Bonded and Unbonded Length Allocation in UHPC-Grouted Corrugated Duct Connections: Anchorage Slip and Reinforcement Strain in Precast Bridge Columns

,
,
and
Highway School, Chang’an University, Xi’an 710064, China
*
Author to whom correspondence should be addressed.
This article belongs to the Section Building Structures

Abstract

In precast bridge columns for accelerated bridge construction (ABC), grouted duct connections must provide reliable anchorage while accommodating reinforcement deformation near the base. Previously reported full-scale pullout and CIP/PGD-S tests, together with newly reported PGD-D/PGS tests, were examined using a local bond–slip-based finite-anchorage model for ultra-high performance concrete (UHPC)-grouted ducts. Bonded and unbonded lengths were varied at a fixed total bar connection length of 14db. Increasing recess depth from 10 to 40 mm raised initial stiffness by 12.6% but peak resistance by 4.35%. Among B8-U6 (B8), B10-U4 (B10), and B12-U2 (B12), peak resistance and cumulative hysteretic energy differed by at most 1.0% and 2.8%, respectively. At 6.38% drift, unbonded elongation contributed 53.2% and 32.9% of connected-bar cyclic deformation in B10 and B12, respectively. Relative to B10, the zero-unbonded-length B14-U0 (B14) model developed 0.6% lower peak resistance and dissipated 7.1% less cumulative energy. At 6.38% drift, B10 exhibited 5.2% lower spatially averaged and 14.0% lower peak reinforcement strains above the joint than B14; the coupled length changes preclude isolating the unbonded-segment effect. Reconstructed maximum local bond stresses remained below 38% of the adopted peak bond stress. Thus, length allocation affects local force transfer and reinforcement strain demand more strongly than global lateral resistance.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.