Abstract
Studies of rural housing on collapsible loess have documented wetting-induced settlement and seismic damage. A practical question remains: how can building inspections and household reports guide preventive maintenance where drought, rewetting, and earthquake shaking may all affect serviceability? We examined a housing renovation project in Awati Township, Kashi, China, using inspections of 27 dwellings, interviews and questionnaires from 156 households, and 12 months of participant observation. Project records show that response time for design changes fell from 7.2 to 2.1 days, reported defect incidence declined from 46.8% to 26.4%, and overall household satisfaction rose from 61.3% to 92.6%. The inspections identified settlement, masonry cracking, and connection defects as monitoring priorities. Only 14 of the 156 surveyed households reported keeping housing condition records. We used these findings to propose a four-dimensional resilience framework and three operation and maintenance (O&M) tiers for assigning inspections and prioritizing repairs. The before-and-after comparisons describe changes in this project. The proposed damage sequence and maintenance tiers require independent validation.
1. Introduction
Earthquake shaking can damage masonry walls, structural connections, and foundations. Drought can dry the near-surface soil and promote fissuring in loess, and subsequent wetting under load can cause collapsible loess to settle [1,2,3,4,5]. Cracking, tilting, and differential settlement can disrupt occupancy and increase repair needs. Post-earthquake studies in Morocco and Nepal illustrate how building type and structural detailing influence the damage observed [6,7].
Before a disaster, residents and project personnel can record building conditions, assign inspection and reporting responsibilities, and plan repairs before defects worsen. Household and building surveys after Nepal’s Gorkha earthquake documented the adoption of earthquake-resistant practices and compliance with reconstruction requirements [8,9]. Here we consider seismic loading alongside drought-related drying and subsequent rewetting. The interaction among these hazards is a working hypothesis for the study dwellings [2,4,10,11]. O&M covers construction handover, building use, inspection, maintenance, repair, and renewal [12,13]. The ability to adapt and recover also depends on social, economic, and institutional resources [14,15]. Chinese rural housing policy emphasizes assigning responsibilities and involving residents [16].
Laboratory and shaking-table studies have examined moisture-sensitive loess behavior and the seismic performance of earthen dwellings [3,4,5,17,18,19,20]. Foundation codes provide design guidance [1,21]. Renovation studies compare design alternatives using life-cycle criteria [22,23], and multi-hazard studies estimate damage and interruptions to building services [24,25]. Studies on housing renewal, resident participation, local construction, and stakeholder management inform how building condition can be documented and communicated [26,27,28,29,30,31,32]. Post-earthquake surveys in Jishishan document vulnerabilities in rural construction [33,34]. The question for O&M is how to combine observations of foundation and structural performance with household reports and local capacity to decide which defects to address first.
The renovation project in Awati Township provided access to building inspections, household feedback, and project records. We used these sources to describe dwelling defects and baseline maintenance practices, compare reported indicators before and after renovation, and propose resilience measures and inspection priorities. The comparisons apply to the project as a whole.
Quantitative resilience models relate changes in functionality and recovery over time to risk-reduction decisions [35,36]. The Awati case complements this work by showing how condition records and household reports can guide what to inspect, who reports defects, and how to allocate inspection resources. Section 1.1 and Section 1.2 explain how the framework incorporates local construction practices, household needs, and stakeholder responsibilities.
1.1. Conceptual Framework
Rural dwellings on collapsible loess may experience progressive settlement, wall cracking, and recurring maintenance problems as soil moisture varies and seismic shaking occurs. Single-hazard assessments and standardized renovation programs may overlook how local construction practices and residents’ needs affect maintenance. The framework proposes that engineering safety, local construction knowledge, and household preferences inform stakeholder coordination and O&M performance. It treats environmental and social conditions as factors that may influence these relationships. Reviews of social resilience emphasize that the relevance of household and community indicators varies by context [37,38].
The framework draws on life-cycle management and cost analysis [12,13], community resilience and multi-hazard performance assessment [3,14,39], local construction and housing renewal [20,26,28,29], community participation in post-disaster reconstruction [27,40], and stakeholder and place-based resilience frameworks [15,32]. Research on community-based reconstruction also identifies barriers to resident participation [41]. Digital twins could help integrate records for future condition monitoring [31].
1.2. Working Hypotheses
We chose hypotheses that connect three concerns observed in the project to maintenance decisions: structural defects, the suitability of local construction practices, and household participation. Table 1 lists the rationale for each hypothesis and the evidence needed to assess it. H2 concerns stakeholder coordination, H3 addresses local conditions, and H4 considers transfer to other sites. The available records support descriptive comparisons. Formal tests of mediation and moderation would require linked or comparative data, and evaluating transferability would require independent sites.
Table 1.
Working hypotheses, rationale, and case-study evidence.
Figure 1 summarizes the proposed relationships among local conditions, renovation inputs, stakeholder coordination, and O&M outcomes.
Figure 1.
Proposed relationships among regional context, renovation inputs, stakeholder coordination, and O&M outcomes. Flow chart showing a process with four labeled boxes: Regional context (H3), Inputs (H1), Coordination (H2), and O&M outcomes. Arrows indicate flow from regional context to coordination, and from inputs to coordination, then to outcomes.
Section 2 describes the study area and explains how the inspections, household surveys, and project records inform the case analysis.
2. Materials and Methods
2.1. Study Area
We selected the Awati Township renovation project in Kashi, Xinjiang, China, because it provided access to building inspections, household feedback, and observations during implementation (Figure 2). Project documents identify collapsible loess as a concern for foundation performance. The case considers earthquake shaking and seasonal drying and rewetting of loess. Published studies inform the proposed damage pathways [2,3,4,42,43]. Quantifying local shaking intensity and drought frequency would require long-term records. Establishing the collapsibility grade and self-weight classification would require representative soil profiles and laboratory results.
Figure 2.
Location of the study area in Awati Township, Kashi, Xinjiang, China. The colored areas and lines indicate the corresponding geographical boundaries and locations, as shown in the map legend. Map series showing Awati Township location from China to local scale. Zoom-ins highlight Xinjiang, Kashgar Prefecture, and Kashgar city. Main map displays Awati Township boundaries, road networks including Tufu Expressway, and neighboring townships: Haohan Township, Baishikeranmu Township, Akkashi Township, Yinwustan Township, and Duolaitebage Township.
Most of the inspected dwellings were simple brick–concrete buildings. Some auxiliary structures used rammed earth or brick-and-timber construction. Figure 3 and Figure 4 show examples of the settlement and dwelling layouts.
Figure 3.
Field views of a dwelling exterior and the settlement. Aerial photograph of a dense settlement with many buildings, roads, and trees, juxtaposed with a ground-level view of a building exterior featuring painted walls and windows.
Figure 4.
Examples of rural dwelling layouts in the study area. Schematic diagram of four floor plans. Top left: 70m2 layout with bedroom, kitchen, living room, bathroom. Top right: 81.48m2 layout with kitchen, bedroom (2), living room, bathroom, eaves corridor. Bottom left: 52m2 layout with bedroom, living room, kitchen, bathroom. Bottom right: 60.16m2 layout with bedroom, living room, kitchen, restaurant, bathroom.
2.2. Field and Social Research Methods
2.2.1. Participant Observation
We conducted participant observation for 12 months, spending at least five days in the field each month. During visits to villages in the renovation project, we documented foundation work, masonry, drainage, construction coordination, and modifications made by residents. We observed settlement and cracking during dry and wet periods. Our field notes recorded conditions, visible defects, management responses, and residents’ experiences. Where available, photographs and records from other observers helped us check these notes [44].
2.2.2. Semistructured Interviews
We recruited households across project villages, taking into account household characteristics, dwelling age, and damage severity. Participation required informed consent. We conducted semistructured interviews with 156 households (approximately 40–60 min each), eight craft workers, six frontline O&M personnel, and five local administrators. We asked about hazard awareness, maintenance, construction quality, satisfaction, and desired improvements. We coded the interviews using NVivo 12 and compared themes with field observations and questionnaire responses [45,46]. Paired responses and uncertainty estimates were unavailable for comparing satisfaction before and after renovation.
2.2.3. Household Questionnaire
The 156 usable questionnaires came from the interviewed households. The sampling criteria included age, household income, building age, and damage severity. We piloted the questionnaire and revised it after two rounds of expert review. Study records report Cronbach’s α > 0.70 for the overall instrument and its dimensions and a content validity index > 0.78 [47,48]. Item-level results and the pilot sample size were unavailable. The questionnaire covered seven domains. It used five-point Likert items to record perceptions of resilience and satisfaction [14]. Bilingual interviewers helped respondents complete the questionnaire. We report descriptive summaries because full estimates from the statistical models described in the study protocol were unavailable [49].
2.3. Data Sources and Analysis
From July 2025 through June 2026, we inspected 27 accessible dwellings within the renovation project and used interviews and questionnaires from 156 households to describe maintenance practices, risk awareness, and satisfaction [1,50]. Participant observation and project records documented implementation and coordination. We first recorded baseline conditions and practices, then summarized the inspection and survey data, compared the available before-and-after indicators, and used those results to propose resilience measures and inspection priorities. Section 3.5 and Section 3.6 explain the scoring, cost comparison, and proposed inspection schedules. The study records report a 95% completeness threshold for household records. We compared the datasets across the township because the records did not link individual household responses to inspected dwellings.
3. Results
The results draw on three sources: inspections of 27 dwellings, questionnaire responses from 156 households, and project summaries of indicators before and after renovation. Dwelling counts, household responses, and project indicators describe different units of analysis.
3.1. Conditions Before Renovation
The project records identify collapsible loess as a foundation concern. The local collapsibility grade and self-weight classification remain unverified. In the survey summary, 82.7% of responses reported settlement. Among responses reporting settlement, 37.2% also reported structural problems. The summary did not provide the number of valid responses for either proportion. Laboratory studies have documented moisture-related changes in loess shear strength and soil fabric [51,52].
3.1.1. Structural Defects
Of the 27 dwellings inspected, eight (29.6%) had through-wall cracks and three (11.1%) had localized wall cracks (Table 2). We also observed cracking at joints, loose roof-to-wall connections, and tilted walls. The reported crack-width thresholds were <0.3 mm for minor damage, 0.3–1.0 mm for moderate damage, and >1.0 mm for severe damage. The corresponding settlement thresholds were <5 mm, 5–15 mm, and >15 mm. The available records did not specify how inspectors combined crack width, settlement, and inclination into a single severity rating.
Table 2.
Defects identified during the inspection of 27 rural dwellings.
3.1.2. O&M Awareness and Practice
The project records indicate limited coordination of O&M responsibilities across project stages. Among the 156 surveyed households, 36 (23.1%) were classified as having basic maintenance knowledge, 142 (91.0%) did not keep housing condition records, and 104 (66.7%) reported no basic O&M knowledge or skills (Table 3). The knowledge measures drew on responses about building components, common defects, and basic repairs. These findings identify priorities for homeowner training and recordkeeping.
Table 3.
Household awareness and practices regarding housing maintenance (n = 156).
3.1.3. Baseline Project Performance
The baseline project summary reported a schedule delay of 12.7% relative to the original plan. Among surveyed households, 23.1% had basic maintenance knowledge and 9.0% kept housing condition records. The project also reported 24.7% completeness of information across project stages, 29.2% effectiveness of stakeholder coordination, 61.3% overall household satisfaction, and a composite O&M score of 42.6 out of 100 (Table 4). The summary did not provide a complete scoring rubric or a regional benchmark, so these figures describe performance in this project.
Table 4.
Baseline O&M indicators in the case-study project.
3.2. Interpretation of the Combined-Hazard Damage Pathway
The inspections recorded settlement, cracking, and connection defects (Table 2). Published studies describe wetting-induced collapse and moisture-related changes in loess fabric [2,4,53,54]. Determining whether an observed defect resulted from earthquake shaking, drought, or rewetting would require dated records of both hazard exposure and dwelling condition.
A plausible sequence is that loess develops fissures as it dries and settles as it rewets, leaving the dwelling more susceptible to damage during later earthquake shaking [2,4,10,53,55]. Differential settlement and seismic forces may both contribute to diagonal masonry cracking. Quantifying their combined effects would require site-specific soil tests and repeated measurements of building condition.
3.3. Renovation and Interface-Coordination Measures
Project measures addressed foundations, structural elements, and O&M coordination (Table 5). The foundation design specified a compacted replacement layer 1.5–2.0 m thick with a compaction coefficient of at least 0.97, a 300 mm lime–soil barrier, and compacted lime–soil piles 400 mm in diameter and 6.0–8.0 m long at 1.0 m spacing. Structural measures included extending foundations at least 200 mm below the frost line to a minimum depth of 800 mm, adding tie beams and confining columns, and applying reinforced mortar to masonry walls. The project assigned reporting and coordination responsibilities to four stakeholder groups. The dimensions apply to this project design. Confirming as-built conditions would require construction quality assurance records [1].
Table 5.
Project-specific foundation, structural, and management measures.
3.4. Performance After Renovation
The project summary reported shorter response times for design changes after renovation and the introduction of coordination measures (Table 6). The response time fell from 7.2 to 2.1 days, a 70.8% decrease. The reported project duration was 10.2% shorter than the original plan. Reported defect incidence fell from 46.8% to 26.4%, a decrease of 20.4 percentage points or 43.6% relative to baseline. Households reporting uneven foundation settlement fell in number from 97 to 18 (81.4%), and recorded structural wall-crack locations fell from 132 to 39 (70.5%). Overall household satisfaction rose from 61.3% to 92.6%, an increase of 31.3 percentage points. Concurrent construction and management measures limit causal interpretation. The original project records are needed to confirm the monitoring intervals.
Table 6.
Post-renovation performance evaluation.
3.5. Four-Dimensional Resilience Assessment
The proposed index combines normalized engineering (E), social (S), economic (C), and institutional (I) scores [12,13,39] (Table 7). It is calculated as R = 0.35E + 0.25S + 0.20C + 0.20I. Engineering has the greatest weight because foundation and structural defects directly affect serviceability. The social dimension represents household participation and reporting. The economic and institutional dimensions receive equal weights to reflect the importance of both affordability and the capacity to sustain O&M. These proposed weights require sensitivity analysis and independent validation [56,57].
Table 7.
Proposed four-dimensional resilience indicator framework.
In the worked example, the mean of the three post-renovation engineering indicators on their reported 0–1 scale is E = (0.89 + 0.87 + 0.92)/3 = 0.8933. Assuming the three social indicators are scored out of 100, rescaling them to 0–1 and taking the mean gives S = (0.897 + 0.826 + 0.853)/3 = 0.8587. Using hypothetical economic and institutional scores of C = 0.70 and I = 0.85 gives R ≈ 0.8373. When applying the index to a full dataset, specify the scale and scoring direction of each indicator, the aggregation rule for each dimension, and the treatment of missing observations.
For each scenario, calculate present life-cycle cost as LCC = C0 + Σ[(Mt + Pt)/(1 + r)ᵗ], summing from year 1 to T. C0 is the initial cost, Mt is the inspection and routine maintenance cost in year t, Pt is the repair cost in year t, r is the annual discount rate, and T is the analysis period in years [12,58]. Compare a defined reference plan with the renovation plan using the same analysis period, discount rate, and price basis. Calculate percentage savings as 100 × (LCC of the reference plan—LCC of the renovation plan)/LCC of the reference plan. Table 7 presents the 12.7% reduction in total life-cycle cost as an estimate reported for the case project.
3.6. Tiered O&M Decision Framework
The project summary classified 15 of the 27 dwellings (55.6%) as Class I, seven (25.9%) as Class II, and five (18.5%) as Class III (Table 8). The expected defect rates of 8.5%, 18.0%, and 35.0%, respectively, are planning assumptions. Weighting the class inputs by dwelling counts gives an annual cost of CNY 2430 per dwelling, 2.65 technical staff per 100 dwellings, and an expected defect rate of 15.9%. For future use, record the condition of each dwelling, use the crack-width and settlement thresholds in Section 3.1.1 to rate individual defects, and document the proposed maintenance class and inspection interval. A single severe defect should trigger technical review to determine whether a shorter inspection interval is warranted [26,58].
Table 8.
Proposed maintenance classes and resource assumptions (27 buildings).
3.7. Comparison of O&M Indicators Before and After Implementation
The project summary reports that early defect detection increased from 34.6% to 82.3%, repair response time fell from 23 to 6 days, and defect recurrence declined from 4.1 to 2.3 events per building-year (Table 9). Emergency reinforcement requests fell from 34.8% to 12.4%, O&M satisfaction increased from 61.5% to 92.9%, and annual O&M spending decreased from CNY 3641 to CNY 2600 per household. Table 9 reports O&M satisfaction and annual spending. Table 6 reports overall household satisfaction, and Table 7 provides the estimated change in life-cycle costs. The project summary does not specify every indicator’s reporting period or denominator.
Table 9.
Reported O&M indicators before and after model implementation.
4. Discussion
The Awati case illustrates how condition records and household reports can inform routine maintenance. Additional evidence is needed to attribute individual defects to particular hazards, test the proposed resilience scores, and determine how much of the reported change resulted from renovation.
4.1. Proposed Damage Sequence and Evidence Limits
The hypothesized sequence links fissuring during drying, soil deterioration during rewetting, and lateral demand during shaking [2,4,10,53,55]. Published studies support the individual mechanisms. Measuring how much their interaction amplifies damage would require field and experimental evidence beyond the present case.
Wetting can weaken interparticle bonds and alter loess fabric. Repeated wetting and drying can change fissure networks and mechanical behavior [2,4,53,55]. At the building scale, nonuniform settlement may influence the response to seismic loading. Local soil tests and repeated measurements of moisture, settlement, and structural response would help assess whether seismic design should account for moisture history [10]. Cyclic simple-shear tests on undisturbed loess found that changes in dynamic shear modulus depended on moisture history, supporting the need for local calibration [59].
4.2. Stakeholder Coordination and Rural O&M
Fragmented responsibilities, inconsistent information exchange, and slow responses to design changes were practical barriers to O&M. The proposed framework identifies roles for local authorities, technical providers, craft workers, and residents. Following renovation, the project reported faster responses and higher satisfaction. The before-and-after comparison leaves open how much these changes reflected coordination, concurrent construction work, staffing, or reporting practices. O&M satisfaction increased from 61.5% to 92.9% (Table 9), and overall household satisfaction rose from 61.3% to 92.6% (Table 6). Research on social resilience supports using participation indicators suited to the local context [60].
4.3. Interpretation of the Four-Dimensional Assessment
The four dimensions connect building condition with household practices, affordability, and the capacity to sustain O&M [12,26,39]. At baseline, 91.0% of surveyed households kept no housing condition records, making routine documentation a priority alongside physical upgrades. The weights and scales require sensitivity analysis and independent validation.
Project materials describe assessments before renovation, immediately afterward, and at a 12-month follow-up. They report different trajectories across dimensions without giving complete time-series scores or confidence intervals. The 12.7% reduction in Table 7 is the cost estimate reported for this case. A long-term comparison should use a common analysis period and account for the timing and cost of inspections, routine maintenance, and recurring repairs in each plan [12,13]. Infrastructure resilience models also highlight the need to state recovery horizons and uncertainty assumptions [61].
4.4. Practical Scope of Tiered O&M
The proposed classes link assessed dwelling condition to inspection schedules and repair priorities. The project reported that early defect detection rose to 82.3% and repair response time fell to 6 days (Table 9). Table 8 provides separate planning inputs for staffing, costs, and assumed defect rates. Local implementation requires documented assignment and escalation criteria, a monitoring protocol, and a budget for inspections and repairs.
Implementation depends on staff experience, available budgets, and thresholds suited to the local building stock. The project summary reports a 17.7% missed-reporting rate without specifying the denominator or verification method. Future applications should document how reporting completeness is checked and calibrate inspection rules for local soils, building types, and responsibilities.
4.5. Limitations and Future Research
The study covered one township, 27 inspected dwellings, and 156 surveyed households. The absence of a comparison group and incomplete documentation of longitudinal sampling limit causal interpretation. Twelve months of observation provide limited evidence about long-term exposure, institutional performance, and costs. Testing the proposed damage sequence requires measurements of soil fabric, moisture history, and shaking [4,53,55]. Future studies should link dwelling and household records, validate scoring and tier thresholds at independent sites, and test whether sensor networks or digital twins improve early detection [31].
Other loess regions in China could adapt the inspection checklist, condition records, and reporting responsibilities after reviewing local soil profiles, moisture exposure, building types, and requirements. Applications outside China would also need to account for local construction and maintenance practices. Monitoring a retrofitted adobe building in Peru illustrates how crack widths, rotations, and environmental measurements can inform condition records [62]. Inspection thresholds, personnel needs, and costs require local calibration.
4.6. Contributions
Table 10 compares the case with studies of loess behavior, post-earthquake housing, renovation, and inspection planning. The Awati case links dwelling condition and household reporting to inspection responsibilities and schedules. Independent studies are needed to validate the damage sequence, resilience scores, and maintenance classes.
Table 10.
Comparison with selected building resilience and maintenance studies.
5. Conclusions
- (1)
- Building serviceability. Settlement, masonry cracking, and connection defects identify priorities for monitoring rural dwellings on collapsible loess. Establishing the contribution of earthquake shaking or moisture changes would require site-specific soil tests and dated records of hazards and dwelling condition.
- (2)
- Project outcomes. Reported defect incidence declined from 46.8% to 26.4%, response time for design changes decreased from 7.2 to 2.1 days, and overall household satisfaction increased from 61.3% to 92.6%. These descriptions of project performance reflect concurrent construction and management changes. The lack of a comparison group limits causal interpretation.
- (3)
- Maintenance and monitoring. Only 14 of 156 surveyed households (9.0%) reported keeping records of dwelling condition. The proposed framework uses the observed defects and reporting gap to guide condition monitoring, assign reporting responsibilities, and plan inspections. The documented foundation and drainage work also identifies priorities for maintenance around the dwellings. The case measured housing outcomes. Agricultural production and wider infrastructure outcomes fall outside its scope.
Future work should verify the soil classification and proposed damage sequence, test the scoring and maintenance tiers at independent sites, and compare maintenance costs over a specified analysis period with longer follow-up.
Author Contributions
P.J., conceptualization and writing—original draft; G.L., investigation, resources, data curation, and writing—review and editing; X.Z., software, validation, and visualization; X.S., methodology and formal analysis; S.X., supervision and project administration. All authors have read and agreed to the published version of the manuscript.
Funding
The authors acknowledge support from the Xinjiang Key Laboratory of Engineering Materials and Structural Safety; A Study on Rural Housing Construction in the Kashgar Region under the Rural Revitalization Strategy, Project No. (2024) 2932.
Institutional Review Board Statement
According to the authors’ submitted ethics declaration, the Academic Committee of Kashi University determined that ethical approval was not required for the anonymous questionnaire component.
Informed Consent Statement
Informed consent was obtained from all participants in the study.
Data Availability Statement
The datasets generated and analyzed in this study may be requested from the corresponding author, subject to applicable consent and data-sharing restrictions.
Acknowledgments
The authors thank the participating households, project personnel, and local administrators for their assistance with fieldwork.
Conflicts of Interest
Author Xinlin Song is employed by Shenzhen Institute of Architectural Design and Research Co., Ltd. The remaining authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.
Abbreviations
O&M, operation and maintenance.
References
- GB 50025—2018; Ministry of Housing and Urban-Rural Development of the People’s Republic of China, State Administration for Market Regulation. Standard for Building Construction in Collapsible Loess Regions. China Architecture & Building Press: Beijing, China, 2018.
- Li, P.; Vanapalli, S.; Li, T. Review of collapse triggering mechanism of collapsible soils due to wetting. J. Rock Mech. Geotech. Eng. 2016, 8, 256–274. [Google Scholar] [CrossRef] [Scilit]
- Xue, J.; Zhao, X.; Zhang, F.; Xu, D.; Hu, X.; Ma, L. Shaking table tests on seismic behavior of the underground loess cave of earth building of traditional dwellings. Eng. Struct. 2020, 207, 110221. [Google Scholar] [CrossRef] [Scilit]
- Wang, T.; Hao, Y.; Wang, Z.; Cheng, L.; Li, J. Experimental study on dynamic strength properties of compacted loess under wetting-drying cycles. Chin. J. Rock Mech. Eng. 2020, 39, 1242–1251. [Google Scholar] [CrossRef]
- Xue, J.; Hu, P.; Zhang, F.; Zhuge, Y. Seismic behavior of brick cave dwellings: Shake table tests. J. Build. Eng. 2021, 43, 102886. [Google Scholar] [CrossRef] [Scilit]
- Imtiaz, A.; Saloustros, S.; Beqiraj, M.; Cortés, G.; Devaux, M.; Lattion, E.; Zhu, Y.; Sehaqui, H. Understanding building damage through the lens of the Swiss post-seismic reconnaissance mission of 2023 Al Haouz, Morocco, earthquake. Sci. Rep. 2025, 15, 16587. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Bohara, B.K.; Bhatt, T.P.; Saud, N.S. Seismic vulnerability and failure typology of masonry buildings in Nepal: A review. Discov. Civ. Eng. 2026, 3, 142. [Google Scholar] [CrossRef] [Scilit]
- Hendriks, E.; Opdyke, A. Adoption of seismic-resistant techniques in reconstructed housing in the aftermath of Nepal’s 2015 Gorkha earthquake. Earthq. Spectra 2021, 37, 2662–2686. [Google Scholar] [CrossRef] [Scilit]
- Paul, B.K.; Adhikari, K.P.; Acharya, B.; Lamichhane, K.; Mishra, M.; Sijapati, D.B. Private housing compliance with public seismic safety measures after 2015 Gorkha earthquake in Nepal. Int. J. Disaster Risk Reduct. 2024, 111, 104690. [Google Scholar] [CrossRef] [Scilit]
- Kappes, M.S.; Keiler, M.; von Elverfeldt, K.; Glade, T. Challenges of analyzing multi-hazard risk: A review. Nat. Hazards 2012, 64, 1925–1958. [Google Scholar] [CrossRef] [Scilit]
- Gill, J.C.; Malamud, B.D. Reviewing and visualizing the interactions of natural hazards. Rev. Geophys. 2014, 52, 680–722. [Google Scholar] [CrossRef] [Scilit]
- Hromada, E.; Macek, D.; Heralova, R.S.; Brožová, L.; Střelcová, I. Integrating Life Cycle Cost Analysis for Sustainable Maintenance of Historic Buildings. Buildings 2024, 14, 1479. [Google Scholar] [CrossRef] [Scilit]
- Frangopol, D.M. Life-cycle performance, management, and optimisation of structural systems under uncertainty: Accomplishments and challenges. Struct. Infrastruct. Eng. 2011, 7, 389–413. [Google Scholar] [CrossRef] [Scilit]
- Bruneau, M.; Chang, S.E.; Eguchi, R.T.; Lee, G.C.; O’Rourke, T.D.; Reinhorn, A.M.; Shinozuka, M.; Tierney, K.; Wallace, W.A.; Von Winterfeldt, D. A Framework to Quantitatively Assess and Enhance the Seismic Resilience of Communities. Earthq. Spectra 2003, 19, 733–752. [Google Scholar] [CrossRef] [Scilit]
- Cutter, S.L.; Barnes, L.; Berry, M.; Burton, C.; Evans, E.; Tate, E.; Webb, J. A place-based model for understanding community resilience to natural disasters. Glob. Environ. Change 2008, 18, 598–606. [Google Scholar] [CrossRef] [Scilit]
- Ministry of Housing and Urban-Rural Development; Ministry of Agriculture and Rural Affairs; National Rural Revitalization Administration. Guidance on Accelerating the Modernization of Rural Housing and Village Construction: Jiancun [2021] No. 47. (8 June 2021). Available online: https://www.beijing.gov.cn/zhengce/zhengcefagui/qtwj/202204/t20220415_2679077.html (accessed on 5 October 2026).
- Wang, J.; Zhao, M.-J.; Zhang, J.-Z.; Hao, Y.-Z.; He, R.-X. Effect of wetting and drying cycles on the dynamic properties of compacted loess. Adv. Civ. Eng. 2022, 2022, 8748109. [Google Scholar] [CrossRef] [Scilit]
- Ge, M.; Han, X.; Yang, R.; Zhu, C. Small-strain stiffness of compacted loess upon wetting, drying and loading: Experiments and model interpretation. Transp. Geotech. 2024, 48, 101341. [Google Scholar] [CrossRef] [Scilit]
- Yuan, K.; Ni, W.; Della Vecchia, G.; Lü, X.; Wang, H.; Nie, Y. Influence of dry density and wetting–drying cycles on the soil–water retention curve of compacted loess: Experimental data and modeling. Acta Geotech. 2024, 19, 8111–8128. [Google Scholar] [CrossRef] [Scilit]
- Zhao, X.; Xue, J.; Zhang, F.; Liu, X.; Luo, Z.; Ma, L.; Zhang, W. Aseismic retrofitting of loess cave using composite materials by shaking table test. Compos. Struct. 2021, 268, 113965. [Google Scholar] [CrossRef] [Scilit]
- JGJ 79—2012; Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Technical Code for Ground Treatment of Buildings. China Architecture & Building Press: Beijing, China, 2012.
- Caruso, M.; Buttazzoni, M.; Passoni, C.; Labò, S.; Marini, A.; Pinho, R. An updated multi-criteria decision-making method for the sustainable renovation of buildings including environmental, economic and social life-cycle metrics. J. Build. Eng. 2024, 98, 110967. [Google Scholar] [CrossRef] [Scilit]
- Bettemir, Ö.H.; Erzurum, T. Comparative life cycle assessment of post-disaster housing according to ground type-outdoor temperature-lifespan relationship: Carbon, energy and cost. J. Build. Eng. 2025, 111, 113388. [Google Scholar] [CrossRef] [Scilit]
- Otárola, K.; Iannacone, L.; Gentile, R.; Galasso, C. Multi-hazard life-cycle consequence analysis of deteriorating engineering systems. Struct. Saf. 2024, 111, 102515. [Google Scholar] [CrossRef] [Scilit]
- Ouache, R.; Guo, J.; Bristow, D. An integrated multi-hazard resilience framework for facility operations: Analysis of buildings’ interdependencies. J. Build. Eng. 2025, 105, 112419. [Google Scholar] [CrossRef] [Scilit]
- Dong, W.; Gao, X.; Han, W.; Wang, J. Renewal Framework for Self-Built Houses in “Village-to-Community” Areas with a Focus on Safety and Resilience. Buildings 2023, 13, 3003. [Google Scholar] [CrossRef] [Scilit]
- Davidson, C.H.; Johnson, C.; Lizarralde, G.; Dikmen, N.; Sliwinski, A. Truths and myths about community participation in post-disaster housing projects. Habitat Int. 2007, 31, 100–115. [Google Scholar] [CrossRef] [Scilit]
- Shi, J.; Zhang, T.; Bai, L.; Fukuda, H.; Gao, W. Comparative analysis on the mechanism of climate responsiveness strategies on indoor thermal performance of Yaodong dwellings in the Loess Plateau region of China. Energy Rep. 2024, 11, 4741–4758. [Google Scholar] [CrossRef] [Scilit]
- Hadlos, A.; Opdyke, A.; Hadigheh, S.A. Where does local and indigenous knowledge in disaster risk reduction go from here? A systematic literature review. Int. J. Disaster Risk Reduct. 2022, 79, 103160. [Google Scholar] [CrossRef] [Scilit]
- Kineber, A.F.; Massoud, M.M.; Hamed, M.M.; Alhammadi, Y.; Al-Mhdawi, M.K.S. Impact of Overcoming BIM Implementation Barriers on Sustainable Building Project Success: A PLS-SEM Approach. Buildings 2023, 13, 178. [Google Scholar] [CrossRef] [Scilit]
- Piras, G.; Agostinelli, S.; Muzi, F. Digital Twin Framework for Built Environment: A Review of Key Enablers. Energies 2024, 17, 436. [Google Scholar] [CrossRef] [Scilit]
- Yang, J.; Shen, G.Q.; Ho, M.; Drew, D.S.; Chan, A.P.C. Exploring critical success factors for stakeholder management in construction projects. J. Civ. Eng. Manag. 2009, 15, 337–348. [Google Scholar] [CrossRef] [Scilit]
- Lan, G.; Chen, T.; Dai, J.; Zhu, X.; Sun, G. Seismic damage investigation and analysis of rural dwellings in the Ms 6.2 Jishishan earthquake. Earthq. Eng. Eng. Dyn. 2024, 44, 200–213. [Google Scholar] [CrossRef]
- Yang, Y.; Tian, J.; Zhou, B.; Nie, G.; Wang, H.; Xie, X.; Dai, J. Investigation and analysis of seismic damage of rural buildings caused by the Ms 6.2 earthquake in Jishishan of Gansu Province. Earthq. Eng. Eng. Dyn. 2024, 44, 208–217. [Google Scholar] [CrossRef]
- Cimellaro, G.P.; Reinhorn, A.M.; Bruneau, M. Framework for analytical quantification of disaster resilience. Eng. Struct. 2010, 32, 3639–3649. [Google Scholar] [CrossRef] [Scilit]
- Marasco, S.; Kammouh, O.; Cimellaro, G.P. Disaster resilience quantification of communities: A risk-based approach. Int. J. Disaster Risk Reduct. 2022, 70, 102778. [Google Scholar] [CrossRef] [Scilit]
- Saja, A.M.A.; Teo, M.; Goonetilleke, A.; Ziyath, A.M. An inclusive and adaptive framework for measuring social resilience to disasters. Int. J. Disaster Risk Reduct. 2018, 28, 862–873. [Google Scholar] [CrossRef] [Scilit]
- Saja, A.M.A.; Goonetilleke, A.; Teo, M.; Ziyath, A.M. A critical review of social resilience assessment frameworks in disaster management. Int. J. Disaster Risk Reduct. 2019, 35, 101096. [Google Scholar] [CrossRef] [Scilit]
- Ricciardi, G.; Scalas, M.; Apreda, C.; Reder, A.; Mercogliano, P.; Sousa, H.S.; Santamaria-Ariza, M.; Matos, J.C.; Di Pietro, A.; Ormando, C.; et al. Quantitative Key Performance Indicators for risk and resilience assessment of the built environment assets under climatic and non-climatic hazards. Int. J. Disaster Risk Reduct. 2025, 128, 105720. [Google Scholar] [CrossRef] [Scilit]
- Rahmayanti, K.P.; Rukmana, D. Scoping review of the depth of participation and barriers to community participation in post-disaster housing reconstruction. Int. J. Disaster Risk Reduct. 2024, 104, 104375. [Google Scholar] [CrossRef] [Scilit]
- Sadiqi, Z.; Trigunarsyah, B.; Coffey, V. A framework for community participation in post-disaster housing reconstruction projects: A case of Afghanistan. Int. J. Proj. Manag. 2017, 35, 900–912. [Google Scholar] [CrossRef] [Scilit]
- Zhong, X.; Wang, Q.; Wang, Y.; Wang, P.; Li, C.; Hu, X. Characteristics of Damage to Rural Houses in the High-Intensity Area of the Jishishan Mw 6.2 Earthquake. Buildings 2024, 14, 3762. [Google Scholar] [CrossRef] [Scilit]
- Song, C.; Chen, B.; Li, Y.; Li, Z.; Du, J.; Yu, C.; Peng, J.; Liu, H.; Liu, Z.; Hu, X.; et al. Amplified coseismic loess failure and postseismic landslide acceleration triggered by the 2023 Jishishan, China earthquake. Eng. Geol. 2025, 352, 108074. [Google Scholar] [CrossRef] [Scilit]
- Kawulich, B.B. Participant Observation as a Data Collection Method. Forum Qual. Sozialforschung/Forum Qual. Soc. Res. 2005, 6, 43. [Google Scholar] [CrossRef]
- Braun, V.; Clarke, V. Using thematic analysis in psychology. Qual. Res. Psychol. 2006, 3, 77–101. [Google Scholar] [CrossRef] [Scilit]
- Tong, A.; Sainsbury, P.; Craig, J. Consolidated criteria for reporting qualitative research (COREQ): A 32-item checklist for interviews and focus groups. Int. J. Qual. Health Care 2007, 19, 349–357. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Cronbach, L.J. Coefficient Alpha and the Internal Structure of Tests. Psychometrika 1951, 16, 297–334. [Google Scholar] [CrossRef] [Scilit]
- Polit, D.F.; Beck, C.T. The content validity index: Are you sure you know what’s being reported? critique and recommendations. Res. Nurs. Health 2006, 29, 489–497. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Kline, R.B. Principles and Practice of Structural Equation Modeling, 4th ed.; The Guilford Press: New York, NY, USA, 2016. [Google Scholar]
- Fetters, M.D.; Curry, L.A.; Creswell, J.W. Achieving Integration in Mixed Methods Designs—Principles and Practices. Health Serv. Res. 2013, 48, 2134–2156. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Hao, R.; Zhang, Z.; Guo, Z.; Huang, X.; Lv, Q.; Wang, J.; Liu, T. Investigation of changes to triaxial shear strength parameters and microstructure of Yili loess with drying–wetting cycles. Materials 2022, 15, 255. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Wu, H.; Shao, S.; Shao, S.; Zhang, S.; Wang, Z. Shear strength and damage characteristics of undisturbed loess exposed to dry–wet cycles. Int. J. Geomech. 2025, 25, 04025252. [Google Scholar] [CrossRef] [Scilit]
- Jiao, S.; Wang, J.; Zhang, D.; Qi, L.; Li, S.; Li, L.; Li, S. Study on the effect of thickness of loess on its crack development under the action of dry-wet cycles. J. Northwest Univ. (Nat. Sci. Ed.) 2024, 54, 1–10. [Google Scholar] [CrossRef]
- Qin, B.; Li, X.-A.; Wang, L.; Gao, R.; Chai, H. Model interpretation and microscopic characteristics of collapsibility evolution of compacted loess under dry-wet cycles. CATENA 2024, 246, 108413. [Google Scholar] [CrossRef] [Scilit]
- Zhang, Y.; Shao, M.; Li, G.; Chen, C. Macro–Micro Correlation Mechanism Between Structural Potential and Mechanical Strength in Collapsible Loess. Buildings 2025, 15, 1940. [Google Scholar] [CrossRef] [Scilit]
- Kammouh, O.; Noori, A.Z.; Taurino, V.; Mahin, S.A.; Cimellaro, G.P. Deterministic and fuzzy-based methods to evaluate community resilience. Earthq. Eng. Eng. Vib. 2018, 17, 261–275. [Google Scholar] [CrossRef] [Scilit]
- Ouyang, M.; Dueñas-Osorio, L.; Min, X. A three-stage resilience analysis framework for urban infrastructure systems. Struct. Saf. 2012, 36–37, 23–31. [Google Scholar] [CrossRef] [Scilit]
- Frangopol, D.M.; Lin, K.-Y.; Estes, A.C. Life-cycle cost design of deteriorating structures. J. Struct. Eng. 1997, 123, 1390–1401. [Google Scholar] [CrossRef] [Scilit]
- Wu, H.; Shao, S.; Shao, S.; Zhang, S.; Wang, Z. Variations in dynamic shear modulus of loess exposed to dry-wet cycles from Xi’an area, China. Soil Dyn. Earthq. Eng. 2023, 173, 108126. [Google Scholar] [CrossRef] [Scilit]
- Saja, A.M.A.; Teo, M.; Goonetilleke, A.; Ziyath, A.M. Assessing social resilience in disaster management. Int. J. Disaster Risk Reduct. 2021, 52, 101957. [Google Scholar] [CrossRef] [Scilit]
- Ouyang, M.; Dueñas-Osorio, L. Time-dependent resilience assessment and improvement of urban infrastructure systems. Chaos 2012, 22, 033122. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Karanikoloudis, G.; Barontini, A.; Mendes, N.; Lourenço, P.B. An integrated data acquisition approach for the structural health monitoring and real-time earthquake response assessment of a retrofitted adobe church in Peru. Sensors 2024, 24, 5327. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Zou, X.; Wang, B.; Ding, Y.; Chen, Z.; Wang, J. Optimal maintenance strategy for chloride-attacked RC structures based on seismic resilience. J. Build. Eng. 2025, 114, 114430. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.