Skip to Content
ProcessesProcesses
  • Article
  • Open Access

20 November 2026

32 Pages

Physics-Guided Graph-Temporal Learning for Power-Grid Stability Assessment and Risk Source Localization

,
,
,
,
and
1
Power System and Its Automation, State Grid Gansu Electric Power Research Institute, Lanzhou 730070, China
2
School of Electrical Engineering, Chongqing University, Chongqing 400044, China
3
State Grid Gansu Electric Power Company Dispatching and Control Center, Lanzhou 730070, China
*
Authors to whom correspondence should be addressed.

Abstract

Transient stability assessment must identify instability and its likely sources despite incomplete and delayed phasor measurement unit (PMU) data. This study develops a physics-guided graph-temporal framework that jointly predicts stability margins, instability types, risk sources, and line fault positions. A physical risk prior derived from differential-algebraic equations aggregates adverse scenarios through conditional value at risk and is fused with measurement-based source probabilities. A graph attention encoder and causal temporal convolution capture spatial and temporal dependencies, with PMU availability and elapsed-time indicators representing measurement degradation. Auxiliary algebraic power balance consistency guides training, while probability calibration and conformal prediction support confidence-based decisions. On the grouped 39-bus test set, rotor-angle and voltage balanced accuracies reached 99.22% and 98.86%, respectively, and Top-1 source localization accuracy reached 96.32%, 1.54 percentage points above the graph-temporal reference. The mean expected calibration error was 0.91%, and nominal 95% source sets achieved 95.40% empirical coverage with 1.42 candidates on average; coverage under 30% PMU loss was 94.62%. Under 30% PMU-channel loss and a six-sample delay, balanced accuracy was 97.31%, compared with 95.08% without measurement quality indicators. After retraining on an independent 68-bus system, rotor-angle balanced accuracy and Top-1 localization accuracy reached 98.37% and 92.68%, respectively. Model-only 95th-percentile latency was 21.8 ms for a single model and 58.9 ms for the five-model ensemble. The evaluated simulations quantify joint prediction accuracy, empirical coverage, and computational cost under topology and measurement variation.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.