Abstract
Forecasts at the grid connection of a photovoltaic (PV)–battery site must respect physical laws and control logic that PV-only forecasters ignore. Using 21 months of 5 min grid-meter data (net active power P, reactive power Q and apparent power S) from the Desert Knowledge Precinct microgrid in Alice Springs, Australia, a logged quality-control pipeline and change-point analysis reveal a seasonal regime in which net power is held near zero, tentatively attributed to battery or export-limit control, six reactive-power setpoint regimes and a step in hidden-PV export. We propose GRIDTRIAD, a persistence-anchored deep forecaster that decomposes the change in net power into physics-based PV and behind-the-meter demand terms, models the hold state as a mixture and guarantees S ≥ √(P2 + Q2). Compared at 5–60 min horizons with LightGBM quantile regression, a long short-term memory network and PatchTST, LightGBM and PatchTST are the most accurate at 60 min (RMSE 23.5 kW versus 25.4 kW), whereas GRIDTRIAD has the lowest CRPS at 15–30 min, no power-triangle violations (others: 28–52% before a simple projection) and a hold-state Brier skill score of 0.66. Online regime-aware conformal calibration keeps coverage within 0.04 of nominal in its calibration cells, but coverage falls to 0.62–0.75 when a hold ends. Physical consistency thus comes at a modest cost in point accuracy.
1. Introduction
Most photovoltaic (PV) forecasting studies predict the output of a single array. Distribution operators and microgrid controllers, however, act on the power at the grid connection point. There, PV is hidden behind load, batteries and control actions, and reactive power matters as much as active power for voltage management.
The Desert Knowledge Australia Solar Centre (DKASC) in Alice Springs is one of the most used public PV datasets [1]. Its literature is dominated by single-array, mostly hourly forecasts built from decomposition, metaheuristic tuning and CNN/LSTM/attention hybrids, usually judged only against other neural networks [2,3,4,5,6]. Reviews warn that such work often lacks naive benchmarks, uses leaky splits and is rarely reproducible [7,8,9]. Few DKASC studies use native 5 min data [10], few report calibrated uncertainty [11,12], and in the literature we reviewed, we found no study that treats a DKASC grid meter as a controlled net-load system.
The DKA Totals—Grid series (source 242) is such a meter. It records the 22 kV connection of the Desert Knowledge Precinct microgrid, which combines building load, PV and a 300 kW/358 kWh battery energy storage system (BESS) added in 2023 [1]. Three features make it unusual: net power is held near zero for long weekday periods (consistent with battery or export-limit control), reactive power switches between discrete setpoints, and hidden PV export changes in steps. A conventional PV forecaster would treat these as contamination. We treat them as the structure a forecaster should learn.
Physics-informed PV models constrain active power from irradiance and temperature [13], and reactive-power forecasting exists mainly on the load side [14,15,16]. In the literature we reviewed, we did not find a model that forecasts active power P and reactive power Q jointly at a PV–battery connection, enforces the power-triangle relation between P, Q and apparent power S, and calibrates its uncertainty by operating regime.
The novelty of this study lies in three aspects. First, the forecasting target: instead of the output of a single PV array, the study forecasts the full power state (P, Q and S) at the grid connection of a PV–battery microgrid, where PV is hidden behind load, storage and control actions. Second, the model GRIDTRIAD builds the control behavior and the physics identified in the data into its structure so that every forecast satisfies the power-triangle relation and exposes interpretable latent components (PV, behind-the-meter demand and the hold state), which black-box forecasters do not provide. Third, the treatment of uncertainty: an online, regime-aware conformal calibration maintains interval coverage within each operating regime, including regimes that are absent from the validation data. The aim of the study is therefore to test whether a forecaster that is physically consistent and interpretable by construction can remain competitive in accuracy with state-of-the-art black-box models at a controlled grid connection.
Accordingly, this study makes four contributions to the literature:
- Forensic data characterization. A reproducible repair and quality-control pipeline for the DKASC grid meter and change-point evidence of a hidden-PV step (5 October 2024), six reactive-power setpoint regimes, and a seasonal near-zero hold regime that is consistent with, but not proven to be, controller action.
- GRIDTRIAD. A persistence-anchored deep forecaster that decomposes the change in net power into a physics-based PV term and a behind-the-meter demand term, models the hold state as a mixture, and satisfies S ≥ √(P2 + Q2) by construction.
- A rigorous comparison. GRIDTRIAD against LightGBM quantile regression, a long short-term memory (LSTM) network and PatchTST, with persistence, smart persistence, climatology and CLIPER references, Diebold–Mariano tests and block-bootstrap intervals.
- Online regime-aware conformal calibration that holds coverage in every operating regime, including those absent from the validation period.
2. Related Work
Day-ahead Temporal Fusion Transformers have been applied to DKASC plants twice: on three plants, with 46% lower RMSE than an LSTM [2], and on 13 plants with MSTL decomposition [3]. Short-term studies combine signal decomposition, similar-day clustering and hybrid networks, for example, ICEEMDAN with TCN-BiLSTM [4], CEEMDAN with an improved iTransformer [5] and iTransformer–LSTM–KAN on a single site [6]. Most resample to hourly data. An exception is TiDE at native 5 min resolution, with R2 = 0.952 at 5 min [10]. Probabilistic outputs are rarer: quantile regression with kernel density estimation [11] and transfer learning with conformalized quantile regression (CQR) [12]. The latter reports 0% coverage at 06:00 in December and names adaptive conformal methods as future work. Time-series foundation models have been tested on DKASC sites, but only at daily resolution and with weather inputs treated as known in advance [17]. At 5 min resolution on ERCOT data, zero-shot foundation models were judged too inaccurate for operations and used weather covariates poorly [18].
Physics-informed networks add PV performance models as soft losses or embedded layers. A recent example adds a relaxation-ODE loss to an iTransformer and improves RMSE by up to 15.5%, but uses one site and two months of data and found physics-loss weights above about 0.05 harmful [13]. Such work constrains active power only. The power triangle between P, Q and S has not, to our knowledge, been used as a constraint.
Reactive power has been forecast for households with a multi-task Transformer that models the P–Q interaction [14] and for a hospital complex with LSTM, GRU and XGBoost [16]. A PV-side neural predictor exists for online voltage control but reports no scores [15]. None of these are probabilistic or treat reactive power as a setpoint-driven process.
Solar forecasting guidelines call for reproducible pipelines [7], skill against a climatology–persistence combination (CLIPER) [19], proper probabilistic scores such as the continuous ranked probability score (CRPS) [20], and a probabilistic climatology reference [21]. Skill against plain persistence overstates gains [8], and time-series splits must avoid leakage [9,22]. Diebold–Mariano tests [23] with false-discovery control [24] and block-bootstrap intervals [25] are now expected. For calibration, CQR [26] gives marginal coverage, Mondrian (group-conditional) conformal prediction [27] gives coverage within groups, and adaptive conformal inference (ACI) [28] tracks distribution shift online. Our calibration combines all three for a regime-switching net load.
3. Materials and Methods
The study uses 21 months of 5 min grid-meter data from the Desert Knowledge Precinct microgrid, repaired and screened by a fully logged pipeline. Figure 1 summarizes the workflow from raw data to calibrated, interpreted forecasts.
Figure 1.
Research workflow, from raw grid-meter data to calibrated, interpretable joint P–Q forecasts. The training-only change-point derivation is described in Section 3.5.6; the robustness and sensitivity analyses in Section 4.9, Section 4.10, Section 4.11, Section 4.12, Section 4.13 and Section 4.14, including the wind-speed check (Section 4.9), Q coupling and setpoint switches (Section 4.10), the bound on δ (Section 4.11), the GRIDTRIAD variants (Section 4.12), the corrected re-evaluation with causal imputation, five seeds and control models (Section 4.13) and the rolling-origin folds (Section 4.14).
3.1. Site
The Desert Knowledge Precinct lies in Alice Springs, Northern Territory, Australia (23.76° S, 133.88° E, about 546 m above sea level), in an arid climate with strong irradiance. Its microgrid connects to the Alice Springs network at a single 22 kV point and combines building load, rooftop and ground-mounted PV (nominally more than 250 kW DC) and a 300 kW/358 kWh BESS added in 2023 [1]. The sky is mostly clear: the median diffuse fraction is 0.13, and 398 of 610 days were classified as clear.
3.2. Data
The DKA Solar Centre publishes the microgrid as four single-technology sources, each with weather data: BESS, Site Demand (source 240), Solar (source 241) and Grid (source 242) [1]. This study uses only the Grid source, “DKA Totals—Grid”, which records the connection-point meter. The series analyzed runs from 7 December 2023 to 4 September 2025 at 5 min resolution, 183,443 slots on a regular grid. It contains active power P (kW), reactive power Q (kVAr) and apparent power S (kVA) at the meter; global and diffuse horizontal irradiance (GHI, DHI; W m−2); global and diffuse irradiance on the array plane (Gtilt, Dtilt; W m−2); ambient temperature Tamb (°C); relative humidity RH (%); and a daily cumulative rainfall counter (mm). The wind-speed channel is empty, and the wind-direction channel is implausible, so both are excluded.
The data indicate that positive P denotes import from the grid: night-time P has a median of +44.7 kW, and clear weekend middays export a median of 88 kW. P correlates negatively with tilted irradiance (Spearman ρ ≈ −0.41 overall, −0.71 at weekends). Timestamps are local standard time (ACST, UTC + 9:30, no daylight saving). The DKA Solar Centre notes on the data do not state units, sign conventions or the timestamp convention [1]; these are therefore inferred from the data. In accordance with the DKA Solar Centre terms of use, Desert Knowledge Australia, the Australian Government, the Northern Territory Government and Ekistica do not endorse the outcomes and conclusions drawn from these data and accept no liability for them.
3.3. File Repair and Quality Control
Every cleaning step, together with the number of rows it affects, is logged (Table 1). In two physical lines, a truncated record is fused with the next one; they are split at the embedded timestamp, keeping the 11 valid fields of the first fragment. Off-grid timestamps are snapped to the 5 min grid, and duplicates are removed. The near-zero hold band (−6 ≤ P < 0 kW) is protected from the stuck-value rule because it is controller behavior, not a fault.
Table 1.
Repair and quality-control log.
Irradiance is set to zero at night only where it was observed, values above 1500 W m−2 are removed, and RH is capped at 100%. The daily rainfall counter, which resets at midnight, is converted into 5 min increments and a trailing 24 h sum. Using the daily total at time t would leak the rest of that day’s rain into the inputs [22].
3.4. Missing Data
The DKA Solar Centre reports that the 5 min interval stamps of the DKP Microgrid/BESS downloads are occasionally incomplete and that these downloads were unavailable or inconsistent during website maintenance from 28 August to 4 September 2024 [1]. In the file analyzed here, that week is not a gap in the time axis: only 4 of its 2304 slots are missing as rows, and 966 of the 1155 missing slots in Table 1 fall between 20 and 23 December 2023. The maintenance week instead marks the onset of incomplete records: P is missing in 3.9% of slots in July and August 2024, in 14.8% during the maintenance week and in 9–11% from September to November 2024 (Figure 2a). The power meter, the weather station and the tilted pyranometers also fail independently, so only 56.8% of rows have every channel. Figure 2a–c shows the daily completeness of each sensor group, and Figure 2d shows the share of missing slots per channel in the raw file, after quality control and after short-gap interpolation. After quality control, P is missing in 16.4% of slots, Q and S in 21.8%, GHI in 20.4% and Gtilt in 18.3%. Most weather gaps are short dropouts. Inputs are linearly interpolated only inside gaps shorter than 1 h, which leaves 5.2% of P and 4.9% of GHI missing. This interpolation is two-sided: inside a gap it uses the next observation, which can lie after the forecast origin. At 33% of test origins, at least one weather input at the origin was filled in this way (P, Q and S at test origins were always observed), so the main results contain a look-ahead in the weather inputs of up to 55 min. Section 4.13 repeats the evaluation with causal imputation, which carries the last observation forward for at most 55 min and never uses later observations. The quality-control flags of Section 3.3 use short centered windows (three steps for stuck values, ±30 min for the Hampel filter), but they only remove values and never insert later observations. Each input channel carries an observation mask. Targets are never interpolated, and all scores use observed targets only.
Figure 2.
Data availability. (a–c) Daily share of 5 min slots in which every channel of a sensor group is observed after quality control: (a) power meter; (b) weather station; (c) plane-of-array sensors. Dashed lines separate the training, validation and test periods; the gray band marks the DKA website maintenance (28 August–4 September 2024). (d) Share of missing slots per channel in the raw file, after quality control and after linear interpolation of gaps shorter than 1 h (input copies only; targets are never interpolated).
3.5. Pre-Modeling System Identification
Before any model is trained, the data reveal a controlled system with three non-stationary processes: a seasonal hold regime, discrete reactive-power setpoints and a step in hidden-PV export. These analyses use the full record because they describe the system. Four quantities that enter the models were first identified from this description: the PV-segment flag (Section 3.5.4), the hold band −6 ≤ P < 0 kW, the hold level of −3 kW in Equation (7) and the 300 W m−2 threshold of the hold label (Section 3.11). Section 3.5.6 shows that each of them can be derived from the training period alone.
3.5.1. Net-Load Fingerprint
Figure 3 shows every 5 min value of P over the record. The site imports about 45 kW every night, exports strongly on weekends at midday, and weekday middays from April to September remain near zero. From January to March 2025, the site imported heavily at midday, which suggests that PV was partly unavailable in that period; this cannot be confirmed without the microgrid’s separate Solar source.
Figure 3.
Net active power at the grid connection for every 5 min slot (rows: days; columns: local time). Blue is export, red is import.
3.5.2. A Seasonal Control Hold Regime
On weekdays between 10:00 and 16:00, net power lies in the band −6 ≤ P < 0 kW in at most 6% of samples from October to March. The share rises to about 50% from April to September 2024 and to about 73% in the same months of 2025, when the hold also extends past sunset and appears on weekend mornings and evenings (Figure 4). On clear days, the band is held while the array receives about 1100 W m−2, so PV is absorbed behind the meter, consistent with battery charging or export limiting. Without the microgrid’s BESS and solar sources, this interpretation cannot be confirmed here, and we use “hold regime” to describe the near-zero state without implying its cause. A model that regresses P on irradiance alone averages two incompatible behaviors.
Figure 4.
Share of samples in the hold band (−6 ≤ P < 0 kW) by month and local hour: (a) weekdays; (b) weekends.
3.5.3. Reactive-Power Setpoint Regimes
Night-time Q has a median of −58 kVAr, far from what a passive load would be expected to draw. Pruned exact linear time (PELT) change-point detection [29,30] on the nightly median of Q finds six regimes (Figure 5). Q sits near −59 kVAr for most of the record, near −78 kVAr from mid-December 2024 to late January 2025, and in a positive regime of +10 to +18 kVAr from early March to mid-April 2025, before returning to −58 kVAr. The switches occur within a single day and are configuration changes, not weather effects.
Figure 5.
Nightly median Q with regime medians and PELT change points.
3.5.4. A Step in Hidden-PV Export
On clear weekend and holiday middays (11:00–13:30, clear-sky index above 0.8, Gtilt above 800 W m−2), net export per unit of tilted irradiance doubles at a change point on 5 October 2024, from a median of 70 to 132 kW per kW m−2 (Figure 6). This net export yield is not a strict lower bound on PV output: net export equals PV minus load minus battery charging plus battery discharge, so a discharging battery can raise it above PV. On weekend middays, when PV exceeds load, charging is more likely than discharge and the yield is a plausible lower bound, but without the signed battery power of the BESS source, this cannot be verified. The step could reflect added PV, lower weekend demand or a change in control mode.
Figure 6.
Midday net export yield on clear off-days, with segment medians and the binary-segmentation change point.
3.5.5. Power Triangle, Operating Plane and Ramps
The site operates in all four combinations of import or export and positive or negative Q (Figure 7a). Import with negative Q accounts for 58% of samples, import with positive Q for 18%, export with negative Q for 20% and export with positive Q for 3%. The median |power factor| is 0.78 by day and 0.60 at night.
Figure 7.
(a) P–Q operating plane; the shading shows the number of 5-min observations in each hexagonal bin (darker = more frequent), and the dashed lines mark P = 0 and Q = 0; (b) power-triangle excess against local volatility; (c) 5-min changes in P against changes in tilted irradiance.
The power triangle holds as an inequality on 5 min averages: S falls below √(P2 + Q2) by more than 0.5% in only 0.0014% of rows. The excess (S − √(P2 + Q2))/S grows about 21-fold from calm to volatile intervals and peaks near noon (Figure 7b). It therefore provides a measure of the variability within each interval at no extra cost.
Only 29% of large 5 min changes in P (more than 50 kW) coincide with a large change in tilted irradiance (more than 150 W m−2), and only 17% of large irradiance changes produce a large change in P (Figure 7c). Most large net-power ramps are therefore driven by load or control actions, and most cloud-induced ramps are absorbed behind the meter.
These findings set the design requirements for the forecaster: anchor on the current state, separate PV from behind-the-meter demand, represent the hold state explicitly, track the Q setpoint, and respect the power triangle.
3.5.6. Derivation from the Training Period
Repeating the change-point analysis of Section 3.5.4 on the 65 clear off-days of the training period alone (up to 30 November 2024) places the break on the same day, 5 October 2024, so the PV-segment flag is unchanged. In the training period, weekday P between 10:00 and 16:00 has a sharp peak between about −7 and −1.5 kW, with its mode at −5.5 to −5.0 kW (Figure S1a); the band −6 ≤ P < 0 kW contains most of this peak and 26% of the samples. The median of P inside the band is −4.5 kW, so the hold level of −3 kW used in Equation (7) is not the training median; its sensitivity is examined in Section 4.12. The share of samples in the band is below 6% for clear-sky plane-of-array irradiance under 300 W m−2 and rises above it (Figure S1b). This threshold also follows from training data: the median night import in the training period, 43.9 kW, equals the clear-sky PV output at about 325 W m−2 for the capacity learned before the change point (135 kW per kW m−2), so below roughly 300 W m−2 PV cannot offset the base load, and export limiting cannot produce a hold. Section 4.13 re-evaluates all models with these training-only choices frozen, including the hold level set to the training median of −4.5 kW.
3.6. Forecasting Setting and Data Split
All models forecast P and Q as 5%, 50% and 95% quantiles and S as a median, 5, 15, 30 and 60 min ahead, from the same information, splits and training budget. We use an operational setting: inputs are measurements up to the forecast origin t plus deterministic covariates at t + h (solar geometry, clear-sky irradiance, calendar and Northern Territory public holidays). No future weather is used, because the file contains no numerical weather prediction. Forecasts are made directly, with one output per horizon h ∈ {1, 3, 6, 12} steps of 5 min.
The split is chronological, with a one-day embargo between blocks. Origins from 7 December 2023 to 30 November 2024 train the models (92,749 origins). Origins from 2 December 2024 to 31 January 2025 are used for early stopping, CLIPER weights and conformal calibration (16,585). The test period runs from 2 February to 4 September 2025 (26,420 origins). Validation spans two months because January 2025 alone contains a 21-day GHI outage and two reactive-setpoint switches. Test origins require P(t) and all four target values to be observed, so every model is scored on the same set. Scalers are fitted on training data only, and input windows look backward only. Section 4.13 examines the resulting selection by comparing the retained and excluded origins and by scoring each horizon on its own evaluation set.
3.7. Features
Solar position and Ineichen clear-sky irradiance [31] are computed with pvlib [32] at the interval midpoint. A shift of −2.5 min matched the measured and clear-sky GHI best on clear training periods. The array orientation, which is undocumented, was fitted by isotropic transposition of clear-sky components to measured Gtilt on 3465 clear training samples: tilt 18°, azimuth 0° (north-facing), RMSE 86.2 W m−2. Derived features are the clear-sky indices kc = GHI/GHIcs and kc,POA = Gtilt/POAcs, the diffuse fraction kd, the 30 min variability of kc,POA, cyclic hour and day of year, an off-day flag, the trailing 24 h rainfall, the current hold indicator, the online reactive-setpoint state zQ (trailing 24 h median of night-time Q) and a PV-segment flag that switches at the change point of Section 3.5.4.
LightGBM uses 62 tabular features: P, Q and S at lags of 0–120 min and 24 h, 1 h and 3 h rolling statistics, the current weather and state features, the future covariates at t + h, and P and Q one day and seven days before t + h. The deep models receive the same information as a 12 h look-back sequence of 24 standardized channels (including observation masks), a vector of future covariates per horizon, and the same target-time lags.
3.8. Reference Forecasts
Persistence sets ŷ(t + h) = y(t). Net-load smart persistence carries the current tilted clear-sky index forward:
where βh = 0.073–0.077 kW per W m−2 is fitted on training data. Climatology gives the empirical 5%, 50% and 95% values of each target by 5 min slot and off-day flag over the training period; it also serves as the probabilistic reference, in the spirit of CH-PeEn [21]. CLIPER is the convex combination of persistence and climatology [19],
with the weight wh fitted on validation for each horizon and target; for P the persistence weight falls from 0.98 at 5 min to 0.86 at 60 min.
3.9. Compared Models
Four models are compared:
- LightGBM-Q [33]: one gradient-boosted quantile model per horizon, target and quantile (28 models), at most 400 trees, learning rate 0.05, 63 leaves and early stopping after 50 rounds. Quantile crossing is removed by sorting.
- LSTM [34]: a two-layer LSTM encoder (64 units; 79,239 parameters).
- PatchTST [35]: 1 h patches (12 steps) and a two-layer Transformer encoder with model width 64 and four heads (113,223 parameters).
- GRIDTRIAD (proposed; Section 3.10): the PatchTST encoder with physics- and control-structured heads (113,517 parameters).
The three deep models share a horizon decoder, a multilayer perceptron over the encoder state, the future covariates, the target-time lags and a horizon embedding. All are persistence-anchored: the median is the last observed value plus a learned change, and the outer quantiles are the median minus or plus a softplus width, so quantiles never cross. Without anchoring, the networks must reconstruct the current level from standardized inputs; in a preliminary run, this made them 30–50% worse than persistence at 5 min.
3.10. GRIDTRIAD
GRIDTRIAD (Figure 8) translates the system characteristics identified in Section 3.5 into model structure. Behind-the-meter demand at the origin is estimated as load plus battery at t = P(t) + PV(t), with PV(t) computed from the measured tilted clear-sky index and the learned capacity. It is therefore exact only up to the error of the PV model, and the split between PV and demand is identified only through the structural assumptions of Equations (3)–(6) and the penalty in Equation (11); Section 4.7 and Section 4.12 show that this identification is weak. PV at time τ is
where Ck is a learnable capacity that may step at the PV change point and γ = −0.44% per °C is fixed. The cell temperature follows a Faiman-type model [36] with a constant wind speed, since wind speed is unavailable:
with the Faiman coefficients U0 = 25 W m−2 K−1 and U1 = 6.84 W s m−3 K−1 and a constant wind speed v = 1 m s−1. The bias introduced by this assumption is quantified in Section 4.9. PV is non-negative and exactly zero when the sun is down. The forecast clear-sky index is anchored on the current one,
where zkc is the output of the clear-sky head. The free-running net power is
so that the capacity is learned from the co-movement of net power and irradiance. A hold head gives the probability πhold that net power lies in the near-zero hold band at t + h, and the central forecast P50 is the mixture
Figure 8.
GRIDTRIAD architecture. Learned heads (third row) feed hard-coded physics and control blocks (shaded gray); the power-triangle head (blue) enforces the physical bound on apparent power; the dashed line carries the measured state at the origin, on which every output is anchored.
Equation (7) is the mean of a two-component mixture, not its median: when πhold is near 0.5 it lies between the two modes, and building the outer quantiles as this center minus or plus learned widths is not a coherent quantile construction for a bimodal distribution. We retain it as the formulation used for the main results and compare it in Section 4.12 with a mixture-density head that yields true mixture quantiles. The hold level of −3 kW lies inside the hold band; its derivation from training data and its sensitivity are discussed in Section 3.5.6 and Section 4.12.
Reactive power is anchored on Q(t) and coupled to the forecast change in P,
with a learnable coupling a and a residual r. Apparent power is the residual r, which is not a constant: it is an output of the horizon decoder and hence a nonlinear function of the encoder state, which includes the history of Q, the online setpoint state zQ and the hold state. The linear term only encodes the physical prior that Q tends to follow changes in P; the discrete setpoint regimes are carried by the anchor Q(t), which holds the current setpoint, and by zQ. Section 4.10 assesses whether this formulation is sufficient.
so for every forecast, and δ learns the sub-interval variability found in Section 3.5.5. Load and battery are not separated: without the microgrid’s BESS source, only their sum is identifiable. The softplus places no upper bound on δ. Section 4.11 checks that the optimization does not produce unrealistically large apparent-power forecasts and describes how a hard bound can be imposed when an equipment rating is known.
3.11. Training
The deep models minimize the pinball loss of the P and Q quantiles,
averaged over the quantile levels τ ∈ {0.05, 0.5, 0.95}, plus the absolute error of S. GRIDTRIAD adds a binary cross-entropy term between πhold and a hold label yhold (−6 ≤ P(t + h) < 0 kW while POAcs > 300 W m−2) and a small penalty on Δ(load + battery), so that changes are explained by PV physics where possible:
All power terms in Equation (11) are computed in units of 100 kW (kVAr, kVA), so that the pinball and absolute-error terms are of order 0.1, the cross-entropy is dimensionless, and the penalty applies to Δ(load + battery) expressed in units of 100 kW. The weights 0.2 and 0.01 were fixed before training and not tuned. The physical parameters are constrained by construction: Ck = softplus(·) > 0, the forecast clear-sky index lies in [0, 1.3], δ ≥ 0 and all quantile widths are non-negative. The sensitivity to the two weights is reported in Section 4.12 and Section 4.13.
Training uses AdamW (learning rate 10−3, weight decay 10−4), a one-cycle schedule, batches of 256, at most 12 epochs and early stopping with patience 3. GRIDTRIAD’s physical parameters use a ten-fold learning rate and no weight decay. Training origins are taken every 15 min (stride 3) for tractability, equally for all deep models. All results use one seed (0).
3.12. Conformal Calibration
Raw quantiles are recalibrated with the conformity score
at miscoverage α = 0.10 [26]. Four schemes are compared: (i) CQR with a global score quantile from validation; (ii) Mondrian CQR [27] with a quantile per regime cell (sun up or down × off-day × hold state at the origin, eight cells); (iii) online Mondrian, where each cell keeps a rolling buffer of the 1000 most recent revealed test scores, a score being revealed h steps after its origin; and (iv) online Mondrian with adaptive conformal inference [28] (step 0.005), which also adapts α online. Each online buffer is initialized with the most recent validation scores of its cell (up to 1000), so there is no cold start, and the global validation quantile is used while a cell holds fewer than 21 scores. Interval width is reported as PINAW, the mean width of the 90% interval divided by the mean absolute observed value over the test period. Every score quantile is the finite-sample conformal quantile, the ⌈(n + 1)(1 − α)⌉-th smallest of the n available scores. With ACI, the miscoverage level is updated after each revealed outcome as αt+1 = αt + γ(α − errt), where errt = 1 if the revealed observation fell outside its interval and 0 otherwise, with γ = 0.005 and αt clipped to [0.005, 0.5]. Day-block bootstrap confidence intervals for the coverage of every group are reported in Section 4.13 and Supplementary Table S11.
3.13. Evaluation
Deterministic scores are the root mean square error (RMSE), mean absolute error (MAE), mean bias error (MBE), normalized RMSE (nRMSE; normalized by the mean absolute observed value, because P crosses zero and capacity is unknown) and R2, with the RMSE skill score
against persistence and against CLIPER. Probabilistic scores are the mean pinball loss, an approximate CRPS,
CRPS skill against climatology, and the coverage (PICP) and normalized width (PINAW) of the 90% interval. Physical and event scores are the share of forecasts with , the F1 score for ramp events (|ΔP| > 50 kW between t and t + h) and the Brier skill score of the hold probability. Differences in squared error are tested with two-sided Diebold–Mariano tests using Newey–West variance with lag h − 1 [23], with Benjamini–Hochberg correction [24]. Confidence intervals for RMSE come from 300 day-block bootstrap resamples. MAE, MBE, nRMSE and R2 of P, Q and S for every model and horizon are reported in Supplementary Tables S1–S3.
Equation (14) is the mean pinball loss at three unevenly spaced levels, scaled so that it equals twice the equally weighted average; it is a coarse approximation of the CRPS and is best read as a three-level quantile score. Its ranking of the four models for P is unchanged at 15–30 min, where GRIDTRIAD leads, when the levels are weighted by their spacing (0.275, 0.45, 0.275) or replaced by the 90% interval score; at 5 and 60 min the ranking depends on the weighting (Supplementary Table S8). Denser quantiles were not produced by the models, so the exact CRPS could not be computed.
3.14. Interpretation and Implementation
LightGBM is explained with TreeSHAP [37], including interaction values and SHAP stratified by operating regime. GRIDTRIAD is explained with integrated gradients [38] (32 steps, 256 test origins) and the three deep models with permutation of input-channel groups. An ablation removes the hold mixture, the PV decomposition or the triangle head in turn. The pipeline uses Python 3.13 with PyTorch 2.11, LightGBM 4.6, SHAP 0.54, pvlib 0.16 and ruptures [30] and runs on a CPU.
4. Results
All four models beat every reference for P, LightGBM and PatchTST are the most accurate at longer horizons, and GRIDTRIAD leads on physical consistency and calibration.
4.1. Point Accuracy
Table 2 gives the RMSE of the median forecast of P. At 5 min the four models lie within 0.2 kW of each other and about 0.2–0.4 kW below persistence. From 15 min onwards the gap to the references widens: at 60 min, LightGBM and PatchTST reduce RMSE by 15% relative to CLIPER, the LSTM by 12% and GRIDTRIAD by 8% (Figure 9). Every model beats CLIPER at every horizon in the Diebold–Mariano test after Benjamini–Hochberg correction (p ≤ 0.019). LightGBM and PatchTST are statistically indistinguishable at all horizons (p ≥ 0.18).
Table 2.
RMSE of the median forecast of net active power P (kW) on the test period, with the RMSE skill score against CLIPER in parentheses. Best model values in bold.
Figure 9.
RMSE and skill against CLIPER for P (left) and Q (right) by forecast horizon. The legend in (b) applies to all panels; dashed gray lines are reference forecasts. Climatology lies below the plotted range in (c,d) and is omitted there; all values are given in Supplementary Tables S1–S3.
GRIDTRIAD’s point error is significantly higher than that of LightGBM and PatchTST from 15 min onwards (Diebold–Mariano statistic 3.2–8.5, p ≤ 0.003). At 60 min, its day-block bootstrap 95% interval, 23.9–27.1 kW, overlaps those of the LSTM (22.7–25.7 kW), LightGBM (21.8–25.1 kW) and, narrowly, CLIPER (26.3–29.2 kW); the paired Diebold–Mariano test nonetheless separates GRIDTRIAD from CLIPER (p < 0.001). GRIDTRIAD also has the largest bias in P, −2.3 kW on average, against at most 0.2 kW in magnitude for LightGBM and PatchTST.
For reactive power, the picture is different. Q is dominated by its setpoint, so persistence is hard to beat at 5 min, where only LightGBM improves on CLIPER (skill 0.06). At 60 min PatchTST (RMSE 11.6 kVAr), the LSTM (11.7 kVAr) and GRIDTRIAD (12.3 kVAr) beat LightGBM (12.7 kVAr) and CLIPER (14.4 kVAr). For apparent power S, all models improve on CLIPER by 7–8% on average across horizons.
Figure 10 shows one test week in May 2025 at 60 min ahead. All models follow the weekday hold and the evening import peak. All of them lag the abrupt start of weekend export, the largest single source of error.
Figure 10.
60 min-ahead forecasts of P with 90% intervals for 17–23 May 2025: (a) LightGBM-Q; (b) LSTM; (c) PatchTST; (d) GRIDTRIAD.
4.2. Probabilistic Skill
Table 3 reports the approximate CRPS of P. GRIDTRIAD has the lowest CRPS at 15 and 30 min, LightGBM at 5 and 60 min, and the four models are within 4% of each other at every horizon. Averaged over horizons, all models improve CRPS on climatology by 63–64%.
Table 3.
Approximate CRPS of P (kW) and coverage of the raw 90% interval (PICP). Best values in bold.
The raw intervals differ more between models than the CRPS does. LightGBM’s 90% intervals are the narrowest (normalized width 0.59 on average) but cover only 76–82% of outcomes. The deep models’ intervals cover 86–91%, and GRIDTRIAD’s are the best calibrated before any post-processing (0.88–0.90 across horizons; width 0.71).
4.3. Physical Consistency, Ramps and Hold State
GRIDTRIAD produces no forecast with Ŝ < , by construction. The other models violate the power triangle in 28% (LightGBM), 45% (LSTM) and 52% (PatchTST) of forecasts (Figure 11a). Such forecasts cannot be passed directly to a power-flow or volt–var calculation. A simple control removes this difference: projecting each model’s apparent-power forecast onto the constraint, Ŝ ← max(Ŝ, ), eliminates every violation and changes the RMSE of S by −0.2 to +0.04 kVA and its MAE by at most 0.25 kVA (Supplementary Table S9). Physical consistency of S alone is therefore not a distinctive advantage of GRIDTRIAD; its added value has to be judged on the hold probability, the calibration and the latent components. A further control that adds only the triangle head to the PatchTST encoder, without the PV decomposition and the hold mixture, is evaluated in Section 4.13.
Figure 11.
(a) Share of forecasts violating the power-triangle inequality; (b) F1 score for ramp events (|ΔP| > 50 kW) by horizon.
Ramp events larger than 50 kW are difficult for every model (Figure 11b). LightGBM detects them best at 5–30 min (F1 0.13–0.19) and at 60 min (0.47). The LSTM and PatchTST almost never forecast a large change at 5–15 min (F1 0.00), and GRIDTRIAD only slightly more often (F1 0.01–0.04 at 5–30 min; 0.35 at 60 min). This matches Section 3.5.5: most large ramps come from load and control actions that leave no trace in the inputs.
GRIDTRIAD’s hold probability has a Brier score of 0.045, against 0.132 for a constant climatological probability, a Brier skill score of 0.66.
4.4. Calibration by Regime
Table 4 compares the calibration schemes at 60 min. Calibrating on the validation period raises LightGBM’s marginal coverage from 0.77 to 0.85 but leaves the worst regime cell 0.59 away from the nominal 0.90. The validation months, December and January, contain almost no hold periods, so validation-based Mondrian cells cannot represent the hold regime of the test period. Online Mondrian calibration, which learns from recently revealed outcomes, brings every model’s worst-cell error to 0.02–0.04 and its marginal coverage to 0.89–0.90, at the cost of 15–25% wider intervals than validation CQR. Adding ACI pins marginal coverage at 0.90 by design and changes the worst-cell error little. Table 4 lists every method for every model; the validation-based Mondrian rows show that conditioning on the validation cells does not fix the hold regime.
Table 4.
Calibration of the 90% interval for P at 60 min (published run): marginal coverage (PICP), normalized width (PINAW) and the largest coverage error in any of the eight calibration cells. All horizons and Q are given in Supplementary Table S4. Smallest worst-cell error in bold.
After online Mondrian calibration GRIDTRIAD has the narrowest calibrated intervals among the deep models (1.25 against 1.31 and 1.41) and the smallest worst-cell error. Coverage by hour stays close to 0.90 except at the evening transition near 18:00, when the hold ends (Figure 12c).
Figure 12.
(a) Marginal coverage at 60 min; (b) worst regime-cell coverage error; (c) GRIDTRIAD coverage by hour for each calibration scheme.
Coverage in Table 4 is measured on the same eight cells on which Mondrian calibration is conditioned, so a small worst-cell error is partly expected by construction. Table 5 therefore evaluates coverage on partitions that the calibration does not use: the hold state at the target time, hold transitions between origin and target, the hour of day, the month, ramps and the time since the last reactive-setpoint switch. Because the published run did not store validation forecasts, this analysis uses a re-run of the same notebook with identical settings; it reproduces the published 60 min RMSE of P within 0.1 kW for LightGBM and 1.1 kW for the deep models (Supplementary Table S7).
Table 5.
Largest coverage error |PICP − 0.90| of the 90% interval for P at 60 min on partitions not used for calibration (re-run). Groups with fewer than 200 test forecasts are omitted. Design cells are shown for comparison.
After online Mondrian calibration, coverage at 60 min stays within 0.05 of nominal in every month and within 0.07 for the hold state at the target time, and the worst hour of day lies 0.09–0.14 from nominal. Coverage remains poor, however, where the operating state changes within the forecast horizon: when a hold ends between origin and target it is 0.62–0.75 (raw intervals: 0.23–0.55); during ramps of more than 50 kW, it is 0.63–0.68 (raw: 0.49–0.58); and within 6 h of a reactive-setpoint switch, it is 0.71–0.78. Online Mondrian calibration therefore improves conditional coverage beyond its own cells, but it does not provide coverage for transitions it cannot anticipate. The full results for P and Q at every horizon are given in Supplementary Tables S5 and S6; at 5–15 min the few ramps are almost never covered by any model.
4.5. Statistical Significance
Figure 13 shows all pairwise Diebold–Mariano statistics. PatchTST is significantly better than the LSTM at every horizon, and LightGBM is significantly better than the LSTM at 60 min. GRIDTRIAD is not significantly worse than LightGBM at 5 min (p = 0.10) or than the LSTM at 5 and 15 min (p ≥ 0.06) but is significantly worse than both from 30 min onwards.
Figure 13.
Pairwise Diebold–Mariano statistics for the squared error of P (row against column; negative means the row model is better; * marks Benjamini–Hochberg-adjusted p < 0.05).
4.6. What Drives the Forecasts
For LightGBM’s 60 min median of P, the four largest mean |SHAP| values belong to P at the origin, P five minutes earlier, and P one day and seven days before the target time (Figure 14). Calendar features, temperature and the diffuse fraction follow. Current P matters most on off-days (mean |SHAP| about 26 kW against about 20 kW on weekdays), where export swings are largest. The previous step and the seven-day lag lose weight during the hold, when the controller fixes P. The diffuse fraction and the off-day flag gain weight during the hold relative to free-running weekdays, and apparent power S matters most in free-running weekdays.
Figure 14.
SHAP values of the 15 most important features for LightGBM’s median P at 60 min.
For the deep models, permuting the P history raises the 60 min RMSE of P by about 6.7 kW for the LSTM and 8.4 kW for PatchTST, but only 1.5 kW for GRIDTRIAD. Because GRIDTRIAD receives the current P directly as its anchor, permuting the history affects it less, and its remaining importance is spread over the temperature, humidity and rainfall group (1.0 kW), the irradiance indices (0.6 kW) and the hold state (0.6 kW). These permutation results should be read with caution. Permutation importance is marginal, and the hold indicator is a deterministic function of the current P (1 when −6 ≤ P(t) < 0 kW), so permuting one while the other is intact understates the importance of both; the small importance of the hold state for the black-box models therefore does not show that they ignore it. SHAP values for LightGBM and permutation importance for the deep models also measure different quantities and are not compared across model families. Finally, a more even spread of importance is not by itself evidence of better interpretability: GRIDTRIAD’s interpretability rests on its explicit latent components and hold probability (Section 4.3 and Section 4.7), whose limitations are discussed below. Integrated gradients for GRIDTRIAD concentrate in the last hour before the origin, with S, P and Q the most attributed channels, followed by rainfall, the reactive-setpoint state zQ and clear-sky POA.
4.7. Latent Components
GRIDTRIAD learns a PV capacity of 135 kW per kW m−2 before the October 2024 change point and 141 kW per kW m−2 after it. On clear-off-day middays in the test period, its median latent PV is 133 kW, above the observed median net export of 124 kW. This ordering follows from the model structure and is not a validation: net export can exceed PV when the battery discharges, and the penalty in Equation (11) favors explaining changes in P by PV. The learned capacity is also well below the stated nominal rating of more than 250 kW DC. Ck is an effective AC gain per unit of irradiance on a single fitted plane (tilt 18°, azimuth 0°), whereas the site combines rooftop and ground-mounted arrays: inverter and other system losses, arrays whose orientation differs from the fitted plane, curtailment during the hold and any PV not behind this meter all lower it. These effects are plausible, but without the solar source they cannot be separated, and the two numbers cannot be reconciled quantitatively here. Figure 15 shows the decomposition for one week. On weekend middays, latent PV exceeds behind-the-meter demand and the site exports. On weekday hold days, the latent demand rises to match PV almost exactly. This is the pattern expected if the battery is charged to keep export at zero, but the model cannot distinguish battery charging from export curtailment.
Figure 15.
GRIDTRIAD 60 min ahead, 17–23 May 2025: (a) observed and forecast net P; (b) latent PV and latent load plus battery; (c) forecast hold probability and observed hold state.
The capacity barely changes at the change point (+4%), while net export per unit irradiance doubles (Section 3.5.4). In the published run, the export step was therefore attributed mainly to lower behind-the-meter demand or a change in control rather than to added PV. This is a hypothesis to test against the microgrid’s metered solar and BESS sources. This attribution is, however, not robust. Across the re-trained variants of Section 4.12, the capacity after the break differs from that before it by −8% to +13%, and in the re-trained reference the median latent PV on clear-off-day middays was 120 kW, below the observed net export of 124 kW. The grid meter alone therefore cannot attribute the export step to PV or to demand.
The hold probability is informative but under-confident (Figure 16): when GRIDTRIAD forecasts a 15–55% chance of hold, the observed frequency is 40–70%. A simple recalibration of πhold, such as isotonic regression on validation data, would improve it further.
Figure 16.
Reliability of GRIDTRIAD’s forecast hold probability on the test period.
4.8. Ablation
Table 6 removes one component at a time, with the same seed, epoch limit and early-stopping rule. The power-triangle head is the only component whose removal changes physical consistency: without it, 47.5% of forecasts violate the triangle. Removing the hold mixture worsens CRPS at 60 min by 5% (8.44 against 8.02 kW) but lowers RMSE. Removing the PV decomposition, or the triangle head, lowers both RMSE and CRPS at 60 min by 2–7%. These single-seed differences of 1–2 kW are of the same order as seed-to-seed variation in deep models, so they are indicative only. Section 4.13 repeats the key comparison over five seeds.
Table 6.
Single-seed ablation of GRIDTRIAD on the test period.
The structure that makes GRIDTRIAD physically consistent and interpretable therefore comes at some cost in point accuracy at 30–60 min. The hold mixture improves the probabilistic forecast, and the triangle head is what guarantees consistency.
4.9. Sensitivity to the Assumed Wind Speed
Because wind speed is not recorded, Equation (4) uses a constant v = 1 m s−1. To bound the bias this introduces, the two PV terms of Equation (6) were recomputed for constant wind speeds of 0–5 m s−1, which covers calm to moderately windy conditions, with all other model outputs held fixed and the hold probability set to zero, which gives an upper bound on the effect. The resulting change in the forecast of P is [PVv(t) − PVv(t + h)] − [PV1(t) − PV1(t + h)]. Table 7 summarizes the results.
Table 7.
Sensitivity of GRIDTRIAD to the assumed constant wind speed v in Equation (4) on the test period. Cell temperature and latent PV are medians on clear off-day middays (11:00–13:30, n = 1123) at the learned capacity; the RMSE columns refer to the 60 min forecast of P.
Varying v changes the median cell temperature by up to 25 °C and the latent PV at fixed capacity by −4.6% to +7.9%. The forecast itself is much less sensitive, because both PV terms in Equation (6) use the same wind speed, and most of the bias cancels in their difference: the 60 min RMSE of P changes by −0.08 to +0.19 kW (−0.3% to +0.8%), the largest change in a single forecast is 4.9 kW, and the change at 5 min is at most 0.01 kW. The constant-wind assumption therefore has a negligible effect on forecast accuracy. It does, however, affect the level of the latent PV and of the learned capacity Ck, which enter Equation (3) as a product with the temperature factor, so the latent PV values in Section 4.7 carry an uncertainty of about −5% to +8%.
4.10. Adequacy of the Reactive-Power Coupling
Table 8 reports the 60 min RMSE of Q in the three reactive-power regimes of the test period and on the days around the two setpoint switches (3 March and 17 April 2025). In the observed data, a linear regression of the 60 min change in Q on the change in P explains only 8–35% of its variance within a regime (slopes 0.14–0.29 kVAr per kW), and GRIDTRIAD’s forecast changes in Q and P are only weakly related (slope 0.02, R2 = 0.005). The linear term of Equation (8) is therefore a minor contributor, and Q is forecast mainly through the anchor and the nonlinear residual.
Table 8.
RMSE of the 60 min forecast of Q (kVAr) by reactive-power regime and around the setpoint switches. Regimes are assigned by the target time; switch days are the day before and the two days after each switch. Lowest RMSE in each row in bold.
With this formulation, GRIDTRIAD has the lowest Q error of all models on setpoint-switch days (15.8 kVAr, against 16.0–18.3 kVAr for the other models and 16.9 kVAr for persistence), and it matches PatchTST in the positive regime of March–April 2025 (11.7 against 11.6 kVAr), in which LightGBM fails (19.0 kVAr). In the long −58 kVAr regime from mid-April, however, it is about 1.1 kVAr less accurate than the other deep models and 2.7 kVAr less accurate than LightGBM. The formulation is thus sufficient to follow the discrete setpoint switches, but it is not optimal within a stable regime. A setpoint-aware head, that is, a mixture over the discrete reactive-power setpoints analogous to the hold mixture of Equation (7), is a natural extension.
The online setpoint state zQ is a trailing 24 h median of night-time Q, so it lags a setpoint switch by up to a day. A finer analysis of the night-time level shows 21 switches between mid-January and mid-April 2025, including short excursions that the regimes of Section 3.5.3 merge. Table 9 reports the 60 min error of Q by the time elapsed since the most recent switch.
Table 9.
RMSE of the 60 min forecast of Q (kVAr) by time since the most recent reactive-setpoint switch (published run). Best model in bold.
In the first 3 h after a switch every model’s error is 2.6–3.3 times its steady-state value (31.6–36.8 kVAr), because no input announces the switch. GRIDTRIAD recovers fastest: it has the lowest error from 3 to 48 h after a switch, when zQ has not yet caught up but the anchor Q(t) already carries the new setpoint. Beyond 48 h, LightGBM, the LSTM and PatchTST are more accurate (10.4–11.3 kVAr against 11.5 kVAr), consistent with Table 8. The single coupling coefficient a therefore matters little; the limiting factor is that switches cannot be anticipated from the available inputs.
4.11. Bounds on the Apparent-Power Forecast
The ratings of the 22 kV connection and of the site inverters are not published, so δ was checked against the envelope of the measured data. On the test period, δ has a median of 0.8 kVA (0.4–1.2 kVA from 5 to 60 min), a 99th percentile of 15.6 kVA and a maximum of 57.4 kVA, whereas the largest excess S − √(P2 + Q2) observed in the training data is 79.0 kVA. The largest apparent-power forecast is 332.6 kVA, below the largest measured value of 347.1 kVA. Only 7 of the 105,680 test forecasts (0.007%) exceed the largest apparent power observed in the training period (279.8 kVA), and the measured S itself exceeded 300 kVA in 21 slots of the record. The optimization therefore does not produce apparent-power peaks outside the range that the connection has actually carried.
Where a rating is known, a hard upper bound can be imposed without losing the triangle guarantee, either by replacing the softplus with δ = δmaxσ(·), where σ is the logistic function, or by clipping δ after prediction. For example, clipping δ at 17.7 kVA, the 99.9th percentile of the excess observed in training, alters 0.74% of the test forecasts, changes the mean absolute error of S by at most 0.01 kVA and the 60 min RMSE of S by 0.05 kVA.
4.12. Mixture Quantiles, Hold Level and Penalty Weight
Three aspects of GRIDTRIAD were varied with all other settings fixed: the hold mixture of Equation (7), replaced by a mixture-density head; the hold level c; and the weight of the Δ(load + battery) penalty in Equation (11). In the mixture-density head, the hold component is a Laplace distribution centered on a learnable level with a learnable scale and the free component a Laplace distribution centered on Pfree with a learned scale; the mixture is trained by negative log-likelihood, and its 5%, 50% and 95% forecasts are the true mixture quantiles obtained by bisection of the mixture distribution function. Each variant was trained once (seed 0) with the notebook settings of the main results and is compared with a re-trained reference (Table 10). Because the re-run differs from the published run by up to 1.1 kW in the 60 min RMSE of P (Supplementary Table S7), differences in this size between variants are within run-to-run variation.
Table 10.
Sensitivity of GRIDTRIAD to the formulation of the hold mixture, the hold level c in Equation (7) and the weight of the Δ(load + battery) penalty in Equation (11) (re-run, seed 0, identical settings; the reference row is the re-trained published formulation).
True mixture quantiles improve the probabilistic forecast: the mixture-density head lowers the 60 min CRPS of P from 8.44 to 8.19 kW (−3%) and the 15 min CRPS from 4.46 to 4.31 kW, keeps the raw coverage at 0.89, and lowers the 60 min RMSE of P by 0.8 kW and of Q by 1.3 kVAr; its hold-state Brier skill score is 0.66 against 0.63. It does not remove the bias of P (−2.9 kW at 60 min against −2.3 kW), so the bias is not caused by using the mixture mean. The learned hold level of the mixture-density head, −4.3 kW, agrees with the training median of the hold band (−4.5 kW, Section 3.5.6). With the published formulation, the fixed level c = −4.5 kW gives the lowest 60 min RMSE (25.4 kW) and CRPS (7.96 kW) of all variants; c = −1.5 kW has the smallest bias (−1.5 kW), and a learnable level drifts to the lower edge of the band (−6.0 kW); −3 kW is therefore not optimal, although all these differences are within run-to-run variation. The penalty weight hardly changes accuracy (60 min RMSE 26.1–26.5 kW), but it does change the decomposition: the learned capacity after the break ranges from 128 to 135 kW per kW m−2 and the median latent PV on clear off-day middays from 117 to 124 kW. Across all variants, the change in capacity at the October 2024 break ranges from −8% to +13%. The forecasts are thus robust to these choices, whereas the latent components are only weakly identified from the grid meter alone.
4.13. Corrected Re-Evaluation: Causal Imputation, Frozen Design and Five Seeds
To address the look-ahead in the input imputation (Section 3.4) and the use of the full record in the design (Section 3.5), the complete pipeline was repeated with two changes and otherwise identical settings: short input gaps are filled causally by carrying the last observation forward for at most 55 min, and all design choices are frozen from the training period, namely the PV change point (again 5 October 2024), the hold band and threshold (Section 3.5.6) and the hold level, set to the training median of −4.5 kW. All four models and two controls were trained with 5 seeds (0–4); LightGBM uses the seed for row and feature subsampling. The test set of 26,420 origins is unchanged. Table 11 summarizes the results over the five seeds.
Table 11.
Corrected re-evaluation on the test period: causal imputation and design choices frozen from training data; mean ± standard deviation over five seeds. The two last model rows are controls: the PatchTST encoder with only the triangle head of GRIDTRIAD, and GRIDTRIAD without the PV decomposition. Best of the four main models in bold.
The correction does not inflate the earlier results. At seed 0, which isolates the effect on the same hardware, the 60 min RMSE of P changes from 23.6 to 22.8 kW for LightGBM, from 24.1 to 22.9 kW for PatchTST, from 24.2 to 24.6 kW for the LSTM and from 26.5 to 25.1 kW for GRIDTRIAD; the two-sided interpolation therefore did not give the models a measurable advantage. The conclusions on point accuracy are unchanged: LightGBM and PatchTST remain the most accurate at 60 min, and GRIDTRIAD remains less accurate (25.5 ± 0.4 kW against 23.3 ± 0.4 kW for PatchTST). At 15 min, GRIDTRIAD’s CRPS is lower than LightGBM’s in 5 of 5 seeds and higher than PatchTST’s in 4 of 5 seeds, so its lead in short-horizon CRPS reported in Table 3 is not robust across seeds.
The controls isolate the contribution of the architecture. Adding only the triangle head to PatchTST removes all violations and changes its 60 min RMSE by +0.88 ± 0.57 kW. Relative to this control, GRIDTRIAD’s 60 min RMSE is +1.38 ± 0.56 kW (0 of 5 seeds better) and its 15 min CRPS +0.054 ± 0.073 kW. Removing the PV decomposition changes the 60 min RMSE by −1.05 ± 0.79 kW and the 60 min CRPS by −0.202 ± 0.208 kW (GRIDTRIAD better in 0 and 1 of 5 seeds), and the 15 min CRPS by +0.040 ± 0.060 kW. The PV decomposition therefore does not provide a reproducible accuracy benefit; its contribution is the interpretable latent structure, which Section 4.7 and Section 4.12 show to be only weakly identified. Varying the weight of the hold cross-entropy in Equation (11) from 0.2 to 0.05 or 0.5 (seed 0) changes the 60 min RMSE of P to 25.5 and 25.7 kW, within the seed-to-seed spread.
Requiring P at the origin and at all four horizons retains 26,420 test origins; scoring each horizon on its own set of origins with an observed target adds 16,632 origins at 5 min and 15,977 at 60 min. The excluded origins have a similar share of night-time origins (50% against 50%). On the horizon-specific sets the 60 min RMSE of P is 22.38, 22.69 and 24.73 kW for LightGBM, PatchTST and GRIDTRIAD, against 22.77, 22.92 and 25.08 kW on the common set; the errors are slightly lower and the ranking is unchanged, so the common evaluation set does not favor any model (Supplementary Table S12).
With causal imputation, online Mondrian calibration again holds marginal coverage at 0.88–0.90 for every model. Day-block bootstrap 95% intervals (300 resamples) show that the shortfalls of Section 4.4 are not sampling noise: for GRIDTRIAD, coverage when a hold ends within the horizon is 0.66 [0.60, 0.71] and during ramps 0.67 [0.62, 0.70], while the worst calibration cell reaches 0.95 [0.92, 0.98]. Coverage with confidence intervals for every group, model and method is given in Supplementary Table S11.
4.14. Rolling-Origin Evaluation Across Control Regimes
The main split tests a single season. Two further chronological folds were therefore run with the corrected pipeline (seed 0), each with its own training period, a one-month validation period and design choices frozen from its training data: fold A trains on December 2023–April 2024 and tests on June–August 2024, when the hold regime is most frequent; fold B trains up to October 2024 and tests on December 2024–January 2025, when there is almost no hold and the reactive setpoint switches repeatedly. In fold A, LightGBM is the most accurate at 60 min (skill against CLIPER 0.10), GRIDTRIAD is second (0.06), PatchTST third (0.04), and the LSTM does not beat CLIPER (−0.03). In fold B, PatchTST is the most accurate (0.08), followed by LightGBM (0.07), GRIDTRIAD (0.04) and the LSTM (0.01). Skill is therefore much lower in both folds than in the main split (0.09–0.18), and the ranking of the deep models changes with the season. Calibration transfers better: online Mondrian calibration gives marginal coverage of 0.895–0.899 in fold A and 0.908–0.914 in fold B, with worst-cell errors of 0.01–0.02 and 0.03–0.05, and GRIDTRIAD has the best-calibrated raw intervals in fold B (0.86) but not in fold A (0.805 against 0.812 for LightGBM). Table 12 lists all results. The accuracy figures of the main split should therefore not be generalized to other seasons, whereas the benefit of online calibration is consistent across the three control regimes.
Table 12.
Rolling-origin evaluation with the corrected pipeline (seed 0): accuracy and calibration of the 60 min forecast of P in three test periods with contrasting control regimes.
5. Discussion
For a controlled grid connection, the best point forecaster and the most useful forecaster are not the same model.
5.1. Accuracy Versus Consistency
LightGBM and PatchTST give the lowest 60 min RMSE, consistent with recent PV benchmarks in which gradient boosting matched or beat deep and foundation models [39]. Yet a quarter to a half of their forecasts imply an apparent power smaller than the vector sum of their own P and Q, which no physical system can produce. An operator feeding such forecasts into a power-flow, volt–var or battery-dispatch calculation must repair them first. GRIDTRIAD’s forecasts can be used directly; its uncertainty is the best calibrated before post-processing, its hold probability is skilful, and its latent components are interpretable, although they have not been verified against metered PV, demand or battery data. Against this, its 60 min RMSE is 8% higher than LightGBM’s. Whether this trade-off is worthwhile depends on the application; we did not evaluate operational costs or constraint violations in a downstream dispatch or voltage-control study, so practical superiority is not established; such an evaluation against constrained baselines, including the projected forecasts of Section 4.3, is needed before that conclusion can be drawn.
5.2. Calibration Under Regime Shift
The calibration results offer a general lesson. Conformal methods calibrated on a fixed validation window assume that the test period resembles it. At this site, the validation months (December and January) contain almost no hold periods, while the test months contain a great deal, so validation-based Mondrian cells failed for the hold regime. Online calibration on recently revealed outcomes repaired coverage in every calibration cell for all four models. On partitions not used for calibration, it also kept coverage close to nominal by month and by hold state, but not across transitions: when a hold ends within the horizon, coverage falls to 0.62–0.75 (Section 4.4). Conditional coverage under regime change therefore remains an open problem. This supports the call for adaptive conformal methods in DKASC forecasting [12] and suggests that regime-conditional, online calibration should be the default for sites under active control.
5.3. Limitations
The study has the following limitations:
- Reduced training settings and single-seed main results. All deep models were trained once (seed 0), with a 12 h look-back and training origins every 15 min. Seed-to-seed variation was not quantified, so the ablation in Section 4.8 is indicative only. The same settings were used for every model. Section 4.13 repeats the evaluation with 5 seeds: the seed-to-seed standard deviation of the 60 min RMSE of P is 0.1–0.4 kW, and the ablation conclusions are revised accordingly.
- Missing inputs. Wind speed is unavailable, so cell temperature uses a constant wind speed of 1 m s−1; Section 4.9 shows that this has a negligible effect on forecast accuracy (at most 0.8% in RMSE) but makes the latent PV level uncertain by about −5% to +8%. About 38% of the 2025 weather records are missing.
- One site. The method is demonstrated on a single connection point.
- Simplified reactive-power coupling. Q is coupled to the change in P by a single linear coefficient plus a learned residual. This follows the setpoint switches well but is less accurate than LightGBM within a stable regime (Section 4.10).
- Unvalidated decomposition and inferred conventions. The latent PV and behind-the-meter demand, the sign conventions, and the interpretation of the hold regime and of the October 2024 export step are inferences from the grid meter alone. The microgrid’s Solar (source 241), Site Demand (source 240) and BESS sources are published by the DKA Solar Centre but were not part of the data analyzed here; the closure P ≈ demand − PV ± battery would test these inferences directly.
- Single fitted plane. One plane (tilt 18°, azimuth 0°) represents a combined rooftop and ground-mounted multi-array system, so Ck is an effective gain rather than a physical capacity.
- Hold mixture. The main results use the mixture mean of Equation (7) with symmetric widths; the mixture-density alternative of Section 4.12 was evaluated with one seed only.
- No downstream evaluation. Operational benefits for dispatch or voltage control were not evaluated.
5.4. Future Work
The most valuable next step is to add the microgrid’s Solar, Site Demand and BESS sources, which would turn the latent decomposition from a plausible inference into a measured result and test the explanation of the October 2024 export step. Further steps are a multi-seed and full-resolution evaluation, rolling-origin testing across a full year, isotonic recalibration of the hold probability, numerical weather prediction inputs for longer horizons, transfer to other DKASC aggregate sources, an on-site or reanalysis wind-speed input for the cell-temperature model, and a setpoint-aware reactive-power head. Comparison with load-side models, such as recent artificial-intelligence estimators of real residential energy consumption [40], would also show how much of the behind-the-meter demand term can be forecast from consumption data alone.
6. Conclusions
The DKA Totals—Grid series is the meter of a controlled PV–battery microgrid, and forecasting it well means modeling that control.
The aim of this study was to test whether a forecaster that is physically consistent and interpretable by construction can remain competitive with state-of-the-art black-box models at the grid connection of a controlled PV–battery microgrid. This aim was achieved. We are not aware of an earlier model that forecasts P, Q and S jointly at such a connection while guaranteeing the power-triangle relation. It reaches competitive probabilistic skill, the best-calibrated raw intervals and interpretable latent components at the cost of a point error 8% higher than that of the best black-box models at 60 min. Its novelty lies in turning the apparent control behavior and the physics revealed by the data into model structure, rather than treating them as noise. The main findings are as follows:
- A logged repair and quality-control pipeline, together with change-point analysis, reveals a seasonal near-zero hold regime, six reactive-power setpoint regimes and a step in hidden-PV export on 5 October 2024.
- Persistence anchoring is essential for deep models at a grid meter: with it, all four models beat CLIPER for P at every horizon from 5 to 60 min.
- LightGBM and PatchTST give the lowest point error at 60 min (23.5 kW), 8% below GRIDTRIAD, while GRIDTRIAD gives the lowest CRPS at 15–30 min.
- GRIDTRIAD satisfies S ≥ √(P2 + Q2) by construction (the others violate it in 28–52% of forecasts, although a simple post hoc projection removes these violations at negligible cost); it has the best-calibrated raw intervals, forecasts the hold state with a Brier skill score of 0.66 and provides latent PV and demand estimates, which remain to be verified against metered data.
- Online, regime-aware conformal calibration reduces the worst regime-cell coverage error from 0.29 to 0.65 (raw intervals) to 0.02–0.04 for every model; on partitions not used for calibration, coverage stays within 0.05 of nominal by month but falls to 0.62–0.75 when a hold ends and to 0.63–0.68 during ramps.
For operators of grid-connected PV–battery sites, physically consistent, calibrated and interpretable forecasts may be worth a modest loss in point accuracy. The proposed approach also shows that the structure of a controlled site, once identified from data, can be built into a forecaster without sacrificing calibration, and the same principle can be transferred to other grid connections with storage and active control. The publicly available solar and BESS sources of the same microgrid would make the decomposition directly testable. A corrected re-evaluation with causal imputation, design choices frozen from training data, five seeds and two rolling-origin folds (Section 4.13 and Section 4.14) confirms that LightGBM or PatchTST is the most accurate model in every period, shows that GRIDTRIAD’s structural components do not add accuracy over a triangle-constrained PatchTST, and shows that online calibration transfers across seasons while accuracy does not.
Supplementary Materials
The following supporting information can be downloaded at: https://www.mdpi.com/article/10.3390/pr14233833/s1. Table S1: Deterministic scores of the median forecast of P on the test period; Table S2: Deterministic scores of the median forecast of Q on the test period; Table S3: Deterministic scores of the median forecast of S on the test period; Table S4: Calibration of the 90% intervals for P and Q at all horizons for every model and method; Table S5: Largest coverage error of the 90% interval for P over the groups of each partition; Table S6: Largest coverage error of the 90% interval for Q over the groups of each partition; Table S7: Reproduction of the published results by the re-run of the same notebook; Table S8: Sensitivity of the probabilistic ranking to the weighting of the three quantile levels; Table S9: Post-hoc projection of the apparent-power forecasts onto the power-triangle constraint; Table S10: Corrected re-evaluation: scores of every model and control for each seed; Table S11: Coverage of the 90% interval for P at 60 min in every group of every partition; Table S12: Selection of test origins; Table S13: Rolling-origin folds; Figure S1: Training-period evidence for the quantities used by GRIDTRIAD.
Author Contributions
Conceptualization, J.C.; methodology, J.C. and K.K.; software, J.C. and R.M.; validation, K.K.; formal analysis, J.C.; investigation, K.K. and R.M.; data curation, S.S.K.; writing—original draft preparation, J.C. and K.K.; writing—review and editing, S.S.K.; visualization, R.M. All authors have read and agreed to the published version of the manuscript.
Funding
This research received no external funding.
Data Availability Statement
The data analyzed in this study are openly available from the DKA Solar Centre (DKP Microgrid, DKA Totals—Grid, source 242) at https://dkasolarcentre.com.au/download?location=dkp-microgrid (accessed on 15 September 2026) [1]. Redistribution of the raw data is subject to the DKA Solar Centre terms of use. Desert Knowledge Australia, the Australian Government, the Northern Territory Government and Ekistica do not endorse the outcomes and conclusions drawn from these data and accept no liability for them. The analysis notebook, the quality-control log, the run configuration and all test-period forecasts are available from the corresponding author on reasonable request.
Acknowledgments
The authors thank the Desert Knowledge Australia Solar Centre for making its data publicly available. During the preparation of this study, the authors used Claude (Anthropic; Claude Opus 5.5) for the purposes of writing and restructuring Python (version 3.13; PyTorch 2.11.0, LightGBM 4.6.0, pvlib 0.16.1) code for data cleaning, analysis, modeling, and figure generation, as well as revising the manuscript text and typesetting equations. The authors have reviewed and edited the output and take full responsibility for the content of this publication.
Conflicts of Interest
The authors declare no conflicts of interest.
Abbreviations
The following abbreviations are used in this manuscript:
| ACI | Adaptive conformal inference |
| BESS | Battery energy storage system |
| CLIPER | Climatology–persistence combination |
| CQR | Conformalized quantile regression |
| CRPS | Continuous ranked probability score |
| DHI | Diffuse horizontal irradiance |
| DKASC | Desert Knowledge Australia Solar Centre |
| DM | Diebold–Mariano |
| GHI | Global horizontal irradiance |
| LightGBM | Light gradient-boosting machine |
| LSTM | Long short-term memory |
| MAE | Mean absolute error |
| MBE | Mean bias error |
| nRMSE | Normalized root mean square error |
| PELT | Pruned exact linear time |
| PICP | Prediction interval coverage probability |
| PINAW | Prediction interval normalized average width |
| POA | Plane of array |
| PV | Photovoltaic |
| RMSE | Root mean square error |
| SHAP | Shapley additive explanations |
References
- Desert Knowledge Australia Centre. Download Data: DKP Microgrid—DKA Totals—Grid (Source 242). Alice Springs. Available online: https://dkasolarcentre.com.au/download?location=dkp-microgrid (accessed on 15 September 2026).
- López Santos, M.; García-Santiago, X.; Echevarría Camarero, F.; Blázquez Gil, G.; Carrasco Ortega, P. Application of Temporal Fusion Transformer for Day-Ahead PV Power Forecasting. Energies 2022, 15, 5232. [Google Scholar] [CrossRef] [Scilit]
- Jiang, Y.; Jiang, X.; Zhou, Y. Day-Ahead PV Power Forecasting Based on MSTL-TFT. arXiv 2023, arXiv:2301.05911. [Google Scholar]
- Zhang, M.; Han, Y.; Wang, C.; Yang, P.; Wang, C.; Zalhaf, A.S. Ultra-Short-Term Photovoltaic Power Prediction Based on Similar Day Clustering and Temporal Convolutional Network with Bidirectional Long Short-Term Memory Model: A Case Study Using DKASC Data. Appl. Energy 2024, 375, 124085. [Google Scholar] [CrossRef] [Scilit]
- Tang, H.; Kang, F.; Li, X.; Sun, Y. Short-Term Photovoltaic Power Prediction Model Based on Feature Construction and Improved Transformer. Energy 2025, 320, 135213. [Google Scholar] [CrossRef] [Scilit]
- Wu, G.; Wang, Y.; Zhou, Q.; Zhang, Z. Enhanced Photovoltaic Power Forecasting: An iTransformer and LSTM-Based Model Integrating Temporal and Covariate Interactions. In Proceedings of the 2024 IEEE 8th Conference on Energy Internet and Energy System Integration (EI2), Shenyang, China, 29 November–2 December 2024; pp. 856–861. [Google Scholar]
- Yang, D. A Guideline to Solar Forecasting Research Practice: Reproducible, Operational, Probabilistic or Physically-Based, Ensemble, and Skill (ROPES). J. Renew. Sustain. Energy 2019, 11, 022701. [Google Scholar] [CrossRef] [Scilit]
- Nguyen, H.; Müsgens, F. A Meta-Analysis of Solar Forecasting Based on Skill Score. arXiv 2022, arXiv:2208.10536. [Google Scholar]
- Wedhasari, T.; Castro, R. A Critical Review and Strategic Roadmap of PV Power Forecasting (2016–2026): Addressing Temporal Leakage and Operational Integration Gaps. Energies 2026, 19, 2937. [Google Scholar] [CrossRef] [Scilit]
- Zi, X.; Liu, F.; Liu, M.; Wang, Y. A Deep Learning Method for Photovoltaic Power Generation Forecasting Based on a Time-Series Dense Encoder. Energies 2025, 18, 2434. [Google Scholar] [CrossRef] [Scilit]
- Guo, W.; Xu, L.; Wang, T.; Zhao, D.; Tang, X. Photovoltaic Power Prediction Based on Hybrid Deep Learning Networks and Meteorological Data. Sensors 2024, 24, 1593. [Google Scholar] [CrossRef] [Scilit]
- Abdullah, R.; Faruk, K. Transfer Learning with Conformalized Quantile Regression for Solar PV Forecasting under Load-Shedding-Driven Data Scarcity. arXiv 2026, arXiv:2609.26959. [Google Scholar]
- Zhang, F.; Li, X.; Wang, Z.; Wen, Y.; Zhou, X.; Wu, Z.; Wang, Z.; Chen, H.; Wang, Z.; Chen, X. MIPV-NWP-PINNs V1.0: Development of a Multi-Scale Photovoltaic Power Forecasting Framework Integrating Numerical Weather Prediction with Physics-Informed Neural Networks. Geosci. Model Dev. 2026, 19, 4999–5017. [Google Scholar] [CrossRef] [Scilit]
- Dong, H.; Zhu, J.; Li, S.; Wu, W.; Zhu, H.; Fan, J. Short-Term Residential Household Reactive Power Forecasting Considering Active Power Demand via Deep Transformer Sequence-to-Sequence Networks. Appl. Energy 2023, 329, 120281. [Google Scholar] [CrossRef] [Scilit]
- Wanik, M.Z.C.; Gad, M.K.; Jabbar, A.A.; Sanfilippo, A.P. Real-Time PV Reactive Power Prediction for Online Voltage Control in Distribution Network Installed with Phasor Measurement Unit. In Proceedings of the 2024 IEEE Sustainable Power and Energy Conference (iSPEC), Kuching, Malaysia, 24–27 November 2024; pp. 315–320. [Google Scholar] [CrossRef] [Scilit]
- Tolun, G.G.; Zor, K. Very Short-Term Reactive Power Forecasting Using Machine Learning-Based Algorithms. In Proceedings of the 2024 9th International Youth Conference on Energy (IYCE), Colmar, France, 2–6 July 2024; pp. 1–5. [Google Scholar] [CrossRef] [Scilit]
- Longarini, L.; Rongoni, A.; Silenzi, S.; Frontoni, E.; Rosati, R. Time Series Foundation Models Based on Physics-Informed Synthetic Histories for Cold-Start Photovoltaic Forecasting. arXiv 2026, arXiv:2606.07457. [Google Scholar]
- Za’ter, M.E.; Hodge, B.S. Empirical Assessment of Time-Series Foundation Models for Power System Forecasting Applications. arXiv 2026, arXiv:2604.22077. [Google Scholar]
- Yang, D.; Alessandrini, S.; Antonanzas, J.; Antonanzas-Torres, F.; Badescu, V.; Beyer, H.G.; Blaga, R.; Boland, J.; Bright, J.M.; Coimbra, C.F.M.; et al. Verification of Deterministic Solar Forecasts. Sol. Energy 2020, 210, 20–37. [Google Scholar] [CrossRef] [Scilit]
- Lauret, P.; David, M.; Pinson, P. Verification of Solar Irradiance Probabilistic Forecasts. Sol. Energy 2019, 194, 254–271. [Google Scholar] [CrossRef] [Scilit]
- Le Gal La Salle, J.; David, M.; Lauret, P. A New Climatology Reference Model to Benchmark Probabilistic Solar Forecasts. Sol. Energy 2021, 223, 398–414. [Google Scholar] [CrossRef] [Scilit]
- Hewamalage, H.; Ackermann, K.; Bergmeir, C. Forecast Evaluation for Data Scientists: Common Pitfalls and Best Practices. arXiv 2022, arXiv:2203.10716. [Google Scholar]
- Diebold, F.X.; Mariano, R.S. Comparing Predictive Accuracy. J. Bus. Econ. Stat. 1995, 13, 253–263. [Google Scholar] [CrossRef] [Scilit]
- Benjamini, Y.; Hochberg, Y. Controlling the False Discovery Rate: A Practical and Powerful Approach to Multiple Testing. J. R. Stat. Soc. Ser. B 1995, 57, 289–300. [Google Scholar] [CrossRef] [Scilit]
- Mayer, M.J.; Baran, Á.; Lerch, S.; Horat, N.; Yang, D.; Baran, S. Post-Processing of Ensemble Photovoltaic Power Forecasts with Distributional and Quantile Regression Methods. Sol. Energy 2026, 307, 114361. [Google Scholar] [CrossRef] [Scilit]
- Romano, Y.; Patterson, E.; Candès, E. Conformalized Quantile Regression. In Proceedings of the Advances in Neural Information Processing Systems 32 (NeurIPS 2019), Vancouver, BC, Canada, 8–14 December 2019. [Google Scholar]
- Vovk, V.; Gammerman, A.; Shafer, G. Algorithmic Learning in a Random World; Springer: New York, NY, USA, 2005. [Google Scholar]
- Gibbs, I.; Candès, E. Adaptive Conformal Inference under Distribution Shift. In Proceedings of the Advances in Neural Information Processing Systems 34 (NeurIPS 2021), Virtual, 6–14 December 2021. [Google Scholar]
- Killick, R.; Fearnhead, P.; Eckley, I.A. Optimal Detection of Changepoints with a Linear Computational Cost. J. Am. Stat. Assoc. 2012, 107, 1590–1598. [Google Scholar] [CrossRef] [Scilit]
- Truong, C.; Oudre, L.; Vayatis, N. Selective Review of Offline Change Point Detection Methods. Signal Process. 2020, 167, 107299. [Google Scholar] [CrossRef] [Scilit]
- Ineichen, P.; Perez, R. A New Airmass Independent Formulation for the Linke Turbidity Coefficient. Sol. Energy 2002, 73, 151–157. [Google Scholar] [CrossRef] [Scilit]
- Holmgren, W.F.; Hansen, C.W.; Mikofski, M.A. pvlib python: A Python Package for Modeling Solar Energy Systems. J. Open Source Softw. 2018, 3, 884. [Google Scholar] [CrossRef] [Scilit]
- Ke, G.; Meng, Q.; Finley, T.; Wang, T.; Chen, W.; Ma, W.; Ye, Q.; Liu, T.-Y. LightGBM: A Highly Efficient Gradient Boosting Decision Tree. In Proceedings of the Advances in Neural Information Processing Systems 30 (NIPS 2017), Long Beach, CA, USA, 4–9 December 2017. [Google Scholar]
- Hochreiter, S.; Schmidhuber, J. Long Short-Term Memory. Neural Comput. 1997, 9, 1735–1780. [Google Scholar] [CrossRef] [Scilit]
- Nie, Y.; Nguyen, N.H.; Sinthong, P.; Kalagnanam, J. A Time Series Is Worth 64 Words: Long-Term Forecasting with Transformers. In Proceedings of the International Conference on Learning Representations (ICLR), Kigali, Rwanda, 1–5 May 2023. [Google Scholar]
- Faiman, D. Assessing the Outdoor Operating Temperature of Photovoltaic Modules. Prog. Photovolt. Res. Appl. 2008, 16, 307–315. [Google Scholar] [CrossRef] [Scilit]
- Lundberg, S.M.; Erion, G.; Chen, H.; DeGrave, A.; Prutkin, J.M.; Nair, B.; Katz, R.; Himmelfarb, J.; Bansal, N.; Lee, S.-I. From Local Explanations to Global Understanding with Explainable AI for Trees. Nat. Mach. Intell. 2020, 2, 56–67. [Google Scholar] [CrossRef] [Scilit]
- Sundararajan, M.; Taly, A.; Yan, Q. Axiomatic Attribution for Deep Networks. In Proceedings of the 34th International Conference on Machine Learning (ICML), Sydney, Australia, 6–11 August 2017. [Google Scholar]
- Xu, Y.-Q.; Zhou, L.-G.; Sun, Z.-H.; Yu, L.; Jiang, M.-M. Horizon-Specific Expert Fusion for Photovoltaic Power Forecasting. arXiv 2026, arXiv:2609.15035. [Google Scholar]
- Atalar, F.; Adıgüzel, E.; Ersoy, A. Application of Contemporary Artificial Intelligence Algorithms in Real Energy Consumption Estimation in Residences. Necmettin Erbakan Univ. J. Sci. Eng. 2025, 7, 31–47. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.