Abstract
As renewable energy sources (RESs) become increasingly prevalent, limitations on connecting new sources arise due to insufficient suitable locations and grid constraints. Existing RES installations introduce challenges such as generation variability, the necessity for costly reserves, and overproduction, which can lead to forced outages. In response, grid operators have adopted more flexible connection policies, notably “cable pooling”, which only restricts the power injected at a given node rather than the total capacity of the connected sources. This article proposes a method for optimal sizing of diverse RES combinations connected to high-voltage networks under cable pooling conditions from an investor’s perspective. The most prominent findings show the existence of a strong relationship between optimal RES sizing and composition on financial objectives, revenue sources, and market prices. Subsequent achievements involve demonstrating that the profitability of energy storage without subsidies is essentially limited to participation in the capacity market and that the reduction of RES generation depends on the investor’s financial objective, not on the market type.
1. Introduction
As renewable energy sources (RESs) become increasingly prevalent, limitations on connecting new sources have emerged due to the scarcity of suitable locations and grid constraints [1]. Existing RES installations introduce challenges such as generation variability, the necessity for costly reserves, and overproduction, which can result in forced outages. Consequently, grid operators who previously calculated the sum of the power from various sources and storage devices at a single connection point are now adopting a more flexible approach known as “cable pooling”. This method restricts only the power injected into the network at a specific node, rather than the total power of all connected sources. Cable pooling facilitates a more economical and adaptable solution by enabling the connection of multiple RES technologies and energy storage systems (ESSs) to a single network node, thereby forming a hybrid renewable energy source (HRES). This approach allows for the installation of higher-capacity RESs at a given location and contributes to a more stable power supply, as demonstrated in [2]. Regulatory frameworks have begun to reflect these developments. In Poland, current regulations [3] permit connecting two or more RES installations, potentially owned by different producers, to a common connection point, and a proposed amendment [4] seeks to include ESSs in the cable pooling framework. Hungary has mandated ESS co-location for solar photovoltaic (PV) assets exceeding a certain capacity, while in France, co-located ESSs and PV systems are eligible to participate in the Contract for Differences, which features auctions with high strike prices [5].
The integration of various RESs, constrained by connection capacity or costs, has been addressed in several studies. For example, [6] examines the connection of a hydroelectric power plant to a floating PV (FPV) system located in the adjacent reservoir, and [7] explores the integration of FPV with offshore wind farms and wave energy converters. S. Golroodbari et al. [8] assess the feasibility of adding an offshore FPV farm to an existing Dutch offshore wind farm in the North Sea, considering a fixed cable capacity constraint. The cable linking the offshore park to the onshore grid is currently underutilized due to the wind farm’s low-capacity factor. The integration of FPV systems with other renewable technologies is further examined in [9], which demonstrates the feasibility and advantages of such combinations through specific examples. Article [10] illustrates the potential to expand PV capacity by installing new sources at the connection points of existing hydroelectric plants. The benefits of combining PV and wind turbine (WT) sources, including increased installed power and energy output, are documented in [11,12]. K. Obradović et al. [13] investigate the distinct physical design requirements of PV/WT hybrid renewable energy systems compared to single-technology facilities, emphasizing spatial layout optimization, electrical design, and macro-siting. Challenges associated with co-locating WT and PV farms, particularly the shading of PV panels by turbine structures and rotor blades, are discussed in [14]. Additionally, [15] presents a spatiotemporal decision-making model for evaluating the development of utility-scale PV, onshore WT, and hybrid PV/WT power plants, incorporating technology-specific parameters and infrastructure costs into the techno-economic assessment.
Numerous studies have addressed the optimization of HRES composition, with a primary focus on isolated systems implemented in real-world locations lacking grid connectivity. For example, publication [16], developed a Mixed Integer Linear Programming (MILP) optimization algorithm to design an optimal hybrid system comprising solar, wind, and diesel generators, along with battery storage (BESS), for a mountain hut in South Tyrol, Italy. In [17], particle swarm optimization was employed to determine the optimal sizing of a solar/wind/battery HRES for a rural community in Rivers State, Nigeria, aiming to minimize total economic cost, total annual system cost, and levelized cost of energy using a two-step approach. The Hybrid Optimization Model for Multiple Energy Resources (HOMER) Pro Software (v. 3.11) was utilized in [18] to minimize net present cost, cost of energy, and CO2 emissions for a hybrid energy system (solar, wind, and diesel-powered generator) with battery storage in northern Bangladesh. Medina-Santana et al. [19] introduced a sizing methodology incorporating long short-term memory cells for long-term weather prediction, multivariate clustering for scenario generation, and a nonlinear mathematical formulation to determine optimal HRES sizing for a rural community on Mexico’s Pacific Coast. K. Kusakana et al. [20] applied linear programming to optimize the initial cost of system components in islanded PV/WT hybrid renewable energy systems. In [21], the Jaya-Grey Wolf Optimizer, a novel hybrid optimization tool, was used to optimize HRES component sizing for smooth operation and cost-effectiveness, achieving the dual objectives of minimizing net annual cost and the probability of power supply loss in a standalone microgrid. Genetic Algorithm and Particle Swarm Optimization techniques were implemented in [22] to select the optimal size of photovoltaic/wind/battery HRES. In [23], an optimal sizing method for a PV and ESS system was proposed to maximize annual net profit from electricity sales to the Dutch day-ahead market, with the results analyzed as a function of energy and technology prices.
The selection of an optimal HRES structure to ensure adequate customer demand coverage or minimize network exchange has been extensively investigated. M. A. Mohamed et al. [24] optimized on-grid renewable energy systems using multiple renewable sources, emphasizing large-scale applications tailored to specific energy loads. The study employed the Walrus Optimization Algorithm, Coati Optimization Algorithm, and Osprey Optimization Algorithm to identify optimal system sizing and energy management strategies that reduce grid electricity costs. Ref. [25] proposed an optimal sizing strategy for a grid-connected PV/WT hybrid system with demand-side scheduling, modeling energy consumption for various load types to facilitate scheduling. Paper [26] reported on linear programming optimization models for PV/WT hybrid system, demonstrating their effectiveness in reducing grid energy use in wine production. Paper [16] presented an optimal sizing method for hybrid energy systems integrating PV, WT, and BESS, ensuring that total monthly solar and wind energy generation meets monthly energy demand. In publication [27], the primary objective was to supply the base load in the Helsinki area using HRES size optimization. The results indicate that an HRES is at least 10.5 times more cost-effective than a single-source RES.
The recent literature has examined several challenges associated with HRES under cable pooling conditions. Paper [11] analyzes energy curtailment, time duration, the capacity factor, and enhancements in the stability coefficient of the grid system in PV/WT hybrid renewable energy system operating under cable pooling conditions. Ref. [28] addresses the selection of suitable deep learning models for multistep, multivariate forecasting of 24 h PV/WT generation in cable pooling scenarios.
From the literature presented, various objectives for HRES structure optimization emerge: grid electricity cost [24] or grid exchange [26], demand-side scheduling [25], monthly [16] or base [27] Energy demand, improvement capacity factor and stability coefficient [11,29], sustainable balance among energy production, economic viability, and environmental responsibility [30], system stability [31], cost minimization while ensuring energy demand coverage in isolated systems [17,18,19,20,21,22,23]. Authors employ a wide range of optimization methods. In computational practice, both linear methods (e.g., Linear (LP) and Mixed Integer Linear Programming (MILP) optimization algorithms) and nonlinear ones (NLP, Genetic Algorithm, and Particle Swarm Optimization) are utilized. In recent years, researchers have also turned to modern hybrid methods, such as the Jaya-Grey Wolf Optimizer, Walrus Optimization Algorithm, Coati Optimization Algorithm, and Osprey Optimization Algorithm. The choice of these methods depends on how the problem is formulated and the complexity of the mathematical model used.
The authors of the article in publication [32] introduced a method for selecting the energy-supply structure for residential premises based on hourly energy consumption and generation. The present study adopts this method to determine, from the investor’s perspective, the optimal sizing of an HRES source connected to a high-voltage network under cable pooling conditions. The grid-scale installation, as illustrated in Figure 1, comprises the most used RES technologies–PV and WT–supplemented by a lithium-ion BESS, reflecting current market practices. The objective of this study is to analyze the relationship between the optimally selected device composition and variables such as the investor’s financial goal, the type of market from which revenues are derived, and prevailing market prices. A notable research gap exists regarding the influence of HRES income sources and an investor’s financial objectives on HRES composition, particularly under cable pooling conditions. This paper addresses this gap by investigating the following topics:
- How does the choice of income source influence the optimal HRES structure?
- How does an investor’s financial goal influence the optimal HRES structure?
- When is it profitable to include the BESS in the HRES structure?
- How significant is the advantage of HRES over single-source RES?
- How large is RES generation reduction under cable pooling conditions?
The first and second of the above points have not yet been addressed in any sources known to the authors.
Figure 1.
The structure of the analyzed hybrid renewable energy system.
2. Definition of the Optimization Problem
The optimization problem involves determining the power and capacity of PV, WT, and lithium-ion battery ESS installations composing the HRES. The objective is to maximize the financial return on investment while restricting the exchange of active power with the grid to a specified constant value, set at 100 MW for this study. For grid-scale RES most often, the limit is based on the technical and operational parameters of the HV network to which the RES is connected and is determined by the transmission or distribution system operator. Investment efficiency is evaluated using the Net Present Value (NPV) method. Three variants of the financial objective are analyzed:
- Maximizing the ratio of NPV to capital costs, NPV/CAPEX.
- Maximizing NPV while maintaining a minimum NPV/CAPEX ratio. In this study, NPV is required to be at least 0.9 times CAPEX, corresponding to an average annual capital income of at least 3%.
- Maximizing NPV with a constraint on CAPEX. For this analysis, CAPEX is limited to $300 M (equivalent to $3000 per kW of connection capacity).
The three financial objectives listed above were selected due to limitations of the applied optimization methods. These objectives are expected to be achieved using a simplified formula. First, maximize the financial leverage of initial outlays (NPV/CAPEX). Second, maximize NPV while achieving a minimum expected rate of return on invested capital. The 3% average rate of return applied in the second optimization objective corresponds to the cash flow discount rate used in the NPV calculation. The weighted average cost of capital (WACC) for bankable power generation projects in the European Union ranges from 14% to 1.1%, depending on the technology, risk tolerance, and geographic location, with the lowest values observed for PV projects in Germany. Third financial objective, maximize NPV while accounting for investment constraints (CAPEX) resulting from limited available capital. The assumed amount, $300 M, allows for an investment comprising of approximately 100 MW WT combined with 100 MW PV and 100 MW ESS with a capacity of 100 MWh.
For each financial objective, three types of installation revenue sources are evaluated:
- Power Purchase Agreement (PPA), with a price range of $50–$250 per MWh considered. Investments were deemed unprofitable for PPA prices below $50 per MWh.
- Day Ahead Market (DAM), with DAM price variations ranging from one-quarter to four times the base prices.
- Capacity Market (CM) in combination with DAM, with a CM price range of $40–$300 per MW considered.
The selected price ranges ensure that further increases or decreases do not significantly influence the optimal HRES composition or result in an unprofitable investment (NPV < 0).
For comparison, the optimization was also performed for individual technologies. A 30-year operational lifetime is assumed for all installations (based on [33,34,35]), except for batteries, which are assigned a 15-year lifetime. Repeatable annual generation cycles are modeled using weather data for PV installations [36] and actual WT generation data (own data from a real installation). Similarly, a repeatable annual cycle is used for DAM, based on data from [37]. This approach introduces uncertainty, particularly regarding DAM price fluctuations, which are simulated through various DAM price levels. Previous research has examined the impact of wind and PV generation fluctuations [14], revealing that, provided that total annual generation remains constant, these fluctuations have a minimal effect on the selection of installation parameters. Over longer periods, generations may change due to climate change, although the extent of such changes is uncertain. Additional parameters include the potential reduction of ESS investment costs through subsidies.
The degradation of storage capacity over time is not explicitly modeled for the sake of simplicity and because the level of degradation depends on the exact battery chemistry. It can be partially addressed by increasing capital capacity costs and decreasing capacity limits. For example, a 20% degradation over 15 years corresponds to approximately a 10% increase in capital capacity costs and narrowing the capacity range from 1 to 10 h to between 0.9 and 9 h. Sample calculations for the capacity market and 20% degradation over 15 years using this simplified method confirmed that although the exact results depend on the inclusion of ESS capacity degradation, the general conclusions remain unchanged.
The calculations limit the annual number of battery cycles to the number corresponding to 320 full discharges, which, given an assumed lifespan of 15 years, results in a total of 4800 cycles, which is consistent with the value given in the literature.
An hourly generation interval is adopted as a simplification; a shorter interval may be used to reduce calculation uncertainty if data are available. Due to the specificity of the optimization problem described and the various financial objective variants adopted by the authors; two types of optimization methods (computational engines) will be used for the calculations. These include an LP algorithm for solving financial objectives 2 and 3, and an NLP algorithm for solving financial objective 1. A more detailed description of the selected algorithm’s structure is provided in Section 3.
All data was taken from the available current sources for actual installations and is included in Appendix B.
3. Mathematical Model
- Cases under consideration:
| Case 11 | – | PPA, financial objective 1; |
| Case 12 | – | PPA, financial objective 2; |
| Case 13 | – | PPA, financial objective 3; |
| Case 21 | – | DAM, financial objective 1; |
| Case 22 | – | DAM, financial objective 2; |
| Case 23 | – | DAM, financial objective 3; |
| Case 31 | – | CM, financial objective 1; |
| Case 32 | – | CM, financial objective 2; |
| Case 33 | – | CM, financial objective 3. |
- Objective functions:
- F.1.
- Objective function 1.–maximizes the ratio of total NPV to capital costs:
- F.2.
- Objective function 2.–maximizes the total NPV value over the installation lifetime:
- Common constraints:
Total CAPEX calculation [$] as a sum of five components: costs common for the whole site, costs related to power of PV, WT and ESS, and costs related to ESS capacity taking into account the level of ESS funding ():
Total NPV calculation [$] as a sum of yearly income from all three considered markets multiplied by constant reflecting their 30-year discounted sum, taking into account the level of DAM prices () and active participation in DAM (ACT), and less-so the 30-year discounted sum of installation O&M costs and less CAPEX:
For assurance of the full use of grid connection capacity, the sum of the installed RES power has to be at least equal to connection capacity:
ESS capacity assumed to be between 1 and 10 h:
Empty storage at the year’s start:
Empty storage at the year’s end:
Energy balance at the i-th hour:
Energy sent to grid not greater than the grid connection capacity:
Energy acquired from grid not greater than the grid connection capacity and equal 0 at PPA market:
Used WT energy at the i-th hour not greater than available generation:
Used PV energy at the i-th hour not greater than available generation:
Energy stored in ESS at the i-th hour:
ESS discharging power at the i-th hour not greater than installed ESS power:
ESS charging power at the i-th hour not greater than installed ESS power:
ESS stored energy at the i-th hour not greater than installed ESS capacity:
Constraint limiting the annual number of ESS cycles:
- Case-dependent market specific constraints:
For cases 11, 12 and 13, energy cannot be bought from the grid:
For cases 21, 22, 23, 31, 32 and 33, energy can be bought from the grid:
For cases 11, 12, 13, 21, 22 and 23, there is no CM in these cases:
For cases 31, 32 and 33, ESS power assigned to CM not greater than connection capacity:
For cases 31, 32 and 33, ESS power assigned to CM not greater than ESS power:
For cases 12, 22 and 32, average yearly income ≥ 3%:
For cases 13, 23 and 33, CAPEX is limited to $3 M per 1 MW of connection capacity:
- The search variables are as follows:
| – | Installed ESS useful capacity [MWh]; | |
| – | Installed ESS power [MW]; | |
| – | Installed PV panels power [MWp]; | |
| – | Installed WT power [MW]. |
- Other variables used in the model:
| – | ESS active market participation indicator [Boolean]; | |
| – | ESS charging energy at the i-th hour [MWh]; | |
| – | ESS discharging energy at the i-th hour [MWh]; | |
| – | Energy stored in ESS at the end of the i-th hour [MWh]; | |
| – | ESS power assigned to CM [MW]; | |
| – | Electricity bought from grid at the i-th hour [MWh]; | |
| – | Electricity sale to grid at the i-th hour [MWh]; | |
| – | Used solar energy at the i-th hour [MWh]; | |
| – | total capital investment [$]; | |
| – | NPV value over installation lifetime [$]; | |
| – | Used wind energy at the i-th hour [MWh]. |
Multiplier calculating NPV for years of equal yearly cash flow at discount rate R:
- The following parameters are used in calculations:
To investigate the dependence on energy prices on DAM:
To investigate the dependence on ESS subsidy:
Symbols not previously defined are provided in Appendix B. The optimization problem for financial objective 1 is formulated as a nonlinear program (NLP) with linear constraints (3)–(23) and the objective function F.1 (1), which is expressed as the quotient of first-degree polynomials. For financial objectives 2 and 3, the problem is a linear program (LP) with both the objective function F.2 (2) and the constraints (3)–(24) for financial objective 2 and (3)–(23), (25) for financial objective 3—being linear relationships. Based on real installations, ESS capacity is limited to between 1 and 10 h. ESS operation, accounting for efficiency, power, capacity, and annual cycle number limits, is represented by Equations (6)–(8) and (14)–(18). The optimization process determines the charging and discharging volume for each hour. Maximum PV and WT generation are based on the installed capacities and deterministic weather data (Equations (12) and (13)), while the actual used generation is also determined through optimization. Grid exchange, constrained by connection capacity, is described in Equations (10) and (11). The components of NPV are specified in Equations (3) and (26), market conditions are detailed in constraints (19)–(25), and the formulas for total capital investment and NPV calculation are provided in Equations (3) and (4).
The objective functions and constraints used for the optimization of each case are summarized in Table 1.
Table 1.
Variants of the objective function and constraints depending on the financial objective and the market.
4. Calculation Methods and Results
The problem was modeled in the Mosel® language, and the calculations were performed using the Xpress® IVE (v. 1.26.00) [38] software under default settings. In addition to the search variables, annual energy consumption and grid supply, losses within the internal installation and the ESS, and reductions in PV and WT generation were also calculated. The data corresponding to the maximum NPV served as the starting point for the NLP calculations. The global extremum for NLP-feasible problems has always been reached within several minutes, while the LP problems were solved within seconds. A flowchart illustrating the optimization process is presented in Figure 2.
Figure 2.
Flowchart illustrating the optimization process used for the calculation of specific variants.
The results were transferred to and analyzed in an MS Excel 365 platform spreadsheet. The selected result tables are provided in Appendix A, and a summary of case-by-case results is presented below.
- Case 11–PPA, financial objective 1.
- ESS profitability: ESS is not profitable for any of the PPA prices analyzed. The results not presented here show that this is also the case for a subsidy covering up to 90% of the ESS CAPEX.
- The RES output reduction is negligible, independently of the PPA price.
- The increase in the NPV/CAPEX value compared to the use of single PV technology is relatively small. This is also the case for single WT technology for PPA prices > 60 $/MWh. Grid output is larger for single WT technology than for the energy mix for PPA prices < 90 $/MWh, while in other cases HRES gives greater output.
- Due to the higher CAPEX and also the higher efficiency of WT, their share increases as the PPA price increases.
Figure 3.
Case 11 without ESS CAPEX subsidy: calculation results depending on the PPA price.
- Case 12–PPA, financial objective 2.
Sample results are shown in Table A2. The main observations are as follows:
- Lack of solutions for the assumed average profit level of 3% and PPA price < 80 $/MWh.
- Without subsidies, the participation of ESS is profitable only at a PPA price > 150 $/MWh. The results not presented here show that, with an increasing ESS subsidy, both its capacity and energy expressed in [h] increase. Single ESS technology results in a lack of solutions across all PPA prices.
- The RES output reduction increases with the PPA price increase.
- The increase in the NPV value and grid output compared to the use of single PV (especially) or WT technology is significant.
- Case 13–PPA, financial objective 3.
Sample results are shown in Table A3. The main observations are as follows:
- ESS is not profitable for any of the PPA prices analyzed. Further calculations show that only for PPA prices > 150 $/MWh and ESS CAPEX subsidy > 85%, small ESS were selected.
- The RES output reduction is very low, independently of the PPA price.
- The increase in the NPV value and grid output compared to the use of single PV (especially) or WT technology is significant.
- Due to the higher CAPEX and also the higher efficiency of WT, their power increases as the PPA price increases while PV size remains stable.
- Case 21–DAM, financial objective 1.
Sample results are shown in Table A4. The main observations are as follows:
- Installation is profitable only for DAM multiplier > 0.33.
- ESS without subsidy is not profitable for any of the DAM multipliers analyzed. Further calculations show that only for DAM price multiplier > 2.0 and ESS CAPEX subsidy > 80% were ESS selected.
- The RES output reduction is very low, independently of the DAM multiplier.
- The NPV/CAPEX value increase compared to the use of single PV and WT technologies is significant for single PV technology and, for larger DAM multipliers, also for single WT technology. The grid output is largest for single WT technology.
- Depending on the DAM multiplier share of PV and WT power differs significantly.
- Case 22–DAM, financial objective 2.
- No solution exists for the assumed average profit level of 3% and the DAM price multiplier < 0.75.
- The participation of ESS is profitable for the DAM price multiplier > 1.0. The higher the ESS CAPEX subsidy, the lower the DAM price multiplier for ESS selection and the larger power and capacity of selected ESS’s. The results not presented here show that a single ESS leads to no solutions for all DAM price multipliers.
- The RES output reduction is very significant for nearly all DAM price multipliers.
- The NPV value and grid output are significantly larger compared to the use of single PV (especially) or WT technology.
Figure 4.
Case 22 without ESS CAPEX subsidy: calculation results depending on the DAM price multiplier.
- Case 23–DAM, financial objective 3.
Sample results are shown in Table A7. The main observations are as follows:
- ESS is not profitable for any of the DAM price multipliers analyzed. Further calculations show that ESS was selected, starting with a DAM price multiplier of 0.75 and an ESS CAPEX subsidy of 90%. The higher the DAM multiplier, the lower the subsidy required for ESS selection. For the DAM price multiplier < 0.5 only PV and WT were selected regardless of the size of the EXX CAPEX subsidies.
- The RES output reduction is <10%, independently of the DAM multiplier.
- The increase in the NPV value and grid output is significant for the DAM price multiplier > 0.33, compared to the use of single PV, WT, or ESS technology.
- Case 31–CM+DAM, financial objective 1.
Sample results are shown in Table A7. The main observations are as follows:
- ESS is profitable for any of the CM prices > 120 $/kW, for the CM price > 160 $/kW, only ESS is selected. The results not shown here show that the lower the DAM price multiplier, the lower the CM price, at which ESS is profitable (always with power 100 MW and capacity 1 h).
- The RES output reduction is negligible, independently of the CM price.
- The increase in the NPV/CAPEX value and grid output compared to the use of single technologies depends on the CM price and technology.
- For the DAM price multiplier > 2.0, only WT are selected; for the DAM price multiplier < 0.5, only PV and ESS are selected.
- Case 32–CM+DAM, financial objective 2.
Sample results are shown in Table A8. The main observations are as follows:
- For the DAM price multiplier < 0.75, no solution exists for CM prices < 120 $/kW.
- The same energy mix is selected for any of the CM prices analyzed: 196.5 MW PV, 239.6 MW WT, and 100 MW/1 h ESS (1 h is the minimum allowed capacity). Further calculations show that for the DAM price multiplier > 1.0, higher DAM prices select, higher PV & WT power values, along with higher ESS capacities [h]; for the DAM price multiplier < 0.5 only PV and ESS are selected.
- The RES output reduction strongly depends on the DAM multiplier.
- The increase in the NPV value and grid output for HRES is significant compared to the use of single PV, WT, or ESS technology.
- Case 33–CM+DAM, financial objective 3.
- ESS is always selected above some CM price level. While WT and PV installed power decreases with the CM price increase, the ESS power increases up to 100 MW (always with 1 h capacity). The results not presented here show that the lower the DAM values, the lower the CM price values for which ESS are selected, with power up to 100 MW and a capacity of 1 h.
- For the DAM price multiplier < 0.5, only PV and ESS are selected.
- The RES output reduction strongly depends on the DAM multiplier.
- While the increase in the NPV value is significant compared to the use of single PV (especially), WT, or ESS technology for all CM prices, grid output for CM > 100 $/kW is greatest for single WT sources.
Figure 5.
Case 33 without ESS CAPEX subsidy and with the DAM price multiplier = 1.0: calculation results depending on the CM price.
5. Key Observations
It should be noted that the results are site-specific and depend on the proportion and distributions of PV and WT generation, as well as on price volatility in the DAM.
The analysis revealed the following patterns:
- The optimal composition of energy sources across all markets is strongly influenced by the financial objective of the investment, as illustrated for the DAM in Figure 6.
Figure 6.
Optimal composition of sources depending on the financial objective of the investment for DAM.
- For all financial objectives considered, the optimal composition of sources depends on the investment income source, as demonstrated for financial objective 1 in Figure 7.
- Participation in the CM results in source selection being strongly influenced by DAM prices, as shown in Figure 8.
- For PPA and all financial objectives, as well as for the DAM with financial objective 1, ESS are generally not profitable, regardless of subsidies. For DAM with financial objectives 2 and 3, subsidies for ESS capital expenditures enable profitability at lower DAM prices (see Figure 9). In the absence of subsidies, ESSs are primarily selected for participation in the CM, and, in some cases, they are the only sources selected.
- The production variability of HRES was substantially lower than that of single technologies. For example, in May in Case 23, the coefficient of variation was 1.12 for PV only, 0.99 for WT only, and 0.69 for HRES.
Figure 7.
Optimal composition of sources depending on the source of income and corresponding price level for financial objective 1.
Figure 8.
Optimal composition of sources depending on the DAM price for financial objective 1 and CM.
Figure 9.
Optimal composition of sources depending on the ESS CAPEX subsidy for financial objective 2 and the DAM price multiplier = 1.0.
Figure 10.
Single technology NPV and grid output in relation to HRES in Case 12.
Figure 11.
Single technology NPV and grid output in relation to HRES in Case 23.
6. Summary, Conclusions, and Future Research Directions
The presented method allows for selecting an optimal mix of RESs while simultaneously limiting active power transfer with the grid. The results indicate a strong dependence of the optimal HRES structure and total combined power on the financial target, revenue sources, and prevailing market prices. Due to higher investment costs, the share of WT relative to PV is greater at higher market prices. The profitability of ESSs without subsidies is largely restricted to participation in the capacity market. At CM prices > 120 $/kW the technology mix may consist solely of ESSs. A profitable share of ESSs in a PPA requires a price exceeding 150 $/MWh, which is only possible with preferential rather than market prices. The profitability of including ESSs in the energy mix for DAM is possible only under high price volatility. For the latter two markets, the conclusions are practically independent of ESS investment cost subsidies.
Consistently, both the profitability and total generation of HRES generally exceed those of individual technologies. The reduction in RES generation is influenced by the financial target, ranging from a few percent for financial objectives 1 and 3 to over 40% for financial objective 2, and is practically independent of market type.
Based on the above statements, it follows that an investment decision in HRES must account for planned revenue sources and the investor’s financial objective, in addition to weather conditions. It can be expected that the optimal composition of sources will differ significantly depending on the expected rate of return or the amount of available capital. The accuracy of the method can be enhanced by using weather and market data from several consecutive years. On the other hand, considering the large, difficult-to-predict changes in market prices alongside the rapid growth of RES generation, the greatest weight should be given to long-term fixed-value contracts, such as PPA and CM contracts, especially for investments involving ESSs.
Due to the strong dependence of the optimal source mix on DAM prices shown in the article, further investor analysis should include calculating financial results for selected variants under various DAM price scenarios when these prices serve as a revenue source. This issue is particularly critical when the DAM is the sole revenue stream. Such analyses can be conducted by calculating the NPV using a methodology analogous to the one applied in this study.
The advantage of the method presented in the article is its relative simplicity and short calculation time, enabling the simulation of many both weather and market variants.
Future research will extend the presented analyses by incorporating uncertainties in renewable generation and market prices, sensitivity analyses, and calculations with various data sets for different climatic and market conditions.
Author Contributions
M.S., Conceptualization, Methodology, Supervision, Formal analysis, Writing—original draft preparation. A.W., Formal analysis, Investigation, Data curation; Validation, Writing—review & editing; T.S., Investigation, Validation, Data curation; Writing—editing. All authors have read and agreed to the published version of the manuscript.
Funding
This research received no external funding.
Data Availability Statement
Dataset available on request from the authors. The raw data supporting the conclusions of this article will be made available by the authors on request.
Conflicts of Interest
The authors declare no conflicts of interest. The authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.
Appendix A. Results Tables
Table A1.
Case 11 without ESS CAPEX subsidy: calculation results depending on the PPA price.
Table A2.
Case 12 without ESS CAPEX subsidy: calculation results depending on the PPA price.
Table A3.
Case 13 without ESS CAPEX subsidy: calculation results depending on the PPA price.
Table A4.
Case 21 without ESS CAPEX subsidy: calculation results on the DAM price multiplier.
Table A5.
Case 22 without ESS CAPEX subsidy: calculation results depending on the DAM price multiplier.
Table A6.
Case 23 without ESS CAPEX subsidy: calculation results depending on the DAM price multiplier.
Table A7.
Case 31 without ESS CAPEX subsidy and with the DAM price multiplier = 1.0: calculation results depending on the CM price.
Table A8.
Case 32 without ESS CAPEX subsidy and with the DAM price multiplier = 1.0: calculation results depending on the CM price.
Table A9.
Case 33 without ESS CAPEX subsidy and with the DAM price multiplier = 1.0: calculation results depending on the CM price.
Appendix B. Data, Symbols and Variables
Summary of data used in the article and their symbols:
- Technical data:
| expected battery life [cycles], [39] | |
| expected ESS battery lifetime [year], [33] | |
| one-way energy storage efficiency [–], (corresponding to A/C–A/C round trip efficency at invertor = 0.85 [39]) | |
| installation auxiliary energy losses, (3% of transmitted energy) [40] | |
| expected installation lifetime [year], (based on [33,34,35]) | |
| maximum active power exchange with the grid [MW], assumed | |
| number of hours [h], , | |
| PV energy output at the i-th hour [MWh/MWp], [36] | |
| WT energy output at the i-th hour [MWh/MW], (own data from real installation) |
- Economic data:
| ESS battery replacement CAPEX [$/kW], [33] | |
| CAPEX common for the whole site: transformer, interconnection, land acquisition, control, common electrical works [$/kW], (estimated on the base of [33]) | |
| fixed O&M annual cost common for the entire site: transformer, interconnection, control, security [$/kW], (estimated on the base of [41]) | |
| contracted capacity market (CM) price [$/kW], [42] | |
| day-ahead market (DAM) prices at the i-th hour [$/MWh] [37] | |
| contracted electricity price at the PPA market [$/MWh], [43] | |
| ESS capacity CAPEX [$/kWh], = 401 $/kWh [33] | |
| ESS capacity fixed O&M annual cost [$/kWh], [33] | |
| ESS power CAPEX [$/kW], [33] | |
| ESS power fixed O&M annual cost [$/kW], [33] | |
| average cost of imbalance [$/MWh], [44] | |
| PV CAPEX [$/kW], [41] | |
| PV fixed O&M annual cost [$/kW], [41] | |
| R | discount rate [−], [45] |
| transmission fee [$/MWh], [46] | |
| WT CAPEX [$/kW], [41] | |
| WT fixed O&M annual cost [$/kW], [41] |
- Other symbols:
| BESS | battery energy storage system |
| CAPEX | capital costs |
| CM | Capacity Market |
| DAM | Day Ahead Market |
| ESS | energy storage system |
| FPV | floating PV |
| HRES | hybrid renewable energy source |
| LP | linear problem |
| MILP | Mixed Integer Linear Programming |
| NLP | nonlinear problem |
| NPV | Net Present Value method |
| PPA | Power Purchase Agreement |
| PV | solar photovoltaic |
| RES | renewable energy source |
| WT | wind turbine |
References
- Wędzik, A.; Siewierski, T.; Szypowski, M. The Use of Black-Box Optimization Method for Determination of the Bus Connection Capacity in Electric Power Grid. Energies 2020, 13, 41. [Google Scholar] [CrossRef] [Scilit]
- Błaszczyk, A.; Matuszak-Flejszman, A.; Nawrocki, K. Determinants of the development of photovoltaics in Poland. Renew. Energy 2024, 233, 121161. [Google Scholar] [CrossRef] [Scilit]
- Ustawa z Dnia 17 Sierpnia 2023 r. o Zmianie Ustawy o Odnawialnych Źródłach Energii Oraz Niektórych Innych Ustaw. Dz.U. 2023, Poz. 1762. 2023. Available online: https://dziennikustaw.gov.pl/DU/rok/2023/pozycja/1762 (accessed on 10 June 2025).
- Sejm RP. Rządowy Projekt Ustawy o Zmianie Niektórych Ustaw w Celu Dokonania Deregulacji w Zakresie Energetyki. Druk nr 1310. 2025. Available online: https://www.sejm.gov.pl/Sejm10.nsf/druk.xsp?nr=1310 (accessed on 10 June 2025).
- Review Energy. Top Markets for Renewable and Co-Location: Germany, GB, Ireland, and Poland. 2024. Available online: https://www.review-energy.com/otras-fuentes/top-markets-for-renewable-and-co-location-germany-gb-ireland-and-poland (accessed on 15 May 2025).
- Alhassan, M.O.; Opoku, R.; Uba, F.; Obeng, G.Y.; Sekyere, C.K.; Nyanor, P. Techno-economic and environmental estimation assessment of floating solar PV power generation on Akosombo dam reservoir in Ghana. Energy Rep. 2023, 10, 2740–2755. [Google Scholar] [CrossRef] [Scilit]
- Kazemi-Robati, E.; Silva, B.; Bessa, R.J. Stochastic optimization framework for hybridization of existing offshore wind farms with wave energy and floating photovoltaic systems. J. Clean. Prod. 2024, 454, 142215. [Google Scholar] [CrossRef] [Scilit]
- Golroodbari, S.; Vaartjes, D.; Meit, J.; van Hoeken, A.; Eberveld, M.; Jonker, H.; van Sark, W. Pooling the cable: A techno-economic feasibility study of integrating offshore floating photovoltaic solar technology within an offshore wind park. Sol. Energy 2021, 219, 65–74. [Google Scholar] [CrossRef] [Scilit]
- Garrod, A.; Neda Hussain, S.; Ghosh, A.; Nahata, S.; Wynne, C.; Paver, S. An assessment of floating photovoltaic systems and energy storage methods: A comprehensive review. Results Eng. 2024, 21, 101940. [Google Scholar] [CrossRef] [Scilit]
- Jurasz, J.; Tomczyk, P.; Bochenek, B.; Kuriqi, A.; Kasiulis, E.; Chen, D.; Ming, B. Solar-hydro cable pooling – Utilizing the untapped potential of existing grid infrastructure. Energy Convers. Manag. 2024, 306, 118307. [Google Scholar] [CrossRef] [Scilit]
- Li, Y.; Janik, P.; Schwarz, H. Cable Pooling for Extending the Share of Renewable PV and Wind Generation—A Regional Perspective. In Proceedings of the 2023 International Conference on Clean Electrical Power (ICCEP); Terrasini, Italy, 27–29 June 2023, pp. 487–491. [CrossRef] [Scilit]
- Mertens, S. Design of wind and solar energy supply, to match energy demand. Clean. Eng. Technol. 2022, 6, 100402. [Google Scholar] [CrossRef] [Scilit]
- Obradović, K.; Dkhili, N.; Sied, M.E.; Réthoré, P.E.M.; Das, K. From the idea to construction: Aspects of relevance of the optimized physical design of renewable hybrid power plants. Sustain. Energy Technol. Assess. 2025, 78, 104325. [Google Scholar] [CrossRef] [Scilit]
- Dekker, N.J.; Slooff, L.H.; Jansen, M.J.; de Graaff, G.; Hovius, J.; Jonkman, R.; Zuurbier, J.; Pronk, J. Wind turbine dynamic shading: The effects on combined solar and wind farms. J. Renew. Sustain. Energy 2023, 15, 063703. [Google Scholar] [CrossRef] [Scilit]
- Elkadeem, M.R.; Younes, A.; Jurasz, J.; AlZahrani, A.S.; Abido, M.A. A spatio-temporal decision-making model for solar, wind, and hybrid systems—A case study of Saudi Arabia. Appl. Energy 2025, 383, 125277. [Google Scholar] [CrossRef] [Scilit]
- Gursoy, G.; Baysal, M. Improved optimal sizing of hybrid PV/wind/battery energy systems. In Proceedings of the 2014 International Conference on Renewable Energy Research and Application (ICRERA), Milwaukee, WI, USA, 19–22 October 2014; pp. 713–716. [Google Scholar] [CrossRef] [Scilit]
- Ukoima, K.N.; Okoro, O.I.; Obi, P.I.; Akuru, U.B.; Davidson, I.E. Optimal Sizing, Energy Balance, Load Management and Performance Analysis of a Hybrid Renewable Energy System. Energies 2024, 17, 5275. [Google Scholar] [CrossRef] [Scilit]
- Ahmed, M.R.; Hasan, M.R.; Al Hasan, S.; Aziz, M.; Hoque, M.E. Feasibility Study of the Grid-Connected Hybrid Energy System for Supplying Electricity to Support the Health and Education Sector in the Metropolitan Area. Energies 2023, 16, 1571. [Google Scholar] [CrossRef] [Scilit]
- Medina-Santana, A.A.; Cárdenas-Barrón, L.E. Optimal Design of Hybrid Renewable Energy Systems Considering Weather Forecasting Using Recurrent Neural Networks. Energies 2022, 15, 9045. [Google Scholar] [CrossRef] [Scilit]
- Kusakana, K.; Vermaak, H.; Numbi, B. Optimal sizing of a hybrid renewable energy plant using linear programming. In Proceedings of the IEEE Power and Energy Society Conference and Exposition in Africa: Intelligent Grid Integration of Renewable Energy Resources (PowerAfrica), Johannesburg, South Africa, 9–13 July 2012; pp. 1–5. [Google Scholar] [CrossRef] [Scilit]
- Arfa, M.; Bilal, M.; Muhammad, F. An Optimization Approach Towards Optimal Sizing of Stand-Alone Microgrid with Renewable Energy Sources and Battery Management System. In Proceedings of the 2024 International Conference on Frontiers of Information Technology (FIT), Islamabad, Pakistan, 9–10 December 2024; pp. 1–5. [Google Scholar] [CrossRef] [Scilit]
- Ashagire, A.A.; Adjallah, K.H.; Bekele, G. Optimal sizing of Hybrid energy Sources by Using Genetic Algorithm and Particle Swarm Optimization algorithms considering Life Cycle Cost. In Proceedings of the 2021 International Conference on Electrical, Computer, Communications and Mechatronics Engineering (ICECCME), Mauritius, Mauritius, 7–8 October 2021; pp. 1–6. [Google Scholar] [CrossRef] [Scilit]
- van Druten, E.; van Wieringen, S. Cable pooling to add renewables amid grid congestion: Exploring optimal integration of solar and batteries with existing onshore wind under cost uncertainty. Sustain. Energy Grids Netw. 2025, 44, 101971. [Google Scholar] [CrossRef] [Scilit]
- Mohamed, M.A.; Shadoul, M.; Yousef, H.; Al-Abri, R.; Sultan, H.M. Multi-agent based optimal sizing of hybrid renewable energy systems and their significance in sustainable energy development. Energy Rep. 2024, 12, 4830–4853. [Google Scholar] [CrossRef] [Scilit]
- Saidi, M.; Li, Z.; Elghali, S.B.; Outbib, R. Optimal Sizing of hybrid grid-connected energy system with demand side scheduling. In Proceedings of the IECON 2019—45th Annual Conference of the IEEE Industrial Electronics Society, Lisbon, Portugal, 14–17 October 2019; pp. 2209–2214. [Google Scholar] [CrossRef] [Scilit]
- Teixeira, R.; Cerveira, A.; Silva, A.; Baptista, J. Hybrid renewable energy system optimisation for application in the winemaking sector. In Proceedings of the 2024 IEEE 22nd Mediterranean Electrotechnical Conference (MELECON), Porto, Portugal, 25–27 June 2024; pp. 272–277. [Google Scholar] [CrossRef] [Scilit]
- Fam, A.M.; Lehtonen, M.; Pourakbari-Kasmaei, M.; Fotuhi-Firuzabad, M. Optimal Sizing of a Wind-PV Grid-Connected Hybrid System for Base Load—Helsinki Case. In Proceedings of the 2023 19th International Conference on the European Energy Market (EEM), Lappeenranta, Finland, 6–8 June 2023; pp. 1–6. [Google Scholar] [CrossRef] [Scilit]
- Aksan, F.; Janik, P.; Suresh, V. Multivariate Multi-step Forecasting for Cable Pooling Applications. In Proceedings of the 2023 International Conference on Clean Electrical Power (ICCEP), Terrasini, Italy, 27–29 June 2023; pp. 237–244. [Google Scholar] [CrossRef] [Scilit]
- Canales, F.A.; Jurasz, J. Assessing micro-scale solar-wind-hydro complementarity in a mountainous catchment through the stability coefficient. Sustain. Energy Technol. Assess. 2025, 82, 104537. [Google Scholar] [CrossRef] [Scilit]
- Roman, J.; Klojzy-Karczmarczyk, B.; Wróblewski, R.; Ceran, B. Analysis of the use of waste gasification in a hybrid generation system to supply an industrial demand and power grid through cable pooling. Renew. Energy 2025, 244, 122721. [Google Scholar] [CrossRef] [Scilit]
- Rens, G.; Nair, R.; Save, N. Sensor Technology in a Changing Electrical Grid. IET Conf. Proc. 2021, 2021, 2276–2279. [Google Scholar] [CrossRef] [Scilit]
- Szypowski, M.; Siewierski, T.; Wędzik, A. Optimization of Energy-Supply Structure in Residential Premises Using Mixed-Integer Linear Programming. IEEE Trans. Ind. Electron. 2019, 66, 1368–1378. [Google Scholar] [CrossRef] [Scilit]
- National Wind Technology Center (NREL). NREL Annual Technology Baseline (ATB)—Utility-Scale Battery Storage. 2024. Available online: https://atb.nrel.gov/electricity/2024/utility-scale_battery_storage (accessed on 15 May 2025).
- Wiser, R.; Bolinger, M. Benchmarking Anticipated Wind Project Lifetimes: Results from a Survey of U.S. Wind Industry Professionals. Report, Lawrence Berkeley National Laboratory, Electricity Markets & Policy Group. 2019. Available online: https://eta-publications.lbl.gov/sites/default/files/wind_useful_life_report.pdf (accessed on 10 April 2025).
- U.S. Department of Energy (DOE)-Energy Technologies Office. End-of-Life Management for Solar Photovoltaics. 2025. Available online: https://www.energy.gov/eere/solar/end-life-management-solar-photovoltaics (accessed on 15 May 2025).
- Photovoltaic Geographical Information System (PVGIS). API Non-Interactive Service. 2025. Available online: https://joint-research-centre.ec.europa.eu/photovoltaic-geographical-information-system-pvgis/getting-started-pvgis/api-non-interactive-service_en (accessed on 15 May 2025).
- Polskie Sieci Elektroenergetyczne S.A. (PSE S.A.). Rynkowa Cena Energii Elektrycznej (RCE)-Dane Archiwalne. 2025. Available online: https://www.pse.pl/dane-systemowe/funkcjonowanie-rb/raporty-dobowe-z-funkcjonowania-rb/podstawowe-wskazniki-cenowe-i-kosztowe/rynkowa-cena-energii-elektrycznej-rce (accessed on 10 June 2025).
- FICO ® Xpress Optimization. FICO ® Xpress: Optimizer Reference Manual & Mosel User Guide. 2025. Available online: https://www.fico.com/en/products/fico-xpress-optimization (accessed on 10 February 2025).
- Viswanathan, V.; Mongird, K.; Franks, R.; Li, X.; Sprenkle, V.; Baxter, R. 2022 Grid Energy Storage Technology Cost and Performance Assessment. Technical Report, Pacific Northwest National Laboratory (PNNL). 2022. Available online: https://www.pnnl.gov/sites/default/files/media/file/ESGC%20Cost%20Performance%20Report%202022%20PNNL-33283.pdf (accessed on 10 April 2025).
- Sanchez, C. Auxiliary Power and Losses for PV and BESS Projects—Part 2. 2024. Available online: https://www.linkedin.com/pulse/auxiliary-power-losses-pv-bess-projects-part-2-sanchez-p-e–ypgic/ (accessed on 10 April 2025).
- International Renewable Energy Agency (IRENA). Renewable Power Generation Costs in 2023. Report, International Renewable Energy Agency (IRENA), Abu Dhabi. 2024. Available online: https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2024/Sep/IRENA_Renewable_power_generation_costs_in_2023.pdf (accessed on 15 May 2025).
- Elżbieciak, T. Rynek Mocy 2024: Fala MagazynóW Energii i MałA Namiastka Gazu. 2024. Available online: https://wysokienapiecie.pl/106689-morska-energetyka-wiatrowa-czas-na-dzialanie/ (accessed on 10 June 2025).
- Urząd Regulacji Energetyki (URE). Aukcje OZE 2024—Dane Archiwalne. 2025. Available online: https://www.ure.gov.pl/pl/urzad/informacje-ogolne/aktualnosci/12358,Aukcje-OZE-2024-16-TWh-energii-elektrycznej-o-wartosci-51-mld-zl-Prezes-URE-pods.html (accessed on 10 June 2025).
- de Jong, C. The Future Is Green—The Financials of Renewable Power and PPA Contracts. 2020. Available online: https://www.europeangashub.com/wp-content/uploads/2020/05/The-future-is-green-the-financials-of-renewable-power-and-PPA-contracts-1.pdf (accessed on 10 April 2025).
- European Commission, Directorate-General for Regional and Urban Policy. Guide to Cost-Benefit Analysis of Investment Projects—Economic Appraisal Tool for Cohesion Policy 2014–2020. Guide, European Commission, 2014. Available online: https://ec.europa.eu/regional_policy/sources/studies/cba_guide.pdf (accessed on 15 May 2025).
- Polskie Sieci Elektroenergetyczne S.A. (PSE S.A.). Taryfy Dla Energii Elektrycznej. 2025. Available online: https://www.pse.pl/dokumenty (accessed on 10 June 2025).
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.