Chowdhury, A.M.; Yee, J.-J.; Park, S.I.; Ha, E.-J.; Choi, J.-H.
Estimating Indirect Accident Cost Using a Two-Tiered Machine Learning Algorithm for the Construction Industry. Buildings 2025, 15, 3947.
https://doi.org/10.3390/buildings15213947
AMA Style
Chowdhury AM, Yee J-J, Park SI, Ha E-J, Choi J-H.
Estimating Indirect Accident Cost Using a Two-Tiered Machine Learning Algorithm for the Construction Industry. Buildings. 2025; 15(21):3947.
https://doi.org/10.3390/buildings15213947
Chicago/Turabian Style
Chowdhury, Ayesha Munira, Jurng-Jae Yee, Sang I. Park, Eun-Ju Ha, and Jae-Ho Choi.
2025. "Estimating Indirect Accident Cost Using a Two-Tiered Machine Learning Algorithm for the Construction Industry" Buildings 15, no. 21: 3947.
https://doi.org/10.3390/buildings15213947
APA Style
Chowdhury, A. M., Yee, J.-J., Park, S. I., Ha, E.-J., & Choi, J.-H.
(2025). Estimating Indirect Accident Cost Using a Two-Tiered Machine Learning Algorithm for the Construction Industry. Buildings, 15(21), 3947.
https://doi.org/10.3390/buildings15213947