Abstract
Urban culverted streams connect river and sewer drainage. This study compares Dongcheon’s HEC-HMS/HEC-RAS planning framework (Case 1) with the U.S. Environmental Protection Agency Storm Water Management Model (EPA-SWMM) dynamic-wave framework for 30-, 50-, 100- and 200-year events. Culvert-only Scenario A supports framework comparison; sewer-connected Scenario B evaluates connectivity. Stage differences of Scenarios A and B relative to Case 1 range from −1.70 to +0.46 m and −2.64 to +0.51 m, respectively. Midstream A stages are lower at No. 90 and slightly higher at No. 85; the maximum positive difference occurs at downstream No. 70 for the 100-year event. B is lower than A in 23 of 24 pairs, except for a 0.14 m increase at No. 70 for the 50-year event. At three corresponding locations, B peak inflows are 0.36–20.82% below A. Nos. 75 and 70 exceed steady planning stages in both configurations at every return period. Under the 100-year design event, No. 70 meets the adopted below-10% residual-clearance criterion for a practically near-full condition. Greater flooding outflow in B removes more water from subsequent routing. Because overflow is removed without re-entry, coupled dual-drainage modeling is proposed as a future extension for urban river planning.
1. Introduction
Rapid urbanization has encouraged stream culverting in older Korean urban districts to accommodate roads and other infrastructure [1]. Beneath these surfaces, culverted streams convey stormwater through confined sections whose hydraulic behavior can resemble that of drainage conduits. Abrupt geometric changes, lateral inflows, temporary storage and transitions between free-surface and pressurized flow can produce spatially and temporally variable water levels [2,3,4]. Consequently, flood-stage assessment should consider both the conveyance of the culverted reach and its connections with surrounding drainage infrastructure. These characteristics are particularly relevant where constrained sections receive concentrated urban runoff and where downstream water levels restrict drainage.
In the river-planning framework examined here, HEC-RAS steady non-uniform flow analysis provides water-surface profiles for prescribed design discharges [5]. Such calculations are useful for planning, but a steady profile does not describe the timing of inflows, transient storage or the rise and recession of hydraulic head. Pressure flow can nevertheless be represented in steady HEC-RAS using cross-sections with lids [5]; pressurization is therefore not exclusive to dynamic-wave models. The distinction concerns the temporal solution and system representation. When river and sewer systems are assessed separately, interactions between their conveyance capacities and boundary conditions may receive insufficient attention [3,4,6].
Previous research has developed integrated urban drainage models and compared river and drainage modeling approaches in Korea [7,8,9]. Hsu et al. [10,11] coupled sewer and overland-flow models, while Seyoum et al. [12] linked a one-dimensional sewer model with two-dimensional inundation calculations. Bragg et al. [13] compared the U.S. Environmental Protection Agency Storm Water Management Model (EPA-SWMM) and HEC-RAS hydrological representations, highlighting input and configuration differences. Leandro et al. [14] compared sewer–surface coupling approaches, and Guo et al. [15] reviewed their capabilities and limitations. Experimental and numerical studies have examined sewer–surface exchange [16,17], surface-grid effects [18], sewer-model configuration [19] and junction calculations [20]. Together, these studies establish the importance of network structure and surface–sewer interaction when interpreting urban hydraulic responses.
A remaining practical question is how an existing river master-plan assessment compares with a dynamic-wave drainage representation of the same urban culverted reach. The cited studies provide important model-comparison and coupling methods but do not directly resolve this planning question for Dongcheon. In particular, examining a culvert-only configuration alongside a sewer-connected configuration can clarify how the representation of surrounding drainage infrastructure changes the interpretation of planning-stage flood levels and inflows. Matching storm return periods provides a common design reference, although the associated inflow hydrographs may differ.
Accordingly, this study examines the culverted reach near Gaya Station in Dongcheon, Busan, Korea, under 30-, 50-, 100- and 200-year design conditions. Case 1 applies HEC-HMS design discharges to the master-plan HEC-RAS steady-flow model; Case 2 applies design rainfall to EPA-SWMM for rainfall–runoff simulation and dynamic-wave routing. Case 2 includes culvert-only Scenario A and sewer-connected Scenario B. The objectives are to compare flood stages between the planning and dynamic-wave frameworks, evaluate changes in stages and inflows associated with sewer connectivity, and identify implications for urban river planning. The two comparisons retain distinct roles: Case 1–A addresses complete analysis frameworks, while A–B examines network representation. Their interpretation also considers how overflow removal and omitted surface-water re-entry affect the water retained within the modeled drainage system. This provides a basis for assessing culverted streams as connected stormwater conveyance systems and for identifying the need for more complete dual-drainage analysis.
2. Materials and Methods
2.1. Study Area
Dongcheon, Busan, Korea, has a reported channel length of 4.8 km, including approximately 2.8 km of culverted reach, equivalent to about 58% of the total [21]. The covered reach near Gaya Station was selected because of its constrained conveyance and historical flooding context (Figure 1). Cross-sectional changes and internal structural elements can affect conveyance, while connections to storm sewers introduce distributed hydraulic interactions [2,3,4,5,21,22].
Figure 1.
Study area and location of the selected culverted reach.
The study therefore examines a culverted reach in which confined conveyance, urban drainage connections and downstream control must be considered together. Its planning records provide the reference geometry and steady-flow assessment for the framework comparison [21,22].
2.2. Research Framework
The research framework comprises the seven steps in Figure 2, linking planning-data compilation, design-storm preparation and hydraulic comparison.
Figure 2.
Study Flowchart.
River and sewer master plans, topography and historical flooding information were compiled. The historical records characterize the study area’s vulnerability. Design rainfall and planning discharges were associated with the same return periods, and the study reach, roughness range and downstream reference level were identified.
Case 1 comprises HEC-HMS design discharges and HEC-RAS steady-flow profiles. Case 2 uses rainfall–runoff generation and dynamic-wave routing in EPA-SWMM, with a culvert-only Scenario A and a sewer-connected Scenario B. The comparisons address flood stage, corresponding peak-flow rates and routing-interval effects. Their interpretation considers hydrological inputs, hydraulic formulation and network representation together.
2.3. Theoretical Background
2.3.1. Classification of Flow: Steady/Unsteady and Uniform/Non-Uniform Flow
River flow can be classified according to its temporal and spatial variability. From a temporal perspective, steady flow refers to conditions in which hydraulic variables, such as discharge and water level, remain constant with time at a given location, whereas unsteady flow refers to conditions in which these variables vary over time. From a spatial perspective, uniform flow is characterized by hydraulic properties that remain constant along the longitudinal direction of the channel, whereas non-uniform flow exhibits spatial variations in these properties.
In Case 1, prescribed design discharges produce a steady non-uniform profile. The master-plan model represents the covered reach using cross sections with lids. This confines the available area and wetted perimeter; a calculated elevation above the internal soffit represents the hydraulic grade line (HGL) rather than a free water surface [5].
The distinction between the frameworks is therefore the treatment of time-dependent continuity, momentum and network interactions. A steady lidded section can represent pressure head and backwater, whereas the adopted steady calculation does not describe their evolution over a rainfall event.
2.3.2. Steady Non-Uniform Flow Analysis Using HEC-RAS (Case 1)
Case 1 uses HEC-HMS version 4.2.1 for design discharges and HEC-RAS version 5.0.3 for the master-plan steady-flow results (U.S. Army Corps of Engineers, Hydrologic Engineering Center, Davis, CA, USA) [5]. HEC-HMS applies the Soil Conservation Service curve number (SCS-CN) loss method and the Clark unit hydrograph. The culverted reach is represented by cross sections with lids; HEC-RAS does not generate rainfall–runoff internally.
Steady non-uniform flow analysis in HEC-RAS is based on the conservation of energy between two adjacent cross-sections, and the water-surface profile is iteratively calculated using the Standard Step Method. The general form of the energy equation can be expressed as follows:
where z1 and z2 are the channel-bed elevations at cross-sections 1 and 2, respectively; y1 and y2 are the corresponding flow depths; α1 and α2 are the velocity-head correction coefficients; V1 and V2 are the mean flow velocities; g is the gravitational acceleration; and hL is the total head loss between the two cross-sections, including friction losses and losses caused by channel contraction and expansion.
The standard-step solution balances energy for the prescribed discharge. With a lid, the pressure head may extend above the internal soffit while the conveyance area remains confined [5]. This steady representation does not resolve the event hydrograph, transient storage or time-dependent exchange with a connected sewer network.
2.3.3. Unsteady Flow Analysis Using EPA-SWMM (Case 2)
The U.S. Environmental Protection Agency Storm Water Management Model (EPA-SWMM) integrates urban rainfall–runoff generation with drainage-network hydraulics [23,24]. The simulations used EPA SWMM 5.0 (Build 5.0.022; U.S. Environmental Protection Agency, Cincinnati, OH, USA). The culverted reach is represented as nodes and links and routed using the dynamic-wave method. Closed-conduit surcharge is interpreted through the calculated nodal hydraulic heads and the conduit geometry [24].
Subcatchment runoff is transferred through specified outlets into the hydraulic network. Dynamic-wave routing solves continuity and momentum to represent changing conduit flow and node hydraulic head, including possible backwater, reversal and surcharge [23,24].
Equations (2) and (3) state the one-dimensional continuity and momentum relations used to explain the dynamic-wave framework [24]. Lateral exchange is represented generically in continuity; hydraulic junctions satisfy their own inflow–outflow–storage balance.
Here, A is flow area, Q is discharge, ql is lateral inflow per unit length, H is hydraulic head measured from a common elevation datum, Sf is friction slope, t is time, x is longitudinal distance and g is gravitational acceleration. Because H includes bed elevation, a separate bed-slope term is not repeated in Equation (3).
Node hydraulic head is the invert elevation plus water depth. In a closed conduit, head above the internal soffit represents a pressurized condition, whereas surface flooding depends on the node’s overflow threshold and surface-exchange treatment [23,24]. Internal soffit and ground elevations are therefore reported separately (Table S1). Allow Ponding is set to NO: water exceeding the modeled node’s flooding threshold is removed from the drainage calculation and is not stored at the surface for later re-entry [23,24]. This outflow is a modeled water-balance term and is distinct from numerical continuity error.
2.3.4. Comparison of Hydrologic–Hydraulic Analysis Frameworks
The cases share design return periods but not identical inflow hydrographs. Case 1 applies HEC-HMS design peak discharges to steady HEC-RAS, whereas Case 2 generates and routes runoff in EPA-SWMM. Stage differences therefore combine hydrological input and hydraulic configuration. The peak-flow comparison in Section 3.2 provides the corresponding input-magnitude context. Table 1 summarizes the two analysis frameworks.
Table 1.
Analysis frameworks.
HEC-HMS results cover six main-channel stations: No. 110, 79, 56, 48, 27 and 14.36. Direct peak-flow comparison is restricted to No. 110, 79 and 56, where corresponding locations are identified within the culverted study reach. The SWMM variable is peak total node inflow (m3/s), including incoming conduit flows and external lateral inflow. Each flow value and each sectionwise flood-stage value represents its event peak, so peaks at different locations or in different configurations need not occur simultaneously. Flood stages are hydraulic grade-line elevations on a common datum. The lines joining these values describe the spatial distribution of sectionwise peaks, rather than a simultaneous longitudinal water-surface profile.
2.4. Model Configuration and Scenario Design
Case 1 uses the master-plan steady-flow profile as its planning reference. Case 2 applies design rainfall to the EPA-SWMM rainfall–runoff and routing system. Both cover the selected culverted reach and the four design return periods, while retaining their distinct hydrological input structures.
Scenario A comprises the culverted reach without the surrounding sewer network; Scenario B includes connected drainage paths. Case 1–A differences describe the contrast between the planning and rainfall-driven dynamic-wave frameworks, while A–B differences describe the change associated with the selected network configurations. Internal-soffit headroom is defined as soffit elevation minus the reported hydraulic head. The residual vertical clearance ratio is r = 100(zs − H)/(zs − zi), where zs is internal-soffit elevation, zi is invert elevation and H is the reported hydraulic head. For planning screening in this study, r < 10% is treated as a practically near-full condition even when H remains below the soffit. This screening classification is distinguished from actual soffit contact, pressurization and ground-level flooding.
2.4.1. Rainfall Input Data
Rainfall input data were developed using 62 years of hourly observations from the Busan meteorological station, covering 1961–2022. Annual maximum rainfall series were constructed for durations ranging from 60 to 1440 min. Fixed-duration rainfall depths were converted to arbitrary-duration depths using the procedure in the Improvement and Supplementation of Probability Rainfall Maps [25].
Design rainfall depths for the 30-, 50-, 100- and 200-year events were estimated using a Gumbel distribution with probability-weighted moments [26]. The frequency analysis considered the chi-square, Kolmogorov–Smirnov, Cramér–von Mises and PPCC tests. The 260 min design duration follows the critical duration for maximum design discharge in the Dongcheon River Master Plan (2020) [21]. Each design-storm total was distributed into 10 min increments using the Huff third-quartile temporal pattern [27]. This 10 min interval describes the design hyetograph, not the sampling interval of an observed annual-maximum rainfall series. Figure 3 presents the dimensionless cumulative rainfall curves by Huff quartile and the 260 min third-quartile hyetographs used in this study. Their rainfall totals are 193.63, 210.70, 233.81 and 256.77 mm. In SWMM, each simulation covers a total of 600 min with a 10 s hydraulic routing interval and a 10 s reporting interval, including rainfall and post-rainfall recession. The evaluation procedure is described in Section 2.4.3, and its numerical results are presented in Section 3.3.
Figure 3.
Design rainfall.
All four goodness-of-fit tests met their reported 5% criteria for the 260-min Gumbel fits obtained by the method of moments, maximum likelihood and probability-weighted moments (Table S4).
2.4.2. Topographic and Infrastructure Input Data
River geometry and infrastructure information originate from the Dongcheon River Master Plan and Busan Sewerage Master Plan [21,22]. The former provides the Case 1 planning reference, and the latter supports the connected drainage representation. Figure 4 shows the modeled main-stem layout and comparison nodes, a representative section at No. 90, and the selected-section elevation profile. Figure S2 provides software interface examples. Its longitudinal views illustrate model geometry; event-peak stage comparisons are presented in Section 3.1.
Figure 4.
Model geometry.
The modeled reach follows the master-plan stationing system from No. 54 to No. 110.15. Flood stages are sampled at No. 110, 105, 90, 85, 75 and 70 (Table 2); direct HEC-HMS/SWMM peak-flow comparisons use No. 110, 79 and 56. The terminal SWMM outfall is downstream of No. 54 and has an invert elevation of EL. 0.00 m on the study datum. A fixed Busan Port stage of EL. 0.503 m was prescribed as an assumed adverse high-water boundary for the design storm. No. 70 is an internal comparison section upstream of the terminal outfall. Rainfall return periods do not represent a joint rainfall–tide probability. The reported roughness range is 0.013–0.018, and the 100-year event is the adopted design-frequency reference for the study reach; the other return periods provide additional comparison conditions.
Table 2.
Comparison sections.
Both SWMM configurations represent a drainage area of 30.7 km2. Scenario A contains 11 subcatchments, 125 nodes and 124 links, whereas Scenario B contains 1392 subcatchments, 1589 nodes and 1591 links. Subcatchment widths range from 227 to 2150 m in A and from 2 to 798 m in B (Table 3). Mountainous areas have an impervious fraction of 25% and a pervious fraction of 75%; urban areas have an impervious fraction of 90–95% and a pervious fraction of 5–10%.
Table 3.
Analysis conditions.
Horton infiltration applies only to pervious subcatchment areas. For HEC-HMS, soil groups and land-use classes mapped in Figures S3 and S4 were identified within each subcatchment for SCS-CN selection. The mapped soil groups are A, B and D, and land-use classes include forest, residential, commercial, industrial and transportation areas. Hydrologic soil groups are distinct from the soil textures in Table S3. Table S3 gives EPA reference values [23] for dry-soil infiltration under dense vegetation in mountainous pervious areas and little or no vegetation in urban pervious areas.
At No. 110, 105, 90, 85, 75 and 70, internal-soffit elevations are EL. 32.89, 31.40, 20.63, 17.38, 8.43 and 6.98 m; ground elevations are EL. 34.05, 33.61, 27.38, 18.86, 10.33 and 8.57 m, respectively (Table S1). Internal soffit denotes the inside ceiling of the closed section.
In Scenario B, No. 110 has an invert elevation of EL. 28.90 m, a specified maximum depth of 4.00 m and a surcharge depth of 0.00 m, with Allow Ponding set to NO. The input maximum-depth elevation is therefore EL. 32.90 m.
2.4.3. Numerical Evaluation Procedure
Because water-level observations are unavailable for the culverted reach, HEC-RAS stages from the official Dongcheon River Master Plan [21] were used as an engineering benchmark for SWMM stage patterns and magnitudes and as a common reference for assessing sewer connectivity. Specified routing intervals of 10, 30, 60, 90 and 120 s were compared for Scenarios A and B, each using 24 peak-stage pairs at six sections and four return periods. Mean absolute error (MAE), root mean square error (RMSE), peak absolute error and mean absolute percentage deviation (MAPD) describe differences from Case 1. Peak absolute error is the largest absolute difference; MAPD uses the corresponding HEC-RAS stage elevation as its reference. These indices assess benchmark agreement and do not, by themselves, demonstrate SWMM time-step independence.
A separate within-scenario refinement check compared the 5-s and 10-s peak stages for Scenario A under the 100-year event at the same six sections (Table S5). The signed difference is ΔH = H5 − H10, and the relative difference is 100(H5 − H10)/H10. Absolute differences are also reported to show the change in metres. Runtime was compared between the two simulations.
For each event and scenario, Table S2 reports routing continuity error, flooded-node count, flooding volume, the ponding setting, and peak and recession-stabilization times at No. 70. Flooding outflow under Allow Ponding = NO is an accounted outflow term. Routing continuity error measures the residual imbalance after inflows, outflows and changes in storage have been accounted for [23,24].
2.5. Use of Generative AI
The authors used ChatGPT (GPT-6; OpenAI, San Francisco, CA, USA) during manuscript preparation for English-language correction, organization of sections and paragraphs, and assistance in drafting explanatory passages based on the authors’ text and descriptions. Prompts requested improvements in grammar, wording and logical presentation. The tool was not used for hydraulic or hydrological model construction, simulations, numerical calculations or scientific interpretation of the results; these tasks were performed by the authors. The authors reviewed the AI-assisted text and retain responsibility for the scientific content, interpretations and final manuscript.
3. Results
3.1. Spatial Variation in Flood Stages
The six flood-stage locations represent the upper, middle and lower reach (Table 2). Table 4 and Figure 5 use the same six-section sequence. The three locations in the peak-flow comparison are selected from the available HEC-HMS stations and are identified separately in Section 3.2. No. 70 is an internal section upstream of the terminal outfall; the fixed EL. 0.503 m boundary was not isolated as a cause of the reported stage differences.
Table 4.
Flood-stage comparison.
Figure 5.
Flood-stage comparison.
Table 4 compares the elevations for Case 1 and Scenarios A and B at six common sections. The signed differences are ② − ① = HA − HCase 1 and ④ = ③ − ① = HB − HCase 1, in metres. Network connectivity is evaluated separately through HB − HA. Figure 5 uses the same station order and numerical values.
Scenario A is lower than Case 1 at No. 110, 105 and 90 in every event, with differences ranging from −1.70 to −0.33 m across these sections. At No. 85, 75 and 70 it is higher, by 0.03–0.46 m. Within the midstream reach, the difference is −1.11 to −0.33 m at No. 90 but +0.03 to +0.34 m at No. 85. The largest positive difference is 0.46 m at No. 70 in the 100-year event; the largest negative difference is −1.70 m at No. 105 in the 200-year event. The largest Scenario A planning-stage exceedance is therefore localized in the lower reach.
Scenario B differences from Case 1 range from −2.64 to +0.51 m. B exceeds Case 1 at No. 75 and 70 in all four events, by 0.01–0.38 m and 0.02–0.51 m, respectively, but remains lower at No. 85. B is lower than A in 23 of 24 pairs, by 0.04–1.73 m. At No. 70 in the 50-year event, B is instead 0.14 m higher than A. Relative to A, B reduces the absolute difference from Case 1 in seven pairs and increases it in 17. These local contrasts show that sewer connectivity changes the spatial distribution of hydraulic head rather than producing an identical reduction everywhere.
At No. 110, the Scenario B peak HGL is EL. 29.20 m in all four events, corresponding to a depth of 0.30 m. This is 3.70 m below the input maximum-depth elevation of EL. 32.90 m. The reported 0.30-m depth is therefore not imposed by the specified maximum-depth and surcharge-depth settings.
All A and B elevations remain below the six internal soffits, but the remaining vertical clearance varies considerably. At No. 70, the 100-year A/B headrooms are 0.31/0.39 m, equivalent to residual clearance ratios of 6.92/8.71%. In the 200-year event, they decrease to 0.08/0.27 m, or 1.79/6.03%. These four conditions meet the adopted practically near-full criterion of less than 10% residual clearance. No other selected section meets this criterion in A or B. All selected-section elevations remain below ground, with minimum clearances of 1.67 m for A and 1.86 m for B. A increases with return period at every section. B includes three decreases between adjacent design events: 0.16 m at No. 75 from 30 to 50 years, and 0.02 and 0.20 m at No. 105 and 90 from 100 to 200 years.
3.2. Peak Inflows Across Configurations
Table 5 compares HEC-HMS design peak discharges with SWMM peak total node inflows at No. 110, 79 and 56. Figure 6 uses the same three locations and values. Differences are defined as ΔQA = QA − QHMS and ΔQB = QB − QHMS. The reduction from Scenario A to B is RB = 100(QA − QB)/QA. All flow rates and signed flow differences are expressed in m3/s.
Table 5.
Peak-flow comparison.
Figure 6.
Peak-flow comparison chart.
The peak rates show that Scenario B is lower than Scenario A at all 12 paired station–event combinations. The reduction relative to A ranges from 0.36% to 20.82%. Differences from HEC-HMS vary in sign and magnitude by station and event, demonstrating why equal design return periods do not imply equal flow magnitudes in the two frameworks.
For the 100-year event, the HEC-HMS peaks at No. 110, 79 and 56 are 201, 293 and 418 m3/s. The corresponding Scenario A peaks are 176.332, 370.000 and 429.287 m3/s, while Scenario B gives 169.013, 292.962 and 423.997 m3/s. The station-matched comparison provides the discharge context for interpreting stage differences.
At each of the three comparison stations, peak flows increase from the 30- to 200-year event in both SWMM configurations. The A–B reduction varies by station and event. Network storage and delayed routing can redistribute runoff before it reaches the culvert, while overflow removal can reduce the water available for subsequent drainage-system routing. The peak-flow comparison represents their combined model response; it does not partition the contribution of each mechanism.
3.3. Time-Step Effects and Numerical Diagnostics
Table 6 compares the stage-difference statistics for both scenarios at five specified routing intervals. At 10 s, Scenario A has an MAE of 0.6546 m, RMSE of 0.8218 m, peak absolute error of 1.70 m and MAPD of 3.75%. The corresponding Scenario B values are 1.1654 m, 1.5116 m, 2.64 m and 5.34%. Both scenarios have their lowest MAE, RMSE and MAPD at 10 s; the Scenario B peak absolute error is also 2.64 m at 30 s. The 60-s, 90-s and 120-s simulations were executed independently and have identical summary values within each scenario at the reported precision. Figure 7 compares the four indices directly. Equality of these summary statistics does not establish equality of all time-series values.
Table 6.
Stage-difference statistics.
Figure 7.
Interval effects.
For Scenario A under the 100-year event, H5 − H10 ranges from −0.14 to +0.05 m (Table S5). Absolute changes range from 0.01 to 0.14 m, with absolute relative differences of 0.035–0.744%. The maximum relative difference occurs at No. 90; the approximately 0.130% difference at No. 110 is one section-specific value. The 5-s simulation required approximately 1.5 times the runtime of the 10-s simulation. The refinement check supports limited sensitivity of the examined peak stages, and the 10-s interval was retained for the study comparisons.
At No. 70, the 5-s and 10-s stages exceed Case 1 by 0.44 and 0.46 m, respectively, retaining the downstream planning-stage exceedance. At No. 85, the difference from Case 1 changes from +0.03 m at 10 s to −0.01 m at 5 s. Thus, the small midstream offset is more sensitive to the routing interval than the downstream exceedance.
Routing continuity errors range from 0.00 to 0.02% in Scenario A and from −3.98 to −1.71% in Scenario B (Table S2). Scenario A has one flooded node in the 30-, 50- and 100-year events and three in the 200-year event; Scenario B has 85, 106, 140 and 152, respectively. Total flooding volumes increase from 12,432 to 17,122 m3 in A and from 13,885 to 21,802 m3 in B. Flooding outflow is greater in B at every return period and is removed without re-entry under the no-ponding configuration.
This exported overflow is already included in the water balance. A negative routing continuity error indicates that the accounted outflows plus final storage exceed the accounted inflows plus initial storage. It is a numerical budget residual, not the volume of exported overflow. Finite-step and iterative flow–head updates can leave residual imbalances, particularly during rapid hydraulic transitions [23,24]. The reported continuity diagnostics distinguish numerical budget residuals from modeled runoff removal.
At No. 70, peak hydraulic head occurs 162–204 min after the simulation starts. Recession stabilizes at 465–471 min in A and 309–311 min in B. Thus, the 600-min simulations include the peak and subsequent recession at this downstream comparison section. These times describe event response and are distinct from the routing solver’s iterative convergence.
4. Discussion
4.1. Differences in Flood-Stage Responses Between the Analytical Frameworks
The Case 1–A comparison identifies section-specific midstream behavior: Scenario A is below the planning reference at No. 90 and slightly above it at No. 85, while its largest positive offset occurs at No. 70 in the 100-year event. The HEC-HMS/SWMM peak-flow comparison provides the discharge context, while the six-section comparison describes the resulting hydraulic heads. Equal rainfall return periods establish a common design reference but do not impose identical inflow hydrographs. The contrast therefore reflects input generation, geometry, prescribed boundary conditions and temporal hydraulic treatment together; the contribution of tidal backwater was not isolated.
In dynamic-wave routing, continuity and momentum couple incoming flow, outgoing flow and storage at connected nodes and conduits [24]. Hydraulic head can continue to rise while outflow is restricted, and peak incoming flow and peak head need not be simultaneous. Unsteady stage–discharge relations also depend on hydraulic gradients and wave evolution [28]. These relationships explain why a tabulated peak inflow alone is insufficient to infer the corresponding stage. The steady HEC-RAS model with lids represents confined cross-sectional conveyance and static backwater [5], whereas SWMM follows their evolution through a rainfall event.
Both dynamic-wave configurations produce higher stages than Case 1 at No. 75 and 70, while the upper sections are generally lower. This lower-reach loading pattern would be missed by a uniform stage adjustment. At No. 70 under the 100-year design event, the residual clearance ratio decreases from 17.19% in Case 1 to 6.92% in A and 8.71% in B. The unsteady assessment therefore places this section in the adopted practically near-full category while its hydraulic head remains below the physical internal soffit. The classification identifies a small remaining vertical margin and is distinct from actual pressurization or ground-level inundation.
The local cross-event decreases in Scenario B are 0.16 m at No. 75 from the 30- to 50-year event, and 0.02 m at No. 105 and 0.20 m at No. 90 from the 100- to 200-year event. Changes in routing, temporary storage and exported overflow provide possible physical explanations in a connected network [23,24,29], but residual numerical effects may also contribute. The system-wide flooding volumes and No. 70 recession times do not distinguish these causes at the affected nodes. These local decreases are therefore not interpreted as evidence of a confirmed attenuation mechanism.
4.2. Effects of Storm Sewer Network Connectivity
Scenario A delivers runoff to the culverted reach without routing it through the surrounding sewer system. In B, the additional conduits and junctions provide different paths, storage and travel times before runoff reaches the main culvert (Figure S1). Urban flood studies show that drainage arrangement and storage affect both flood peaks and response timing [29,30,31]. The lower B peak inflows at all three flow-comparison locations, together with predominantly lower stages, are consistent with this combined redistribution of runoff. The local B > A stage at No. 70 in the 50-year event also demonstrates that lower inflow peaks elsewhere do not require lower hydraulic head at every section.
Overflow treatment is central to this response. With Allow Ponding = NO, water discharged by node flooding leaves the modeled drainage system instead of accumulating on the surface and returning later [23,24]. B has greater flooding outflow than A in all four events, from 13,885 versus 12,432 m3 in the 30-year event to 21,802 versus 17,122 m3 in the 200-year event. Thus, the connected configuration changes both the routing of runoff and the amount of water retained for subsequent conveyance. Flooded-node counts refer to each configuration’s own network, so the larger count in B also reflects its inclusion of additional sewer nodes. Network storage, timing and overflow removal act together; their separate contributions to a particular peak cannot be inferred from total overflow volume alone.
At No. 110, upstream sewer-node flooding removes runoff before it reaches the section under the no-ponding configuration, while network routing delays inflow arrival. The limited head rise and peak depth near 0.30 m are interpreted as the response to this reduced and delayed inflow.
The connectivity effect varies with location and event magnitude. At No. 75, A−B is only 0.05 m in the 200-year event, whereas it is 1.61 m at No. 90 and 1.73 m at No. 110. Consequently, the connectivity effect does not decrease uniformly along the reach as return period increases. Hydraulic gradients, connected storage and downstream restrictions provide a physical framework for interpreting these spatial differences [24,32].
4.3. Implications for Dual-Drainage Analysis and River Master Planning
Urban culverted streams transfer runoff among subcatchments, sewers, the covered main channel and the ground surface. When sewer capacity is exceeded, water may emerge through nodes and later re-enter through manholes and inlets as internal levels decline. Coupled sewer–surface studies explicitly represent this two-way exchange [10,11,12,14,16]. Scenario B represents sewer connectivity but omits that complete feedback. Its lower internal stages therefore identify a change in modeled conveyance and retention, while the destination and later return of overflow remain necessary parts of a system-level flood assessment.
Coupled dual-drainage modeling is proposed as a future extension where surface overflow and re-entry are important. In Dongcheon, No. 75 and 70 warrant priority review because both A and B exceed the steady planning stage in every event. At the 100-year design frequency, A/B differences from Case 1 are 0.15/0.01 m at No. 75 and 0.46/0.38 m at No. 70. The adopted 10% clearance screen additionally reclassifies No. 70 as practically near-full in both unsteady configurations at the design frequency, compared with 17.19% residual clearance in Case 1. Its 200-year A/B clearances are only 1.79/6.03% of the internal height. Reviewing downstream conveyance, junction connections, storage and surface overflow routes at these sections can improve the selection of mitigation measures. Mapping inundation extent additionally requires ground-surface routing and exchange calculations; it cannot be inferred from an internal stage comparison alone.
The fixed EL. 0.503 m stage at the terminal outfall represents an assumed adverse high-water boundary for the design storm. It provides an explicit boundary condition for the comparison but does not represent tidal phase variation or a joint rainfall–tide return period. The contribution of this boundary to the computed stage differences was not isolated through a boundary-stage sensitivity analysis. Planning applications should therefore combine the steady design-discharge reference with connected, time-dependent drainage assessment under stated boundary assumptions.
A proposed coupled dual-drainage extension would retain overflow on the surface, route it along urban pathways and permit re-entry as local hydraulic gradients change [14,16]. Such an extension could represent the surface feedback omitted from the present configurations; its effects on flood stages and inundation would require separate evaluation. The proposal complements the planning-stage and network comparisons by identifying a process that the present model does not represent.
4.4. Limitations and Future Research
This study compares complete hydrologic–hydraulic frameworks in one urban culverted watershed. Because runoff generation and hydraulic representation differ between Case 1 and SWMM, their stage differences cannot be attributed solely to steady versus unsteady formulation. Table 6 and Figure 7 measure agreement with the planning reference. The separate 5-s/10-s comparison provides within-SWMM refinement evidence for Scenario A at the 100-year return period; the reported system-wide continuity diagnostics provide additional mass-balance information for both configurations. These checks do not replace independent predictive validation against observed rainfall, stage and inundation data.
The no-ponding configuration omits the storage, movement and re-entry of water on the urban surface, while the fixed downstream stage omits tidal phase variation. The flooding volumes and recession times quantify aspects of the modeled response, but do not partition every local stage difference among storage, overflow and hydraulic backwater. System-wide continuity errors likewise characterize aggregate mass balance rather than local wave behavior. These limits are particularly relevant when interpreting small cross-event stage differences in the connected network.
Future applications should couple river and sewer hydraulics with explicit surface-flow pathways and observed-event assessment. Retaining overflow on the surface and allowing exchange with drainage nodes would address the missing feedback directly. Comparisons across other culvert ratios, network layouts and downstream controls would establish how broadly the Dongcheon planning implications apply.
5. Conclusions
The Dongcheon comparison shows spatially variable differences between the HEC-HMS/HEC-RAS planning framework and EPA-SWMM dynamic-wave configurations. A−Case 1 differences range from −1.70 to +0.46 m and B−Case 1 differences from −2.64 to +0.51 m. At midstream No. 90, Scenario A is below Case 1, while No. 85 has a small positive offset; its maximum positive offset occurs at downstream No. 70 in the 100-year event. Network connectivity lowers the reported stage in 23 of 24 section–event pairs, with a 0.14-m increase at No. 70 in the 50-year event. The framework comparison and the connectivity comparison therefore provide complementary information.
At No. 110, 79 and 56, Scenario B peak total inflows are 0.36–20.82% below Scenario A. Their differences from HEC-HMS vary by station and event. B also has greater flooding outflow than A in every event. With ponding disabled, this overflow is removed from subsequent routing. Network redistribution and temporary storage may alter runoff delivery, while exported overflow reduces the water available for subsequent routing. The separate contributions of these processes are not isolated by this comparison.
No. 75 and 70 warrant priority unsteady assessment because both SWMM configurations exceed the steady planning stages in all four events. At the 100-year design frequency, B exceeds Case 1 by 0.01 m at No. 75 and 0.38 m at No. 70. At No. 70, A and B retain only 6.92% and 8.71% of the internal height as vertical clearance, compared with 17.19% in Case 1. Thus, the unsteady assessment identifies a practically near-full condition at the design frequency under the adopted 10% screening criterion, even though the heads remain below the internal soffit. The 200-year A/B clearance ratios decrease to 1.79/6.03%. These findings support targeted review of downstream conveyance and drainage connections, while ground-level inundation is assessed separately.
Because overflow is removed without surface-water re-entry, lower drainage-system stages do not describe the complete urban flood response. The present network comparison identifies internal stage, flow and overflow responses under this assumption. Coupled dual-drainage modeling is proposed as a future extension to evaluate surface pathways, re-entry and ground-level inundation alongside the steady planning reference.
Supplementary Materials
The following supporting information can be downloaded at: https://www.mdpi.com/article/10.3390/w18232967/s1, Figure S1: Drainage connectivity; Figure S2: Software interface examples; Figure S3: Hydrologic soil groups; Figure S4: Land use; Table S1: Structure elevations; Table S2: Numerical checks; Table S3: Horton reference values; Table S4: Gumbel fit tests; Table S5: Fine-step comparison. Reference [23] are cited in the supplementary materials.
Author Contributions
Conceptualization, H.C., J.K. and S.K.; methodology, H.C. and J.K.; software, H.C.; validation, S.P., K.C. and J.K.; formal analysis, H.C.; investigation, H.C., S.P. and K.C.; resources, S.P., K.C. and S.K.; data curation, H.C.; writing—original draft preparation, H.C.; writing—review and editing, J.K. and S.K.; visualization, H.C.; supervision, S.K.; project administration, J.K. and S.K.; funding acquisition, S.K. All authors have read and agreed to the published version of the manuscript.
Funding
This work was supported by an Institute of Information & communications Technology Planning & Evaluation (IITP) grant funded by the Korean government (MSIT) (No. RS-2024-00441794, AI-based urban cooling technology development: South Korea–Singapore joint grant Challenge).
Data Availability Statement
The data supporting the findings of this study are available from the corresponding author upon reasonable request due to institutional policy.
Acknowledgments
During manuscript preparation, the authors used ChatGPT (GPT-6; OpenAI, San Francisco, CA, USA) for English-language editing, organization and assistance in drafting explanatory text. The authors reviewed and edited the AI-assisted content and take full responsibility for the final manuscript.
Conflicts of Interest
Authors Sangho Park and Kunhak Chun were employed by SH Engineering Co., Ltd. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.
Abbreviations
| EPA-SWMM | U.S. Environmental Protection Agency Storm Water Management Model |
| FEMA | Federal Emergency Management Agency |
| HEC-HMS | Hydrologic Engineering Center’s Hydrologic Modeling System |
| HEC-RAS | Hydrologic Engineering Center’s River Analysis System |
| PPCC | Probability Plot Correlation Coefficient |
| PWM | Probability Weighted Moments |
| USACE | U.S. Army Corps of Engineers |
References
- Lim, Y.S. Human modification of the river with a focus on the buried urban streams in the northwestern region of Seoul. Landsc. Geogr. 2024, 34, 152–175. (In Korean) [Google Scholar] [CrossRef]
- Hodges, B.R. An artificial compressibility method for 1D simulation of open-channel and pressurized-pipe flow. Water 2020, 12, 1727. [Google Scholar] [CrossRef] [Scilit]
- Mark, O.; Weesakul, S.; Apirumanekul, C.; Boonya-Aroonnet, S.; Djordjević, S. Potential and limitations of 1D modelling of urban flooding. J. Hydrol. 2004, 299, 284–299. [Google Scholar] [CrossRef] [Scilit]
- Schmitt, T.G.; Thomas, M.; Ettrich, N. Analysis and modeling of flooding in urban drainage systems. J. Hydrol. 2004, 299, 300–311. [Google Scholar] [CrossRef] [Scilit]
- Brunner, G.W. HEC-RAS River Analysis System Hydraulic Reference Manual, Version 5.0; Report No. CPD-69; U.S. Army Corps of Engineers, Hydrologic Engineering Center: Davis, CA, USA, 2016.
- Federal Emergency Management Agency (FEMA). Guidance for Flood Risk Analysis and Mapping: Hydraulics—One-Dimensional Analysis; Guidance Document 80; Federal Emergency Management Agency: Washington, DC, USA, 2016.
- Lee, C.H.; Han, K.Y.; Noh, J.W. Development of urban inundation analysis model using dual-drainage concept. J. Korean Soc. Civ. Eng. B 2006, 26, 379–387. (In Korean) [Google Scholar]
- Lee, J.H.; Yeon, K.S. Flood inundation analysis using XP-SWMM model in urban area. J. Korean Soc. Hazard Mitig. 2008, 8, 155–161. (In Korean) [Google Scholar]
- Yoon, Y.; Lee, S.; Lee, T. Comparative analysis of water-level forecasting using SWMM and HEC-RAS flood simulation models: A case study of Waryong, Jinju. J. Korean Soc. Hazard Mitig. 2025, 25, 161–168. (In Korean) [Google Scholar] [CrossRef] [Scilit]
- Hsu, M.H.; Chen, S.H.; Chang, T.J. Inundation simulation for urban drainage basin with storm sewer system. J. Hydrol. 2000, 234, 21–37. [Google Scholar] [CrossRef] [Scilit]
- Hsu, M.H.; Chen, S.H.; Chang, T.J. Dynamic inundation simulation of storm water interaction between sewer system and overland flows. J. Chin. Inst. Eng. 2002, 25, 171–177. [Google Scholar] [CrossRef] [Scilit]
- Seyoum, S.D.; Vojinovic, Z.; Price, R.K.; Weesakul, S. Coupled 1D and noninertia 2D flood inundation model for simulation of urban flooding. J. Hydraul. Eng. 2012, 138, 23–34. [Google Scholar] [CrossRef] [Scilit]
- Bragg, M.A.; Poudel, A.; Vasconcelos, J.G. Comparing SWMM and HEC-RAS hydrological modeling performance in semi-urbanized watershed. Water 2025, 17, 1331. [Google Scholar] [CrossRef] [Scilit]
- Leandro, J.; Chen, A.S.; Djordjević, S.; Savić, D.A. Comparison of 1D/1D and 1D/2D coupled (sewer/surface) hydraulic models for urban flood simulation. J. Hydraul. Eng. 2009, 135, 495–504. [Google Scholar] [CrossRef] [Scilit]
- Guo, K.; Guan, M.; Yu, D. Urban surface water flood modelling—A comprehensive review of current models and future challenges. Hydrol. Earth Syst. Sci. 2021, 25, 2843–2860. [Google Scholar] [CrossRef] [Scilit]
- Rubinato, M.; Martins, R.; Kesserwani, G.; Leandro, J.; Djordjević, S.; Shucksmith, J. Experimental calibration and validation of sewer/surface flow exchange equations in steady and unsteady flow conditions. J. Hydrol. 2017, 552, 421–432. [Google Scholar] [CrossRef] [Scilit]
- Chen, A.S.; Leandro, J.; Djordjević, S. Modelling sewer discharge via displacement of manhole covers during flood events using 1D/2D SIPSON/P-DWave dual drainage simulations. Urban Water J. 2016, 13, 830–840. [Google Scholar] [CrossRef] [Scilit]
- Lee, S.; An, H. Evaluating the effect of grid size and type in integrated 1D/2D coupled urban inundation modelling on the interacting discharge between the surface and sewerage system. J. Flood Risk Manag. 2019, 12, e12537. [Google Scholar] [CrossRef] [Scilit]
- Martins, R.; Leandro, J.; Djordjević, S. Influence of sewer network models on urban flood damage assessment based on coupled 1D/2D models. J. Flood Risk Manag. 2018, 11, S717–S728. [Google Scholar] [CrossRef] [Scilit]
- Li, Q.; Liang, Q.; Xia, X. A novel 1D–2D coupled model for hydrodynamic simulation of flows in drainage networks. Adv. Water Resour. 2020, 137, 103519. [Google Scholar] [CrossRef] [Scilit]
- Busan Metropolitan City. Dongcheon River Master Plan (Revision); Busan Metropolitan City: Busan, Republic of Korea, 2020. (In Korean)
- Busan Metropolitan City. 2040 Busan Sewerage Master Plan (Revision); Busan Metropolitan City: Busan, Republic of Korea, 2022. (In Korean)
- Rossman, L.A. Storm Water Management Model User’s Manual Version 5.0; EPA/600/R-05/040; U.S. Environmental Protection Agency: Cincinnati, OH, USA, 2010.
- Rossman, L.A. Storm Water Management Model Reference Manual Volume II—Hydraulics; EPA/600/R-17/111; U.S. Environmental Protection Agency: Cincinnati, OH, USA, 2017.
- Korea Institute of Civil Engineering and Building Technology. Improvement and Supplementation of Probability Rainfall Maps; Ministry of Land, Transport and Maritime Affairs: Gwacheon, Republic of Korea, 2011. (In Korean)
- Landwehr, J.M.; Matalas, N.C.; Wallis, J.R. Probability weighted moments compared with some traditional techniques in estimating Gumbel parameters and quantiles. Water Resour. Res. 1979, 15, 1055–1064. [Google Scholar] [CrossRef] [Scilit]
- Huff, F.A. Time distribution of rainfall in heavy storms. Water Resour. Res. 1967, 3, 1007–1019. [Google Scholar] [CrossRef] [Scilit]
- Dottori, F.; Martina, M.L.V.; Todini, E. A dynamic rating curve approach to indirect discharge measurement. Hydrol. Earth Syst. Sci. 2009, 13, 847–863. [Google Scholar] [CrossRef] [Scilit]
- Smith, B.K.; Smith, J.A.; Baeck, M.L.; Miller, A.J. Exploring storage and runoff generation processes for urban flooding through a physically based watershed model. Water Resour. Res. 2015, 51, 1552–1569. [Google Scholar] [CrossRef] [Scilit]
- Ogden, F.L.; Pradhan, N.R.; Downer, C.W.; Zahner, J.A. Relative importance of impervious area, drainage density, width function, and subsurface storm drainage on flood runoff from an urbanized catchment. Water Resour. Res. 2011, 47, W12503. [Google Scholar] [CrossRef] [Scilit]
- Getirana, A.; Mandarino, F.; de Montezuma, P.N.; Kirschbaum, D. An urban drainage scheme for large-scale flood models. J. Hydrol. 2023, 627, 130410. [Google Scholar] [CrossRef] [Scilit]
- Hellmers, S.; Fröhle, P. Computation of backwater effects in surface waters of lowland catchments including control structures—An efficient and re-usable method implemented in the hydrological open-source model Kalypso-NA (4.0). Geosci. Model Dev. 2022, 15, 1061–1077. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.