Zhang, B.; He, S.; Ma, J.; He, J.; Li, Y.; Zheng, J.
Comprehensive Substantiation of the Impact of Pre-Support Technology on a 50-Year-Old Subway Station During the Construction of Undercrossing Tunnel Lines. Infrastructures 2025, 10, 183.
https://doi.org/10.3390/infrastructures10070183
AMA Style
Zhang B, He S, Ma J, He J, Li Y, Zheng J.
Comprehensive Substantiation of the Impact of Pre-Support Technology on a 50-Year-Old Subway Station During the Construction of Undercrossing Tunnel Lines. Infrastructures. 2025; 10(7):183.
https://doi.org/10.3390/infrastructures10070183
Chicago/Turabian Style
Zhang, Bin, Shaohui He, Jianfei Ma, Jiaxin He, Yiming Li, and Jinlei Zheng.
2025. "Comprehensive Substantiation of the Impact of Pre-Support Technology on a 50-Year-Old Subway Station During the Construction of Undercrossing Tunnel Lines" Infrastructures 10, no. 7: 183.
https://doi.org/10.3390/infrastructures10070183
APA Style
Zhang, B., He, S., Ma, J., He, J., Li, Y., & Zheng, J.
(2025). Comprehensive Substantiation of the Impact of Pre-Support Technology on a 50-Year-Old Subway Station During the Construction of Undercrossing Tunnel Lines. Infrastructures, 10(7), 183.
https://doi.org/10.3390/infrastructures10070183