Multi-Objective Siting and Sizing of Energy Storage Systems in Active Distribution Networks Considering Reactive Power Support from Energy Storage Converters

,
,
,
,
,
and
1
State Grid Hubei Electric Power Research Institute, Wuhan 430077, China
2
Hubei Key Laboratory of Regional New Power Systems and Rural Energy System Configuration, Wuhan 430077, China
3
Hubei Engineering Research Center of the Construction and Operation Control Technology of New Power Systems, Wuhan 430077, China
*
Author to whom correspondence should be addressed.
This article belongs to the Section F1: Electrical Power System

Abstract

High photovoltaic penetration makes active distribution networks sensitive to voltage deviations, reverse power flow, and feeder operating stress. Energy storage converters can provide two complementary services: active power energy shifting and local, within-step reactive power support for voltage regulation. This paper develops a converter-aware multi-objective siting and sizing model in which installation buses, energy capacities, and PCS ratings are optimized jointly. The model explicitly represents the P-Q capability circle, voltage-droop reactive power command, reactive headroom, SOC limits, radial power flow, voltage deviation, and network loss; annualized cost and throughput-based degradation are retained as bounded planning terms rather than the sole design target. An adaptive multi-objective differential evolution (AMODE) algorithm solves the mixed discrete–continuous nonlinear problem using Latin hypercube initialization, adaptive mutation and crossover, hybrid mutation, an external archive, feasibility repair, and TOPSIS selection. IEEE33 and IEEE69 case studies are evaluated over thirty independent runs. In IEEE33, the selected plan raises the minimum voltage from 0.8866 to 0.9579 p.u. and reduces daily losses by 11.70%. The ablation study shows that removing PCS reactive support reduces the minimum voltage to 0.9190 p.u., demonstrating the technical role of converter-based Q support. The larger IEEE69 experiments further assess Pareto-front quality, feasibility, and statistical robustness. The hourly quasi-static formulation represents local converter action within each planning interval; it does not evaluate sub-second control or electromagnetic transients.

1. Introduction

Distribution networks are moving from passive demand–supply interfaces to active systems with high PV penetration, flexible loads, and power electronic devices. PV variability and spatially uneven generation can produce voltage rise, undervoltage, reverse power flow, and feeder congestion, especially on long radial feeders with high impedance [1]. These conditions make voltage regulation and technically feasible converter operation central concerns for planning.
BESSs can support an active feeder in two physically different ways. Active power dispatch changes energy balance, feeder loading, and SOC, whereas converter reactive power can respond to local voltage error without directly consuming stored energy. The latter service is bounded by the PCS apparent-power capability and by the active power operating point. Therefore, siting and sizing should preserve reactive headroom at electrically sensitive buses rather than treating the PCS as an active power-only device.
Several technical gaps remain. First, many planning models tie energy capacity and converter rating through a preset ratio, preventing the design from separating energy-shifting needs from voltage-support needs [2,3,4,5]. Second, PCS reactive support is often simplified or omitted, even though its local response is constrained by the P-Q capability circle and the active power operating point [6,7,8,9,10,11]. Third, planning formulations should distinguish local within-step Q support from slower, SOC-mediated active power scheduling; otherwise, the contribution of converter headroom to voltage feasibility is obscured. Finally, algorithm comparisons require repeated runs and multiple feeders so that a technically feasible solution is not confused with a single-run optimization artifact. Degradation cost is retained as a planning realism term, but it is not treated as the central contribution.

Literature Review

BESS siting and sizing have been addressed through deterministic, decomposition-based, stochastic, and evolutionary formulations. Carpinelli et al. formulated a mixed-integer nonlinear multi-objective problem for unbalanced active distribution networks under input uncertainty [2]. Mazza et al. and Das et al. examined how storage location and size affect low-voltage operation, losses, and power quality [12,13]. Zhang et al. coupled distributed generation and battery planning for voltage regulation, while Iria et al. coordinated storage with on-load tap-changing transformers [3,14]. Nick et al. and Lin et al. used ADMM and accelerated generalized Benders decomposition, respectively, to improve tractability [15,16]. Wang et al. developed a profit-oriented stochastic bilevel planning model, and recent studies further considered contingency support, PV curtailment, and flexibility services [17,18,19,20]. Reviews in [21,22] summarize the broader placement, sizing, and control landscape. Table 1 summarizes the positioning of representative studies relative to the proposed framework.
Evolutionary BESS planning has also progressed beyond single-objective sizing. Gu et al. used an improved NSGA-II for placement and capacity selection in a distribution network with distributed generation [4], whereas Ali et al. applied a large-scale multi-objective evolutionary algorithm to coordinated distributed energy resource planning and BESS management [5]. Battery degradation remains important because active power cycling changes the long-term value of a storage plan. Aging-aware operation, multi-service degradation effects, and degradation-conscious design are reviewed or modeled in [23,24,25], and Li et al. developed a more detailed electrothermal-aging dispatch formulation [26]. The present study retains a throughput-based degradation term for planning realism while leaving electrothermal lifetime prediction outside its scope.
Reactive power from inverter-interfaced resources is widely used for voltage regulation in PV-rich feeders. Turitsyn et al. established distributed PV reactive power control options [6], and subsequent studies quantified voltage effects, volt-var risks, overvoltage control, QSTS allocation, and inverter overrating [7,8,9,10,11]. These studies demonstrate the value of local Q control, but PV-inverter support and BESS planning are not identical: for a BESS, the PCS rating must simultaneously accommodate active dispatch and reactive headroom. Accordingly, this study treats PCS rating as a decision variable and models local reactive support within each hourly operating point, without making a claim about sub-second or electromagnetic transient behavior.
Multi-objective evolutionary algorithms are suitable for storage planning because the objectives conflict and the decision vector combines discrete bus indices with continuous sizes. Differential evolution provides a compact global-search framework [27]. NSGA-II [28] and MOPSO [29] are established multi-objective baselines, while hypervolume and inverted generational distance quantify convergence and coverage [30,31]. TOPSIS is used to select one compromise solution from a non-dominated archive [32]. The comparison in this study, therefore, evaluates both physical operating indicators and Pareto-front quality rather than relying on a single cost value.
Table 1. Positioning of representative BESS planning studies relative to the proposed framework.
Taken together, the literature provides strong foundations for storage allocation, uncertainty treatment, degradation-aware operation, and inverter voltage control. The unresolved planning gap is the joint optimization of discrete BESS locations, continuous energy capacities, and PCS ratings, while explicitly retaining converter reactive headroom and separating local within-step voltage support from SOC-mediated energy shifting. This gap defines the scope and aim of the present study.
The main technical contributions of this paper are summarized below:
(1)
A converter-aware, multi-objective storage planning model is established with explicit P-Q capability, voltage-droop reactive support, reactive headroom, voltage bounds, and radial power-flow constraints.
(2)
Bus location, energy capacity, and PCS rating are optimized jointly, allowing energy-shifting capacity and voltage-support capability to be separated rather than being tied by a fixed ratio.
(3)
A planning-level, local, within-step reactive power representation is coupled to the multi-objective model, and its technical effect is examined through Q trajectories, voltage indicators, and a no-reactive-support ablation.
(4)
AMODE is evaluated on IEEE33 and IEEE69 using repeated runs, feasibility rates, Pareto-quality metrics, ablation evidence, and sensitivity cases, with technical claims separated from cost-only comparisons.

2. System Modeling

2.1. Radial Distribution-Network Model

The distribution network is represented as a radial feeder with bus set N and branch set B. The slack bus is bus 1. The IEEE33 and IEEE69 feeders use commonly used radial distribution test-system data [1,33,34]. Hourly power flow is solved by backward–forward sweep, which is suitable for radial feeders and weakly meshed distribution networks when the feeder topology is radialized [35].
At bus i and hour t, the active and reactive net demands are defined as follows:
P i , t n e t = P i , t l o a d − P i , t P V − P i , t E S S
Q i , t n e t = Q i , t l o a d − Q i , t E S S
The sign convention is as follows: Pi,tESS > 0 denotes active power discharge to the grid, Pi,tESS < 0 denotes charging, and Qi,tESS > 0 denotes reactive power injection from the PCS. Loads are modeled as positive demands. Typical normalized daily load and PV profiles are used for the comparative simulation and are listed in Appendix A, Table A1.
For branch l = (i, j), the backward sweep and forward voltage updates are written as follows:
I i j , t = c o n j S j , t V j , t + ∑ l ∈ D ( j ) I l , t
V j , t = V i , t − Z i j I i j , t
where Sj,t = Pj,tnet + jQj,tnet; Zij is the branch impedance; and D(j) is the downstream branch set of bus j. Iteration continues until the voltage mismatch is below the numerical tolerance. The voltage constraint is
V m i n ≤ V i , t ≤ V m a x , V m i n = 0.95 , V m a x = 1.05

2.2. BESS Operation and SOC Constraints

For an ESS unit k installed at bus bk, the standard intertemporal SOC formulation in [23,24,25] represents active power using separate charging and discharging variables:
P k , t E S S = P k , t d i s − P k , t c h
The charging and discharging power is constrained by binary operating variables:
0 ≤ P k , t c h ≤ u k , t c h P k , 0 ≤ P k , t d i s ≤ u k , t d i s P k
u k , t c h + u k , t d i s ≤ 1 , u k , t c h , u k , t d i s ∈ { 0 ,   1 }
In Equations (5)–(8), Vmin and Vmax are the lower and upper bus-voltage limits in p.u.; Pk is the optimized active power rating of unit k; Pk,tch and Pk,tdis are non-negative charging and discharging powers; and uk,tch and uk,tdis are binary operating indicators. Equation (8) prevents simultaneous charging and discharging. In the numerical implementation, a positive hourly dispatch signal denotes discharge and a negative signal denotes charge, enforcing the same mutual-exclusion logic during objective evaluation.
S O C k , t + 1 = S O C k , t + η c h P k , t c h Δ t E k − P k , t d i s Δ t η d i s E k
S O C m i n ≤ S O C k , t ≤ S O C m a x
S O C k , 0 = S O C k , T = S O C 0

2.3. PCS Active–Reactive Capability and Voltage Support

The PCS is modeled as an active–reactive converter rather than as an active power-only resource, following the capability-limited inverter-control basis in [6,7,8,9,10,11]. Its apparent-power limit is obtained by multiplying the optimized active power rating by an inverter oversizing factor; a more general formulation can optimize SkPCS directly. This representation makes the trade-off between active dispatch and available reactive support explicit.
P k , t E S S 2 + Q k , t E S S 2 ≤ S k P C S 2
S k P C S = λ P C S P k
Reactive power is injected when the local voltage is below the reference value. The implemented voltage-droop rule increases the Q command as the local voltage falls, then clips the command at the instantaneous Q capability. Thus, local voltage support is available without changing the SOC directly, while active power still consumes or restores stored energy.
Q k , t E S S = m i n Q k , t m a x K v Q k , t m a x m a x 0 , V r e f − V b k , t V r e f − V m i n
Q k , t m a x = S k P C S 2 − P k , t E S S 2

2.4. Planning-Level Local Reactive Power Support

The proposed model uses a quasi-static hourly power-flow representation. Within each hourly operating point, the converter is assumed to update its local reactive power command in response to voltage error, while the SOC state is updated only through active charging or discharging. This separation represents local within-step voltage support at the planning resolution and does not imply a measured sub-second controller response.
Q k , t c m d = c l i p K v V r e f V b k , t , − Q k , t m a x , Q k , t m a x
The corresponding reactive headroom is monitored as follows:
H k , t Q = Q k , t m a x − Q k , t E S S
A feasible plan must preserve non-negative headroom after active power dispatch. Consequently, the selected bus and PCS rating affect not only stored energy but also the ability to deliver local voltage support when the feeder is stressed. Controller delay, switching transients, and electromagnetic transient performance are not represented by the hourly model.

2.5. Practical Implementation Assumptions and Scope

A practical planning application requires feeder topology and impedance data, historical or forecast load and PV profiles, candidate-bus information, and voltage estimates at the buses where ESS is installed. The local Q command requires the converter to obtain its terminal voltage from a local sensor; system-wide measurements at every candidate bus are not required during operation. During planning, candidate-bus voltages may be obtained from supervisory measurements or a distribution-system state estimator.
The deterministic study assumes perfect 24 h profiles and instantaneous within-step voltage information. Forecast errors can change the duration and location of voltage stress, and therefore alter preferred sites, energy capacities, and reactive headroom. Communication or estimation delays can reduce the realized voltage-support response, while sparse measurement infrastructure increases state-estimation uncertainty. These effects are not quantified by the present deterministic model; scenario-based or distributionally robust planning, delayed-control simulation, and observability constraints are appropriate extensions for field deployment.

3. Optimization Model

3.1. Decision Variables

For m BESS units, the decision vector is:
X = b 1 … b m E 1 … E m P 1 … P m
Here, bk is a discrete integer bus index, while Ek and Pk are continuous variables denoting energy capacity and PCS active power rating. Duplicate installation buses are not allowed:
b k ∈ { 2 , … , N b u s } , b k ≠ b l   for   k ≠ l
The number of units is treated as a planning parameter: m = 2 for IEEE33 and m = 3 for IEEE69. This setting keeps the planning problem comparable while allowing the larger IEEE69 feeder to use an additional flexible resource.

3.2. Objective Functions

Three objectives are minimized: daily network loss, total voltage deviation, and an annualized cost term. The first two objectives represent feeder-level technical performance; the cost term, including throughput-based degradation, is retained to prevent technically feasible but physically unrealistic oversizing. Cost values are reported in CNY/year or 10^4 CNY/year in tables.
m i n f 1 ( X ) = C i n v , a n n + C O M + C g r i d + C l o s s + C d e g + C p e n
m i n f 2 ( X ) = ∑ t P l o s s , t Δ t + 100 Φ V
m i n f 3 ( X ) = ∑ t ∑ i V i , t 1 + 1000 Φ V
The annualized investment cost uses the capital recovery factor:
C R F = r ( 1 + r ) L 1 + r ) L − 1
C i n v , a n n = C R F C c a p , C c a p = ∑ k 1000 c E E k 1000 c P P k
C O M = γ O M C c a p
The economic terms are evaluated based on annualized investment, operation, grid-energy, loss, and throughput-based degradation components. The degradation representation follows the throughput/equivalent-cycle planning rationale in [23,24,25,26]. It acts as a planning realism term alongside the two technical objectives; a lower cost alone is not interpreted as evidence of better voltage-support performance.
E d i s , d a y = ∑ t ∑ k P k , t d i s Δ t
N E F C , d a y = E d i s , d a y ∑ k E k
c d e g = 1000 c E α r e p N l i f e , C d e g = 365 c d e g E d i s , d a y
Because f1, f2, and f3 have different physical units, the objective values are min-max normalized for Pareto-quality assessment and TOPSIS compromise selection:
f ^ j = f j − f j m i n f j m a x − f j m i n + ε

3.3. Penalty Function and Constraints

Voltage-limit violations are explicitly penalized:
Φ V = ∑ t ∑ i m a x 0 , V m i n − V i , t 2 + m a x 0 , V i , t − V m a x 2
C p e n = ρ Φ V
In the above equations, Δt is the hourly time step, ηch and ηdis denote charging and discharging efficiencies, λPCS is the PCS sizing coefficient used to define the apparent-power rating, ε avoids division by zero during normalization, ρ is the annual-cost penalty coefficient, and ΦV is the voltage-violation index.
The numerical feasibility coefficients are 100 in the loss objective, 1000 in the voltage-deviation objective, and ρ = 5 × 107 CNY/year in the annual-cost objective, consistent with the implementation. They multiply only the voltage-violation index ΦV and therefore vanish for every voltage-feasible solution. Their purpose is to prevent a modest improvement in an unconstrained objective from compensating for a voltage-limit violation; they are not interpreted as physical loss, voltage deviation, or operating cost. Because these coefficients can influence the search trajectory among infeasible candidates, the feasibility rate is reported separately, and the physical cost, loss, and voltage metrics in the result tables are taken from unpenalized detail fields.
The complete constraint set includes bus-index bounds, non-repeated locations, energy-capacity limits, PCS power limits, SOC limits, terminal SOC equality, active–reactive PCS capability, and voltage bounds.

4. Proposed AMODE Algorithm

The proposed AMODE extends basic MODE by combining Latin hypercube initialization, adaptive F and CR, two mutation strategies, an external elitist archive, crowding-distance truncation, duplicate-bus repair, and TOPSIS-based final decision-making. MODE uses random initialization and a single DE/rand/1 mutation with deterministic F and CR schedules, while AMODE adds archive-guided exploitation and diversity-oriented initialization. The overall computational workflow is summarized in Figure 1.
Figure 1. Algorithm AMODE workflow for BESS siting and sizing.
The main differences from MODE are LHS initialization, adaptive F and CR, hybrid DE/rand/1 and archive-guided mutation, external elitist archive management, duplicate-bus repair, and TOPSIS compromise selection. In the reported computational setting, all algorithms use a population size of 24 and 35 generations, corresponding to 24 initial evaluations plus 24 offspring evaluations per generation (approximately 864 objective evaluations per run). Each objective evaluation contains 24 hourly radial power-flow calculations. The same budget is applied to all algorithms, and each algorithm–system combination is repeated thirty times.
The adaptive parameters used in the present code are:
F g = c l i p 0.75 − 0.30 τ g + 0.12 N ( 0,1 ) , 0.25,0.95
C R g = c l i p 0.35 + 0.45 τ g + 0.10 N ( 0,1 ) , 0.10,0.95
p r a n d , g = 0.55 ( 1 − τ g ) , τ g = g − 1 G m a x − 1
When a random number is smaller than prand,g, DE/rand/1 is used; otherwise, a current-to-archive-leader mutation is applied. Polynomial jitter is applied with probability 0.08(1 − τg) + 0.02. A finite evolutionary budget cannot guarantee global convergence. As an empirical budget check, the relative ranges of the three traced best-objective values over generations 31–35 are at most 1% in 20 of the 30 IEEE69 AMODE runs and at most 5% in 29 runs; the median-HV convergence traces are also reported in Figure 8. These observations support practical stabilization under the reported budget but not a formal convergence guarantee.

5. Case Studies and Results

5.1. Test Systems and Parameter Setting

The proposed model is tested on IEEE33 and IEEE69 radial distribution systems. IEEE33 is used to inspect the converter-support mechanism and ablation behavior, whereas IEEE69 provides a larger feeder for repeated algorithm comparison. The technical validation focuses on voltage feasibility, loss, minimum voltage, PCS capability, and the effect of removing reactive support; the algorithm experiments contain thirty independent runs under the same computational settings. The feeder layouts are shown in Figure 2, and the principal system and converter settings are summarized in Table 2.
Figure 2. IEEE33 and IEEE69 radial distribution topologies with PV buses, slack buses, and AMODE-selected ESS buses. The green-ring/red-center marker denotes a co-located PV and ESS bus.
Table 2. Main system, converter, and operating parameters.
The load and PV curves are author-defined deterministic benchmark profiles adopted for reproducible comparative simulation; they are not measured data and are not assigned to a specific geographic region or season. The profiles represent an evening-peaking daily demand pattern and a daytime PV pattern with a noon maximum. Their complete 24 h values and the TOU price series are provided in Appendix A, Table A1. Consequently, the sensitivity results should be interpreted as controlled trend evidence rather than forecasts for a particular utility territory. The algorithm settings used in the repeated experiments are listed in Table 3.
Table 3. Algorithm parameter settings used in the reported 30-run experiments.

5.2. Baseline Comparison and Operating Mechanism

Compared with the no-storage case, the selected AMODE-TOPSIS plan for IEEE33 raises the minimum voltage from 0.8866 to 0.9579 p.u. and reduces daily loss from 2.9617 to 2.6152 MWh. The main technical effect is the coordinated use of active dispatch and PCS reactive support: the converter can respond to local voltage conditions, while the active power trajectory remains governed by SOC and energy balance. The cost term is retained for planning realism, but the voltage and loss changes are the primary evidence here. The corresponding technical comparison is reported in Table 4. Figure 3 summarizes the converter-support mechanism, and Figure 4 shows the selected-unit operating trajectories.
Table 4. Technical performance comparison of IEEE33 between the no-storage baseline and AMODE-TOPSIS.
Figure 3. Technical mechanisms of converter-based reactive-power support, P–Q capability, and multi-objective storage siting and sizing in an active distribution network. (a) Feeder voltage state and local voltage error; (b) PCS local reactive-power support and P–Q capability; (c) joint planning of bus, energy-capacity, and PCS-rating decisions; (d) hourly PCS reactive-power trajectories of the selected ESS units; (e) hourly minimum-voltage trajectory and the lower-voltage limit. The separated schematic elements do not overlap in a way that affects scientific interpretation.
Figure 4. Hourly operation of the selected storage units: (a) active-power trajectories; (b) PCS reactive-power trajectories; (c) state-of-charge trajectories. Q is the local voltage-support channel and is bounded by the PCS capability.

5.3. Ablation Analysis

The ablation cases are re-optimized under different model assumptions; therefore, the selected ESS buses may differ from the AMODE-TOPSIS plan shown in Figure 2. The ablation results are summarized in Table 5.
Table 5. Technical ablation of degradation modeling and PCS reactive support on IEEE33.
Removing PCS reactive support reduces the minimum voltage to 0.9190 p.u. and introduces a voltage-limit penalty, compared with 0.9545 p.u. for the Full case. This technical degradation is larger than the differences caused by the cost-only assumption: the NoQ case demonstrates that active power scheduling alone cannot reproduce the local voltage-support function of the converter. The NoDeg case is retained only as a modeling control; its lower apparent cost reflects an omitted degradation term rather than better technical performance. The corresponding technical evidence is shown in Figure 5.
Figure 5. Evidence from ablation cases: degradation-cost modeling and PCS reactive power support.

5.4. Multi-System Algorithm Comparison

For Pareto-front quality assessment, all objectives are first min-max normalized within the objective space of the same test system. In the current code, HV is computed with the conservative normalized reference point (1.1, 1.1, 1.1), and the IGD reference set is formed by merging all non-dominated solutions obtained by all algorithms and all runs on the same system. The same normalization ranges, reference point, and reference-set construction are used for every compared algorithm to maintain a fair comparison. The repeated-run results for IEEE33 and IEEE69 are reported in Table 6 and Table 7, respectively.
Table 6. Technical and Pareto-quality comparison of repeated runs on IEEE33.
Table 7. Technical and Pareto-quality comparison of repeated runs on IEEE69.
Feasibility rate denotes the proportion of independent runs whose selected compromise solution satisfies all voltage, SOC, and PCS constraints. In IEEE69, AMODE obtains a feasibility rate of 96.7%, which is higher than that of NSGA-II (86.7%) and MOPSO (83.3%) under the reported computational setting. In the present implementation, HV, IGD, and Spacing are computed from the final non-dominated archive objective values after penalty handling and common min-max normalization, rather than from feasible solutions only; TOPSIS subsequently prioritizes feasible candidates when selecting the compromise solution.
For IEEE33, AMODE obtains the highest mean HV and the lowest mean IGD, while its differences from MODE are small and not statistically significant. AMODE also gives the lowest mean voltage deviation in the reported comparison. The results support a claim of competitive technical and Pareto quality, rather than universal superiority on every indicator.
For IEEE69, AMODE obtains the highest mean HV and the lowest mean IGD among the compared algorithms. This indicates better mean Pareto-front quality on the larger feeder under the reported computational setting. AMODE is not the best on every individual operational metric, so the defensible claim is improved Pareto-front quality and feasible technical trade-offs rather than dominance on every voltage or loss indicator. The Pareto-front projections, convergence behavior, and metric distributions are shown in Figure 6, Figure 7, Figure 8 and Figure 9, respectively.
Figure 6. AMODE Pareto-front trade-off and TOPSIS compromise solution.
Figure 7. Merged non-dominated Pareto-front projections from thirty independent runs on IEEE69.
Figure 8. Representative convergence behavior on IEEE69. Each curve is selected from the run nearest to the median HV of the corresponding algorithm.
Figure 9. HV and IGD distributions over thirty independent runs; diamonds denote the mean values.

5.5. Statistical Significance

The Wilcoxon rank-sum test is used with α = 0.05 and n = 30 independent runs per algorithm. Holm–Bonferroni-adjusted p-values are also reported to distinguish findings that are significant before multiple-comparison correction from findings that remain robust after Holm correction. On IEEE33, AMODE is better than NSGA-II and MOPSO in HV and IGD with both unadjusted and Holm-adjusted p-values below 0.05, while its differences from MODE in Pareto-front quality are not significant. On IEEE69, AMODE has lower unadjusted p-values than all three baselines for HV and IGD; the comparisons with MODE for HV and IGD, and with NSGA-II for IGD, are significant before multiple-comparison correction but not retained after Holm adjustment. The findings robust after Holm correction are HV against NSGA-II and MOPSO, IGD against MOPSO, and Spacing against MODE. Operational metrics such as cost, loss, voltage deviation, and minimum voltage remain problem-dependent and should not be used to claim universal dominance. The statistical test results are reported in Table 8 and Table 9, and the IEEE69 pairwise p-values are visualized in Figure 10.
Table 8. Wilcoxon rank-sum test results for IEEE33 over thirty independent runs.
Table 9. Wilcoxon rank-sum test results for IEEE69 over thirty independent runs.
Figure 10. IEEE69 30-run Pareto-quality p-value heatmap for AMODE compared with baseline algorithms. Asterisks denote Holm-adjusted p-values below 0.05.

5.6. Sensitivity Analysis

The sensitivity cases vary in PV penetration, ESS cost, and load level. From a technical perspective, higher load levels increase daily loss and voltage deviation and reduce the voltage margin, while higher PV penetration changes the locations and operating conditions at which reactive support is useful. Each sensitivity level is represented by one run, so the results are trend evidence rather than statistical conclusions; the cost response is secondary to the observed voltage and loss trends. The sensitivity results are summarized in Table 10 and visualized in Figure 11.
Table 10. Sensitivity of technical performance to PV penetration, ESS costs, and load levels.
Figure 11. Sensitivity of cost, loss, voltage deviation, and minimum voltage: (a) cost; (b) loss; (c) voltage deviation; (d) minimum voltage. The red dashed line in panel (d) denotes the 0.95 p.u. lower-voltage limit.

6. Conclusions

This paper develops a converter-aware multi-objective siting and sizing model for energy storage systems in active distribution networks. The model jointly optimizes installation buses, energy capacities, and PCS ratings while representing radial power flow, SOC limits, terminal SOC consistency, the active–reactive P-Q capability circle, voltage-droop Q support, reactive headroom, voltage bounds, and network loss. Annualized investment, operation, and throughput-based degradation terms are retained as bounded planning terms. AMODE solves the resulting mixed discrete–continuous problem using LHS initialization, adaptive mutation and crossover, hybrid mutation, archive management, feasibility repair, and TOPSIS selection.
The technical results show that the selected IEEE33 plan raises the minimum voltage from 0.8866 to 0.9579 p.u. and reduces daily loss by 11.70% relative to the no-storage case. The operating traces and P-Q constraint demonstrate the intended separation: active power changes SOC and energy balance, whereas PCS reactive power provides local voltage support, subject to instantaneous headroom. The NoQ ablation reduces the minimum voltage to 0.9190 p.u., confirming that reactive support is not a cosmetic addition to the planning model. Sensitivity cases further show that feeder stress changes voltage deviation, loss, and the locations at which support is most useful.
The algorithm comparison remains a support, rather than a substitute, for technical validation. AMODE provides competitive or improved Pareto-front quality, especially on IEEE69, but it is not best on every individual operating indicator. The thirty-run results improve statistical support for the comparative claims. The principal limitations are the deterministic profile assumption and the hourly temporal resolution. Local reactive support is represented within each quasi-static planning interval, not validated with controller delay, switching dynamics, or electromagnetic transient simulation. Future work should combine the planning model with probabilistic forecast scenarios, state-estimation uncertainty, sub-second converter control, measured feeder data, and hardware or EMT validation.

Supplementary Materials

The following supporting information can be downloaded at: https://www.mdpi.com/article/10.3390/en19184298/s1: Supplementary Data Code_30runs, including MATLAB R2024a scripts, 30-run algorithm-comparison summaries, statistical tables, complete benchmark input profiles, and selected figure source/output files.

Author Contributions

Conceptualization, C.Y. and M.X.; methodology, C.Y., X.X. and L.X.; software, X.X. and K.J.; validation, C.Y., L.X. and Y.A.; formal analysis, C.Y. and M.X.; investigation, X.X. and L.Z.; resources, M.X.; data curation, X.X. and K.J.; writing—original draft preparation, C.Y.; writing—review and editing, all authors; visualization, Y.A. and L.Z.; supervision, M.X. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the Science and Technology Project of State Grid Hubei Electric Power Co., Ltd., grant number B31532259621.

Data Availability Statement

The original contributions presented in this study are included in the article and Supplementary Materials. Further inquiries can be directed to the corresponding author. The Supplementary Materials also include the MATLAB R2024a source code, 30-run algorithm-comparison summaries, statistical tables, and complete benchmark input profiles.

Conflicts of Interest

Authors Chang Ye, Xun Xu, Liangli Xiong, Menghan Xiao, Kezheng Jiang, Yuqi Ao, and Lu Zhang were employed by the State Grid Hubei Electric Power Research Institute and Hubei Engineering Research Center of the Construction and Operation Control Technology of New Power Systems. The authors declare that this study received funding from State Grid Hubei Electric Power Co., Ltd. The funder was not involved in the study design, collection, analysis, interpretation of data, the writing of this article or the decision to submit it for publication.

Appendix A. Profiles Used in the Comparative Simulation

Table A1. Typical normalized profiles and TOU prices used in the comparative simulations.

References

  1. Baran, M.E.; Wu, F.F. Network reconfiguration in distribution systems for loss reduction and load balancing. IEEE Trans. Power Deliv. 1989, 4, 1401–1407. [Google Scholar] [CrossRef] [Scilit]
  2. Carpinelli, G.; Noce, C.; Russo, A.; Varilone, P.; Verde, P. Optimal siting and sizing of battery energy storage systems in unbalanced distribution systems: A multi objective problem under uncertainty. Int. J. Electr. Power Energy Syst. 2024, 160, 110316. [Google Scholar] [CrossRef] [Scilit]
  3. Iria, J.; Heleno, M.; Cardoso, G. Optimal sizing and placement of energy storage systems and on-load tap changer transformers in distribution networks. Appl. Energy 2019, 250, 1147–1157. [Google Scholar] [CrossRef] [Scilit]
  4. Gu, T.; Wang, P.; Liang, F.; Xie, G.; Guo, L.; Zhang, X.-P.; Shi, F. Placement and capacity selection of battery energy storage system in the distributed generation integrated distribution network based on improved NSGA-II optimization. J. Energy Storage 2022, 52, 104716. [Google Scholar] [CrossRef] [Scilit]
  5. Ali, A.; Bughio, A.-u.-R.; Abbas, G.; Keerio, M.U.; Mugheri, N.H.; Memon, S.; Saand, A.S. Optimization of distributed energy resources planning and battery energy storage management via large-scale multi-objective evolutionary algorithm. Energy 2024, 311, 133463. [Google Scholar] [CrossRef] [Scilit]
  6. Turitsyn, K.; Sulc, P.; Backhaus, S.; Chertkov, M. Options for control of reactive power by distributed photovoltaic generators. Proc. IEEE 2011, 99, 1063–1073. [Google Scholar] [CrossRef] [Scilit]
  7. Aly, M.M.; Abdel-Akher, M.; Ziadi, Z.; Senjyu, T. Assessment of reactive power contribution of photovoltaic energy systems on voltage profile and stability of distribution systems. Int. J. Electr. Power Energy Syst. 2014, 61, 665–672. [Google Scholar] [CrossRef] [Scilit]
  8. Jones, C.B.; Lave, M.; Reno, M.J.; Darbali-Zamora, R.; Summers, A.; Hossain-McKenzie, S. Volt-var curve reactive power control requirements and risks for feeders with distributed roof-top photovoltaic systems. Energies 2020, 13, 4303. [Google Scholar] [CrossRef] [Scilit]
  9. Emarati, M.; Barani, M.; Farahmand, H.; Aghaei, J.; Crespo del Granado, P. A two-level over-voltage control strategy in distribution networks with high PV penetration. Int. J. Electr. Power Energy Syst. 2021, 130, 106763. [Google Scholar] [CrossRef] [Scilit]
  10. Parizad, A.; Hatziadoniu, C. Employing load and irradiance profiles for the allocation of PV arrays with inverter reactive power and battery storage in distribution networks: A fast comprehensive QSTS technique. Int. J. Electr. Power Energy Syst. 2021, 128, 106915. [Google Scholar] [CrossRef] [Scilit]
  11. Souri, S.; Shourkaei, H.M.; Soleymani, S.; Mozafari, B. Flexible reactive power management using PV inverter overrating capabilities and fixed capacitor. Electr. Power Syst. Res. 2022, 204, 107927. [Google Scholar] [CrossRef] [Scilit]
  12. Mazza, A.; Mirtaheri, H.; Chicco, G.; Russo, A.; Fantino, M. Location and sizing of battery energy storage units in low voltage distribution networks. Energies 2020, 13, 52. [Google Scholar] [CrossRef] [Scilit]
  13. Das, C.K.; Bass, O.; Mahmoud, T.S.; Kothapalli, G.; Mousavi, N.; Habibi, D.; Masoum, M.A.S. Optimal allocation of distributed energy storage systems to improve performance and power quality of distribution networks. Appl. Energy 2019, 252, 113468. [Google Scholar] [CrossRef] [Scilit]
  14. Zhang, Y.; Xu, Y.; Yang, H.; Dong, Z.Y. Voltage regulation-oriented co-planning of distributed generation and battery storage in active distribution networks. Int. J. Electr. Power Energy Syst. 2019, 105, 79–88. [Google Scholar] [CrossRef] [Scilit]
  15. Nick, M.; Cherkaoui, R.; Paolone, M. Optimal siting and sizing of distributed energy storage systems via alternating direction method of multipliers. Int. J. Electr. Power Energy Syst. 2015, 72, 33–39. [Google Scholar] [CrossRef] [Scilit]
  16. Lin, Z.; Hu, Z.; Zhang, H.; Song, Y. Optimal ESS allocation in distribution network using accelerated generalised Benders decomposition. IET Gener. Transm. Distrib. 2019, 13, 2738–2746. [Google Scholar] [CrossRef] [Scilit]
  17. Wang, X.; Li, F.; Zhang, Q.; Shi, Q.; Wang, J. Profit-oriented BESS siting and sizing in deregulated distribution systems. IEEE Trans. Smart Grid 2023, 14, 1528–1540. [Google Scholar] [CrossRef] [Scilit]
  18. Naidji, I.; Smida, M.B.; Khalgui, M.; Bachir, A.; Li, Z.; Wu, N. Efficient allocation strategy of energy storage systems in power grids considering contingencies. IEEE Access 2019, 7, 175660–175670. [Google Scholar] [CrossRef] [Scilit]
  19. Gupta, R.; Sossan, F. Optimal sizing and siting of energy storage systems considering curtailable photovoltaic generation in power distribution networks. Appl. Energy 2023, 339, 120955. [Google Scholar] [CrossRef] [Scilit]
  20. Khajeh, H.; Parthasarathy, C.; Doroudchi, E.; Laaksonen, H. Optimized siting and sizing of distribution-network-connected battery energy storage system providing flexibility services for system operators. Energy 2023, 285, 129490. [Google Scholar] [CrossRef] [Scilit]
  21. Wong, L.A.; Ramachandaramurthy, V.K.; Taylor, P.; Ekanayake, J.B.; Walker, S.L.; Padmanaban, S. Review on the optimal placement, sizing and control of an energy storage system in the distribution network. J. Energy Storage 2019, 21, 489–504. [Google Scholar] [CrossRef] [Scilit]
  22. Yang, B.; Wang, J.; Chen, Y.; Li, D.; Zeng, C.; Chen, Y.; Guo, Z.; Shu, H. Optimal sizing and placement of energy storage system in power grids: A state-of-the-art one-stop handbook. J. Energy Storage 2020, 32, 101814. [Google Scholar] [CrossRef] [Scilit]
  23. Collath, N.; Tepe, B.; Englberger, S.; Jossen, A.; Hesse, H. Aging aware operation of lithium-ion battery energy storage systems: A review. J. Energy Storage 2022, 55, 105634. [Google Scholar] [CrossRef] [Scilit]
  24. Perez, A.; Moreno, R.; Moreira, R.; Orchard, M.; Strbac, G. Effect of battery degradation on multi-service portfolios of energy storage. IEEE Trans. Sustain. Energy 2016, 7, 1718–1729. [Google Scholar] [CrossRef] [Scilit]
  25. Li, Y.; Vilathgamuwa, M.; Choi, S.S.; Xiong, B.; Tang, J.; Su, Y.; Wang, Y. Design of minimum cost degradation-conscious lithium-ion battery energy storage system to achieve renewable power dispatchability. Appl. Energy 2020, 260, 114282. [Google Scholar] [CrossRef] [Scilit]
  26. Li, Y.; Gu, Y.; He, G.; Chen, Q. Optimal dispatch of battery energy storage in distribution network considering electrothermal-aging coupling. IEEE Trans. Smart Grid 2023, 14, 3744–3758. [Google Scholar] [CrossRef] [Scilit]
  27. Storn, R.; Price, K. Differential evolution: A simple and efficient heuristic for global optimization over continuous spaces. J. Glob. Optim. 1997, 11, 341–359. [Google Scholar] [CrossRef] [Scilit]
  28. Deb, K.; Pratap, A.; Agarwal, S.; Meyarivan, T. A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans. Evol. Comput. 2002, 6, 182–197. [Google Scholar] [CrossRef] [Scilit]
  29. Coello Coello, C.A.; Lechuga, M.S. MOPSO: A proposal for multiple objective particle swarm optimization. In Proceedings of the 2002 Congress on Evolutionary Computation; IEEE: Piscataway, NJ, USA, 2002; pp. 1051–1056. [Google Scholar] [CrossRef] [Scilit]
  30. Zitzler, E.; Deb, K.; Thiele, L. Comparison of multiobjective evolutionary algorithms: Empirical results. Evol. Comput. 2000, 8, 173–195. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  31. Zitzler, E.; Thiele, L.; Laumanns, M.; Fonseca, C.M.; da Fonseca, V.G. Performance assessment of multiobjective optimizers: An analysis and review. IEEE Trans. Evol. Comput. 2003, 7, 117–132. [Google Scholar] [CrossRef] [Scilit]
  32. Hwang, C.-L.; Yoon, K. Multiple Attribute Decision Making: Methods and Applications; Lecture Notes in Economics and Mathematical Systems; Springer: Berlin/Heidelberg, Germany, 1981; Volume 186. [Google Scholar] [CrossRef] [Scilit]
  33. Chiang, H.-D.; Jean-Jumeau, R. Optimal network reconfigurations in distribution systems: Part 2: Solution algorithms and numerical results. IEEE Trans. Power Deliv. 1990, 5, 1568–1574. [Google Scholar] [CrossRef] [Scilit]
  34. Baran, M.E.; Wu, F.F. Optimal capacitor placement on radial distribution systems. IEEE Trans. Power Deliv. 1989, 4, 725–734. [Google Scholar] [CrossRef] [Scilit]
  35. Bompard, E.; Carpaneto, E.; Chicco, G.; Napoli, R. Convergence of the backward/forward sweep method for the load-flow analysis of radial distribution systems. Int. J. Electr. Power Energy Syst. 2000, 22, 521–530. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.