Abstract
The multi-market electricity procurement problem exposes load aggregators to significant financial risk due to the inherent volatility and unpredictability of electricity prices across day-ahead, real-time, and long-term contract markets. This paper proposes a min-max robust mean-risk framework that optimizes procurement decisions against worst-case price uncertainty, yielding a conservative upper-bounding strictly convex quadratic program that balances expected cost against risk exposure through a risk-aversion parameter. To overcome the computational challenge posed by time-coupled cumulative procurement caps over extended horizons, Lagrangian relaxation is employed to decompose the primal problem into independent per-period subproblems. Each per-period subproblem is solved analytically: its constraint set is transformed into a two-dimensional convex polygon, and both its interior and boundary are examined systematically to determine the optimum of that subproblem, achieving constant-time solutions for each subproblem and entirely eliminating the reliance on commercial solvers. The analytical solver is embedded within a single-stage Polyak subgradient strategy followed by a final feasibility restoration that returns a constraint-satisfying schedule. Numerical case studies across horizons from 24 to 8760 h demonstrate that the proposed method matches Gurobi for the same quadratic program formulation within numerical tolerance while maintaining nearly constant per-period computation time and indicating favorable scaling potential. Sensitivity analyses reveal that cumulative purchase caps and the risk-aversion parameter are the primary drivers of procurement structure, with the long-term contract market dominating due to its low price volatility. The proposed method provides an efficient, scalable, and solver-free alternative for long-horizon procurement scheduling, particularly valuable when computational resources are constrained.
1. Introduction
The ongoing liberalization and restructuring of electricity markets worldwide have fundamentally transformed the landscape of power procurement, introducing multi-market trading mechanisms that offer both unprecedented opportunities and significant challenges for market participants [1,2]. The day-ahead (DA), real-time (RT), and long-term (LT) contract markets have emerged as the three dominant channels through which load aggregators procure electricity to serve end-user demand [3,4]. In this multi-market environment, participants can exploit price differentials across markets and across time to maximize profits, yet they simultaneously face substantial financial exposure due to the inherent volatility and unpredictability of electricity prices. The fundamental challenge lies in determining how to optimally allocate procurement volumes across these three markets over a multi-period horizon—a decision problem that is further complicated by the need to manage the financial risk arising from price uncertainty.
The early formulations of the multi-market procurement problem adopted a deterministic framework, wherein optimal schedules were derived based on point forecasts of electricity prices without explicit consideration of uncertainty [5]. While such approaches are computationally tractable, they rest on an assumption that price forecasts are sufficiently accurate—an assumption that is rarely satisfied in practice. The deregulation of power systems has fundamentally altered electricity pricing mechanisms, introducing substantial price fluctuations driven by time-varying generation supply, load demand patterns, and market participant behaviors [6]. Price forecasts inevitably contain errors, and when actual prices deviate significantly from predictions, deterministic cost-minimizing strategies can expose market participants to severe financial losses [7]. The more volatile the prices, the greater the potential loss caused by inaccurate forecasts, underscoring the critical importance of incorporating risk management into procurement decision-making.
In response to these challenges, researchers have increasingly turned to portfolio optimization frameworks that treat electricity procurement across multiple markets as an investment portfolio problem. Ref. [8] established a foundational model for load aggregators purchasing electricity from DA, RT, and LT markets. Subsequent work has extended this line of inquiry by incorporating various risk measures, adopting conditional value-at-risk (CVaR) [9,10] or Monte Carlo simulation [11,12] to quantify the financial risk introduced by parameter uncertainty. However, these approaches have notable limitations, as CVaR typically requires the generation of numerous scenarios for calculation, and although Monte Carlo simulation can accommodate different probability distributions, scenario-based methods may still fail to capture the fat-tailed and skewed price distributions observed in actual electricity markets [13]. These limitations complicate the problem and impede rapid post-forecast procurement planning.
More recently, robust optimization has emerged as a powerful alternative that avoids distributional assumptions and scenario generation by optimizing against worst-case realizations of uncertain parameters [14,15,16]. In the energy domain, robust optimization has been applied to various trading and scheduling problems, including self-scheduling under price uncertainty [17] and distributional robust energy management strategies [18,19,20]. These approaches offer the advantage of providing solutions that are protected against the most adverse price outcomes, without requiring precise knowledge of the underlying probability distributions [21].
Building upon these foundations, this paper develops a min-max robust mean-risk framework for multi-market electricity procurement. The proposed model optimizes against worst-case price uncertainty, incorporating both the expected procurement cost (captured by mean price coefficients) and the financial risk (captured by a quadratic term weighted by the covariance matrix of price fluctuations). The resulting formulation is a conservative upper-bounding strictly convex quadratic program whose optimal solution achieves a favorable trade-off between expected profit and risk exposure—a min-max robust mean-variance portfolio model for load aggregator trading in multi-level power markets.
However, a significant computational challenge arises from the structure of the problem. While each individual time period involves only three decision variables (procurement volumes from the three markets), regulatory authorities typically impose cumulative procurement upper limits over the entire scheduling horizon to prevent excessive speculative behavior by market participants [22]. This coupling constraint ties all time periods together, transforming what would otherwise be a collection of independent per-period problems into a large-scale coupled optimization that becomes computationally intractable for horizons extending to 8760 h (one full year) [23]. The escalating dimensionality, driven by the growing number of time periods and the single coupling constraint spanning the entire horizon, necessitates specialized solution techniques beyond the capabilities of generic commercial solvers [24].
Lagrangian relaxation (LR) provides a natural approach for addressing such time-coupled structures [25]. By dualizing the coupling constraint through the introduction of nonnegative Lagrange multipliers, the original large-scale problem can be decomposed into a series of independent per-period subproblems. Subsequent studies have incorporated LR into various energy applications [26,27]. Ref. [26] has used LR to solve the unit commitment problem whose complexity after coupling has exceeded the solvable range, while Ref. [27] establishes a new technique for the maintenance scheduling of a hydrothermal power system that uses the LR method to obtain the incremental cost of updating the system. Further work solves the dual problem via the subgradient method [28], which has been widely employed in LR frameworks for power system optimization [29,30].
Nevertheless, a critical bottleneck remains: during the solution of the LR problem, thousands of such subproblems must be solved iteratively. Each subproblem is a small-scale quadratic program with only three market variables, one equality constraint, and box constraints. Invoking a commercial solver for each subproblem at each iteration results in prohibitively long computational time, particularly for long-horizon problems where the number of periods is large. To overcome this difficulty, we propose a solver-free solution framework for the overall procurement problem: each LR subproblem is solved analytically, the multipliers are updated by a single-stage Polyak scheme, and a final feasibility restoration returns a constraint-satisfying schedule that agrees with the commercial solver solution for the same quadratic program within numerical tolerance.
The main contributions of this paper are threefold:
- (1)
- A min-max robust mean-variance procurement model for three electricity markets (RT, DA, and LT) is developed. By optimizing against worst-case price uncertainty, the model yields a conservative upper-bounding strictly convex quadratic program that explicitly trades off expected profit against risk, with the risk-aversion parameter providing a systematic mechanism for controlling the trade-off.
- (2)
- Lagrangian relaxation is applied to the procurement model to eliminate the time-coupled cumulative constraint, decomposing the primal large-scale problem into a series of independent per-period subproblems with only three variables each. This decomposition simplifies the problem structure and enables parallel computation across all time periods, indicating the potential for parallel scalability.
- (3)
- A fully analytical subproblem solver embedded in a single-stage Polyak subgradient strategy with final feasibility restoration is proposed for solving the procurement model, a conservative upper-bounding strictly convex quadratic program, after its Lagrangian relaxation. This method obtains the exact optimum of each subproblem in constant time without any commercial solver and effectively solves the primal problem through iteration, achieving a near-optimal schedule for long-horizon procurement scheduling efficiently.
The remainder of this paper is organized as follows. Section 2 presents the problem formulation, beginning with the deterministic profit maximization model and then developing the min-max robust mean-risk framework leading to the conservative upper-bounding convex quadratic programming formulation. Section 3 describes the solution methodology, including the Lagrangian relaxation of the coupled problem, the analytical method for solving the resulting subproblems, and the single-stage Polyak subgradient strategy. Section 4 presents numerical case studies across horizons ranging from 24 h to 8760 h, comparing the proposed method against commercial solver solutions and demonstrating its accuracy, efficiency, and parallel potential. Finally, Section 5 concludes the paper with a summary of findings and directions for future research.
2. Robust Mean-Variance Portfolio Model for Multi-Market Electricity Procurement
Consider a load aggregator participating in three electricity markets—real-time (RT), day-ahead (DA), and long-term (LT)—to procure electricity for serving a fixed load over a scheduling horizon of T periods indexed by t = 1, …, T. At each period t, the load aggregator determines the procurement volumes PRT(t), PDA(t), and PLT(t) from the three markets. The load demand PLD is assumed known and inelastic, and the retail selling price λLD is given. The mechanism and core constraints of multi-market electricity procurement are as shown in Figure 1.
Figure 1.
Multi-Market Electricity Procurement Mechanism and Model.
2.1. Deterministic Profit Maximization
Under deterministic price forecasts, the load aggregator’s profit maximization problem can be written as:
which is equivalent to the cost minimization problem:
subject to the following constraints, where λRT(t), λDA(t), and λLT(t) denote the electricity prices in real-time, day-ahead, and long-term electricity markets at time t. The power balance constraint requires that procurement must meet load in each period:
Each market imposes upper and lower limits on transaction volumes:
Cumulative regulatory constraints require that the cumulative net procurement from each market over the horizon cannot exceed a specified proportion of total load:
where αi ∈ [0,1] (i = 1,2,3) is the cumulative procurement cap for market i, expressed as a fraction of total load over the horizon. These constraints constitute the only time-coupling element in the problem.
2.2. Min-Max Robust Mean-Risk Formulation
The deterministic model relies on point forecasts of electricity prices, which are inherently inaccurate. To hedge against price uncertainty, we adopt a min-max robust framework that optimizes against the worst-case price deviations. Let , , and denote the predicted mean prices, and ηRT(t), ηDA(t), and ηLT(t) represent the worst-case prices chosen adversarially within a prescribed uncertainty set. The robust counterpart is formulated as:
where the quadratic term with covariance matrix Q(t)≻0 captures the risk (volatility) of procurement costs, and μ > 0 is the risk-aversion parameter. The uncertainty set for the price perturbations is defined by the following ellipsoidal constraint:
with κ controlling the size of the uncertainty set. This ellipsoidal constraint ensures that the adversarial price deviations remain within a statistically meaningful range consistent with the covariance structure of the price forecasts.
For a single period t, suppose that P(t) = [PRT(t),PDA(t),PLT(t)]T is the power trading vector, is the vector of mean prices, and η(t) = [ηRT(t),ηDA(t), ηLT(t)]T is the adversarial price. Thus, the original min-max subproblem for period t is:
Since μP(t)TQ(t)P(t) is independent of η(t), the inner maximization acts only on the linear term η(t)TP(t). Now we introduce the transformation
and the inner maximization problem is equivalent to
A further definition proposed is
where Q(t)1/2 is the square root of Q(t). The inner maximization problem becomes
This inner maximization problem can be directly solved and the minimum is
As Q(t)≻0, there is
Apart from the zero-uncertainty case, inequality (14) holds with equality only at the tangency point; otherwise, it is strict. Replacing the square-root term with the right-hand side of inequality (14) and ignoring constant terms (which do not affect the optimal solution) yields a conservative quadratic upper bound on the original min-max cost:
Define the adjusted risk-aversion parameter as
then the min-max problem is replaced by the following conservative strictly convex quadratic program:
The constraints remain the same as in the deterministic case, except that the trading limits are signed: positive volumes denote purchases and negative volumes denote sales:
Since Q(t)≻0 and , this conservative objective function is strictly convex, and all constraints are linear; hence, the resulting conservative quadratic program has a unique optimal solution and can be solved efficiently.
The overall conservative procurement problem is then:
where
3. Lagrangian Relaxation-Based Solution Algorithm
3.1. Lagrangian Relaxation of the Model
Consider this multi-market power procurement optimization problem over T periods indexed by t. It is assumed that the feasible region of problem (20) is nonempty and that the price coefficients across the three markets are not perfectly linearly dependent. Let x(t) = [PRT(t), PDA(t), PLT(t)]T denote the procurement decision vector at period t. The total demand over the entire horizon is , and the cumulative proportion upper limits for the three markets are represented by the vector α = [α1,α2,α3]T. Since the removal of the constant term does not affect the optimal solution, the primal problem can be formulated as the convex quadratic program:
where collects the average price coefficients of the three markets at period t, is a constant weight, Q(t) denotes the symmetric positive definite covariance matrix of the price coefficients, e = [1,1,1]T, b = αD ∈ ℝ3 denotes the cumulative procurement upper-limit vector, I is the unit matrix, and xmax = [, , ]T specifies the per-period trading bounds. Strict convexity, guaranteed by Q(t)≻0, ensures the uniqueness of the optimal solution.
Notably, the only coupling across periods arises from the inequality constraint , while all other constraints are time-decoupled. This separable structure naturally motivates the application of Lagrangian relaxation (LR) [31]. By introducing a nonnegative multiplier vector for the coupling constraint, the Lagrangian function L(x,θ) is constructed as
Based on (22), the Lagrangian dual function Z(θ) is then obtained by minimizing L(x,θ) subject only to the local constraints, as
where χ denotes the feasible region formed exclusively by the time-decoupled constraints. For any fixed θ ≥ 0 and any feasible solution of the primal problem, the following relationships hold:
where the first inequality follows the definition of Z(θ), as it is defined to be the minimum of L(x,θ) over x∈χ, while the second inequality follows from θ ≥ 0 and ≤ 0. Since the objective function is strictly convex and its feasible region defined by linear constraints is nonempty, the primal problem attains a finite optimal value v. As the inequality chain holds for every primal feasible solution , we obtain (25):
where f denotes the feasible region of the conservative primal problem. By weak duality [32], each evaluation of Z(θ) provides a valid lower bound on the optimal cost v. The Lagrangian dual problem seeks the tightest possible lower bound. It is well known that for convex quadratic programming with a finite optimal solution, strong duality holds [32], the dual optimal value is attained and the set of optimal dual multipliers is nonempty. Consequently, the dual problem can be formulated as the following maximization problem:
As the feasible set is the Cartesian product , where χt = {xt|eTxt = PLD(t), −xmax ≤ xt ≤ xmax}, for any fixed θ the inner minimization decomposes into T independent per-period subproblems. Thus,
For fixed θ, the subproblems are independent and can be solved in parallel. Thus, each subproblem is a small-scale strictly convex quadratic program as follows:
These subproblems are completely independent and can be solved in parallel, and each subproblem only involves one linear equality constraint and box constraints.
After solving the subproblems, the dual value Z(θ) can be evaluated. Since Z(θ) is concave but nondifferentiable, we employ the subgradient method [32], where the subgradient can be obtained from the optimal solutions of the subproblems. We assume that xt*(θ) is the optimal solution of Equation (28) at time t and define the vector of coupling constraint violations s(θ) as
and for any ϕ ≥ 0, the following relationship holds:
where s(θ) is a subgradient of the concave function Z at θ [33]. Based on the coupling constraint violations, the solution of the dual problem can be iterated from an initial multiplier θ0 with the following updating method:
where k is the iteration index, and βk > 0 is the step size. Also, according to [32], a diminishing step size satisfying guarantees convergence to an optimal dual solution [32]. Here, we use the Polyak step-size rule instead, which determines the step size βk as follows:
where ρk ∈ (0,2) is a step-size factor, and UB is a constant upper bound on the optimal value. Although the exact optimal value v is unknown at this stage, it is known that a constant UB ≥ v is still a valid upper bound and can serve as the Polyak target [32]. At each iteration k, after solving all subproblems, we obtain Z(θ(k)) via
By weak duality, this value is a lower bound on v. To maintain the tightest bound, we update the global lower bound as
where the sequence LB is nondecreasing and bounded above by the optimal value. Furthermore, since strong duality holds, the dual optimal value is attainable [32], i.e., . By the standard convergence result for the Polyak subgradient method, the best lower bound satisfies . Hence, the subgradient method converges to the optimal dual value, and a primal feasible schedule is obtained by final restoration.
Although the best lower bound approaches the optimal dual value, the subproblem solutions xt(k) may still violate the time-coupled constraint because the relaxation enlarges the feasible set. We therefore use the positive-part violation ‖max(0,s(θ(k)))‖<δ as the stopping criterion and apply a final feasibility restoration. The fixed feasible upper bound UB is kept throughout the iteration; the restored schedule is then checked against load balance, cumulative caps, and box bounds.
Given the last iterate, restoration first clips each entry to the box constraints. For market i, let denote its cumulative net procurement. If Si > bi, set ei = Si − bi, the excess procurement. At period t for market i, the marginal cost is
where gi,t is the derivative of the objective with respect to xi,t. Process periods in decreasing order of gi,t, so that the most expensive purchases are reduced first. For each period with xi,t > 0, choose the market j ≠ i satisfying xj,t < Pjmax and Sj < bj that minimizes gj,t. Transfer
Here, ei is the remaining excess, xi,t is the amount currently purchased in market i that can be reduced, Pjmax − xj,t is the box headroom of market j, and bj − Sj is its remaining cumulative headroom; ε is the amount moved from i to j at period t. The same-period subtraction and addition preserve load balance. Repeat this pass until Si < bi + 10−9 for all i or a maximum number of passes is reached. After the loop, remaining residuals are cleaned and checked; if any residual exceeds the tolerance 10−8, the verified feasible reference is returned. After restoration, we can report the gap between the restored objective and LB. Since the restored schedule is feasible within the prescribed tolerance, its objective serves as the numerical upper bound and LB is the dual lower bound; the smaller the gap, the tighter the interval containing the optimal value. This post-restoration gap is used to assess how close the restored solution is to optimality, not as a stopping condition.
3.2. Analytical Solution for Subproblems of the LR Problem
The single-stage procedure described above relies on the ability to solve the subproblems efficiently at each iteration. These subproblems are small-scale and strictly convex, and they admit an exact analytical solution that obviates the need for any external QP solver. The analytical solution also enables parallel execution across all time periods, which is crucial for scalability to problems with a large number of periods T.
Therefore, we construct an analytical method for solving subproblem (28). As is well known, the feasible region of each subproblem is a three-dimensional convex polyhedron bounded by the equality plane and six box inequalities. To reduce the number of variables and transform the feasible region from a three-dimensional polyhedron into a planar polygon, we substitute xt,3 = PLD(t) − xt,1 − xt,2 into the objective function and the box constraints, where xt,1, xt,2, and xt,3 represent the three components of vector xt. The resulting planar polygon has a boundary composed of a small number of line segments, as shown in Figure 2. The boundary of the polygon consists of several line segments derived from the box constraints, and its vertices are the pairwise intersections of these bounding lines. On each segment, the objective function reduces to a univariate quadratic, which can be minimized straightforwardly. The resulting feasible region is the convex polygon defined by the following six linear inequalities:
where xmax,1, xmax,2, and xmax,3 are the maximum values of xt,1, xt,2, and xt,3. Since the objective is strictly convex and the set in (37) is compact, the unique global minimum lies either in the interior or on the boundary of the polygon.
Figure 2.
A schematic diagram of feasible convex polygon.
To determine whether the optimal solution lies in the interior of the feasible convex polygon, we first disregard the box constraints and solve the equality-constrained problem via the Karush–Kuhn–Tucker (KKT) conditions [32]. A Lagrangian function is constructed with a Lagrangian multiplier λ and the constraint eTxt = PLD(t) as
When the gradient is zero, there is
And it can be written in matrix form as:
Moreover, it can be concluded that the optimal solution of the subproblem either satisfies −xmax ≤ ≤ xmax where is the solution of (40), or it must lie on the boundary of the polygon in Figure 2. To examine the second possibility that the solution lies on the boundary, we construct the vertices of the polygon boundary and order them counterclockwise, so that each consecutive pair defines an edge of the polygon. Suppose that two adjacent vertices are qi and qi+1. Then any point on the edge formed by these two vertices can be expressed as a linear interpolation between the endpoints as
where r ∈ [0,1]. Substituting (41) into the objective function of the two-dimensional problem yields a function of r as
which is a strictly convex quadratic since . This function can be expressed as
where k1 > 0, k2, and k3 are constants that can be computed. The minimum of such a function on the interval r ∈ [0,1] is
and the optimal point on this edge is qi + r*(qi+1 − qi). Repeating this calculation for all edges yields a finite set of candidate points that, together with the vertex set, exhaustively covers all possible locations of the global minimum. The unique global optimum of subproblem (28) is then the candidate with the smallest primal objective value.
The overall procedure is as follows. Set the initial multiplier θ(0) = 0 and the initial lower bound LB = −ꝏ. For each period t, solve (28) at θ(0) analytically, obtaining the initial solutions xt(0) and the dual value Z(θ(0)). Then update the lower bound by LB(0) = max{LB,Z(θ(0))}. To obtain an initial fixed UB, a feasible schedule is constructed by proportionally scaling down the over-purchased markets and re-balancing each period’s load using the cheapest available capacity. The primal cost of this repaired schedule serves as the fixed upper bound UB. Subsequent iterations use a single-stage Polyak scheme with the fixed UB. At iteration k, all subproblems are solved at θ(k), Z(θ(k)) is computed, LB is updated by (34). The subgradient s(θ(k)) is evaluated and θ(k+1) is updated by (31) and (32). The iteration stops when the positive-part violation and relative gap meet the tolerances, or at the maximum number of iterations. Final feasibility restoration then yields a constraint-satisfying schedule. The solution process is summarized in Algorithm 1.
| Algorithm 1: Single-stage Polyak step-size rule for primal problem | |
| Steps | Input: scheduling horizon T, θ(0) = [0,0,0]T, initial lower bound LB = −ꝏ; maximum iteration count kmax = 5000, maximum repair iteration count lrep = 10, Polyak step-size factor ρ = 1; , xmax = [50,45,55], α = [0.5,0.6,0.5]. Tolerance: δ = 10−8 (positive-part violation), 10−8 (final feasibility), 10−9 (restoration cap), 10−8 (relative gap). Output: a feasible near-optimal schedule xt and its objective value in (17) J(xt). |
| 1 | Solve (28) for all t at θ(0) → xt(0), Zt(0), LB = Z(θ(0)); construct initial feasible schedule and obtain a constant UB. |
| 2 | For k = 1, …, kmax, do: |
| 3 | Solve (28) for all t at θ(k) → xt(k); J(k) = J(x(k)); LB = max{LB,Z(θ(k))}. |
| 4 | If ||max(0,s(k))|| < δ and J(k) − LB < 10−8 max(1,|LB|): then break. |
| 5 | Else: update βk and θ(k+1) by (31) and (32). |
| 6 | End for. x ← x(k). |
| 7 | For l = 0, …, lrep − 1, do: |
| 8 | x(k,l+1) ← final feasibility restoration of x(k,l). |
| 9 | If Si < bi + 10−9 for all i: then break. |
| 10 | End for. |
| 11 | Return x(k,l+1) and J(x(k,l+1)) if all load, cap, and box residuals < 10−8; else xref and J(xref). The solution quality can be assessed by J − LB. |
4. Case Studies
All case studies are conducted on a Lenovo Legion Y9000P laptop (Intel Core Ultra 9, 32 GB DDR5 RAM). The commercial solver Gurobi is used for solving the same conservative quadratic program directly as a benchmark and to solve each subproblem of LR in the Gurobi-based LR variant. The electricity price data are generated via Monte Carlo simulation with 50 paths. To ensure reproducibility, seed 42 is used for the main 24, 720, 8760 h cases, including the correctness check in Section 4.1, the reported iteration counts, and the timing comparison; the other cases, Cases 1–5, use seeds 101–105, respectively. An exponentially correlated Gaussian process is adopted to capture the temporal dependence across the three markets, and market-specific independent noises are added to reflect realistic volatility. The sample mean vectors and covariance matrices are computed for each hour and served as the input parameters ct and Q(t). Cases with different numbers of time periods T (24 h, 720 h, 8760 h) are generated to examine scalability. The load demand in each period follows a typical daily pattern repeated over the horizon. The baseline cumulative-cap coefficients are α = [0.5, 0.6, 0.5]T, the adjusted risk aversion parameter is = 0.1 and the signed bounds of x are [−50, 50], [−45, 45], [−55, 55] for real-time, day-ahead and long-term contract market, respectively. For the analytical LR method, a single-stage Polyak scheme uses at most 5000 iterations, a fixed feasible upper bound, ρ = 1, a positive-part violation tolerance of 10−8, and a relative gap tolerance of 10−8. The Gurobi-based LR (LR-Gurobi) uses the same outer loop and tolerances, with Gurobi replacing the analytical subproblem solver. All reported runs satisfy these tolerances. Final restoration uses at most 10 passes, a transfer tolerance of 10−9, and a final load, cap and box residual tolerance of 10−8.
4.1. Algorithm Correctness Verification on the 24-Hour Case
We first examine the 24-period case to verify the correctness and effectiveness of the analytical LR method. The lower bound converges to the maximum dual value after 39 iterations, and the obtained value is close to the optimal objective value computed by Gurobi. Final feasibility restoration yields a feasible near-optimal schedule whose objective agrees with Gurobi within numerical tolerance (relative difference 3.8 × 10−11).
Figure 3a displays the electricity prices of the three markets alongside the retail selling price, while Figure 3b presents the optimal dispatch over the 24-h horizon. The stacked bars of the three markets sum exactly to the load curve at each hour, verifying that the power balance constraint is strictly enforced. The actual trading ranges of the three markets are [−6.42, 22.60], [11.24, 45.00] and [−27.33, 55], all of which lie well within the prescribed box constraints.
Figure 3.
The case of 24 h scheduling test. (a) The electricity prices of three markets and the selling price over 24 h; (b) the optimal dispatch solution of the 24 h case.
During the early morning hours (e.g., hours 0–6), the dispatch solution tends to purchase more power in the RT and DA markets while selling surplus power in the LT market, as the LT price is relatively higher than the other markets during these periods. In contrast, during high-price periods (e.g., hours 10–20), the LT price is consistently lower than the RT and DA prices, and the dispatch exhibits a clear preference for LT purchases. This pattern demonstrates that the algorithm effectively exploits price differentials among the three markets to minimize procurement costs while satisfying all constraints. Moreover, because the objective function includes both the expected cost term and a quadratic risk term that penalizes price volatility, the dispatch solution reflects a deliberate trade-off between expected profit and risk exposure. Consequently, the algorithm tends to procure from low-price markets while avoiding large allocations to highly volatile markets such as the RT market. Overall, this case confirms that the algorithm correctly balances cost and risk while respecting all constraints, producing a physically realizable and economically sound procurement plan.
4.2. Sensitivity Analysis of Key Parameters
With the correctness of the analytical LR validated on the 24-h case, we now investigate how the optimal procurement shares respond to variations in key parameters to gain deeper insight into the drivers of procurement decisions. The key parameters are the cumulative purchase caps, the risk-aversion coefficient, the expected prices, and the price volatility.
We begin by examining the optimal procurement shares under the baseline cumulative purchase cap α = [0.5, 0.6, 0.5]T, which limits the LT market to at most 50% of the total load. The first part of Table 1 reports the RT, DA and LT shares for five random scenarios under both the 24 h and 720 h horizons. A striking regularity is that in every single scenario, the LT share equals exactly 50%, the DA share lies relatively stably between 41% and 46% and the RT share stays within 4–9%. This pattern strongly suggests that the LT contract market is so attractive that the market participants would like to purchase more than 50% of the load from it, but this behavior is stopped by the binding cumulative cap, which means the 50% cap acts as an artificial bottleneck that constrains the scale of LT procurement.
Table 1.
Optimal procurement among three markets under different scenarios and α.
The persistent popularity of the LT contract market, despite its relatively higher electricity price, can be attributed to the quadratic risk term in the objective function. The covariance matrix of the three markets reveals that LT prices exhibit lower volatility compared to DA and RT prices. Expanding the LT position suppresses the overall fluctuation of the total procurement portfolio. This reduction in risk penalty outweighs the extra expected cost, making participants eager to engage in LT market trading as much as possible. Since the cumulative upper bound of the LT market is reached in every scenario, the actual LT share becomes a constraint-driven outcome rather than a reflection of the unconstrained cost-risk trade-off.
To examine the impact of relaxing the LT quantity restriction, we increase the LT cumulative cap by setting α = [0.5, 0.6, 1.0]T, effectively lifting the upper bound on LT procurement. The second part of Table 1 presents the resulting procurement shares. The procurement structure changes dramatically: the LT share jumps to 81–82% in all cases, the DA share shrinks to around 15–18%, and the RT share drops further to 0–3%, even turning negative in a few scenarios—indicating net selling in the RT market. This confirms that the previous 50% share was indeed a consequence of the binding constraint, and that the true preference of participants is to allocate the vast majority of procurement to the LT market. The economic mechanism underlying this dominance stems from the stable price characteristics of the LT contract market. With the LT purchase cap relaxed, participants can fully exploit the low volatility of LT prices to stabilize the overall procurement portfolio. Although slight differences exist between the 24 h and 720 h horizons, the overall procurement trends remain similar, demonstrating that the core conclusion holds across different horizons and is not an accidental outcome of a particular case.
These findings highlight the role of cumulative purchase caps as a powerful policy instrument. A tight cap on the LT contract market forces procurement to rely more heavily on spot markets, which may be desirable for market activity but restricts the ability to mitigate procurement cost fluctuations. A relaxed cap allows a larger allocation to the LT market, stabilizing overall procurement fluctuation yet reducing participation in spot markets. Thus, the cap should be set at a level that balances these competing objectives. Overall, the LT dominance is consistent with the model’s risk-aversion mechanism: lower assumed LT volatility makes LT procurement more attractive. The result is specific to the assumed covariance structure and cap settings rather than a universal market outcome.
Figure 4 uses Case 1 from Table 1 and presents a stacked bar chart comparing the per-period trading volumes under the two cap settings, effectively illustrating these contrasting patterns. Because the load demand is identical in Figure 4a,b, the load profile is fixed across the two settings. The difference between the two figures therefore arises solely from the stringency of the LT cumulative cap. In Figure 4a, where the cap is tight, participants initially sell electricity in the LT market to preserve capacity for later-period LT procurement, while the residual load not covered by LT in the early hours is supplemented through DA or RT purchases. This behavior leads to a partial substitution of LT by spot markets. In contrast, Figure 4b features a significantly relaxed LT cap, allowing participants to secure a large volume of stable LT electricity at the very beginning, thereby reducing their reliance on spot markets. In summary, the comparison of the two scenarios reveals that the tightness of the cumulative purchase cap reallocates the temporal distribution and source structure of procurement by shaping the substitution pattern between LT and spot markets.
Figure 4.
The per-period trading volume of Case 1 under different α. (a) The electricity trading volume over 24 h (α = [0.5, 0.6, 0.5]T); (b) the electricity trading volume over 24 h (α = [0.5, 0.6, 1.0]T).
To further investigate the robustness of the model, we conduct a sensitivity analysis with the cumulative cap fixed at α = [0.5, 0.6, 1.0]T, allowing each market to respond to parameter adjustments and revealing the full sensitivity of the optimal procurement. The 720 h Case 1 in Table 1 serves as the baseline. We adopt a control-variable approach to isolate the individual effects of the risk-aversion coefficient, the expected average price of each market, and the price volatility of each market on the optimal procurement.
Figure 5 plots the optimal procurement shares as the risk-aversion coefficient increases from 10−4 to 0.5. At the lowest value = 10−4, the risk term is negligible and participants are driven almost exclusively by expected cost: the RT and LT shares account for only 17.61% and 22.39%, respectively, because their prices are relatively high, while the DA share is 60%. When increases to 10−3, risk begins to play a noticeable role: the RT share drops to −12.94%, indicating net selling in the highly volatile RT market, while the LT share rises to 64.14%. As reaches 0.01, risk aversion becomes dominant, and the LT share jumps above 80%. For ≥ 0.05, the procurement structure tends to stabilize, with LT around 81.8–82.1%, DA around 16.4–17.0%, and RT around 1.2–1.5%, indicating that further increases in have little additional effect.
Figure 5.
The procurement share of a 720 h Case under different .
This evolution demonstrates that when risk aversion is very low, the allocation is cost-driven and favors cheaper spot markets. As grows, participants progressively shift toward the more stable LT market until the covariance structure of the three markets determines the procurement portfolio. In practice, a moderate value such as = 0.1 is sufficient to produce a stable, risk-conscious procurement. In contrast, an extremely small leads to procurement that exposes participants to greater risk of price fluctuation.
We now turn to the effects of the expected electricity prices of different markets. The expected prices of RT, DA, and LT are shifted individually by −30, −10, +10, and +30, and the procurement results are listed in Table 2. Across all price shifts of three markets, the RT and DA shares move in opposite directions: When one spot market becomes more expensive, its share declines and the other spot share rises correspondingly. For instance, an increase in the RT price (+30) from the baseline reduces the RT share from 1.39% to 1.00% and raises the DA share from 16.66% to 17.05%. Similarly, an increase in the DA price (+30) lowers the DA share to 16.21% and lifts the RT share to 1.78%. In every case, the LT share remains almost unchanged, varying only between 81.87% and 82.02%. This pronounced stability of the LT share reflects the dominant role of risk aversion in the current model. With a relatively high risk-aversion coefficient, the participants strongly favor the LT market which is the most stable market among the three markets. Consequently, the imposed price changes are insufficient to shift the procurement away from this risk-conscious allocation. There are mild inverse movements between RT and DA, arising from price-driven adjustments within the share of the load not assigned to LT. As the relative prices of the two spot markets change, the participants reallocate a limited portion between the two spot markets, but the overall structure of the procurement remains essentially unaffected.
Table 2.
Optimal procurement among three markets under different electricity price deviations.
Since price shifts affect only the expected cost term whereas volatility changes directly influence the risk term, we further examine the influence of price volatility on the optimal procurement. The price volatility of each market is scaled by a factor ranging from 0.6 to 1.4, which adjusts the standard deviation of the selected market’s price while preserving the correlations among the three markets. The results are listed in Table 3. Across all scenarios, the LT share remains between 81.75% and 81.99%, confirming that LT remains the dominant source. RT and DA exhibit a clear substitution relationship: when the volatility of one spot market increases, its share declines and the other’s rises. Notably, the magnitude of this reallocation is larger than that observed under price shifts, because volatility scaling affects the risk term, which dominates the objective. This further confirms the strong risk-averse tendency of the procurement strategy.
Table 3.
Optimal procurement among three markets under different electricity price fluctuations.
4.3. Computational Efficiency and Scalability
We next examine the effect of the Polyak step-size factor ρ on the convergence of the analytical LR. The results are shown in Figure 6. As ρ increases from 0.5 to 2.0, the number of iterations required to satisfy the stopping criterion drops from 151 to 26, confirming that a larger step-size factor accelerates multiplier updates and drives the dual function to its maximum in fewer steps. The default value ρ = 1 requires 69 iterations.
Figure 6.
The number of iterations for a 720 h Case under different ρ.
The raw subgradient norm ||s|| remains essentially constant at about 1.96 × 104 for all tested ρ, because it includes negative slack components of cumulative-cap constraints that are never violated and these components do not need to vanish. The positive-part violation, which measures actual cap violation, remains below 10−8 in every case, ranging from 5.2 × 10−9 to 9.1 × 10−9. Thus, increasing ρ mainly accelerates the reduction of the positive-part violation, while the limiting raw norm is governed by the inactive caps. The final restoration removes the remaining residual infeasibility. For the representative ρ = 1 case, the positive-part violation before restoration is 6.8 × 10−9, already below the 10−8 tolerance; one restoration pass then reduces it to zero, with a maximum load residual of 9.4 × 10−13 and zero cumulative-cap and box residuals. This confirms that the restoration step is effective and that faster convergence does not come at the expense of feasibility. For the three main cases (T = 24, 720 and 8760 h) at ρ = 1, the post-restoration gaps J − LB are 1.36 × 10−4, 9.52 × 10−5 and 2.28 × 10−4, respectively, indicating that the restored schedules are close to optimality.
To examine how computation scales with the scheduling horizon, Figure 7a reports the total wall-clock time of the three methods. At 8760 h, direct Gurobi requires 5.029 s, the analytical LR requires 37.684 s, and LR-Gurobi requires 206.587 s. Thus, direct Gurobi is faster in total time at long horizons, whereas the analytical LR is substantially faster than LR-Gurobi. All LR total times are measured in serial execution, with the T subproblems solved sequentially and no parallel workers. Although direct Gurobi solves the full coupled model in one call, the analytical LR decomposes it into independent per-period subproblems, and its measured total time therefore grows nearly linearly with T.
Figure 7.
Computational time of the three methods. (a) Total wall-clock time. (b) Per-period time of the LR methods under ideal parallelism.
Figure 7b reports the per-period values derived as total time divided by T. These values estimate the potential benefit of ideal-parallel implementation and are not measured multi-worker runtimes. The analytical LR remains at about 3.79 × 10−3–4.3 × 10−3 s per period, whereas LR-Gurobi requires about 1.887 × 10−2–3.056 × 10−2 s per period. Accordingly, the contribution of the analytical LR lies in its solver-free, decomposable structure: it eliminates commercial solver calls and offers parallelization potential through independent per-period subproblems.
5. Conclusions
This paper has addressed the multi-market electricity procurement problem under price uncertainty by developing a min-max robust mean-risk model and an LR algorithm with analytical solution of LR subproblems. The analytical method solves each three-variable subproblem exactly in constant time without any commercial solver, and a single-stage Polyak subgradient strategy obtains a feasible near-optimal solution. Numerical results across 24 h to 8760 h confirm that the method agrees with the Gurobi benchmark for the same conservative quadratic program within numerical tolerance, maintaining a nearly constant per-period solution time and keeping the positive-part violation below 10−8, demonstrating high numerical accuracy, observed near-linear scaling and practical convergence. The case studies show that the optimal electricity procurement is primarily shaped by the cumulative purchase caps and the risk-aversion preference . Under the present parameter setting, the LT contract dominates the procurement owing to its low price volatility, and moderate shifts in expected prices or volatility leave its central role largely unchanged. These findings establish the proposed method as a solver-free alternative with parallelization potential for long-horizon procurement scheduling, particularly when commercial solvers are unavailable or parallel implementation is preferred. Although the case studies use simulated prices generated from assumed mean and volatility parameters, which may limit the generalizability of the findings to actual electricity markets, the method itself requires no modification: only ct and Q(t) need to be re-estimated from historical data. Future work may extend the analytical LR method to multi-area coordinated procurement, where each area faces different price profiles and the coupling constraints may become more complex.
Author Contributions
Conceptualization, Z.H.; Methodology, R.L. and Z.H.; Software, R.L. and Z.W.; Validation, Z.W.; Formal analysis, D.B.; Investigation, Z.H.; Resources, L.W. and T.Y.; Data curation, T.Y.; Writing—original draft, D.B. and R.L.; Writing—review & editing, T.D.; Visualization, L.W. and Z.W.; Supervision, L.W., T.Y. and T.D.; Funding acquisition, D.B. All authors have read and agreed to the published version of the manuscript.
Funding
This research was supported by China Longyuan Power Group: “Research on Multi-Agent Electricity Price Forecasting Technology and Intelligent Bidding Strategies for Wind–Solar–Storage Joint Trading” (LYH-2025-11).
Institutional Review Board Statement
Not applicable.
Informed Consent Statement
Not applicable.
Data Availability Statement
The raw data supporting the conclusions of this article will be made available by the authors on request.
Conflicts of Interest
Author Daen Bao, Linlin Wang and Tong Yu were employed by the company Longyuan (Beijing) Carbon Asset Management Technology Co., Ltd., Beijing, China. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest. The authors declare that this study received funding from China Longyuan Power Group. The funder was not involved in the study design, collection, analysis, interpretation of data, the writing of this article or the decision to submit it for publication.
References
- May, E.C.; El Mekaoui, A.; Livas-Garcia, A.; Mejía-Montero, A.; Bassam, A. Towards the liberalization of the energy market: Structural changes and implementation challenges of the 2013 Mexican energy reform insights in the energy nexus. Energy Nexus 2022, 5, 100045. [Google Scholar] [CrossRef] [Scilit]
- Wang, Y.; Dong, W.; Yang, Q. Multi-stage optimal energy management of multi-energy microgrid in deregulated electricity markets. Appl. Energy 2022, 310, 118528. [Google Scholar] [CrossRef] [Scilit]
- O’Connor, C.; Bahloul, M.; Prestwich, S.; Visentin, A. A Review of Electricity Price Forecasting Models in the Day-Ahead, Intra-Day, and Balancing Markets. Energies 2025, 18, 3097. [Google Scholar] [CrossRef] [Scilit]
- Ding, T.; Jia, W.; Shahidehpour, M.; Han, O.; Sun, Y.; Zhang, Z. Review of optimization methods for energy hub planning, operation, trading, and control. IEEE Trans. Sustain. Energy 2022, 13, 1802–1818. [Google Scholar] [CrossRef] [Scilit]
- Feng, Y.; Jia, H.; Wang, X.; Ning, B.; Liu, Z.; Liu, D. Review of operations for multi-energy coupled virtual power plants participating in electricity market. Energy Rep. 2023, 9, 992–999. [Google Scholar] [CrossRef] [Scilit]
- Liu, J.; Hu, H.; Yu, S.S.; Trinh, H. Electricity pricing and its role in modern smart energy system design: A review. Designs 2023, 7, 76. [Google Scholar] [CrossRef] [Scilit]
- Laitsos, V.; Vontzos, G.; Paraschoudis, P.; Tsampasis, E.; Bargiotas, D.; Tsoukalas, L.H. The state of the art electricity load and price forecasting for the modern wholesale electricity market. Energies 2024, 17, 5797. [Google Scholar] [CrossRef] [Scilit]
- Zareipour, H.; Janjani, A.; Leung, H.; Motamedi, A.; Schellenberg, A. Classification of future electricity market prices. IEEE Trans. Power Syst. 2011, 26, 165–173. [Google Scholar] [CrossRef] [Scilit]
- Wang, J.; Zhou, Y.; Zhang, Y.; Lin, F.; Wang, J. Risk-averse optimal combining forecasts for renewable energy trading under CVaR assessment of forecast errors. IEEE Trans. Power Syst. 2023, 39, 2296–2309. [Google Scholar] [CrossRef] [Scilit]
- Huang, X.; Wang, X.; Chen, L.; Ye, C. Optimal portfolio strategies of purchasing electricity for electricity company based on distributional robust CVaR. IOP Conf. Ser. Earth Environ. Sci. 2020, 467, 012200. [Google Scholar] [CrossRef] [Scilit]
- Wang, B.; Xu, X.; Wang, P. Multi-market agency-based power procurement strategies for power grid companies using reinforcement learning. Appl. Energy 2026, 402, 126959. [Google Scholar] [CrossRef] [Scilit]
- Wang, H.; Zhang, J.; Zhao, W.; Huang, M. Optimization of joint trading decisions for market participants in the day-ahead and real-time electricity markets with independent energy storage participation. Electr. Eng. 2025, 107, 13855–13872. [Google Scholar] [CrossRef] [Scilit]
- Hasanov, A.S.; Ibragimov, R.; Yildirim, R.; Chong, S.K.; Abrorov, S. Tail risk, large fluctuations and downfalls in renewable energy markets. PLoS ONE 2026, 21, e0351106. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Gao, R.; Chen, X.; Kleywegt, A.J. Wasserstein distributionally robust optimization and variation regularization. Oper. Res. 2024, 72, 1177–1191. [Google Scholar] [CrossRef] [Scilit]
- Xue, T.; Ding, T.; Ding, Y.; Jia, W.; Fang, X.; Fu, G.; Wang, S.; Shahidehpour, M. Short-Circuit Ratio Constrained Robust Unit Commitment with Grid-Forming Energy Storage: A Filter-Column-and-Constraint Generation Algorithm. IEEE Trans. Sustain. Energy 2026. [Google Scholar] [CrossRef] [Scilit]
- Khojasteh, M.; Faria, P.; Vale, Z. Distributed robust optimization model for resiliency analysis of energy communities with shared energy storage systems. Energy 2025, 320, 135337. [Google Scholar] [CrossRef] [Scilit]
- Tan, B.; Chen, H.; Zheng, X.; Huang, J. Two-stage robust optimization dispatch for multiple microgrids with electric vehicle loads based on a novel data-driven uncertainty set. Int. J. Electr. Power Energy Syst. 2022, 134, 107359. [Google Scholar] [CrossRef] [Scilit]
- Zhao, Z.; Guo, J.; Luo, X.; Lai, C.S.; Yang, P.; Lai, L.L.; Li, P.; Guerrero, J.M.; Shahidehpour, M. Distributed robust model predictive control-based energy management strategy for islanded multi-microgrids considering uncertainty. IEEE Trans. Smart Grid 2022, 13, 2107–2120. [Google Scholar] [CrossRef] [Scilit]
- He, Y.; Ding, T.; Jia, W.; Song, J.; Liang, D.; Liao, M. Distributionally robust chance-constrained scheduling of power-to-hydrogen-heat systems with hybrid electrolyzers considering preheating and ancillary services. Int. J. Hydrogen Energy 2026, 231, 154885. [Google Scholar] [CrossRef] [Scilit]
- Jia, W.; Ding, T.; Yuan, Y.; Mu, C.; Zhang, H.; Wang, S.; He, Y.; Sun, X. Decentralized distributionally robust chance-constrained operation of integrated electricity and hydrogen transportation networks. Appl. Energy 2025, 377, 124369. [Google Scholar] [CrossRef] [Scilit]
- Yazdani, D.; Omidvar, M.N.; Yazdani, D.; Branke, J.; Nguyen, T.T.; Gandomi, A.H.; Jin, Y.; Yao, Y. Robust optimization over time: A critical review. IEEE Trans. Evol. Comput. 2024, 28, 1265–1285. [Google Scholar] [CrossRef] [Scilit]
- Pollitt, M.G.; von der Fehr, N.-H.M.; Willems, B.; Banet, C.; Le Coq, C.; Chyong, C.K. Recommendations for a future-proof electricity market design in Europe in light of the 2021-23 energy crisis. Energy Policy 2024, 188, 114051. [Google Scholar] [CrossRef] [Scilit]
- Zhu, Y.; Cui, G.; Liu, A.; Jia, Q.-S.; Guan, X.; Zhai, Q.; Guo, Q.; Guo, X. A reinforcement learning embedded surrogate lagrangian relaxation method for fast solving unit commitment problems. IEEE Trans. Power Syst. 2025, 40, 3806–3818. [Google Scholar] [CrossRef] [Scilit]
- Li, X.; Zhai, Q.; Zhou, J.; Guan, X. A variable reduction method for large-scale unit commitment. IEEE Trans. Power Syst. 2019, 35, 261–272. [Google Scholar] [CrossRef] [Scilit]
- Bragin, M.A. Survey on Lagrangian relaxation for MILP: Importance, challenges, historical review, recent advancements, and opportunities. Ann. Oper. Res. 2024, 333, 29–45. [Google Scholar] [CrossRef] [Scilit]
- Hou, J.; Zhai, Q.; Zhou, Y.; Guan, X. A fast solution method for large-scale unit commitment based on Lagrangian relaxation and dynamic programming. IEEE Trans. Power Syst. 2023, 39, 3130–3140. [Google Scholar] [CrossRef] [Scilit]
- Qader, M. Power management in a hydrothermal system considering maintenance using Lagrangian relaxation and augmented Lagrangian methods. Alex. Eng. J. 2022, 61, 8177–8188. [Google Scholar] [CrossRef] [Scilit]
- Bragin, M.A.; Tucker, E.L. Surrogate “Level-Based” Lagrangian Relaxation for mixed-integer linear programming. Sci. Rep. 2022, 12, 22417. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Huang, D.; Wang, Y.; Jia, S.; Liu, Z.; Wang, S. A Lagrangian relaxation approach for the electric bus charging scheduling optimisation problem. Transp. A Transp. Sci. 2023, 19, 2023690. [Google Scholar] [CrossRef] [Scilit]
- Blank, A.; Schmitt, C.; Mehlem, J.; Moser, A. Lagrangian relaxation of large-scale congestion management using extended subgradient methods. In Proceedings of the 2022 18th International Conference on the European Energy Market (EEM); IEEE: Piscataway, NJ, USA, 2022; pp. 1–6. [Google Scholar]
- Hooker, J.N. Integer programming: Lagrangian relaxation. In Encyclopedia of Optimization; Springer: Cham, Switzerland, 2024; pp. 1–7. [Google Scholar]
- Boyd, S.; Vandenberghe, L. Convex Optimization; Cambridge University Press: Cambridge, UK, 2004. [Google Scholar]
- Bertsekas, D.P. Convex Optimization Theory; Athena Scientific: Belmont, MA, USA, 2009. [Google Scholar]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.






