  • Article
  • Open Access

7 September 2026

41 Pages

Rethinking Post-Disaster Shelters: An Integrated LCA of Environmental, Techno-Economic and Resilience Across Three Modern Methods of Construction

,
,
,
,
and
1
School of Computing, Engineering and the Built Environment, Edinburgh Napier University, Edinburgh EH14 1DJ, UK
2
School of Engineering and Design, College of Technology and Environment, London South Bank University, London SE1 0AA, UK
3
School of Design and the Built Environment, Curtin University, Perth 6102, Australia
4
Department of Industrial Engineering, College of Engineering, University of Business and Technology, Jeddah 21448, Saudi Arabia

Abstract

The increasing frequency and severity of natural and human-induced disasters are intensifying the need for post-disaster shelters that can be rapidly deployed while delivering low environmental impact, affordability and acceptable occupant comfort. Modern Methods of Construction (MMC), including Three-Dimensional Printing (3DP), prefabrication and modular container-based systems, offer promising solutions for accelerating emergency housing delivery. However, their environmental, economic and thermal performance is rarely assessed within an integrated life-cycle framework, limiting robust comparison and evidence-based technology selection. This study addresses this gap by developing an integrated assessment framework combining Whole-Life Carbon (WLC), Life-Cycle Costing (LCC), and dynamic thermal simulation to comparatively evaluate three MMC-based emergency shelter systems over a 15-year service life. Applied to a representative post-disaster scenario, the framework reveals clear performance trade-offs among the three systems. Container-based shelters demonstrate the strongest overall environmental and economic performance, achieving the lowest whole-life energy consumption, carbon emissions and life-cycle costs. Compared with container-based shelters, 3DP shelters exhibit 7% higher whole-life energy consumption, 39% higher whole-life carbon emissions and 26% higher life-cycle costs. Relative to prefabricated shelters, 3DP shelters show 3% higher whole-life energy consumption, 37% higher whole-life carbon emissions and 12% higher life-cycle costs. In contrast, 3DP shelters deliver substantially better thermal performance, achieving approximately 70% predicted thermal satisfaction, compared with approximately 50% for both container-based and prefabricated shelters. The findings demonstrate a pronounced trade-off between environmental impact, economic efficiency and occupant thermal comfort, confirming that no single MMC system simultaneously optimises all performance dimensions. This challenges single-criterion approaches to post-disaster shelter selection and highlights the importance of integrated life-cycle decision-making. The proposed framework provides a transferable approach for evaluating emerging MMC shelter technologies and identifying context-specific solutions under time, resource and performance constraints. The findings offer evidence-based decision support for humanitarian organisations, policymakers and construction practitioners, while highlighting targeted opportunities to improve the material, energy and process efficiency of 3DP to enhance its environmental and economic competitiveness in future post-disaster applications.

1. Introduction

The increasing frequency and severity of natural and human-induced disasters worldwide have intensified the need for rapidly deployable, cost-effective, and environmentally sustainable post-disaster housing solutions. Over the past two decades, disaster occurrence has increased substantially, placing unprecedented pressure on humanitarian systems and reconstruction processes [1]. By the end of 2021, approximately 89.3 million people were forcibly displaced globally, highlighting the scale and persistence of contemporary displacement crises [2]. Within this context, the provision of safe, rapidly deployable, and sustainable shelter solutions has become a critical component of disaster risk management and humanitarian response.
Post-disaster housing typically evolves through a series of transitional stages, including emergency shelter, temporary shelter, temporary housing, and eventual permanent reconstruction [3]. Emergency shelters are often required to accommodate displaced populations for periods extending from several months to multiple years, particularly in prolonged crises [2]. Historically, shelter provision has prioritised rapid deployment and immediate protection, frequently relying on simple structures and locally available materials [4]. However, the urgency of humanitarian response often results in resource-intensive construction practices with limited consideration of long-term environmental performance, operational energy demand, and lifecycle affordability [5]. Common challenges associated with conventional emergency shelters include inadequate thermal performance, high lifecycle costs, poor adaptability, and limited capacity for long-term use [5].
These challenges are particularly evident in prolonged displacement contexts such as the Syrian crisis, which has displaced more than 11 million people since 2011, including approximately 8 million internally displaced persons (IDPs) [6]. Syrian refugee camps demonstrate the complexity of large-scale temporary settlement management. Initially established using emergency tents in 2012, the camp subsequently transitioned towards prefabricated shelter units due to harsh climatic conditions, including extreme summer temperatures exceeding 40 °C and severe winter weather events [7]. Similar challenges have been experienced in displacement settlements around Damascus, including Jaramana, Khan Dunoun, Khan Eshieh, Qabr Essit, and Sbeineh, where both planned camps and informal settlements have developed in response to prolonged displacement pressures [8].
Although formal settlements are generally designed to improve logistical management, displaced communities frequently adapt shelter layouts to better respond to household requirements and environmental conditions. For example, residents have modified standard shelter arrangements into courtyard-based configurations to improve privacy and social interaction [9]. Assessments based on Sphere Handbook indicators have identified significant shortcomings in shelter materials, ventilation, sanitation, spatial adequacy, and thermal conditions, affecting both comfort and long-term habitability [10]. Consequently, the Syrian displacement context represents a complex challenge where shelter solutions must balance rapid delivery with environmental performance, economic feasibility, and operational suitability.
Despite increasing recognition of these challenges, post-disaster shelter design continues to prioritise speed of deployment and initial affordability over integrated sustainability considerations [11]. The concept of “time compression” in emergency response illustrates the inherent trade-off between rapid delivery and long-term building performance, often resulting in shelters that are environmentally and operationally inefficient [10]. Previous studies have highlighted that many emergency shelter solutions fail to adequately address climatic suitability and long-term performance requirements [12,13,14,15]. Therefore, there is a growing need for assessment frameworks capable of evaluating shelter alternatives through integrated environmental, economic, and building performance indicators.
Life-Cycle Assessment (LCA) and Life-Cycle Costing (LCC) have become established methodologies for evaluating environmental and economic consequences of building systems throughout their lifecycle [16]. LCA considers impacts associated with material extraction, manufacturing, construction, operation, and end-of-life stages [16], while LCC evaluates the long-term economic implications of design and material decisions [17]. Within post-disaster shelter research, LCA has primarily been applied to assess embodied energy, operational energy consumption, and carbon emissions [18]. However, several limitations remain. Existing studies often rely on different datasets and assumptions due to variations in climatic, economic, and geographical contexts, reducing comparability between investigations [19]. Furthermore, many assessments focus independently on operational energy or thermal performance rather than evaluating whole-life environmental impacts [5,20,21,22,23]. Although some studies have incorporated economic analysis, integrated LCA and LCC approaches remain relatively limited in humanitarian shelter research [2,4,24,25].
In parallel, Modern Methods of Construction (MMC), including prefabrication, containers, and three-dimensional printing (3DP), have attracted increasing attention as potential approaches for improving construction efficiency and sustainability [26]. Three-dimensional printing has emerged as an innovative construction technique over the past three decades, utilising computer-aided design and robotic extrusion technologies to fabricate structures layer-by-layer [27,28,29]. Reported advantages include reduced construction time, improved material efficiency, reduced labour requirements, and enhanced geometric flexibility [19,26,30,31]. However, printable materials must satisfy several technical requirements, including printability, buildability, pumpability, and workability [26].
The increasing adoption of MMC has created new opportunities for delivering rapid, resilient, and sustainable post-disaster housing. Although growing research has explored the application of MMC, a distinct research field integrating MMC with environmental sustainability in disaster management contexts has yet to emerge [32,33]. Existing studies have primarily focused on material development, structural optimisation, and experimental prototypes, with limited evidence on full-scale humanitarian deployment and environmental sustainability performance [34,35].
Furthermore, previous studies have generally examined the environmental, economic, operational, and thermal performance of post-disaster shelters as separate or partially integrated dimensions. Life-cycle assessment (LCA) studies have evaluated the environmental and energy performance of post-disaster temporary, prefabricated, and container-based housing systems [2,18] while research on 3D-printed shelters has primarily investigated their potential application, benefits, challenges, and cost implications in post-disaster contexts [19,26,30,31]. Similarly, thermal performance studies have mainly focused on the thermal behaviour, indoor environmental conditions, and occupant comfort of temporary and emergency shelters [4,20,23]. Although these studies provide valuable insights into individual aspects of shelter performance, environmental, economic, operational, and thermal considerations have not been consistently evaluated within a unified life-cycle framework. This fragmented approach limits a comprehensive understanding of the trade-offs between embodied environmental impacts, life-cycle costs, operational energy demand, and occupant thermal comfort, thereby constraining evidence-based decision-making for sustainable post-disaster shelter selection.
Recent research has increasingly highlighted the importance of integrating circular economy principles into post-disaster reconstruction and the Build Back Better (BBB) framework [7,10,36]. Circular approaches emphasise resource efficiency, material recovery, reuse, recycling, and the reduction of material waste during reconstruction. For example, Khaddour and Elhassnaoui [36] highlight the potential of circular approaches to support post-disaster recovery and climate-resilient reconstruction. Similarly, sustainability-oriented approaches have been applied to post-disaster temporary housing and reconstruction, including multi-criteria assessment and optimisation of shelter and building performance [5,12,14,16]. Research on temporary housing has also highlighted the importance of considering the longer-term performance and second-life potential of temporary shelters, rather than treating them solely as short-term emergency solutions [3]. In parallel, recent research on 3D-printed construction has explored the potential for more resource-efficient and resilient construction approaches while recognising ongoing technical and sustainability challenges [26,31,32,33].
Despite these advancements, significant knowledge gaps remain. Existing research has largely examined individual sustainability dimensions, specific circular economy interventions, or individual post-disaster shelter systems rather than providing a systematic comparison across alternative construction approaches [2,5,18,19,33,35]. Moreover, environmental and techno-economic performance have generally been assessed through separate approaches, with limited consideration of their interactions with operational energy requirements and occupant thermal performance throughout the shelter life cycle. Consequently, an integrated LCA framework capable of simultaneously evaluating the environmental, techno-economic, operational, and thermal performance of alternative MMC-based post-disaster shelters remains underdeveloped. Addressing this gap is essential for enabling decision-makers to identify shelter solutions that achieve an appropriate balance between environmental sustainability, affordability, energy performance, and occupant comfort over the full life cycle.
This research gap is particularly critical in hot-arid and conflict-affected regions such as Southern Syria, where extreme climatic conditions, damaged infrastructure, disrupted supply chains, limited energy availability, and material scarcity significantly influence shelter design, deployment, and operational performance. Nevertheless, most existing assessments have been conducted within conventional construction contexts rather than climate- and resource-constrained humanitarian environments, limiting their applicability to emergency housing scenarios.
The present study addresses this gap by developing an integrated environmental and techno-economic LCA framework to evaluate and compare three MMC-based post-disaster shelter systems. In contrast to previous studies that examine these performance dimensions separately, the proposed framework provides a holistic assessment of embodied and operational environmental impacts, lifecycle costs, and passive thermal performance within a unified decision-support methodology.
The aim of this study is to develop and apply an integrated environmental and techno-economic life-cycle evaluation framework to assess the sustainability of MMC for post-disaster shelters in Southern Syria. The framework combines WLC, LCA, LCC, and dynamic thermal performance simulation to evaluate the environmental, economic, and operational performance of alternative shelter systems. To achieve this aim, the study addresses the following objectives:
  • To quantify and compare the whole-life environmental performance of 3D-printed, prefabricated concrete, and container-based shelters using a cradle-to-grave assessment, including embodied energy, carbon emissions, and whole-life environmental impacts.
  • To evaluate the lifecycle economic performance of the three shelter systems using LCC, considering construction, transportation, installation, maintenance, operational, replacement, and end-of-life costs.
  • To assess the thermal performance and passive indoor comfort of the shelter alternatives under representative climatic conditions in Southern Syria using dynamic building performance simulation, reflecting energy-constrained post-disaster scenarios.
  • To identify the environmental, economic, and thermal performance trade-offs among the evaluated shelter systems and determine their relative suitability for sustainable post-disaster housing.
By integrating WLC, LCA, LCC, and thermal performance into a unified decision-support framework, this study provides practical and scalable guidance for post-disaster shelter selection. The framework is applied to three representative MMC systems (3D-printed, prefabricated concrete, and container-based shelter) under the climatic and humanitarian conditions of Southern Syria. The study makes two principal contributions. First, it advances methodological practice by combining environmental, economic, whole-life, and thermal performance assessment within a single framework tailored to post-disaster shelters. Second, it translates these assessments into actionable decision support for policymakers, humanitarian organisations, and construction practitioners, enabling evidence-based selection of shelter systems that balance environmental sustainability, economic feasibility, resilience, and occupant wellbeing in resource-constrained settings.

2. Materials and Methods

A comparative whole-life assessment framework was developed to evaluate three MMC for post-disaster shelters: 3D-printed concrete, prefabricated concrete, and container-based construction. This approach integrates LCA, LCC, dynamic building-performance simulation, and thermal-comfort assessment within a common functional, geometric, climatic, and service-life basis.
The assessment adopts a cradle-to-grave perspective, covering material production, transportation, construction and installation, operation, maintenance and replacement, and end-of-life. The analysis is contextualised to representative post-disaster conditions in Southern Syria.
The methodology comprises eight stages: (1) site and climatic characterisation, (2) shelter geometry and functional modelling, (3) construction systems and material specifications, (4) dynamic simulation using IESVE to determine operational energy demand and indoor conditions, (5) cradle-to-grave LCA, (6) LCC over the defined service life, (7) thermal-comfort assessment, and (8) validation and benchmarking against relevant published studies.
This integrated framework provides a consistent basis for comparing the environmental, economic, operational-energy, and thermal performance of the three shelter systems and identifying the key trade-offs relevant to sustainable post-disaster housing.

2.1. Site Description

This study evaluates post-disaster shelter solutions in the context of protracted internal displacement resulting from the Syrian conflict, focusing on southern Damascus, with particular emphasis on the Sayida Zaynab area. Southern Damascus has served as a long-term reception zone for IDPs due to its relative security, proximity to the urban core, and the availability of public buildings suitable for emergency sheltering [37]. Figure 1 illustrates the geographical location of the study area within southern Damascus using satellite imagery.
Figure 1. The geographical location of the study area.
The selection of Sayida Zaynab district for research on 3D-printed shelters is based on its strategic relevance as an urban area with a high concentration of displaced populations. The Governorate of Damascus, including both the city and surrounding regions, accommodates a diverse mix of residents and IDPs as a result of the prolonged Syrian crisis. Damascus remains one of the primary urban centres where IDPs live within both informal settlements and regular city neighbourhoods [38].
Sayida Zaynab itself spans approximately 3.5 km2 [39]. The district contains a mix of residential blocks, community facilities, and informal settlements, where IDPs are densely concentrated. This combination of high population density, a diverse urban fabric, and vulnerable communities makes Sayida Zaynab an ideal case study for testing 3D-printed shelter technologies. The area provides both the spatial context and demographic variability necessary to evaluate the adaptability, scalability, and social impact of innovative housing solutions in urban displacement scenarios.

2.2. Geometrical Model and the Design of the Emergency Shelters

The design and construction assumptions for the emergency shelters in this study are based on the utilisation of International Standard Organisation (ISO) shipping containers, which have been repurposed for temporary housing in various contexts [40]. These designs typically come in two standard sizes: 20 ft and 40 ft, constructed with corrugated sheet steel walls and roofs supported by a tubular steel frame [41]. The dimensions and structural components of these containers are standardised, with the 20 ft container measuring 2.44 × 6.06 × 2.59 m and the 40 ft container measuring 2.438 × 12.192 × 2.438 m [41].
For this study, two standard ISO 20 ft designs were used, arranged in a configuration that provides ample space to accommodate different family sizes. The suggested design involved positioning the containers on their sides, resulting in a space with dimensions of 4.88 × 6.06 × 2.59 m (Figure 2). This configuration provides flexibility in the design layout, enabling various room arrangements, such as one- or two-bedroom layouts, a living room, and a bathroom (Figure 2).
Figure 2. The geometrical model: (a) illustrates the plan view of the proposed emergency shelter, showing the internal layout and spatial dimensions. (b) presents the front elevation, highlighting the shelter’s structural form and architectural configuration. (c) shows the shelters’ 3D model using IESVE.
The selected two-bedroom layout, generated from the space created by two ISO 20 ft containers, served as the standard design for studying other emergency shelters. This decision was made due to the fixed dimensions of the ISO containers, whereas the dimensions of prefabricated and 3DP emergency shelters can be adjusted [40].

2.3. Construction Methods and Specifications

The construction specifications of the three shelter systems were defined as key inputs to the LCA, LCC, and thermal performance analyses, given the direct influence of building fabric characteristics on embodied impacts, operational energy demand, and indoor thermal conditions. The complete wall, roof, and floor assemblies including material layers, thicknesses, quantities, and material specifications are provided in Appendix A.
All three shelter systems were assumed to be constructed on a 50 mm reinforced-concrete raft foundation, which also serves as the ground slab. This foundation configuration was selected in response to the geotechnical conditions of the study context, where Sayida Zaynab soils, as most of Damascus soils, are expansive and contain minerals capable of absorbing water and undergoing substantial volumetric changes [42]. The selected foundation system is considered suitable for expansive and low-bearing-capacity soils [43] and provides additional resistance to seismic and flood-related conditions [44]. A 20 mm plywood layer was specified as the floor finish based on its sustainability characteristics, ease of installation, and satisfactory stability and strength performance [45].
Wood wool boards were selected as the primary insulation material for the wall and roof assemblies because of their favourable environmental characteristics, thermal resistance, fire resistance, and acoustic performance [46]. Insulation thicknesses and material quantities were incorporated consistently across the shelter specifications, as detailed in Appendix A, and were explicitly considered in both the embodied-impact and thermal-performance assessments.
External doors were specified with PVC frames to provide durability and resistance to adverse weather conditions, while internal doors were assumed to be timber-based, reflecting their sustainability characteristics [47,48]. Windows were specified with timber frames and double glazing to improve thermal performance and reduce heat transfer through the building envelope.
The material quantities and construction specifications for the three shelter systems were established based on the design parameters reported in [49]. The resulting material inventories, provided in Appendix A, were applied consistently across the LCA, LCC, and dynamic thermal simulation models. This approach establishes a common and transparent geometric and material basis for comparison while retaining the construction-specific characteristics of each shelter system.

2.4. System Boundaries and LCA Framework

The environmental assessment was conducted in accordance with ISO 14040 and ISO 14044, adopting a WLC approach to evaluate the environmental performance of the three post-disaster shelter systems. The functional unit was defined as one emergency shelter with a usable floor area of 32.2 m2, accommodating four occupants over a 15-year service life. The system boundary includes the product stage (A1–A3), use stage (B), end-of-life stage (C), and benefits and loads beyond the system boundary (Module D).
The assessment accounts for the key processes influencing whole-life carbon performance, including material production, transportation, construction activities, operational energy, and end-of-life material recovery. The material inventories and construction specifications used in the assessment are provided in Appendix A.
Product stage (A1–A3): Material production: Modules A1–A3 include raw material extraction, processing, manufacturing, and production of all construction materials and shelter components. Material quantities for each shelter system were derived from the construction specifications presented in Appendix A and combined with established life-cycle inventory datasets and embodied carbon factors.
For the 3D-printed shelter, the impacts associated with producing the printing mixture were included through the life-cycle datasets of the constituent materials. The energy and resource requirements associated with concrete mixture preparation were considered within the manufacturing datasets. Water consumption during material production was not modelled separately due to its negligible contribution to whole-life carbon impacts compared with material manufacturing processes.
Use stage (B1–B7) (Operational performance): The use stage represents the operational impacts over the assumed 15-year service life. Operational carbon emissions (Module B6) were quantified using dynamic thermal simulation in IESVE under representative climatic conditions for southern Damascus.
Each shelter system was modelled using its specific wall, roof, and floor assemblies, including differences in material composition, insulation, and thermal properties. Therefore, variations in building fabric performance and their influence on heat transfer, indoor conditions, and operational energy demand were explicitly considered.
Modules B1–B5, including maintenance, repair, refurbishment, and replacement, and Module B7 (operational water consumption were excluded): This approach follows previous studies showing that these contributions have a limited influence on the whole-life environmental performance of temporary shelter systems [50]. Furthermore, equivalent maintenance requirements were assumed for all shelter alternatives; therefore, excluding these modules does not affect the comparative evaluation.
End-of-life stage (C1–C4) (Deconstruction and material recovery): Modules C1 and C2, representing deconstruction/demolition activities and transportation of waste materials, were excluded because their contribution to overall whole-life carbon impacts was considered negligible for the investigated shelter systems [50]. Modules C3 and C4, related to waste processing and disposal, were considered through the assumed recovery and recycling pathways of construction materials.
At the end of the service life, materials were assumed to be recovered for reuse or recycling where technically feasible. The associated environmental benefits were assessed separately through Module D.
Module D: Benefits and loads beyond the system boundary: Module D quantifies the potential environmental benefits associated with material reuse, recycling, and resource recovery beyond the assessed service life. Although often excluded from building LCAs, recent studies have demonstrated that Module D can significantly influence whole-life environmental performance, in some cases accounting for more than 50% of total life-cycle impacts [51]. Its inclusion therefore provides a more comprehensive assessment of the circularity potential of the investigated shelter systems. For this study, we assume the recovery percentage follows three scenarios: 75%/25%, 50%/50%, and 25%/75%. In the first, optimistic scenario, where the available resource is abundant, the recovery percentage can reach 75%; in the moderate scenario, 50%; and where less recycling resource is available, the recovery percentage can be 25%.
The adopted system boundary provides a transparent and ISO 14040/14044-compliant framework for evaluating MMC-based post-disaster shelters. By explicitly accounting for material production, transportation, construction processes, 3D-printing equipment impacts, operational energy, and end-of-life recovery pathways, the framework enables a robust comparison of shelter alternatives based on their whole-life environmental performance.

2.5. LCA Simulation

The Integrated Environmental Solutions Virtual Environment (IESVE) version 2023 simulation tool was utilised to evaluate the operational energy/emission performances of three types of emergency shelters, while embodied energy/emissions were calculated using the Inventory of Carbon and Energy (ICE) database, Version 1.6a [52]. To ensure a consistent comparison, all shelter types adopted the same geometric configuration (Figure 2), while their respective wall, roof, and floor assemblies were modelled using the construction specifications and material properties specific to each shelter type. The complete construction assemblies, including material layers, thicknesses, and quantities, are provided in Appendix A.
The climatic data used for the techno-economic and environmental LCA were for the typical conditions of southern Damascus, Syria. The region experiences a semi-arid Mediterranean climate characterised by hot, dry summers and cool winters. Summer conditions generally extend from June to September (approximately 120 days), while winter conditions span from mid-November to mid-April (approximately 150 days). According to the national climatic zoning, ambient temperatures range from summer maxima approaching 40 °C to winter minima of approximately −2 °C [53].
IESVE was employed to simulate the operational performance of the shelter systems using an integrated modelling environment. The software incorporates a Common User Interface (CUI) and a single Integrated Data Model (IDM), enabling multiple simulation modules to operate from a shared dataset. The ModelIT module was used to develop the three-dimensional building geometry, while SunCast was applied for solar shading analysis, Radiance for daylight simulation, and ApacheSim for dynamic thermal simulation [54].
The construction specification was the principal simulation input, as the thermal properties of the building fabric directly influence heat transfer and indoor thermal conditions. Accordingly, each shelter type was modelled using its specific wall, roof, and floor assemblies, with differences in material composition, insulation, and thermal characteristics explicitly represented in the simulations. Internal heat gains were defined based on occupant numbers and appliance use, with the adopted values reported in Table 1 [55].
Table 1. Internal heat gains (values adapted from [55]).
Natural ventilation was assumed for all shelter types to reflect the operating conditions of temporary emergency shelters in the study context, where reliable mechanical heating, cooling, and ventilation cannot be assumed. Accordingly, mechanical heating, air conditioning, and mechanically driven ventilation (e.g., fans) were excluded. The resulting operational electricity consumption therefore primarily represents common appliance and plug loads and is not interpreted as conventional HVAC-based whole-building energy performance. The simulations were instead used to assess the passive thermal performance of the shelter envelopes under natural-ventilation conditions.
Ventilation rates, window-opening schedules, infiltration, and shading were not independently varied or calibrated, and occupant-driven variations in solar and internal heat gains were not parametrically investigated. These factors may influence indoor thermal conditions and are therefore recognised as sources of uncertainty in the predicted thermal-comfort results. The findings are consequently interpreted as a comparative assessment under consistent modelling assumptions, rather than as an absolute validation of occupant thermal comfort.

2.6. LCA Assumptions and Inventory

Several assumptions were established for the LCA and LCC analyses to ensure a consistent and comparable basis for evaluating the environmental and economic performance of the three emergency shelter systems. The principal assumptions are as follows:
  • Assessment period: A service life of 15 years was adopted for all shelter systems. Previous studies have reported service lives of approximately 15–25 years for emergency and temporary shelters [2,18,56]. The 15-year period was selected to reflect the temporary nature of the shelters and the assumption of limited maintenance over the assessment period.
  • Functional equivalence: The prefabricated, container-based, and 3DP shelters were assessed on an equivalent functional basis, with the same 32.2 m2 usable floor area and an occupancy of four persons.
  • Construction and material conditions: Material specifications, construction methods, and relevant production conditions were assumed to remain unchanged over the assessment period.
  • Energy conditions: The electricity mix and associated emission factors were assumed to remain constant throughout the 15-year assessment period.
  • Component service life: Major structural and building components were assumed to remain in service for the full assessment period unless a shorter service life was explicitly specified in the inventory.
  • End-of-life recovery: Partial recovery of construction materials was assumed at the end of the service life, with recovery pathways determined according to the material type and shelter construction system.
  • Operational energy: Annual operational electricity consumption was assumed to remain constant over the 15-year assessment period.
  • Maintenance: Maintenance requirements and associated costs were based on the adopted current-condition assumptions and were assumed to remain constant throughout the assessment period.
  • LCC scope: Land, furniture, landscaping, insurance, and property taxes were excluded because they are not directly attributable to the construction and operation of the shelter systems within the defined assessment scope.
  • Thermal and operational modelling: All shelters were modelled under natural-ventilation conditions, with mechanical heating, cooling, and mechanically driven ventilation excluded. This assumption reflects the operating context of temporary emergency shelters considered in this study. Accordingly, the operational electricity results primarily represent common appliance/plug-load consumption and are not interpreted as conventional HVAC-based whole-building energy performance. The thermal simulations were used to evaluate the passive thermal performance of the shelter envelopes under natural-ventilation conditions.
  • Energy cost: Annual electricity costs were derived from the simulated annual electricity consumption obtained from IESVE and the applicable electricity tariff April 2025.
  • Functional unit: The LCA functional unit was defined as one emergency shelter accommodating four occupants, providing 30 m2 of usable floor area, over a 15-year service life.
The life-cycle inventory was developed from the construction specifications and material quantities of each shelter system. For each material component, embodied energy (EE) and embodied carbon (EC) were calculated from the corresponding material quantity and the relevant EE and EC factors. Material quantities were determined from the component geometry, density, and specified dimensions. The Inventory of Carbon and Energy (ICE), Version 1.6a, was used as the primary source of EE and EC factors, while secondary data were adopted for materials or mixtures not directly represented in the database, as described in Section 2.5.
Equations (1)–(4) were used to calculate material quantities and their associated EE and EC contributions. First, the volume of each material component was determined using Equation (1). Material mass was then calculated from the corresponding density. The resulting mass was multiplied by the relevant EE and EC factors to quantify the embodied impacts of each component. The component-level results were subsequently aggregated to obtain the total embodied energy and embodied carbon of each shelter system.
V = W × H × D
where:
V = Volume of material (m3)
W = Width (m)
H = Height (m)
D = Depth (m)
Equation (2) was used to convert the volume of the materials to mass (as all the embodied energy and emissions data in ICE are in mass).
M = V × ρ
M = Mass of material (kg)
ρ = Density of material (kg/m3)
The embodied energy was determined using Equation (3).
E E = M × E E I C E
EE = Embodied energy (MJ)
EEICE = Embodied energy per kg of material from ICE data (MJ/Kg)
The embodied carbon was determined using Equation (4)
E C = M × E C I C E
EC = Embodied carbon (kg CO2)
ECICE = Embodied carbon per kg of material from ICE data (kg CO2/kg)
For doors and windows, the EEICE and ECICE were accounted for by the total element. To compute Embodied Energy (EE) and Embodied Carbon (EC) for 3DP concrete, the constituent materials and their percentages were obtained from previous studies. Subsequently, EE and EC values for these materials were obtained from the Inventory of Carbon and Energy (ICE) database Version 1.6a [52] to determine the overall EE and EC for 3DP concrete.
Although the ICE database is primarily based on UK construction-material data, it is widely used internationally for life-cycle assessment and provides a consistent source of embodied energy (EE) and embodied carbon (EC) data [57]. At the time of this study, no recognised and sufficiently comprehensive national database for construction-material EE and EC was available for the case-study context. Therefore, the ICE database was adopted to ensure consistency and transparency in the assessment.
As ICE does not provide specific EE and EC data for the concrete mixture used in three-dimensional printing (3DP), secondary data from previous research were adopted [56]. The 3DP concrete mixture comprises 42.02% cement, 46.22% sand, 10.50% water, 0.42% admixture, and 0.42% superplasticiser with polypropylene [58]. The EE and EC values of the individual constituents were used to calculate the total EE and EC of the 3DP concrete based on its composition.
For the end-of-life assessment, recovery rates of 90% for container shelters, 70% for prefabricated concrete shelters, and 50% for 3DP shelters were assumed based on their relative material recoverability, dismantling characteristics, and available recycling pathways [59,60,61,62,63]. The higher rate for container shelters reflects their modular, predominantly steel construction, which facilitates dismantling, component reuse, and steel recycling. Prefabricated concrete shelters were assigned an intermediate rate because components can be reused and concrete can be crushed into recycled aggregate, although complete recovery is constrained by material connections and separation requirements. The lower rate for 3DP shelters reflects the limited potential for direct component reuse and the current reliance on crushing printed concrete for recycled aggregate [59,60,61,62,63]. These assumptions provide a consistent basis for comparing the end-of-life environmental performance of the three shelter systems.
Equations (5) and (6) were used to compute the end-of-life embodied energy and carbon emissions, accounting for recovered materials. The end-of-life (EL) embodied energy was calculated according to [64] using Equation (5). As the materials will be recovered in this stage, this assumes that the material’s embodied energy and carbon emissions will always be presented as a negative outstanding. The recovery is accounted for from A1 to A3 of the materials. If this material is reused, it replaces virgin materials that can be used in the construction of the shelters. This is important to avoid double counting of embodied energy and carbon.
E L e e = − E E × r e c o v e r e d   m a t e r i a l s                
ELee = The end-of-life embodied energy (MJ)
EE = The embodied energy (MJ)
The end-of-life embodied emissions were calculated according to [61] using Equation (6).
E L e c = − E C × r e c o v e r e d   m a t e r i a l s
ELec = The end-of-life embodied carbon per (Kg/CO2)
EC = The embodied carbon (Kg/CO2)
Finally, the total life-cycle energy (LCE) and carbon emissions (LCCE) for each shelter type were determined by summing the embodied energy and emissions, operational energy and emissions over the 15-year lifespan, and end-of-life embodied energy and emissions, as shown in Equations (7) and (8).
To calculate the total life-cycle energy for the three emergency shelter types, Equation (7) was used.
L C E = E E + O E × 15 + E L

2.7. Life-Cycle Cost (LCC) Calculation

To compute the LCC for the three types of emergency shelters, the costs associated with construction, services, maintenance, operation, and end-of-life were assessed and aggregated to determine the total LCC. The construction cost of the emergency shelters was calculated by first determining the quantities of materials required based on the design specifications. Subsequently, the cost of each construction material and the corresponding labour wages were allocated using recent official pricing tables provided by the Syrian General Company of Housing. The total construction cost was then calculated using Equation (9):
C o n s t r u c t i o n   c o s t   = ∑ m a t e r i a l   q u i n t i t y ×   m a t e r i a l   a n d   c o n s t r u c t i o n   c o s t    
The service costs, including plumbing and electricity, were estimated at SYP 609 per m2 [65], equivalent to USD 0.05 per square meter, considering the prevailing exchange rate (https://www.excontainerange-rates.org, retrieved on 26 February 2024). Hence, the service cost for the three types of shelters can be computed using Equation (10):
S e r v i c e s   c o s t = T h e   f l o o r   a r e a   ×   0.05
The maintenance cost was estimated at 6% of the initial construction cost, based on the assumption that the lifespan of emergency shelters is 15 years [63], and it was calculated using Equation (11):
M a i n t e n a n c e   c o s t = 6 %   o f   c o n s t r u c t i o n   c o s t  
The total energy consumption for the three types of emergency shelters was determined using IESVE. The operation cost, as determined by Equation (12), was computed as the product of the operational energy and the energy tariff in Syria, which was approximately USD 0.08 per kWh [66]. Hence, the actual post-disaster energy expenditure may differ substantially from grid-based estimates because of unreliable electricity supply, diesel-generator operation, fuel costs, and limited access to affordable energy. These factors are highly site-specific and cannot be adequately represented by a single standard tariff. They are therefore identified as an important limitation and a priority for future, location-specific LCC assessments.
O p e r a t i o n   c o s t = O E × S y r i a n   e n e r g y   t a r r i f f
The simulated annual operational energy demand was used to estimate electricity costs within the LCC analysis. At the time of the assessment in early 2025, Syria’s electricity sector was characterised by heavily subsidised tariffs, severe supply constraints, and limited grid reliability. Residential electricity was therefore assumed to cost approximately USD 0.08/kWh, consistent with the flat, subsidised tariff prevailing during the study period. The annual electricity consumption predicted by IESVE, approximately 5500 kWh per shelter, was multiplied by this tariff and projected over the assumed 15-year service life. Because all three shelter alternatives had the same simulated annual energy demand, their electricity costs were identical and did not affect the comparative LCC results.
The effect of alternative energy-price conditions is nevertheless relevant to the interpretation of the LCC results. Higher electricity prices would increase the operational and total life-cycle costs of all alternatives proportionally but would not change their relative ranking because their annual energy demand is identical. Thus, the assumed tariff influences the absolute LCC values but not the comparative conclusions of the analysis.
Since completion of the assessment, Syria has replaced the previous subsidised pricing arrangement with a tiered electricity tariff ranging from SYP 600/kWh for lower-consumption households to SYP 1800/kWh for high-consumption users. This reform has substantially increased household electricity bills and raised concerns regarding affordability. These revised tariffs were not incorporated into the primary LCC analysis because they post-date the study-period assumptions. Nevertheless, they highlight the sensitivity of long-term shelter costs to energy-price changes and the need to consider alternative renewable energy in future post-disaster assessments. Actual energy expenditure may also be affected by unreliable grid supply, diesel-generator use, fuel costs, and energy-access constraints; these site-specific factors warrant further investigation where reliable data are available. The implications of the tariff reform for future shelter deployment are discussed further in the Discussion section.
Given the substantial economic volatility in the Syrian context, the LCC analysis was conducted using a Net Present Value (NPV) approach to account for the time value of money over the 15-year assessment period. The inflation rate was assumed to be 27.5%, based on data reported by the Syrian Center for Policy Research [67]. In accordance with ISO 15686-5, which recommends the use of discounted cash-flow methods for LCC of construction assets [68], future costs were discounted to their present value using the adopted discount rate. This approach provides a more consistent basis for comparing alternatives with different initial, maintenance, and operational cost profiles under conditions of high economic uncertainty. As the inflation rate is significantly high in the Syrian context, the NPV calculation (13) is implemented.
N P V = ∑ t = 0 n   A t 1 + i t − A 0
In this equation: At—Cash flow at the end of the nth year (will be presented here as the maintenance, service, and operation running cost for the shelters); A0—Initial investment amount; i—Discount rate; n—Investment calculation period.

2.8. Thermal Comfort and Indoor Air Evaluation

Thermal comfort and indoor air temperature were evaluated to assess the operational performance of the three emergency shelter systems, as these factors are critical determinants of occupant health, wellbeing, and overall shelter habitability in post-disaster environments. Dynamic thermal simulations were undertaken using the IES Virtual Environment (IESVE), employing the ApacheSim simulation engine. The simulations were performed in accordance with the principles of CIBSE TM52 and ASHRAE Standard 55, enabling the prediction of indoor thermal conditions and occupant thermal comfort under representative climatic conditions [69].

2.9. Validation and Benchmarking

To evaluate the robustness and credibility of the proposed assessment framework, the results were benchmarked against published studies reporting the environmental and techno-economic performance of comparable post-disaster shelter systems. As the shelter designs evaluated in this study are conceptual and no monitored operational or post-occupancy data are currently available, empirical validation against measured energy consumption, indoor environmental conditions, or actual construction costs was beyond the scope of this research.
The benchmarking exercise compared the predicted embodied energy, embodied carbon, life-cycle costs, and thermal performance with values reported in the literature for temporary, modular, and prefabricated emergency shelters developed using similar assessment methodologies [70]. The comparison demonstrates good agreement with previously published findings, particularly regarding the relative environmental performance of container-based and prefabricated shelter systems and the trade-offs between environmental impact, economic performance, and thermal comfort.
Rather than validating the absolute accuracy of the simulation outputs, the benchmarking exercise provides confidence that the adopted modelling approach produces results that are consistent with established research and current best practice. This approach is widely adopted in simulation-based environmental assessments where field measurements or post-occupancy data are unavailable and provides an appropriate basis for evaluating the comparative performance of alternative shelter systems.

3. Results

This section presents the IESVE simulation results for operational, embodied, and end-of-life energy performance; total LCA and LCC; and thermal performance and indoor air temperature for the three emergency shelter types.

3.1. Total Life-Cycle Assessment

The calculation of the three shelters’ life-cycle impacts, including operational energy and carbon, embodied energy and carbon, and end-of-life energy and carbon emissions, will be presented in this section.

3.1.1. Operational Energy and Emissions Performance Analysis of the Shelter Types

The operational energy and emissions performance of the post-disaster shelters was analyzed using the Integrated Environmental Solutions Virtual Environment (IESVE, 2023 version) program. As all shelter types have the equipment listed in Table 1, the energy consumption and carbon emissions were identical (no HVAC system is used; therefore, the different construction types did not affect energy consumption). The Syrian electricity grid CO2 emission factor is 0.61 kgCO2/kWh and the primary energy factor is 1.159 kWh/kWh [66].
The monthly energy consumption and carbon emissions are shown in Figure 3 and Figure 4. The average monthly energy consumption is 0.45 MWh, and the annual energy consumption is 5.5 MWh. The average carbon emissions are 65 kg CO2, and the annual emissions are 775 kg CO2. In general, both energy consumption and carbon emissions follow the same pattern throughout the year, resulting from the use of the same equipment across all shelter types and the absence of an HVAC system.
Figure 3. The shelter’s monthly energy consumption.
Figure 4. The shelter’s monthly carbon emissions.
To effectively compare operational energy with embodied energy and the energy associated with the shelter’s end-of-life phase, it is necessary to convert units from kilowatt-hours (kWh) to gigajoules (GJ). This conversion was performed by multiplying the total operational energy consumption (in kWh) by 0.0036, since 1 kWh is equivalent to 0.0036 GJ [71]. Thus, the operational energy is 19.8 GJ, and the total carbon emissions are 0.78 t/CO2.
This conversion factor enabled a consistent comparison of operational, embodied, and end-of-life energy, all expressed in gigajoules. This comparison is crucial for understanding the shelter’s overall energy impact throughout its lifecycle, providing a comprehensive view of its environmental performance.

3.1.2. Embodied Energy and Emissions

The Embodied Energy (EE) and Embodied Carbon (EC) of three types of emergency shelters, container, prefabricated, and 3DP, are crucial indicators of their environmental impact. These metrics represent the total energy and carbon emissions associated with the production, transportation, and assembly of the materials used in constructing these shelters. Appendix B shows the details of the EE and EC calculations for the three shelters.
To accurately calculate the EE and EC for the 3DP shelter, it was necessary first to determine these values for the concrete used in the 3DP construction. This is because concrete is a primary material in 3D-printing, significantly shaping the structure’s overall energy and emissions profile. The calculations for the concrete’s EE and EC are shown in Table 2. To calculate the EE and EC for the 3DP, the EE and EC for the concrete used for the 3DP are determined. Table 2 reveals that the EE for concrete used in 3DP construction is 2.54 MJ/kg, whereas the EC is 0.38 kg CO2/kg.
Table 2. EE and the EC for the concrete used for the 3DP construction.
For 3DP construction, the wall thickness varies between 15, 16, 17, and 24 cm, according to the use and construction methods [58,72]. For this research, a thickness of 17 cm was selected (as the construction is a lightweight structure). Table 3 shows the different elements of the three shelters, EE and EC. All calculations are based on 1 kg of 3DP concrete. Thus, the reported constituent masses (e.g., 0.4202 kg of cement) represent the mass of each constituent per 1 kg of concrete and correspond to 42.02% by mass. Figure 5 compares EE and EC across the three types of emergency shelter construction.
Table 3. EE and the EC for container, prefabricated, and 3DP.
Figure 5. Comparison of the embodied energy/carbon of the three shelter types.
The results show that the container-based shelter has the lowest embodied energy (107.9 GJ) and embodied carbon (9.7 tCO2), followed by the prefabricated shelter (115.3 GJ and 9.8 tCO2). The 3D-printed (3DP) shelter exhibits the highest embodied energy (123.8 GJ) and embodied carbon (17.2 tCO2), approximately 14.7% and 77.3% higher than the container-based alternative, respectively. These findings indicate that container-based shelters currently offer the best environmental performance, while the higher impacts of 3DP are primarily associated with carbon-intensive printable materials.

3.1.3. End-of-Life Energy and Emissions

The end-of-life phase of emergency shelters plays a crucial role in determining their overall environmental impact. This phase encompasses dismantling, material recovery, reuse, recycling, and final disposal. The environmental performance of this stage is strongly influenced by the selected end-of-life management scenario and the proportion of materials that can be recovered. The associated environmental impacts are quantified as end-of-life embodied energy (ELEE) and end-of-life embodied carbon (ELEC), which account for both the burdens associated with demolition and waste processing and the environmental credits obtained from material recovery that displaces the production of virgin materials.
Consistent with established LCA practice, a scenario-based approach was adopted to model end-of-life material flows, recognising that actual recovery rates depend on material characteristics, dismantling methods, available recycling infrastructure, and local waste management practices rather than assuming complete recovery (ISO 14044, 2006; EN 15978, 2011). Accordingly, recovery rates were assigned according to the expected recoverability of each shelter system. Container shelters were assumed to achieve the highest material recovery because of their modular steel construction and bolted connections, which facilitate disassembly and component reuse. Prefabricated shelters were assigned an intermediate recovery rate owing to the presence of prefabricated panels and composite assemblies that reduce the efficiency of material separation. In contrast, 3DP shelters were assumed to have the lowest recovery rate because their monolithic concrete construction limits selective dismantling and high-value material recovery.
Based on these considerations, 30% of the container shelter materials were assumed to be directly reused, 60% recycled, and 10% disposed of in landfill or conventional waste treatment, resulting in a total recovery rate of 90%. For prefabricated shelters, 20% of the materials were assumed to be reused, 50% recycled, and 30% disposed of, corresponding to an overall recovery rate of 70%. For 3DP shelters, 10% of the materials were assumed to be reused, 40% recycled, and 50% disposed of, reflecting the comparatively limited opportunities for recovering monolithic concrete elements. These assumptions are consistent with circular economy principles and published evidence indicating that steel-based modular construction generally achieves substantially higher recovery rates than concrete-based construction systems (ISO 14044, 2006; EN 15978, 2011).
Table 4 presents the end-of-life EE and EC values for three different types of emergency shelters (Container, Prefabricated, and 3DP):
Table 4. End-of-life energy and emissions of the three MMC emergency shelter systems.
  • EE (GJ): Embodied energy in gigajoules (GJ).
  • EL_ee (GJ): End-of-life embodied energy.
  • EC (t/CO2): Embodied carbon.
  • EL_ec (kg CO2): End-of-life embodied carbon.
As shown in Table 4, container shelters exhibit the greatest end-of-life environmental benefits, with an embodied energy recovery credit of 97.1 GJ and an embodied carbon credit of 8.8 t CO2. These substantial credits are attributable to the high reuse and recycling potential of steel structural components, which can be efficiently dismantled and recovered. Prefabricated shelters achieve moderate recovery credits (80.7 GJ and 6.9 t CO2), reflecting the partial recoverability of prefabricated elements and the challenges associated with separating composite materials. Although material recovery still provides significant environmental benefits, the lower recovery rate results in higher net end-of-life impacts than those of container shelters.
The 3DP shelters exhibit the highest embodied energy (123.8 GJ) and embodied carbon (17.2 t CO2) at the end of life, while providing the lowest energy recovery credit (61.9 GJ). This comparatively lower recovery efficiency reflects the current limitations of dismantling and recycling monolithic concrete structures. Although a carbon credit of 8.6 t CO2 is achieved through material recovery, the overall end-of-life environmental burden remains higher than that of the other shelter systems.
For this study, we assume the recovery percentage follows three scenarios: 75%/25%, 50%/50%, and 25%/75%, Table 5. In the first, optimistic scenario (1), where the available resource is abundant, the recovery percentage can reach 75%; in the moderate scenario (2), 50%; and where less recycling resource is available, the recovery percentage can be 25% in scenario (3).
Table 5. Recovery scenarios for the end-of-life energy and emissions.
Overall, the findings indicate that container shelters provide the most favourable end-of-life environmental performance because of their superior reuse and recycling potential. Prefabricated shelters represent an intermediate solution, whereas 3DP shelters currently exhibit the highest end-of-life energy demand and carbon emissions. These results underscore the importance of integrating design-for-disassembly principles and improving recycling technologies for emerging construction systems, particularly 3D-printed concrete structures, to enhance their long-term environmental sustainability.

3.1.4. Total Life Energy and Emissions

Total life-cycle energy and emissions are critical metrics that provide a comprehensive understanding of the environmental impact of emergency shelters, from construction through operation to end of life. By considering all stages of the shelter’s life cycle, including embodied energy and carbon, operational energy and carbon, and the impacts of end-of-life processes, decision-makers can better assess the sustainability of different shelter types.
Figure 6 and Figure 7 present the total LCA energy and emissions results for three types of emergency shelters. Total energy represents the combined embodied energy, operational energy, and end-of-life embodied energy, providing a complete picture of the energy demands throughout the shelter’s lifecycle. Similarly, total carbon is the sum of embodied, operational, and end-of-life embodied carbon, reflecting the total carbon footprint over the shelter’s lifecycle.
Figure 6. Total life energy of the three MMC emergency shelter systems.
Figure 7. Total life carbon of the three MMC emergency shelter systems.
Figure 6 and Figure 7 show that the total energy and emissions for container shelters were lower compared to the prefabricated and 3DP shelters. When comparing the lower recovery percentage in scenario (3), 3DP total life energy is 7% higher than the container total energy and 3% higher than the prefabricated. Total carbon life follows the same pattern, with the container having lower life carbon emissions. Total life emissions for 3DP are 39% and 37% higher than the container and prefabricated shelters, respectively.
The 3DP shelters have the highest total life energy at up to 405.8 GJ, driven by a high initial embodied energy and the lowest energy recovery of at the end of life. This indicates that 3DP shelters are the most energy-intensive option over their entire lifecycle. The carbon footprint of 3DP shelters is also the highest, with total life carbon emissions up to 26.9 t CO2. This is due to the high embodied carbon, which, even after accounting for the end-of-life recovery, leaves a substantial net carbon impact.
The results in this section indicate that container shelters are the most energy- and carbon-efficient option across their entire lifecycle, making them the most environmentally sustainable choice for emergency shelters. Prefabricated shelters, while more energy- and carbon-intensive than containers, still offer a relatively balanced profile. However, 3DP shelters, despite their innovative appeal, currently exhibit the highest total life energy consumption and carbon emissions, underscoring the need for further development in materials and processes to improve their sustainability in post-disaster scenarios.

3.2. Life-Cycle Costing

The LCC analysis for the Container, Prefabricated, and 3D-Printed (3DP) shelters includes costs incurred across the shelter’s lifecycle, including construction, services, maintenance, operation, and end-of-life. Appendix B shows the details of the construction materials’ amount, cost, and overall cost. The construction costs (calculated using Equation (9)) for each shelter type were determined to be a significant component of the LCC and were therefore meticulously calculated. The results are presented in Table 6, which details the specific costs associated with constructing Container, Prefabricated, and 3DP shelters.
Table 6. The construction cost of the three MMC emergency shelter systems.
−
Container Shelters: The construction cost for a Container emergency shelter was calculated based on the materials, labour, and other resources required for its assembly. This type of shelter is typically less expensive to construct because it uses repurposed shipping containers and straightforward assembly.
−
Prefabricated Shelters: Prefabricated shelters, while still economical, involve higher construction costs compared to Container shelters. This is due to the additional off-site fabrication processes required, including the manufacture of panels and other structural components.
−
3DP Shelters: The construction cost for 3DP shelters includes not only the cost of materials but also the substantial expense of the 3D-printing technology itself. For this study, the cost of a 3D-printer, averaging USD 650,000, was amortised over the construction of 100 shelters, resulting in an additional USD 6500 per shelter. This cost, combined with the cost of construction materials and labour, makes the 3DP shelter the most expensive option among the three.
In addition to construction cost, the LCC analysis also considers services (calculated using Equation (10)), maintenance (calculated using Equation (11)), operation (calculated using Equation (12)), and end-of-life costs (calculated using Equation (13)), which are essential for a comprehensive understanding of the total financial investment required over the shelter’s lifespan.
−
Service Costs: The service costs, which include minor expenses such as routine inspections and small repairs, were calculated using a standardised formula (Equation (10)). These costs are relatively low and uniform across all three shelter types, with an estimated cost of USD 1.50 per shelter.
−
Maintenance Costs: Maintenance costs, a significant portion of the LCC, were determined as a percentage of the initial construction cost. For the Container shelter, with a construction cost of USD 58,325, maintenance costs were estimated at 6%, totaling USD 3500. Prefabricated shelters, with higher initial costs, incurred maintenance expenses of USD 3980, while the 3DP shelters, the most expensive to construct, had the highest maintenance costs at USD 4519.
−
Operation Costs: Operation costs were derived from the energy consumption required to maintain the shelter over its expected lifespan of 15 years. Using Equation (12), the total energy consumption was multiplied by the cost per kilowatt-hour (kWh) to yield an operational cost of USD 6600 per shelter type.
Figure 8 presents the total life-cycle costs for each type of emergency shelter, summing up the construction, service, maintenance, operation, and end-of-life costs:
Figure 8. Life-cycle cost of the three MMC emergency shelter systems.
Container shelters’ total LCC is the lowest at USD 68,427, primarily because their high material recovery rate at the end of life significantly offsets initial construction costs. Prefabricated shelters have a total LCC of USD 76,908. While their construction and maintenance costs are higher than those of container shelters, they remain a relatively economical option, particularly given their moderate end-of-life cost recovery. The 3DP shelters have the highest total LCC at USD 86,442, driven by their high construction costs and lower material recovery at the end of life. This highlights the current financial challenges associated with adopting 3D-printing technology in emergency shelter construction.
The LCC results indicate clear differences in the economic performance of the three shelter systems over the 15-year assessment period. Container-based shelters provide the lowest life-cycle cost, primarily because of their lower initial construction cost and the assumed potential for material recovery at the end of the service life. Prefabricated shelters occupy an intermediate position, representing a balance between initial investment and life-cycle expenditure. In contrast, 3D-printed (3DP) shelters have the highest life-cycle cost, driven principally by their higher initial construction cost and associated running costs.
The NPV results, presented in Table 7, incorporate the time value of money over the 15-year assessment period. Service, operation, and maintenance expenditures are represented as cash outflows in the NPV calculation, whereas initial construction expenditure is treated as the upfront investment. The results show NPVs of USD 94,099.21, USD 103,800.04, and USD 114,703.78 for the container, prefabricated, and 3DP shelters, respectively. Thus, under the economic assumptions adopted, the container shelter represents the most economically favourable option, while the 3DP shelter incurs the highest discounted life-cycle expenditure.
Table 7. NPV of the three MMC emergency shelter systems.
These results should be interpreted in the context of the high economic volatility and uncertainty of the Syrian post-conflict environment. The NPV values reflect the adopted price and discount-rate assumptions and therefore represent a comparative economic scenario rather than fixed future costs. Nevertheless, the relative ranking indicates that the higher upfront and running costs of 3DP construction would need to be offset by reductions in construction time, labour requirements, material consumption, or other project-specific benefits for 3DP to become economically competitive with the alternatives considered.

3.3. Thermal Comfort and Indoor Air Temperature: Simulation Results

Dynamic thermal simulations were conducted in IESVE for the three shelter systems to evaluate indoor air temperature and thermal comfort under the climatic conditions of southern Damascus. The results are presented in Figure 9, which illustrates the variation in indoor air temperature and thermal comfort from January to December, together with the corresponding daytime conditions. The figure presents air temperature in °C on the vertical axis, months on the horizontal axis, and daytime hours across the depth axis, with the colour scale indicating the magnitude of indoor air temperature.
Figure 9. The thermal comfort and indoor air temperature of the three MMC emergency shelter systems.
The simulations reveal clear differences in the thermal response of the three shelter systems. For the container shelter, indoor air temperatures vary substantially throughout the year, ranging from approximately 15 °C during winter and cooler morning periods to 35–40 °C during summer daytime conditions. The prefabricated shelter exhibits a broadly similar seasonal pattern, although some elevated temperatures are observed during September and October. In contrast, the 3DP shelter demonstrates a more moderated thermal response, with indoor temperatures generally remaining within approximately 15–30 °C and substantially lower peak temperatures during the hottest periods. This behaviour is attributed primarily to the greater wall thickness and thermal mass of the 3DP envelope.
Thermal comfort was assessed using the IESVE thermal comfort index, with the simulation framework aligned with the principles of CIBSE TM52 and ASHRAE 55 and relevant parameters defined in accordance with ISO 7730 and ASHRAE 55. The assessment considers key thermal comfort variables, including occupant activity, indoor air temperature, and mean radiant temperature. Under the adopted natural-ventilation scenario, the results indicate that the container and prefabricated shelters exhibit broadly similar comfort patterns. Conditions are generally more acceptable during cooler winter and morning periods, whereas thermal discomfort increases substantially during the warmer months, particularly from May to October, when elevated indoor temperatures exceed the adopted comfort range.
The 3DP shelter demonstrates a comparatively more stable thermal environment. Acceptable or satisfactory conditions are maintained for a greater proportion of the year, although thermal discomfort remains evident during the hottest periods and around midday. Overall, the predicted thermal satisfaction is approximately 70% for the 3DP shelter, compared with approximately 50% for both the container and prefabricated shelters. These results indicate that the 3DP envelope provides a measurable thermal-performance advantage under the assumed natural-ventilation conditions.
The findings should, however, be interpreted within the modelling assumptions adopted in this study. Mechanical heating, cooling, and ventilation were not included, reflecting the limited availability and reliability of such systems in post-disaster and energy constrained settings. Consequently, the thermal results primarily demonstrate the passive thermal performance of the shelter envelopes rather than conventional HVAC-assisted comfort. The relatively high indoor temperatures observed in all three systems during the hot season also indicate that additional measures including improved insulation, solar shading, enhanced ventilation strategies, and increased thermal control would be required to achieve consistently acceptable thermal conditions. These findings reinforce the importance of considering thermal performance alongside environmental and economic indicators when selecting shelter systems for hot-climate, resource-constrained post-disaster applications.

4. Discussion and Analysis

A comparative analysis of the life-cycle environmental and financial impacts of three distinct types of emergency shelters: container, prefabricated, and 3D-printed (3DP) has been carried out. In post-disaster scenarios. This research is the first to evaluate the comprehensive life-cycle impacts of 3DP shelters compared with conventional container and prefabricated shelters. A unified design was employed to ensure a valid basis for comparison, with calculations encompassing overall energy consumption, emissions, and costs.

4.1. Life-Cycle Energy and Emissions

The operational energy demand was identical across the three shelter systems, with each shelter consuming approximately 5.5 MWh annually and generating 0.78 t CO2 in operational emissions over the assumed assessment period. This equivalence results from the modelling assumption that all shelter types have the same occupancy, appliance loads, and operational electricity demand, while mechanical heating, cooling, and ventilation are excluded. Accordingly, differences in whole-life performance arise primarily from embodied impacts and end-of-life recovery, rather than operational energy use.
As shown in Figure 5, the 3DP shelter has the highest embodied energy (EE), at 123.8 GJ, while the container shelter has the lowest, at 107.9 GJ. The 3DP shelter also exhibits the highest embodied carbon (EC). This difference is primarily attributable to the 3DP concrete mixture, which accounts for approximately 81% of total embodied energy and 87% of total embodied carbon of the 3DP shelter.
The environmental intensity of the 3DP concrete is higher than that of the concrete used in the prefabricated shelter. The latter has an EE of 2.00 MJ/kg and an EC of 0.215 kg CO2/kg, compared with 2.54 MJ/kg and 0.38 kg CO2/kg, respectively, for the 3DP concrete. This difference makes a substantial contribution to the higher embodied impacts of the 3DP shelter. Although steel has considerably higher material-level impacts (31.5 MJ/kg EE and 2.51 kg CO2/kg EC), its relatively low mass in the container shelter results in a lower overall contribution than the concrete-intensive 3DP and prefabricated alternatives.
End-of-life (EOL) impacts were evaluated using assumed material-recovery scenarios to examine the potential environmental benefits associated with reuse and recycling. The baseline recovery assumptions were 90% for container shelters, 70% for prefabricated shelters, and 50% for 3DP shelters. Under these assumptions, the estimated EOL energy recovery was 97.1 GJ, 80.7 GJ, and 61.9 GJ for the container, prefabricated, and 3DP shelters, respectively. The corresponding EOL carbon recovery was 8.8, 6.9, and 8.6 t CO2, respectively.
To test the influence of recovery assumptions, three recovery scenarios were subsequently examined: optimistic (75% recovery/25% non-recovery), moderate (50%/50%), and conservative (25%/75%). For container shelters, the corresponding recovered energy was 73, 49, and 24 GJ, respectively. For prefabricated shelters, recovered energy ranged from 20 to 61 GJ, while the 3DP shelter yielded 15–46 GJ across the three scenarios. The corresponding carbon recovery followed the same general trend, with higher recovery rates producing greater potential environmental benefits. These scenarios demonstrate that EOL outcomes are sensitive to material recovery rates and should therefore be interpreted as scenario-based estimates rather than guaranteed environmental credits.
The resulting whole-life assessment indicates clear differences among the three shelter systems. The container shelter achieves the lowest total life-cycle energy and carbon emissions, whereas the 3DP shelter has the highest overall impacts. The total life-cycle energy of the 3DP shelter is approximately 7% higher than that of the container shelter and 3% higher than that of the prefabricated shelter. A similar pattern is observed for whole-life carbon, with the 3DP shelter producing approximately 39% more life-cycle carbon than the container shelter and 37% more than the prefabricated shelter.
The higher whole-life impacts associated with the 3DP shelter are primarily attributable to two factors: (i) the higher embodied energy and carbon intensity of the 3DP concrete mixture compared with the concrete used in the prefabricated shelter; and (ii) the lower assumed material-recovery rate for 3DP construction at end of life. Conversely, the container system benefits from comparatively low embodied impacts and a higher assumed recovery potential.
Overall, the results demonstrate that 3DP construction does not currently provide the lowest whole-life environmental performance under the assumptions adopted in this study, despite its advantages in thermal performance. The findings therefore reinforce the importance of evaluating post-disaster shelter systems using multiple performance criteria rather than relying on a single environmental or operational indicator.

4.2. Total Life-Cycle Cost

The second part of the study evaluates the LCC of the three emergency shelter systems—container-based, prefabricated, and 3DP over the assumed 15-year service life. The assessment incorporates initial construction, building services, maintenance, operational energy, and end-of-life costs, thereby providing a consistent basis for comparing their long-term economic performance.
Construction costs were estimated from the material quantities defined by the common design specifications, with material prices and labour costs obtained from the most recent available official pricing data. The results show that the container shelter has the lowest initial construction cost (USD 58,325), followed by the prefabricated shelter (USD 66,326) and the 3DP shelter (USD 75,321). The higher initial cost of the 3DP option is primarily associated with the equipment and specialised processes required for 3D-printing. Previous studies have similarly reported that 3DP construction can involve substantially higher initial costs than conventional construction methods [74,75].
Building service costs, comprising plumbing and electrical installations, were estimated at SYP 609/m2, equivalent to approximately USD 0.05/m2 based on the study-period exchange rate. For the common shelter floor area of 32.2 m2, this corresponds to an estimated service cost of approximately USD 1.50 per shelter. The same service-cost assumption was applied consistently across all three shelter types.
Maintenance costs were estimated as 6% of the initial construction cost, resulting in approximately USD 3500 for the container shelter, USD 3980 for the prefabricated shelter, and USD 4519 for the 3DP shelter. The higher maintenance allowance for the 3DP option reflects its higher initial construction cost rather than an assumption of inherently poorer durability.
Operational costs were estimated from the annual electricity demand predicted by the IESVE simulations. As discussed in Section 2.7, all three shelter types were assumed to operate under natural ventilation without mechanical heating, cooling, or mechanically driven ventilation. Consequently, the simulated operational electricity demand, approximately 5500 kWh/year per shelter, primarily represents common appliance and plug loads rather than conventional whole-building HVAC energy performance. Applying the study-period Syrian electricity tariff to this common annual demand results in the same operational-cost contribution across the three shelter types. Given the economic volatility and energy-market uncertainty in Syria, these values should be interpreted as study-period, grid-based estimates rather than forecasts of future household energy expenditure.
The resulting life-cycle assessment indicates that the container shelter has the lowest undiscounted LCC, whereas the 3DP shelter has the highest. The estimated total life-cycle costs are approximately USD 68,427 for the container shelter and more than USD 86,442 for the 3DP shelter, with the prefabricated option occupying an intermediate position. Overall, the 3DP shelter is approximately 26% more expensive than the container shelter and 12% more expensive than the prefabricated alternative. These differences are driven principally by the higher initial construction cost of 3DP, rather than by differences in operational energy demand.
To account for the time value of money, the LCC was additionally evaluated using net present value (NPV) over the 15-year assessment period, consistent with the approach described in Section 2.7 and the relevant life-cycle costing guidance [68]. The resulting NPV values are USD −94,099.21 for the container shelter, USD −103,800.04 for the prefabricated shelter, and USD −114,703.78 for the 3DP shelter. Because these values represent discounted expenditure streams, the more negative value indicates a greater overall financial burden. Accordingly, the container shelter remains the most economically favourable option, while the 3DP shelter has the highest life-cycle financial burden.
These findings demonstrate that, under the assumptions and economic conditions adopted in this study, container-based shelters provide the strongest cost advantage, while 3DP shelters currently incur a substantial economic premium. However, the results should not be interpreted as evidence that 3DP is inherently economically uncompetitive. Reductions in printing-equipment costs, increased printing productivity, locally sourced materials, reduced labour requirements, and technological maturation could substantially alter its future cost position. Thus, the LCC results provide a context-specific economic comparison rather than a fixed-cost ranking across all post-disaster settings.

4.3. Thermal Comfort and Indoor Air Temperature

Thermal comfort levels are low across all three types. Under the assumptions adopted in this study, the 3DP demonstrated superior thermal comfort performance compared with the other two types, primarily due to its greater wall thickness of 17 cm, compared with 7.5 cm for the prefabricated type and 3 cm for the container type. Thicker external walls provide greater thermal mass, which can help moderate indoor temperature fluctuations and enhance thermal comfort, particularly in hot-climate regions.
Air temperature for the three types varies widely throughout the year. For the container shelter and prefabricated shelter, the temperature range is 15–40 °C; the 3DP is better for a range of 15–30 °C. The recommendation is to increase thermal insulation to lower the air temperature, particularly during the long summer months.
Many studies have evaluated the thermal performance of post-disaster shelters and have reported similar results. A study evaluating a container as a post-disaster temporary house in Gaza found that the indoor temperature of the shelter varies from 30 °C in summer to 12 °C in winter [4]. Another study evaluated two different designs for a shipping container as a post-disaster shelter. The study found the indoor temperature for the two designs was between 26.7 and 29 °C [76].

4.4. Benchmarking of the Assessment Framework

To evaluate the plausibility and robustness of the proposed assessment framework, the environmental and economic results obtained for the three shelter systems were benchmarked against comparable studies reported in the literature (Table 8). Because the shelter configurations assessed in this study have not yet been constructed and monitored under operational conditions, direct empirical validation is not currently possible. Literature-based benchmarking therefore provides an appropriate means of assessing whether the magnitude and direction of the predicted results are consistent with established evidence. Differences in absolute values were interpreted in relation to variations in system boundaries, functional units, construction specifications, material inventories, and economic assumptions.
Table 8. Benchmarking and validation of the present study against comparable published studies.
Study 1 examined the life-cycle environmental performance of container-based and prefabricated post-disaster shelters in Türkiye [77]. Consistent with the present study, the authors reported lower embodied energy (EE) and embodied carbon (EC) for container-based shelters than for prefabricated alternatives. The absolute values reported in [77] are higher than those obtained in the present study, primarily because of differences in construction specifications and system boundaries. In particular, the present assessment includes a 50 mm reinforced-concrete raft foundation, which accounts for more than 30% of the total embodied impacts and therefore has a substantial influence on the overall results.
Study 2 compared the environmental and economic performance of container-based and prefabricated shelters using both LCA and LCC [18]. The overall environmental ranking is consistent with the present findings, although the reported impacts per unit floor area differ. Such differences are expected because the two studies adopt different material specifications, functional units, and system boundaries. The higher life-cycle costs identified in the present study are also attributable to differences in construction costs, material prices, labour rates, and broader economic conditions, particularly given that the reference study was conducted approximately a decade earlier.
Study 3 assessed the embodied environmental performance of shipping-container housing and reported an embodied energy of 3210 MJ/m2 [78]. This value differs by approximately 4% from the corresponding result obtained for the container shelter in the present study. The close agreement provides useful support for the plausibility of the modelled embodied-energy results, despite differences in case-study context, material specifications, and methodological assumptions.
Study 4 evaluated the embodied environmental performance of prefabricated concrete buildings using alternative material configurations [50]. The higher embodied-energy values reported in that study can largely be explained by its broader construction scope, which included additional components such as external cladding, staircases, and ceiling systems that are not included in the shelter configurations assessed here. This comparison highlights the importance of maintaining consistent system boundaries when interpreting LCA results across studies.
Overall, the benchmarking indicates that the direction and relative magnitude of the key environmental findings are broadly consistent with previous research. In particular, the present study agrees with the literature in identifying container-based shelters as having lower embodied environmental impacts than comparable prefabricated alternatives. Differences in absolute values are principally attributable to variations in system boundaries, functional units, material specifications, building components, and economic assumptions.
This benchmarking should not be interpreted as empirical validation of the proposed framework, as such validation would require field implementation and measured operational data. Rather, it provides a literature-based plausibility check demonstrating that the outputs generated by the integrated WLC, LCA, LCC, and thermal-performance framework are broadly consistent with established findings. This strengthens confidence in the framework as a comparative decision-support methodology for assessing modern methods of construction (MMC) in post-disaster shelter applications.

4.5. Life-Cycle Impact Assessment

Figure 10 presents a comparative assessment of whole-life energy, carbon emissions, and life-cycle costs, excluding end-of-life benefits (Module D), for the three emergency shelter systems. The results show that the container-based shelter has the lowest overall whole-life impacts, with total life-cycle energy of 404.9 GJ, carbon emissions of 21.4 tCO2, and a life-cycle cost of USD 62.6 thousand. The prefabricated shelter records slightly higher values, at 412.3 GJ, 21.5 tCO2, and USD 71.5 thousand, respectively. The 3D-printed (3DP) shelter has the highest impacts, with 420.0 GJ of whole-life energy, 28.9 tCO2 of carbon emissions, and a life-cycle cost of USD 79.9 thousand.
Figure 10. Life-cycle energy/carbon/cost for the three types, excluding end of life.
The comparatively higher environmental burden of the 3DP shelter is primarily associated with its cement-intensive printable concrete. The embodied energy of the 3DP concrete is approximately 22% higher than that of the concrete used in the prefabricated shelter, while its embodied carbon is approximately 43% higher. Given the dominant contribution of the printable concrete to the 3DP material inventory, these differences substantially influence the overall whole-life energy and carbon performance.
The influence of material recovery was further examined through sensitivity analysis using alternative end-of-life recovery assumptions. The baseline assessment considered recovery rates of 90% for container-based shelters, 70% for prefabricated shelters, and 50% for 3DP shelters. The analysis demonstrates that material recovery can substantially reduce the associated whole-life environmental burden. Importantly, however, the relative ranking of the three shelter systems remains unchanged, with container-based shelters exhibiting the lowest impacts and 3DP shelters the highest under the scenarios examined. This indicates that the principal comparative finding is relatively robust to variations in end-of-life recovery assumptions. Nevertheless, the recovery analysis represents a scenario-based assessment rather than a detailed prediction of actual demolition, recycling, transport, processing, or secondary-material market conditions.
These findings address Research Objectives 1 and 2 by demonstrating that construction technology and material selection are important determinants of the environmental and economic performance of post-disaster shelters. Although 3DP construction offers potential advantages in terms of automation, construction speed, geometric flexibility, and reduced dependence on conventional formwork, its current whole-life performance remains less favourable under the assumptions adopted in this study. Improving the sustainability of 3DP therefore requires particular attention to low-carbon printable materials, optimisation of material composition and utilisation, energy-efficient printing processes, and improved recovery and reuse pathways.
Overall, the results indicate that container-based shelters provide the most favourable environmental and economic performance among the three systems evaluated, while prefabricated shelters offer an intermediate alternative. The 3DP system demonstrates a notable trade-off: although it provides superior thermal performance, it currently incurs higher embodied impacts and life-cycle costs. This reinforces the importance of evaluating post-disaster shelter technologies using multiple performance criteria rather than a single environmental or economic indicator.
The findings further demonstrate the value of the proposed integrated WLC, LCA, LCC, and thermal-performance framework as a comparative decision-support approach for evaluating MMC. In resource-constrained post-disaster contexts, such an integrated assessment can help decision-makers identify the trade-offs between environmental impact, economic feasibility, and thermal performance, while highlighting specific opportunities for improving the future competitiveness of emerging technologies such as 3DP.

5. Limitations and Recommendations for Future Research

This study provides an integrated comparison of container-based, prefabricated concrete, and 3DP emergency shelters in terms of environmental performance, operational energy, thermal performance, and LCC. The findings should be interpreted within the system boundaries, data sources, methodological assumptions, and Damascus/ Sayida Zaynab camp case-study context defined in Section 2.4 and Section 2.5. These factors introduce uncertainty and limit direct transferability to other post-disaster and post-conflict settings. The key limitations and priorities for future research are outlined below.
First, life-cycle inventory data and methodological assumptions introduce uncertainty into the environmental assessment. Despite the growing adoption of WLC assessment, differences in system boundaries, data sources, allocation procedures, and modelling assumptions can produce substantial variation in embodied-carbon estimates and reduce comparability between studies [79]. This challenge is particularly important in post-conflict contexts, where reliable, region-specific supply-chain data are often limited [80]. The present study therefore uses the best available data within the defined system boundary. Future research should strengthen this evidence base through region-specific supply-chain inventories, transparent data provenance, harmonised methodological assumptions, and formal sensitivity and uncertainty analysis. This will allow expanding the inventory to incorporate additional upstream, construction, operational, and end-of-life processes as reliable data become available.
Second, the LCC incorporates simplified assumptions for maintenance and end-of-life activities, reflecting the limited availability of reliable cost data for temporary shelters in post-disaster settings. Actual costs may vary substantially with site conditions, occupancy, infrastructure availability, labour costs, maintenance practices, inflation, energy prices, and market conditions. The simplified end-of-life approach does not explicitly account for demolition or deconstruction, sorting, collection, transportation, recycling and processing, disposal, material degradation, or the market value of recovered materials. These factors could substantially reduce the estimated recovery benefit, particularly in post-conflict environments where recycling infrastructure and secondary-material markets may be underdeveloped. Future research should therefore incorporate field-based cost data and detailed end-of-life costing models that distinguish recovery value from actual salvage, processing, and disposal costs.
Third, the LCC is sensitive to economic conditions and key modelling assumptions. Actual post-disaster energy expenditure may differ from the modelled values because of electricity rationing, grid unreliability, generator use, alternative energy sources, fuel prices, and future tariff reforms. The electricity tariff adopted in this study reflects conditions during the assessment period and should therefore be regarded as a context-specific assumption rather than a fixed or universally applicable value. Similarly, the economic performance of 3DP depends strongly on printer utilisation, production scale, printing productivity, labour requirements, and capital-cost allocation. Future studies should apply multi-parameter sensitivity and scenario analysis to electricity prices, inflation and discount rates, material costs, printer utilisation, and recovery rates.
Fourth, the operational energy and thermal-performance results are based on dynamic IESVE simulations and have not been validated against monitored field data. The modelling assumes naturally ventilated shelters without mechanical heating, cooling, or mechanically driven ventilation, reflecting the resource-constrained emergency-shelter context considered in this study. Consequently, the operational electricity results primarily represent common appliance and plug loads, while the thermal simulations assess the passive performance of the shelter envelopes. Future research should incorporate field monitoring of indoor temperature, thermal comfort, ventilation, infiltration, occupancy patterns, and actual energy use to calibrate and validate the simulations.
Hence, the reported performance of 3DP should not be interpreted as an inherent limitation of the technology. Its environmental and economic performance is highly dependent on printable-material formulation, printer productivity, equipment utilisation, production scale, energy source, local material availability, and end-of-life recovery. Advances in these areas could substantially change its comparative performance. Future research should therefore investigate low-carbon printable materials, including geopolymer-based formulations, optimised mix designs, energy-efficient printing, material-use optimisation, and improved reuse and recycling pathways.
Finally, the study does not comprehensively assess the social dimension of shelter sustainability. Future research should incorporate Social Life-Cycle Assessment (S-LCA) to examine occupant health and safety, living conditions, affordability, accessibility, employment and local economic benefits, community participation, labour conditions, and equity of access. Integrating S-LCA with environmental LCA, LCC, WLC, and building-performance assessment would provide a more comprehensive basis for decision-making in post-disaster reconstruction.
Overall, the findings should be interpreted as context-specific comparative results rather than universal rankings of the three MMC systems. Future research should prioritise higher-quality regional supply-chain data, formal sensitivity and uncertainty analysis, field validation, comprehensive life-cycle inventories, site-specific energy and cost data, robust end-of-life modelling, and realistic 3DP deployment scenarios. Addressing these priorities will improve the reliability, reproducibility, and transferability of whole-life assessments and strengthen their value as decision-support tools for sustainable post-disaster shelter selection.

6. Conclusions

This study developed an integrated assessment framework combining WLC, LCC, and dynamic thermal simulation to comparatively evaluate three MMC; 3DP, prefabrication, and container-based construction for post-disaster shelters. By integrating environmental, economic, energy, and thermal-performance indicators within a common life-cycle framework, the approach provides a more comprehensive basis for shelter selection than conventional single-criterion assessments.
Within the defined system boundaries and the Syrian case-study context, container-based shelters demonstrated the most favourable overall environmental and economic performance, achieving the lowest whole-life energy consumption, carbon emissions, and life-cycle cost. Prefabricated shelters showed intermediate performance, whereas 3DP shelters exhibited 7% higher whole-life energy consumption than container-based shelters and 3% higher than prefabricated shelters. Their whole-life carbon emissions were 39% and 37% higher, respectively, while life-cycle costs were 26% higher than containers and 12% higher than prefabricated shelters. These disadvantages are primarily attributable to the embodied energy and carbon associated with the printable concrete and to the current capital, production, and deployment costs of 3DP technology.
Conversely, 3DP demonstrated a clear advantage in thermal performance, achieving approximately 70% predicted occupant thermal satisfaction compared with around 50% for both container-based and prefabricated shelters. This result highlights an important sustainability trade-off: improved thermal comfort does not necessarily correspond to lower whole-life environmental impacts or costs. Consequently, post-disaster shelter selection should not be based on a single performance criterion but should consider environmental impact, affordability, energy demand, and occupant comfort collectively.
The principal contribution of this research is the integration of WLC, LCA, LCC, and dynamic thermal simulation into a unified decision-support framework that makes trade-offs between competing MMC technologies explicit. This provides a structured and transferable basis for evidence-informed decision-making where post-disaster responses must balance environmental objectives, financial constraints, limited infrastructure, rapid deployment requirements, and occupant well-being.
The findings also demonstrate that the current environmental and economic disadvantages of 3DP should not be interpreted as evidence that the technology is inherently less sustainable. Its performance is highly sensitive to printable-material formulation, printer utilisation, production scale, electricity source, capital expenditure, material efficiency, and recovery pathways. Significant improvements could therefore be achieved through the development of low-carbon printable materials, energy-efficient printing systems, higher equipment utilisation, localised production, material optimisation, and circular strategies for material recovery and reuse. These interventions could substantially reduce the life-cycle impacts and improve the economic competitiveness of 3DP in future post-disaster applications.
Importantly, the comparative outcomes presented here should be interpreted as context-specific rather than universal technology rankings. They reflect the study’s system boundaries, data availability and quality, economic assumptions, material specifications, climatic conditions, and modelling parameters for the Syrian case study. Future research should therefore strengthen the evidence base through field validation and post-occupancy monitoring, region-specific supply-chain data, systematic sensitivity and uncertainty analysis, improved end-of-life modelling, and scenario-based evaluation of energy prices, recovery rates, technology scale, and 3DP deployment conditions.
Ultimately, sustainable post-disaster shelter selection is not a single-metric optimisation problem. It requires an integrated understanding of environmental impact, life-cycle cost, energy performance, and occupant comfort, alongside the specific constraints of the deployment context. The framework developed in this study provides a practical foundation for making these trade-offs transparent and for guiding the development and selection of lower-carbon, affordable, and thermally effective MMC shelter solutions. More broadly, the findings suggest that the future sustainability of post-disaster construction will depend not only on selecting the most appropriate technology for a given context, but also on systematically improving the materials, energy systems, production processes, and circularity pathways that determine whole-life performance.

Author Contributions

Conceptualisation and research design, L.A.K.; methodology, L.A.K. and S.K.Y.; investigation, formal analysis, data curation, and original draft preparation, L.A.K. and R.O.; simulation modelling, R.O.; validation, L.A.K., S.K.Y. and T.M.; review and editing, L.A.K., S.K.Y., T.M., N.M.E.-B. and I.S. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

The original contributions presented in this study are included in the article. Further inquiries can be directed to the corresponding author.

Acknowledgments

The authors express their gratitude to the School of Computing, Engineering and the Built Environment (SCEBE) at Edinburgh Napier University for providing the support and resources necessary for the completion of this research.

Conflicts of Interest

The authors declare no conflicts of interest.

Appendix A

Table A1. Quantities and specifications of the materials for the container shelter.
Table A2. Quantities and specifications of the materials for the prefabricated shelter.
Table A3. Quantities and specifications of the materials for the 3DP shelter.

Appendix B

Table A4. EE and EC results for the container emergency shelter.
Table A5. EE and EC results for the prefabricated emergency shelter.
Table A6. EE and EC results for 3DP emergency shelters.

Appendix C

Table A7. The construction cost for the container emergency shelter.
Table A8. The construction cost for the prefabricated emergency shelter.
Table A9. The construction cost for the 3DP emergency shelter.

References

  1. Ismail, F.Z.; Halog, A.; Smith, C. How sustainable is disaster resilience?: An overview of sustainable construction approach in post-disaster housing reconstruction. Int. J. Disaster Resil. Built Environ. 2017, 8, 555–572. [Google Scholar] [CrossRef] [Scilit]
  2. Atmaca, A.; Atmaca, N. Life Cycle Assessment of Post Disaster Prefabricated & Container Housings. Int. J. Struct. Civ. Eng. Res. 2016, 5, 323–328. [Google Scholar] [CrossRef] [Scilit]
  3. Rathnasinghe, A.; Sirimewan, D.; Shandraseharan, A.; Thurairajah, N.; Thayaparan, M.; Waidyasekara, K.G.A.S. Towards long-term sustainable performance of post-disaster housing reconstruction: Second life for temporary housing. In Proceedings of the World Construction Symposium, Ceylon Institute of Builders, Colombo, Sri Lanka, 9–10 July 2021; pp. 540–552. [Google Scholar] [CrossRef] [Scilit]
  4. Asfour, O.S. Learning from the past: Temporary housing criteria in conflict areas with reference to thermal comfort. Int. J. Disaster Risk Reduct. 2019, 38, 101206. [Google Scholar] [CrossRef] [Scilit]
  5. Hosseini, S.M.A.; Farahzadi, L.; Pons, O. Assessing the sustainability index of different post-disaster temporary housing unit configuration types. J. Build. Eng. 2021, 42, 101206. [Google Scholar] [CrossRef] [Scilit]
  6. Khaddour, L.A.; Deng, W. Multi-criteria sustainability risk management for post-war residential re-construction: The case of Damascus. J. Hous. Built Environ. 2023, 38, 1939–1982. [Google Scholar] [CrossRef] [Scilit]
  7. UNISDR. Build Back Better in Recovery, Rehabilitation, and Reconstruction; UNISDR: Geneva, Switzerland, 2017. [Google Scholar]
  8. The Danish Immigration Service. Country of Origin Information (COI) October 2021 Brief Report Syria Palestinians in Damascus and Rural Damascus Governorates; The Danish Immigration Service: Næstved, Denmark, 2021. [Google Scholar]
  9. Alshawawreh, L.; Smith, R.S.; Wood, J.B. Assessing-the-Sheltering-Response-in-the-Middle-East-Studying-Syrian-Camps-in-Jordan. Int. J. Soc. Behav. Educ. Econ. Bus. Ind. Eng. 2017, 11, 1751–1757. [Google Scholar]
  10. Mannakkara, S. A Framework For Building Back Better During Post-Disaster Reconstruction and Recovery Sandeeka Mannakkara. Ph.D. Thesis, University of Auckland, Auckland, New Zealand, 2014. [Google Scholar]
  11. Ismail, I.H.; Al-Hazmi, A.M.A.; Al-Hussein, A.A.R. Deepening the understanding of shelter through the proposals of the displaced in Syria. GeoJournal 2024, 89, 181. [Google Scholar] [CrossRef] [Scilit]
  12. Khaddour, L.A.; Yeboah, S.K. Multiple-criteria optimization of residential buildings envelope toward nZEBs: Simplified approach for Damascus post-war. In International Conference on Energy and Sustainable Futures; Springer: Berlin/Heidelberg, Germany, 2022. [Google Scholar]
  13. Ismail, A.S.H.; Morishita, D.-I.N.; Cetin, A.R.; Dilsiz, A.A. A Vital Proposal for Reestablishing Post-War Rural Housing in Syria. 2017. Available online: http://www.sgemvienna.org (accessed on 15 January 2025).
  14. Khaddour, L.A. Life-cycle sustainability risk management a multi-stakeholder approach: The case of Damascus post-war residential projects. Environ. Dev. Sustain. 2022, 24, 12756–12786. [Google Scholar] [CrossRef] [Scilit]
  15. Barakat, S. Housing Reconstruction After Conflict and Disaster; Overseas Development Institute: London, UK, 2003. [Google Scholar]
  16. Khaddour, L.A.; Elhassnaoui, I.; Obead, R. Life Cycle Energy, Emission, and Costing Footprints for Post-disaster Schools: Case from Damascus Post-conflict. In International Conference on Advanced Technologies for Humanity; Springer: Berlin/Heidelberg, Germany, 2025; pp. 127–141. [Google Scholar] [CrossRef] [Scilit]
  17. Carvalho, J.P.; Alecrim, I.; Bragança, L.; Mateus, R. Integrating BIM-based LCA and building sustainability assessment. Sustainability 2020, 12, 7468. [Google Scholar] [CrossRef] [Scilit]
  18. Atmaca, A.; Atmaca, N. Comparative life cycle energy and cost analysis of post-disaster temporary housings. Appl. Energy 2016, 171, 429–443. [Google Scholar] [CrossRef] [Scilit]
  19. Subramanya, K.; Kermanshachi, S. Exploring Utilization of the 3D Printed Housing as Post-Disaster Temporary Shelter for Displaced People. In Construction Research Congress; ASCE Library: Reston, VA, USA, 2022. [Google Scholar]
  20. Obyn, S.; Van Moeseke, G.; Virgo, V. Thermal performance of shelter modelling: Improvement of temporary structures. Energy Build. 2015, 89, 170–182. [Google Scholar] [CrossRef] [Scilit]
  21. Salvalai, G.; Imperadori, M.; Scaccabarozzi, D.; Pusceddu, C. Thermal performance measurement and application of a multilayer insulator for emergency architecture. Appl. Therm. Eng. 2015, 82, 110–119. [Google Scholar] [CrossRef] [Scilit]
  22. D’Orazio, M.; Maracchini, G. An experimental investigation on the indoor hygrothermal environment of a reinforced-EPS based temporary housing solution. Energy Build. 2019, 204, 109500. [Google Scholar] [CrossRef] [Scilit]
  23. Cornaro, C.; Sapori, D.; Bucci, F.; Pierro, M.; Giammanco, C. Thermal performance analysis of an emergency shelter using dynamic building simulation. Energy Build. 2015, 88, 122–134. [Google Scholar] [CrossRef] [Scilit]
  24. Kheiri, F. A review on optimization methods applied in energy-efficient building geometry and envelope design. Renew. Sustain. Energy Rev. 2018, 92, 897–920. [Google Scholar] [CrossRef] [Scilit]
  25. Depecker, P.; Menezo, C.; Virgone, J.; Lepers, S. Design of Buildings Shape and Energetic Consumption. Build. Environ. 2001, 36, 627–635. [Google Scholar] [CrossRef] [Scilit]
  26. Bazli, M.; Ashrafi, H.; Rajabipour, A.; Kutay, C. 3D printing for remote housing: Benefits and challenges. Autom. Constr. 2023, 148, 104772. [Google Scholar] [CrossRef] [Scilit]
  27. Leong, Z.; Chen, R.; Xu, Z.; Lin, Y.; Hu, N. Robotic arm three-dimensional printing and modular construction of a meter-scale lattice façade structure. Eng. Struct. 2023, 290, 116368. [Google Scholar] [CrossRef] [Scilit]
  28. Sheng, R. 3-D printing in the construction industry. In 3D Printing; Elsevier: Amsterdam, The Netherlands, 2022; pp. 39–46. [Google Scholar] [CrossRef] [Scilit]
  29. Prasad, K.V.; Vasugi, V.; Kumaran, G.S. Application of 3D printing concepts in the Architecture Engineering and Construction (AEC) industry—A scientometric review. Mater. Today Proc. 2023, 119, 37–44. [Google Scholar] [CrossRef] [Scilit]
  30. Gregory, M.; Hameedaldeen, S.A.; Intumu, L.M.; Spakousky, J.J.; Toms, J.B.; Steenhuis, H.J. 3D Printing and Disaster Shelter Cost. In Proceedings of the 2016 Portland International Conference on Management of Engineering and Technology (PICMET), Honolulu, HI, USA, 4–8 September 2016. [Google Scholar]
  31. Robayo-Salazar, R.; de Gutiérrez, R.M.; Villaquirán-Caicedo, M.A.; Arjona, S.D. 3D printing with cementitious materials: Challenges and opportunities for the construction sector. Autom. Constr. 2023, 146, 104693. [Google Scholar] [CrossRef] [Scilit]
  32. Kantaros, A.; Petrescu, F.I.T.; Brachos, K.; Ganetsos, T.; Petrescu, N. Leveraging 3D Printing for Resilient Disaster Management in Smart Cities. Smart Cities 2024, 7, 3705–3726. [Google Scholar] [CrossRef] [Scilit]
  33. Mehdizade, A.; Ayoobi, A.W.; Inceoğlu, M. Applicable and Flexible Post-Disaster Housing Through Parametric Design and 3D Printing: A Novel Model for Prototyping and Deployment. Sustainability 2025, 17, 7212. [Google Scholar] [CrossRef] [Scilit]
  34. Perkins, I.; Skitmore, M. Three-dimensional printing in the construction industry: A review. Int. J. Constr. Manag. 2015, 15, 1–9. [Google Scholar] [CrossRef] [Scilit]
  35. Al-Shoubaki, H.; Psychogyios, D.; Drilling, M.; Chatziefthymiou, Y.; Fragkou, T.; Costa, A.M.; Tsangrassoulis, A. A Human-Centered Shelter Design for People on the Move in the Al-Sahel Region. Sustainability 2024, 16, 9127. [Google Scholar] [CrossRef] [Scilit]
  36. Khaddour, L.A.; Elhassnaoui, I. Building Back Circular: Post-disaster Recovery for Climate Resilience Innovation. In Resilient by Design: Urban Systems, Policy, and Community Engagement; Springer: Singapore, 2026; pp. 71–94. [Google Scholar] [CrossRef] [Scilit]
  37. Wind, B.; Ibrahim, B. The war-time urban development of Damascus: How the geography- and political economy of warfare affects housing patterns. Habitat Int. 2020, 96, 102109. [Google Scholar] [CrossRef] [Scilit]
  38. European Union Agency for Asylum. Country Guidance Syria—Comprehensive Update 2025; European Union Agency for Asylum: Marsa, Malta, 2025. [Google Scholar]
  39. UN OCHA. Humanitarian Needs Overview Syrian Arab Republic Humanitarian Programme Cycle 2020. 2020. Available online: https://hum-insight.info (accessed on 15 January 2025).
  40. Tan, C.S.; Ling, P.C.H. Shipping Container as Shelter Provision Solution for Post-Disaster Reconstruction. In E3S Web of Conferences; EDP Sciences: Les Ulis, France, 2018. [Google Scholar] [CrossRef] [Scilit]
  41. Smith, J.D. Shipping Containers as Building Components; University of Brighton: Brighton, UK, 2005. [Google Scholar]
  42. Awwad, T.; Bazarov, B.; Al Kodsi, S. Soil Improvement and Foundations Strengthen Techniques for Damaged Buildings in Syria. 2018. Available online: https://www.researchgate.net/publication/324280710_SOIL_IMPROVEMENT_AND_FOUNDATIONS_STRENGTHEN_TECHNIQUES_FOR_DAMAGED_BUILDINGS_IN_SYRIA (accessed on 22 August 2026).
  43. STARK Building Materials UK Limited. What is a Raft Foundation? Pros, Cons & Types. Available online: https://www.jewson.co.uk/expert-advice/safety-regulations/raft-foundations (accessed on 22 August 2026).
  44. Magar, J.S.; Kudtarkar, A.; Magar, J.; Pachpohe, J.; Nagargoje, P. Study and Analysis of Types of Foundation and Design Construction. Int. Res. J. Eng. Technol. 2020, 7, 3301–3307. [Google Scholar] [CrossRef]
  45. Ćehić, M.; Omer, S.E.; Ćehić, S.M.; Hodžić, S.A. Analysis of Properties of Plywood for Some Areas of Usage in Wooden Constructions. 2007. Available online: https://www.researchgate.net/publication/332466206 (accessed on 15 January 2026).
  46. Yates, T. The use of non-food crops in the UK construction industry. J. Sci. Food Agric. 2006, 86, 1790–1796. [Google Scholar] [CrossRef] [Scilit]
  47. Švajlenka, J.; Kozlovská, M.; Spišáková, M. The benefits of modern method of construction based on wood in the context of sustainability. Int. J. Environ. Sci. Technol. 2017, 14, 1591–1602. [Google Scholar] [CrossRef] [Scilit]
  48. Hamdi, W.J.; Abdul-Nebi, M.; Sabah, S.A. Comparison Study of the Mechanical, Thermal and Thermomechanical Properties of PVC Turkey Doors. Available online: https://www.researchgate.net/publication/325807831_Comparison_Study_of_the_Mechanical_Thermal_and_Thermomechanical_Properties_of_PVC_Turkey_Doors_Comparison_Study_of_the_Mechanical_Thermal_and_Thermomechanical_Properties_of_PVC_Turkey_Doors (accessed on 22 August 2026).
  49. Gunawardena, T.; Ngo, T.D.; Aye, L.; Mendis, P.; Ngo, T. Innovative Prefabricated Modular Structures-An Overview and Life Cycle Energy Analysis. 2011. Available online: https://www.researchgate.net/publication/267959613 (accessed on 15 January 2025).
  50. Gibbons, O.P.; Orr, J.J.; Arnold, W. How to Calculate Embodied Carbon; The Institution of Structural Engineers: London, UK, 2025. [Google Scholar]
  51. Delem, L.; Wastiels, L. Module D in the Building Life Cycle: Significance Based on a Case Study Analysis. In IOP Conference Series: Earth and Environmental Science; Institute of Physics Publishing: Bristol, UK, 2019. [Google Scholar] [CrossRef] [Scilit]
  52. Hammond, G.; Jones, C.; Lowrie, F.; Tse, P. Embodied Carbon: The Inventory of Carbon and Energy (ICE); BSRIA: Bracknell, UK, 2011. [Google Scholar]
  53. Khaddour, L.A. Comparative analysis of residential building envelopes newly implementing the building insulation code in Damascus. Int. J. Environ. Sci. Technol. 2024, 21, 1509–1536. [Google Scholar] [CrossRef] [Scilit]
  54. IESVE. Introducing the Virtual Environment. Available online: https://help.iesve.com/ve2024/introducing_the_virtual_environment.htm (accessed on 26 February 2025).
  55. CIBSE. Environmental Design; CIBSE: London, UK, 1999. [Google Scholar]
  56. Rezazadehbaee, S.; Balyemez, S. Disaster Shelters: A Comparative Analysis of Tents, Containers, and Prefabricated Shelters. In Proceedings of the 6th International Symposium on Innovations in Scientific Areas (SISA2024), Ankara, Türkiye, 7 June 2024; pp. 78–86. [Google Scholar] [CrossRef] [Scilit]
  57. Hammond, G.P.; Jones, C.I. Embodied energy and carbon in construction materials. Proc. Inst. Civ. Eng. Energy 2008, 161, 87–98. [Google Scholar] [CrossRef] [Scilit]
  58. Zhang, D.; Feng, P.; Zhou, P.; Xu, W.; Ma, G. 3D printed concrete walls reinforced with flexible FRP textile: Automatic construction, digital rebuilding, and seismic performance. Eng. Struct. 2023, 291, 116488. [Google Scholar] [CrossRef] [Scilit]
  59. Asam, C. Recycling Prefabricated Concrete Components—A Contribution to Sustainable Construction. In International Conference on Sustainable Buildings; IEMB: Mumbai, India, 2007. [Google Scholar]
  60. Mengistu, G.M.; Nemes, R. Recycling 3D Printed Concrete Waste for Normal Strength Concrete Production. Appl. Sci. 2024, 14, 1142. [Google Scholar] [CrossRef] [Scilit]
  61. Venkrbec, V.; Klanšek, U. Suitability of recycled concrete aggregates from precast panel buildings deconstructed at expired lifespan for structural use. J. Clean. Prod. 2020, 247, 119593. [Google Scholar] [CrossRef] [Scilit]
  62. Islam, H.; Jollands, M.; Setunge, S. Life cycle assessment and life cycle cost implication of residential buildings—A review. Renew. Sustain. Energy Rev. 2015, 42, 129–140. [Google Scholar] [CrossRef] [Scilit]
  63. Félix, D.; Branco, J.M.; Feio, A. Temporary housing after disasters: A state of the art survey. Habitat Int. 2013, 40, 136–141. [Google Scholar] [CrossRef] [Scilit]
  64. BRE. BRE Global Methodology for the Environmental Assessment of Buildings Using; BRE: Glasgow, UK, 2018. [Google Scholar]
  65. Central Bureau of Statistics. Cost Per Floor Area Square Meter by Stages of Construction in Governorates Centers for Private & Public Sectors Dwellings; Central Bureau of Statistics: New Delhi, India, 2011. [Google Scholar]
  66. The United Nations Environment Programme’s (UNEP) United for Efficiency (U4E). SYR_U4E-Country-Saving-Assessment_Jul-22; The United Nations: Manhattan, NY, USA, 2022. [Google Scholar]
  67. Syrian Center for Policy Research. Monthly Bulletin for Consumer Price Index and Inflation in Syria Issue (4). Available online: https://scpr-syria.org/publications2/bulletins/monthly-bulletin-for-consumer-price-index-and-inflation-in-syria-issue-4-april-2026/ (accessed on 22 August 2026).
  68. Xie, H.; Cui, Q.; Li, Y. Net Present Value Method: A Method Recommended by ISO 15686-5 for Economic Evaluation of Building Life Cycle Costs. World J. Eng. Technol. 2022, 10, 224–229. [Google Scholar] [CrossRef]
  69. IESVE. Thermal Applications Category User Guide; IESVE: Glasgow, Scotland, 2012. [Google Scholar]
  70. Sidik, S. Validation studies-validating new tools and adapting old ones to new contexts. In How to Do Primary Care Research; CRC Press: Boca Raton, FL, USA, 2018. [Google Scholar]
  71. Thermal Energy Conversions Technical Reference. 2015. Available online: https://www.energystar.gov/SourceEnergy (accessed on 15 December 2024).
  72. Karpova, E.; Skripkiunas, G.; Sedova, A.; Tsimbalyuk, Y. Additive manufacturing of concrete wall structures. In E3S Web of Conferences; EDP Sciences: Les Ulis, France, 2021. [Google Scholar] [CrossRef] [Scilit]
  73. BLT. BLT 3D PRINTER. Available online: https://www.xa-blt.com/en/products/?utm_source=google&utm_medium=cpc&utm_campaign=search_blt_tooling&utm_adgroup=material&utm_ad=760692323488&utm_ad=&utm_term=industrial%203d%20printer&gad_source=1&gad_campaignid=22632279297&gbraid=0AAAAA_5vdNmKUQ47cWeirxpa-yhyMP170&gclid=CjwKCAjwsrbTBhAvEiwA0Bpp4Y9260tAaaw7xZ1hxgFMTUM7LmLyS9q3bQgJppzQpwLK1hqsiOeu2hoCUT4QAvD_BwE (accessed on 2 August 2026).
  74. Besklubova, S.; Raza, M.H.; Zhong, R.Y.; Skibniewski, M.J. 3D Printing vs. Traditional Construction: Cost Comparisons from Design to Waste Disposal Stages. In Proceedings of the International Symposium on Automation and Robotics in Construction, International Association for Automation and Robotics in Construction (IAARC), Lille, France, 3–5 June 2024; pp. 1247–1254. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  75. Besklubova, S.; Tan, B.Q.; Zhong, R.Y.; Spicek, N. Logistic cost analysis for 3D printing construction projects using a multi-stage network-based approach. Autom. Constr. 2023, 151, 104863. [Google Scholar] [CrossRef] [Scilit]
  76. Zafra, R.G.; Mayo, J.R.; Villareal, P.J.; De Padua, V.M.; Castillo, M.H.; Sundo, M.B.; Madlangbayan, M.S. Structural and thermal performance assessment of shipping container as post-disaster housing in tropical climates. Civ. Eng. J. 2021, 7, 1437–1458. [Google Scholar] [CrossRef] [Scilit]
  77. Atmaca, N. Life-cycle assessment of post-disaster temporary housing. Build. Res. Inf. 2017, 45, 524–538. [Google Scholar] [CrossRef] [Scilit]
  78. Islam, H.; Zhang, G.; Setunge, S.; Bhuiyan, M.A. Life cycle assessment of shipping container home: A sustainable construction. Energy Build. 2016, 128, 673–685. [Google Scholar] [CrossRef] [Scilit]
  79. Khaddour, L.A.; Yeboah, S.K.; Dodoo, J.K. Ecological and Carbon Footprints of Cities; Elsevier: Amsterdam, The Netherlands, 2023. [Google Scholar]
  80. Khaddour, L.A.; Olawumi, T.O.; Osunsanmi, T.; El-Berishy, N.M.; Shyha, I. Resilient and Sustainable Industrial Site Reclamation Fuzzy AHP: A Case Study. Land 2026, 15, 1253. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.