Next Article in Journal
Overturning and Reinforcement of Single-Column Pier Curved Girder Bridge Considering the Secondary Effect of Overturning
Next Article in Special Issue
Impact Analysis of BIM on Power Substation Project Costs: Techno-Economic Data Evidence from China
Previous Article in Journal
Mechanical Response of Pipeline Leakage to Existing Tunnel Structures: Insights from Numerical Modeling
Previous Article in Special Issue
Optimizing Rebar Process and Supply Chain Management for Minimized Cutting Waste: A Building Information Modeling-Based Data-Driven Approach
 
 
Article

Article Versions Notes

Buildings 2025, 15(11), 1774; https://doi.org/10.3390/buildings15111774
Action Date Notes Link
article pdf uploaded. 22 May 2025 16:56 CEST Version of Record https://www.mdpi.com/2075-5309/15/11/1774/pdf-vor
article xml file uploaded 23 May 2025 11:45 CEST Original file -
article xml uploaded. 23 May 2025 11:45 CEST Update https://www.mdpi.com/2075-5309/15/11/1774/xml
article pdf uploaded. 23 May 2025 11:45 CEST Updated version of record https://www.mdpi.com/2075-5309/15/11/1774/pdf
article html file updated 23 May 2025 11:49 CEST Original file -
article html file updated 25 June 2025 05:41 CEST Update https://www.mdpi.com/2075-5309/15/11/1774/html
Back to TopTop