Bearing Performance of a Precast Circular Pipe-Jacking Working Shaft: Full-Scale Experimental and Numerical Investigation

,
,
,
,
and
1
Hefei Municipal Design and Research Institute Co., Ltd., Hefei 230041, China
2
School of Civil and Hydraulic Engineering, Hefei University of Technology, Hefei 230009, China
3
Shenzhen Urban Public Safety Technology Research Institute, Shenzhen 518000, China
4
Office of Scientific Research, North Minzu University, Yinchuan 750021, China

Abstract

With the growing use of precast circular pipe-jacking working shafts in urban drainage projects, their bearing performance under jacking reaction forces remains insufficiently understood, limiting reliable structural design. A full-scale field experiment and a detailed numerical simulation were carried out on the No. 16 precast circular pipe-jacking working shaft of the Xiyou Road drainage pipeline project in Hefei; gauges monitored soil pressure, concrete stress, and bolt axial force of the reaction segment and adjacent segments as the jacking force was raised to the structural limit. The numerical model included shaft–soil contact and segment–bolt connections to capture the mechanical responses. The results indicate a strongly localized soil disturbance mainly outside the reaction segment, with the core loaded zone being the reaction segment and its adjacent cutting-edge and standard-ring segments. Tensile stress was concentrated on the inner face of the cutting-edge ring and at its segment joints, and at 3000 kN the principal tensile stress approached the C40 concrete tensile strength. Only the bolts around the reaction segment were clearly tensioned, with stresses far below capacity. The experiment showed no cracking at the maximum measured force of 2600 kN, and a nominal cracking-initiation capacity of about 3000 kN was estimated numerically by extrapolation beyond the measured range. Quantitatively, at the maximum measured jacking force of 2600 kN the soil pressure outside the reaction segment increased from about −0.05 MPa to between −0.15 and −0.17 MPa, while that at the adjacent segment remained close to −0.04 MPa; the measured circumferential and vertical concrete stress increments did not exceed about 0.70 and 0.55 MPa in magnitude, respectively; and the bolt axial-force increments were small, with envelope maxima of about 14 kN for the vertical bolts and about 40 kN for the circumferential bolts over the full loading range. At 3000 kN, the computed maximum principal tensile stress at the cutting-edge-ring joints reached 2.35 MPa, close to the 2.39 MPa axial tensile strength of C40 concrete, whereas the maximum bolt stress was 294.55 MPa against the 800 MPa strength of 8.8-grade bolts. These findings provide a reference for the structural design and safety control of such working shafts.

1. Introduction

With the continuous development of urban underground space, the pipe-jacking method has been widely used in municipal drainage and water-supply pipelines [1]. This is because it causes little disturbance to surface traffic and underground utilities and offers high construction safety. During pipe jacking, the huge jacking force must be taken by the working shaft and transferred to the surrounding soil through the shaft wall. As a key loaded node of the pipe-jacking system, the structural safety of the working shaft directly determines the success of the jacking operation [2,3]. Traditional cast-in-place reinforced concrete working shafts have long construction periods and cause large disturbances to the surroundings. In contrast, precast circular working shafts are built from factory-made segments assembled on site. They offer fast construction, controllable quality, and low carbon emissions. In recent years, they have been gradually adopted in small- and medium-diameter pipe-jacking projects [4,5].
A precast circular working shaft is assembled from prefabricated segment blocks connected by bolts into a ring. Its structural form is similar to a shield tunnel segment lining. Both consist of curved segments assembled by circumferential and longitudinal bolts and behave as a cylindrical structure [5,6]. A shield tunnel segment is a horizontal structure. It mainly bears a stable distributed surrounding water and soil pressure, and its behavior is dominated by circumferential compression and overall bending. The bearing performance and failure modes of such segments have been revealed by many field monitoring studies, full-scale tests, and numerical analyses [7,8,9,10,11]. For the segment–bolt assemblies, many beam-spring (or shell-spring) models that consider joint stiffness have been proposed, and refined numerical analyses based on concrete damage/plasticity constitutive models have deepened the understanding of segment mechanics [12,13,14,15]. However, a pipe-jacking working shaft is a vertical structure. Under the jacking reaction force, the load is highly concentrated on one side of the reaction wall and is strongly non-uniform around the shaft circumference. This loading pattern clearly differs from that of shield segments under nearly uniform water and soil pressure [4,5]. Therefore, the bearing conclusions for shield segments under water and soil pressure can only be partially applied to working shafts. Yet the calculation and simulation methods for segment–bolt assemblies provide an important methodological reference for the mechanical analysis of precast working shafts. Recent studies that combine experimental testing with numerical calibration and AI-based surrogates for structural characterization [16], and that address the automated design and resistance assessment of reinforced concrete members [17], provide useful methodological context for judging the reliability of numerical models and for interpreting predicted structural resistance.
Meanwhile, studies on pipe-jacking working shafts have accumulated some results. However, most existing studies focus on the overall stability, deformation control, and support response of traditional cast-in-place working shafts. For cast-in-place shafts, a study on a diaphragm-wall-supported launching shaft combined field monitoring with 3D FE analysis. It revealed the mechanical response and spatial effects of the diaphragm wall under the combined action of excavation and pipe jacking [3]. For caisson reaction walls, researchers built a 3D numerical model and introduced the shakedown theorem. They analyzed the soil deformation behind the reaction wall and its shakedown behavior caused by parallel pipe jacking [18]. For precast working shafts, related explorations have also appeared in recent years. One study combined field tests with numerical analysis to examine the soil settlement and support response of a new steel-section–polymer composite precast support shaft during pipe jacking. An orthogonal test identified the pile spacing as the dominant factor [19]. Another study used 3D numerical analysis with field monitoring to analyze the segment concrete and connecting bolts of a precast circular working shaft under jacking force. It noted obvious tension on the outer concrete of the segments at the reaction wall and the need for reinforcement if necessary [5]. A further study proposed a new steel-section–polymer composite precast support structure and conducted field tests and parametric sensitivity analyses [4]. In addition, for pipe jacking itself, systematic field monitoring tests have been carried out on real projects. They revealed the variation in jacking forces in upper-soft and lower-hard strata [20]. In terms of structural strengthening and performance improvement, many studies on shield tunnel segments have used UHPC (ultra-high-performance concrete) and its steel-UHPC composite for strengthening tests and mechanism analyses. They show that UHPC can markedly improve the ultimate bearing capacity and stiffness of segments and even the whole ring lining, which can provide some reference for the reinforcement and strengthening of working shafts [21,22,23]. In general, existing studies on precast working shafts mostly address support stability, soil settlement, and parametric sensitivity. Some only check the forces in segments and bolts from monitoring data. There is still a lack of integrated full-scale field tests covering ‘shaft–soil–segment–bolt’ and of refined quantitative studies on the force distribution among segments and bolts. Thus, the bearing-performance characteristics of precast circular pipe-jacking working shafts have not been fully revealed.
The studies cited above each have distinct strengths and limitations. Field monitoring and full-scale tests on segmental linings [7,8,9,10,11] reproduce realistic boundary conditions and provide reliable benchmark data, but they are tied to particular projects and cannot isolate individual load components. Beam-spring and shell-spring models [12,13,14,15] are computationally efficient and represent joint stiffness explicitly, and refined damage/plasticity analyses resolve local nonlinearity; both, however, were developed for horizontal linings under nearly uniform ground and water pressure and cannot be transferred directly to a vertical shaft under a concentrated one-sided reaction. The diaphragm-wall and caisson studies [3,18] clarify the overall stability and the soil deformation of cast-in-place shafts, but do not resolve the segment-joint and bolt forces of a precast assembly. The composite precast support investigations [4,19] provide useful parametric evidence, yet their structural form differs from the bolted concrete segmental ring examined here. Recent field-monitoring and numerical work on jacking reactions, back-wall earth pressures and instrumentation practice [24,25,26] has improved the understanding of load transfer during pipe jacking, but it likewise concerns the pipe and the back-wall soil rather than the segmental response of a precast circular shaft. Compared with the above studies, the novelty of this work is threefold: (i) a full-scale field loading test in which the jacking force was increased until the loading system reached its limit, providing synchronized soil-pressure, concrete-stress and bolt-force measurements for a real precast circular working shaft; (ii) a refined soil–segment–bolt numerical model that reproduces the strongly non-uniform, one-sided jacking reaction and quantifies the ‘tension at the bottom and compression at the top’ stress pattern together with the distinct force shares of the circumferential and vertical bolts, which have not been reported for precast working shafts; and (iii) a tensile-strength-based estimate of the cracking-initiation load of the cutting-edge ring, which identifies the segmental joints as the controlling zone and yields quantitative safety-control recommendations. The present work should also be distinguished from our earlier study on the mechanical performance of prefabricated circular pipe-jacking working shafts [5]. The full-scale loading test on the No. 16 shaft, the synchronized soil-pressure, concrete-stress and bolt-force measurements, the soil–segment–bolt model validated against them, and the cracking-initiation-based estimate of the cutting-edge ring capacity are reported. Unlike the earlier numerical study [5], the present work adds conclusions on the localized soil disturbance and the ‘tension at the bottom and compression at the top’ stress pattern and the distinct force shares of the circumferential and vertical bolts are likewise derived from the present dataset.
Therefore, this paper takes the No. 16 precast circular pipe-jacking working shaft of the Xiyou Road drainage pipeline project in Hefei as the studied case. A full-scale field experiment and a detailed numerical simulation were carried out. On site, a monitoring system for soil pressure, concrete stress, and bolt axial force was installed on the reaction wall and the adjacent segments. The jacking force was applied step by step up to the structural ultimate state. On this basis, a detailed numerical model considering shaft–soil contact and segment–bolt connections was proposed. The characteristics of soil pressure, segment stress, and bolt force under the jacking force were systematically analyzed. The ultimate bearing capacity of the shaft was then evaluated and safety-control suggestions were proposed.

2. Studied Case

The Xiyou Road drainage pipeline project in Hefei is about 7350 m long. It passes through built-up areas and is close to many existing structures. The drainage works include two systems: stormwater and sewage. For the sewage works, a new D1500 sewer was built along Xingang Road and Duan Road. Pipe jacking was adopted because of the restricted surroundings. Pipe jacking disturbs surface traffic and underground pipelines only slightly and is safe to construct. However, the huge jacking force during construction must be taken by the launching shaft and reliably transferred to the surrounding soil. The structural safety of the working shaft directly determines the success of the pipe jacking.
The No. 16 precast circular pipe-jacking working shaft of this project was selected as the studied case. It is a pipe-jacking launching shaft with an inner radius of 3.0 m. It is assembled from four standard rings and one cutting-edge ring (at the shaft bottom, taking the main reaction). The segment thickness of both the standard and cutting-edge rings is 0.3 m, and the shaft depth is 10.5 m. It is a typical small-diameter precast circular pipe-jacking working shaft. Figure 1 shows the circumferential and vertical assembly details and key dimensions of the shaft structure. The precast working shaft is built from prefabricated segment blocks assembled on site. It has the advantages of fast construction, easy quality control, and little impact on the surroundings. The numerical model was built with the geometry dimensioned in Figure 1: an inner radius of 3000 mm (R3000), an outer radius of 3300 mm (R3300), a segment thickness of 300 mm and a depth of 10.5 m.
Figure 1. Structural design of the working shaft (unit: mm).

3. Full-Scale Field Experiment

3.1. Measurement Scheme

During jacking, the jack force acts on the concrete pad of the reaction wall. This force is then transferred to the surrounding soil through the reaction segment. Figure 2 shows the force schematic of the bottom cutting-edge ring under the jacking force. Since the reaction segment (the segments directly pushed by the jack) must take the reaction of the jacking force, it is the most unfavorably loaded part of the shaft. Therefore, this monitoring focused on the mechanical behavior of the reaction segment and its neighboring zone. Measuring points were mainly placed on the reaction segment and its adjacent segments, as well as the connecting bolts between segments. Three types of data were observed: soil pressure, concrete stress, and bolt axial force. The jack’s built-in pressure gauge was used to apply the jacking force step by step and to read its value. In this way, the mechanical response of the key structural parts under different load levels was obtained.
Figure 2. Force schematic of the cutting-edge ring of the precast working shaft.
Under the jacking reaction force, the soil pressure around the cutting-edge ring is complex and changes markedly with the force level, especially the soil pressure behind the reaction segment. It is a key indicator for evaluating shaft–soil interaction. Therefore, four soil-pressure monitoring points, labeled ①s, ②s, ③s, and ④s, were placed on the outer face of the reaction segment and its adjacent zone. Their layout is shown in Figure 3. Point ①s is at the center of the reaction segment outer face. Points ②s and ③s are on the two sides of that face. Point ④s is at the center of the outer face of a normal segment adjacent to the reaction segment. This arrangement distinguishes the soil-pressure response of the reaction segment from that of the far zone. After the shaft was assembled, soil-pressure cells were embedded at the designed positions on the outside of the cutting-edge ring by drilling and grooving. The sensors sank with the cutting-edge ring to the design depth and were fixed to the shaft wall. They were used to continuously monitor the variation in the external soil pressure during the whole jacking loading process.
Figure 3. Soil-pressure monitoring.
Concrete stress directly reflects the cracking risk of segments. It is a core index for evaluating the bearing performance of the working shaft. As shown in Figure 4, four concrete stress monitoring points (①c, ②c, ③c, and ④c) were placed on the inner face of the reaction segment and its adjacent segments. Point ①c is at the center of the inner face of the reaction segment. Points ②c, ③c, and ④c are near the joints of the segments adjacent to the reaction segment. At each point, two concrete strain gauges were installed. They measured the increments of the circumferential stress and vertical stress, respectively, to capture the stress evolution in the two principal directions under the jacking force.
Figure 4. Concrete stress monitoring.
The precast shaft is connected to the whole by bolts between segments. The bolt force state determines the shear and tensile capacity of the assembled interface. As shown in Figure 5, four of the key bolts connecting the reaction segment and the adjacent segments were selected for monitoring. Bolts ①b and ②b are vertical bolts; bolts ③b and ④b are circumferential bolts. Axial-force meters were used to observe the change in bolt axial force under the jacking force. The focus was on the magnitude and distribution of bolt forces during the transfer of the jacking reaction. With regard to measurement accuracy, all measuring devices were zeroed before each loading stage and the readings were recorded only after stabilization; the jacking force was obtained from the jack’s built-in pressure gauge.
Figure 5. Bolt axial force monitoring.

3.2. Jacking Force Control

In real pipe jacking, thixotropic slurry is usually used for drag reduction. This makes the pipe-jacking resistance much smaller than the theoretical value. As a result, the reaction taken by the working shaft is far below its design value, and its full force state cannot be revealed [5]. To reproduce the force response of the shaft under the ultimate load and to find its ultimate bearing capacity, the pipe end was blocked by a steel plate on site (Figure 6a). This artificially increased the pipe-jacking resistance. In this way, the reaction load on the reaction segment could be applied effectively and stably up to a large value. The full-scale field experiment used a jack for step-by-step loading. According to the pressure gauge readings, readings were recorded at jack-pressure intervals of 4 MPa until the pipe end showed obvious cracking failure. In this way, the shaft force state under the maximum field jacking force was obtained. In the full-scale field experiment, when the jacking force reached 2600 kN, the blocked pipe end cracked (Figure 6b), so loading could not be increased further. At this time, no cracking or damage was observed on the segments of the working shaft. It should be emphasized that blocking the pipe end is a loading technique used to develop a large and stable reaction on the shaft; it reproduces the magnitude and the one-sided, concentrated character of the jacking reaction at the reaction wall, but not the distributed jacking resistance along an actual drive. The test is therefore a structural loading test of the shaft rather than a reproduction of the construction process, and the measured response is used to validate the mechanical model of the shaft under a given reaction force. The jacking force was not measured by an independent load cell; it was derived from the jack’s built-in pressure gauge reading (20 MPa corresponded to about 2600 kN), so the reported forces inherit the accuracy of that pressure reading. In the numerical model, the load was applied as a uniform surface pressure on the reaction face; possible eccentricity of the jack thrust was not represented, and its effect on the local stress concentration should be examined in future work. For clarity, the loading protocol was as follows. Starting from the unloaded state, the jack pressure was raised in steps of 4 MPa, corresponding to about 520 kN of jacking force and giving the six measured load levels of 0, 520, 1040, 1560, 2080 and 2600 kN. At each level, the pressure was held constant until the readings of the soil-pressure cells, strain gauges and bolt axial-force meters had stabilized, and all readings were recorded before the next increment was applied. The test was terminated at 20 MPa (about 2600 kN) when the blocked pipe end cracked. The state of the experiment immediately before loading, with the pipe end blocked by the steel plate and all gauges installed, is shown in Figure 6a.
Figure 6. Pipe end: (a) test setup before loading, with the pipe end blocked by a steel plate; (b) cracking of the blocked pipe end at 2600 kN.

4. Detailed Numerical Simulation

4.1. Materials

To fully reveal the bearing performance characteristics of the working shaft, a detailed numerical simulation was also carried out. The materials in the model include C40 concrete, steel reinforcement, 8.8 grade bolts, and the surrounding soil. Under the jacking force, the analysis is restricted to the pre-cracking elastic range, where tensile strength governs. Therefore, concrete, steel, and bolts all use a linear-elastic constitutive model. The soil uses the Drucker–Prager criterion to reflect its yield behavior. The physical and mechanical parameters of each material are listed in Table 1. This choice is justified by the scope of the present analysis, which is limited to the stress state up to the onset of concrete cracking. Within this range, the field test confirmed quasi-elastic behavior of the shaft (no cracking or damage was observed up to 2600 kN). Accordingly, the ‘ultimate bearing capacity’ denotes the load at which the maximum principal tensile stress first reaches the axial tensile strength of C40 concrete, i.e., a cracking-initiation limit rather than a post-cracking failure load. Since a linear-elastic model cannot reproduce cracking propagation, stiffness degradation or the failure mechanism, nonlinear concrete damage/plasticity constitutive models [27] should be adopted in future work.
Table 1. Physical and mechanical parameters of materials.
The soil parameters listed in Table 1 were taken from the geotechnical investigation report of the Xiyou Road project. An elastic modulus of 30 MPa, a unit weight of 19.5 kN/m3, a Poisson’s ratio of 0.3, zero cohesion and a friction angle of 22° are representative of the backfill and silty clay surrounding the shaft, whose yield behavior is described by the Drucker–Prager criterion. The soil is represented as a single homogeneous layer with one set of parameters, so the numerical results should be regarded as approximate.

4.2. Element Types

In the model, suitable element types were chosen for each component according to its force and geometry. The soil was modeled by the 8-node solid element SOLID 45. The concrete was modeled by the 8-node solid element SOLID 65, using real constants (material number, reinforcement ratio, and orientation angle) to account for the reinforcing effect. The bolts were modeled by the 2-node 3D beam element BEAM 188, which is suitable for slender to moderately short beams and can consider shear deformation. It can reasonably reflect the axial force and bending of bolts. The force face of the reaction segment was modeled by the 4-node surface element SURF 154, which allows the jacking force to be applied uniformly as a surface load. The overall numerical model of the working shaft and the detailed segment–bolt model are shown in Figure 7. In the present work, rather than conducting a global mesh convergence study, we adopted a local mesh refinement strategy for the segments to resolve the high stress gradient, and the refined mesh scheme (81,707 elements and 81,068 nodes) was selected based on numerical practices of similar segmental structural problems.
Figure 7. Detailed numerical model of the precast working shaft.
The model contains two types of contact. The first is the contact between segments and the surrounding soil. The second is the contact between adjacent segments. Surface-to-surface contact elements (target element TARGE 170 and contact element CONTA 174) were used to simulate these behaviors. The contact surfaces were set to transfer only normal compressive stress and tangential friction, not normal tensile stress. This reflects the physical behavior of dry interfaces, which transfer compression and friction but cannot sustain normal tension. The friction coefficient of concrete contact surfaces is generally 0.3–0.4, so a uniform value of 0.35 was taken in the model. The contact interfaces were treated as only compression without tension to ensure convergence [28,29,30]. The value of 0.35 was selected as the representative mean of the commonly reported 0.3–0.4 range for concrete-to-concrete interfaces [28], and is consistent with the interface treatment used in segmental-joint simulations [29,30]. The compression-only, no-tension condition reflects the physical behavior of the dry assembled interfaces, which can transfer compression and friction but cannot sustain normal tension.

4.3. Boundary Conditions

As shown in Figure 7, to fully reflect the effect of soil confinement on the shaft structure and avoid boundary effects, the length and width of the soil model are taken as 30 m (about 5 times the shaft diameter) and the height is taken as 21 m. The bottom of the model was fully fixed in three directions. The four sides were constrained in the normal direction. The top surface was free. The jacking force was applied as a graded uniform surface load on the reaction face of the reaction segments. It was increased step by step to simulate the on-site jack loading. The maximum measured jacking force was 2600 kN. To extend the analysis and study the mechanical response and potential failure mode under the ultimate load, the maximum jacking force in the simulation was raised to 3700 kN. The lateral extent of 30 m is about five times the shaft diameter, which is sufficient to make the artificial boundaries insensitive to the localized jacking reaction. Fixing the model bottom and constraining only the normal displacements of the four sides, with a free ground surface, reproduces the in situ confinement without over-constraining the shaft. In the present work, rather than conducting a global mesh convergence study, we adopted a local mesh refinement strategy for the segments to resolve the high stress gradient, and the refined mesh scheme (81,707 elements and 81,068 nodes) was selected based on numerical practices of similar segmental structural problems.

5. Results and Discussion

5.1. Soil Pressure

As shown in Figure 8, before the jacking force was applied (after the shaft sank into place), the soil pressures at points ①s, ②s, ③s and ④s were close, all around −0.05 MPa. This shows that the initial stress in the soil around the shaft was relatively uniform. The comparable initial readings provided a consistent baseline. They provided a reliable baseline for the comparative analysis in the later loading stage.
Figure 8. Soil pressure at monitoring points.
As the jacking force increased, the soil pressures at points ①s, ②s and ③s on the outside of the reaction segments increased clearly. Their increments grew almost linearly with the jacking force. In contrast, the pressure at point ④s on the outside of the segment adjacent to the reaction segment changed very little and stayed near its initial state. This phenomenon shows that the effect of the jacking force on soil pressure is clearly local. Only the soil at and near the center of the reaction segment was significantly disturbed, and the other parts were almost unaffected. The mechanical reason is that the jacking reaction is transferred through the reaction segment and concentrated into the surrounding soil. This causes squeezing deformation and local stress redistribution in the soil outside the reaction segment. The soil behind the segment adjacent to the reaction segment does not bear a notable additional load, so its stress basically does not change. Quantitatively, the simulated curve was linearly interpolated at each measured jacking-force level; the maximum absolute differences between the measured and simulated soil pressures at these six levels (0–2600 kN) are 0.012, 0.023, 0.028 and 0.011 MPa at ①s, ②s, ③s and ④s, respectively.

5.2. Concrete Stress

5.2.1. Circumferential Stress Increment

As shown in Figure 9, under the jacking force, the circumferential stress increments at points ①c, ②c, and ③c of the cutting-edge ring were mainly tensile, but the increments were small. Their maximum values were all below 1 MPa, showing that the circumferential direction of the cutting-edge ring had not reached the cracking threshold. The circumferential stress increment at point ④c of the standard ring was mainly compressive, with a maximum computed value of less than 2 MPa (compression). In general, the simulation and measurement followed the same trend. The simulated values were generally larger in magnitude than the measured ones, and, at some points, the difference was not negligible. The deviation may come from the actual concrete strength on site being a little higher than the design value, or from local restraints at the measuring points that made the measured strain smaller. However, the overall trends agreed, which supports the model’s ability to reproduce the overall trends. For the circumferential stress increments, the maximum absolute differences evaluated at the same six measured load levels are 0.123, 0.636, 0.692 and 1.242 MPa at ①c, ②c, ③c and ④c, respectively. The largest deviation occurs at ④c of the standard ring, where the maximum difference of 1.242 MPa is reached at 1560 kN; at the final measured level of 2600 kN, the measured increment is about −0.70 MPa against about −1.75 MPa from the simulation, corresponding to a difference of about 1.05 MPa. As noted above, the higher in situ concrete stiffness and the local restraint at the gauges partly explain this difference; the discrepancy is confined to the compressive branch at this point and does not affect the tensile cracking-initiation criterion used in Section 5.2.3. The agreement between measurement and simulation should therefore be understood at the level of trends rather than of point-by-point values.
Figure 9. Circumferential stress increment of concrete.
The above pattern indicates a clear vertical variation in the structural force. Under the jacking force, the inner face of the bottom cutting-edge ring develops circumferential tensile stress, while the inner face of the upper standard ring develops circumferential compressive stress. The reason is that the jacking reaction makes the reaction segment tend to deform outward. As the main bearing member at the bottom, the cutting-edge ring is in tension on the inside and compression on the outside under the bulging deformation of the shaft wall. The upper standard ring is acted on by the lateral restraint of the upper soil and the coordination of the overall shaft deformation, so it shows circumferential compression. This ‘tension at the bottom and compression at the top’ circumferential stress pattern is the force characteristic of a precast circular working shaft under a one-sided jacking load.

5.2.2. Vertical Stress Increment

As shown in Figure 10, the vertical stress increments at all four points were mainly tensile. This means the jacking force induced a clear vertical tensile stress field in the shaft wall. Among them, the vertical stress increment at point ①c (center of the cutting-edge-ring reaction wall) was relatively small. The increments at points ②c, ③c, and ④c (segments adjacent to the reaction segment) were relatively large. This shows that under the jacking force, the vertical tensile stress in the shaft is not uniform. It is mainly concentrated in the segment zone adjacent to the reaction segment. This zone is the key part in vertical tension and should be emphasized in crack resistance design. At the same six measured load levels, the maximum absolute differences between the measured and simulated vertical stress increments are 0.153, 1.207, 0.931 and 0.213 MPa at ①c, ②c, ③c and ④c, respectively; the simulated values are systematically larger at ②c and ③c, consistent with the deviation discussed in Section 5.2.1.
Figure 10. Vertical stress increment of concrete.
Combining the numerical and experimental circumferential and vertical stress increments, the core-loaded parts of the shaft segments under the jacking force are the reaction segment and its adjacent segments of the cutting-edge ring and standard ring. Specifically, the inner surface of the cutting-edge ring segment develops tensile stress increments in both the circumferential and vertical directions. It is a bi-axial tension zone with the highest cracking risk. The inner surface of the standard-ring segment shows a combined state of ‘vertical tension and circumferential compression’. The difference in stress between these two zones further shows the clear spatial non-uniformity of the shaft force under the jacking load. The structural design and detailing measures should thus be strengthened by zone accordingly.

5.2.3. Principal Tensile Stress of the Cutting-Edge Ring

As shown in Figure 11, when no jacking force was applied, the cutting-edge ring concrete was wholly in compression. As the jacking force increased step by step, the cutting-edge ring segment deformed outward along the force direction. The outer side of the reaction segment and the inner side of the segment adjacent to it changed from compression to tension. The maximum principal tensile stress grew with the jacking force. This shows that in the elastic stage, the principal tensile stress has a good linear relation with the applied load level.
Figure 11. Principal tensile stress of the cutting-edge ring concrete (MPa): (a) F = 0 kN; (b) F = 1000 kN; (c) F = 2000 kN; (d) F = 3000 kN.
When the jacking force reached 3000 kN, the maximum principal tensile stress of the cutting-edge ring concrete was about 2.35 MPa. The high-stress zone was mainly at the segmental joints. Stress easily concentrates there because of the assembly gap. This value is already close to the standard axial tensile strength of C40 concrete (2.39 MPa). It shows that local concrete cracking is very likely at this part when the jacking force increases further. This part is the control zone for the bearing performance of the precast circular working shaft concrete structure. It can also be inferred that, under the conditions of this project, the actual safe upper limit of the jacking force should be controlled within the 3000 kN level.

5.3. Bolt Axial Force and Stress

5.3.1. Bolt Axial Force

As shown in Figure 12, as the jacking force increased, the axial force of the bolts around the reaction segment also increased. The numerical and experimental results agreed in trend, showing that the model reasonably reflects the force characteristics of the segment connection system. In terms of force distribution, the axial-force increments of the vertical bolts ①b and ②b were small, with a maximum of about 14 kN. The increments of the circumferential bolts ③b and ④b were relatively large, with a maximum of about 40 kN. This difference shows that, under the jacking reaction, the circumferential bolts carry the main connection force. They are the dominant loaded members among the connecting bolts, while the vertical bolts are lightly loaded and play a secondary role. In addition, the axial forces remain small because the soil behind the reaction wall carries most of the jacking reaction, so the segment joints open only slightly and the bolts are not fully tensioned. If this soil were soft, the joint deformation and the bolt axial forces would increase considerably.
Figure 12. Bolt axial force increment.

5.3.2. Bolt Stress

The circumferential and vertical bolts with the most notable forces were extracted separately to analyze their maximum principal tensile stress distributions. The results are shown in Figure 13 and Figure 14, respectively. Under the same jacking force, the maximum principal tensile stress of the circumferential bolts was much larger than that of the vertical bolts. Both stress levels grew almost linearly with the jacking force. At a jacking force of 3000 kN, the maximum principal tensile stress of the circumferential bolts was 294.55 MPa, far below the standard tensile strength of 8.8 grade bolts (800 MPa). The maximum principal tensile stress of the vertical bolts was even lower. It can be seen that even under a load close to the ultimate bearing capacity of the shaft, the bolt material stays in the elastic stage with ample safety margin. According to Figure 13 and Figure 14, stress concentration in the bolts gives a high peak tensile stress. Since the tensile zone is very small, the bolt axial force therefore remains very low and consistent with the experimental increments.
Figure 13. Maximum principal stress of circumferential bolts (MPa): (a) F = 1000 kN; (b) F = 2000 kN; (c) F = 3000 kN.
Figure 14. Maximum principal stress of vertical bolts (MPa): (a) F = 1000 kN; (b) F = 2000 kN; (c) F = 3000 kN.
In summary, for the precast circular working shaft, only the bolts connecting the reaction segment were clearly in tension. The tension in the bolts in other parts was very small and can be neglected. Moreover, the maximum axial force and maximum principal tensile stress of the tensioned bolts were far below their material tensile strength. The load-bearing potential of the bolts was far from fully exploited. This shows that the force system of the working shaft takes the concrete segments as the main bearing members. The bolts serve mainly as assembly connections that accommodate deformation, rather than as main bearing members. This understanding is useful for optimizing the bolt layout of precast working shafts and for properly simplifying the connection detailing while meeting the assembly and shear requirements.

5.4. Ultimate Bearing Performance

In the full-scale field experiment, when the jack pressure gauge reached 20 MPa, obvious cracking appeared at the pipe end blocked by a steel plate. The corresponding jacking force was about 2600 kN. Throughout the on-site observation, the shaft segments showed no cracking, spalling, or obvious deformation. This shows that, under a jacking force of 2600 kN, the No. 16 precast circular working shaft still had good bearing performance. The structure as a whole was in a safe state, and the actual construction jacking force did not exceed its bearing capacity.
The numerical simulation further raised the jacking force to 3700 kN. The shaft segments showed no overall instability or failure, but the principal tensile stress at the cutting-edge ring segment joints already approached the tensile strength standard value of C40 concrete. There was an obvious local cracking risk, indicating that the structure was close to its ultimate bearing capacity. Combining the experimental and numerical results, the actual ultimate bearing capacity of this precast circular working shaft is about 3000 kN. From the view of safety reserve, the construction jacking force should be kept within 2600 kN. The detailing protection at the cutting-edge ring segment joints should be strengthened (e.g., by increasing the reinforcement ratio, using ultra-high-performance concrete, or locally bonding steel plates) to suppress cracking caused by principal tensile stress concentration. It should be emphasized that 3000 kN is not a measured failure load. The field test was interrupted at 2600 kN because the pipe end blocked by the steel plate cracked (Figure 6b); that is, the loading system rather than the shaft reached its limit, and the shaft itself showed no cracking, spalling or obvious deformation at this load (Section 3.2). The value of 3000 kN is therefore a numerical estimate obtained by extrapolating the validated elastic model beyond the measured range and adopting the C40 axial tensile strength (2.39 MPa) as a cracking-initiation criterion. Because post-cracking behavior is not represented, this value should be understood as a conservative lower bound: local cracking at the segmental joints does not imply loss of global stability, and the shaft may still sustain additional load. The recommendation to keep the construction jacking force within 2600 kN is thus a conservative, experimentally verified safe limit. Accordingly, no ultimate bearing capacity was established experimentally in this study; throughout the paper, the term denotes only the nominal cracking-initiation threshold defined above, and the actual post-cracking reserve of the shaft remains to be determined by nonlinear analyses and by loading tests carried to structural failure.

6. Conclusions

Taking the No. 16 precast circular pipe-jacking working shaft of the Xiyou Road drainage pipeline project in Hefei as the studied case, full-scale field experiment and detailed numerical simulation were carried out. The shaft–soil interaction under the jacking reaction force and the mechanical response laws of the shaft segments and connecting bolts were revealed. The main conclusions are as follows.
(1)
The effect of the jacking force on the soil pressure around the working shaft is clearly regional. Only the soil pressure on the direct soil-facing side of the reaction segment and its adjacent zone grows almost linearly with the jacking force. The other parts far from the reaction segment basically keep their initial stress state and are hardly disturbed by the jacking force. This observation supports focusing monitoring and analysis on the reaction segment. Quantitatively, at 2600 kN the measured soil pressure outside the reaction segment rose from about −0.05 MPa to between −0.15 and −0.17 MPa, while the point on the adjacent segment stayed near −0.04 MPa.
(2)
The core-loaded parts of the precast circular working shaft are the reaction segment and its adjacent cutting-edge ring and standard ring segments. The force shows a ‘tension at the bottom and compression at the top’ feature. The inner face of the cutting-edge ring segment is in circumferential-vertical bi-axial tension. The inner face of the standard ring segment is in vertical tension and circumferential compression. The segmental joints of the cutting-edge ring segment are the concentration zone of principal tensile stress. At a jacking force of 3000 kN, the principal tensile stress already approaches the standard tensile strength of C40 concrete, which defines the nominal cracking-initiation threshold, so local cracking is likely. It is suggested that in design and construction, the reinforcement ratio of this zone be appropriately increased, and measures such as ultra-high-performance concrete or bonded steel plates be used for local strengthening, so as to improve its crack resistance. As an additional design option, prestressing the lower segments with the prestress level varied along the shaft height could make the distribution of stresses and deformations more uniform and thereby help protect the concrete against cracking; this possibility deserves further investigation.
(3)
Among the connecting bolts, only those around the reaction segment were clearly in tension, and the circumferential bolts carried more force than the vertical bolts. The circumferential bolts are the dominant loaded members of the connection system. Since the experimental and numerical axial-force increments are about 14 kN for the vertical bolts and about 40 kN for the circumferential bolts over the full loading range, and the maximum principal tensile stress of all tensioned bolts was far below the standard tensile strength of 8.8 grade bolts, the mechanical performance of the bolts was not fully used. The working shaft as a whole still takes the concrete segments as the main bearing members, and the bolts play an auxiliary connecting role. It should be emphasized that, for a given axial force, the tensile stress in a bolt is governed by its cross-sectional area (i.e., its diameter) rather than by its strength class: reducing the bolt diameter would raise the principal tensile stress considerably. The ample safety margin reported above therefore refers to the bolt cross-section used in this shaft, and any change in the bolt diameter requires a re-evaluation of the bolt stress level.
(4)
The full-scale experiment shows that, under the maximum jacking force, the shaft segments had no cracking or other damage. This means the designed bearing capacity meets the requirements of on-site pipe jacking and leaves a safety margin. Since the cutting-edge ring joints are the control zone of principal tensile stress concentration, when the design jacking force is large, it is suggested to install long-term monitoring points at key parts such as the reaction segment and its joints. The concrete stress and deformation should be monitored in real time and an early warning mechanism should be established. When the monitored value reaches the warning threshold, jacking work should stop immediately and strengthening or drag reduction measures should be taken, so as to achieve active prevention and control of structural safety. The structure remained crack-free up to the maximum measured force of 2600 kN, i.e., within the experimentally verified safe range.
The main differences between the numerical and experimental results are also summarized here. Evaluated at the six measured load levels (0–2600 kN), the maximum absolute differences are 0.011–0.028 MPa for the soil pressure, 0.123–1.242 MPa for the circumferential stress increments and 0.153–1.207 MPa for the vertical stress increments; the simulated stress increments are generally larger in magnitude than the measured ones, with the largest deviation of 1.242 MPa at point ④c in Figure 9 (1560 kN). These differences are attributed to the higher in situ concrete stiffness, to local restraint at the gauges and to the idealized homogeneous soil and interface parameters, and they are confined mainly to the compressive branch; the agreement in trends, the localization of the loaded zone and the cracking-initiation criterion are not affected. A systematic quantification of these deviations under a nonlinear constitutive model and a converged mesh is left for future work.

Author Contributions

Conceptualization, X.Z. and F.Y.; methodology, F.Y. and H.Y.; software, Z.H. and F.Y.; validation, G.Q. and L.Y.; formal analysis, F.Y.; investigation, X.Z. and F.Y.; resources, X.Z. and H.Y.; data curation, Z.H. and F.Y.; writing—original draft preparation, X.Z. and F.Y.; writing—review and editing, X.Z. and F.Y.; visualization, G.Q.; supervision, H.Y.; project administration, X.Z. and F.Y.; funding acquisition, X.Z. and L.Y. All authors have read and agreed to the published version of the manuscript.

Funding

Fundamental Research Funds for the Central Universities of North Minzu University (No. 2023ZRLG16) and Anhui Province Housing and Urban–Rural Construction Science and Technology Plan Project (No. 2025-YF096).

Institutional Review Board Statement

Not applicable.

Data Availability Statement

The original contributions presented in this study are included in the article. Further inquiries can be directed to the corresponding author.

Conflicts of Interest

Authors Xingqi Zhang and Li Yuan were employed by the company Hefei Municipal Design and Research Institute Co., Ltd, and Gan Qin were employed by the company Shenzhen Urban Public Safety Technology Research Institute. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

References

  1. Hu, D.; Xiang, X.; Huang, J.; Qi, K.; Li, Y.; Yang, X.; Liang, X. Calculation methods for the jacking force of a rectangular pipe jacking tunnel: Overview and prospects. J. Pipeline Syst. Eng. Pract. 2025, 16, 03125001. [Google Scholar] [CrossRef] [Scilit]
  2. Tao, L.J.; Zhang, Y.; Zhao, X.; Bian, J.; Chen, X.H.; An, S.; Han, X.C. Group effect of pipe jacking in silty sand. J. Geotech. Geoenviron. Eng. 2021, 147, 05021012. [Google Scholar] [CrossRef] [Scilit]
  3. Liu, K.T.; Ariaratnam, S.T.; Zhang, P.; Chen, X.; Wang, J.; Ma, B.; Zhang, Y.; Feng, X.; Xu, T. Mechanical response of diaphragm wall supporting deep launch shaft induced by braced excavation and pipe jacking operation. Tunn. Undergr. Space Technol. 2023, 134, 104998. [Google Scholar] [CrossRef] [Scilit]
  4. Zhang, C.; Zhai, W.B.; Xia, Y.Y.; Wang, C.; Zhao, P.; Li, B.; Pan, Y.; Fang, H.; Ummin, O.; He, W.; et al. Analysis of the stability of a novel assembled working shaft support structure during pipe jacking construction: Experiments and numerical simulations. Eng. Fail. Anal. 2024, 162, 108418. [Google Scholar] [CrossRef] [Scilit]
  5. Zhang, X.Q.; Yang, F.; Yao, H.Y. Research on mechanical performance of prefabricated circular working shaft for pipe jacking. Yangtze River 2024, 55, 143–149. [Google Scholar] [CrossRef]
  6. Lin, W.; Sheil, B.; Zhang, P.; Li, K.; Xie, X. Structural geometry-informed 3D deep learning for segmental tunnel lining analysis in point clouds. Autom. Constr. 2025, 176, 106281. [Google Scholar] [CrossRef] [Scilit]
  7. He, Y.; Zhao, D.; Xu, J.; Zhang, Q.; Liu, R.; Li, W.; Bai, J. Monitoring of segmental lining uplift and synchronous grouting control during shield tunnel construction using point-cloud data. Autom. Constr. 2026, 185, 106870. [Google Scholar] [CrossRef] [Scilit]
  8. Zhang, L.; Lian, Z.; Feng, K.; Tang, R.; He, C. Experimental investigation of 15.5-m prototype segment lining structures: The load equivalent method and in-situ verification. Tunn. Undergr. Space Technol. 2025, 159, 106481. [Google Scholar] [CrossRef] [Scilit]
  9. Wang, Q.; Chen, Y.; Wang, S.; Geng, P.; Li, P.; Shen, H.; Deng, L. Parametric study of tunnel fault resistance using numerical modeling and orthogonal experiment for segmental lining design. Soil Dyn. Earthq. Eng. 2025, 198, 109599. [Google Scholar] [CrossRef] [Scilit]
  10. Wei, G.; Feng, F.; Huang, S.; Xu, T.; Zhu, J.; Wang, X.; Zhu, C. Full-scale loading test for shield tunnel segments: Load-bearing performance and failure patterns of lining structures. Undergr. Space 2025, 20, 197–217. [Google Scholar] [CrossRef] [Scilit]
  11. Hwang, C.; Yang, S.; Kim, Y.; Park, S.; Choi, H. Simulation-driven deep learning for rebar clutter elimination in ground-penetrating radar images to detect backfill grout defects in segment linings. Comput.-Aided Civ. Infrastruct. Eng. 2025, 40, 6722–6740. [Google Scholar] [CrossRef] [Scilit]
  12. Xue, C.; Cai, G.; Ma, L.; Liu, Y.; Zhu, H. Segment lining uplift during shield tunnelling: A three-dimensional shell-spring analysis model and control measures. Structures 2025, 79, 109561. [Google Scholar] [CrossRef] [Scilit]
  13. Yang, F.; Liu, G.; Wang, Y.Q.; Yu, S.K. Numerical investigation of the segmental lining performance for a shield tunnel. KSCE J. Civ. Eng. 2022, 26, 2443–2455. [Google Scholar] [CrossRef] [Scilit]
  14. Zhang, W.; Yang, Y.; Zhang, G.; Qi, J.; He, L.; Lyu, J. Progressive failure analysis of the key segment region in an ultra-large section shield tunnel lining: Experimental and numerical investigations. Tunn. Undergr. Space Technol. 2026, 168, 107211. [Google Scholar] [CrossRef] [Scilit]
  15. Liang, R.Z.; Zhang, Z.W.; Li, Z.C.; Cao, S.; El Naggar, M.H.; Xiao, M.; Wu, W. Simplified method for predicting the shield tunnel longitudinal responses to over-crossing tunneling considering circumferential joint effect. Int. J. Geomech. 2024, 24, 04024140. [Google Scholar] [CrossRef] [Scilit]
  16. Fulgione, M.; Palladino, S.; Esposito, L.; Sarfarazi, S.; Modano, M. A multi-stage framework combining experimental testing, numerical calibration, and AI surrogates for composite panel characterization. Buildings 2025, 15, 3900. [Google Scholar] [CrossRef] [Scilit]
  17. Rabi, M.; Abarkan, I.; Sarfarazi, S.; Ferreira, F.P.V.; Alkherret, A.J. Automated design and optimization of concrete beams reinforced with stainless steel. Struct. Concr. 2025, 27, 3247–3270. [Google Scholar] [CrossRef] [Scilit]
  18. Sun, Y.; Su, J.B.; Xia, X.H.; Xu, Z.L. Numerical analysis of soil deformation behind the reaction wall of an open caisson induced by horizontal parallel pipe-jacking construction. Can. Geotech. J. 2015, 52, 2008–2016. [Google Scholar] [CrossRef] [Scilit]
  19. Xia, Y.Y.; Fang, H.Y.; Zhang, C.; Pan, Y.H.; Zhai, W.B.; Shi, M.S. Mechanical response analysis of pipe jacking construction to new composite assembly supporting work shaft. Rock Soil Mech. 2022, 43, 2799–2808. [Google Scholar] [CrossRef]
  20. Luo, Z.M.; Zhang, Y.J.; Chen, J.H.; Ou, X.; Zhang, X. Stress and deformation response of pipe jacking in upper-soft and lower-hard strata: A case study in Changsha. Eng. Fail. Anal. 2024, 166, 108879. [Google Scholar] [CrossRef] [Scilit]
  21. Chen, R.P.; Fan, M.; Cheng, H.Z.; Wu, H.-N.; Zhang, Y.; Ruan, S.-Q.; Gao, B.-Y. Experimental and analytical study on the mechanical response of shield tunnel segmental linings strengthened by a steel-UHPC composite. Tunn. Undergr. Space Technol. 2024, 150, 105824. [Google Scholar] [CrossRef] [Scilit]
  22. Liu, X.; Zhang, J.L.; Jiang, Z.J.; Liu, Z.; Xu, P.; Li, F. Experimental investigations of a segmental tunnel ring strengthened by using UHPC. China J. Highw. Transp. 2021, 34, 181–190. [Google Scholar] [CrossRef]
  23. Chen, R.P.; Lu, L.; Zhang, Y.; Wu, H. Reinforced technology and mechanical properties of shield tunnel lining with UHPC. Eng. Mech. 2019, 36, 41–49. [Google Scholar] [CrossRef]
  24. Bai, Q.; Zhao, W.; Wang, X.; Ma, H.L.; Zhao, Z. Influence of pipe-jacking reaction on earth pressure of back wall of pilot tunnel of subway station. Sustainability 2023, 15, 1033. [Google Scholar] [CrossRef] [Scilit]
  25. Wadood, A.; McCabe, B.A.; Sheil, B.B. Field monitoring and instrumentation in microtunnelling/pipe jacking: A review and future directions. Undergr. Space 2025, 22, 225–240. [Google Scholar] [CrossRef] [Scilit]
  26. Zheng, S.; Luo, Z.M.; Wang, C.Q.; Zhang, Y.J. Field monitoring and numerical simulation for force characteristics of pipe jacking in deep buried moderately weathered slate. Eng. Res. Express 2024, 6, 035417. [Google Scholar] [CrossRef] [Scilit]
  27. Zucca, M.; Crespi, P.; Vecchi, E.; Stochino, F. On the seismic performance of existing RC motorway viaducts subject to corrosion effects. In Proceedings of the Fib Symposium, Antibes, France, 16–18 June 2025; pp. 282–289. [Google Scholar]
  28. Mohamad, M.E.; Ibrahim, I.S.; Abdullah, R.; Rahman, A.A.; Kueh, A.B.H.; Usman, J. Friction and cohesion coefficients of composite concrete-to-concrete bond. Cem. Concr. Compos. 2015, 56, 1–14. [Google Scholar] [CrossRef] [Scilit]
  29. Huang, M.; Shi, X.; Yang, F.; Liu, K. Numerical investigation for the bearing performance of the segmental joint with elastic gasket. Period. Polytech. Civ. Eng. 2022, 66, 1158–1168. [Google Scholar] [CrossRef] [Scilit]
  30. Yang, F.; Cao, S.R.; Qin, G. Mechanical behavior of two kinds of prestressed composite linings: A case study of the Yellow River Crossing Tunnel in China. Tunn. Undergr. Space Technol. 2018, 79, 96–109. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics