Abstract

Statutory feasibility assessment can establish whether forest restoration is suitable but does not specify interventions. We examined project records for three degraded sites in Gangwon Province, Republic of Korea: Yanggu (1.0 ha), Cheorwon (2.0 ha within a 6.4-ha disturbed area), and Goseong (2.0 ha; one record reports 1.0 ha). A documentary protocol classified 66 statements as recorded observations (R) or source-report judgments (J) and derived planning inferences (I) linking actions to evidence, uncertainty, and action status. All sites were recorded as eligible. Field determinations using landslide-prone-area tables were 301 points (Grade 2), 375 (Grade 1), and 351 (Grade 2); these are not statutory feasibility scores or validated physical-risk measures. This study retained mapped-versus-localized slope discrepancies, an undocumented terrain-analysis boundary at Cheorwon, and conflicting area entries at Goseong. Priorities were to inspect the gabion wall and cut face at Yanggu, map rills and inspect existing structures at Cheorwon, and survey the collection-yard cut and assess plantation survival and regeneration at Goseong. Because all sites shared the same suitability outcome and no measured erosion or restoration outcomes were available, the comparison is descriptive. The protocol does not validate predictive performance, inter-coder reliability, or treatment effectiveness; it prepares pre-design decisions and identifies required field verification.

1. Introduction

Anthropogenic disturbance can substantially alter landforms, soil structure, hydrological pathways, and vegetation, affecting both the need for ecological restoration and the measures required before vegetation recovery can proceed [1,2]. Restoration planning must distinguish the removal of continuing disturbance pressures from the longer-term recovery of ecosystem structure and function [3]. These objectives are related but not interchangeable, and their relative importance depends on the disturbance history, residual site conditions, landscape context, and intended restoration outcomes [4,5].
Slope restoration presents a particular challenge because surface erosion and slope instability can be influenced by interacting factors, including slope geometry, soil exposure, runoff concentration, vegetation cover, and drainage [6]. Vegetation can contribute to soil protection and root reinforcement, but revegetation alone may be insufficient where concentrated runoff or unfavorable slope geometry remains unresolved [7]. Consequently, restoration prescriptions should be based on the physical processes observed at each site rather than on generalized assumptions about degraded slopes [5,6].
In the Republic of Korea, forest restoration feasibility assessment is a statutory process intended to evaluate the need, suitability, environmental implications, and practical feasibility of proposed restoration projects [8,9]. The legal framework includes Article 42-6 of the Act on the Creation and Management of Forest Resources, Article 48-5 of its Enforcement Decree, and the Korea Forest Service notice entitled Detailed Standards for Feasibility Assessment of Forest Restoration Projects [8,9,10]. The notice requires assessment using document analysis and field investigation, including the examination of disturbance, surrounding conditions, terrain, soils, streams, forest ecosystems, and reference ecosystems. The assessment is therefore intended to inform both the decision to proceed with restoration and the initial direction of project planning.
An erosion control feasibility file, however, contains more than the statutory decision. The assessment workflow also generates auxiliary field determinations—most notably the landslide- and debris-flow-prone-area determination tables applied during the field investigation of disturbance degree under the Korea Forest Service guideline established pursuant to Article 37-2(4) of the Enforcement Rule of the Forest Protection Act [11]. These tabular determinations record the field team’s structured judgment of slope, soil, drainage, and downstream exposure, and they are reported as points and grades (for example, 301 points, Grade 2). They are not the statutory feasibility total; the available records contain neither the item-level sheets nor the measured slope-stability, runoff, or sediment data that would be required to treat them as physical-risk metrics. Because the two kinds of numbers appear side by side in project documents, relabeling a field risk determination as a “statutory feasibility score” would misstate both its source and its meaning, and any treatment logic built on it would inherit that error.
Nevertheless, neither a statutory decision nor a field risk determination should automatically be interpreted as a quantitative measure of landslide probability, erosion rate, or expected restoration success. Such interpretations require independent validation against measured physical conditions or subsequent outcomes [12,13,14,15]. A site can be considered feasible for restoration while still requiring further diagnosis to determine the appropriate location, type, and intensity of intervention [16,17].
Previous restoration research emphasizes reference ecosystems, explicit objectives, and evaluation of ecological outcomes [1,17]. Erosion research shows that vegetation, soil properties, runoff concentration, and slope geometry interact, making diagnosis of the active process essential to treatment selection [5,6,7]. Studies of military training areas also demonstrate that land-use history and access constraints can shape restoration choices [18,19]. These studies provide the ecological and geomorphic rationale for site-specific planning, but they do not, by themselves, explain how to translate mixed project records into reviewable intervention priorities when observations, professional judgments, and later analytical interpretations are intermingled. The practical gap addressed here is therefore procedural: how can the evidential path from a recorded decision, through a documented site problem, to a provisional intervention be made explicit without overstating what the records establish?
When records are incomplete, three statement types need to remain distinguishable: recorded observations (measured values or documented field conditions), source-report judgments (evaluations, predictions, and recommendations made in the source report), and planning inferences drawn by a subsequent analyst. International restoration standards call for assessment to be connected to objectives, context-appropriate interventions, and subsequent evaluation [1,20,21], but the available records in this case do not provide a ready-made way to separate these statement types or to record when uncertainty should prevent a planning decision. This study addresses this gap by making provenance and uncertainty explicit rather than treating every statement in an assessment file as equivalent evidence.
Several established approaches address parts of this problem. Evidence-based conservation and systematic review methods synthesize published evidence on the effectiveness of interventions [22,23], and the evidence-use framework of Salafsky et al. [24] distinguishes the types and sources of evidence supporting a management decision. The Open Standards for the Practice of Conservation [25] and structured decision-making [26] link objectives, alternatives, and uncertainty to management choices, and taxonomies of uncertainty classify the epistemic and linguistic uncertainties that affect such choices [27]. Environmental impact assessment, in turn, predicts and evaluates the effects of a proposed project, whereas the protocol makes no prediction and only records, for an existing file, whether each statement is an observation, a source-report judgment, or a planning inference. These approaches generally assume that the evidence base is a body of published studies, monitoring data, or an assessment designed for the decision at hand. They do not specify how a single project report, in which a recorded decision, a tabulated field determination, a source-report recommendation, and a later analyst’s interpretation coexist, should be decomposed so that each proposed action can be traced to its own provenance and so that an unresolved conflict halts an action instead of being averaged away. The protocol proposed here is narrower than these frameworks and does not replace them. It is a record-level audit step between an assessment file and detailed design, with three specific elements: (i) a provenance coding (R, J, I) applied to the statements of one file, with the statement type recorded in a separate field; (ii) a conflict-and-uncertainty register whose entries can change an action’s status; and (iii) rules that make every action conditional on at least one recorded observation. Section 4.1 uses worked examples to show how these rules change the planning outcome relative to adopting the source recommendations directly.
This study develops and applies a documentary evidence-to-plan protocol to three anthropogenically degraded sites in Gangwon Province that were all judged eligible for forest restoration. The protocol links (i) the recorded project suitability decision, (ii) the separate field risk determination, (iii) the documented disturbance mechanism and its spatial context, and (iv) provisional intervention priorities with explicit pre-design verification requirements. Its methodological contribution is operational rather than predictive: it specifies evidence classes, a conflict-and-uncertainty register, a rule requiring each proposed action to be supported by at least one recorded observation, and a defer condition when unresolved information affects an action’s premise. This allows readers to audit how the available records support—or do not yet support—a proposed action. The protocol is not presented as a validated assessment instrument, a new empirical finding about restoration outcomes, or evidence that the proposed interventions improve erosion control or ecological recovery. The framing is consistent with restoration research distinguishing stressor removal from ecosystem recovery and emphasizing context-dependent choices between active intervention and natural regeneration [28,29,30,31,32,33].
The objectives were to: (1) describe the disturbance history and physical setting of the three sites; (2) distinguish recorded project suitability decisions from field risk determinations and classify extracted statements as recorded observations (R), source-report judgments (J), or planning inferences (I); (3) derive provisional site-specific priorities with explicit verification requirements and an action status; and (4) show, using worked examples, how the protocol rules change planning outcomes relative to adopting source recommendations directly. The study is a structured documentary comparison of three eligible sites, not a test of the predictive validity of the assessment system. Because all three sites received the same suitability outcome, the comparison is descriptive and cannot show whether the assessment system separates suitable from unsuitable sites. It does not infer causal relationships between the recorded determinations and site conditions or evaluate the effectiveness of any intervention.

2. Materials and Methods

2.1. Study Sites

The study covered three sites in Gangwon Province, Republic of Korea, with a combined assessed area of 5.0 ha according to the project records used for this comparison (Figure 1) [34].
Figure 1. Relative positions and recorded setting of three forest restoration study sites (Yanggu, Cheorwon, and Goseong) in Gangwon Province, Republic of Korea. Exact coordinates are withheld because of military security restrictions (schematic; not a map; not to scale).
Exact coordinates are not reported because some locations are subject to military security restrictions. The sites were included in a regional forest restoration plan prepared in 2020. The assessed area denotes the portion evaluated for restoration and should not be interpreted as the full extent of disturbance in the surrounding landscape. For Cheorwon, the assessed 2.0 ha was selected from a broader disturbed area of 6.4 ha because the remainder included active military facilities. Area figures are reported as recorded in the project materials; where the records disagree with one another (Goseong, Section 2.2), the disagreement is retained rather than silently resolved. Because the delineation of a study area can change the apparent spatial distribution of slope processes [35], every statistic is reported together with the boundary to which it refers, and a statistic whose boundary is undocumented (the Cheorwon terrain summary) is not assigned to either the assessed or the disturbed footprint.
Case selection: The three sites were selected because they are covered by one research report [34], which allowed the same record types to be extracted for every site. They were not sampled to represent a population of degraded sites. Within this set they differ in disturbance type (soil excavation for the expansion of a military facility at Yanggu; abandoned military facilities followed by removal, filling, and regrading at Cheorwon; an agricultural-plastic collection yard combined with larch clear-cutting and a poorly established plantation at Goseong), in bedrock (granite at Yanggu and Cheorwon; banded gneiss at Goseong), in mean elevation (about 244–595 m), and in existing erosion control works (Table 1). The protocol is therefore applied as a worked demonstration in one setting, a research-society application of the Korean statutory feasibility method to erosion control projects, and no claim is made that it transfers to other degraded forest environments or regulatory settings without adaptation. Sites that were more accessible but not covered by this report were outside the scope of the records analyzed, and no new field data were collected (Section 4.5).
Table 1. Characteristics of the three assessed sites, as recorded in the available project records.
Source of the records: The source report [34] is a 2021 graduate-school academic research society result report, prepared by a group of experts and graduate students that included the first author, in which the statutory feasibility procedure was applied to the three sites as a research exercise. Its suitability conclusions and field determinations are therefore the report group’s own evaluations, not decisions of an administrative authority. The present study is a retrospective re-analysis of the authors’ own earlier report, and it is not independent of that report’s authorship (Section 4.7). The report is unpublished; an English translation of the original Korean excerpt of every register entry is given in Supplementary Table S1, and the Korean originals can be provided on request.
Yanggu: The assessed area covered 1.0 ha in two plots. Project records attribute the disturbance to soil excavation associated with the expansion of a military facility, beginning in 2011 and intensifying from 2015. Available terrain records reported mean mapped slopes of 9.0° and 10.0° for the two plots and no mapped area of at least 25°; the same records, however, document a localized cut face of at least 30° in plot 1 from the field survey. These values describe different spatial scales, and the records themselves note the divergence: the plot-level mean does not characterize the geometry of the localized cut face. The records also describe exposed, weakly consolidated sandy material, active raindrop-impact (splash) erosion at the soil surface even in small rainfall events, and a square gabion retaining wall already constructed at the lower slope, with sediment recorded as continuing to discharge from the upper part of the slope at the time of assessment. A national landslide-hazard map analysis was not performed for this site because it lies within a military-controlled zone, so the field determination (Section 2.2) is the only recorded risk assessment.
Cheorwon: The assessed area covered 2.0 ha within a broader disturbed area of 6.4 ha associated with former military land use, with disturbance visible in imagery from 2012; facility removal, filling, and regrading were undertaken in 2019 under a forest-watershed-management project, and part of the site was recorded as remaining bare at the time of assessment. The available site records describe rill erosion in the filled sections and in abandoned bare sections, and identify existing erosion control structures along the adjacent stream—two check dams, slope-toe and streambed protection works, and a retention basin constructed as part of the 2019 works. The terrain summary reported a mean slope of 10.0° and indicated that 5.6% of the analyzed area had slopes of at least 25°. The boundary from which these statistics were derived is not documented in the available records relative to the 2.0-ha assessed area and the 6.4-ha disturbed footprint, so the statistics are reported as recorded and are not assigned to either boundary. The project summary separately records a planned works scale of 4 ha for Cheorwon, which differs from the 2.0-ha assessed area recorded in the eligibility table; this difference is retained and flagged for confirmation (Supplementary Table S2).
Goseong: The project records identify a 2.0-ha assessed area adjacent to a village, used as an agricultural-plastic collection yard beginning in 2016, followed by larch clear-cutting in 2017 and planting of Sorbus commixta in 2018. The records describe very poor seedling growth (E27, R), which the source report attributes to frost damage (E65, J), and a recorded establishment rate below 50%, with sections that remained sparsely vegetated or bare; sediment is recorded as continuing to discharge at the lowest part of the clear-cut area, which the source report attributes to slope instability (a recorded attribution rather than a verified mechanism). Natural regeneration of shrub species is documented in the clear-cut area. The site summary table records the disturbed area as 1.0 ha, whereas the main text and the digitized boundary analysis record 2.0 ha; the eligibility table also records 2.0 ha. This internal disagreement is disclosed rather than resolved (Supplementary Table S2). The available GIS summary reported a mean slope of 7.7° and no mapped area exceeding 20°; the field records, however, describe the collection-yard construction site as a very steep section with active raindrop-impact (splash) erosion at the soil surface even in small rainfall events. The site therefore combines two components with different problems: a steep, actively eroding cut associated with the collection-yard construction, and a poorly established plantation on the clear-cut area. The principal characteristics of the three assessed sites are summarized in Table 1.

2.2. Recorded Assessment Results

Two kinds of assessment results appear in the available records, and they are reported separately throughout this study. First, the source report’s own evaluation concluded that all three sites (5.0 ha combined) were suitable for the erosion control (sabang) project, based on a comprehensive review of necessity, suitability, and environmental conditions; the available records do not present this as a formal statutory authorization, and it is reported here as a recorded internal judgment that the project could proceed. Second, during the field investigation of disturbance degree, the assessment teams applied the landslide- and debris-flow-prone-area determination tables promulgated under the Korea Forest Service guideline established pursuant to Article 37-2(4) of the Enforcement Rule of the Forest Protection Act [11]. The resulting determinations were 301 points (Grade 2, “high possibility of occurrence”) for Yanggu, 375 points (Grade 1, “markedly high possibility of occurrence”) for Cheorwon, and 351 points (Grade 2) for Goseong. These numeric determinations record the field teams’ structured risk judgments; they are not the statutory feasibility total, and they are not treated as measures of landslide probability, erosion rate, or expected restoration success.
The relevant legal framework recorded in the project file comprises Article 42-6 of the Act on the Creation and Management of Forest Resources, Article 48-5 of its Enforcement Decree, the Korea Forest Service’s Detailed Standards for Feasibility Assessment of Forest Restoration Projects, and the feasibility-assessment provisions of Article 7-3 of the Erosion Control Act and Article 4-2 of its Enforcement Decree [8,9,10,34]. The detailed standards were originally issued as Korea Forest Service Notice No. 2019-50 on 20 August 2019 and were subsequently amended, including by Notice No. 2026-10, effective 9 January 2026 [10]. Because the original item-level assessment sheets and the complete criteria applicable on each assessment date were not available, the 2026 notice is cited for current legal context only, and the recorded results were not recalculated under the amended notice. No criterion of the 2026 notice was used to classify, score, or interpret any recorded value. The guideline governing the determination tables has itself been revised several times; the version applicable on the assessment dates should be confirmed against the original file (Supplementary Table S2).
The available materials did not include the item-level components needed to reconstruct either the field determination scores or the internal suitability evaluation independently. Both record types are therefore reported descriptively and considered alongside the documented site observations; score differences are not attributed to individual terrain, drainage, or ecological factors. The analysis consequently addresses the traceability of planning decisions rather than the validity or predictive performance of the assessment instruments. Figure 2 summarizes the workflow as represented in the available records.
Figure 2. Workflow of the statutory feasibility assessment and the auxiliary field risk determination for forest restoration and erosion control projects, as represented in the available records (schematic; not a quantitative diagram). The dashed line links the box “Not part of the statutory decision” to the determination tables, indicating that the determination points are reported separately from the statutory feasibility total.

2.3. Terrain and Disturbance-History Information

Terrain information was compiled from the available site-assessment records. The comparison distinguishes mean mapped slope, the mapped proportion of steep terrain, and localized slope observations. These measures are not interchangeable: a plot-level mean does not describe the geometry of every cut face, rill, or drainage channel, and the source records themselves document cases in which the mapped summary and the field observation diverge. The analysis therefore retains both values side by side, applies a scale-separation rule, and requires a field survey to resolve the geometry of any localized feature before structural treatment is selected.
Disturbance history was reconstructed from the available project records and descriptions of imagery interpretation. The records identify the sequence of land use and earthworks at each site, while imagery descriptions support the chronology of visible land-cover or surface disturbance. The available materials do not provide a consistently documented image-acquisition series or a validated change-detection workflow; imagery was therefore used to describe disturbance history, not to calculate erosion rates, soil-volume change, or restoration trajectories. The GIS pre-survey described in the methods used ArcGIS 10.1 with the national landslide-hazard map, and areas were determined by time-series analysis of aerial imagery, supplemented where necessary by GNSS field survey; these are recorded methods of the source assessment, not independently reproduced analyses of this study. Rainfall extremes appearing in some source records were excluded from comparative interpretation because station metadata and representativeness for the individual sites could not be verified consistently; the study therefore does not use those values to estimate site-specific erosivity, runoff, sediment yield, or landslide probability [36,37,38,39]. The spatial resolution of the terrain data, the slope-calculation procedure, and the exact analytical boundaries are not documented in the available records (Section 4.7), so the GIS values are treated as transcribed summaries.

2.4. Reference-Ecosystem Data Sources

Reference-ecosystem information was used to describe the ecological context for restoration planning. Fixed reference plots were recorded at approximately 20 m (Yanggu), 100 m (Cheorwon), and 50 m (Goseong) from the assessed sites. Available reference-plot records described sandy-loam soils, gravel content below 5%, and brown forest soil. Recorded reference-plot soil depths were approximately 60 cm at Yanggu, 40 cm at Cheorwon, and 70 cm at Goseong. These values describe the reference plots and should not be confused with the separate soil-depth observations for the assessed sites in Table 1.
Quercus mongolica was recorded as the dominant tree-layer species in the Yanggu and Goseong reference plots, whereas Robinia pseudoacacia was dominant in the Cheorwon reference plot. The records reported approximately 80% tree-layer cover, 40% subcanopy cover, 40% shrub cover, and 10% herb cover at Yanggu. The Cheorwon reference-plot vegetation was recorded in the source report as a species list; the records do not document plot dimensions or cover-estimation procedures. No legally protected species were recorded in the assessed sites or reference plots. These values are summarized as observations from the source records, not as estimates from a statistically replicated vegetation survey. The amount of information also differs among the sites (cover values are recorded only for Yanggu), which is a further reason why the reference plots are not compared quantitatively.
The available materials did not provide a complete description of reference-plot dimensions, replication, vegetation-cover estimation procedures, or taxonomic recording protocols. The vegetation information is therefore treated as local context only; it is not used to set restoration targets, to estimate site-wide species richness, compare vegetation statistically among sites, or establish a quantitative ecological baseline. Dominance of a species in a reference plot was not treated as sufficient evidence that the species should automatically be selected as a restoration target; target composition should be determined in relation to restoration objectives, disturbance history, site conditions, native-species suitability, and applicable project requirements [12,17,28,31].

2.5. Evidence-to-Plan Protocol

A structured protocol was applied to convert the available records into conditional planning priorities. The three evidence classes describe provenance, not evidential strength: R (recorded observation) denotes a number, measurement, or field condition documented in the source report; J (source-report judgment) denotes an evaluation, prediction, or treatment recommendation made in the source report; and I (planning inference) denotes a conditional interpretation made in this analysis, accompanied by explicit verification requirements. Where a source statement combines observation and evaluation, it is split into separate register entries, each coded on its own (for example, a recorded poor growth of seedlings and the source report’s attribution of that growth to frost damage), and a sentence that cannot be split is classified as J. The classes do not independently establish accuracy or reliability.
Coding procedure: The register was compiled retrospectively by the authors from a single internal source report [34]. Statements on any of the analytical fields listed below were extracted, assigned a stable ID, and coded according to rule S2. For each statement the register also records a statement type (observation, determination, causal attribution, or evaluation or recommendation) in a separate field, so that an observed condition, an administrative decision, and a causal attribution are never merged in one entry. Where the original excerpt of an entry also contains an evaluative clause that is not rendered in the English statement (for example, the concern clause in E06 and the purpose clause in E10), only the observational clause is registered under that entry, and the evaluative clause is not used as support for any action. During revision, every entry was re-examined against rule S2. The suitability conclusion (E42) was recoded from R to J because it is an evaluative judgment; the source sentence attributing poor seedling growth to frost damage was split into an observation (E27, R) and a causal attribution (E65, J); and one source recommendation that had been omitted from the register (revegetation of suitable sections at Cheorwon, E66) was added. The register was not independently double-coded and no inter-rater agreement was measured, so the consistency of the protocol across coders is untested (Section 4.6).
Action status and sequence: Each proposed action is given one of three statuses. “Inspection possible now” means that the action is an investigation or survey whose premise does not depend on an unresolved register item. “Design deferred” means that an unresolved item (S4) affects the premise, scale, or quantity of the action, so that design quantities and budget scope cannot be fixed until the item is resolved. “Selectable if condition met” means that the action is a source-recommended option (J) that may be chosen only after the stated verification confirms the local problem it addresses. Within a site, actions follow a fixed order: (1) flag or resolve records that change the premise of an action; (2) investigate the documented source of the active process; (3) manage conveyance and drainage; and (4) establish or assist vegetation. Vegetation measures come last because their success depends on understanding the physical processes addressed in steps (2) and (3), and because on steep or wet slopes they cannot be assumed to be neutral for slope stability (Section 4.3). The protocol adds no new field procedure and does not replace established diagnostic practice; it organizes what the existing records do and do not support before those procedures are carried out.
Table 2 specifies the protocol inputs, decision rules, record formats, and conditions for proceeding or deferring a decision. The resulting action table links each provisional priority to its supporting R and J evidence IDs and identifies the checks required before detailed design (Section 3.5). The protocol is intended to make the reasoning auditable; it does not replace field diagnosis, engineering analysis, or the responsible authority’s approval process.
Table 2. Evidence-to-plan protocol applied in this study.
The same analytical fields were applied to all three cases: (1) disturbance history and assessed area; (2) recorded suitability decision; (3) recorded field risk determination; (4) available terrain information and localized erosion observations; (5) reference-ecosystem and soil information; (6) existing erosion control infrastructure and drainage context; and (7) source-recommended works. Within the inference step, actions were grouped into four functions: (i) control of continuing disturbance and removal of residual waste; (ii) treatment of localized slope or surface-erosion problems; (iii) management of drainage and concentrated runoff; and (iv) recovery of vegetation structure and ecological attributes.
No new field measurements, numerical slope-stability calculations, rainfall–runoff simulations, sediment-yield estimates, or post-implementation monitoring data were generated. Accordingly, the proposed actions are pre-implementation planning priorities based on the records available for review. They are not engineering designs, quantitative risk estimates, or demonstrations of treatment effectiveness. Any action whose justification depends on unresolved site geometry, infrastructure condition, or project scope is explicitly subject to verification before design.

3. Results

3.1. Recorded Assessment Results and Record Uncertainties

All three sites were recorded as suitable for the erosion control project in the internal evaluation, with assessed areas of 1.0 ha (Yanggu), 2.0 ha (Cheorwon), and 2.0 ha (Goseong). The recorded field risk determinations—301 points (Grade 2) at Yanggu, 375 points (Grade 1) at Cheorwon, and 351 points (Grade 2) at Goseong—were produced by the landslide-prone-area determination tables during the field investigation and are reported as recorded field outputs. The two record types answer different questions: the suitability decision records the internal judgment that the project could proceed, and the field determination records the assessment team’s structured judgment of slope and erosion risk. Neither is a quantitative measure of erosion rate, landslide probability, or restoration success.
The evidence register (Supplementary Table S1) contains 66 entries: 53 recorded observations (R) and 13 source-report judgments (J), each with a separate statement-type field. Section 4.1 shows which actions the protocol rules change relative to direct adoption of the source recommendations. The inference class (I) is used in the action table (Section 3.5), where each provisional priority is linked to its supporting records. Ten uncertainty items were identified and retained under the conflict and uncertainty check (S4); they are classified by type—numerical inconsistency, spatial-support difference, scope ambiguity, missing information, or unverified judgment—in Supplementary Table S2, with their handling and required verification. Three of these items are central to the site comparisons: the Goseong area records disagree internally (1.0 ha versus 2.0 ha); the Cheorwon terrain statistics have an undocumented analysis boundary; and, at both Yanggu and Goseong, the GIS slope summary and the field observation of a steep cut describe different spatial scales within the same site.
The recurring pattern in these records is that a low or moderate mean mapped slope co-occurs with a documented localized steep or actively eroding feature. At Yanggu, the mapped summary reports no area of at least 25°, while the field survey records a cut face of at least 30° with active splash erosion at the soil surface. At Goseong, the mapped summary reports no area exceeding 20°, while the field records describe the collection-yard construction site as a very steep section with active splash erosion even in small rainfall events. Cheorwon shows the opposite combination: a Grade 1 field determination and documented rill erosion, together with an existing check-dam and retention-basin system of undocumented condition. These are case descriptions, not evidence of statistical association or causation, and the scores are used descriptively throughout.

3.2. Site-Specific Conditional Priorities

3.2.1. Yanggu: Existing-Structure Condition Survey and Cut-Face Management

Basis in records (R): Yanggu has a recorded mean mapped slope of 9.0° and 10.0° for its two plots and no mapped area of at least 25°; the field survey nevertheless recorded a cut face of at least 30° in plot 1, with active splash erosion at the soil surface even in small rainfall events and exposed, weakly consolidated sandy material. A square gabion retaining wall already exists at the lower slope, and sediment was recorded as continuing to discharge from the upper part of the slope at the time of assessment. Military barracks are located below the site.
Source recommendations (J): The source report recommends slope regrading and gabion-type stabilization together with gully check, sod-staking, drainage channel, and sod-covering works.
Conditional priorities (I): Because a structure already exists at the toe and continues to receive sediment from above, the first planning action is not the selection of a new structure but a condition survey of the existing gabion wall, its drainage, and the geometry of the cut face (verification: structural condition assessment and slope-stability analysis). The continuing discharge is documented, but the records do not establish whether it reflects wall underperformance, sediment delivery from the exposed upper slope, or ordinary conveyance, so this question is deliberately left open. The subsequent priorities are: delineate the cut face and its contributing runoff pathways and provide a defined route for safe conveyance or dispersal; protect treated surfaces with contour-oriented sod or equivalent surface-protection measures; consider additional toe support only where the condition survey identifies a specific unresolved function; and establish suitable native shrubs and forbs on treated surfaces while maintaining required military sightlines. The available records provide no factor of safety and no measured erosion rate, so neither the need for additional structural work nor its dimensions can be inferred from the recorded determination or slope angle alone. Splash erosion (E06) is a surface-erosion observation; it does not by itself indicate a sliding mechanism, which would have to be diagnosed separately (Section 4.3).

3.2.2. Cheorwon: Rill Management Coordinated with Existing Infrastructure

Basis in records (R): Cheorwon has a recorded mean mapped slope of 10.0° with 5.6% of the analyzed area of at least 25° (analysis boundary undocumented), documented rill erosion in the filled sections and in abandoned bare sections, and existing erosion control structures along the adjacent stream—two check dams, toe and streambed protection, and a retention basin—constructed as part of the 2019 works. Part of the site was recorded as remaining bare at the time of assessment, following the 2019 regrading. A residential area lies downstream.
Source recommendations and judgments (J): The source report judges that, because the downstream works exist, the risk of sediment reaching the residential area is low; it also recommends revegetation of suitable sections. The low-risk statement is a source judgment, not a verified finding: the hydraulic capacity and structural condition of the dams and basin are not documented in the available records.
Conditional priorities (I): The documented combination of active rill erosion and existing downstream infrastructure supports a priority order that begins with the existing system: map the observed rills, trace them upslope to their contributing flow paths, and inspect the continuity and functional condition of the existing check dams and retention basin before proposing additional structures (verification: hydraulic and structural assessment of the existing works). Initial measures should address verified rill channels and exposed surfaces, and correct identified runoff concentrations where technically justified. Residual waste should be removed where documented, and existing channels and structures should remain accessible for inspection and maintenance. Moisture-tolerant native trees and understory vegetation may be established in suitable microsites provided that planting does not obstruct drainage routes or maintenance access. The Grade 1 determination is not, by itself, justification for adding general slope-stabilization structures. Two administrative questions also require confirmation before design: the boundary from which the terrain statistics were derived, and the intended works scale (4 ha recorded in the project summary versus 2.0 ha assessed).

3.2.3. Goseong: Two Components with Distinct Problems

Basis in records (R): Goseong combines two components. The collection-yard construction site is recorded as a very steep section with active splash erosion at the soil surface even in small rainfall events, on banded gneiss, above a village road and greenhouses; the source report describes the surrounding area as designated within the Baekdudaegan Protection Area (buffer zone); the GIS summary nevertheless reports a mean slope of 7.7° with no mapped area exceeding 20°. The clear-cut area was planted with S. commixta in 2018; growth was recorded as very poor (E27, R), which the source report attributed to frost damage (E65, J), and the recorded establishment rate is below 50%, with sections sparsely vegetated or bare; sediment is recorded as continuing to discharge at the lowest part of the clear-cut area, which the source report attributes to slope instability (a recorded attribution rather than a verified mechanism). Natural regeneration of shrub species (Spiraea, Weigela, Pinus seedlings, Rhododendron) is documented in the clear-cut area. The site records disagree internally on area (1.0 ha in the summary table versus 2.0 ha in the main text and eligibility table).
Source recommendations and judgments (J): The source report judges natural recovery to forest to be impossible if the site is left in its present state and recommends, for the collection-yard cut, slope regrading, large-stone retaining works, sod staking, and drainage channels, together with sod or mat covering and a low windbreak for the cut slope; for the plantation, it prioritizes supplementary S. commixta planting.
Conditional priorities (I): The two components are treated separately. For the collection-yard cut slope, the first action is a cut-slope survey—gradient, length, soil, toe condition, and runoff pathways—to resolve the documented divergence between the gentle mapped summary and the steep field observation (verification: field survey of the cut slope). The source-recommended stabilization works (regrading, large-stone retaining works, sod staking, drainage channels) are carried as conditional options that may be selected only after this survey confirms the local problem they are intended to address; the low windbreak is considered only if damaging wind exposure is confirmed. For the plantation, the first actions are an assessment of S. commixta survival and of the documented natural shrub regeneration, followed by selective supplementary planting or natural-regeneration management rather than uniform replanting; the recorded discharge at the lowest part of the clear-cut links the plantation component to a drainage and toe-stability question that the survey should also address. The area disagreement must be resolved against the project boundary before any design quantities are computed. The source judgment (E35) is conditional (“if maintained in the present state”) and concerns recovery to forest, whereas the records (E41) document early shrub colonization; the two are not necessarily contradictory, but the records do not reconcile them. The restoration strategy at Goseong, active replanting versus assisted natural regeneration, therefore remains open until the survival and regeneration survey is completed, and the supplementary planting recommended in the source report (E40) is carried only as a conditional option. The counting unit, survey date, and sampling method behind the below50% establishment rate are not documented, so the figure is an R record of limited auditability, and the frost attribution (E65) is a source-report causal statement; neither is used to select species or replanting density.

3.3. Reference-Ecosystem Observations

The reference-ecosystem records provided information on soil texture, soil depth, dominant tree species, and understory condition. These observations help characterize the ecological context, but because plot dimensions, replication, and cover-estimation procedures are undocumented, they are not used to set restoration targets or species lists and do not constitute a replicated baseline for statistical evaluation of restoration outcomes [13,14,17].
At Yanggu and Goseong, Q. mongolica dominance provides a local reference point for tree composition. At Cheorwon, the recorded dominance of R. pseudoacacia describes the existing reference-plot composition but does not, by itself, establish that the species should be a restoration target. Species selection should be consistent with the intended ecological objectives and local site conditions rather than being based solely on the most abundant species in a single reference plot [12,13,17,31]. The recorded dominant species in the tree, sub-tree, shrub, and herb layers of the three reference plots are summarized in Table 3.
Table 3. Dominant species of the reference ecosystem by layer, as recorded in the available project records.

3.4. Cross-Site Comparison

Table 4 aligns the recorded decisions and observations across the three sites. The same suitability status coexists with different field determinations, different existing works, and different source-recommended works; the recurring GIS-versus-field divergences appear at two of the three sites. The comparison is strictly qualitative: the records have different spatial supports, area entries, and types of field observation, so differences in determination points or terrain statistics are not interpreted as comparable measures of physical risk. Figure 3 schematically illustrates the recorded conditions at the three sites.
Table 4. Cross-case matrix of recorded decisions, observations, and conditional priorities.
Figure 3. Schematic of the recorded conditions at the three sites. The drawings are not to scale, have no elevation axis, and do not represent surveyed profiles; all labels are taken from the project records (Table 1 and Table 4).
The protocol’s scale-check rule (S5) is not an academic formality in these cases. At Goseong, the gentle mapped summary by itself neither establishes nor excludes a local structural need, and the source-recommended works by themselves do not verify one; the protocol requires both to be carried together with the cut-slope survey that separates them. Accepting the mapped summary alone would reduce the site to a vegetation-recovery problem, whereas the field record documents an actively eroding steep cut that the source report itself proposes to treat with structural works. Conversely, accepting the source-recommended works without the condition survey would convert an unverified recommendation into a design decision. The conditional treatment keeps both the problem and the required verification visible.

3.5. Evidence-Linked Priorities

Table 5 synthesizes each site’s principal problem, the corresponding conditional priority, the register items that support it, and the verification that remains before detailed design. Every documented problem in Table 5 is supported by at least one recorded observation (R), in accordance with the inference rule (S6); source recommendations (J) appear only as candidate responses, conditional on verification. Table 5 also lists the source-recommended options (J) carried for each site, with their register IDs, the sequence of the priorities, and an action status for each action. Source recommendations never appear as the support for a documented problem.
Table 5. Site-specific conditional priorities, their evidential basis, source options carried, required verification, and action status.

4. Discussion

4.1. From Suitability Screening to Site-Specific Planning

The main finding is that a common suitability status does not imply a common restoration prescription. Although all three sites were judged eligible, the available records support different conditional priorities: a condition survey of the existing gabion wall and cut face at Yanggu, rill management coordinated with the inspection of existing infrastructure at Cheorwon, and separate treatment of the collection-yard cut and the poorly established plantation at Goseong. The strength of this finding lies in the traceable link between each documented site problem and the next planning question, not in a claim that the cases quantify relative risk or prove intervention effectiveness.
This distinction is consistent with restoration frameworks that separate the removal of continuing stressors from the recovery of ecosystem attributes [3,28,33,40]. It also demonstrates why the transition from assessment to implementation should include an explicit diagnosis of the physical or ecological problem that each intervention is intended to address. The contribution of this study is a structured procedure—inputs, decision rules, record formats, and go/defer conditions—for translating suitability screening and heterogeneous field records into conditional priorities. Because the comparison includes only three suitable sites and uses existing records, the procedure should be regarded as a case-based planning aid, not a validated or universally transferable decision-support model. The protocol is therefore best read as a record-level audit step that complements, and does not replace, evidence-based and decision-analytic frameworks [22,23,24,25,26,27].
To show what the rules change, Table 6 contrasts the direct adoption of the source recommendations with the protocol output for four decisions in the records. In none of these cases does the protocol reject the source recommendation; it changes its status and its sequence. These examples do not show that the protocol leads to better restoration outcomes, which would require monitoring data. They show that, in a project report, the same sentence can be an observation, a decision, or a judgment, and that treating them alike changes what is designed first.
Table 6. Illustrative effect of the protocol rules on four planning decisions in the records (descriptive; no outcome comparison is implied).

4.2. Interpreting Suitability Decisions and Field Risk Determinations

The reported totals have a numerical order, but they are field risk-determination results, not restoration-feasibility totals. Their item-level contributions could not be independently reconstructed, and their predictive validity and implications for intervention needs were not evaluated in this study. Relabelling them as statutory feasibility scores would therefore support a ranked comparison among the sites that the available file does not document. In this study, the determinations are used only as descriptive records of the field teams’ structured judgments, and the suitability decision is reported separately. The available materials do not include the item-level sheets needed to determine which assessment components contributed to the differences among sites [8,9,10,11].
At Cheorwon, the Grade 1 determination co-occurs with recorded rill erosion and existing downstream erosion control infrastructure. The available evidence does not establish that the determination predicts these conditions or that the highest-determined site necessarily requires the greatest number of structural interventions. Similarly, Goseong’s Grade 2 determination does not independently establish a need for any particular structure [37,39]. The appropriate use of both record types in planning is descriptive; site-specific intervention choices are derived from the documented problem and require further verification where engineering performance is concerned.
The determination tables rate categories such as slope, soil, drainage, and downstream exposure; they are not process-based assessments. A high grade can therefore reflect the exposure of downstream elements as much as the likelihood of a particular process, and similar grades can arise from different combinations of processes. No relationship between the recorded grades and any geomorphological process at these sites (splash erosion, rill erosion, cut-face failure, or deep-seated movement) can be inferred from the records. Testing such a relationship would require the item-level sheets together with independent field measurements at sites spanning different grades.

4.3. Matching Measures to Observed Mechanisms

Interactions among root architecture, surface cover, concentrated flow, soil erodibility, and hillslope geometry are known to influence erosion processes and shallow slope stability [5,6,7,37,41,42]. Recent reviews of ecosystem-condition indicators also emphasize the importance of clearly defining indicators and documenting their data sources [15]. These findings support diagnosis before treatment selection but do not substitute for site-specific engineering analysis [38,39,43]. All mechanisms mentioned in this section are hypotheses to be tested by the investigations listed in Table 7, not established explanations of the observed processes.
Table 7. Process-specific diagnostic criteria and investigations that remain to be defined before design (illustrative; none of these criteria was applied in the source records).
At Yanggu, the documented cut face of at least 30° justifies further investigation of that particular slope section, but it does not by itself establish the necessity or dimensions of any additional gabion works—especially because a gabion wall already exists and its condition is undocumented. The planning sequence is to survey the existing structure, define the affected area, identify runoff pathways, and then select a treatment that addresses the diagnosed problem [6,7].
At Cheorwon, the documented rill erosion makes runoff-pathway diagnosis and surface protection direct planning priorities. Because check dams and a retention basin already exist downstream, their condition and function should be assessed before additional structures are proposed. Research on check-dam deterioration supports the importance of condition assessment in maintenance decisions [44], but it does not establish the current condition of the Cheorwon facilities. The planning task is to determine whether the observed erosion is associated with concentrated runoff, inadequate conveyance, local surface exposure, or another site-specific mechanism.
A structural measure should be considered only when a specific local support or erosion problem is documented through field inspection or engineering assessment [37,39,43]. The poorly established plantation is treated as an ecological problem to be assessed against the documented natural regeneration rather than as a uniform replanting task; the source report’s frost attribution remains unverified.
Surface-erosion control and landslide mitigation are related but different objectives, and a measure that is effective for one is not automatically suitable for the other. Vegetation reduces surface erosion by intercepting rainfall and binding the soil surface, and roots can reinforce the shallow soil mantle against shallow failures [5,6,7,45]. However, the mechanical and hydrological effects of vegetation are confined to the rooting zone and depend on slope, soil, and hydrogeology; deep-seated movements are not controlled by roots, and tree planting can add surcharge and alter infiltration and groundwater recharge, so that its effect on slope stability is site-specific and may be adverse under some hydrogeological conditions [45,46,47]. Accordingly, the planting steps in Table 5 are placed after process diagnosis and are not presented as stabilizing measures; at the cut faces of Yanggu and Goseong in particular, a vegetation recommendation presupposes that shallow failure and concentrated runoff on the cut have been assessed. The records document surface processes (splash and rill erosion) and steep cut faces, but no record establishes the type of any slope movement. The landslide type, for example shallow translational failure of the soil mantle versus deep-seated movement, determines which investigation and which measures are relevant and has to be established in the engineering investigation that precedes design (Table 7). The protocol does not adjudicate this question; it requires that the question be asked before a measure is chosen.

4.4. Reference Ecosystems and Restoration Objectives

Reference ecosystems can help identify locally relevant soil and vegetation attributes, but they should not be treated as rigid templates [1,2,3,4,17]. Their value depends on how well they represent the intended restoration objective and the environmental conditions of the disturbed site.
The available records indicate Q. mongolica dominance in the Yanggu and Goseong reference plots and R. pseudoacacia dominance at Cheorwon. These observations are useful for describing the recorded vegetation context, but they do not provide sufficient evidence to prescribe a fixed species composition. In particular, the presence of R. pseudoacacia in the Cheorwon reference plot should not automatically determine the restoration target. Species selection should reflect the ecological objective, disturbance history, soil and moisture conditions, and relevant management constraints [12,28,31]. The reference-ecosystem data should therefore be treated as local context only, not as evidence that the proposed vegetation treatments will achieve a particular ecological outcome.

4.5. Military Land Use and Access Constraints

Two sites were associated with military land use, where security restrictions and operational requirements can constrain field access, spatial assessment, and the implementation of restoration measures. Research on military training areas has shown that disturbance management can require balancing land-use requirements with environmental recovery [18,19].
The present study does not establish that military land use confers a biodiversity advantage, nor does it quantify biodiversity outcomes. The relevant implication is methodological: restrictions on access and disclosure affect the completeness of site records. At Yanggu, the national landslide-hazard map analysis could not be performed because the site lies within a military-controlled zone, so the field determination is the only recorded risk assessment. At Cheorwon, the assessed 2.0 ha represents only part of the broader disturbed area, and the findings should not be generalized to the entire 6.4 ha without additional evidence.
Military-related access and disclosure constraints contributed to the incompleteness of the records available for this retrospective analysis. Accordingly, this study examines what these records can and cannot support, without claiming that they constitute the only possible basis for planning at military sites. It does not claim that restricted sites are representative of degraded land in general, and it does not substitute for studies on openly accessible research sites, where the same protocol can be combined with independent field measurements (Section 4.7).

4.6. Re-Applicability and Transferability of the Protocol

The protocol is documented so that its classification rules and inference rule can be re-applied to the register by another coder, with the restriction that the register itself cannot be regenerated independently: the source report is an unpublished research report, and the original assessment sheets and several spatial-data and processing details are unavailable. The Supplementary Materials provide a 66-item evidence register with an English translation of the original excerpt, a short English rendering of each recorded statement, class, and statement type, together with a ten-item uncertainty and verification register. These materials allow readers to audit the stated links between the planning priorities and the evidence transcribed from the available records; they do not independently verify the accuracy of the original records. An English translation of the original Korean excerpt of each entry is provided in Supplementary Table S1. Because the source report is unpublished, readers can check the entries only against these excerpts, which were selected by the authors, together with the internal consistency of the register, the uncertainty register, and the action table.
The scope of re-applicability must be distinguished from validation. The register was compiled retrospectively for this analysis, and entries were not independently double-coded; no inter-rater agreement statistics are available. The protocol was not used in the source report, and its performance on rejected or borderline projects is unknown because all three cases were recorded as eligible. Thus, the procedure is specified for re-execution and audit, but its classification reliability and decision performance have not been empirically established. Future applications should use independent double-coding with reported agreement and include sites spanning different assessment outcomes.

4.7. Limitations and Future Research

Several limitations govern interpretation. First, the study covers only three sites in Gangwon Province, all recorded as eligible for the project. This purposive case set cannot estimate predictive performance, classification accuracy, or the ability of the assessment system to distinguish suitable from unsuitable projects. Broader evaluation should include more sites, including rejected and borderline cases, under a predefined protocol [13,14,15].
Second, the original item-level assessment sheets, complete assessment documentation, and the version of the determination-table guideline applicable on each assessment date were unavailable for independent reconstruction. The recorded decisions and determinations are therefore reported descriptively; the analysis does not infer the contribution of individual criteria. Future work should obtain the original sheets where permitted and compare individual criteria with independently documented terrain, drainage, soil, and vegetation conditions [8,9,10,11].
Third, the spatial information comes from project records and terrain summaries. Image-acquisition dates, digital elevation model source and resolution, coordinate reference system, GIS software version, slope-calculation settings, and analysis boundaries were not consistently documented in the materials reviewed. The reported slope values should therefore be treated as transcribed summaries, not independently reproduced GIS measurements. Future applications should preserve dataset provenance, dates, spatial resolution, coordinate reference system, processing settings, analysis boundaries, and field-verification records [15].
Fourth, the evidence register was not independently double-coded, and source-report judgments—such as the statement that natural recovery is impossible at Goseong—cannot be tested from the records alone. Fifth, this study includes no new field measurements, slope-stability calculations, or post-implementation monitoring. Field verification at other accessible sites, where direct measurements can be obtained, is a task for follow-up studies. The contribution is limited to making the reasoning from existing records to differentiated pre-implementation priorities explicit and traceable across three cases; it does not show that the protocol improves restoration outcomes or predicts risk. Future research should combine complete item-level records, reproducible spatial analysis, quantitative field measurements, independent register coding, and post-implementation monitoring to test whether this approach supports measurable improvements in erosion control and ecological recovery [48,49] (Figure 4).
Figure 4. Conceptual sequence of the documentary protocol: recorded decisions kept separate (Stage 1), evidence register and conflict checks (Stage 2), and conditional priorities with action status and pre-design verification (Stage 3). The diagram is conceptual and does not represent a validated decision-support model.
Sixth, documentary assessment carries biases that the protocol can make visible but cannot remove. The source report is a single document prepared by a research group that included the first author, so the analysis is not independent of its authorship: the separation between source-report judgments (J) and planning inferences (I) is a separation across time and purpose, not across independent teams, and the authors’ prior familiarity with the sites may have influenced the coding. The choice of what the report recorded, its terminology, and its conclusions reflect the purpose of that report. Records may also be shaped by access restrictions, by the timing of site visits relative to rainfall and the vegetation season, and by dependence on earlier project documents. Translation from Korean and the authors’ retrospective coding add interpretive steps, and coders who know the eventual planning questions are open to hindsight bias. The 2026 amendment of the detailed standards post-dates the assessment, so no recorded value was re-evaluated against it. These biases cannot be quantified with the available records, which is why all outputs are expressed as conditional priorities that require field verification.
Because the records define no restoration target or monitoring criterion, the outputs stop at pre-design verification. Before outcomes can be evaluated, each site would need a target and monitoring criteria set by the responsible authority. The records suggest variables that could be considered but are not targets in themselves: rill length and density and sediment retained by the existing dams at Cheorwon, the condition class of the gabion wall and the retreat of the cut face at Yanggu, and seedling survival and natural-regeneration density with defined plots and dates at Goseong [48,49]. At sites where landslide inventories exist, inventory-based analyses such as frequency–area distributions [50] can complement the documentary approach, and the choice of the study-area boundary should be justified in the same way as in this study [35].

5. Conclusions

This comparison indicates that recorded project suitability decisions, field risk determinations, and site-specific intervention choices should be treated as related but distinct components of pre-implementation planning. The suitability decision provides a screening reference, while the field determination records a structured judgment recorded in the source report. Provisional actions must additionally reflect the documented disturbance mechanism, its location, existing infrastructure, and ecological context. Applying the same evidence-to-plan protocol to the three cases yielded different conditional priorities, each linked to recorded evidence and explicit pre-design verification requirements. Because all three sites received the same suitability outcome and no outcome data were used, the comparison is descriptive and does not test how well the assessment system distinguishes suitable from unsuitable sites.
The study’s contribution is a transparent documentary procedure comprising an evidence register, explicit classification rules, an uncertainty register, and an inference rule linking each proposed action to recorded observations and required verification. It does not validate the field determinations as predictors of erosion risk, landslide probability, or restoration success. The divergence between gentle mapped terrain summaries and localized steep, actively eroding features at Yanggu and Goseong illustrates why spatial scale and unresolved discrepancies must be retained in planning records rather than reconciled by assumption. Evaluation beyond these cases requires item-level assessment data, independently coded registers, reproducible spatial information, quantitative field measurements, and post-implementation monitoring. The findings should be used to structure further site investigation, not as a substitute for engineering design or as evidence of restoration effectiveness. In the worked examples (Table 6), the protocol changed the status and sequence of source-recommended actions rather than rejecting them.

Supplementary Materials

The following supporting information can be downloaded at: https://www.mdpi.com/article/10.3390/land15122297/s1, Table S1: Evidence register for the three study sites (66 entries, with statement type and an English translation of the original Korean excerpt); Table S2: Uncertainty and verification register.

Author Contributions

Conceptualization, S.K. and C.K.; Methodology, S.K. and H.K.W.; Validation, H.K.W. and C.K.; Formal Analysis, H.K.W.; Investigation, C.K.; Resources, S.K.; Data Curation, H.K.W. and C.K.; Writing—Original Draft, S.K. and H.K.W.; Writing—Review and Editing, S.K. and C.K. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the National Institute of Forest Science, under grant number FM0200-2022-02-2026.

Data Availability Statement

The evidence register (Table S1) and the uncertainty register (Table S2) are provided in the Supplementary Materials, including an English translation of the original Korean excerpt of each register entry. The source report is an unpublished research report written in Korean. Page references to the source report can be provided to the editors and reviewers on request. Further inquiries can be directed to the corresponding author.

Conflicts of Interest

The authors declare no conflicts of interest.

References

  1. Gann, G.D.; McDonald, T.; Walder, B.; Aronson, J.; Nelson, C.R.; Hallett, J.G.; Guariguata, M.R.; Gonzales, E.K.; Hua, F.; Echeverría, C.; et al. International Principles and Standards for the Practice of Ecological Restoration. Third Edition. Restor. Ecol. 2026, 34, e70441. [Google Scholar] [CrossRef] [Scilit]
  2. Chazdon, R.L. Beyond Deforestation: Restoring Forests and Ecosystem Services on Degraded Lands. Science 2008, 320, 1458–1460. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  3. Arneth, A.; Olsson, L.; Cowie, A.; Erb, K.-H.; Hurlbert, M.; Kurz, W.A.; Mirzabaev, A.; Rounsevell, M.D.A. Restoring Degraded Lands. Annu. Rev. Environ. Resour. 2021, 46, 569–599. [Google Scholar] [CrossRef] [Scilit]
  4. Cramer, V.A.; Hobbs, R.J. (Eds.) Old Fields: Dynamics and Restoration of Abandoned Farmland; Island Press: Washington, DC, USA, 2007. [Google Scholar]
  5. Gyssels, G.; Poesen, J.; Bochet, E.; Li, Y. Impact of Plant Roots on the Resistance of Soils to Erosion by Water: A Review. Prog. Phys. Geogr. 2005, 29, 189–217. [Google Scholar] [CrossRef] [Scilit]
  6. Sidle, R.C.; Ziegler, A.D.; Negishi, J.N.; Rahim Nik, A.; Siew, R.; Turkelboom, F. Erosion Processes in Steep Terrain—Truths, Myths, and Uncertainties Related to Forest Management in Southeast Asia. For. Ecol. Manag. 2006, 224, 199–225. [Google Scholar] [CrossRef] [Scilit]
  7. Stokes, A.; Bengough, A.G.; Fourcaud, T.; Atger, C.; Sidle, R.C. Desirable Plant Root Traits for Protecting Natural and Engineered Slopes against Landslides. Plant Soil 2009, 324, 1–30. [Google Scholar] [CrossRef] [Scilit]
  8. Republic of Korea. Act on the Creation and Management of Forest Resources, Article 42-6 (Feasibility Assessment of Forest Restoration Projects). Korean Law Information Center. Available online: https://www.law.go.kr/lsLinkCommonInfo.do?chrClsCd=010202&lsJoLnkSeq=1032641489 (accessed on 3 September 2026).
  9. Republic of Korea. Enforcement Decree of the Act on the Creation and Management of Forest Resources, Article 48-5 (Criteria for Feasibility Assessment of Forest Restoration Projects). Korean Law Information Center. Available online: https://law.go.kr/lsLinkCommonInfo.do?chrClsCd=010202&lspttninfSeq=151941 (accessed on 5 September 2026).
  10. Korea Forest Service. Detailed Standards for Feasibility Assessment of Forest Restoration Projects (Forest Service Notice No. 2026-10, Effective 9 January 2026). Korean Law Information Center. Available online: https://www.law.go.kr/LSW/admRulLsInfoP.do?admRulSeq=2100000272596 (accessed on 10 September 2026).
  11. Korea Forest Service. Guidelines for the Survey of Landslide- and Debris-Flow-Prone Areas and the Designation and Management of Vulnerable Areas, Established Pursuant to Article 37-2(4) of the Enforcement Rule of the Forest Protection Act. Korean Law Information Center. Available online: https://www.law.go.kr/LSW/admRulLsInfoP.do?admRulSeq=2100000231096 (accessed on 15 October 2026).
  12. Prach, K.; Durigan, G.; Fennessy, S.; Overbeck, G.E.; Torezan, J.M.D.; Murphy, S.D. A Primer on Choosing Goals and Indicators to Evaluate Ecological Restoration Success. Restor. Ecol. 2019, 27, 917–923. [Google Scholar] [CrossRef] [Scilit]
  13. Ruiz-Jaen, M.C.; Aide, T.M. Restoration Success: How Is It Being Measured? Restor. Ecol. 2005, 13, 569–577. [Google Scholar] [CrossRef] [Scilit]
  14. Wortley, L.; Hero, J.-M.; Howes, M. Evaluating Ecological Restoration Success: A Review of the Literature. Restor. Ecol. 2013, 21, 537–543. [Google Scholar] [CrossRef] [Scilit]
  15. Thomas, I.N.; Bernardo, F.; Cazacu, C.; Černecký, J.; Cortinovis, C.; Czúcz, B.; Duchková, H.; Kičić, M.; Lange, S.; Lecomte, X.; et al. Towards a Standardised Monitoring of Ecosystem Condition: A Literature Review on Indicators and Their Data Sources. Ecol. Indic. 2025, 178, 113952. [Google Scholar] [CrossRef] [Scilit]
  16. Nichols, J.D.; Williams, B.K. Monitoring for Conservation. Trends Ecol. Evol. 2006, 21, 668–673. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  17. Lindenmayer, D.B.; Likens, G.E. Effective Ecological Monitoring; CSIRO Publishing: Collingwood, Australia, 2010. [Google Scholar]
  18. Warren, S.D.; Holbrook, S.W.; Dale, D.A.; Whelan, N.L.; Elyn, M.; Grimm, W.; Jentsch, A. Biodiversity and the Heterogeneous Disturbance Regime on Military Training Lands. Restor. Ecol. 2007, 15, 606–612. [Google Scholar] [CrossRef] [Scilit]
  19. Jentsch, A.; Friedrich, S.; Steinlein, T.; Beyschlag, W.; Nezadal, W. Assessing Conservation Action for Substitution of Missing Dynamics on Former Military Training Areas in Central Europe. Restor. Ecol. 2009, 17, 107–116. [Google Scholar] [CrossRef] [Scilit]
  20. Gann, G.D.; McDonald, T.; Walder, B.; Aronson, J.; Nelson, C.R.; Jonson, J.; Hallett, J.G.; Eisenberg, C.; Guariguata, M.R.; Liu, J.; et al. International Principles and Standards for the Practice of Ecological Restoration. Second Edition. Restor. Ecol. 2019, 27, S1–S46. [Google Scholar] [CrossRef] [Scilit]
  21. Food and Agriculture Organization of the United Nations (FAO). Principles for Ecosystem Restoration to Guide the United Nations Decade 2021–2030; FAO: Rome, Italy, 2021. [Google Scholar]
  22. Sutherland, W.J.; Pullin, A.S.; Dolman, P.M.; Knight, T.M. The Need for Evidence-Based Conservation. Trends Ecol. Evol. 2004, 19, 305–308. [Google Scholar] [CrossRef] [PubMed]
  23. Pullin, A.S.; Stewart, G.B. Guidelines for Systematic Review in Conservation and Environmental Management. Conserv. Biol. 2006, 20, 1647–1656. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  24. Salafsky, N.; Boshoven, J.; Burivalova, Z.; Dubois, N.S.; Gomez, A.; Johnson, A.; Lee, A.; Margoluis, R.; Morrison, J.; Muir, M.; et al. Defining and Using Evidence in Conservation Practice. Conserv. Sci. Pract. 2019, 1, e27. [Google Scholar] [CrossRef] [Scilit]
  25. Conservation Measures Partnership. Open Standards for the Practice of Conservation, Version 4.0; Conservation Measures Partnership: Washington, DC, USA, 2020; Available online: https://conservationstandards.org (accessed on 4 November 2026).
  26. Gregory, R.; Failing, L.; Harstone, M.; Long, G.; McDaniels, T.; Ohlson, D. Structured Decision Making: A Practical Guide to Environmental Management Choices; Wiley-Blackwell: Chichester, UK, 2012. [Google Scholar]
  27. Regan, H.M.; Colyvan, M.; Burgman, M.A. A Taxonomy and Treatment of Uncertainty for Ecology and Conservation Biology. Ecol. Appl. 2002, 12, 618–628. [Google Scholar] [CrossRef]
  28. Meli, P.; Holl, K.D.; Rey Benayas, J.M.; Jones, H.P.; Jones, P.C.; Montoya, D.; Moreno Mateos, D. A Global Review of Past Land Use, Climate, and Active vs. Passive Restoration Effects on Forest Recovery. PLoS ONE 2017, 12, e0171368. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  29. Crouzeilles, R.; Ferreira, M.S.; Chazdon, R.L.; Lindenmayer, D.B.; Sansevero, J.B.B.; Monteiro, L.; Iribarrem, A.; Latawiec, A.E.; Strassburg, B.B.N. Ecological Restoration Success Is Higher for Natural Regeneration than for Active Restoration in Tropical Forests. Sci. Adv. 2017, 3, e1701345. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  30. Holl, K.D.; Aide, T.M. When and Where to Actively Restore Ecosystems? For. Ecol. Manag. 2011, 261, 1558–1563. [Google Scholar] [CrossRef] [Scilit]
  31. Chazdon, R.L.; Guariguata, M.R. Natural Regeneration as a Tool for Large-Scale Forest Restoration in the Tropics: Prospects and Challenges. Biotropica 2016, 48, 716–730. [Google Scholar] [CrossRef] [Scilit]
  32. Rey Benayas, J.M.; Newton, A.C.; Diaz, A.; Bullock, J.M. Enhancement of Biodiversity and Ecosystem Services by Ecological Restoration: A Meta-Analysis. Science 2009, 325, 1121–1124. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  33. Suding, K.N. Toward an Era of Restoration in Ecology: Successes, Failures, and Opportunities Ahead. Annu. Rev. Ecol. Evol. Syst. 2011, 42, 465–487. [Google Scholar] [CrossRef] [Scilit]
  34. Kwon, S. 2021 Graduate School Academic Research Society Result Report: Feasibility Assessment of Erosion-Control (Sabang) Projects at Three Sites in Gangwon Province. Department of Circular Economy and Environmental Systems, Inha University, 100 Inha-ro, Michuhol-gu, Incheon 22212, Republic of Korea. 2021; Unpublished research report. (In Korean)
  35. Bounab, A.; Sahrane, R.; El Kharim, Y.; Obda, O.; Mastere, M.; Obda, I. The Influence of Study Area Selection and Landslide Inventory Practices on Landslides Spatial Distribution: An Example from Northern Morocco. Sci. Rep. 2026, 16, 5613. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  36. Renard, K.G.; Foster, G.R.; Weesies, G.A.; McCool, D.K.; Yoder, D.C. Predicting Soil Erosion by Water: A Guide to Conservation Planning with the Revised Universal Soil Loss Equation (RUSLE); USDA Agriculture Handbook No. 703; United States Department of Agriculture: Washington, DC, USA, 1997.
  37. Poesen, J.; Nachtergaele, J.; Verstraeten, G.; Valentin, C. Gully Erosion and Environmental Change: Importance and Research Needs. Catena 2003, 50, 91–133. [Google Scholar] [CrossRef] [Scilit]
  38. Morgan, R.P.C. Soil Erosion and Conservation, 3rd ed.; Blackwell Publishing: Oxford, UK, 2005. [Google Scholar]
  39. Sidle, R.C.; Ochiai, H. Landslides: Processes, Prediction, and Land Use; Water Resources Monograph 18; American Geophysical Union: Washington, DC, USA, 2006. [Google Scholar]
  40. Lamb, D.; Erskine, P.D.; Parrotta, J.A. Restoration of Degraded Tropical Forest Landscapes. Science 2005, 310, 1628–1632. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  41. Reubens, B.; Poesen, J.; Danjon, F.; Geudens, G.; Muys, B. The Role of Fine and Coarse Roots in Shallow Slope Stability and Soil Erosion Control with a Focus on Root System Architecture: A Review. Trees 2007, 21, 385–402. [Google Scholar] [CrossRef] [Scilit]
  42. De Baets, S.; Poesen, J.; Knapen, A.; Galindo, P. Impact of Root Architecture on the Erosion-Reducing Potential of Roots during Concentrated Flow. Earth Surf. Process. Landf. 2007, 32, 1323–1345. [Google Scholar] [CrossRef] [Scilit]
  43. Gray, D.H.; Sotir, R.B. Biotechnical and Soil Bioengineering Slope Stabilization: A Practical Guide for Erosion Control; John Wiley & Sons: New York, NY, USA, 1996. [Google Scholar]
  44. Lee, K.-H.; Ewane, E.B.; Uchida, T.; Woo, C.-S. Damage Types and Deterioration Characteristics of Check Dams Built on Mountain Streams in Southeast Korea. Front. Earth Sci. 2021, 9, 788029. [Google Scholar] [CrossRef] [Scilit]
  45. Stokes, A.; Douglas, G.B.; Fourcaud, T.; Giadrossich, F.; Gillies, C.; Hubble, T.; Kim, J.H.; Loades, K.W.; Mao, Z.; McIvor, I.R.; et al. Ecological Mitigation of Hillslope Instability: Ten Key Issues Facing Researchers and Practitioners. Plant Soil 2014, 377, 1–23. [Google Scholar] [CrossRef] [Scilit]
  46. Sidle, R.C.; Bogaard, T.A. Dynamic Earth System and Ecological Controls of Rainfall-Initiated Landslides. Earth-Sci. Rev. 2016, 159, 275–291. [Google Scholar] [CrossRef] [Scilit]
  47. Forbes, K.; Broadhead, J. Forests and Landslides: The Role of Trees and Forests in the Prevention of Landslides and Rehabilitation of Landslide-Affected Areas in Asia, 2nd ed.; RAP Publication 2013/02; FAO Regional Office for Asia and the Pacific: Bangkok, Thailand, 2013. [Google Scholar]
  48. Cho, Y.; Kim, K.; Pi, J.; Lee, C. Restoration Effects Influenced by Plant Species and Landscape Context in Young-il Region, Southeast Korea: Structural and Compositional Assessment on Restored Forest. J. Ecol. Environ. 2016, 39, 1–10. [Google Scholar] [CrossRef] [Scilit]
  49. Wang, M.; Liu, Q.; Pang, X. Evaluating Ecological Effects of Roadside Slope Restoration Techniques: A Global Meta-Analysis. J. Environ. Manag. 2021, 281, 111867. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  50. Bounab, A.; El Kharim, Y.; El Kharrim, M.; Kharrim, A.E.; Sahrane, R. The Performance of Landslides Frequency-Area Distribution Analyses Using a Newly Developed Fully Automatic Tool. Appl. Geomat. 2024, 16, 789–796. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.