Next Article in Journal
The Cyclic Performance and Macro-Simplified Analytical Model of Internal Joints in RC-Assembled Frame Structures Connected by Unbonded Prestressed Strands and Mortise-Tenon Based on Numerical Studies
Next Article in Special Issue
Practicalities of Incorporating 3D Laser Scanning with BIM in Live Construction Projects: A Case Study
Previous Article in Journal
Stability Analysis of “321” Prefabricated Highway Steel Truss Bridge
Previous Article in Special Issue
Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)
 
 
Article

Article Versions Notes

Buildings 2024, 14(6), 1627; https://doi.org/10.3390/buildings14061627
Action Date Notes Link
article xml file uploaded 2 June 2024 02:44 CEST Original file -
article xml uploaded. 2 June 2024 02:44 CEST Update https://www.mdpi.com/2075-5309/14/6/1627/xml
article pdf uploaded. 2 June 2024 02:44 CEST Version of Record https://www.mdpi.com/2075-5309/14/6/1627/pdf
article html file updated 2 June 2024 02:47 CEST Original file https://www.mdpi.com/2075-5309/14/6/1627/html
Back to TopTop