of one actual day of type k, drawn at random for each seed and day type and common to all PV loads of the feeder, and the power flow is solved with the net load . The estimator does not know the actual day and uses the mean profile instead, so the active-power pseudo-measurement of a PV load becomes . This pseudo-measurement therefore carries two errors: the demand error of the main experiment and the deviation of the actual PV output from its mean profile. When the estimator accounts for the PV uncertainty, both terms are assumed independent and the variance of the active-power pseudo-measurement is
Seven variants were compared. (i) Model 2 with PV uncertainty applies the equation above with the profile of the actual day type, which represents an operator who knows the expected sky condition, for instance from a day-ahead forecast. (ii) Model 2 without PV uncertainty uses the same expected net load but omits the generation term. (iii) Model 2 with unknown day type uses the climatological profile and variance, obtained by mixing the three day types through the law of total variance:
(iv) and (v) are fixed-CV baselines with and , in which the standard deviation is computed as over the net-load pseudo-measurement and the PV uncertainty is not represented. (vi) and (vii) use the same fixed CVs but compute the standard deviation over the demand pseudo-measurement, , as in Model 2, so that they differ from variant (ii) only in the CV assigned to each load. Each PV level was combined with each day type, and the no-PV case was kept as reference, in which variants (i) to (iii) coincide, as do (iv) with (vi) and (v) with (vii). The experiment used meter penetrations of 20, 40, and 60%, Gaussian noise of 0.001 p.u. in the real voltage measurements (Section 2.6), and the same 10 seeds. Since PV output is zero at night, where every scenario coincides with the no-PV case, all cases, including the no-PV reference, were estimated only over the 13 h with nonzero mean irradiance (05:00 to 17:00), and accuracy is reported as the daytime RMSE over those hours. This experiment required 77,220 WLS estimations: , that is, 9 PV scenarios with 7 variants plus the no-PV reference with 3 distinct variants, over 13 daylight hours, three meter penetration levels, 10 seeds, and 3 feeders.
The parameters of the PV experiment are also listed in Table 3.
A further experiment introduced realistic forecast errors. In the ground truth, the actual day profile of each PV load was multiplied by its own random factor with a standard deviation of 10%, which represents differences in cloud cover and orientation within the feeder. The estimator received one of five forecasts: the mean profile of the actual day type, as above; a day-type forecast that was correct with a probability of 80% or 60% and otherwise indicated one of the other two types; the climatological profile; or the mean profile of the actual day type multiplied by a common error with a standard deviation of 20% for the whole day. In Model 2 with PV uncertainty, the generation term was made consistent with each forecast: with a day-type forecast of accuracy $a$, its variance was , with weights proportional to , and with the 20% error it was . This model was compared with Model 2 without PV uncertainty and with the fixed CVs of 0.10 and 0.36 computed over the demand, for PV levels of 40% and 80%, the three day types, and a meter penetration of 40%. This experiment required 46,800 WLS estimations.
3. Results
This section presents the results of applying the proposed trajectory-based pseudo-measurement framework to the three real distribution feeders described in Section 2.1. Section 3.1 first characterizes the base-case operating conditions of each feeder through power-flow simulation, establishing the voltage regulation context in which the state estimation framework is subsequently evaluated. Section 3.2 then presents the comparative performance of the three pseudo-measurement uncertainty models (dominant-trajectory, full-mixture weighted, and fixed baseline) across a sweep of real-time meter penetration levels, in terms of voltage estimation accuracy (RMSE). Section 3.4 evaluates the sensitivity of Model 2 to misspecification of the assumed CV. Section 3.5 compares Model 2 against fixed-CV baselines to separate the effect of the level of the assumed uncertainty from that of its load-to-load heterogeneity. Section 3.6 repeats the main variants with noisy voltage measurements. Section 3.11 evaluates the robustness of the models to behind-the-meter PV generation. Section 3.12 reports the computational performance of the simulations. These findings are discussed in relation to feeder characteristics and measurement design choices in Section 4.
3.1. Base-Case Scenario
Prior to evaluating the proposed pseudo-measurement uncertainty models, base-case power-flow simulations were performed for each feeder using a representative aggregate demand profile, in order to characterize their baseline operating conditions and voltage regulation margins. For each circuit, the network’s total nominal demand was distributed across its load points following the aggregate daily demand shape obtained from the four consumption trajectories (Section 2.2), and a power flow was solved for each of the 24 h of a representative weekday.
Table 4 summarizes the resulting voltage statistics for each feeder, and Figure 5 presents the corresponding daily voltage profiles, showing the minimum, mean, and maximum voltage magnitude across all buses at each hour.
Table 4.
Base-case voltage statistics across the simulated day for each feeder.
Figure 5.
Base-case daily voltage profile for C1, C2, and C3.
C1 and C2 maintain comfortable voltage margins throughout the day, with minimum voltages of 0.968 p.u. and daily average voltages of 0.983 and 0.985 p.u., respectively, never violating the 0.95 p.u. regulatory threshold commonly adopted for medium-voltage distribution networks. C3, in contrast, exhibits severe and sustained undervoltage, falling below the 0.95 p.u. threshold during 22 of the 24 simulated hours and reaching a minimum of 0.861 p.u. (daily average 0.930 p.u.)—nearly 9 percentage points below the 0.95 p.u. threshold. This operational diversity, ranging from comfortable margins to sustained regulatory violations, provides a realistic and contrasting testbed for evaluating the proposed pseudo-measurement framework under varying levels of operational stress, and motivates the selection of these three feeders as representative case studies.
3.2. Comparative RMSE Performance Across Uncertainty Models
Building on the base-case conditions established in Section 3.1, the three pseudo-measurement uncertainty models, Model 1 (dominant-trajectory), Model 2 (full-mixture weighted), and Model 3 (fixed 10% baseline), were evaluated within the WLS state estimation framework described in Section 2.5, across a sweep of real-time meter penetration levels (20–60%) and 10 independent random seeds per feeder, with ideal voltage measurements; the effect of voltage measurement noise is analyzed in Section 3.6. No convergence failures were observed in any of the 3600 state estimations performed per feeder for these three models (3 models × 5 penetration levels × 10 seeds × 24 h). In absolute terms, all RMSE values are small, between 3.3 × and 18.2 × p.u.
Table 5 summarizes the mean RMSE and standard deviation obtained by each model, feeder, and penetration level, and Figure 6 presents the corresponding curves with ±1 standard deviation bands across seeds.
Table 5.
Mean RMSE ± standard deviation across 10 seeds ( p.u.) by uncertainty model, feeder, and meter penetration level.
Figure 6.
Mean RMSE ± 1 standard deviation across 10 seeds, by uncertainty model and real meter penetration, for C1, C2, and C3. The vertical scale differs among panels.
Three consistent patterns emerge across all feeders. First, the mean RMSE decreases monotonically with increasing real-time meter penetration in every feeder and every uncertainty model, falling by 25–33% between 20% and 60% penetration, which is consistent with additional voltage measurements improving overall network observability once power pseudo-measurements are preserved at all load buses regardless of metering status (Section 2.4). Second, Model 3 is consistently the worst-performing model, and Model 2 achieves the lowest mean RMSE in all fifteen feeder–penetration combinations; Model 2 outperformed Model 3 in all 150 seed–penetration pairs. Third, the magnitude of the gap varies by feeder: Model 3’s RMSE is 2.1–2.2 times that of Model 2 in C1 and 1.9–2.0 times in C3, but only about 1.2 times in C2. Section 3.5 examines to what extent this gap reflects the level of uncertainty assumed by Model 3.
The advantage of Model 2 over Model 1 is smaller but consistent. Model 2’s mean RMSE is 7–8% lower in C1, 6–7% lower in C3, and 5–7% lower in C2, and it is lower in 44, 50, and 50 of the 50 seed–penetration pairs, respectively. Since Model 1 differs from Model 2 in both the expected demand curve and the assumed CV, this gap reflects the combined effect of approximating each load by its dominant trajectory alone.
3.3. Worked Example: One Feeder, One Hour, and One Penetration Level
To illustrate how the proposed calibration changes a single estimation, this subsection solves one case with the standard approach, a WLS estimator with a fixed relative uncertainty of 10% for every pseudo-measurement (Model 3), and with the proposed one, the same estimator with the AMI-based CV of each load (Model 2). The case corresponds to feeder C1, seed 1, a meter penetration of 40% (146 of the 363 buses metered, including the substation), and ideal voltage measurements. Each hourly estimation uses 146 voltage measurements, 168 active and reactive power pseudo-measurements at the 84 load buses, and 556 zero-injection measurements, for 725 state variables. To avoid choosing a favorable hour, the hour shown in detail is the one whose improvement is closest to the median improvement of the day, which is 08:00.
Table 6 shows the pseudo-measurements of the first five loads at that hour, whose errors range from to 10.0 kW. With a standard deviation of 10%, these errors amount to up to 7.1 standard deviations, and the median absolute normalized error over the 84 loads is 2.11, whereas for Gaussian errors consistent with the assigned uncertainty it should be about 0.67. With the AMI-based CV, the median is 0.61. The standard approach therefore trusts the pseudo-measurements about three times more than their actual accuracy warrants, and the estimator propagates their errors to the voltages.
Table 6.
Active power pseudo-measurements of the first five loads of C1 at 08:00 (seed 1), standard deviation assigned by each approach, and error normalized by that standard deviation.
Table 7 compares both estimates. At 08:00, the proposal reduces the voltage RMSE from 6.34 to 4.12 × p.u. (35%), the RMSE at the unmetered buses from 5.89 to 3.95 × p.u., and the maximum voltage error from 25.6 to 12.9 × p.u., while both estimators converge in three iterations. Over the 24 h of the day, the proposal is more accurate in every hour, and the daily RMSE falls from 10.23 to 4.90 × p.u. (52%). With noise of 0.001 p.u. in the voltage measurements, the same case gives a smaller improvement of 10% over the day (from 12.93 to 11.66 × p.u.), with the proposal more accurate in 12 of the 24 h, in line with Section 3.6.
Table 7.
Results of the worked example (C1, seed 1, 40% of metered buses, ideal voltage measurements). Voltage errors in p.u.
3.4. Sensitivity to CV Misspecification
To assess how the accuracy of Model 2 depends on the level of the CV assumed by the estimator, the assumed CV was scaled by a misspecification factor (Section 2.6), while the noise injected into the pseudo-measurements remained unchanged, which represents a systematic mismatch between the assumed and the true CV. The factors were evaluated both with ideal voltage measurements and with noise of 0.001 p.u. in the voltage measurements, at meter penetrations of 20, 40, and 60%. Figure 7 presents the mean RMSE for each factor together with Model 3, and Table 8 summarizes the values averaged over the three penetration levels.
Figure 7.
Mean RMSE as a function of real-time meter penetration for five levels of CV misspecification ( = 0.5–1.5) applied to Model 2 and for Model 3, with ideal voltage measurements (top) and with voltage noise of 0.001 p.u. (bottom), for C1, C2, and C3. The vertical scale differs among panels.
Table 8.
Mean RMSE ( p.u.), averaged over meter penetrations of 20, 40, and 60% and ten seeds, for each misspecification factor applied to Model 2 and for Model 3 (M3), with ideal and noisy voltage measurements.
With ideal voltage measurements, the RMSE decreases monotonically with in every feeder–penetration combination: assuming a higher CV than the true one, that is, underweighting the pseudo-measurements relative to the voltage measurements, improves accuracy. Because the ideal voltage measurements are given a standard deviation of 0.001 p.u. in the WLS weighting but have no error, the weights do not match the actual errors, and shifting weight towards the voltage measurements pays off. Even with , Model 2 outperforms Model 3 in all 90 seed–penetration pairs; however, half of the weighted CV (about 0.18) is still above the 0.10 of Model 3, so this result alone does not show that the load-specific CV matters.
With noise of 0.001 p.u. in the voltage measurements, which matches the standard deviation assigned to them, the monotonic trend disappears. The lowest RMSE is obtained with in C1 and with between 0.8 and 1.0 in C3, while in C2 all factors give similar errors (9.01–9.38 × p.u.); overestimating the CV by 50% increases the RMSE by 3–4% with respect to . This is consistent with the property of WLS that the most accurate estimates are obtained when the weights match the actual error variances. In this condition, Model 2 outperforms Model 3 in 72 of the 90 pairs at , and the pairs in which it does not are concentrated in C2, where Model 3 is as accurate as Model 2. The next subsection separates the effect of the level from that of the load-specific structure of the assumed CV.
3.5. Level Versus Heterogeneity of the Assumed Uncertainty
The sensitivity analysis of Section 3.4 changes the level of the assumed uncertainty while keeping its load-specific structure. To separate the two aspects, Model 2 was compared with the fixed-CV baselines described in Section 2.6, evaluated with the same noise realizations as Model 2. In the simulated loads, the weighted CV has a mean of approximately and a standard deviation of approximately in the three feeders, so the load-to-load heterogeneity of the assumed uncertainty is narrow in this design. Section 3.8 repeats this comparison with more heterogeneous loads. Table 9 reports the mean RMSE of each variant, and Figure 8 shows the corresponding curves across the penetration sweep.
Table 9.
Mean RMSE ( p.u.), averaged over the five penetration levels and ten seeds, for Model 2 and for fixed-CV baselines. The value 0.36 corresponds to Model 3b. Percentages in the text are computed from unrounded values.
Figure 8.
Mean RMSE as a function of real-time meter penetration for Model 2 (load-specific CV) and for fixed-CV baselines (0.10, 0.20, 0.36, and 0.50), for C1, C2, and C3. The vertical scale differs among panels.
The level of the assumed uncertainty accounts for most of the difference with respect to the 10% baseline. Relative to the fixed CV of $0.10$, Model 2 reduces the mean RMSE by 54%, 18%, and 49% in C1, C2, and C3, respectively, and it is lower in all 150 seed–penetration pairs; relative to a fixed CV of , the reductions are 32%, 13%, and 30%, again in all 150 pairs. When the fixed CV equals the population average (, Model 3b), the difference nearly vanishes: the mean RMSE of Model 2 is lower by only 0.4%, 0.2%, and 0.4% in C1, C2, and C3 (computed from unrounded values), and it is lower in 111 of the 150 pairs (74%). Averaged over penetration levels, Model 2 is lower than Model 3b in 23 of the 30 seed–feeder combinations. This advantage is small but systematic; since the pairs of a given seed share the load mixtures and metered buses across penetration levels, they are not independent, and it should be read descriptively. Finally, a fixed CV of , above the population average, yields a lower RMSE than Model 2 in all 150 pairs, by 19%, 11%, and 18% in C1, C2, and C3. This is consistent with the trend with in Section 3.4, and indicates that, in this design, the accuracy depends mainly on the level of the assumed uncertainty rather than on its distribution among loads. The better performance of the fixed CV of 0.50 holds only with ideal voltage measurements (Section 3.6).
3.6. Effect of Voltage Measurement Noise
The preceding subsections assumed ideal voltage measurements, although the WLS weighted them with a standard deviation of 0.001 p.u. Because this idealization gives the voltages more accuracy than the weighting assumes, it may favor assigning a large uncertainty to the pseudo-measurements. This subsection first reports the same models with zero-mean Gaussian noise of 0.001 p.u., equal to the value assigned in the weighting, added to every real voltage measurement (Section 2.6), and then the effect of other noise levels and of a mismatch between the assumed and the actual accuracy of the meters (Section 2.7). Table 10 reports the mean RMSE of each variant, and Figure 9 shows the curves across the penetration sweep.
Table 10.
Mean RMSE ( p.u.), averaged over the five penetration levels and ten seeds, with Gaussian noise of 0.001 p.u. added to the real voltage measurements.
Figure 9.
Mean RMSE as a function of real-time meter penetration with Gaussian noise of 0.001 p.u. added to the real voltage measurements, for Model 2 (load-specific CV) and fixed-CV baselines (0.10, 0.20, 0.36, and 0.50), for C1, C2, and C3. The vertical scale differs among panels.
Voltage noise dominated the absolute error: the mean RMSE of Model 2 more than doubled with respect to the ideal case (from 5.3 to 12.6 × p.u. in C1, from 3.8 to 8.9 in C2, and from 7.5 to 15.4 in C3), which compresses the differences among variants. The RMSE still decreased monotonically with penetration in every variant and feeder. Model 2 and the fixed CV of 0.36 were indistinguishable (paired differences below 0.05%; Model 2 lower in 79 of 150 pairs). Relative to the fixed CV of 0.10 (Model 3), Model 2 reduced the RMSE by 13.5% in C1 and 15.3% in C3, but not in C2 (−0.4%), and it was lower in 119 of 150 pairs; relative to 0.20, the reductions were 1.7%, −0.8%, and 3.5%. Unlike in the ideal case, a higher assumed uncertainty no longer helped: the fixed CV of 0.50 gave a mean RMSE about 2.5% higher than Model 2 in the three feeders, with Model 2 lower in 148 of 150 pairs.
Table 11 extends this comparison to other noise levels and to a mismatch between the standard deviation assigned to the voltage measurements and the actual one. With the assigned standard deviation equal to the actual one, Model 2 reduces the RMSE with respect to Model 3 by 10–16% in C1 and C3 for noise levels up to 0.002 p.u.; at 0.005 p.u., the reduction falls to 2% in C1 but remains 16% in C3, and in C2 the two models stay within 1%. When the assigned standard deviation is twice the actual one, the reductions rise to up to 37% in C1 and C3 and to 1.4–8.6% in C2. When it is half the actual one, that is, when the accuracy of the meters is overestimated, Model 3 is 4–9% more accurate in every feeder, because overweighting the voltages is partly compensated by also overweighting the pseudo-measurements. In every combination, Model 2 and Model 3b differed by less than 0.3%.
Table 11.
Paired RMSE reduction (%) of Model 2 with respect to Model 3 for several levels of voltage measurement noise and ratios between the standard deviation assigned to the voltage measurements and the actual one, averaged over meter penetrations of 20, 40, and 60% and ten seeds. Negative values indicate that Model 3 is more accurate.
These results indicate that the advantage of inflating the assumed uncertainty observed in Section 3.4 and Section 3.5 was a consequence of ideal voltage measurements. With noise matching the standard deviation assigned in the weighting, the lowest RMSE among the levels tested was obtained near the population-average CV. The gap with respect to the 10% baseline shrinks but remains in C1 and C3 and disappears in C2, and, as in the ideal case, the load-specific CV adds practically nothing beyond a feeder-wide CV equal to the population average. More generally, the benefit of calibrating the pseudo-measurement uncertainty depends on weighting the voltage measurements consistently with their actual accuracy, since what determines the estimate is the balance between both weights.
Table 12 complements the voltage RMSE with other quantities that an operator derives from the estimate, at a meter penetration of 40%. The improvement of Model 2 over Model 3 carries over to all of them. With ideal voltage measurements, Model 2 halves the maximum voltage error in C1 and C3, reduces the RMSE of the voltage angles by 20–25% and that of the active power flow in the lines by 12–26%, and reduces the error in total losses by 19–53%. With voltage noise, the improvements are smaller but keep the same sign in every feeder, including C2. In C3, where most buses operate below 0.95 p.u. (about 10,330 of the 14,832 bus-hours of each seed), both models identify almost all of them; with ideal measurements, Model 2 reduces the false alarms from 7.7 to 3.9 bus-hours per seed, and with voltage noise the two models perform similarly. Model 3b gave values within about 2% of those of Model 2 for all these quantities.
Table 12.
Additional accuracy metrics of Model 2 (M2) and Model 3 (M3) at a meter penetration of 40%, averaged over ten seeds: maximum absolute voltage error, RMSE of the voltage angles, RMSE of the active power flow in the lines, and mean absolute error in total losses.
3.7. Robustness to Pseudo-Measurement Noise Independent of the Assumed CV
In the main experiment, the pseudo-measurement noise is generated with the same CV that Model 2 assumes, which could favor Model 2 by construction. To rule out this effect, the comparison was repeated with pseudo-measurement noise generated with a CV different from the one assumed by the estimator, which kept Equation (3), as described in Section 2.7. Table 13 reports the mean voltage RMSE over the 10 seeds and the meter penetrations of 20, 40, and 60%, together with the mean paired reduction of Model 2 with respect to Model 3.
Table 13.
Voltage RMSE ( p.u.) when the pseudo-measurement noise is generated with a CV different from the one assumed by Model 2. Mean over 10 seeds and meter penetrations of 20, 40, and 60%, with voltage noise of 0.001 p.u. Actual CV: mean CV used to generate the noise. Red.: mean paired reduction of Model 2 with respect to Model 3 (%).
The advantage of Model 2 does not depend on the noise being generated with the assumed CV. When the CV of each load is perturbed by a lognormal factor, its correlation with the CV assumed by Model 2 drops to 0.36 and 0.21, and when it is drawn uniformly between 0.15 and 0.65, the correlation is close to zero. Even so, Model 2 reduces the RMSE of Model 3 by 15.3 to 17.7% in C1 and by 16.5 to 19.4% in C3, values similar to or larger than those obtained when the noise follows Equation (3). The reduction depends instead on the level of the actual uncertainty. It grows to 21.4 and 22.8% when the actual CV is 1.3 times the assumed one, falls to 2.5 and 4.1% when it is 0.7 times the assumed one, and vanishes, with differences between and %, under independent components, whose mean CV of 0.22 is the closest to the 10% assumed by Model 3. In C2, the differences remain between and 2.1% in all cases, in line with Section 3.2.
In all the scenarios, Model 3b gives the same RMSE as Model 2, with mean paired differences below 0.1%, and Model 2 stays within 3% of an oracle model that knows the actual CV of each load, except under independent components, where the gap reaches 4.4% in C1 and C3. These results confirm that the benefit of the proposal comes from setting the level of the pseudo-measurement uncertainty according to the variability observed in AMI data, and not from matching the CV of each load, as discussed in Section 3.5.
3.8. Robustness to Load Heterogeneity
Since the load mixtures of the main experiment are drawn with , the CV of the loads in each feeder differs relatively little from one load to another, which could hide a benefit of assigning a specific CV to each load. Table 14 repeats the comparison with , 1, and 0.5, and with each load assigned a single trajectory, as described in Section 2.7. As a reference, it includes a fixed CV equal to the mean CV of the loads of each realization, which is the best possible common value.
Table 14.
Voltage RMSE ( p.u.) for increasing load heterogeneity. Mean over 10 seeds and meter penetrations of 20, 40, and 60%, with voltage noise of 0.001 p.u. CV SD: standard deviation of the CV across the loads of C1 (similar in C2 and C3). Fixed mean: fixed CV equal to the mean CV of the loads.
As decreases, the standard deviation of the CV across loads grows from 0.040 to 0.095, and with a single trajectory per load it reaches 0.122, with 80% of the loads between CVs of 0.24 and 0.52. Even so, the conclusions of the main experiment do not change. The mean paired reduction of Model 2 with respect to Model 3 remains between 13.4 and 16.1% in C1 and between 15.5 and 16.0% in C3, and between and % in C2. The fixed CV equal to the feeder mean gives the same accuracy as Model 2 in all cases, with mean paired differences between and 0.1%, slightly favorable to the fixed value as heterogeneity increases. Model 3b, with a fixed CV of 0.36, behaves in the same way. Therefore, even when the CV of the loads triples its dispersion, the accuracy of the estimator is governed by the level of the assumed pseudo-measurement uncertainty rather than by its distribution among loads, which extends the conclusion of Section 3.5 to feeders with more heterogeneous customers.
3.9. Robustness to Meter Placement
The main experiment places the meters at random. To assess whether the conclusions depend on this choice, Table 15 compares the random placement with the greedy placement described in Section 2.7, computed either with the standard deviations of Model 3 (10%) or with those of Model 2.
Table 15.
Voltage RMSE ( p.u.) for different meter placements. Mean over 10 seeds, with voltage noise of 0.001 p.u. Greedy ( 10%) and greedy ( M2): greedy placement computed with the pseudo-measurement standard deviations of Model 3 and Model 2, respectively.
The advantage of Model 2 over Model 3 holds for all the placements. Its mean paired reduction is 13.5, 15.6, and 14.2% in C1 and 15.5, 28.5, and 16.6% in C3 for the random, greedy ( 10%), and greedy ( M2) placements, respectively, while in C2 the differences remain between and %. Model 3b again gives the same RMSE as Model 2, with mean paired differences below 0.25%.
The placement itself, however, interacts strongly with the assumed uncertainty. The greedy placement computed with a standard deviation of 10% relies on a prior voltage covariance that underestimates the actual uncertainty of the pseudo-measurements, and the resulting meter sets are far from adequate. With Model 2 as the estimator, the placement computed with the standard deviations of Model 2 reduces the RMSE of the one computed with 10% by 33.2, 38.5, and 53.5% in C1, C2, and C3. When the 10% assumption is used both to place the meters and to estimate the state, the RMSE in C3 reaches p.u. at 20% of metered buses, more than twice the p.u. obtained with random placement and Model 2. In contrast, the greedy placement computed with the standard deviations of Model 2 performs close to the random one. It reduces the RMSE by 1.1% in C2 and 1.9% in C3 and increases it by 9.9% in C1, so the random placement of the main experiment is not a favorable choice for the proposal. These results show that a realistic level of pseudo-measurement uncertainty matters not only for the estimation but also for any placement method based on it.
3.10. Robustness to Non-Ideal Errors
The previous results assume independent Gaussian pseudo-measurement errors and an exact network model, which are the assumptions of the WLS estimator. Table 16 reports the results when these assumptions are violated, as described in Section 2.7, while the estimator keeps them. The base case of this experiment uses its own noise realizations, so its values differ slightly from those of the previous sections.
Table 16.
Voltage RMSE ( p.u.) under non-ideal errors. Mean over 10 seeds and meter penetrations of 20, 40, and 60%, with voltage noise of 0.001 p.u. Red.: mean paired reduction of Model 2 with respect to Model 3 (%).
Correlated errors are the most demanding case for both models, since a common hourly factor shifts all the pseudo-measurements in the same direction and its effect does not average out across loads. With a correlation of 0.3, the RMSE of Model 3 in C1 grows from 15.32 to p.u., whereas that of Model 2 grows to p.u. Because Model 2 assigns a larger uncertainty to the pseudo-measurements, the estimator relies more on the voltage measurements to correct the common shift. As a result, the reduction of Model 2 increases to 52.3 to 55.1% in C1 and 38.3 to 41.2% in C3, and becomes 17.7 to 18.7% in C2, where it was absent with independent errors. With asymmetric lognormal errors, the reductions are similar to those of the base case. With heavy-tailed Student t errors of the same standard deviation, they decrease to 9.6% in C1 and 12.7% in C3, because most errors of such a distribution are smaller than its standard deviation, which partly offsets the underestimation of Model 3.
Errors in the line impedances increase the RMSE of both models, especially in C3, where it reaches p.u. with Model 2 and p.u. with Model 3 for errors of 20%. The proposal does not correct parameter errors, which require parameter estimation or model validation, but its advantage holds, with reductions of 17.8 and 18.7% in C1, 16.5 and 12.7% in C3, and 1.3 and 3.9% in C2. In all the scenarios, Model 3b gives the same RMSE as Model 2, with mean paired differences below 0.6%. Therefore, the benefit of a realistic level of pseudo-measurement uncertainty does not depend on the Gaussian and independent error assumptions of the main experiment, and it becomes larger when errors are correlated across loads.
3.11. Robustness to Photovoltaic Generation
Table 17 reports the daytime RMSE of the seven variants for each PV level, averaged over seeds, meter penetrations, and day types, and Figure 10 shows the evolution of the Model 2 variants and of the fixed-CV baselines computed over the expected demand with the PV level. Without PV, the three Model 2 variants coincide. As the PV level increases, the error of Model 2 with PV uncertainty grows only slightly: at 80%, it rises from 12.61 to p.u. in C1 (2.2%) and from 8.89 to p.u. in C2 (2.6%), and it remains practically constant in C3 (15.45 and p.u.). The fixed baseline with computed over the demand degrades faster, by 20.0%, 5.9%, and 6.3% in C1, C2, and C3, respectively, so the advantage of Model 2 widens with PV. The mean paired reduction of Model 2 with PV uncertainty relative to this baseline, computed over the 90 cases of each PV level (10 seeds, three meter penetration levels, and 3 day types), grows from 13.8% at 20% of PV to 24.9% at 80% in C1 and from 14.5 to 18.5% in C3. In C2, it changes from to 1.5%, so the fixed CV of 10% loses the slight advantage it had in this feeder without PV. Computing the standard deviation of the fixed baselines over the expected net load instead of the expected demand changes these results only slightly, with reductions at 80% of 25.7%, 1.5%, and 19.4%. Relative to the fixed CV of 0.36, the differences remain below 0.1% when it is computed over the demand and below 0.6% when it is computed over the net load, consistent with Section 3.5.
Table 17.
Mean daytime RMSE ± standard deviation across 10 seeds ( p.u.) by PV level, feeder, and variant, averaged over meter penetrations of 20, 40, and 60% and over the three day types. In the fixed-CV baselines, the standard deviation of the pseudo-measurement is computed over the expected net load or over the expected demand.
Figure 10.
Daytime RMSE of the Model 2 variants and of the fixed-CV baselines computed over the expected demand as a function of the PV level in each feeder, averaged over seeds, meter penetrations, and day types. The vertical scale differs among panels and does not start at zero.
Representing the PV uncertainty in the pseudo-measurement variance brought practically no improvement. At 80% of PV, the mean paired RMSE reduction of Model 2 with PV uncertainty relative to Model 2 without it was 0.09%, %, and 0.07% in C1, C2, and C3, and it was lower in 50, 31, and 49 of the 90 paired cases (10 seeds, 3 penetrations, and 3 day types), respectively. At the peak hour, the between-day standard deviation of the PV output is about 0.056 p.u. of the installed capacity. The resulting term remains smaller than the demand term and affects only 30% of the loads, so it barely changes the relative weights of the pseudo-measurements.
The largest degradation comes from not knowing the day type. With the climatological profile, the mean daytime RMSE at 80% is 6.1%, 7.0%, and 0.9% higher than with the known day type in C1, C2, and C3, and in C2 it even exceeds that of the fixed baseline with (9.76 versus p.u.). Figure 11 shows that this penalty is largest on clear days, when the actual output exceeds the climatological mean the most. At 80%, the RMSE rises by 14.6% in C1 (from 12.87 to p.u.) and by 18.6% in C2 (from 8.92 to p.u.). On overcast days, the climatological profile overestimates the PV output and the penalty is smaller but still present (3.6%, 2.5%, and 2.8% in C1, C2, and C3), whereas on partly cloudy days, which dominate the climatology with a probability of 0.61, it practically vanishes. In C3, the penalty appears only on overcast days. These results indicate that, under high PV penetration, information on the expected sky condition matters more to the estimator than an explicit representation of the PV variance.
Figure 11.
Daytime RMSE of the Model 2 variants and of the fixed-CV baselines computed over the expected demand by day type at a PV level of 80% of the feeder peak demand, averaged over seeds and meter penetrations. The vertical scale differs among panels.
Table 18 reports the results of the forecast-error experiment at a PV level of 80%, in which the actual output of each PV load also differs from the day-type profile by a random factor of 10%. Forecast errors increase the daytime RMSE of all the variants, but they affect the fixed CV of 10% the most. In C1, its RMSE grows from 16.96 with the known day type to p.u. with a day-type forecast that is correct with a probability of 60%, whereas that of Model 2 with PV uncertainty grows from 12.15 to p.u. As a result, the mean paired reduction of Model 2 with PV uncertainty relative to the fixed CV of 10% increases from 26.4% with the known day type to between 28.0 and 38.1% with the inaccurate forecasts in C1, from 19.3% to between 23.3 and 25.2% in C3, and from 1.3% to between 3.0 and 7.0% in C2.
Table 18.
Mean daytime RMSE ( p.u.) with PV forecast errors at a PV level of 80%, a meter penetration of 40%, and 10% spatial variability of the actual PV output, averaged over seeds and day types. M2 + PV: Model 2 with the PV uncertainty consistent with each forecast; M2: Model 2 without PV uncertainty; Fixed 0.10: fixed CV of 0.10 computed over the demand.
Unlike the experiment with known day types, representing the PV uncertainty now brings a consistent, although small, improvement. When the generation term is made consistent with the forecast, the mean paired reduction of Model 2 with PV uncertainty relative to Model 2 without it at 80% of PV is between 0.27 and 1.39% in C1, between 0.05 and 0.77% in C2, and between 0.39 and 0.89% in C3 for the inaccurate forecasts, compared with less than 0.14% for the known day type. At 40% of PV, the differences remain below 0.11% in all cases. Therefore, the explicit PV variance becomes useful only when it reflects the actual uncertainty of the PV forecast, and its benefit remains smaller than that of setting a realistic level of uncertainty for the demand.
3.12. Computational Performance
All simulations were executed on a laptop equipped with an Intel Core i9-14900HX processor (24 cores, 32 threads, 2.20 GHz base frequency) and 64 GB of RAM, running Windows 64-bit, with pandapower and ten parallel processes. The experiments of Section 3 comprised about 444,000 WLS estimations, which were completed in about one hour of wall-clock time, and no convergence failures were observed in any run.
To assess the complexity and scalability of the estimator, Table 19 reports the mean time of one WLS estimation, measured in a single process with Model 2 and 40% of metered buses over six hours of the day and three seeds, for the three feeders ordered by size and for synthetic networks formed by two, four, and eight copies of C2 connected at the substation bus. Each Gauss–Newton iteration of the WLS estimator builds the sparse measurement Jacobian , forms the gain matrix , and solves the sparse linear system . In radial and weakly meshed distribution networks, and have a number of nonzero entries proportional to the number of buses, and sparse factorization with fill-reducing ordering keeps the cost of each iteration close to linear in the network size.
Table 19.
Size of the estimation problem and mean WLS computation time in a single process (Model 2, 40% of metered buses, six hours of the day, and three seeds). C2 × k: k copies of C2 connected at the substation bus.
The computation time increases monotonically with the number of buses: 0.031 s for C1 (363 buses), 0.036 s for C3 (618 buses), and 0.041 s for C2 (862 buses). The estimator converges in three iterations in all networks, except in C3, where some hours require four, which explains why the time per estimation of C3 is closer to that of C1 than its size alone would suggest. For the synthetic networks, the time grows to 0.210 s for 6889 buses and 13,777 state variables. The slope of the logarithm of the time per iteration against the logarithm of the number of buses is 0.69, because the fixed overhead of building the measurement set dominates in small networks. Between 3445 and 6889 buses, where this overhead weighs less, doubling the network size multiplies the time by 1.84, which is consistent with the nearly linear complexity expected from sparse WLS. The proposed calibration does not change this cost, since it modifies only the diagonal entries of . An estimation every hour, or even every few minutes, is therefore feasible for distribution networks of several thousand buses.
4. Discussion
The results show that the level of uncertainty assigned to the pseudo-measurements has a large effect on voltage estimation accuracy, and that deriving it from the coefficient of variation (CV) of the AMI-based trajectories improves on a conventional fixed value of 10%. With ideal voltage measurements, Model 2 reduced the RMSE of Model 3 by 53%, 18%, and 49% in C1, C2, and C3 (mean paired reduction) and outperformed it in all 150 seed–penetration pairs. A fixed CV equal to the population average of the trajectories (0.36, Model 3b) gave practically the same RMSE as Model 2 (at most 0.4% higher in any feeder), whereas fixed values of 0.10 and 0.20 were clearly worse. In this design, therefore, most of the benefit comes from the level of the assumed uncertainty, calibrated to the dispersion of consumption in the AMI data, and only a small part from assigning it load by load. The robustness experiments support this reading. The advantage of Model 2 persisted when the pseudo-measurement noise was generated with a CV unrelated to the one assumed by the estimator (Section 3.7), and a load-specific CV added nothing beyond the feeder mean even when the dispersion of the CV across loads tripled (Section 3.8).
Voltage noise proved decisive for how far this level should go. With ideal voltage measurements, the RMSE kept decreasing as the assumed uncertainty was raised above the population average (a fixed CV of 0.50 and were better than Model 2 in all pairs). With Gaussian noise of 0.001 p.u. added to the voltage measurements, equal to the standard deviation assigned in the WLS weighting, this advantage disappeared. Model 2 and the fixed CV of 0.36 were indistinguishable, and both were better than 0.50 and , by about 2.5% and 3.4% on average. This is consistent with the property of WLS that the best weights are those that match the true error variances: when the voltages are exact but weighted as if they had a 0.001 p.u. error, assuming a larger pseudo-measurement uncertainty compensates for that mismatch. Under voltage noise, the improvement of Model 2 over the 10% baseline shrinks to 13.5%, %, and 15.3% in C1, C2, and C3. It also depends on how the voltage measurements are weighted. When their assigned standard deviation was half the actual one, Model 3 was 4–9% more accurate, whereas when it was twice the actual one, the reduction of Model 2 rose to up to 37% (Section 3.6).
The benefit over the 10% baseline was not uniform across the three networks. With ideal voltage measurements, the mean RMSE of Model 3 was 2.16 times that of Model 2 in C1, 1.95 times in C3, and 1.22 times in C2; with voltage noise, these ratios fell to 1.16, 1.18, and 1.00, respectively. Since the fixed CV of 0.10 is the same in the three feeders, this ordering reflects how much the 10% baseline degrades in each network, rather than a property of the uncertainty model. It coincides with the average demand per load point (25.4, 18.0, and 8.9 kW in C1, C3, and C2; Table 1) and inversely with the number of load points (84, 169, and 213). A plausible interpretation is that, since pseudo-measurement errors scale with each load’s demand, feeders with fewer and larger loads concentrate larger absolute errors in fewer injections, so underestimating their uncertainty is penalized more heavily. With only three feeders, however, these factors cannot be separated, and this interpretation should be regarded as a hypothesis. Voltage noise also dominated the absolute error (the RMSE of Model 2 roughly doubled), which compresses the differences among models. In C2, the 10% baseline became as accurate as Model 2, which was lower in only 22 of 50 pairs.
For a distribution operator deciding how to improve state estimation under limited observability, these results suggest a low-cost option: setting the level of the pseudo-measurement uncertainty from the dispersion of consumption already recorded by the AMI, instead of using a generic value, provided that the voltage measurements are weighted according to their actual accuracy. A single feeder-wide CV equal to the population average captured practically all of the benefit, with and without voltage noise, so assigning a CV to each load appears optional in settings like the one simulated here. A fixed CV of 0.36 amounts to calibrating the pseudo-measurement uncertainty from error statistics, which does not in itself require trajectories. The results therefore do not show that the trajectory-based model outperforms such a calibrated fixed value, but that the AMI-derived trajectories provide a way to obtain the right level of uncertainty, which a generic 10% assumption does not. The benefit of the trajectory-specific mixtures for the expected demand curve was not isolated either, since Models 2 and 3 share it. The approach relies on consumption records already collected for billing, and a software-based improvement may be less costly than installing additional metering hardware, although this cost comparison was not evaluated. The payoff was not uniform: under voltage noise, it was 13.5 and 15.3% in the feeders with fewer, larger loads (C1 and C3) and absent in the feeder with many small loads (C2), so an operator evaluating this approach across a portfolio of feeders should expect uneven returns. In absolute terms, the RMSE values (about p.u. with voltage noise) and their differences among models are small compared with the 0.05 p.u. regulatory margin, so the improvement should not be read as changing operating decisions by itself. Its value lies in the relative reduction in the estimation error for a given metering coverage, which also carried over to the maximum voltage error, the voltage angles, the line flows, and the losses (Table 12). A realistic level of uncertainty also matters beyond the estimation itself: a greedy meter placement designed with the 10% assumption increased the RMSE by 33–54% compared with the same method designed with the AMI-based uncertainty (Section 3.9).
Model 2 also outperformed Model 1 with ideal voltage measurements, but by a smaller margin. The mean paired reduction was 7.0% in C1, 5.5% in C2, and 6.4% in C3, with Model 2 lower in 44, 50, and 50 of the 50 pairs, respectively. Since Model 1 differs from Model 2 in both the expected demand curve and the assumed CV, these results do not isolate which component drives the difference. They do indicate that representing each load by its dominant trajectory alone retains most, though not all, of the benefit of the full mixture. At a meter penetration of 40%, Model 1 captured 93%, 73%, and 93% of the RMSE reduction that Model 2 achieves with respect to Model 3 in C1, C2, and C3. With voltage noise, the difference between Models 1 and 2 fell below 1% (0.8%, 0.3%, and 0.7%).
RMSE decreased monotonically with penetration in all cases, by 25–33% between 20% and 60% with ideal voltage measurements and by about 34% for Model 2 with voltage noise. The marginal gain of each additional 10 percentage points diminished as penetration increased. For example, with ideal voltages in C3, the first step reduced the mean RMSE of Model 2 by p.u. and the last by p.u. The advantage of Model 2 over the fixed 10% baseline persisted at every penetration level evaluated in C1 and C3, both with ideal voltages (for example, from to p.u. at 20% and from to p.u. at 60% in C1) and with voltage noise (ratios of 1.16–1.19), and it was absent in C2 (ratios of 0.99–1.00 with noise).
The PV experiment indicates that these conclusions hold with behind-the-meter generation. With an installed capacity of up to 80% of the feeder peak demand in 30% of the loads, the daytime RMSE of Model 2 increased by about 2% in C1 and C2 and remained practically constant in C3, whereas that of the 10% baseline increased by 6–20%, so the advantage of Model 2 widened rather than narrowed as the net load departed from the demand. At 80% of PV, the mean paired reduction with respect to this baseline reached 24.9%, 1.5%, and 18.5% in C1, C2, and C3. The fixed CV of 0.36 matched Model 2 at every PV level, with differences below 0.1% when it was computed over the expected demand and below 0.6% when it was computed over the expected net load. The finding that the level of the assumed uncertainty matters more than its load-by-load assignment therefore also holds with PV generation. With a known day type, the explicit representation of the PV variance brought practically no improvement (below 0.1%), because the between-day dispersion of PV output at the hourly scale is small compared with the demand uncertainty. It became useful, although still small (0.05–1.4%), only when the day-type forecast was inaccurate and the PV term was made consistent with the forecast uncertainty. The expected PV output was far more important. When the day type was unknown and the climatological profile was used, the RMSE increased by up to 7% at 80% of PV, and by up to 18.6% on clear days, and in C2 it exceeded that of the 10% baseline. Forecast errors penalized the 10% baseline even more, so the reduction of Model 2 with respect to it rose to 28–38% in C1 and 23–25% in C3. For an operator, this suggests that combining AMI-derived demand uncertainty with even a coarse day-ahead classification of the sky condition is more valuable than refining the variance of the PV term.
Several limitations should be considered. The study is based on simulation: the CV values come from real AMI data and were not tuned to this study, but the pseudo-measurement errors, the voltage noise, and the PV output were generated synthetically, and the state estimates were not validated against measured voltages. Although the advantage of Model 2 persisted when the pseudo-measurement noise was generated with a CV different from the one assumed (Section 3.7), the finding that the best level of uncertainty lies near the population-average CV is a consistency result for the simulation, not evidence that the AMI-derived CV is optimal with real data. With voltage noise, the lowest RMSE among the levels tested was obtained near that average, but the levels form a coarse grid, so the optimum was not located precisely. The benefit of the proposal also depends on weighting the voltage measurements according to their actual accuracy, and it reverses when that accuracy is overestimated (Section 3.6). The evaluation used three feeders, a single representative weekday at hourly resolution, and the balanced single-phase equivalent of the feeders, whereas real medium-voltage feeders may operate unbalanced and their loads change within the hour. The CV of each trajectory is a single value averaged over users and hours, and the framework assumes that the trajectory mixture of each load is known, which in practice requires customer-level AMI history; customers without it would need a default assignment. The proposal does not correct errors in the network parameters, which increased the RMSE of all the models (Section 3.10). Only random and greedy meter placements were compared, so the interaction between the uncertainty model and an optimal placement method was not fully explored. The PV model represents the between-day variability of the hourly irradiance within each day type and a 10% spatial variability of the actual output, but not intra-hour fluctuations caused by passing clouds. It uses a constant performance ratio, unity power factor, and a single year of satellite-derived data, and the forecast errors were represented by simplified models of the day-type classification and of a common error rather than by an actual forecasting method. Finally, RMSE is averaged over all buses and hours; the additional metrics reported in Table 12 reduce, but do not remove, the risk that it hides the largest errors in critical buses or hours.
Future work should address several of these limitations. First, and most importantly, the pseudo-measurement model and the resulting state estimates should be validated against real, independently measured voltage data, which would be a more stringent test of the method’s practical value. Second, the CV could be refined using the same user-to-trajectory assignment already produced by the NMF and clustering procedure in our previous work [17]. Since every user in that original population was assigned to one of the four trajectories, and hourly CV values were computed for each of them, an hour-resolved CV per trajectory could be obtained by averaging the hourly CV values only across the users assigned to each trajectory, rather than collapsing across both users and hours into a single number. This hour-dependent CV could then be applied to the synthetic loads to test whether it sharpens state estimation further, particularly during peak hours, when pseudo-measurement errors are most consequential. Third, the framework should be extended to three-phase unbalanced estimation, to a larger set of feeders, and to the joint design of meter placement and pseudo-measurement uncertainty with optimal placement methods [4]. Fourth, the PV analysis could be extended with intra-hour irradiance data, actual day-ahead forecasts of the sky condition, and PV inverters operating with reactive power control [38], as well as combined with parameter estimation to handle errors in the network model.
5. Conclusions
This study evaluated pseudo-measurement uncertainty models for distribution system state estimation, using the consumption trajectories characterized in our previous work from real AMI data (termed flexibility trajectories there). In a simulation study on three real Colombian feeders with contrasting loading and voltage conditions, assigning uncertainty from the mixture-weighted coefficient of variation (Model 2) produced lower voltage estimation error than a conventional fixed uncertainty of 10%. With ideal voltage measurements, the mean paired reduction in RMSE was 53%, 18%, and 49% in the three feeders, with lower error in all 150 seed–penetration pairs. When Gaussian noise with the standard deviation assigned in the WLS weighting (0.001 p.u.) was added to the voltage measurements, the reduction fell to 13.5% and 15.3% in the two feeders with fewer and larger loads and vanished in the feeder with many small loads.
Additional comparisons show that most of this improvement comes from the level of the assumed uncertainty. A single fixed CV equal to the population average of the trajectories (0.36) gave practically the same RMSE as Model 2, whereas fixed values of 0.10 and 0.20 were clearly worse, so assigning the CV load by load adds practically nothing over a single feeder-wide value. This conclusion held when the pseudo-measurement noise was generated with a CV unrelated to the one assumed by the estimator, when the dispersion of the CV across loads tripled, under correlated, asymmetric, and heavy-tailed errors and errors in the line impedances, and with a greedy meter placement. Correlated errors across loads even widened the advantage over the 10% baseline to 38–55% in two feeders. With ideal voltage measurements, a higher assumed uncertainty further reduced the error; with noisy voltage measurements, the lowest error was obtained near the population-average CV, which is consistent with weighting each measurement according to its actual error. The benefit also depends on weighting the voltage measurements consistently with their accuracy, since overestimating that accuracy made the 10% baseline more accurate.
These conclusions held when behind-the-meter PV generation was added to 30% of the loads, with installed capacities of up to 80% of the feeder peak demand and clear, partly cloudy, and overcast days derived from satellite irradiance data. The daytime RMSE of Model 2 increased by about 2% or less, whereas the 10% baseline degraded faster, so the advantage of Model 2 widened with PV, to 24.9% and 18.5% in the two feeders with larger loads at the highest PV level. Including the variance of PV output in the pseudo-measurement weights brought practically no improvement with a known day type and only a small one with inaccurate forecasts, whereas not knowing the expected sky condition increased the error by up to 7%, and by up to 18.6% on clear days. Thus, with PV, a reasonable estimate of the expected generation matters more than a detailed model of its variability.
These findings suggest that utilities with AMI infrastructure already in place have a low-cost option for improving state estimation accuracy under limited real-time metering: setting the level of the pseudo-measurement uncertainty from the dispersion of consumption in data they already collect, instead of using a generic value. The calibration modifies only the weights of the estimator and does not change its computational cost, which grew nearly linearly with network size and remained about 0.2 s per estimation for a network of 6889 buses. This does not replace the value of expanding real-time measurement coverage, but offers a complementary improvement.
The results are based on simulations with three feeders, a single representative weekday at hourly resolution, the balanced single-phase equivalent of the feeders, and synthetic pseudo-measurement errors calibrated from population-level statistics, so they should be interpreted within these bounds. Natural next steps include validating the approach against real, independently measured voltage data; using hour-dependent uncertainty models; extending it to three-phase unbalanced estimation and to the joint design of meter placement and pseudo-measurement uncertainty; and incorporating intra-hour PV variability and actual forecasts of the sky condition.
Author Contributions
Conceptualization, J.A.O.-L. and J.A.R.-G.; methodology, R.G.-S. and J.A.R.-G.; software, J.A.O.-L.; validation, J.A.O.-L. and J.A.R.-G.; formal analysis, J.A.O.-L.; investigation, J.A.O.-L. and J.A.R.-G.; resources, R.G.-S.; data curation, J.A.O.-L.; writing—original draft preparation, J.A.O.-L.; writing—review and editing, J.A.O.-L. and J.A.R.-G.; visualization, J.A.O.-L.; supervision, J.A.R.-G.; project administration, J.A.R.-G. and R.G.-S. All authors have read and agreed to the published version of the manuscript.
Funding
This research was supported by Electrical Machines and Drives (EM&D) from Universidad Nacional de Colombia, Energy Solutions Cooperation Network for Communities, code: 59384.
Institutional Review Board Statement
Not applicable.
Informed Consent Statement
Not applicable.
Data Availability Statement
The distribution network models and consumption data used in this study are not publicly available due to confidentiality agreements with the utility that provided them. The irradiance data were obtained from the National Aeronautics and Space Administration (NASA) Langley Research Center’s Prediction Of Worldwide Energy Resources (POWER) project, funded through the NASA Earth Science Division, Hourly 2.10.2 version, accessed on 5 October 2026.
Conflicts of Interest
The authors declare no conflicts of interest.
Abbreviations
The following abbreviations are used in this manuscript:
| AMI | Advanced Metering Infrastructure |
| CV | Coefficient of Variation |
| DSSE | Distribution System State Estimation |
| GIS | Geographic Information System |
| HV | High Voltage |
| MV | Medium Voltage |
| NMF | Non-negative Matrix Factorization |
| PCA | Principal Component Analysis |
| p.u. | per unit |
| PV | Photovoltaic |
| R/X | Resistance-to-reactance ratio |
| RMSE | Root Mean Squared Error |
| SCADA | Supervisory Control and Data Acquisition |
| STC | Standard Test Conditions |
| WLS | Weighted Least Squares |
References
- Radhoush, S.; Bahramipanah, M.; Nehrir, H.; Shahooei, Z. A Review on State Estimation Techniques in Active Distribution Networks: Existing Practices and Their Challenges. Sustainability 2022, 14, 2520. [Google Scholar] [CrossRef] [Scilit]
- Fotopoulou, M.; Petridis, S.; Karachalios, I.; Rakopoulos, D. A Review on Distribution System State Estimation Algorithms. Appl. Sci. 2022, 12, 11073. [Google Scholar] [CrossRef] [Scilit]
- Xia, Y.; Wang, K.; Yu, R.; Gao, R.; Li, Z.; Wu, F. Coordinating electric vehicles, peer-to-peer energy market, and network reconfiguration to improve the distribution system resilience. IEEE Trans. Ind. Inform. 2026, 1–12. [Google Scholar] [CrossRef] [Scilit]
- Jabari, F.; Bahmanyar, A.; Shabanzadeh, M. Optimal Meter Placement in Distribution Feeders Using Branch-Current based Three-Phase State Estimation: A Quest for Observability Enhancement. In Proceedings of the 2020 10th Smart Grid Conference (SGC), Kashan, Iran, 16–17 December 2020; pp. 1–6. [Google Scholar] [CrossRef] [Scilit]
- Dehghanpour, K.; Yuan, Y.; Wang, Z.; Bu, F. A Game-Theoretic Data-Driven Approach for Pseudo-Measurement Generation in Distribution System State Estimation. IEEE Trans. Smart Grid 2019, 10, 5942–5951. [Google Scholar] [CrossRef] [Scilit]
- Wang, Y.; Gu, J.; Yuan, L. Distribution network state estimation based on attention-enhanced recurrent neural network pseudo-measurement modeling. Prot. Control Mod. Power Syst. 2023, 8, 31. [Google Scholar] [CrossRef] [Scilit]
- Liu, J.; Singh, R.; Pal, B.C. Distribution System State Estimation With High Penetration of Demand Response Enabled Loads. IEEE Trans. Power Syst. 2021, 36, 3093–3104. [Google Scholar] [CrossRef] [Scilit]
- Madbhavi, R.; Natarajan, B.; Srinivasan, B. Graph Neural Network-Based Distribution System State Estimators. IEEE Trans. Ind. Inform. 2023, 19, 11630–11639. [Google Scholar] [CrossRef] [Scilit]
- Soroudi, A.; Rabiee, A.; Keane, A. Distribution networks’ energy losses versus hosting capacity of wind power in the presence of demand flexibility. Renew. Energy 2017, 102, 316–325. [Google Scholar] [CrossRef] [Scilit]
- Subramanya, S.A.; Parathodiyil, M.; Nagashree, A. Implementation of Peak Demand Reduction on a Distribution Feeder using Python-OpenDSS co-simulation. In Proceedings of the 2021 IEEE International Conference on Electronics, Computing and Communication Technologies (CONECCT), Bangalore, India, 9–11 July 2021; pp. 1–6. [Google Scholar] [CrossRef] [Scilit]
- Mosbah, H.; Guerra, E.C.; Barrera, J.L.C. Maximizing the Electricity Cost-Savings for Local Distribution System Using a New Peak-Shaving Approach Based on Mixed Integer Linear Programming. Electronics 2022, 11, 3610. [Google Scholar] [CrossRef] [Scilit]
- Wynn, S.L.L.; Pinthurat, W.; Marungsri, B. Multi-Objective Optimization for Peak Shaving with Demand Response under Renewable Generation Uncertainty. Energies 2022, 15, 8989. [Google Scholar] [CrossRef] [Scilit]
- Thayer, B.; Engel, D.; Schneider, K. Load Modeling with Smart Meter Data for Advanced Volt-VAR Optimization Applications. In Proceedings of the 2019 IEEE Power & Energy Society General Meeting (PESGM), Atlanta, GA, USA, 4–8 August 2019; pp. 1–5. [Google Scholar] [CrossRef] [Scilit]
- Wang, Y.; Chen, Q.; Kang, C.; Xia, Q. Clustering of Electricity Consumption Behavior Dynamics Toward Big Data Applications. IEEE Trans. Smart Grid 2016, 7, 2437–2447. [Google Scholar] [CrossRef] [Scilit]
- Toledo-Cortés, S.; Lara, J.S.; Zambrano, A.; Osorio, F.A.G.; Garcia, J.R. Characterization of electricity demand based on energy consumption data from Colombia. Int. J. Electr. Comput. Eng. 2023, 13, 4798–4809. [Google Scholar] [CrossRef] [Scilit]
- Estrada, J.H.; Cano-Plata, E.A.; Younes-Velosa, C.; Cortés, C.L. Entropy and coefficient of variation (CV) as tools for assessing power quality. Ing. Investig. 2011, 31, 45–50. [Google Scholar] [CrossRef] [Scilit]
- Osorio-Lázaro, J.; Rosero-García, J. Characterization of Regulated Electricity Consumption Flexibility Using Variability, Entropy, and Latent Profiling. Processes 2026, 14, 712. [Google Scholar] [CrossRef] [Scilit]
- Osorio-Lázaro, J.A.; Garcia-Sierra, R.; Rosero-García, J. Characterization of Consumer Flexibility and Its Impact on Voltage Regulation in Distribution Systems. Electricity 2026, 7, 110. [Google Scholar] [CrossRef] [Scilit]
- Douglass, P.J.; Garcia-Valle, R.; Ostergaard, J.; Tudora, O.C. Voltage-Sensitive Load Controllers for Voltage Regulation and Increased Load Factor in Distribution Systems. IEEE Trans. Smart Grid 2014, 5, 2394–2401. [Google Scholar] [CrossRef] [Scilit]
- Xie, Q.; Hui, H.; Ding, Y.; Ye, C.; Lin, Z.; Wang, P.; Song, Y.; Ji, L.; Chen, R. Use of demand response for voltage regulation in power distribution systems with flexible resources. IET Gener. Transm. Distrib. 2020, 14, 883–892. [Google Scholar] [CrossRef] [Scilit]
- Rahman, A.; Srikumar, V.; Smith, A.D. Predicting electricity consumption for commercial and residential buildings using deep recurrent neural networks. Appl. Energy 2018, 212, 372–385. [Google Scholar] [CrossRef] [Scilit]
- Maamar, A.; Benahmed, K. A Hybrid Model for Anomalies Detection in AMI System Combining K-means Clustering and Deep Neural Network. Comput. Mater. Contin. 2019, 60, 15–39. [Google Scholar] [CrossRef] [Scilit]
- Jokar, P.; Arianpoo, N.; Leung, V.C.M. Electricity Theft Detection in AMI Using Customers’ Consumption Patterns. IEEE Trans. Smart Grid 2016, 7, 216–226. [Google Scholar] [CrossRef] [Scilit]
- Paatero, P.; Tapper, U. Positive matrix factorization: A non-negative factor model with optimal utilization of error estimates of data values. Environmetrics 1994, 5, 111–126. [Google Scholar] [CrossRef] [Scilit]
- Xu, W.; Liu, X.; Gong, Y. Document clustering based on non-negative matrix factorization. In Proceedings of the 26th Annual International ACM SIGIR Conference on Research and Development in Informaion Retrieval, Toronto, ON, Canada, 28 July–1 August 2003; pp. 267–273. [Google Scholar] [CrossRef] [Scilit]
- Singh, R.; Pal, B.C.; Jabr, R.A. Choice of estimator for distribution system state estimation. IET Gener. Transm. Distrib. 2009, 3, 666–678. [Google Scholar] [CrossRef] [Scilit]
- Singh, R.; Pal, B.C.; Vinter, R.B. Measurement placement in distribution system state estimation. IEEE Trans. Power Syst. 2009, 24, 668–675. [Google Scholar] [CrossRef] [Scilit]
- Pau, M.; Pegoraro, P.A.; Sulis, S. Efficient branch-current-based distribution system state estimation including synchronized measurements. IEEE Trans. Instrum. Meas. 2013, 62, 2419–2429. [Google Scholar] [CrossRef] [Scilit]
- Zhang, Y.; Wang, J.; Li, Z. Interval state estimation with uncertainty of distributed generation and line parameters in unbalanced distribution systems. IEEE Trans. Power Syst. 2020, 35, 762–772. [Google Scholar] [CrossRef] [Scilit]
- Song, X.; Zheng, W.X. A Kalman-filtering derivation of input and state estimation for linear discrete-time systems with direct feedthrough. Automatica 2024, 161, 111453. [Google Scholar] [CrossRef] [Scilit]
- Thurner, L.; Scheidler, A.; Schäfer, F.; Menke, J.H.; Dollichon, J.; Meier, F.; Meinecke, S.; Braun, M. pandapower—An Open-Source Python Tool for Convenient Modeling, Analysis, and Optimization of Electric Power Systems. IEEE Trans. Power Syst. 2018, 33, 6510–6521. [Google Scholar] [CrossRef] [Scilit]
- Abur, A.; Gómez Expósito, A. Power System State Estimation: Theory and Implementation; Power Engineering, Marcel Dekker: New York, NY, USA, 2004. [Google Scholar]
- Kekatos, V.; Wang, G.; Conejo, A.J.; Giannakis, G.B. Stochastic Reactive Power Management in Microgrids With Renewables. IEEE Trans. Power Syst. 2015, 30, 3386–3395. [Google Scholar] [CrossRef] [Scilit]
- Pinthurat, W.; Deanseekeaw, A.; Surinkaew, T.; Boonraksa, T.; Boonraksa, P.; Marungsri, B. An Intelligent Voltage Control With Power Loss Model Integration in Active Distribution Network. IEEE Open Access J. Power Energy 2025, 12, 678–690. [Google Scholar] [CrossRef] [Scilit]
- Abdelkader, S.M.; Kinga, S.; Ebinyu, E.; Amissah, J.; Mugerwa, G.; Taha, I.B.M.; Mansour, D.E.A. Advancements in data-driven voltage control in active distribution networks: A Comprehensive review. Results Eng. 2024, 23, 102741. [Google Scholar] [CrossRef] [Scilit]
- NASA Langley Research Center. Prediction of Worldwide Energy Resources (POWER) Project, Hourly API Version 2.10.2. 2026. Available online: https://power.larc.nasa.gov (accessed on 5 October 2026).
- Duffie, J.A.; Beckman, W.A. Solar Engineering of Thermal Processes, 4th ed.; John Wiley & Sons: Hoboken, NJ, USA, 2013. [Google Scholar]
- Xu, S.; Xue, Y.; Chang, L. Review of Power System Support Functions for Inverter-Based Distributed Energy Resources- Standards, Control Algorithms, and Trends. IEEE Open J. Power Electron. 2021, 2, 88–105. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.