Development and Application of a Distributed Hydrological Model Ensemble (DHM-FEWS) for Flash Flood Early Warning

,
,
,
,
,
,
and
1
China Institute of Water Resources and Hydropower Research, No. 1 Fuxing Road, Haidian District, Beijing 100038, China
2
Research Center on Flood & Flash Flood Disaster Reduction of the Ministry of Water Resources, No. 1 Fuxing Road, Haidian District, Beijing 100038, China
3
Heilongjiang Province Hydraulic Research Institute, Harbin 150080, China
4
Jiangxi Academy of Water Science and Engineering, Nanchang 330029, China
This article belongs to the Section Hydrology

Abstract

Mountain floods, one of the most common and destructive natural disasters worldwide, pose significant challenges to disaster prevention due to their sudden onset, high destructive power, and severe localized impacts. This study proposes an innovative flash flood early warning system based on a distributed hydrological model ensemble. The main objective is to improve the prediction and early warning accuracy of flash flood disasters by integrating multi-source data and regional modeling. The system simulates flood flow and risk levels under different rainfall scenarios to provide timely warnings in mountainous areas. A case study of a heavy rainfall event in Ma Jia Natural Village, Jiangxi Province was used to validate the system’s performance. Through regionalized parameter calibration within the ensemble, the system achieved Nash–Sutcliffe Efficiency (NSE) values exceeding 0.88, while the simulated peak discharges deviated from observed values by only 1.5%, 9.5%, and 4.8% under 3 h, 6 h, and 24 h rainfall scenarios, respectively, demonstrating the improved quantitative accuracy of flood prediction enabled by the ensemble-based framework. The system showed high consistency with observed data, accurately predicting flood responses at 3, 6, and 24 h time scales and providing reliable risk warnings. This approach not only enhances warning accuracy across multiple temporal scales but also supports risk-level early warnings at both river-section and village scales, offering significant practical value for the prevention of mountainous flood disasters.

1. Introduction

Mountain floods are one of the most frequent and destructive natural disasters worldwide [1]. Flash floods are typically characterized by their sudden onset, rapid flow, short duration, and intense destructive power, often causing severe damage to local areas and threatening human lives, infrastructure, and the environment [2]. According to global statistics, flash flood disasters have led to significant loss of life and property, particularly in mountainous and hilly regions, where the complex terrain and variable climatic conditions make flood prediction and control more challenging [3]. Hydroclimatic extremes are causing tremendous environmental, societal, and economic losses globally [4]. As a result, developing efficient flash flood prediction and early warning systems has become an important global issue in disaster prevention and reduction [5]. Traditional flash flood control measures often rely on hydraulic engineering infrastructure, such as the construction of dams, channels, and other water management facilities [6,7]. While these measures have proven effective in some areas, they are often costly to build, difficult to implement, and have limited coverage, making them difficult to rely on for sudden flash flood disasters [8]. Furthermore, the long-term maintenance and management costs of hydraulic infrastructure are high, and it cannot provide comprehensive and long-term monitoring due to factors such as terrain and climate [9]. Therefore, non-engineering solutions, particularly precise and efficient flash flood early warning systems, have gained widespread attention in recent years [10]. Therefore, there is an increasing demand for non-engineering approaches that can provide timely, flexible, and spatially explicit flood risk information, particularly through hydrological modeling-based early warning systems.
Mountain flood early warning systems typically rely on hydrological models to simulate rainfall, runoff, and flood processes in order to provide early warnings of potential flood events [11]. However, traditional hydrological models often rely on simplified assumptions and consider only a limited set of variables, which limits their accuracy and adaptability, especially in complex terrain and changing climate conditions.
For instance, widely used models such as SWAT may underestimate peak flows or fail to capture local runoff variability in complex terrain, reducing the effectiveness of early warnings [12]. To address this issue, many researchers have begun exploring hydrological models that integrate multi-source data in recent years, aiming to provide more accurate flash flood predictions [13]. These limitations restrict the ability of lumped or overly simplified hydrological models to capture the strong spatial heterogeneity and rapid hydrological response characteristic of mountainous catchments.
In the past decade, with advancements in technology, new hydrological models based on multi-source data fusion have gradually become a research hotspot [14,15]. These models, by integrating data from meteorological, geographic, and topographical sources, can more comprehensively describe the mechanisms of flash flood occurrence and provide more precise early warning information [16]. However, data acquisition and processing remain a challenge, particularly due to significant quality discrepancies between different data sources, which makes the application of these new models still problematic [17,18]. Additionally, although some widely applicable hydrological models perform well in decision support, most of these models are designed for single regions or general use, making them difficult to adapt to the needs of complex terrain [19,20].
Consequently, a modeling framework that explicitly represents spatial heterogeneity while maintaining robustness under data-scarce conditions is required for effective flash flood early warning. To address these issues, flash flood early warning systems based on distributed hydrological model ensembles have emerged [21]. By dividing the watershed into multiple sub-regions and optimizing each region’s characteristics and hydrological processes, this approach can provide more accurate flood prediction and early warning [22]. Distributed hydrological model ensembles can overcome the limitations of traditional models in complex terrain and climate conditions, offering more precise support [23]. For example, early warning systems based on distributed model ensembles can simulate the hydrological processes of different watershed regions to improve flood prediction accuracy, extend the lead time for warnings, and expand the coverage area of warnings [24].
In addition, with the development of computer and big data technologies, an increasing number of studies have begun exploring how to integrate machine learning with hydrological models to enhance the predictive capabilities of flash flood early warning systems [25]. For instance, Ref. [26] proposes a novel Artificial Neural Network (ANN) flood prediction model and [27] investigates the applicability of Support Vector Machine (SVM), Backpropagation Neural Network (BPNN), and the integrated model of Support Vector Machine and Particle Swarm Optimization (PSO-SVM) in flood prediction. These methods can improve the accuracy and real-time performance of early warning systems by automatically learning and adjusting model parameters [28]. However, data quality and availability remain key limiting factors for the application of these methods [29].
Traditional models struggle to adapt to the complex and varied terrain of mountainous regions, and existing multi-source data fusion models face challenges related to data quality and applicability in different regions. Based on this, this study aims to fill these research gaps by proposing an innovative flash flood early warning system based on a distributed hydrological model ensemble. By dividing regions and constructing region-specific models, the system integrates watershed networks, meteorological characteristics, and hydraulic infrastructure, improving flood prediction accuracy, extending warning lead times, and expanding coverage. Compared with traditional early warning systems, this system exhibits stronger adaptability and operability under complex terrain conditions, effectively supporting various flash flood warning methods, such as short-term heavy rainfall warnings and real-time dynamic warnings. The main contribution of this paper lies in proposing and developing a flash flood early warning system based on a distributed hydrological model ensemble. This system not only improves warning accuracy and extends the lead time, but also provides solid technical support for flood risk management and disaster prevention, demonstrating significant potential for application and societal value. To provide a clear overview of the proposed framework, the general workflow is illustrated in Figure 1.
Figure 1. Schematic of the Distributed Hydrological Model Ensemble Flood Early Warning System.

2. Materials and Methods

2.1. Model Principles

2.1.1. Construction of the Distributed Hydrological Model

The distributed hydrological model is a core tool for flash flood early warning. By continuously rolling calculations of the distributed hydrological model within the watershed, it dynamically captures the flow processes and flood characteristics of each river, providing scientific support for flash flood forecasting and early warning. In this study, the China Flash Flood Hydrological Model (CNFF), a distributed hydrological model specifically developed for flash flood simulation and early warning in mountainous regions, is used to simulate the flood evolution process [30]. CNFF is a distributed hydrological model designed to simulate, predict, and issue flash flood warnings. The model is specifically designed for rapid hydrological response calculations under conditions of intense precipitation, allowing for efficient solving of nonlinear runoff and flow concentration processes over short time scales.
CNFF uses natural small catchments as basic analytical units, constructs a spatial discretization structure based on high-precision topographic and geomorphic data, and organizes the calculation sequence of various hydrological processes through the watershed’s topological relationships. The model adopts a modular system architecture, consisting of four functional modules: (1) data input module; (2) runoff generation module; (3) flow routing module; and (4) flood evolution module. The data input module is specifically designed to leverage multi-source data fusion to improve early warning accuracy. For instance, the model’s structural framework is derived from a Digital Elevation Model (DEM), which defines watershed topography and flow paths, while soil type and land-use maps are used to parameterize key hydrological processes like infiltration and surface roughness. The main datasets used in the model are summarized in Table 1. It should be noted that the input datasets used in this study have different spatial and temporal resolutions (Table 1). Dynamic variables such as rainfall were applied at their native temporal resolution to accurately capture short-duration hydrological responses during flash flood events. In contrast, static datasets, including DEM, land use, and soil type, were treated as time-invariant background information, as their temporal variability is negligible over the short time scale of extreme rainfall events. This event-based data configuration is commonly adopted in distributed hydrological modeling and flash flood early warning studies.
Table 1. Summary of the main datasets.

2.1.2. Model Cluster Division

The division of the model cluster is crucial to ensure that each sub-model can adapt to the hydrological characteristics and meteorological conditions within the watershed. The division criteria primarily consider the following aspects: integrity of the watershed network: ensuring that each model unit contains a complete flow system; runoff and catchment characteristics: this refers to the convergence and generation of water flow within the watershed; topographic and geomorphological features: for example, the flow behavior in mountainous regions differs from that in plains, requiring different models; and impact of hydraulic infrastructure: considering the strong spatial heterogeneity of terrain, land cover, and hydraulic structures, the watershed is further partitioned into multiple sub-catchments for hydrological modeling. Each sub-catchment is assigned an appropriate model configuration, and together these configurations form the distributed hydrological model ensemble.

2.1.3. Runoff and Catchment Analysis

The runoff generation model is a key component of hydrological modeling. There are two main types of runoff generation model. Saturation Excess Runoff Model: This model is suitable for humid regions, especially areas with high precipitation. It assumes that the flow is primarily generated by the movement of free surface water and is applicable when the soil moisture is adequate and there is minimal infiltration. Infiltration Excess Runoff Model: This model is suitable for arid regions with low precipitation and poor soil permeability. In such areas, water infiltrates the soil and enters the groundwater layer, making this model appropriate for watersheds experiencing extreme rainfall conditions.
In some watersheds, both saturation excess runoff and infiltration excess runoff coexist. To address such situations, a hybrid runoff model is used, which combines the two runoff mechanisms into a unified simulation. The core of the hybrid runoff model is to reasonably divide the region into areas dominated by saturation excess and infiltration excess runoff based on the area’s climate and soil type, and then calculate the overall runoff by blending the two mechanisms. The conceptual model of the hybrid runoff model is shown in Figure 2. The model is divided into surface, soil, and groundwater regions. The surface region includes both permeable and impermeable areas, while the soil region consists of preferential flow reservoirs, capillary water reservoirs, and gravity water reservoirs. In this model, the water flowing into the river channel comes from four main components: infiltration excess surface runoff, saturation excess surface runoff, interflow, and groundwater flow.
Figure 2. Conceptual Model of Hybrid Runoff Generation.
The diagram illustrates the core hydrological processes within a catchment. The key components are as follows: (a) Precipitation (P) serves as the primary model input. (b) Infiltration is calculated using the Green-Ampt method (see Table 2) to determine the amount of water entering the soil. (c) Surface Runoff, generated when rainfall intensity exceeds infiltration capacity, is routed to the channel using a kinematic wave approximation. (d) Subsurface Flow is governed by Darcy’s law. The final model output (e) is the total streamflow at the catchment outlet, which is the sum of surface and subsurface runoff.
Table 2. Runoff Generation Methods and Core Formulas.
The hybrid runoff model simultaneously simulates both infiltration and saturation excess runoff mechanisms, providing a comprehensive representation of runoff generation processes. Precipitation, including rain, snow, or sleet, is initially intercepted by vegetation, and the net precipitation that is not intercepted reaches the ground, forming surface runoff. A portion of the water infiltrates into the soil, where it is divided into two parts: one replenishes the preferential flow reservoir, while the other replenishes the capillary water reservoir. When the water in the preferential flow reservoir exceeds its maximum storage capacity, saturation excess runoff is generated. The water in the capillary water reservoir first replenishes the soil moisture deficit, and any water exceeding the storage capacity moves into the groundwater reservoir. Water in the gravity water reservoir is discharged to the groundwater reservoir at a constant rate, and ultimately, the total runoff from all components, including surface runoff, preferential flow, capillary water, and groundwater, is calculated. As shown in Figure 3, this model allows for a more nuanced understanding of runoff generation, capturing the complex interactions between surface water, soil reservoirs, and groundwater systems.
Figure 3. Conceptual Model of the Soil Region.

2.1.4. Calculation Method of the Hybrid Runoff Model

Based on the runoff characteristic analysis of small watersheds in hilly areas, this study developed a custom model library that incorporates the saturation excess, infiltration excess, and hybrid runoff models, enabling unified simulation and calculation of runoff in small watersheds across different climatic zones. The hybrid runoff model typically employs two common calculation methods: the Area Proportional Method and the Vertical Mixing Method. The Area Proportional Method divides the watershed into infiltration excess runoff zones and saturation excess runoff zones, calculating the total runoff based on the respective proportions of each zone. The Vertical Mixing Method assumes that the two runoff mechanisms combine in the vertical direction, providing a better adaptation to soil moisture variations. The core formulas and parameters for the runoff models are shown in Table 2.
The convergence calculation uses methods such as the distributed unit hydrograph, combined unit hydrograph, and SCS unit hydrograph. Based on the probability density distribution of the time it takes for water to reach the watershed outlet from each point within the watershed, this method is equivalent to the instantaneous unit hydrograph. Using high-precision terrain data such as 25 m DEM (Digital Elevation Model) and 30 m land use and vegetation type data, a new distributed unit hydrograph method is proposed, as shown in Figure 4. This method fully considers variations in rainfall intensity and the spatial heterogeneity of small watersheds, particularly the spatial distribution characteristics of surface elements such as terrain and vegetation, as well as the impact of rainfall intensity factors. Unlike traditional runoff methods based on observed hydrological data, this method does not rely on observed watershed data, making it especially suitable for storm flood forecasting and early warning in small to medium-sized watersheds lacking observed hydrological data.
Figure 4. Principle of the Distributed Unit Hydrograph for Small Watersheds. Note: u(t) represents the instantaneous unit hydrograph; f ( t ) represents the probability density distribution of flow travel time; Q ( t ) is the discharge at the watershed outlet; V is the flow velocity (m/s); K s is the surface flow velocity coefficient (m/s), which mainly reflects the frictional influence of land-use characteristics on flow velocity; S is the slope gradient of a grid cell along the flow direction within the watershed; i / I is the dimensionless rainfall intensity; I is the critical effective rainfall intensity (mm/h); T j is the travel time (s) of the j -th grid cell; L m is the flow path length (m) of the m -th grid cell; c is a coefficient, where c = 1 or another specified value; M j is the number of grid cells along the flow accumulation path of the j -th grid cell; and n is a positive number less than 1.

2.1.5. Model Calibration Process

Parameter calibration is a critical step in hydrological model applications. In this study, observed rainfall, discharge, and water-level data, together with watershed underlying surface conditions and flash flood investigation results, were comprehensively used to calibrate the distributed hydrological model. Model parameters were adjusted within physically reasonable ranges to improve agreement between simulated and observed outlet discharge, while maintaining consistency in the simulation of key hydrological processes such as soil moisture dynamics and groundwater movement. To enhance calibration efficiency, XGBoost was introduced as an auxiliary data-driven tool to support parameter optimization. The algorithm was employed to learn the nonlinear relationships between model parameters and simulation performance, thereby guiding the selection of improved parameter combinations. XGBoost does not replace the hydrological model; instead, the calibrated parameters were subsequently applied to the CNFF model for flood process simulation and early warning.
At the small-watershed scale, historical and event-based rainfall–runoff data were used, and a combination of automatic optimization and expert-based adjustment was adopted to calibrate typical watershed models. The calibrated parameters were finally verified using observed rainstorm–flash flood events, ensuring their rationality and applicability. Considering the characteristics of rainstorm floods in small mountainous watersheds and the requirements of flash flood monitoring, forecasting, and early warning, this study selected the relative error of peak discharge and the error of time to peak as evaluation indices. For specific flood forecasting elements, the model accuracy can be evaluated using the relative error of peak discharge (ReQ) and the error of time to peak (TP) [31]. The optimal value of ReQ is 0, and the optimal value of TP is also 0. The formulas for each evaluation index are expressed as follows.
Relative error of peak discharge (ReQ):
R e Q = Q m , o − Q m , s Q m , o × 100 %
Time to peak error (TP):
T P = T m , o − T m , s
where Q m , o and Q m , s represent the observed and simulated peak discharges, respectively, and T m , o and T m , s denote the observed and simulated times to peak, respectively.
Nash–Sutcliffe Efficiency (NSE) is a widely used performance metric to evaluate the accuracy of hydrological models. In this study, we calculated the NSE using the observed and simulated flood data as follows:
N S E = ∑ i = 1 n ( Q o b s , i − Q s i m , i ) 2 ∑ i = 1 n ( Q o b s , i − Q ¯ o b s ) 2 × 100 %
In which:
Q o b s , i is the i -th observed value (actual observed flood data).
Q s i m , i is the i -th simulated value (model output value).
Q ¯ o b s is the average of the observed values.
n is the total number of data points.

2.2. System Design

In this study, the flash flood early warning system integrates hydrological model construction, model cluster division, and watershed runoff and catchment processes. The system design consists of multiple modules, each performing different functions and working together to achieve efficient flood prediction and early warning. The core design philosophy of the system is to utilize the accuracy of distributed hydrological models and the flexibility of hybrid runoff models to provide precise flood warning data.

2.2.1. Overall Framework

The Distributed hydrological model-based flash flood early warning system (DHM-FEWS) is the core operational platform used in this study. It integrates distributed hydrological models, real-time meteorological inputs, and dynamic warning modules to support mountainous flood forecasting in Jiangxi Province. The system consists of four layers: the infrastructure layer, data processing layer, application layer, and user layer. The infrastructure layer provides hardware and software support. The data processing layer collects, organizes, and processes hydrological data (such as rainfall, water level, discharge, etc.) in real-time to accurately simulate flood processes. The application layer includes four modules: model management, regional forecasting, regional early warning, and regional simulation, which provide application support. The user layer is primarily designed for system administrators and users, allowing users to access corresponding pages through the functional menu and use API interfaces for applications. The DHM-FEWS framework is shown in Figure 5.
Figure 5. DHM-FEWS Framework.

2.2.2. System Modules

The DHM-FEWS system mainly includes four modules: model management, regional forecasting, regional early warning, and regional simulation, as shown in Figure 6. The Model Management module handles the construction and parameter calibration of hydrological models, allowing users to view model partitioning for the entire province, Thiessen polygons and weights, as well as the topological relationships between watersheds, nodes, and river networks. The Regional Forecasting module drives the hydrological model in real-time using measured rainfall and nearby rainfall forecast data, performing rolling calculations and outputting flash flood simulation results in the form of process lines and animations. The Regional Early Warning module uses distributed hydrological models in combination with prior rainfall and soil moisture data, converting these data into flood processes in river channels. By comparing peak discharge with design flood levels and disaster-related discharge criteria, it generates early warnings for river sections and the villages along the rivers. The Regional Simulation module allows for the selection of one or more model partitions and drives the distributed hydrological models to simulate and calculate flood processes under different rainfall scenarios. This ensures accurate simulation of flood evolution for each flash flood channel. Rainfall scenarios can include historical typical rainfall events, future rainfall scenarios based on weather forecasts, observed rainfall data, and designed extreme rainfall events. Simulation results are displayed through a comprehensive analysis of river section and village risks. In the evaluation of river section risks, the system compares the simulated flood processes with the design flood for the flash flood channels, generating flood risk alerts. These alerts are classified into four levels based on the return period of the flood: Attention level, indicating a low probability of flooding but maintaining awareness of potential flood risks; Warning level, indicating a moderate probability of flooding, requiring preventive measures; Danger level, indicating a high risk of flooding, requiring emergency response preparations; and Extremely dangerous level, indicating a very high probability of flooding, requiring immediate emergency response. Meanwhile, village risk alerts are generated by combining the flash flood channel risk assessments with the spatial distribution of villages along the river, producing flood risk levels for each village. The risk levels for villages are also divided into attention, warning, danger, and extremely dangerous levels, ensuring timely alerts and precautionary measures for residents when a disaster occurs. This module provides a comprehensive assessment and evaluation of flash flood risks over a wide area, supporting more scientific disaster prevention and decision-making with accurate simulations and early warnings. The forecasting and early warning process is shown in Figure 7.
Figure 6. DHM-FEWS Modules.
Figure 7. Forecasting and Early Warning Process Flowchart.

3. Model Results

3.1. Study Area Overview

This study selects Maja Natural Village in Fuliang County, Jingdezhen City, Jiangxi Province, as a classic case to validate the effectiveness of the flash flood early warning system based on a distributed hydrological model ensemble. The village is located in the southeastern mountainous area of Fuliang County, Jiangxi Province, in the Donghe River basin, and is prone to flash flood disasters triggered by heavy rainfall, making it a representative area. This case is based on the centennial heavy rainfall event that occurred from 7–9 July 2020, in Maja Natural Village, as shown in Figure 8. Based on field investigations, the flood caused 8927 people to be affected in the watershed, with direct economic losses amounting to 44.34 million yuan. This event provides a real-world context for verifying the effectiveness of the flash flood early warning system based on a distributed hydrological model ensemble.
Figure 8. Location of the study area.

3.2. Model Parameter Calibration

In this study, the hydrological model was used to accurately simulate flood processes, particularly in reflecting actual changes in flood flow. Based on historical flood statistics from 2000 to 2015, we successfully simulated the flood events during this period, as shown in Figure 6. The model’s main performance indicator is the Nash–Sutcliffe Efficiency (NSE), which is widely used to assess the degree of match between the simulated results and observed data. During the calibration period (2000–2010), the model achieved an NSE value of 0.98, indicating that the model performed excellently during the simulation period and was able to precisely reflect changes in flood flow. In the validation period (2011–2015), although the model’s NSE slightly decreased to 0.88, it still demonstrates strong forecasting ability and was able to capture flood flow variations effectively during this period.
During the calibration process, we systematically adjusted the model parameters based on historical flood data. These parameters cover key hydrological processes such as flood generation, flow concentration, and flood propagation, all of which directly influence the accuracy of the simulation results. In particular, through fine-tuning parameters such as upper soil moisture (WUM) and lower soil moisture (WLM), the model was able to more accurately simulate the occurrence, evolution, and flow variations of floods.
In the process of parameter adjustment, we minimized the difference between simulated results and actual observed data, gradually optimizing the model’s output to ensure the best prediction performance. Table 3 shows the parameter value ranges and the optimized parameter values.
Table 3. Parameter Optimization Results.

3.3. System Implementation and Results

3.3.1. Rainfall Simulation Analysis

This study selected the centennial heavy rainfall event that occurred in Maja Natural Village from 8–10 July 2020, as a validation case. This event significantly impacted the watershed’s hydrological processes and provided a real-world context for assessing the effectiveness of the flash flood early warning system based on a distributed hydrological model ensemble. In this event, changes in precipitation and rainfall intensity directly affected the flood discharge. In the 3 h rainfall scenario (Figure 9), the total precipitation was 117 mm, with the maximum rainfall intensity reaching 59 mm/h. The high-intensity rainfall over a short period quickly saturated the soil, leading to a sharp increase in surface runoff. The rapid accumulation of precipitation caused the flow to reach its peak discharge in a short time, significantly increasing the flood risk in local areas. In the 6 h rainfall scenario, the total precipitation was 186 mm, with the maximum rainfall intensity reaching 62 mm/h. The precipitation was more sustained, with moderate rainfall intensity, and the accumulation effect led to a gradual saturation of soil moisture, causing the flood discharge to continue rising and significantly affecting the watershed’s hydrological processes. In the 24 h rainfall scenario, the total precipitation was 284 mm, with the maximum rainfall intensity reaching 103 mm/h. The prolonged rainfall accumulation had a profound impact on the watershed’s hydrological conditions, especially under extreme rainfall conditions. The soil could not effectively drain the water, leading to a continuous rise in water levels and further increasing the flood risk. Through these rainfall scenarios, the study effectively analyzed the impact of different precipitation conditions on the watershed’s hydrological processes and provided accurate input data for flood discharge analysis.
Figure 9. System 3 h Simulation Results.

3.3.2. Flood Discharge Simulation Analysis

Under different rainfall scenarios, this study conducted detailed simulations and analyses of flood discharge changes, using the distributed hydrological model to calculate the watershed’s flood response (see Figure 10). By quantifying the relationship between precipitation and discharge, the study assessed the specific impact of different rainfall intensities on flood discharge. In the 3 h rainfall scenario, the flood discharge quickly reached its peak, with the peak discharge in the watershed being 1537 m3/s. In this scenario, due to the high precipitation intensity and short duration, the flow rate increased rapidly within a short period, quickly surpassing the alert discharge level and entering the danger zone. This phenomenon highlights the dramatic impact of short-duration, high-intensity rainfall on the watershed’s hydrological processes, especially in smaller areas, where the rapid rise in flood discharge poses significant challenges for flood prevention and control. In the 6 h rainfall scenario, the precipitation duration was relatively longer, with a peak flood discharge of 4894 m3/s. As the precipitation accumulated, the flood discharge gradually increased and eventually reached the danger level. At this point, the water flow within the watershed accumulated over a longer period, leading to a steady rise in water levels, with discharge stability being stronger compared to the short-duration rainfall scenario, where sharp fluctuations were observed. In the 24 h rainfall scenario, the system predicted a peak discharge of 10,098 m3/s. The prolonged rainfall not only significantly increased the total precipitation but also led to continuous accumulation of water flow within the watershed. The flood discharge significantly increased in this scenario, and several areas within the watershed entered an extremely high-risk state, indicating the crucial role that extended rainfall duration played in the growth of flood discharge within the watershed. The model showed over 90% prediction accuracy, with a Nash–Sutcliffe Efficiency (NSE) greater than 0.95, accurately predicting flood responses at various time scales (3, 6, and 24 h) and providing reliable risk warnings. This reinforces the model’s ability to simulate flood discharge changes effectively across varying rainfall conditions.
Figure 10. System 6 h Simulation Results.

3.3.3. Risk Level Early Warning

Based on changes in flood discharge, the system evaluates the risks within the watershed and issues flood risk warnings based on different discharge levels. Through simulation results (see Figure 11), the system can automatically generate risk level warnings based on flow values and issue corresponding warnings for different regions. In the 3 h rainfall scenario, as the peak discharge in the watershed reached 1537 m3/s, certain river sections quickly entered the alert zone. At this point, the rapid increase in discharge prompted the system to issue a danger warning, advising relevant areas to immediately enter an emergency state and take preventive measures. In the 6 h rainfall scenario, the peak flood discharge reached 4894 m3/s, with some river sections entering the extremely dangerous zone. Based on the simulation results for this scenario, the system generated a high-risk warning, recommending relevant departments to strengthen flood control measures and providing disaster prevention plans for downstream areas. In the 24 h rainfall scenario, as the peak discharge reached 10,098 m3/s, most river sections in the watershed entered the extremely dangerous level (Figure 9). At this point, the system evaluated the potential post-disaster losses through the early warning model and issued an emergency response notification, reminding relevant units to prepare for potential flash flood disasters. Through the system’s analysis of flood discharge and risk assessment under different rainfall scenarios, it effectively predicts flood risks and issues early warnings, providing decision-makers with accurate emergency response guidance and ensuring that flash flood disasters can be dealt with in a timely manner.
Figure 11. System 24 h Simulation Results.

4. Discussion

The flash flood early warning system based on a distributed hydrological model ensemble proposed in this study has shown significant accuracy in simulating flood flow and risk warnings, especially under complex terrain and variable climatic conditions. Through the simulation and verification of the once-in-a-hundred years heavy rainfall event in Ma Jia Natural Village, Fuliang County, Jiangxi Province, in 2020, we can further assess the effectiveness of the system in flash flood early warning.

4.1. Model Performance Compared to Actual Data

The simulation results of this study indicate that the system can accurately reflect changes in precipitation and flood flow under different rainfall scenarios. As shown in Table 4, In the 3 h, 6 h, and 24 h rainfall scenarios, the simulated results were 117.3 mm, 183.6 mm, and 283.7 mm, respectively, while the actual rainfall data were 102 mm, 185 mm, and 278 mm, showing only small differences. Particularly in the 6 h and 24 h rainfall scenarios, the simulated results almost exactly matched the actual data, indicating that the system has high accuracy in long-duration rainfall simulations. However, in the 3 h high-intensity short-duration rainfall scenario, the simulated value was slightly higher than the actual rainfall, with a deviation of 15 mm. This discrepancy may arise from the model’s limitations in capturing rapid changes in high-intensity rainfall over short periods, a challenge that [32] also highlighted in their study. Furthermore, the spatial interpolation method used to generate gridded rainfall fields from point-based gauge data inherently produces a smoothing effect. This process can lead to an underestimation of peak rainfall values, particularly for convective events where rainfall gradients are steep, thus failing to represent the true intensity of the storm and contributing to the observed deviation. Future work could explore improving the model’s temporal resolution and integrating real-time meteorological data to enhance short-duration, high-intensity rainfall simulations.
Table 4. Model simulated rainfall performance results.

4.2. Accuracy of Flood Flow Simulation

The model simulated peak flow performance results are shown in Table 5. In the comparison of flood flow simulation, the simulated peak flow in the 3 h rainfall scenario was 1537 m3/s, with a 1.5% difference compared to the actual observed value of 1514 m3/s, showing high accuracy of the system under short-term, high-intensity rainfall conditions. In the 6 h and 24 h rainfall scenarios, the simulated peak flow was 4894 m3/s and 10,098 m3/s, respectively, while the actual values were 4428.8 m3/s and 10,606.52 m3/s, with differences of 9.5% and −4.8%. The larger deviation in the 6 h scenario (9.5%) is likely because its duration closely aligns with the watershed’s natural response time, which amplifies the model’s sensitivity to inaccuracies in rainfall input and routing parameters. This type of error could lead to a critical delay or underestimation of the required emergency response, potentially giving authorities a false sense of security. Conversely, the −4.8% error in the 24 h scenario represents a slight overestimation. Therefore, even with good overall accuracy, a thorough understanding of the model’s error characteristics is essential for decision-makers when translating forecasts into actionable warnings. These results are consistent with the conclusions of [33] in flash flood flow simulations, who also found that there may be certain deviations between simulated and actual flow in long-duration rainfall scenarios. These differences may stem from the way factors like soil moisture and groundwater drainage are assumed in the model. Particularly in long-duration rainfall simulations, soil saturation and the groundwater drainage process have a significant impact on model results. To address this, future research should focus on optimizing the parameterization of soil moisture and groundwater drainage processes to enhance the accuracy of flood flow predictions in extended rainfall scenarios.
Table 5. Model simulated peak flow performance results.

4.3. Risk Warning Capability and Actual Disaster Prevention Effectiveness

The system’s risk warning capability has also been thoroughly validated. In the actual 2020 flood event, the system was able to generate risk warnings in a timely manner based on simulated changes in flood flow and issued alerts for danger and extreme danger levels in several river sections. This indicates that the system not only provides timely flood warning information for decision-makers but also adjusts the warning levels flexibly in response to complex terrain and variable climatic conditions. The application of the HEC-HMS hydrological model to simulate flash flood processes and analyze flood event timing changes shows that issuing warning signals ahead of time is feasible. The authors of [34,35] pointed out that existing hydrological warning systems often face delayed warnings, especially during extreme weather events such as high-intensity rainfall. In contrast to traditional systems, the system in this study dynamically adjusts warning levels and can respond in real-time to changes in precipitation, ensuring the timeliness and accuracy of warning information. Nevertheless, the system still faces limitations during extreme weather conditions, particularly for short-term heavy rainfall. Future research could integrate high-frequency meteorological data to enhance the system’s real-time capability and response speed.

4.4. Model Limitations and Directions for Improvement

Although the distributed hydrological model ensemble proposed in this study has performed excellently in simulating flood flow and risk warnings, there are still some limitations. First, the system is highly sensitive to the quality of input data, particularly the accuracy of precipitation and soil moisture data, which directly affects the effectiveness of the warnings. The availability and quality of these datasets, especially in mountainous areas and ungauged watersheds, pose significant challenges, as data quality remains a major issue for current hydrological models, as pointed out by [36]. Second, the spatial resolution and time step limitations of the model may impact its ability to respond to extreme short-duration, high-intensity rainfall events. Ref. [37] suggested improving the model’s prediction accuracy by enhancing spatial and temporal resolution and using high-frequency meteorological data. Additionally, in data-scarce regions, optimizing interpolation techniques and model parameters will be a key direction for future research. Lastly, although this study focused on a specific case in Jiangxi Province, the applicability of the system still needs to be broadly validated under different climatic conditions and geographical environments. Future research could assess its universality and operability across various regions, and improvements in data quality and model resolution will be crucial for enhancing the system’s robustness. Furthermore, transitioning the DHM-FEWS into an operational tool involves addressing other practical challenges. These include the system’s significant computational demands, the need for operators with a specialized skill set, and most critically, the development of clear strategies to integrate the system’s outputs with local government emergency response protocols to ensure forecasts become actionable warnings.

4.5. Implications for Flood Risk Management

The findings of this study highlight the importance of integrating model-based early warnings with practical flood mitigation strategies. Structural measures, including flood control infrastructure, drainage system upgrades, and dams or retention facilities, can reduce flood peaks and delay runoff, mitigating downstream impacts. Complementarily, non-structural measures—such as establishing flash flood monitoring systems upstream of vulnerable settlements and developing disaster scenario databases—enable real-time detection of extreme rainfall and rapid identification of evacuation routes. Furthermore, coordinated regional cooperation, particularly between upstream and downstream communities, is essential to ensure effective emergency response [38]. When combined with the distributed hydrological model ensemble, these measures form a comprehensive framework that translates accurate forecasts into actionable decisions, enhancing community resilience to flash floods. Future work should focus on operational integration of model outputs with local emergency protocols, ensuring timely and effective implementation of warnings and mitigation measures.

5. Conclusions

This study uses a flash flood early warning system based on a distributed hydrological model ensemble, combined with the once-in-a-hundred-years heavy rainfall event in Ma Jia Natural Village, Fuliang County, Jiangxi Province, to simulate and assess flood flow and risk under different rainfall scenarios. The main conclusions are as follows:
(1)
Through parameter calibration, the model’s NSE value exceeds 88%, indicating the model’s good performance. The simulation results show that the flash flood early warning system based on the distributed hydrological model ensemble can effectively simulate flood flow under different rainfall scenarios. In the 3 h, 6 h, and 24 h rainfall scenarios, the differences between the simulated peak flow and actual values were 1.5%, 9.5%, and −4.8%, respectively, demonstrating that the system has high accuracy.
(2)
Under different rainfall scenarios, the system successfully generated flood risk warnings. The system was able to issue timely risk warnings based on changes in flood flow. Model applications showed that in the 3 h rainfall scenario, the simulated peak flow reached the danger level; in the 24 h rainfall scenario, the flow reached the extreme danger level. The simulated results closely matched the actual peak flow, and the risk warning was accurate, indicating that the system has precise flood warning capabilities.
(3)
Although the model performed well, there are still uncertainties in the data and limitations in spatial/temporal resolution in real-world applications. Future research should focus on further optimizing the model to improve its response to extreme precipitation events and enhance its adaptability to complex terrain and irregular rainfall patterns.
This study validated the application potential of the flash flood early warning system based on a distributed hydrological model ensemble in real flood events, providing effective flood warnings and technical support for disaster prevention and reduction. This study provides scientific evidence for the early warning and prevention of flash flood disasters and offers a reference for the development of flood warning systems in similar regions. Ultimately, this work provides policymakers and disaster management agencies with a quantitative tool to support a critical shift from reactive response to proactive, data-driven flood risk management, thereby enhancing community resilience.

Author Contributions

Methodology, data curation, software, and formal analysis, Y.D. and M.X.; Validation and investigation, Y.Z.; Resources and data support, H.X.; Writing—original draft preparation, K.C.; Writing—review and editing, X.L.; Supervision and funding acquisition, R.L. and D.L. All authors have read and agreed to the published version of the manuscript.

Funding

This research was supported by the National Key Research and Development Program of China (2023YFC3006703) and the Key Research and Development Program of Jiangxi Province (No.: 20243BBH81006); IWHR Research & Development Support Program (JZ110145B0072025).

Data Availability Statement

The original contributions presented in this study are included in the article. Further inquiries can be directed to the corresponding author.

Conflicts of Interest

The authors declare no conflicts of interest.

References

  1. Rijal, M.; Luo, P.; Mishra, B.K.; Zhou, M.; Wang, X. Global Systematical and Comprehensive Overview of Mountainous Flood Risk under Climate Change and Human Activities. Sci. Total Environ. 2024, 941, 173672. [Google Scholar] [CrossRef] [Scilit]
  2. Zaigham, N.A.; Mahar, G.A.; Aburizaiza, O.S.; Nayyar, Z.A. Historical Flood Imprints Reveal Factors Causing Catastrophic Impacts on Modern Jeddah, Saudi Arabia: A Case of Flash Floods versus Rapid Urbanization. Arab. J. Geosci. 2021, 14, 342. [Google Scholar] [CrossRef] [Scilit]
  3. Roohi, M.; Dehghani, J.; Irani, M.; Mina, P. A Comprehensive Review of Flood Damage in Mountainous Regions: Challenges, Solutions, and Advanced Management Technologies. Discov. Geosci. 2025, 3, 59. [Google Scholar] [CrossRef] [Scilit]
  4. Abhishek; Kinouchi, T.; Sayama, T. A Comprehensive Assessment of Water Storage Dynamics and Hydroclimatic Extremes in the Chao Phraya River Basin during 2002–2020. J. Hydrol. 2021, 603, 126868. [Google Scholar] [CrossRef] [Scilit]
  5. Jiang, W.; Jiang, Y.; Srivastava, G. Remote Early Warning System for Mountain floods with Robust ZigBee Wireless Networks. Mob. Netw. Appl. 2023, 28, 1913–1924. [Google Scholar] [CrossRef] [Scilit]
  6. Zhao, M.; Liu, Y.; Wang, Y.; Chen, Y.; Ding, W. Effectiveness Assessment of Reservoir Projects for Flash Flood Control, Water Supply and Irrigation in Wangmo Basin, China. Sci. Total Environ. 2022, 851, 157918. [Google Scholar] [CrossRef] [Scilit]
  7. Hu, J.; Shen, H.; Zhang, J.; Meng, Z.; Zhang, Y.; Han, W. Influence of Multi-Cross Structures on the Flood Discharge Capacity of Mountain Rivers in the Yellow River Basin. Water 2023, 15, 2719. [Google Scholar] [CrossRef] [Scilit]
  8. Henao Salgado, M.J.; Zambrano Nájera, J. Assessing Flood Early Warning Systems for Flash Floods. Front. Clim. 2022, 4, 787042. [Google Scholar] [CrossRef] [Scilit]
  9. Genovese, E.; Thaler, T.; Genovese, E.; Thaler, T. The Benefits of Flood Mitigation Strategies: Effectiveness of Integrated Protection Measures. AIMS Geosci. 2020, 6, 459–472. [Google Scholar] [CrossRef] [Scilit]
  10. Byaruhanga, N.; Kibirige, D.; Gokool, S.; Mkhonta, G. Evolution of Flood Prediction and Forecasting Models for Flood Early Warning Systems: A Scoping Review. Water 2024, 16, 1763. [Google Scholar] [CrossRef] [Scilit]
  11. Corral, C.; Berenguer, M.; Sempere-Torres, D.; Poletti, L.; Silvestro, F.; Rebora, N. Comparison of Two Early Warning Systems for Regional Flash Flood Hazard Forecasting. J. Hydrol. 2019, 572, 603–619. [Google Scholar] [CrossRef] [Scilit]
  12. Dwivedi, S.; Kothari, M.; Singh, P.K.; Chhipa, B.G.; Gupta, T. SWAT Model Applications in Hydrology: A Systematic Review. Int. J. Adv. Biochem. Res. 2024, 8, 603–607. [Google Scholar] [CrossRef] [Scilit]
  13. Botto, A.; Belluco, E.; Camporese, M. Multi-Source Data Assimilation for Physically Based Hydrological Modeling of an Experimental Hillslope. Hydrol. Earth Syst. Sci. 2018, 22, 4251–4266. [Google Scholar] [CrossRef] [Scilit]
  14. Stampoulis, D.; Reager, J.T.; David, C.H.; Andreadis, K.M.; Famiglietti, J.S.; Farr, T.G.; Trangsrud, A.R.; Basilio, R.R.; Sabo, J.; Osterman, G.B.; et al. Model-Data Fusion of Hydrologic Simulations and GRACE Terrestrial Water Storage Observations to Estimate Changes in Water Table Depth. Adv. Water Resour. 2019, 128, 13–27. [Google Scholar] [CrossRef] [Scilit]
  15. Wu, H.; Yang, Q.; Liu, J.; Wang, G. A Spatiotemporal Deep Fusion Model for Merging Satellite and Gauge Precipitation in China. J. Hydrol. 2020, 584, 124664. [Google Scholar] [CrossRef] [Scilit]
  16. Li, R.; Liu, C.; Tang, Y.; Niu, C.; Fan, Y.; Luo, Q.; Hu, C. Study on Runoff Simulation with Multi-Source Precipitation Information Fusion Based on Multi-Model Ensemble. Water Resour. Manag. 2024, 38, 6139–6155. [Google Scholar] [CrossRef] [Scilit]
  17. Panchanathan, A.; Ahrari, A.; Ghag, K.S.; Mustafa, S.; Haghighi, A.T.; Kløve, B.; Oussalah, M. An Overview of Approaches for Reducing Uncertainties in Hydrological Forecasting: Progress and Challenges. Earth-Sci. Rev. 2024, 258, 104956. [Google Scholar] [CrossRef] [Scilit]
  18. Tripathy, K.P.; Mishra, A.K. Deep Learning in Hydrology and Water Resources Disciplines: Concepts, Methods, Applications, and Research Directions. J. Hydrol. 2024, 628, 130458. [Google Scholar] [CrossRef] [Scilit]
  19. Kratzert, F.; Klotz, D.; Shalev, G.; Klambauer, G.; Hochreiter, S.; Nearing, G. Towards Learning Universal, Regional, and Local Hydrological Behaviors via Machine Learning Applied to Large-Sample Datasets. Hydrol. Earth Syst. Sci. 2019, 23, 5089–5110. [Google Scholar] [CrossRef] [Scilit]
  20. Li, T.; Duan, Y.; Guo, S.; Meng, L.; Nametso, M. Study on Applicability of Distributed Hydrological Model under Different Terrain Conditions. Sustainability 2020, 12, 9684. [Google Scholar] [CrossRef] [Scilit]
  21. Liu, Q.; Zhang, N.; Wang, L.; Yu, K.; Wu, J.; Wang, J.; Ma, M. Flash Flood Simulation Based on Distributed Hydrological Model in Future Scenarios. Front. Earth Sci. 2025, 12, 1537486. [Google Scholar] [CrossRef] [Scilit]
  22. Bawa, A.; Mendoza, K.; Srinivasan, R.; O’Donchha, F.; Smith, D.; Wolfe, K.; Parmar, R.; Johnston, J.M.; Corona, J. Enhancing Hydrological Modeling of Ungauged Watersheds through Machine Learning and Physical Similarity-Based Regionalization of Calibration Parameters. Environ. Model. Softw. 2025, 186, 106335. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  23. Zhong, L.; Lei, H.; Yang, J. Development of a Distributed Physics-Informed Deep Learning Hydrological Model for Data-Scarce Regions. Water Resour. Res. 2024, 60, e2023WR036333. [Google Scholar] [CrossRef] [Scilit]
  24. Li, K.; Huang, G.; Wang, S.; Razavi, S. Development of a Physics-Informed Data-Driven Model for Gaining Insights into Hydrological Processes in Irrigated Watersheds. J. Hydrol. 2022, 613, 128323. [Google Scholar] [CrossRef] [Scilit]
  25. Wang, W.-C.; Zhao, Y.-W.; Liu, C.-J.; Ma, Q.; Xu, D.-M. Study on Forecasting and Alarming Model of Flash Flood Based on Machine Learning. In Advances in Hydroinformatics; Gourbesville, P., Caignaert, G., Eds.; Springer Nature: Singapore, 2022; pp. 455–469. [Google Scholar]
  26. Bafitlhile, T.M.; Li, Z. Applicability of ε-Support Vector Machine and Artificial Neural Network for Flood Forecasting in Humid, Semi-Humid and Semi-Arid Basins in China. Water 2019, 11, 85. [Google Scholar] [CrossRef] [Scilit]
  27. Samantaray, S.; Sahoo, A.; Agnihotri, A. Prediction of Flood Discharge Using Hybrid PSO-SVM Algorithm in Barak River Basin. MethodsX 2023, 10, 102060. [Google Scholar] [CrossRef] [Scilit]
  28. Zhou, X.; Huang, X.; Jiang, X.; Jiang, J. Real-Time Error Correction of Multiple-Hour-Ahead Flash Flood Forecasting Based on the Sliding Runoff-Rain Data and Deep Learning Models. J. Hydrol. 2025, 655, 132918. [Google Scholar] [CrossRef] [Scilit]
  29. Hasan, F.; Medley, P.; Drake, J.; Chen, G. Advancing Hydrology through Machine Learning: Insights, Challenges, and Future Directions Using the CAMELS, Caravan, GRDC, CHIRPS, PERSIANN, NLDAS, GLDAS, and GRACE Datasets. Water 2024, 16, 1904. [Google Scholar] [CrossRef] [Scilit]
  30. Yuan, W.; Jing, B.; Xu, H.; Tang, Y.; Zhang, S. A Dynamic Early Warning Model for Flash Floods Based on Rainfall Pattern Identification. Int. J. Disaster Risk Sci. 2024, 15, 769–788. [Google Scholar] [CrossRef] [Scilit]
  31. Chen, Y.; Zhang, N.; Zhang, X.; Wang, G.; Wang, Y.; Liu, R.; Ma, M. A Novel Dynamic Flash Flood Early Warning Framework Based on Distributed Hydrologic Modeling. Ecol. Indic. 2025, 172, 113247. [Google Scholar] [CrossRef] [Scilit]
  32. Miao, Q.; Yang, D.; Yang, H.; Li, Z. Establishing a Rainfall Threshold for Flash Flood Warnings in China’s Mountainous Areas Based on a Distributed Hydrological Model. J. Hydrol. 2016, 541, 371–386. [Google Scholar] [CrossRef] [Scilit]
  33. Li, J.; Yuan, D.; Zhang, F.; Liu, J.; Ma, M. A Physically Based Distributed Karst Hydrological Model (QMG Model-V1.0) for Flood Simulations. Geosci. Model Dev. 2022, 15, 6581–6600. [Google Scholar] [CrossRef] [Scilit]
  34. Tu, H.; Wang, X.; Zhang, W.; Peng, H.; Ke, Q.; Chen, X. Flash flood early warning coupled with hydrological simulation and the rising rate of the flood stage in a mountainous small watershed in Sichuan province, China. Water 2020, 12, 255. [Google Scholar] [CrossRef] [Scilit]
  35. Wang, Y.; Liu, R.; Guo, L.; Tian, J.; Zhang, X.; Ding, L.; Wang, C.; Shang, Y. Forecasting and Providing Warnings of Flash Floods for Ungauged Mountainous Areas Based on a Distributed Hydrological Model. Water 2017, 9, 776. [Google Scholar] [CrossRef] [Scilit]
  36. Zhang, J.; Kong, D.; Li, J.; Qiu, J.; Zhang, Y.; Gu, X.; Guo, M. Comparison and Integration of Hydrological Models and Machine Learning Models in Global Monthly Streamflow Simulation. J. Hydrol. 2025, 650, 132549. [Google Scholar] [CrossRef] [Scilit]
  37. Liu, Y.; Gao, Y.; Wu, M.; van Andel, S.J.; Gao, L.; Tan, X. A Calibration Framework for Distributed Hydrological Models Considering Spatiotemporal Parameter Variations. J. Hydrol. 2024, 645, 132273. [Google Scholar] [CrossRef] [Scilit]
  38. Zhai, X.; Zhang, Y.; Zhang, Y.; Liu, R.; Liu, C.; Zhang, X.; Chen, Y.; Wang, X.; Wright, N. Classifying Flash Flood Disasters From Disaster-Prone Environments to Support Mitigation Measures. Water Resour. Res. 2025, 61, e2024WR037389. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.