Abstract
The University of the Philippines Los Baños operates twelve electric minibuses (eLBeep), whose removable 5.4 kWh lithium iron phosphate battery packs are charged off-board. This case study uses HOMER Grid to compare five grid-connected combinations of solar photovoltaics (PV), a 10 kW wind turbine, and a battery energy storage system (BESS) for a dedicated charging station against a grid-only base case over 25 years and under a flat energy tariff of USD 0.24/kWh. The charging load is 52.0 MWh per year with a 17.4 kW peak. Without compensation, 40 kW of PV with 72 kWh of storage has the lowest net present cost (NPC; USD 123,919, 34% below the grid-only base), meets 78% of the load on site, and reduces gross grid-related CO2 emissions by 78%. Solar-only at the same PV size costs USD 17,794 more. Wind adds cost at this site, where the turbine’s capacity factor is 7.7%, and storage without PV did not provide returns under either tariff tested. Under the flat tariff, the ranking depends on export credit: at the net-metering rate of about USD 0.13/kWh, solar-only becomes least-cost. Under the MERALCO General Service B tariff, which adds a demand charge, solar–BESS is the least-cost, with or without export credit. Solar–BESS remains least-cost across the tested ranges of the component cost, discount rate, project lifetime, tariff, and fleet size. The findings are specific to the modeled tariff, costs, and site.