Abstract

During the transformation of power systems toward a high proportion of renewable energy, thermal power units remain the core support for ensuring a stable power supply. Controlling carbon emissions and allocating resource utility are the keys to economic dispatch optimization. Most existing economic dispatch optimization models focus on cost and total carbon emission control, but ignore the utility balance of carbon emission resources among different units. Based on the envy-free fairness theory, this paper establishes an economic dispatch optimization model for thermal power-integrated power systems that considers the carbon emission utility game among multiple agents. By constructing a mixed-integer programming model that minimizes the mean absolute error, this study obtains a piecewise linear scheme for the power generation–coal consumption and carbon emission utility of thermal power units. The standard linear programming form of this scheme is also derived. Based on the principle of almost envy-free fair distribution, carbon emission utility game constraints are proposed. On this basis, combining the above models and constraints, an economic dispatch model aiming to minimize the total power generation cost of the system is proposed. Case study verification shows that the mean absolute error of the proposed linear fitting method is lower than that of existing methods. The economic dispatch optimization model ensures optimal cost while satisfying the source-load power balance. Meanwhile, with a slight increase in total power generation cost, the carbon emission utility balance of each unit is achieved, thereby promoting the fairness of carbon emission reduction responsibilities among multiple units.

1. Introduction

The power system is currently undergoing a structural transformation from a traditional thermal power unit (TPU)-dominated framework to grid integration with a high proportion of renewable energy sources, serving as a critical domain for both energy supply and carbon emissions [1]. Given the volatility and randomness of renewable energy resources such as wind power (WP) and photovoltaic (PV), coupled with the fact that current energy storage has not yet reached a reasonable deployment level, TPU generation remains the core supporting power source for ensuring stable power supply [2]. Consequently, TPUs have long been targets for carbon emission control in the power system. In most economic dispatch optimization models, cost minimization [3,4] and total carbon emission control [5,6] are two mainstream optimization objectives. Against this background, accurately establishing the relationship between power generation, coal consumption, and carbon emissions of different TPU entities is fundamental for achieving optimal decision-making regarding fuel and carbon emission costs. Furthermore, under carbon emission regulations, balancing the fair allocation of carbon emission reduction responsibilities with the utility of carbon emission resources in power system dispatching has become particularly crucial [7,8].
In scenarios of combined power generation from renewable and traditional energy sources, economic dispatch optimization must balance the dual requirements of economic efficiency and low-carbon performance [9]. The former, as a classic dispatch objective, minimizes fuel costs, start-up/shut-down costs, WP/PV curtailment costs, and reserve costs by optimizing TPU commitment and power output allocation [10,11]. The latter treats carbon emissions as constraints on dispatch decisions. Extensive research has been conducted on low-carbon economic dispatch of power systems incorporating energy storage [12], demand-side response [13], and carbon capture [14]. However, limited by China’s resource endowments and the cost constraints of energy storage facilities, most regions still lack sufficient flexible resources. The grid integration of renewable energy, represented by WP and PV, still mainly relies on TPUs to provide auxiliary services [15].
Approximately 80% of the power system’s carbon emissions stem from TPUs [16]. Therefore, the key to economic dispatch optimization considering coal consumption and low-carbon objectives lies in accurately describing the relationship between TPU power generation, coal consumption, and carbon emissions. In traditional dispatch modeling, the fuel and emission characteristic functions of TPUs are constructed based on valve-point loading effects and typically take a quadratic combined function form [17]. Nevertheless, these complex functional forms lead to low solution efficiency. Some scholars have formulated TPU fuel cost as a quadratic programming model [18] solved by Gurobi or adopted heuristic methods [19] for model solution. In addition, piecewise linear functions are a typical method for linearizing nonlinear mappings [20]. The linearization of the mapping relationship among power generation, coal consumption, and carbon emissions consists of two stages: piecewise linear function fitting and piecewise linear model construction. Regarding recent piecewise linear function fitting, Reference [21] compared two mixed-integer programming models for continuous piecewise linear function fitting [22,23], finding that the model proposed in Reference [23] uses fewer binary variables and is more applicable in engineering. For piecewise linear function modeling, the core challenge lies in using linear programming models to achieve stable mapping from power generation to coal consumption and carbon emissions via piecewise linear functions. References [24,25] elaborated on the linearization process of quadratic coal consumption functions for TPUs, but did not establish a standard economic dispatch optimization model incorporating linear piecewise schemes for coal consumption. References [26,27] adopted lower bound constraints on coal consumption to achieve stable fitting of coal consumption via piecewise linear functions. However, this modeling method heavily depends on the monotonically increasing property of each linear segment and exhibits weak generalization ability for constraint forms.
Scholars have also explored benefit equilibrium games among multiple stakeholders under the carbon market framework. Reference [28] constructed an energy-carbon coupled carbon emission accounting model and achieved economic and environmental benefit equilibrium for each microgrid through the Nash–Harsanyi bargaining game. Reference [29] treated the power generation supply side and the electricity load side as distinct decision-making entities, established a Stackelberg game-based economic dispatch model, and constructed a source–load bilateral carbon trading incentive mechanism. Reference [30] proposed an optimal energy-carbon pricing model based on the Stackelberg game framework from the perspective of electricity–carbon coupling, thereby guiding active carbon reduction on the distribution network side. Overall, the aforementioned studies focus on carbon emission reduction strategies based on source-load transactions under carbon market regulation. However, due to the uneven carbon emission intensity of different generation units, inefficient power plants often undertake excessive emission reduction burdens, thereby adversely affecting their normal production and operation [31]. Therefore, another research stream focuses on exploring the fairness of emission reduction responsibility allocation in economic dispatch optimization [32]. Reference [33] implemented carbon emission quota redistribution within TPU economic dispatch optimization to achieve fair allocation of emission reduction responsibilities. Reference [34] minimized power generation costs while ensuring that users’ carbon emissions do not exceed quotas, and also considered the fairness of carbon emission reduction responsibilities within power systems. In summary, carbon emission quotas have become a limited public resource. However, research on balancing the fairness of emission reduction responsibilities with the resource utility of carbon emissions for TPUs in power system dispatch optimization remains relatively scarce.
Existing fairness-oriented dispatch models [33,34] mainly address fairness through monetary compensation or quota redistribution, treating carbon quotas primarily as economic goods. By contrast, this paper focuses on the utility allocation of carbon emission resources from a physical perspective. To this end, this paper adopts the Envy-Freeness (EF) theory [35,36] to measure and balance the carbon emission utility among TPUs in economic dispatch optimization. Rather than relying on carbon pricing or trading mechanisms, the proposed framework evaluates the fairness of carbon emission resource utilization through the ε -EF allocation rule, aiming to achieve cost optimization while promoting a more equitable distribution of emission utility across generating units. The primary contributions of this paper are as follows:
(1) An integer programming model for fitting piecewise linear units and its equivalent standard linear programming form are proposed. Computational results demonstrate that the proposed piecewise linear unit accurately captures the dynamic relationship between power generation–coal consumption and carbon emission utility, and its equivalent linear programming model exhibits strong generalization capability.
(2) The envy-free principle is applied, and multi-agent carbon emission utility game constraints for TPUs are proposed. Based on the piecewise linear function for power generation–coal consumption, a carbon emission utility model was established. Combined with the standard ε -EF allocation principle, multi-agent carbon emission game constraints were proposed.
(3) An economic dispatch model for the power system considering multi-agent carbon emission game is established. By incorporating the power generation–coal consumption model, the carbon emission utility model, and the utility game constraints, a mixed-integer programming model for economic dispatch optimization is established. It realizes optimal power output allocation and ensures optimal cost-effectiveness while satisfying the source-load power balance constraint.
The remaining sections of this paper are organized as follows: Section 2 establishes an MAE-based mixed integer programming (MIP) model and a piecewise linear model for power generation–coal consumption; Section 3 combines the envy-fair allocation principle and proposes multi-agent carbon emission utility game constraints based on ε -EF allocation; Section 4 establishes an economic dispatch model of the power system with the objective of minimizing the total power generation cost; Section 5 verifies the efficacy of the proposed strategies, ε -EF constraints and models through practical system case studies; Section 6 provides a concise overview of the research conducted in this paper.

2. Piecewise Linear Unit Modeling for Power Generation–Coal Consumption

2.1. Definition of Piecewise Linear Unit

The non-uniform piecewise linear unit (NPLU) consists of multiple linear segments, and the standard formula is defined as Equation (1):
S r C o a l = K 0 C o a l P r g + Y 0 C o a l ∀ P g ∈ < α 0 C o a l , α 1 C o a l > K 1 C o a l P r g + Y 1 C o a l ∀ P g ∈ < α 1 C o a l , α 2 C o a l > K 2 C o a l P r g + Y 2 C o a l ∀ P g ∈ < α 2 C o a l , α 3 C o a l > … K Q − 1 C o a l P r g + Y Q − 1 C o a l ∀ P g ∈ < α Q − 2 C o a l , α Q − 1 C o a l >
where P r g represents the power generation of TPU, and S r C o a l is the coal consumption, while K q C o a l , Y q C o a l ( q = 1 , … , Q − 1 ) denote the slope and the y-intercept of each piecewise linear function. ⟨ α q , α q + 1 ⟩ are the boundary points of the q-th linear segment.

2.2. Optimal MAE-Based MIP for Power Generation–Coal Consumption

According to Equation (1), a predefined number Q of linear segments can be obtained by the mixed-integer programming model (MIP). Based on samples ( P r g ^ , S ^ r C o a l ) of TPUs, a MIP model is proposed to minimize the mean absolute error (MAE) [23]. The definitions and explanations of the decision variables are listed in Table 1.
Min ∑ r = 1 n ω r
Subject to
ω r ≥ S r C o a l − S ^ r C o a l ω r ≥ S ^ r C o a l − S r C o a l ∀ r = 1 , … , n
S r C o a l ≥ P r g ^ · K q C o a l + Y q C o a l − M · ( 1 − ν r , q ) S r C o a l ≤ P r g ^ · K q C o a l + Y q C o a l + M · ( 1 − ν r , q ) ∀ r = 1 , … , n ; q = 0 , … , Q − 1
∑ q = 1 m ν r , q = 1 ∀ r = 1 , … , n
∑ r = 1 n ν r , q ≥ S m i n ∀ q = 0 , … , Q
Table 1. Decision variables of MIP model.
Generally, the MAE value of the r-th sample is ω r = | S r C o a l − S ^ r C o a l | . Constraint (3) ensures that ω r is the non-negative value between S r C o a l − S ^ r C o a l and S ^ r C o a l − S r C o a l , which actually is | S r C o a l − S ^ r C o a l | . In constraint (4), a big M (which can be specified as M = ∑ i = 1 n S r C o a l ) is adopted to activate the constraint. If v i , q = 1 , constraint (4) is equivalent to S r C o a l = P r ^ g · K q + Y q , which means that S r C o a l is fitted by linear segment q; otherwise, constraint (4) is redundant. Constraint (5) requires that each sample corresponds to at most one linear segment. Constraint (6) stipulates a minimum number of S m i n (which can be specified as S m i n = 3 ) samples for each linear segment.
P r g ^ − M · ( 1 − ν r , q ) ≤ P s g ^ + M · ( 1 − ν s , q + 1 ) ∀ r ≠ s ; r , s = 1 , … , n ; q = 0 , … , Q − 1
Y q C o a l − Y q + 1 C o a l ≥ P r g ^ · ( K q + 1 C o a l − K q C o a l ) − M · ( 1 − ν r , q ) ∀ r = 1 , … , n ; q = 0 , … , Q − 1 Y q C o a l − Y q + 1 C o a l ≤ P s g ^ · ( K q + 1 C o a l − K q C o a l ) + M · ( 1 − ν s , q + 1 ) ∀ s = 1 , … , n ; q = 0 , … , Q − 1
Constraints (7) and (8) ensure the continuity between each pair of adjacent linear segments. In constraint (7), if and only if v q , r = 1 and v q + 1 , s = 1 , the bounded constraint P ^ r g ≤ P ^ s g is valid; otherwise, the constraint is invalid. Generally, the cross point of linear segments q and q + 1 is α q + 1 = Y q C o a l − Y q + 1 C o a l K q + 1 C o a l − K q C o a l . Thus, the samples allocated to the linear segments q and q + 1 must satisfy P r g ^ ≤ Y q C o a l − Y q + 1 C o a l K q + 1 C o a l − K q C o a l and P s g ^ ≥ Y q C o a l − Y q + 1 C o a l K q + 1 C o a l − K q C o a l . In constraint (8), if ν r , q = 1 , it forces sample r to satisfy P r g ^ ≤ α q + 1 C o a l ; otherwise, the constraint is invalid. Similarly, for variable ν s , q + 1 , the above logic applies analogously.
By solving the MIP model, K q C o a l and Y q C o a l for each linear segment can be obtained, and the boundary points < α q C o a l , β q C o a l > are determined by Equation (9):
α 0 C o a l = min { P r g ^ } ; β 0 C o a l = K 0 C o a l α 0 C o a l + Y 0 C o a l α q C o a l = Y q C o a l − Y q − 1 C o a l K q C o a l − K q − 1 C o a l ; β q C o a l = K q C o a l Y q C o a l − K q C o a l Y q − 1 C o a l K q − 1 C o a l − K q C o a l ∀ q = 1 , … , Q − 2 α Q − 1 C o a l = max { P r g ^ } ; β Q − 1 C o a l = K Q − 2 C o a l α Q − 1 C o a l + Y Q − 1 C o a l

2.3. Piecewise Linear Model for Thermal Power Units’ Power Generation–Coal Consumption

For a single thermal power unit (TPU), Equation (9) provides the corresponding slope ( K q C o a l ) and boundary points ( < α q C o a l , β q C o a l > ) of the piecewise linear segments. For N g TPUs, let K i , q C o a l and α i , q C o a l be parameters of the i-th TPU. Then, a piecewise linear programming (PWLP) model is established, which characterizes the relationship between the power generation and the coal consumption. For the i-th TPU during the time period t, we define a variable P i , t g ∈ R + to represent power generation, and S i , t C o a l ∈ R + to denote coal consumption. Moreover, let auxiliary variable γ i , q , t C o a l ∈ R + be the intercept distance between P i , t C o a l and α i , q C o a l . The binary variable μ i , t g ∈ { 0 , 1 } indicates the start ( μ i , t g = 1 ) or stop ( μ i , t g = 0 ) state of the i-th TPU during the time period t. In summary, the general form of PWLP model is established as follows:
Min M 1 = σ ∑ i = 1 N g ∑ q = 0 Q i − 1 ∑ t = 1 T γ i , q , t C o a l
Subject to
γ i , q , t C o a l ≥ P i , t g − α i , q C o a l q = 0 , 1 , … , Q i − 1 ; i = 1 , … , N g ; t = 1 , … , T
S i , t C o a l = β i , 0 C o a l μ i , t g + K i , 0 C o a l γ i , 0 , t C o a l + ∑ q = 1 Q i − 1 ( K i , q C o a l − K i , q − 1 C o a l ) γ i , q , t C o a l ∀ i = 1 , … , N g ; t = 1 , … , T
γ i , q , t C o a l ≥ 0 ∀ q = 0 , 1 , … , Q i − 1 ; i = 1 , … , N g ; t = 1 , … , T S i , t C o a l ≥ 0 ∀ i = 1 , … , N g ; t = 1 , … , T μ i , t g ∈ { 0 , 1 } ∀ i = 1 , … , N g ; t = 1 , … , T
The objective function (10) of M 1 minimizes the total auxiliary variable value and σ denotes the objective factor, which ensures that each γ i , q , t C o a l stably convergeslopes to its lower bound. Constraint (11) restricts the intercept distance γ i , q , t C o a l from the power generation P i , t g to the boundary point α i , q C o a l , which ensures that α i , q C o a l ≥ 0 when P i , t g ≥ α i , q C o a l , and α i , q C o a l = 0 otherwise (see Figure A1). Constraint (12) is the coal consumption constraint, where μ i , t g decides the start-up or shut-down state, and the auxiliary variables γ i , q , t C o a l are linked with the slopes ( K i , q C o a l ) of each piecewise linear segment (see Figure A2). Constraint (13) defines the variables. The derivation of constraints (12) and (13) is shown in Appendix A.1, and the associated parameters are listed in Appendix B Table A2.

3. Game of Carbon Emission Utility Based on Envy-Free Fairness

The envy-free concept is derived from the classic fair-division problem, addressing how to allocate resources among agents so that no participant prefers another’s allocation. In this work, the envy-free game is applied to the power system dispatching problem, where each TPU is a participant. Wind power (WP) and photovoltaic (PV) sources are not included as game participants because they do not generate carbon emissions and thus do not compete for carbon emission allowances. Instead, WP and PV are treated as exogenous inputs to the dispatch problem, consistent with their physical role in the system. Beyond minimizing the total generation cost, the envy-free game ensures that no TPU prefers the load allocation of others. The key metric is the carbon emission utility. Under the same carbon emission caused by the load allocation, a TPU’s obtainable power generation is superior to that of others.
Based on model M 1 , the coal consumption of each TPU under the given load allocation can be determined. Furthermore, model M 2 is proposed to characterize the mapping from carbon emission to power generation, which underpins the aforementioned carbon emission utility.

3.1. Carbon Emission–Power Generation Utility Model

Let variable E i , t C O 2 denote the carbon emission of the i-th TPU under the allocation P i , t g . Parameters η i C O 2 or η h C O 2 respectively indicate the carbon emission factor of i-th or h-th TPU. Thus, E i , t C O 2 / η h C O 2 represents the coal consumption of TPU h from the carbon emission of TPU i. In addition, the variable γ i , q , t h , P o w e r serves as an intermediate variable that denotes the intercept distance when TPU i is replaced by TPU h under the carbon emission E i , t C O 2 . Correspondingly, E i , t h denotes the attainable power generation output of the h-th TPU subject to the carbon emission of TPU i. The associated piecewise linear parameters are derived from M 1 and listed in Table 2. The general form of M 2 is as follows:
Min M 2 = σ ∑ i = 1 N g ∑ h = 1 , h ≠ i N g ∑ q = 0 Q h − 1 ∑ t = 1 T γ i , q , t h , P o w e r
Subject to
E i , t C O 2 = η i C O 2 S i , t C o a l ∀ i = 1 , … , N g ; t = 1 , … , T
η h C O 2 γ i , q , t h , P o w e r ≥ E i , t C O 2 − η h C O 2 α h , q P o w e r ∀ q = 0 , … , Q h ; h , i = 1 , … , N g , i ≠ h ; t = 1 , … , T
E i , t h = β h , 0 P o w e r μ i , t h + K h , 0 P o w e r γ i , q , t h , P o w e r + ∑ q = 1 Q i − 1 ( K h , q P o w e r − K h , q − 1 P o w e r ) γ i , q , t h , P o w e r ∀ h , i = 1 , … , N g , i ≠ h ; t = 1 , … , T
E i , t C O 2 ≤ μ i , t h · η h C O 2 α h , Q h P o w e r ∀ h , i = 1 , … , N g , i ≠ h ; t = 1 , … , T
E i , t C O 2 ≥ μ i , t h · η h C O 2 α h , 0 P o w e r ∀ h , i = 1 , … , N g , i ≠ h ; t = 1 , … , T
Table 2. Parameters of carbon emission–power generation utility model.
The objective function (14) minimizes the total intercept distance to obtain the lower bound of each γ i , q , t i , P o w e r . Constraint (15) is the carbon emission constraint for TPU i, where η i CO 2 denotes the carbon emission factor associated with the coal type used by TPU i. As specified in constraint (15), the coal consumption S h , t Coal is computed as E i , t C O 2 / η h CO 2 . It enables the conversion from the carbon emission of TPU i to the equivalent coal consumption of TPU h. Building on the conversion, constraints (16) and (17) in M 2 , similar to constraints (11) and (12) in M 1 , ensure that each E i , t h yields the attainable power generation of TPU h derived from the carbon emission E i , t CO 2 of the i-th TPU. In constraints (18) and (19), the binary variable u i , t h ∈ { 0 , 1 } represents the start-up or shut-down status of TPU h. Additionally, α h , Q h P o w e r and α h , 0 P o w e r denote the upper and lower limits of coal consumption for TPU h, determined by the technical output bounds P h g , max and P h g , min , respectively. The derivation of constraints in M 2 is presented in Appendix A.2, and the associated parameters are also listed in Appendix B Table A3.
In contrast to M 1 , model M 2 employs a piecewise linear relationship to inversely derive the power generation of others from the carbon emission of a given TPU. The joint modeling of M 1 and M 2 characterizes the carbon emission utility, i.e., deriving the coal consumption of TPU i, and exploring the power generation of other TPUs h ( ∀ h = 1 , … , N g , h ≠ i ) under the same carbon emission. Therefore, envy-free fair allocation constraints are established based on the variables E i , t C O 2 and E i , t h from the joint modeling of M 1 and M 2 .

3.2. Utility Game Process of Carbon Emission Based on Envy-Free Fairness

3.2.1. Strictly Envy-Free Carbon Emission Game

Generally, envy-free game [36] requires that every TPU prefers its own allocation P i , t g to that of others. Based on the carbon emission E i , t C O 2 derived from P i , t g , the attainable power generation E i , t h of TPU h ( h ≠ i ) should satisfy the following:
P i , t g ≥ E i , t h ∀ h , i = 1 , … , N g ; h ≠ i ; t = 1 , … , T
The strict envy-free requirement mandates that all TPUs satisfy inequality (20). However, strict envy-free allocations do not always exist [37,38,39,40], motivating a relaxed version of envy-freeness. The main idea is to allow a limited degree of envy within a tolerable range.

3.2.2. Almost Envy-Free Carbon Emission Game

Almost envy-free allocations center on two approaches: (1) all participants allow a tolerance ε [38,39], i.e., P i , t g ≥ E i , t h − ε , which is also referred to as ε -EF allocation; (2) each participant tolerates envy toward at most e others [40]. Therefore, the lower bound of inequality (20) is relaxed, leading to the following constraints:
P i , t g ≥ E i , t h − ε · ν h , t i ∀ h , i = 1 , … , N g ; h ≠ i ; t = 1 , … , T
∑ h = 1 , h ≠ i N g ν h , t i ≤ e ∀ i = 1 , … , N g ; t = 1 , … , T
In constraint (21), ν h , t i ∈ { 0 , 1 } is a binary variable indicating whether TPU i tolerates TPU h, and ε denotes the tolerable allocation difference. Constraint (22) further specifies that each TPU i tolerates at most e other TPUs. Together, constraints (21) and (22) constitute the almost envy-free carbon emission game constraints.

4. Economic Dispatch Model Considering Multi-Agent Carbon Emission Utility Game

This section constructs a day-ahead economic dispatch model incorporating wind power (WP), photovoltaic power (PV), and thermal power units (TPUs). Since WP and PV produce no carbon emissions, they do not participate in the carbon emission game. They enter the model as fixed power sources, with curtailment being the only decision made for them. Before proceeding, we define the superscripts g, w, v, D, u p , and d n as TPU, WP, PV, load demand, and the upward and downward flexible reserves of TPUs, respectively.

4.1. System Objective Functions

The day-ahead economic dispatch model (Model F) minimizes the total generation cost, which comprises coal consumption costs, WP and PV curtailment costs, and system reserve costs. The decision variable definitions and explanations are listed in Table 3.
Table 3. Decision variables of mixed integer programming model.
The model involves N g TPUs, N w WPs, and N v PVs as participants. Based on the decision variables defined in Table 3, the overall objective function is formulated in Equation (23). The objective function combines the objectives of the aforementioned models M 1 and M 2 , expressed as σ ∑ i = 1 N g ∑ q = 0 Q i − 1 ∑ t = 1 T ( γ i , q , t C o a l + ∑ h = 1 , h ≠ i N g γ i , q , t h , P o w e r ) , which guarantees valid values for the piecewise linear constraints.
Min F = ∑ i = 1 N g ∑ t = 1 T ( C i , t C o a l + C i , t u p + C i , t d n + C i , t o n + C i , t o f f ) + ∑ j = 1 N g ∑ t = 1 T C i , t w + ∑ k = 1 N v ∑ t = 1 T C k , t v + σ ∑ i = 1 N g ∑ q = 0 Q i − 1 ∑ t = 1 T ( γ i , q , t C o a l + ∑ h = 1 , h ≠ i N g γ i , q , t h , P o w e r )
Subject to
C i , t C o a l = p i C o a l · S i , t C o a l C i , t o n ≥ η i o n ( μ i , t − 1 g − μ i , t g ) C i , t o f f ≥ η i o f f ( μ i , t g − μ i , t − 1 g ) C i , t u p = φ i u p · R i , t u p C i , t d n = φ i d n · R i , t d n ∀ i = 1 , … , N g ; t = 1 , … , T
C j , t w = ω j w · P j , t w l o s s ∀ j = 1 , … , N w ; t = 1 , … , T C k , t v = ω k v · P k , t v l o s s ∀ k = 1 , … , N v ; t = 1 , … , T
Constraints (24) and (25) represent the cost constraints related to TPU coal consumption, start-up and shut-down, upward and downward reserves, and WP and PV curtailment. In constraint (24), p i Coal , φ i up , and φ i dn denote the coal price of TPU i and the cost coefficients for upward and downward reserves, respectively; η i on and η i off represent the start-up and shut-down costs of TPU i. In constraint (25), ω j w and ω k v denote the curtailment cost coefficients of WP j and PV k, respectively.

4.2. Game Constraints on Power–Coal Consumption and Carbon Emission Utility of Thermal Power Units

(1) Piece linear constraints for TPU’s power generation–coal consumption
Following inequalities (11)–(13), all constraints are adopted from model M 1 . These constraints (11)–(13) characterize the coupling relationship between power generation P i , t g and coal consumption S i , t C o a l , and ensure reliable calculation of coal consumption under various operating power levels.
(2) Carbon emission–power generation utility constraints
Following inequalities (15)–(19), all constraints are retained from model M 2 . These constraints (15)–(19) enable the mutual conversion between carbon emissions E i , t C O 2 and the equivalent generating power of other TPUs E i , t h ( h ≠ i ) , and reflect the cross-unit utilization correlation of carbon emission resources.
(3) Almost envy-free carbon emission game constraints
The preset game constraints (21) and (22) are retained to form carbon emission game constraints. These constraints (21) and (22) limit the preference deviation among TPUs to achieve reasonable and balanced load allocation.

4.3. Carbon Emission Constraints of Thermal Power Units

∑ t = 1 T E i , t C O 2 ≤ ∑ t = 1 T P i , t g A C O 2 ∀ i = 1 , … , N g
Constraint (26) enforces that the cumulative carbon emissions of each TPU over the entire dispatch horizon must not exceed its allocated emission allowance. The coefficient A CO 2 (t/MWh) represents the carbon quota assigned per unit of electricity generated, while the allowance is defined as the product of the unit’s total power output and the coefficient A CO 2 .

4.4. Technical Generation Constraints of Thermal Power Units

Since WP and PV do not generate carbon emissions and thus are not included as game participants, parameters P j , t w , P k , t v , and P t D denote the power output of WP j, the power output of PV k, and the total load demand at time period t, respectively. The power balance constraint for TPUs coordinated with renewable energy generation is given by Equation (27):
∑ i = 1 N g P i , t g + ∑ j = 1 N w ( P j , t w − P j , t w l o s s ) + ∑ k = 1 N v ( P k , t v − P k , t v l o s s ) = P t D ∀ t = 1 , … , T
where P i , t g , P j , t w l o s s , and P k , t v l o s s are decision variables representing the power generation of TPUs, the wind curtailment of WP, and the photovoltaic curtailment of PV in period t, respectively.
Constraints (28)–(30) encompass TPU start-up/shut-down constraints, upward/downward ramping constraints, and technical output constraints:
∑ r = t + 1 t + T i o n μ i , r g ≥ T i o n ( μ i , t + 1 g − μ i , t g ) ∀ i = 1 , … , N g ; t = 1 , … , T − T i o n − 1 ∑ r = t + 1 t + T i o f f ( 1 − μ i , r g ) ≥ T i o f f ( μ i , t g − μ i , t + 1 g ) ∀ i = 1 , … , N g ; t = 1 , … , T − T i o f f − 1
In constraint (28), μ i , t g ∈ { 0 , 1 } denotes the start-up/shut-down binary variable for TPU i at time t; T i on and T i off represent the minimum up and down time of TPU i, respectively. The terms ∑ r = t + 1 t + T i on μ i , r g and ∑ r = t + 1 t + T i off ( 1 − μ i , r g ) ensure that the start-up and shut-down decisions of TPU i within the intervals [ t + 1 , t + T i on ] and [ t + 1 , t + T i off ] satisfy the minimum up and down durations, respectively.
P i , t + 1 g − P i , t g ≤ Δ R i g , + P i , t g − P i , t + 1 g ≤ Δ R i g , − ∀ i = 1 , … , N g ; t = 1 , … , T − 1
P i , t g ≥ μ i , t g P i g , m i n P i , t g ≤ μ i , t g P i g , m a x ∀ i = 1 , … , N g ; t = 1 , … , T
In constraints (29), Δ R i g , + and Δ R i g , − denote the maximum upward and downward ramping rates of TPU i, respectively. These constraints limit the power variation between adjacent time periods to satisfy the actual regulation capability. Combined with the binary operating status variable μ i , t g , constraint (30) restricts the real-time power output to the feasible operational range, where P i g , min and P i g , max are the minimum and maximum technical outputs of TPU i, respectively.

4.5. System Flexible Reserve Constraints

The function for upward/downward flexible reserves is defined by the following:
R i , t u p = min ( Δ R i g , + , μ i , t g P i g , m a x − P i , t g ) R i , t d n = min ( Δ R i g , − , P i , t g − μ i , t g P i g , m i n ) ∀ i = 1 , … , N g ; t = 1 , … , T
Combined with start-up/shut-down decision variables, it is rewritten as constraint (31):
R i , t u p ≤ Δ R i g , + R i , t u p ≤ μ i , t g P i g , m a x − P i , t g R i , t d n ≤ Δ R i g , − R i , t d n ≤ P i , t g − μ i , t g P i g , m i n ∀ i = 1 , … , N g ; t = 1 , … , T
Furthermore, under confidence level β , the forecast output ranges of WP and PV generation are defined as [ P ̲ j , t w , P ¯ j , t w ] and [ P ̲ k , t v , P ¯ k , t v ] , respectively. The upward and downward flexible reserves should at least compensate for the aggregate output imbalance induced by the upper and lower bounds of these confidence intervals. Accordingly, the flexible reserve requirements are formulated in constraints (31) and (32):
∑ i = 1 N g R i , t d n ≥ ∑ j = 1 N w ( P j , t w ¯ − P j , t w l o s s ) + ∑ k = 1 N v ( P k , t v ¯ − P k , t v l o s s ) + ∑ i = 1 N g P i , t g − P t D ∑ i = 1 N g R i , t u p ≥ P t D − ∑ j = 1 N w P j , t w ̲ − ∑ k = 1 N v P k , t v ̲ − ∑ i = 1 N g P i , t g ∀ t = 1 , … , T

5. Case Study Analysis

5.1. Data Description

To validate the proposed models, actual operational data from a real-world power system are utilized. The system comprises five conventional thermal power units (TPUs), one wind power (WP) farm with an installed capacity of 1000 MW, and one photovoltaic (PV) station with an installed capacity of 680 MW. After data preprocessing and filtering, high-quality sample points are adopted to linearly fit the generation–coal consumption characteristics of TPUs. Comparative analysis is conducted with benchmark methods from existing studies, with results listed in Table 4. The K-means clustering algorithm is employed to reduce the number of scenarios for WP, PV, and load profiles. Daily scenarios are clustered based on nine statistical features: daily average, daily standard deviation, peak power, peak occurrence time, valley power, valley occurrence time, and mean outputs during morning (6:00–12:00), afternoon (12:00–18:00), and nighttime (0:00–6:00 and 18:00–24:00) periods. The detailed K-means clustering procedure is presented in Appendix B.1. Four representative scenarios are retained for the case study. The corresponding WP, PV, and load time-series curves are illustrated in Figure 1, while the key parameters of the TPUs are listed in Table A1.
Table 4. Comparison of MAE of power–coal consumption curve.
Figure 1. WP, PV and load curves: (a) WP output curve, (b) PV output curve, (c) load demand curve.
According to the “2023 and 2024 National Carbon Emission Trading Power Generation Industry Quota Total and Allocation Plan,” the power supply benchmark value for carbon quota allocation is 0.7910 t/MWh. Considering the impact of peak regulation on carbon emission intensity, the plan introduces a peak regulation correction coefficient of 1.015. Thus, A CO 2 = 1.015 × 0.7910 in constraint (26). The formulated models are linear and are solved using CPLEX 12.9.

5.2. Piecewise Linear Unit Comparison

Numerical experiments were conducted using the non-uniform piecewise linear unit (NPLU), uniform piecewise linear unit (PWLU) [20], and Quadratic Curve Fitting (QCF) [17] methods. The mean absolute error (MAE) is employed as the evaluation metric to assess the performance of each method.
As shown in Figure 2, Figure 2a–e present the fitting curves for TPUs 1–5, respectively. The horizontal axis represents power generation, and the vertical axis represents coal consumption. Comparing the fitting curves of NPLU, QCF, and PWLU, it can be observed that NPLU more accurately captures the trend of coal consumption variation across different power generation intervals. Table 4 lists the MAE values of the three methods, consistent with the results in Figure 2. The NPLU method outperforms the others in terms of MAE. Compared with PWLU, NPLU achieves lower MAE with differences ranging from 0.096 to 0.3056; compared with QCF, the MAE differences range from 0.0002 to 0.0196. The specific piecewise linear expressions are provided in Appendix B Table A2 and Table A3.
Figure 2. Piecewise linear units of power–coal consumption for TPUs: (a) Unit 1, (b) Unit 2, (c) Unit 3, (d) Unit 4, (e) Unit 5.

5.3. Economic Dispatch Optimization Model Verification and Comparison

Three dispatch approaches are compared across scenarios 1–4. The traditional dispatch without game (N–G) constraints serves as the baseline. The other two approaches incorporate carbon emission games: one based on the Aumann–Shapley value (A–S) [34], and the other following the almost envy-free criterion (E–F). The comparison encompasses economic indicators including coal cost, reserve cost, start–stop cost, and overall cost, as well as the WP and PV curtailment rate. The CO2 gini coefficient [41] is further adopted to quantify the fairness of carbon emission allocation among TPUs—a lower gini coefficient indicates a more equitable distribution. All results are summarized in Table 5.
Table 5. Comparisons under different scenarios.
As shown in Table 5, the WP and PV curtailment rates and costs are identical across all three methods. No curtailment occurs in scenarios 1–3, while scenario 4 exhibits a WP curtailment rate of 2.42% and a cost of 128,884.4¥, with PV curtailment remaining at zero throughout. In terms of total generation cost, N–G achieves the lowest overall cost in all scenarios. Compared to N–G, E–F increases the overall cost by 0.11%, 0.31%, 0.62%, and 1.37% in scenarios 1–4, while A–S leads to increases of 0.07%, 0.05%, 1.53%, and 1.75%, respectively. Between the two game-based methods, A–S achieves a lower cost than E–F in scenarios 1–2, whereas E–F outperforms A–S in the scenarios 3–4. Under N–G, the CO2 gini coefficients are 0.0628, 0.0561, 0.1835, and 0.1749 for scenarios 1–4. A–S reduces the values to 0.0624, 0.0513, 0.1520, and 0.1606, whereas E–F achieves a substantial reduction to 0.0166, 0.0210, 0.0795, and 0.0790. Thus, E–F consistently delivers fairness carbon emission allocation across all scenarios, with the advantage being particularly pronounced in the scenarios 3–4. In contrast, N–G exhibits the highest unfairness, and A–S offers a limited improvement.
In terms of the renewable energy penetration ratio, which is defined as
R E P R = ∑ t = 1 T ∑ j = 1 N w ( P j , t w − P j , t w l o s s ) + ∑ k = 1 N v ( P k , t v − P k , t v l o s s ) ∑ t = 1 T ∑ j = 1 N w ( P j , t w − P j , t w l o s s ) + ∑ k = 1 N v ( P k , t v − P k , t v l o s s ) + ∑ i = 1 N g P i , t g ,
the R E P R values are 4.23%, 20.40%, 34.98%, and 48.88% for scenarios 2, 1 (low-renewable energy) and 4, 3 (high-renewable energy), respectively, covering a meaningful range from low to high penetration. E–F consistently delivers fairer carbon emission allocation than A–S across the full range of renewable penetration levels, and its slight cost disadvantage under low-renewable penetration. Overall, the E–F game framework is robust across a range of renewable penetration levels. It is particularly well-suited to systems with higher renewable shares. In such systems, the tension between cost efficiency and emission fairness is most acute, and the method delivers a simultaneous improvement in both dimensions.

5.4. Multi-Agent Carbon Emission Utility Game Results and Analysis

Since the A–S method does not involve envy-based metrics, the subsequent analysis focuses on the envy-free mechanism of N–G and E–F. This section compares the results without the carbon emission game (N–G) and with the constraints (E–F). For E–F method, the tolerable output difference ε in constraint (21) is set to 1/4 of the maximum output, i.e., 90 MW; the tolerable number e is determined based on the principle that the output should exceed the majority, i.e., e = 2 . In each figure, subfigures (a) and (b) present the dispatch results of methods 1 and 2, respectively. Subfigures (c) and (d) illustrate the carbon emission utility game of the TPU most affected in each scenario. The bar chart shows the carbon emissions of TPU i, while the dashed lines denote the attainable power generation E i , t h when the same carbon emission resources are hypothetically reallocated to other TPUs h.
As shown in Figure 3a, TPU 3 is shut down from 0:00 to 7:00, whereas in Figure 3b, it remains operational from 0:00 to 23:00. Figure 3c,d illustrate the carbon emission utility game of TPU 3, the unit most affected in this scenario. In Figure 3c, the power generation of TPU 3 (solid green line) is substantially lower than the attainable power generation of TPUs 2, 4, and 5 (dashed lines) during the 8:00–17:00 period. According to the almost envy-free principle, TPU 3 envies TPUs 2, 4, and 5, revealing a fairness deficiency under the tolerable number e = 2 . In Figure 3d, the power generation of TPU 3 is reallocated such that the attainable power generation of TPUs 2, 4, and 5 is reduced during the 0:00–17:00 period. Most of these gaps fall within the predefined tolerance ε (90 MW). E–F achieves improved fairness without significantly increasing the total cost (see Table 5).
Figure 3. Dispatching results of scenario 1: (a) Dispatching results of N–G, (b) dispatching results of E–F, (c) carbon emission game of TPU 3 N–G, (d) carbon emission game of TPU 3 E–F.
Scenario 2 is characterized by limited WP/PV power generation and low load demand. In Figure 4a, TPU 3 is shut down from 0:00 to 5:00, while it remains operational throughout the entire 0:00–23:00 period in Figure 4b. In Figure 4c, the power generation of TPU 3 is substantially lower than the attainable power generation of TPUs 2–5 during the 8:00–15:00 period, meaning that TPU 3 envies TPUs 2–5 and revealing a fairness deficiency. According to the results of E–F (see Figure 4d), the power generation of TPU 3 is reduced through reallocation such that it surpasses TPUs 1 and 5, thereby satisfying the almost envy-free principle.
Figure 4. Dispatching results of scenario 2: (a) Dispatching results of N–G, (b) dispatching results of E–F, (c) carbon emission game of TPU 3 N–G, (d) carbon emission game of TPU 3 E–F.
Scenario 3 is characterized by high-WP/PV power generation and low load demand. In Figure 5a, the abundant renewable generation forces TPUs 3 and 4 to shut down at 0:00 and 19:00, respectively. As shown in Figure 5b, the game constraints further induce the shut-down of TPU 3 (from 10:00 to 14:00) and TPU 4 (from 19:00 to 23:00), while other TPUs maintain the same schedule as in Figure 5a. In the N–G result (Figure 5c), TPU 3 envies TPUs 3–5 during the 5:00–9:00 period. In the E–F result (Figure 5d), TPU 3 extends its operational period to cover 0:00–4:00 and 15:00–23:00, while remaining shut down during the 10:00–14:00 period. Moreover, the power generation of TPU 3 is reallocated such that it outperforms TPUs 1 and 5 during the 4:00–9:00 period, thereby satisfying the envy-free constraint (22).
Figure 5. Dispatching results of the scenario 3: (a) Dispatching results of N–G, (b) dispatching results of E–F, (c) carbon emission game of TPU 3 N–G, (d) carbon emission game of TPU 3 E–F.
Scenario 4 represents the extreme high-renewable, low-load condition. Figure 6a,b illustrate that the WP remains at a high-output state from 0:00 to 4:00, forcing TPUs 3 and 4 to shut down, while TPUs 1, 2, and 5 continue to provide peak regulation and reserve support. A counterintuitive observation is that, at 3:00, shutting down one or two of TPUs 1, 2, and 5 could further reduce WP curtailment by 103.16 MWh. However, the minimum start-up and shut-down durations of the three TPUs (see constraint (28) and Table A1: 6 h, 6 h, and 5 h) make such an adjustment infeasible, leaving the curtailment irreducible during this period. The WP curtailment during 00:00–04:00 is 231.30 MWh, corresponding to a curtailment rate of 2.41%. Figure 6c shows that TPU 3 envies TPUs 2, 4, and 5 during the 8:00–11:00 period, with the maximum gap reaching 92.6 MW, exceeding the tolerable ε = 90 MW. In contrast, under E–F (Figure 6d), TPU 3 extends its operational period to cover 14:00–23:00 (compared to 7:00–13:00 in Figure 6c) and elevates its generation output through reallocation. Furthermore, the gap between TPU 3’s power generation and the maximum attainable power generation is reduced to 88.0 MW.
Figure 6. Dispatching results of the scenario 4: (a) Dispatching results of N–G, (b) dispatching results of E–F, (c) carbon emission game of TPU 3 N–G, (d) carbon emission game of TPU 3 E–F.
Table 6 compares the metrics of all non-compliant TPUs obtained by N–G and E–F. Under N–G, the EFs value of all TPUs fall between 3 and 4, exceeding the permissible threshold e = 2 . By introducing game-based constraints, the EFs value in all cases are strictly limited to 2. TPU 3 is the only unit that violates both criteria. Its maximum gaps reach 91.67 MW, 93.80 MW, and 92.58 MW in scenarios 1, 2, and 4, respectively, all exceeding the limit ε = 90 MW. For the E–F method, all maximum gaps are controlled within 90 MW. From a temporal perspective, violations of TPU 1 occur throughout the entire 24-h period in all scenarios, which is attributed to its inherently high coal consumption efficiency. In contrast, violations of TPU 3 are concentrated during daytime and evening peak load hours, such as 9:00–16:00 in scenario 1 and 8:00–11:00 in scenario 4, revealing that unfairness is exacerbated under high load demand conditions. TPU 4 and TPU 5 only experience occasional single-hour violations during off-peak periods, with gaps far below ε . In summary, the proposed game mechanism effectively restricts EFs value and completely eliminates all gaps beyond the prescribed limit.
Table 6. Comparison of ε -EF constraint metrics under N–G and E–F.

5.5. Sensitivity Analysis of the Tolerable Parameters

Table 7 reports the overall cost and the increase rate under each feasible ( e , ε ) combination. Each combination lists two metrics: the overall cost (in ¥) and the cost increase percentage. Note that under combination ( e = 4 , ε = 135 ) , the game constraints impose negligible restrictions, and the dispatch outcomes match those of N–G (see Table 5). Therefore, this combination is adopted as the baseline, which leads to 0.00% cost increase percentages. All other rows report the cost increase percentages relative to this combination.
Table 7. Overall cost increase under feasible ( e , ε ) combinations.
Combinations with e = 1 are infeasible and are not listed in the table. Similarly, ε = 45 MW yields no feasible solution for any e. The model becomes feasible only from ( e = 2 , ε = 90 ) onward. Comparing the cost increase rates across different e values at the same ε reveals that e exerts a discernible influence. In contrast, varying ε at a fixed e produces only marginal changes, with differences typically within 0.01–0.02% (except for the transition from ( e = 2 , ε = 90 ) to ( e = 2 , ε = 135 ) ). Overall, the almost envy-free carbon emission game constraints (21) and (22) incur only slight cost increases—below 1.5% in the most affected scenarios. Accordingly, the combination ( e = 2 , ε = 90 ) is adopted, as it maximizes fairness while ensuring computational tractability.

6. Conclusions

This paper proposes an economic dispatch model for power systems integrated with thermal power units (TPUs). The model incorporates multi-agent carbon emission utility games through piecewise linear fitting of unit power–coal consumption characteristics. Typical case studies verify the superiority of the proposed model, and the main conclusions are drawn as follows:
(1) A piecewise linear fitting integer programming model and its equivalent standard linear programming form are developed. Computational results demonstrate that the model accurately characterizes the dynamic relationship between TPU power generation–coal consumption and carbon emission utility. The equivalent linear programming model exhibits strong generalization performance.
(2) The envy-free principle and the standard ε -EF allocation rule are introduced to construct multi-agent carbon emission utility game constraints for TPUs. Verification results indicate that the game mechanism only slightly increases the total generation cost by 0.11–1.39%. Meanwhile, it balances carbon emission utility across TPUs and enhances the fairness in sharing the responsibility for emission reduction.
(3) After scenario reduction of wind, photovoltaic, and load data, the established mixed-integer programming economic dispatch model demonstrates strong adaptability to various operating scenarios. The model optimizes the power generation allocation of TPUs and ensures optimal economic operation while satisfying all source–load power balance constraints.

Author Contributions

Conceptualization, J.G.; Writing—original draft preparation, J.G.; methodology, J.G.; software, W.G.; data curation, Y.X.; writing—review and editing, W.G.; visualization, W.G.; project administration, J.G.; funding acquisition, J.G., supervision, H.W. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the Postdoctoral Fellowship Program of CPSF (no. GZC20230790), the Fundamental Research Funds for the Central Universities (no. 2024MS028), the China Postdoctoral Science Foundation (no. 2024M750894).

Institutional Review Board Statement

Not applicable.

Data Availability Statement

Some of the data are provided in Appendix A and Appendix B. The raw data supporting the conclusions of this article will be made available by the authors on request.

Conflicts of Interest

The authors declare no conflicts of interest.

Appendix A

Appendix A.1. The Derivation of Constraints (12) and (13) in M1

As shown in Figure A1, the piecewise linear segments have boundary points, such as α i , 0 C o a l , α i , 1 C o a l , …, α i , q C o a l . Let variable γ i , q , t C o a l ≥ 0 represents the distance between power generation P i , t g and boundary point α i , q C o a l . Obviously, if P i , t g − α i , q C o a l > 0 , the objective (10) of M 1 leads to γ i , q , t C o a l = P i , t g − α i , q C o a l ; otherwise, it leads to γ i , q , t C o a l = 0 . For example, when P i , t g lies between α i , 2 C o a l and α i , 3 C o a l , it can be seen the relationships ➀, ➁ and ➂ in Figure A1. Furthermore, γ i , q , t C o a l = 0 holds for all q ≥ 3 , which also demonstrates that γ i , q − 1 , t C o a l − γ i , q , t C o a l = 0 when q ≥ 4 . Based on the explanation of constraint (11), Figure A2 shows the details of constraints (12).
Figure A1. Schematic diagram of constraint (11) in model M 1 .
For each piecewise linear segment, it satisfies the trigonometric functions. Therefore, no matter which segment the power generation P i , t g lies on, see Figure A2, its vertical height always satisfies K i , 0 C o a l ( γ i , 0 , t C o a l − γ i , 1 , t C o a l ) + K i , 1 C o a l ( γ i , 1 , t C o a l − γ i , 2 , t C o a l ) + … + K i , Q i − 1 C o a l ( γ i , Q i − 1 , t C o a l − γ i , Q i , t C o a l ) . Because α i , Q i C o a l is the last boundary point, and it always holds P i , t g − α i , Q i C o a l ≤ 0 , which leads to γ i , Q i , t C o a l = 0 . Therefore, the formula can be rearranged as K i , 0 C o a l γ i , 0 , t C o a l + ( − K i , 0 C o a l + K i , 1 C o a l ) γ i , 1 , t C o a l + ( − K i , 1 C o a l + K i , 2 C o a l ) γ i , 2 , t C o a l + … + ( − K i , Q i − 2 C o a l + K i , Q i − 1 C o a l ) γ i , Q i − 1 , t C o a l . Accordingly, it can be reformulated as K i , 0 C o a l γ i , 0 , t C o a l + ∑ q = 1 Q i − 1 ( K i , q C o a l − K i , q − 1 C o a l ) γ i , q , t C o a l . Considering the operating state of the i-th TPU μ i , t g ∈ { 0 , 1 } , the piecewise linear formulation between power and coal consumption can be expressed as S i , t C o a l = β i , 0 C o a l μ i , t g + K i , 0 C o a l γ i , 0 , t C o a l + ∑ q = 1 Q i − 1 ( K i , q C o a l − K i , q − 1 C o a l ) γ i , q , t C o a l . In summary, constraints (11) and (12) realize the mapping from power generation P i , t g to coal consumption S i , t C o a l in MIP model.
Figure A2. Schematic diagram of constraint (12) in model M 1 .

Appendix A.2. The Derivation of Constraints in M2

As shown in Figure A3, the horizontal and vertical coordinate of M 2 are opposite to M 1 . With this value setting, the power generation can be obtained inversely from coal consumption in the MIP model. For the i-th TPU, the corresponding carbon emission is E i , t C O 2 . Thus, based on E i , t C O 2 , the coal consumption of the h-th TPU is E i , t C O 2 / η h C O 2 , and constraints (16) and (17) are formulated to derive the power generation E i , t h of the h-th TPU (see cases (1)–(2) in Figure A3).
Figure A3. Schematic diagram of constraints in model M 2 .

Appendix B

Appendix B.1. K-Means Algorithm for Load Profiles, Wind Power and Photovoltaic Power

For any time series S of load profiles, wind power (WP) or photovoltaic power (PV) output, it can be divided into N sub-time series at 24-h intervals, i.e., S i = [ P i , 1 , P i , 2 , … , P i , 24 ] , i = 1 , 2 , … , N , where P i , t is the power output of WP or PV in i-th scene at time period t. For each S i , there are nine-dimensional quantitative features. The definitions of features are as follows:
F ˜ i = F ˜ i 1 = 1 24 ∑ t = 1 24 P i , t , F ˜ i 2 = 1 24 ∑ t = 1 24 ( P i , t − F i 1 ) 2 F ˜ i 3 = max ( P i , t ) , F ˜ i 4 = arg max ( P i , t ) F ˜ i 5 = min ( P i , t ) , F ˜ i 6 = arg min ( P i , t ) F ˜ i 7 = 1 6 ∑ t = 6 12 P i , t , F ˜ i 8 = 1 6 ∑ t = 12 18 P i , t F ˜ i 9 = 1 12 ∑ t = 1 6 P i , t + ∑ t = 18 24 P i , t
where F ˜ i = [ F ˜ i 1 , F ˜ i 2 , … , F ˜ i 9 ] represents daily average, daily standard deviation, peak power, peak occurrence time, the valley value, the valley time, the morning average (6:00–12:00), the afternoon average (12:00–18:00) and the nighttime average (0:00–6:00, 18:00–24:00), respectively.
It clusters daily scenarios based on nine statistical features, including daily average, daily standard deviation, the peak power, the peak occurrence time, the valley power, the valley occurrence time, as well as mean outputs of the morning (6:00–12:00), the afternoon (12:00–18:00) and the nighttime (0:00–6:00, 18:00–24:00) periods. Since these features are measured in different units, the scale discrepancy needs to be eliminated:
F i , j = F ˜ i , j − min 1 ≤ i ≤ N ( F ˜ i , j ) max 1 ≤ i ≤ N ( F ˜ i , j ) − min 1 ≤ i ≤ N ( F ˜ i , j )
The normalized feature vector of the i-th daily scenario is then expressed as F i = [ F i , 1 , F i , 2 , … , F i , 9 ] .
Considering the preset cluster number K, the K-Means algorithm optimizes the sum of squared errors to realize feature aggregation:
min J = ∑ k = 1 K ∑ F i ∈ C k ∥ F i − μ k ∥ 2 2
where C k denotes the k-th cluster; μ k is the centroid of the k-th cluster; ∥ · ∥ 2 represents the euclidean norm.
Within each cluster, the typical time serie S k ∗ is determined by minimizing the euclidean distance between sample features F i and the cluster centroid μ k :
S k ∗ = arg min S i ∈ C k ∥ F i − μ k ∥ 2 2
In the dispatch models, the four representative scenarios are treated with equal weight, each representing an equally valid typical operational day.

Appendix B.2. Parameters of Thermal Power Unit

Table A1. Major technical indicators of TPUs.
Associated with model M 1 , the parameters of piecewise linear for power generation–coal consumption are given by Table A2.
Table A2. Parameters of piecewise linear segments in M 1 .
Associated with model M 2 , the parameters of piecewise linear for carbon emission–power generation are listed by Table A3.
Table A3. Parameters of piecewise linear segments in M 2 .

Appendix B.3. Methods for Comparisons

  • (1) Formulation of Aumann–Shapley based game
In the carbon emission allocation game, each TPU is a participant, and the system total carbon emission c ( · ) is the cost to be allocated. The Aumann–Shapley (A–S) value of TPU i at time t is defined as by a discrete summation with M equal segments:
X i , t AS = P i , t g · ∑ m = 1 M c m M P t g + Δ P i − c m M P t g M · Δ P
where M = 200 , Δ P i = 1 MW is the perturbation step. Here P t g = [ P 1 , t g , P 2 , t g , … , P N g , t g ] denotes the vector of all TPU outputs at time t, while each term in the summation evaluates the incremental carbon emission attributable to TPU i. The time-averaged A–S value of each TPU is normalized to obtain the carbon responsibility ratio ρ i :
ρ i = 1 T ∑ t = 1 T X i , t AS ∑ j = 1 N g 1 T ∑ t = 1 T X j , t AS
where ρ i ∈ [ 0 , 1 ] represents the share of system-wide carbon emission responsibility assigned to TPU i, and ∑ i = 1 N g ρ i = 1 .
The carbon responsibility ratios ρ i are incorporated into the economic dispatch model (Model F) as fairness constraints:
∑ t = 1 T E i , t C O 2 − ρ i · A C O 2 · ∑ j = 1 N g ∑ t = 1 T P j , t g ≤ β i ∀ i = 1 , … , N g
Constraint (A7) enforces that the cumulative carbon emission of TPU i must not exceed its A–S fair share of the total system emission benchmark. The slack variable β i ≥ 0 permits bounded violations, which are penalized in the objective with weight λ :
min ( 23 ) + λ ∑ i = 1 N g β i
Replacing the ε -EF game constraints (21) and (22) in Model F with (A7) and (A8) yields the A–S based game model F for comparison. In the formulation, (A7) is a linear constraint and is solved jointly with the MIP model, whereas (A5) and (A6) are nonlinear and must be evaluated externally to obtain ρ i before each MIP call. Thus, an iteration must be adopted, ρ i is computed from the dispatch P i , t g via (A5) and (A6), yet the dispatch is constrained by ρ i via (A7). The iterative procedure consists of the following steps:
Step 1: 
Solve model F without the A–S fairness constraints (A7) and (A8) to obtain the initial dispatch P i , t g , ( 0 ) . Compute the initial carbon responsibility ratios ρ i ( 0 ) from P i , t g , ( 0 ) via (A5) and (A6). Set k = 0 , go to Step 2.
Step 2: 
With the current ratios ρ i ( k ) , update the corresponding parameter of constraint (A7) in the A–S based game model F . Solve the resulting MIP to obtain the new dispatch P i , t g , ( k + 1 ) , go to Step 3.
Step 3: 
From the dispatch P i , t g , ( k + 1 ) , compute the updated carbon responsibility ratios ρ i ( k + 1 ) via (A5) and (A6), go to Step 4.
Step 4: 
If
max 1 ≤ i ≤ N g ρ i ( k + 1 ) − ρ i ( k ) < τ
with τ = 10 − 3 , the iteration terminates. Otherwise, set k ← k + 1 and go to Step 2.
  • (2) Formulation of CO2 gini coefficient
Let E i = ∑ t = 1 T E i , t C O 2 denote the cumulative carbon emission of TPU i. Sort the values in ascending order:
E ( 1 ) ≤ E ( 2 ) ≤ ⋯ ≤ E ( N g ) .
The Lorenz curve plots the cumulative share of emissions against the cumulative share of TPUs. The Gini coefficient G is then
G = 2 ∑ i = 1 N g i · E ( i ) N g ∑ i = 1 N g E ( i ) − N g + 1 N g .
with G ∈ [ 0 , 1 ] , where G = 0 corresponds to perfect equality (all TPUs emit the same amount of CO2) and G = 1 corresponds to extreme inequality. A lower G thus indicates a fairer emission distribution.

References

  1. Yin, G.; Wang, B.; Duan, M.; Kuang, Y. Integrating more renewable electricity into the power system may increase carbon emissions. Sustain. Energy Technol. Assess. 2022, 49, 101796. [Google Scholar] [CrossRef] [Scilit]
  2. Tong, J.; Liu, W.; Mao, J.; Ying, M. Role and Development of Thermal Power Units in New Power Systems. IEEE J. Radio Freq. Identif. 2022, 6, 837–841. [Google Scholar] [CrossRef] [Scilit]
  3. Said, M.; Houssein, E.H.; Aldakheel, E.A.; Khafaga, D.S.; Ismaeel, A.A.K. Performance of the Walrus Optimizer for solving an economic load dispatch problem. AIMS Math. 2024, 9, 10095–10120. [Google Scholar] [CrossRef] [Scilit]
  4. Jain, A.K.; Gidwani, L. Dynamic economic load dispatch in microgrid using hybrid moth-flame optimization algorithm. Electr. Eng. 2024, 106, 3721–3741. [Google Scholar] [CrossRef] [Scilit]
  5. Yan, S.; Lv, C.; Yao, L.; Hu, Z.; Wang, F. Hybrid Dynamic Coal Blending Method to Address Multiple Environmental Objectives Under a Carbon Emissions Allocation Mechanism. Energy 2022, 254, 124297. [Google Scholar] [CrossRef] [Scilit]
  6. Acharya, S.; Ganesan, S.; Kumar, D.V.; Subramanian, S. Optimization of cost and emission for dynamic load dispatch problem with hybrid renewable energy sources. Soft Comput. 2023, 27, 14969–15001. [Google Scholar] [CrossRef] [Scilit]
  7. Nehrir, M.H.; Wang, C.; Strunz, K.; Aki, H.; Ramakumar, R.; Bing, J.; Miao, Z.; Salameh, Z. A Review of Hybrid Renewable/Alternative Energy Systems for Electric Power Generation: Configurations, Control, and Applications. IEEE Trans. Sustain. Energy 2011, 2, 392–403. [Google Scholar] [CrossRef] [Scilit]
  8. Ding, N.; Guo, P.; Xi, Y.; Zhang, A.; Lei, X. Low-carbon development in power systems based on carbon emission analysis models: A comprehensive review. Sustain. Energy Technol. Assess. 2024, 65, 103774. [Google Scholar] [CrossRef] [Scilit]
  9. Yu, G.; Zhang, Z.; Cui, G.; Dong, Q.; Wang, S.; Li, X.; Shen, L.; Yan, H. Low-carbon economic dispatching strategy based on feasible region of cooperative interaction between wind-storage system and carbon capture power plant. Renew. Energy 2024, 228, 120706. [Google Scholar] [CrossRef] [Scilit]
  10. Wang, Z.; Qi, Y.; Wang, R.; Ren, S.; Wu, J. Optimization of Low-Carbon Integrated Energy Systems with Efficient Hydrogen Use and Flexible CCPP-MR-HCHP Operations. Int. Trans. Electr. Energy Syst. 2025, 2025, 1924852. [Google Scholar] [CrossRef] [Scilit]
  11. Carrion, M.; Arroyo, J. A Computationally Efficient Mixed-Integer Linear Formulation for the Thermal Unit Commitment Problem. IEEE Trans. Power Syst. 2006, 21, 1371–1378. [Google Scholar] [CrossRef] [Scilit]
  12. Chen, Z.; Cen, B.; Zhao, J.; Wu, H.; Wang, H.; Fu, Z. Optimal Dispatch Model for Hybrid Energy Storage in Low-Carbon Integrated Energy Systems. Energies 2025, 18, 5797. [Google Scholar] [CrossRef] [Scilit]
  13. Han, H.; Wei, T.; Wu, C.; Xu, X.; Zang, H.; Sun, G.; Wei, Z. A Low-Carbon Dispatch Strategy for Power Systems Considering Flexible Demand Response and Energy Storage. Front. Energy Res. 2022, 10, 883602. [Google Scholar] [CrossRef] [Scilit]
  14. Wang, J.; Ji, X.; Meng, X.; Bai, Y.; Li, M. Low-carbon economic dispatch of integrated energy system with carbon capture power plant and multiple utilization of hydrogen energy. Front. Energy Res. 2025, 12, 1447858. [Google Scholar] [CrossRef] [Scilit]
  15. Wang, Y.; Wang, Y.; Liu, C.; Fang, Y.; Cai, G.; Ge, W. Auxiliary Service Dynamic Compensation Mechanism Design for Incentivizing Market Participants to Provide Flexibility in China. Prot. Control Mod. Power Syst. 2024, 9, 112–128. [Google Scholar] [CrossRef] [Scilit]
  16. Yan, Y.; Chang, H.; Yan, J.; Li, L.; Liu, C.; Xiang, K.; Liu, Y. Benchmarking and contribution analysis of carbon emission reduction for renewable power systems considering multi-factor coupling. Energy 2024, 302, 131674. [Google Scholar] [CrossRef] [Scilit]
  17. Albalawi, H.; Wadood, A.; Park, H. Economic Load Dispatch Problem Analysis Based on Modified Moth Flame Optimizer (MMFO) Considering Emission and Wind Power. Mathematics 2024, 12, 3326. [Google Scholar] [CrossRef] [Scilit]
  18. Lei, C.; Bu, S.; Wang, Q.; Chen, Q.; Yang, L.; Chi, Y. Look-Ahead Rolling Economic Dispatch Approach for Wind-Thermal-Bundled Power System Considering Dynamic Ramping and Flexible Load Transfer Strategy. IEEE Trans. Power Syst. 2024, 39, 186–202. [Google Scholar] [CrossRef] [Scilit]
  19. Fitri, I.R.; Kim, J.S. Priority-Considered Load Shedding in Economic Dispatch: Distributed Optimization Approach. IEEE Trans. Control Netw. Syst. 2023, 10, 1400–1411. [Google Scholar] [CrossRef] [Scilit]
  20. Zhu, Z.; Zhou, Y.; Dong, Y.; Zhong, Z. PWLU: Learning Specialized Activation Functions with the Piecewise Linear Unit. IEEE Trans. Pattern Anal. Mach. Intell. 2023, 45, 12269–12286. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  21. Warwicker, J.A.; Rebennack, S. A Comparison of Two Mixed-Integer Linear Programs for Piecewise Linear Function Fitting. Inf. J. Comput. 2022, 34, 1042–1047. [Google Scholar] [CrossRef] [Scilit]
  22. Rebennack, S.; Krasko, V. Piecewise Linear Function Fitting via Mixed-Integer Linear Programming. INFORMS J. Comput. 2020, 32, 507–530. [Google Scholar] [CrossRef] [Scilit]
  23. Kong, L.; Maravelias, C.T. On the Derivation of Continuous Piecewise Linear Approximating Functions. INFORMS J. Comput. 2020, 32, 531–546. [Google Scholar] [CrossRef] [Scilit]
  24. Dong, J.; Li, Y.; Lu, Y.; Han, S. Accuracy study of linearization methods for quadratic cost curves of thermal units in unit commitment problems. IET Gener. Transm. Distrib. 2022, 16, 2198–2207. [Google Scholar] [CrossRef] [Scilit]
  25. Ngueveu, S.U. Piecewise linear bounding of univariate nonlinear functions and resulting mixed integer linear programming-based solution methods. Eur. J. Oper. Res. 2019, 275, 1058–1071. [Google Scholar] [CrossRef] [Scilit]
  26. Zheng, J.H.; Liang, Z.T.; Li, Z.; Wang, F.; Wu, Q.H. Online coal consumption characteristics fitting for daily economic dispatch using a data-driven hybrid sequential model. Appl. Energy 2023, 341, 121127. [Google Scholar] [CrossRef] [Scilit]
  27. Liu, J.; Zhao, H.; Wang, S.; Liu, G.; Zhao, J.; Dong, Z.Y. Real-time emission and cost estimation based on unit-level dynamic carbon emission factor. Energy Convers. Econ. 2023, 4, 47–60. [Google Scholar] [CrossRef] [Scilit]
  28. Zhang, S.; Hu, W.; Cao, X.; Du, J.; Bai, C.; Liu, W.; Tang, M.; Zhan, W.; Chen, Z. Low-carbon economic dispatch strategy for interconnected multi-energy microgrids considering carbon emission accounting and profit allocation. Sustain. Cities Soc. 2023, 99, 104987. [Google Scholar] [CrossRef] [Scilit]
  29. Li, L.L.; Miao, Y.; Lim, M.K.; Sethanan, K.; Tseng, M.L. Integrated energy system for low-carbon economic operation optimization: Pareto compromise programming and master-slave game. Renew. Energy 2024, 222, 119946. [Google Scholar] [CrossRef] [Scilit]
  30. Yan, Y.; Xie, S.; Tang, J.; Qian, B.; Lin, X.; Zhang, F. Transaction strategy of virtual power plants and multi-energy systems with multi-agent Stackelberg game based on integrated energy-carbon pricing. Front. Energy Res. 2024, 12, 1459667. [Google Scholar] [CrossRef] [Scilit]
  31. Wang, X.; Zhao, X.; Yang, Y.; Shao, Y.; Zhang, L.; Ni, Y.; Pan, J.; Zhang, Y.; Zheng, C.; Gao, X. Comprehensive analysis of carbon emission reduction technologies (CRTs) in China’s coal-fired power sector: A bottom-up approach. Renew. Sustain. Energy Rev. 2024, 202, 114696. [Google Scholar] [CrossRef] [Scilit]
  32. Gao, S.; Jiang, W.; Yang, J.; Sui, Z.; Wei, C.; Lu, B. Optimal dispatch of electricity considering shared source-load carbon responsibility. Electr. Power Syst. Res. 2023, 217, 109135. [Google Scholar] [CrossRef] [Scilit]
  33. Wang, B.J.; Zhao, J.L.; Wei, Y.X. Carbon emission quota allocating on coal and electric power enterprises under carbon trading pilot in China: Mathematical formulation and solution technique. J. Clean. Prod. 2019, 239, 118104. [Google Scholar] [CrossRef] [Scilit]
  34. Nan, J.; Feng, J.; Deng, X.; Wang, C.; Sun, K.; Zhou, H. Hierarchical Low-Carbon Economic Dispatch with Source-Load Bilateral Carbon-Trading Based on Aumann–Shapley Method. Energies 2022, 15, 5359. [Google Scholar] [CrossRef] [Scilit]
  35. Amanatidis, G.; Aziz, H.; Birmpas, G.; Filos-Ratsikas, A.; Li, B.; Moulin, H.; Voudouris, A.A.; Wu, X. Fair division of indivisible goods: Recent progress and open questions. Artif. Intell. 2023, 322, 103965. [Google Scholar] [CrossRef] [Scilit]
  36. Bei, X.; Lu, X.; Suksompong, W. Truthful cake sharing. Soc. Choice Welf. 2025, 64, 309–343. [Google Scholar] [CrossRef] [Scilit]
  37. Amanatidis, G.; Birmpas, G.; Filos-Ratsikas, A.; Hollender, A.; Voudouris, A.A. Maximum Nash welfare and other stories about EFX. Theor. Comput. Sci. 2021, 863, 69–85. [Google Scholar] [CrossRef] [Scilit]
  38. Yuen, S.M.; Suksompong, W. Approximate envy-freeness in graphical cake cutting. Discret. Appl. Math. 2024, 357, 112–131. [Google Scholar] [CrossRef] [Scilit]
  39. Hollender, A.; Rubinstein, A. Envy-Free Cake-Cutting for Four Agents. J. ACM 2025, 72, 1–54. [Google Scholar] [CrossRef] [Scilit]
  40. Chaudhury, B.R.; Kavitha, T.; Mehlhorn, K.; Sgouritsa, A. A Little Charity Guarantees Almost Envy-Freeness. SIAM J. Comput. 2026, 50, 1336–1358. [Google Scholar] [CrossRef] [Scilit]
  41. Zhang, N.; Zhang, M.; Sun, L.; Hu, J.; Li, J.; Li, W. An Annual Electric Energy Trade Scheduling Model under the Dual Track Mode. Energies 2022, 15, 5075. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.