Abstract
The widespread integration of wind energy conversion systems has fundamentally reshaped modern power grid architecture. However, the limited dynamic response of wind turbine (WT) converters during grid faults—particularly their inability to provide sufficient reactive current and maintain voltage stability under severe dips—necessitates a redefinition of the conventional low-voltage ride-through (LVRT) curve. This study addresses this challenge by proposing a Mutation-Adaptive Mean Variance Mapping Optimization (A-MVMO) algorithm for the control of grid-side converters (GSCs) in wind farms (WFs). To systematically assess post-fault voltage recovery, a Time-Segmented Analysis for Voltage Recovery (T-SAVR) approach is developed with a multi-objective function. The performance of the proposed A-MVMO is benchmarked against standard MVMO and conventional particle swarm optimization (PSO) under both moderate (0.7 pu) and severe (0.15 pu) voltage dips using the IEEE 39-bus system implemented in DIgSILENT/PowerFactory. The results demonstrate that A-MVMO achieves fast, oscillation-free voltage recovery with negligible overshoot (<1%) and lower current injection than PSO and MVMO, while satisfying all engineering constraints. Moreover, the co-optimization of Park-level and turbine-level controllers ensures seamless coordination, as evidenced by the close tracking between the farm-wide reactive power reference and the aggregated turbine response. The T-SAVR method proves essential for focusing optimization on controllable recovery dynamics, yielding a superior LVRT curve.
1. Introduction
The rapid integration of wind turbines (WTs) into modern power grids has substantially altered grid dynamics [1]. WTs interface with the power system through power electronics; thus, their performance is highly dependent on control strategies. Conventional, static control approaches may compromise grid dynamic stability during disturbances [2]. Consequently, ensuring adequate response under faults, specifically low-voltage ride-through (LVRT), is essential for maintaining overall system stability [3]. Contemporary grid codes mandate LVRT compliance, requiring WTs to remain connected during voltage sags or swells while supplying dynamic reactive current to support voltage recovery [4,5]. The primary objectives include rapid restoration of the voltage at the Point of Common Coupling (PCC) to pre-fault levels, mitigation of voltage dips, and stabilization of DC-bus voltage [6]. Noncompliance can aggravate grid instability and lead to loss of renewable generation [7,8]. The design of LVRT curves remains a critical aspect for grid-connected WTs, with countries enforcing distinct requirements based on operational philosophy. Figure 1 presents representative LVRT curves from Finland, Turkey, Spain, and France. The Finnish code emphasizes extended fault ride-through duration, whereas the Turkish and Spanish codes impose strict reactive current injection requirements during voltage dips. The French code prioritizes rapid post-fault voltage recovery in systems with high renewable penetration. Among these, the Spanish grid code is adopted as a reference in this study, as it combines stringent voltage tolerance and reactive current support during faults. By targeting the most restrictive standard, the proposed methodology ensures compliance with other grid codes under similar operating conditions.
Figure 1.
LVRT curves used by some countries.
Traditionally, LVRT controllers employ static parameters for turbine-side converters (TSC) and grid-side converters (GSC). During severe or unbalanced faults, WTs often fail to supply sufficient reactive current, which may trigger protective crowbar activation and compromise grid stability [9,10]. Recent studies have addressed these limitations through dynamic LVRT models and advanced control strategies, including direct power control combined with intelligent algorithms and coordinated methods with external devices such as battery energy storage systems [11] or superconducting magnetic energy storage [12]. While these techniques enhance performance, they generally optimize control at the individual turbine level. Heuristic optimization algorithms have been widely used to overcome the limitations of linear, fixed-gain controllers. Approaches such as Genetic Algorithms (GA) [13], Particle Swarm Optimization (PSO) [14], Gray Wolf Optimization [15], Bonobo Optimization [16], hybrid LAPO-AI [17], and neuro-fuzzy techniques [18] have been applied to tune controllers for LVRT enhancement. Metaheuristic algorithms, including the Mountain Gazelle algorithm [19] and hybrid whale optimization [20], focus on proportional-integral (PI) controller tuning for WTs converter performance improvement. Additionally, hybrid heuristic–machine learning frameworks have been proposed to predict faults and enhance stator-voltage sag response [21]. Despite their ability to navigate complex, nonlinear search spaces, these methods exhibit fundamental limitations. Table 1 summarizes some existing optimization strategies, highlighting challenges such as local optima trapping, slow convergence, excessive complexity, and limited coordination between WF-level and turbine-level controllers. Most existing strategies focus primarily on fault-period performance with limited consideration of post-fault voltage recovery. This omission is critical, as grids require both fault ride-through capability and rapid voltage restoration. LVRT control is inherently nonlinear, constrained, and multi-objective, balancing voltage support, current limits, and converter protection. Conventional algorithms often suffer from premature convergence or poor adaptability under dynamic conditions [22]. Addressing these challenges, this study adopts the mutation Adaptive Mean-Variance Mapping Optimization (A-MVMO) as a Co-optimization framework that simultaneously considers (i) the Park-level controller responsible for monitoring PCC voltage and generating aggregate reactive power references and (ii) turbine-level GSC controllers, which satisfy local current and converter constraints. Independent optimization at either layer risks suboptimal or infeasible operation during disturbances. The mutation A-MVMO algorithm is well-suited for constrained optimization due to its balance of exploration and exploitation within bounded search spaces. However, standard MVMO uses a fixed mutation mechanism, limiting adaptability in highly dynamic LVRT scenarios. The proposed mutation A-MVMO algorithm dynamically adjusts mutation rates based on optimization progress, enhancing global search during stagnation and accelerating convergence in promising regions. The adaptive approach enables coordinated co-optimization of LVRT controllers. The main contributions of this paper are as follows: (i) development of the mutation A-MVMO algorithm specifically tailored for co-optimization in WFs, a multi-objective LVRT optimization function considered for voltage recovery. (ii) Comparative evaluation against conventional MVMO and the widely used PSO under both moderate (0.7 pu) and severe (0.15 pu) voltage dip scenarios. Performance is assessed using the IEEE 39-bus test. The rest of this paper is arranged as follows: Section 2 discusses the system configuration and modeling, which includes integrating the WF into the IEEE 39-bus system. Section 3 describes the implementation of the aggregation control mechanism. Section 4 presents the case studied.
Table 1.
Presents a critical assessment of existing optimization methods for LVRT Enhancement.
2. System Modeling and Control Architecture
2.1. Modeling of WT and GSC Controller
The WF in Figure 2 consists of six WTs divided across two feeders. Feeder 1 connects WT 1.1 and WT 1.2 via a two-kilometer line, while Feeder 2 connects WT 2.1 through WT 2.4 via a three-kilometer line. Each WT is equipped with a fully rated converter wind turbine generator Type-4. The control architecture includes a supervisory Park-level controller computing the aggregate reactive power reference based on PCC voltage error and turbine-level PQ controllers distributing this reference while responding to local voltage deviations. This layered structure introduces coupling that cannot be captured by optimizing either layer in isolation. The main simulation parameters and algorithm settings are summarized in Appendix A (Table A1 and Table A2).
Figure 2.
Single line diagram of DFIG-based WTs connected to the grid with a converter local controller and a remote Park controller.
2.2. Hierarchical Architecture of Park and PQ Controllers
The proposed control structure adopts a supervisory Park-level controller and local turbine-level PQ controllers. The Park controller is responsible for coordinating the overall WF response by continuously monitoring the voltage at the PCC and generating the aggregate reactive power reference required to support grid voltage during fault conditions. To illustrate the necessity of the controller’s coordination, the steady-state
relationship between the PCC voltage and the reactive power output of the WF can be approximated by the Park controller as in Equation (1). Here, , are the measured voltage at PCC and grid voltage seen from the farm, the equivalent reactance between the WF and the grid. is the total reactive power for the entire farm, is the required reactive power from the WF, and is the additional compensation of the reactive power. This relationship highlights that maintaining PCC voltage stability is a global objective dependent on the collective response of all turbines. However, each turbine operates under local constraints, such as converter current limits. As a result, maximizing reactive power injection at the WF level may conflict with the operational limits of individual turbines, particularly during severe voltage dips. This inherent conflict makes independent control at either level insufficient and necessitates a coordinated hierarchical strategy. As shown in Figure 3, the Park controller evaluates the voltage deviation as in Equation (2), where is the reference voltage typically set to 1.0 pu, is the measured voltage at PCC, then the Park controller employs a PI controller to compute the required total reactive power dynamically as in Equation (2), is the available reactive power from the grid, is the amount of reactive power estimated by the PI controller, itis limited between maximum and minimum to prevent saturation as denoted by respectively. and are the proportional and integral gain of the controller.
Figure 3.
The remote supervisory Park controller.
Once the total reactive power reference is estimated by the Park controller, and it must be allocated to the individual WTs. In this study, a hybrid distribution strategy is employed, combining equal sharing with local voltage correction. Specifically, the reactive power reference for a single PQ controller is given in Formula (3). The PQ controller of the individual WT, as illustrated in Figure 4, will receive the distributed reactive power reference estimated by the Park controller, which is presented by Equation (3). Hence, is the number of turbines, is the local reactive power adjusted for each turbine, is a gain for local voltage compensation, is the measured local voltage, is the local voltage adjustment factor, is the reference voltage. , , , are the active power, reactive power, voltage, and power factor command signals issued by the grid operators
Figure 4.
The block diagram of the PQ controller.
The interaction between the Park controller and turbine-level controllers forms a closed-loop hierarchical coordination process, which operates as follows: (i) a voltage dip occurs at the PCC, resulting in a voltage deviation. (ii) the Park controller detects this and computes the required total reactive power by using Equation (2). (iii) the total reactive power reference is distributed among turbines as . (iv) each turbine’s PQ controller tracks its assigned reference while respecting local constraints such as current limits and converter capacity. (v) the aggregated reactive power response from all turbines influences the PCC voltage, which is fed back to the Park controller for continuous adjustment. The iterative process ensures that both global and local control objectives are continuously aligned. However, a fundamental challenge arises due to the conflicting objectives of the two control layers. The Park controller seeks to maximize reactive power injection to restore PCC voltage rapidly, while turbine-level controllers must operate within strict physical limits. Under severe voltage dips, these constraints become binding, and uncoordinated control actions may lead to infeasible commands or degraded system performance.
To address this challenge, the proposed framework adopts a co-optimization strategy, in which the control parameters of both the Park controller (e.g., , ) and the turbine-level controllers (e.g., ) are optimized simultaneously. This unified approach enables coordinated decision-making across control layers, ensuring that system-level voltage support is achieved without violating local operational constraints. As a result, the proposed hierarchical control structure enhances the LVRT capability of the WF by improving voltage recovery performance, maintaining converter safety, and ensuring stable operation under both fault and post-fault conditions.
2.3. Adaptive Mutation for Enhanced MVMO Algorithm
The MVMO algorithm is an evolutionary strategy characterized by its statistical archive-based approach to guide the search tactics. Unlike conventional algorithms, MVMO employs statistical moments, mean, and variance ( and ) of elite solutions to construct a nonlinear mapping function for offspring generation [1]. During optimization, for each decision variable MVMO maintains an archive that comprises the best optimal solution detected for the decision variable () is in [0, 1]. Two statistical moments are quantified from those archived values as follows:
Hence, the is consistently updated at dimension i and j, m is the total number of data points confirming statistical values, ( and ) reflect the distribution of promising boundaries in the search space. The core novelty of MVMO Algorithms is the transformation of the nonlinear mapping function, which randomly maps the distributed variable. U [0, 1] into the solution variable in Equation (7), where the center parameters are defined in equation () with the boundary parameters () in (8) as:
Hence; is the output value, , are the weight control, and are the distance parameters of the shape factor that controls the mapping slope. The standard MVMO incorporates a fixed mutation. rate for selected dimension m, with variable selection criteria of , is the total number of decision variables. To apply the dynamic adaptive mutation, for each variable selected , The mapping function should be applied. If the variable is not within , The value is inherited directly from the parent as:
The adaptive-mutation rate instigates a sliding window as in (12), where . The success or failure of the outcome that can be tracked to optimize progress can be expressed as follows:
When is signifies the success in improvement in generation , while indicates stagnation in outcome, is the window size. is the rate of success. They are set off from the text with rules above and below the title and after the last line. Then the mutation is adapted based on the rate of success by employing a piecewise linear scaling function in (15) and (16). This adaptive exploration boosts the optimization process. When the success rate is 10%, increase the mutation by 50%; if the success rate increases to 50%, decrease the mutation by 50%. This will achieve stability. Figure 5 shows the flowchart of the proposed control mechanism [28,29].
Figure 5.
The flowchart of the proposed A-MVMO control algorithm.
The optimal is determined by mutation variables by maintaining a dynamic probability distribution model promising the best solutions, explicitly characterized by a mean-variance vector guiding the search direction, continuously updated from the previous optimal generation in the solution space by shrinking the statistics mean-variance and .
2.4. Multi-Objective and LVRT Performance Metrics
The effective enhancement of the LVRT curve necessitates a comprehensive evaluation of sequential performance domains. To achieve this, the T-SAVR approach in Figure 6 analyzes the system state after the fault has cleared. As illustrated in Figure 6, the analysis window is defined from the moment the fault is cleared (), then start analyzing for voltage recovery at () until the end of the simulation (). To avoid penalizing the unavoidable transients caused by the fault clearing itself, the analysis begins after a short delay () (e.g., 100 ms), which allows the initial protection actions (such as crowbar operation) to settle. This ensures that the optimization focuses on the controllable dynamics rather than the inevitable switching transients. During the post-fault recovery zone, the primary objective is to bring the PCC voltage back to its reference value as quickly as possible without excessive overshoot or undershoot. The sub-objective in Formula (19) penalizes the voltage error with an exponential time-weighting factor which emphasizes errors occurring soon after the fault clearance, is the fault start time. To ensure the voltage remains within the band and does not exhibit sustained oscillations. Sub-objective in Equation (20) penalizes any excursion above the upper bound () or below the lower bound (), which are defined based on the LVRT curve requirements (e.g., ±2% after . Additionally, in Equation (21) quantifies the time needed for the voltage to enter the tolerance band and stay there for a sustained period , thereby capturing both recovery speed and stability.
Figure 6.
Time-Segmented Analysis for Voltage Recovery (T-SAVR) approach window.
To achieve effective voltage regulation from the Park controller, the controller’s effort in Equation (22) is applied, where the sub-objective is applied to the total Park reactive power to reduce aggressive control actions. To ensure a coordinated response across the entire Park, the reactive power error is computed for each individual WT by as:
To achieve a balanced voltage profile across all WTs, local voltage deviation is calculated by in Formula (24). This step is crucial, as it will prevent local under-and over-voltage and avoid power quality degradation. is used to distribute reactive power equally among the WTs; this indicator minimizes the maximum loading across WTs, ensuring balanced utilization of converter capacities and preventing premature saturation of individual units. For smooth reactive power injection during a transient, is essential for the stability of converter actions.
This multi-objective structure is designed to ensure that optimized control parameters not only improve LVRT capability but also reflect practical deployment in real-world wind power systems; hence, will pass to the main script loop of the optimization algorithm as a cost function to be minimized.
where are the weight factors, by segmenting the timeline and assigning tailored sub-objectives. T-SAVR provides an assessment that aligns with the physical stages of the LVRT event. It allows the optimization algorithm (here A-MVMO) to differentiate between transient errors that are unavoidable and those that can be mitigated by proper controller tuning. Consequently, the optimized parameters yield a voltage recovery profile that is not only fast but also smooth and well-coordinated across the entire WF. To ensure that the optimized controller parameters respect practical hardware limits and grid code requirements, four engineering constraints are explicitly enforced using a penalty function method. Each constraint is expressed as in expression (25). If a constraint is violated (PCC voltage is far from ), a penalty term is added to the objective function . The constraints are:
where , , and are voltage upper limit, voltage upper limit, and recovery time limit respectively, , are the maximum and minimum voltage at PCC. For each violated constraint, a normalized penalty is computed as in (26), is the violation normalized by its expected maximum (±0.02 pu for voltage, 0.2 s for time, and the penalty factor is dynamically increased from 1.0 up to 50 to ensure that infeasible solutions receive a high cost. The PCC voltage must stay below 1.002 pu () and above 0.988 pu (); the voltage must settle within 0.2 s ().
Figure 7 is a flowchart of the cost function with multiple objectives that are used to calculate the sub-objectives and .
Figure 7.
The proposed objective function calculation flowchart.
3. Results
To evaluate the performance of the proposed Mutation—MVMO—for VRT enhancement, the IEEE 39-bus test system was used to integrate a w comprising six Type-4 fully rated converter WTs (2.5 MW each, 50 Hz). Two critical fault scenarios were investigated: a moderate voltage dip to 0.7 pu at the PCC and a severe dip to 0.15 pu. The results of A-MVMO are compared against standard MVMO and PSO. All simulations were performed in DIgSILENT/PowerFactory 2021 SP2.
3.1. Moderate Voltage Dip
A three-phase short-circuit fault is applied at the PCC for 255 ms, reducing the voltage to 0.7 pu. The following analyses refer to the optimized controller parameters obtained, which balance voltage recovery , control effort , reactive power tracking , local voltage support , balanced sharing , and rate-of-change limits . The six subplots in Figure 8 show voltages identical for all turbines under PSO, MVMO, and A-MVMO. For the PSO, the voltage recovers slowly and exhibits sustained oscillations around 1.0 pu, with overshoots exceeding 1.02 pu. This indicates that the PSO-tuned parameters over-emphasize fast error reduction (low ), but neglect overshoot penalties (), and recovery time (), leading to poor damping. However, the MVMO recovery is faster than PSO but still shows an aggressive overshoot to ≈1.03 pu before settling. The fixed mutation rate of standard MVMO prevents fine-tuning of the trade-off between voltage error and control effort, resulting in a “bang-bang” type response. For A-MVMO, the voltage rises smoothly, reaches 1.002 pu at the peak, and immediately returns to 1.0 pu with no oscillations. The adaptive mutation mechanism allows the algorithm to escape local optima and find parameters that simultaneously minimize , , and , yielding a critical response. For a 0.7 pu dip, the Spanish grid code requires the voltage to recover above 0.85 pu within 1.5 s. All three methods satisfy this, but A-MVMO achieves recovery to 0.98 pu within 0.28 s, far exceeding the requirement. Each turbine’s reactive power output is shown in Figure 9 for the three optimization methods. PSO: The six turbines exhibit large inter-turbine variations (0.15–0.28 pu), indicating that the PSO-tuned PQ controllers are poorly coordinated. The MVMO ‘s reactive power profiles are more uniform than PSO, but still show noticeable spikes and slower settling. The fixed mutation limits the search for parameters that minimize ( spread) and . For the proposed A-MVMO, all six turbines deliver nearly identical reactive power trajectories, with smooth ramping and no overshoot. The adaptive mutation enables the optimizer to find a set of PQ gains , , , and that achieve balanced reactive power sharing (low ), while respecting slew-rate limits (low ). This prevents any single converter from exceeding its current rating. Figure 9a shows the maximum reactive current capabilities each can deliver up to (1.2 times ). The peak reactive current observed under A-MVMO is 1.1 , and remains below 1.1 well within the safe operating. The control strategy explicitly prioritizes reactive current over active current during voltage dips, as implemented in the PQ controller’s current limiter (Figure 4). The subplots (a–c) of Figure 10 compare the Park controller’s reactive power reference , (blue) with the actual measured reactive power at the PCC (pink) for PSO, MVMO, and A-MVMO. During PSO (a), the measured reactive power lags significantly behind the reference and exhibits large oscillations. This indicates that the PSO-tuned PQ controllers cannot track the farm-wide command accurately, leading to poor coordination.
Figure 8.
Transient voltage responses of GSC of (a) WT1.1, (b) WT1.2, (c) WT2.1, (d) WT2.2, (e) WT2.3, and (f) WT2.4 under different optimization methods for 0.7 pu voltage dip.
Figure 9.
Transient reactive power response of each WT under different optimization methods at 0.7 pu voltage dip: (a) WT1.1, (b) WT1.2, (c) WT2.1, (d) WT2.2, (e) WT2.3, and (f) WT2.4.
Figure 10.
Park controller reactive power reference and measured reactive power at the PCC: (a) PSO, (b) MVMO, (c) A-MVMO, and (d) PCC voltage response all three methods for 0.7 pu voltage dip.
While the MVMO improved tracking but still shows a persistent offset and slower convergence. The fixed mutation rate prevents the algorithm from fine-tuning controllers simultaneously. During the A-MVMO (c), the measured reactive power follows the reference almost. The close tracking confirms that the co-optimization of controllers is successful, the Park controller computes the exact amount needed to restore voltage, and the PQ controllers faithfully execute it. The bottom subplot (d) overlays the PCC voltage recovery for the three methods. PSO slowest recovery, overshoot ≈ 1.02 pu, settling time ≈ 0.1 s. MVMO faster recovery but overshoot ≈ 1.03 pu, settling time ≈ 0.1 s. A-MVMO fastest recovery, negligible overshoot (<0.2%), settling time ≈ 0.28 s. The superior performance of A-MVMO is a direct consequence of the adaptive mutation allowing the optimizer to find parameters that minimize (overshoot) and (recovery time) without increasing (control effort). The resulting voltage profile is both fast and smooth. The responses in Figure 11 demonstrate the superior dynamic performance of the A-MVMO strategy under fault conditions. In Figure 11a, PSO and conventional MVMO exhibit pronounced current transients, reaching up to 1.4 pu, indicative of suboptimal tuning and insufficient damping. In contrast, A-MVMO constrains the current to below 1.1 pu, thereby remaining within the converter’s short-term overload limit (1.2 ). This behavior results from an effective multi-objective trade-off between voltage support and control effort , ensuring secure converter operation. A-MVMO achieves a lower peak injection with faster settling, as reflected in Figure 11b, although all strategies provide reactive power support during the disturbance enforcement of the rate-of-change constraint and improved transient smoothness. As shown in Figure 11c, A-MVMO exhibits the smallest active power deviation and the fastest recovery, indicating that reactive power support is delivered without excessively compromising active power. The coordinated power allocation reduces electromechanical stress on the turbine drivetrain. Figure 11d shows that A-MVMO maintains the lowest frequency deviations, whereas PSO and MVMO reach deviations of ±0.04 Hz.
Figure 11.
Simulation results with different control methods under 0.7 pu voltage dip (a) Current shared by the farm (b) Active power shared by the farm. (c) Reactive power shared by the farm (d) Frequency at PCC.
Table 2 provides a turbine-by-turbine comparison of objective function performance for the moderate dip. Comparison of performance metrics for the different control methods for the first case (0.7 pu dip). A-MVMO maintains a voltage dip between 0.678 pu and 0.688 pu during the fault, whereas PSO allows dips as low as 0.621 pu. After 0.5 s, A-MVMO has restored all turbine voltages to within 0.992–1.004 pu, and by 1.0 s, all are exactly at 1.000 pu with no overshoot. In contrast, MVMO and PSO exhibit persistent deviations up to 1.030 pu. The turbine-by-turbine voltage dip and recovery performance for the moderate dip is summarized in Table 3.
Table 2.
Objective Function Performance for the first case.
Table 3.
Comparison of performance metrics for the different control methods for the second case.
3.2. Severe Voltage Dip
A three-phase fault reduces the PCC voltage to 0.15 pu for 255 ms, thereby imposing a severe transient on the hierarchical control framework. Figure 12 represents the Voltage recovery of individual WT, under PSO, the voltage collapses to 0.18 pu and exhibits a slow Spanish requirement 1.875 × within 0.28 s without overshoot. This performance recovery has pronounced undershoot and oscillations. MVMO improves the fault-time voltage to 0.22 pu but introduces overshoot beyond 1.04 pu. In contrast, A-MVMO sustains 0.23 pu during the fault and restores the voltage to 0.98 pu while remaining below reflects an effective satisfaction of the voltage recovery while maintaining converter constraints. Figure 13 illustrates reactive power support. PSO results in significant inter-turbine variation (0.05–0.25 pu), indicating uneven loading. MVMO reduces this variability but still exhibits transient spikes. A-MVMO achieves a uniform and smooth reactive power profile across all turbines, indicating effective minimization of the distribution spread and rate-of-change constraints . The peak reactive current reaches 1.65 × satisfying German, and IEEE 2800 requirements (≥1.5 × . During fault, priority is given to reactive current injection, ensuring operation within the converter’s short-term overload capability (1.2 × ). The reactive power reference coordination and the measured PCC reactive power are shown in Figure 14a–c. A-MVMO achieves effective coordination between the Park-level and turbine-level controllers. PCC performance Figure 15. A-MVMO limits the peak current to 1.18 × , remaining within safe operating margins, whereas PSO and MVMO exceed 1.2 × , increasing the risk.
Figure 12.
Transient voltage response of each WT under different optimization methods at 0.15 pu voltage dip: (a) WT1.1, (b) WT1.2, (c) WT2.1, (d) WT2.2, (e) WT2.3, and (f) WT2.4.
Figure 13.
Transient reactive power response of each WT under different optimization methods at 0.15 pu voltage dip: (a) WT1.1, (b) WT1.2, (c) WT2.1, (d) WT2.2, (e) WT2.3, and (f) WT2.4.
Figure 14.
Park controller reactive power reference () and measured reactive power at the PCC () under different optimization methods at 0.15 pu voltage dip: (a) PSO, (b) MVMO, (c) A-MVMO, and (d) PCC voltage response for all three methods.
Figure 15.
Simulation results with different control methods under (0.15 pu) dip (a) Current shared by the farm (b) Active power shared by the farm. (c) Re-active power shared by the farm (d) Frequency at PCC.
The active power dip is minimized (≈0.3 pu), and frequency deviations are confined within ±0.02 Hz, compared to ±0.1 Hz for the other methods. The reduced current stress also limits the IGBT junction temperature rise to below 25 °C. Table 4 summarizes the objective function values for the severe dip. A-MVMO achieves = 0.047, which is 45% lower than PSO and 45% lower than MVMO.
Table 4.
Objective Function Performance for the second case.
Table 5 provides turbine-level details for the severe dip. A-MVMO maintains the voltage during the fault between 0.220 pu and 0.227 pu, whereas PSO allows drops as low as 0.170 pu. At 0.5 s, A-MVMO has recovered all turbines to 0.980–0.992 pu, while MVMO and PSO are still below 0.950 pu. After 1.0 s, A-MVMO voltages are within 0.990–1.003 pu, whereas the other methods exhibit overshoots up to 1.046 pu.
Table 5.
Comparison of performance metrics for the different control methods for the first case.
The convergence curves in Figure 16 show that PSO reaches a lower objective value faster than MVMO and A-MVMO. However, this apparent advantage is deceptive because PSO violates the four engineering constraints enforced via penalty functions: voltage limits (≤1.002 pu, ≥0.988 pu) and recovery time (≤0.2 s). MVMO respects some constraints but occasionally exceeds the best solution. A-MVMO converges to a slightly higher objective value but satisfies all constraints in every run, making its solutions the only fully feasible ones for practical deployment.
Figure 16.
Presents the convergence curves of the three optimization algorithms for (a) the moderate dip (0.7 pu) and (b) the severe dip (0.15 pu). The curves show the best objective function value versus iteration number.
3.3. FRT Compliance with Grid Codes
To evaluate practical grid-code compliance, we compared the severe dip response against the LVRT curves of Figure 1, using the Spanish grid. Table 6 summarizes the compliance metrics; the code requires that the turbine remain connected during the fault and that voltage recovers to 0.85 pu within 1.5 s after clearance. A-MVMO achieves recovery to 0.98 pu in 0.28 s, well within the limit. All six turbines remained connected throughout. Regarding reactive current injection, the Spanish code demands 1.875 × at 0.15 pu, while A-MVMO delivers 1.65 × this does not meet the Spanish requirement, but it satisfies the German and IEEE 2800-2022 codes 1.50 × [30], thus, the proposed method is fully compliant with most major grid codes.
Table 6.
Comparative LVRT performance of the proposed A-MVMO against state-of-the-art optimization algorithms.
4. Conclusions
The adaptive MVMO algorithm successfully controlled the converters in a WFs. The approach demonstrates superior convergence owing to its adaptive mutation, enabling A-MVMO to significantly outperform both PSO and standard MVMO. The optimized controller achieves fast voltage recovery with negligible overshoot. Critically, only A-MVMO maintains lower current injection to the grid even during severe faults, whereas the other algorithms cause higher current transients. The method follows the T-SAVR window effectively, focusing optimization on controllable recovery dynamics and ensuring compliance with voltage limits, recovery time requirements, and equipment protection thresholds. The resulting parameters enable seamless Park-PQ coordination, balancing centralized voltage control with distributed reactive power management across all wind turbines. Practical benefits include guaranteed grid code compliance, reduced converter stress, and maintained real power capability during support operations. This study proves that intelligent heuristic optimization of existing control architectures can substantially enhance performance without hardware upgrades, offering a cost-effective pathway for improved renewable integration. Moreover, A-MVMO requires less computation time than PSO, enables real-time adaptation, and reduces operational delays. A crucial trade-off remains: balancing convergence speed against solution quality is valuable for power system stability.
Author Contributions
Conceptualization, H.A.I.G.; methodology, H.A.I.G.; software, H.A.I.G. and G.I.R.; validation, H.A.I.G.; formal analysis, G.I.R.; investigation, C.L.; resources, C.L.; data curation, H.A.I.G.; writing—original draft, H.A.I.G.; writing—review and editing, C.L.; visualization, G.I.R.; project administration, C.L.; funding acquisition, C.L. All authors have read and agreed to the published version of the manuscript.
Funding
This research was funded by Shenzhen Science and Technology Program grant number [JCYJ20250604122544017] and The APC was funded by Shenzhen Science and Technology Program.
Data Availability Statement
The simulation code used in this study is publicly available on GitHub at: https://github.com/hashim525/LVRT-Curve-Enhancement--Mutation-Adaptive-MVMO-script.git (accessed on 2 February 2026).
Acknowledgments
During the preparation of this manuscript, the authors used ChatGPT (OpenAI, GPT-4) solely for language editing and to improve readability. The authors have carefully reviewed and verified all generated text and take full responsibility for the content and scientific integrity of the manuscript.
Conflicts of Interest
The authors declare no conflicts of interest.
Abbreviations
The following abbreviations are used in this manuscript:
| MVMO | Mean Variance Mapping Optimization |
| PSO | Particle Swarm Optimization |
| VRT | Voltage Ride Through |
| LVRT | Low Voltage Ride Through |
| T-SAVR | Time-Segmented Analysis for Voltage Recovery |
| GSCs | Grid Side Converters |
| TSCs | Turbine Side Converters |
| DFIG | Double Fed Induction Generator |
| WTs | Wind Turbines |
| WF | Wind Farm |
| PCC | Point of common coupling |
| Park Controller Objective Function | |
| PQ Controller Objective Function | |
| Cost function |
Appendix A
Table A1.
Important simulated WF model parameters.
Table A2.
Parameter settings for different algorithms.
References
- Alaboudy, A.H.K.; Mahmoud, H.A.; Elbaset, A.A.; Abdelsattar, M. Technical Assessment of the Key LVRT Techniques for Grid-Connected DFIG Wind Turbines. Arab. J. Sci. Eng. 2023, 48, 15223–15239. [Google Scholar] [CrossRef] [Scilit]
- Ahmed, M.A.; Bayoumi, M.A. A novel deep learning-based control for voltage sag prediction and DVR–LVRT coordination in grid-connected wind turbine systems. Ain Shams Eng. J. 2026, 17, 103882. [Google Scholar] [CrossRef] [Scilit]
- Gupta, A.P.; Mitra, A.; Mohapatra, A.; Singh, S.N. A Multi-Machine Equivalent Model of a Wind Farm Considering LVRT Characteristic and Wake Effect. IEEE Trans. Sustain. Energy 2022, 13, 1396–1407. [Google Scholar] [CrossRef] [Scilit]
- Dubreuil, J.; Zurbriggen, I.G.; Pieper, J. Dual-Loop Geometric Control of Stator Flux for Improved LVRT Response in DFIG-Based Wind Turbine Systems. In 2024 IEEE Applied Power Electronics Conference and Exposition (APEC); IEEE: Piscataway, NJ, USA, 2024; pp. 3053–3060. [Google Scholar] [CrossRef] [Scilit]
- Mohammadpour, H.; Banaiemoqadam, A.; Hooshyar, A.; Al-Durra, A. Eliminating the Need for a Less Strict Requirement for the Negative-Sequence LVRT Current of Type-III Wind Turbine Generators in the IEEE 2800 Standard. IEEE Trans. Sustain. Energy 2023, 14, 587–601. [Google Scholar] [CrossRef] [Scilit]
- Chen, S.; Yao, J.; Pei, J.; Liu, Y.; Liu, R.; Huang, S.; Chen, Z. Transient Stability Analysis and Improved Control Strategy for DC-Link Voltage of DFIG-Based WT During LVRT. IEEE Trans. Energy Convers. 2022, 37, 880–891. [Google Scholar] [CrossRef] [Scilit]
- Zhang, Y.; Zhang, J.; Li, C.; Ou, J.; Zhao, W.; Zhang, S. Voltage Sag Evaluation in Power Grids Considering the Voltage Support Capabilities of Doubly-Fed Wind Farms During LVRT. IEEE Trans. Power Deliv. 2025, 40, 1540–1553. [Google Scholar] [CrossRef] [Scilit]
- Lu, S.; Chiu, C.; Wang, M.; Liu, H. Optimizing Low-Voltage Ride-Through (LVRT) Curves for Wind Farms Using Genetic Algorithms: A Case Study of Taiwan Power System. IEEE Trans. Ind. Appl. 2025, 61, 847–858. [Google Scholar] [CrossRef] [Scilit]
- Luo, Y.; Yao, J.; Yang, D.; Xie, H.; Zhao, L.; Jin, R. Improved LVRT Strategy for DFIG-Based Wind Turbine Considering RSC-GSC Interaction During Symmetrical Grid Faults. IEEE Trans. Energy Convers. 2025, 40, 1674–1677. [Google Scholar] [CrossRef] [Scilit]
- Chowdhury, M.A.; Shafiullah, G.M.; Ferdous, S.M. Low voltage ride-through augmentation of DFIG wind turbines by simultaneous control of back-to-back converter using partial feedback linearization technique. Int. J. Electr. Power Energy Syst. 2023, 153, 109394. [Google Scholar] [CrossRef] [Scilit]
- Gupta, S.; Shukla, A.; Abusara, M. DFIG Driven Wind Turbine With Grid Supporting Battery Storage System. IEEE Trans. Ind. Electron. 2025, 72, 1537–1548. [Google Scholar] [CrossRef] [Scilit]
- Song, D.; Zheng, Z.; Ren, J.; Li, C.; Xie, Q. SMES Based Reconfigured Converter Architecture for DFIG to Enhance FRT and Grid Forming Capability. IEEE Trans. Appl. Supercond. 2024, 34, 1–5. [Google Scholar] [CrossRef] [Scilit]
- Bhol, R.; Swain, S.C.; Dash, R.; Reddy, K.J.; Dhanamjayulu, C.; Kotb, H.; Emara, A. Performance analysis of DFIG support microgrid using GA optimized restricted Boltzmann Machine algorithm. Heliyon 2024, 10, e30669. [Google Scholar] [CrossRef] [Scilit]
- Li, D.; Qin, S.; He, J.; Li, S. Transient Control Parameter Identification of Double-Fed Wind Turbine Model Based on Chaotic Particle Swarm Optimization Algorithm. In 2023 International Conference on Power System Technology (PowerCon); IEEE: Piscataway, NJ, USA, 2023; pp. 1–6. [Google Scholar] [CrossRef] [Scilit]
- Vrabel, R. Hybrid Particle Swarm and Grey Wolf Optimization for Robust Feedback Control of Nonlinear Systems. Automation 2025, 6, 89. [Google Scholar] [CrossRef] [Scilit]
- Mostafa, M.A.; El-Hay, E.A.; Elkholy, M.M. Optimal low voltage ride through of wind turbine doubly fed induction generator based on bonobo optimization algorithm. Sci. Rep. 2023, 13, 7778. [Google Scholar] [CrossRef] [Scilit]
- Sayed, N.G.E.L.; Yousef, A.M.; El-Saady, G.; Alanazi, M.D.; Ziedan, H.A.; Abdelsattar, M. Artificial intelligent fuzzy control and LAPO algorithm for enhancement LVRT and power quality of grid connected PV/wind hybrid systems. Sci. Rep. 2024, 14, 30475. [Google Scholar] [CrossRef] [Scilit]
- Uddin, M.N.; Arifin, M.S.; Rezaei, N. A Novel Neuro-Fuzzy Based Direct Power Control of a DFIG Based Wind Farm Incorporated With Distance Protection Scheme and LVRT Capability. IEEE Trans. Ind. Appl. 2023, 59, 5792–5803. [Google Scholar] [CrossRef] [Scilit]
- El Zahraa Magdy, F.; Hasanien, H.M.; Sabry, W.; Ullah, Z.; Alkuhayli, A.; Yakout, A.H. Optimal Artificial Intelligence Technique for LVRT Capability Improvement of a Grid-tied Wind Energy Conversion System: A MGOANFIS-PI Methodology. Ain Shams Eng. J. 2024, 15, 102876. [Google Scholar] [CrossRef] [Scilit]
- Rahimnejad, A.; Akbari, E.; Mirjalili, S.; Gadsden, S.A.; Trojovský, P.; Trojovská, E. An improved hybrid whale optimization algorithm for global optimization and engineering design problems. PeerJ Comput. Sci. 2023, 9, e1557. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Parameswari, G.A.; Arunsankar, G. Hybrid approach based optimal low voltage ride through capability in DFIG-based wind energy systems. Energy 2025, 324, 135541. [Google Scholar] [CrossRef] [Scilit]
- Rahman, F.S.; Israjuddin; Hariyanto, N.; Liu, C. Swarm-based mean-variance mapping optimization for optimal placement of energy storage with synthetic inertia control on a low inertia power grid. IET Gener. Transm. Distrib. 2021, 15, 2527–2537. [Google Scholar] [CrossRef] [Scilit]
- Sabzevari, K.; Khosravi, N.; Abdelghany, M.B.; Belkhier, Y.; Tostado-Véliz, M.; Kotb, H.; Govender, S. Low-voltage ride-through capability in a DFIG using FO-PID and RCO techniques under symmetrical and asymmetrical faults. Sci. Rep. 2023, 13, 17534. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Qais, M.H.; Hasanien, H.M.; Alghuwainem, S. Optimal Transient Search Algorithm-Based PI Controllers for Enhancing Low Voltage Ride-Through Ability of Grid-Linked PMSG-Based Wind Turbine. Electronics 2020, 9, 1807. [Google Scholar] [CrossRef] [Scilit]
- Muisyo, I.N.; Muriithi, C.M.; Kamau, S.I. Enhancing low voltage ride through capability of grid connected DFIG based WECS using WCA-PSO tuned STATCOM controller. Heliyon 2022, 8, e09999. [Google Scholar] [CrossRef] [Scilit]
- Dayo, S.A.; Memon, A.; Memon, Z.A.; Jumani, T.A.; Abbas, G.; Othmen, S.; Youssef, A.; Wijaya, A.A. A new approach for improving dynamic fault ride through capability of gridtied based wind turbines. Sci. Rep. 2025, 15, 6144. [Google Scholar] [CrossRef] [Scilit]
- Madan, C.; Kumar, N. Enhancement of low voltage ride-through ability of the photovoltaic array aided by the MPPT algorithm connected with wind turbine. Data Technol. Appl. 2020, 54, 503–527. [Google Scholar] [CrossRef] [Scilit]
- Saenphon, T.; Phimoltares, S.; Lursinsap, C. Enhancing Mean-Variance Mapping Optimization Using Opposite Gradient Method and Interior Point Method for Real Parameter Optimization Problems. Processes 2023, 11, 465. [Google Scholar] [CrossRef] [Scilit]
- Tamayo, D.C.L.; Villa-Acevedo, W.M.; López-Lezama, J.M. Multi-Period Optimal Reactive Power Dispatch Using a Mean-Variance Mapping Optimization Algorithm. Computers 2022, 11, 48. [Google Scholar] [CrossRef] [Scilit]
- IEEE Std 2800-2022; IEEE Standard for Interconnection and Interoperability of Inverter-Based Resources (IBRs) Interconnecting with Associated Transmission Electric Power Systems. IEEE: New York, NY, USA, 2022. Available online: https://standards.ieee.org/standard/2800-2022.html (accessed on 3 February 2026).
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.















