Skip to Content
You are currently on the new version of our website. Access the old version .
Materials ProceedingsMaterials Proceedings
  • Proceeding Paper
  • Open Access

9 November 2021

11 Pages

A Regulatory Roadmap to the Past, Present and Future of Geothermal Energy in Greece †

and
1
Head of Directorate of Policies & Development, DG Mineral Raw Materials, Ministry of Environment & Energy, 11526 Athens, Greece
2
Department of Geothermal Energy, Directorate of Policies & Development, DG Mineral Raw Materials, Ministry of Environment & Energy, 11526 Athens, Greece
*
Author to whom correspondence should be addressed.
†
Presented at the International Conference on Raw Materials and Circular Economy, Athens, Greece, 5–9 September 2021.

Abstract

Greece is gifted with geologic features that promote geothermal heat flow. Geothermal energy exploration began in the late 60s, culminating in the first geothermal energy law in 1984 and the introduction of geothermal energy as a mineral resource under the amendment of the Greek Mining Code. Since then, low- and high-temperature geothermal activities followed their separate ways, with a modest utilization of the energy product in the primary sector (agriculture, aquaculture) and attempts for electricity production stalled since the mid-1990s. The adoption of green policies by both the EU and Greece, the acceptance of global warming as an existing threat, the adhesion to CO2 reduction goals, energy efficiency and the application on renewable energy solutions as means to combat the increase in global temperature have led to an increasing interest in the utilization of the geothermal energy applications. This paper presents the new legal framework for geothermal energy established by Law 4602/2019, as introduced by the Greek Ministry of Environment and Energy, Directorate-General for Mineral Raw Materials and discusses its scope and goals set by the implementation of its provisions. The paper offers a roadmap to successfully test those new policies and regulatory provisions and, finally, it maps the interfaces of stakeholders and geothermal industry in an attempt to highlight the steps of the necessary administrative procedures towards the facilitation of viable geothermal projects.

1. Introduction

Geothermal energy is a non-stochastic form of renewable energy, with the lowest CO2 footprint among other RES, fit for power generation and heating purposes depending on its energy potential. The presence of geothermal energy in Greece has been acknowledged as far back as the antiquity, mainly in the form of hot springs associated with medicinal use and recreational purposes. In recent years, Greece has been late, by comparison to other countries such as Italy, in exploring and utilizing her geothermal potential in an organized and effective manner. Exploration and exploitation were first regulated by Law 1475/1984 (Government Gazette vol. A, no. 113) while geothermal energy was classed as a mineral resource under the provisions of the Greek Mining Code. Later developments led to Law 3175/2003 and subsequent regulatory texts that served mainly the primary sector applications (agriculture, aquaculture, etc.), whilst attempts for electricity production were unsuccessful and were abandoned altogether in 1986. The need to update the legal framework in view of past shortcomings and new developments produced Law 4602/2019 (GG vol. A, no. 45). The new law introduces fresh concepts and sets a new regulatory framework which determines the roles, responsibilities and obligations towards a sustainable and rational use of geothermal potential in Greece.
Greece is undoubtedly characterized by significant high- and low-temperature geothermal potential due to favorable geological conditions. Despite the presence of good quality geothermal resources in a number of locations, geothermal use today remains limited to small–scale direct use applications such as greenhouse heating, agriculture crop drying and balneology. There is a few technical and non-technical matters that rendered cumbersome the development of industrial scale applications or more ambitious direct-use projects that could use this sustainable resource for electricity generation or urban heating. Such applications could significantly contribute to the renewable energy targets set by Greece and the European Union as well as safeguarding local energy security.
Technical matters refer to geological uncertainties and technical challenges faced upfront during the exploration phase and the resource development. Similarly, issues linked to reinjection of the geothermal fluids and chemical wear of wells require experience and long-term investment commitment. Those are some of the reasons why industry seems to have pursued other renewable technologies, whereby the initial CAPEX seems less risky, but they cannot undo their inherent stochastic character.
Non-technical matters are related to legal, financial and other supporting issues concerning the integration of the geothermal energy regulatory framework into the establishment of a coherent and farsighted policy dedicated to the management of geothermal resources. While there are a number of socio-economic and technical know-how factors that affect the poor performance of the geothermal projects, it is clear that sound and suitable regulatory regimes are important in the development of an energy sector that incorporates a much more widespread use of the geothermal potential than now.

3. Regulation on Geothermal Works

The Regulation was completely rewritten between 2019 and 2020 by a committee of experienced academics, research and field practitioners as well as competent authorities’ staff that handled exploration, drilling technology, HSE, production contracts and resource management issues. Following intense research in relevant codes and practices from countries with significant geothermal production and similar legal system, the Committee also utilized the accumulated local low-temperature geothermal experience, tested practices from the oil and gas industry and the HSE framework as set by internationally accepted standards, EU and national law.
The new Regulation on Geothermal Works consists of 27 articles, divided into 4 chapters and 7 indexes. The Regulation was approved by Ministerial Decision ΥPEN/DAP/42138/552/29.04.2021 (GG, vol. B, no. 1960), and came into force on the 14 May 2021. It provides unambiguous definitions on all important items and aspires to provide a hand-in-hand guide to exploration and production procedures in chapter B for national interest fields and unexplored areas, as well as in chapter C for local interest fields and areas of geothermal interest.
In either cases and in an effort to reduce bureaucracy, the Regulation provides detailed lists of contents that the lessee should follow in the preparation of exploration work-programs that are submitted to the lessor prior to any such activity. The lessor no longer grands approval of the submitted document, but rather checks the adherence to the specific work program list of contents and provides a statement of no objection. Particular attention is placed on the details of a drilling program submittal. The Regulation requires the production of health and safety manuals for the various types of exploration works and emergency response plans in particular for deep drilling operations. The lessee’s only document required for approval by the lessor is the production technical report. However, it should be stressed that there may be other documents subject to approval as required by the applicable environmental, labor, etc., legislation.
The Regulation details the drilling operations and the obligations of the lessee during the exploration phases, the abandonment of a well, and it specifies the contents of a well’s daily diary and record. It also describes the production/exploitation works, including pump tests, the measurements taken, the requirements for the necessary equipment and their acceptable accuracy levels. Likewise, the Regulation details the lessee’s obligations in facilitating the sustainable management of the geothermal resources.
Apart from the purely geothermal activities, in chapter D, the Regulation sets the general obligations of the lessee. It spells out the environmental protection prerequisites and obligations with particular reference to emergencies or accidents. In order to limit disturbance caused by exploration and production works and installations, the Regulation establishes minimum distances from neighboring activities, installations, various utilities networks and buildings. Health and safety rules, legislation and codes are listed for easy access. Additionally, chapter D provides rules and obligations on HSE measures for activities near power or other sensitive or dangerous networks, e.g., electricity, exposure to chemical agents and work inside enclosed or restricted areas, e.g., troughs, pits, containers, silos. Finally, the Regulation sets rules and places great importance to the documentation produced, in order to safeguard that important data is not lost. Primary data ownership belongs to the lessor, while the lessee can enjoy the copyright by generating secondary data through elaboration or processing.

4. On the Bidding and Leasing Procedures and Processes

Ministerial Decisions on the Bidding Procedures for the Lease of the State’s Rights to Explore, Exploit and Manage the Potential of the Geothermal Fields

Alongside the Regulation on Geothermal Works, the aforementioned Committee elaborated on the regulatory framework of the bidding procedures for both national and local interest geothermal fields. The draft of a ministerial decision on the terms and procedure for the lease of the state’s right to explore, exploit and manage the potential of unexplored areas and the geothermal fields of national interest entered into public consultation in December 2020, in order to ensure that all stakeholders can provide their input.
The provisions of the draft ministerial decision do not drastically change the previous regulatory landscape on geothermal energy, as they follow the general rules set by Law 4602/2019 combined with some of the prerequisites and terms of the legal framework on public procurement. In this context, the new framework rather offers remedial changes, as an attempt to attract investment, without endangering the viability of the resources and the protection of public interest.
The focal point is to make a clear and structured bidding and contracting manual for the potential investor in order to know exactly how to participate in the open tender procedure, what to expect and, most importantly, what the agreement terms and conditions are.
As mentioned before, the exploration rights in an unexplored area are leased through an open tender procedure which can be initiated either by an interested party or by MoEE. The whole process is described in an invitation to public tender document, elaborated by the competent authority, which includes the invitation to bid, the instructions to bidders, the general conditions of the lease agreement and other technical specifications.
In general, participation in the tender is open, on equal terms, to those parties that meet the legal, financial and technical requirements set in by the invitation document and can demonstrate the required professional adequacy and relevant experience. There are certain grounds for disqualification from the tender procedure that are on a par with the general provisions of the public procurement processes. The eligible bidders are invited to submit a sealed folder containing a sub-folder with the participation supporting documents and a second one with the exploration program as well as their environmental, financial and technical qualifications.
All applications are evaluated by the Tender Committee which is established by the decision of the Minister of Environment and Energy, on the basis of the evaluation criteria as set by the Law 4602/2019. These criteria include the amount of expenditure for exploration within the leased area and, in particular, concerning the minimum exploration work program, the type of exploration works, their gradual development in connection with the works execution time and the time when expenditure is made, together with the ability to implement environmental management, the proven technical experience and financial ability to meet the required obligations. Any lack of efficiency or responsibility displayed by the bidder in relation to obligations under previous projects should be taken into account by the Committee.
On this occasion it should be noted that one of the key changes introduced by the provisions of the ministerial decision is the division of the exploration program in two phases, following the standards of oil and gas exploration activities. The first phase carries the exploratory work necessary to identify a geothermal source and determine its properties. The budgeted cost of this phase is an important biddable item and hence is backed in full by a bank guarantee. This is a motivation to the bidders to design and price their first phase based on science, value engineering and weighted risk assessment. An important difference compared to the previous regime is that the amount of the bank guarantee (euro commitment corresponding to the estimation of the minimum work exploration program) is reduced by an amount equal to the expenditure made by the lessee depending on the progress of the program. This reduction is facilitated by a ministerial decision following a documented request made by the lessee.
The second phase contains only additional exploration items that could be realized based on the findings of the previous phase. This exploratory phase is not mandatory but optional, as it heavily depends on the results of the minimum work program, nevertheless, is evaluated as a competition criterion and is backed up by a financial guarantee if it eventually takes place.
Another important element concerns the negotiation process presented for the first time in the geothermal regulatory framework. Applicants who are found to be both technically and financially qualified are invited to enter into negotiations on the basis of the biddable items and specifically the minimum work program, the financial guarantee (euro-commitment) and the supplementary work program (the second exploratory phase). Negotiations can be an extremely useful tool for evaluating and improving the bids as it infuses the bidding process with a more dynamic perspective.
In general, when the tender procedure is over, the successful bidder is invited to appear before a notary public in order to sign a formal agreement, the lease contract. The contract must necessarily have the form of a notarial deed, signed by the appointed representatives of the competent agency and the successful bidder. It includes all the terms and conditions described in the tender declaration document and the relevant legal framework, as well as the obligations undertaken by the successful bidder.
Depending on the results and the data acquired upon the completion of the exploratory work program, if a geothermal field is certified as of national interest (i.e., T > 90 °C), the lessee is invited to submit a feasibility study for the exploitation/management of the geothermal potential. The study is evaluated and if deemed accurate, viable and adequate, the exploitation/management right is granted and a relevant lease contract is signed. It should be noted that according to the previous provisions, when signing the exploitation lease contract, the lessee was obligated to submit a bank guarantee equal to 3% of the value of the related works and installations which was then replaced by the letter guarantee for the due performance of the contract terms upon the start of the production. The new provisions include only the letter bank guarantee which is submitted when the contract is signed.
Furthermore, the provisions of the draft ministerial decision include the lessee’s rights and obligations, the lease payments, the monitoring of the lease contract terms and the related sanctions, the concession of the rights, and the termination of the contract.
A similar ministerial decision is under elaboration by the competent Directorate of MoEE regarding the terms and procedure for the lease of the right to explore exploit and manage the potential of the geothermal fields of local interest and areas of geothermal interest (i.e., 30 °C < T < 90 °C). This decision will include provisions similar but more on the simplified leasing procedures of the potential in low-temperature geothermal fields. The aim is to encourage geothermal investment at a local level, with applications that will support local production potential and restore public confidence in the use of this alternative form of energy. The basic structure that discerns between exploration and exploitation still holds for local interest geothermal fields. Depending on the available data and past history, the competent DAs may initiate an exploration tender process or go for an exploitation (production) tender process. The steps are more or less akin to the above described ones. Unlike the national interest fields, an interested party may apply for the exploitation right to a particular local interest field. This procedure enables investor’s initiative to be generated at will. Depending on the viability, the general added value for the state of the proposed investment scheme and the integrity potential investor, the competent authority may proceed to an open invitation for more bids. The outcome of such an invitation will eventually conclude to an exploitation lease agreement.

5. Next Regulatory Framework Acts

In addition to the above described texts, the Law 4602/2019 prescribes the elaboration of other texts that detail procedures and processes on important supporting issues such as financial or fiscal incentives on investments, the contents of the quinquennial Geothermal Potential Development Plan reports on local interest geothermal fields and areas of geothermal interest drawn by each DA, the creation of interactive databases in the Ministry and EAGME to support informed decisions by the state or potential investors, the terms and conditions for licensing heating–cooling energy systems that exploit the non-geothermal potential of ground strata and surface aquifers (via geothermal heat pumps), concurrent issues with spas and medicinal baths, etc.

5.1. Geothermal Potential Development Plan and Annual Account Reports

This is a new type of report drawn and approved by each competent DA on a quinquennial basis (5 years). It aims to be a useful tool that spells out a medium-term planning for the development of geothermal potential in local interest geothermal fields and areas of geothermal interest. Those reports will be reviewed by EAGME for technical evaluation and once approved they are displayed on DA’s and the MoEE’s internet sites. The Law 4602/2019 requires that DAs should also include plans of action for the expansion of areas where geothermal potential exploitation may take place and report on changes to the available potential per area or field. This new reporting comes along with the annual obligation by each DA to report to the MoEE on the previous year’s account on exploration and the exploitation of geothermal potential within their areal jurisdiction. The procedures and the data required for the production and dissemination of those two types of reports will be the subject of a separate ministerial decision.

5.2. Heating and Cooling Energy Systems—Geothermal Heat Pumps

Those systems are earth-coupled, ground-source, or water-source heat pumps known as Geothermal Heat Pumps (GHPs), sometimes referred to as GeoExchange, locally also known, albeit incorrectly, as shallow geothermal systems. They utilize the thermal capacity and constant temperature that does not constitute geothermal potential (i.e., T < 30 °C), of near surface geological strata and/or the surface aquifers as the exchange medium instead of the outside air temperature. They have been in use since the late 1940s [4]. The licensing of such installations and other technical and environmental issues is regulated by a ministerial decision that, although it works, needs upgrading to the new geothermal framework and other related laws. The MoEE in collaboration with CRES and other institutions will serve this need as a matter of priority, given the potential of those energy applications to the 2030 national energy goals.

5.3. Incentives

The question of elaborating ministerial decisions that create new or provide access to existing financial or fiscal tools and incentives is a complex one. It should be noted, however, that although Law 4602/2019 applies to all matters related to the exploitation of the geothermal potential, it has little to do with the processing of the geothermal product into thermal of electrical power, its distribution and the authorizations required. Thus, any incentives or such tools require the collaboration of the Regulatory Authority for Energy (RAE) and the Ministry of Finance.
This is an issue primarily linked to high-temperature or deep geothermal related exploratory drilling as it carries a forward risk in capital expenditure before the final result is known. This risk is similar to the oil and gas industry, however, if successful, the investment recovery is slower by comparison. Additionally, the HSE requirements during operations may add to the burden of concerns in an investor’s calculations. That, in some investors’ mind, may be a disadvantage by comparison to solar of wind farms that have a fraction of a cost in exploration and a smaller risk in countries like Greece. However, geothermal energy is not a stochastic source of power and that should be a counterbalance, provided that short term thinking is not present. The mere notion of Italy’s and Turkey’s performance on developing geothermal resources [5] is an indication that stable, long-term production is an asset worth risking. Hence, the effort should be directed to create incentives that ameliorate derisking, by helping potential investors to use tools such as insurance policies that may hedge against failed or less productive exploration campaigns. Other incentives may be initiated by the state’s acknowledgment that geothermal power generation contributes to the national energy basis and could provide energy stability by supporting local interconnections between certain island groups. For instance, the state could ensure, as in Germany in 2016 [6], that geothermal power generation stays in feed-in tariffs when all other forms of RES have entered the target model scheme. Incentives may be the kick start factor for more municipalities to seek and pursue local geothermal solutions for urban heating. Other fiscal, financial or tax related incentives may already exist by existing development funds and laws and may have already been enjoyed by some investors; however, there is a need to bring such initiative together on order to formulate a base tailored to the particular needs of geothermal potential exploration and exploitation.
Other incentives may include the installation of heating-cooling energy systems, especially in non-geothermally rich mountainous areas and parts of Northern Greece which may not be related to other national, or EU funded general energy efficiency initiatives. For example, since 2017, the German government provides a grant for new heating technologies by the market stimulation program (MAP). The rules of the MAP changed a couple of times in the past (amount of the grant, type of technologies, grant for new and/or existing buildings). Since 2015, very good conditions for the installation of geothermal heat pumps were established [7].

5.4. Databases and Online Information

Law 4602/2019 foresees the creation of two compatible databases in the Ministry of Environment and Energy and EAGME, respectively. The National Registry of Geothermal Utility Focii is a gateway that shall reside within the MoEE internet site. Its purpose is to collect, maintain, process and present in a GIS environment, technical, contractual and administrative information related to geothermal fields and areas of geothermal interest around the country. The Registry is linked to relevant databases in EAGME and the Centre for Renewable Energy Sources (CRES) and receives relevant data from the DAs and regional authorities. Once in operation, the gateway will become the central and compulsory point of publicity about any geothermal act or action related to the implementation of Law 4602/2019. EAGME shall create and maintain a Registry of Documentation and Monitoring of all geothermal spots and monitoring stations (including hot springs) and a database of the geothermal wells constructed or about to be constructed by the survey as part of its activities, or any such information by third bodies associated to EAGME. EAGME shall construct and maintain an internet gateway, where all the available geospatial data and geothermal monitoring results are presented in a GIS environment. The publicly available information will abide by the legislation that protects sensitive data. The details on the characteristics and the available services provided by the above gateways shall be determined be a ministerial decision.

References

  1. CRES & IGME. Review of Greece’s Geothermal Potential—Feasible Applications—Problems, Operational Program for Energy, Project 3.1.2, CSF 1994–1999, 1st Progress Report. 1999, internal unpublished volume in Greek.
  2. ΥΒΕΤ (Ministry of Industry, Energy & Technology). Renewable Energy Sources in Greece, National Policy Proposal, Vasilakos Committee. 1989, internal unpublished volume in Greek.
  3. GeoThermal Regulation Heat (GTR-H) Project. Geothermal Regulation Framework, Final Version; Intelligent Energy Europe: Dublin, Ireland, 2009. [Google Scholar]
  4. US Department of Energy, Heat & Cool—Geothermal Heat Pumps. Available online: https://www.energy.gov/energysaver/heat-and-cool/heat-pump-systems/geothermal-heat-pumps (accessed on 2 August 2021).
  5. EGEC. 2020 EGEC Geothermal Market Report, 10th ed.; EGEC: Bruxelles, Belgium, 2021. [Google Scholar]
  6. Appunn, K. EEG Reform 2016—Switching to Auctions for Renewables, Cleanenergywire.org. Available online: https://www.cleanenergywire.org/factsheets/eeg-reform-2016-switching-auctions-renewables (accessed on 2 August 2021).
  7. Weber, J.; Holger, B.; Moeck, I. Geothermal energy use, country update for Germany 2016–2018. In Proceedings of the European Geothermal Congress 2019, Den Haag, The Netherlands, 11–14 June 2019. [Google Scholar]
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.