A Column-and-Constraint Elimination Method for Model Simplification of Local Energy Markets

,
,
,
,
,
,
and
1
China Southern Power Grid Co., Ltd., Guangzhou 510663, China
2
State Key Laboratory of Power System Operation and Control, Department of Electrical Engineering, Tsinghua University, Beijing 100084, China
*
Author to whom correspondence should be addressed.
Energies2026, 19(23), 5775;https://doi.org/10.3390/en19235775 
(registering DOI)
This article belongs to the Special Issue Next-Generation Grid Flexibility: Technologies, Control Strategies and Market Designs

Abstract

Local energy markets (LEMs) enable the coordination of distributed energy resources (DERs), but their optimization models suffer from high dimensionality and tightly coupled constraints. This paper proposes a column-and-constraint elimination (C&CE) framework for LEM model simplification, which simplifies the LEM model in both the variable and the constraint dimensions within a unified Fourier–Motzkin elimination (FME) process. First, a method is developed to efficiently identify and remove redundant constraints. Second, a constraint merging strategy based on geometric clustering is introduced to control constraint growth while preserving the essential structure of the feasible region. Unlike existing projection methods that rely on predefined geometric approximations, the proposed framework directly exploits the structural information of the original high-dimensional polytope without imposing shape assumptions. Case studies on a modified IEEE 33-bus system show that the proposed method significantly mitigates the constraint growth of FME, reducing constraint size by over 60% while maintaining an F-score above 97%. In a market clearing test on the IEEE 30-bus system, the simplified model reproduces the cleared power of the original model with a Mean Absolute Percentage Error of 2.97%. The results demonstrate that the proposed C&CE framework provides an accurate tool for LEM aggregation.

1. Introduction

With the increasing penetration of renewable energy, power systems are facing escalating challenges in maintaining the real-time balance between supply and demand [1]. At the same time, the deployment of advanced metering infrastructure and the Internet of Things has made a large population of low-voltage distributed energy resources (DERs) observable and controllable, so that air-conditioning systems, electric vehicles, distributed generators (DGs) and energy storage systems (ESSs) can respond to market signals and provide operational flexibility [2].
Despite their considerable flexibility potential, DERs are individually too small to participate directly in wholesale electricity markets, and coordinating them requires an intermediary. The local energy market (LEM) has emerged for this purpose. It aggregates the DERs connected to a local distribution network and represents them in the wholesale market. In this paper, the LEM is jointly operated by DER aggregators and distribution system operators (DSOs). By integrating DER operational constraints with distribution network constraints, the LEM constructs an aggregated flexibility model at the point of common coupling (PCC), which is subsequently submitted to the independent system operator (ISO) for participation in wholesale market clearing, as illustrated in Figure 1.
Figure 1. Framework of LEM participation in wholesale electricity markets.
There are generally two approaches for LEM participation in wholesale electricity markets. In the first approach, the LEM submits conventional price-quantity bidding curves, similar to those used by traditional generating units. However, due to the strong heterogeneity of DERs, this approach often leads to conservative estimations of system flexibility. In the second approach, the LEM directly submits a detailed flexibility model that preserves the heterogeneous characteristics of DERs. Although this approach can more effectively exploit the flexibility potential of DERs, the resulting optimization model may contain a large number of variables and constraints [3], thereby substantially increasing the computational burden of market clearing. Therefore, efficient model simplification is a critical technology for facilitating LEM participation in wholesale electricity markets.
Existing studies on model simplification can generally be categorized into constraint reduction methods and variable reduction methods. Constraint reduction methods aim to decrease the number of constraints while preserving the original feasible region as accurately as possible. Existing approaches mainly include redundancy identification, approximate screening, and data-driven methods. Some studies define the minimum set of constraints required to fully characterize a feasible region as umbrella constraints and identify redundant constraints through repeated optimization [4,5]. Although such methods can achieve exact simplification, they require solving a large number of auxiliary optimization models, leading to substantial computational burden. Other studies employ sensitivity analysis or worst-case analysis to rapidly screen out constraints that are unlikely to become active [6,7,8]. Relax-and-tighten strategies have been proposed to dynamically introduce constraints during the optimization process [7,9]. However, these methods are generally objective-dependent and cannot guarantee equivalence under arbitrary operating conditions. More recently, data-driven approaches have been developed to identify critical constraint patterns from historical operating data [10,11,12,13]. Nevertheless, challenges regarding generalization capability and interpretability of the data-driven approaches remain unresolved.
Variable reduction methods focus on eliminating internal decision variables while retaining only the variables relevant to external market interactions, thereby simplifying the overall model. In the context of the simplex method for linear programming (LP), this process is equivalent to column elimination; accordingly, these methods are also referred to as column elimination methods. For LEMs, the objective is typically to preserve the power variables at the PCC. Geometrically, this process can be formulated as the projection of high-dimensional polytopes. Existing approaches mainly rely on approximating the Minkowski sum of DER feasible regions. Relaxation-based methods can efficiently generate outer approximations [3], while box-based [14], ellipsoidal [15], and zonotope-based methods [16] provide different forms of inner approximations. Some studies further incorporate distribution network constraints, thereby transforming the aggregation problem into a general polytope projection problem [17,18,19]. However, these methods aim to completely eliminate internal variables when simplifying the feasible regions, which requires various approximation techniques. Most existing methods assume predefined geometric structures for the resulting feasible region, which limits their ability to fully exploit the structural characteristics of the original model and achieve more accurate approximations.
To address the limitations of existing studies, this paper proposes a unified column-and-constraint elimination (C&CE) framework for LEM model simplification. The proposed method integrates constraint elimination and column elimination into a unified modeling framework by alternately reducing redundant constraints and eliminating internal decision variables. Unlike existing approaches that aim to completely eliminate internal variables with predefined structures, the proposed framework recognizes that, in LEM applications, standardized interaction models are not required. Instead, the elimination process can be terminated at a user-defined level of simplification, thereby reducing computational complexity. Fourier–Motzkin elimination (FME) is adopted as the projection engine because it is exact and does not require assuming a predefined shape for the aggregated feasible region. Since the difficulty of FME lies in the intermediate constraints it generates, redundant constraint identification and constraint merging methods are proposed to keep the constraint scale bounded and thereby alleviate the computational burden. The main contributions of this paper are summarized as follows:
(1)
A fast redundant constraint identification method is proposed. By exploiting the active-constraint information revealed by optimal solutions, the proposed method significantly reduces the number of redundancy checks and identifies a compact constraint set that preserves the feasible region.
(2)
An LP-based constraint merging method is developed to further control the constraint scale. The proposed method preserves the structural characteristics of the original polytope while enabling flexible trade-offs between approximation accuracy and computational complexity.
(3)
A unified C&CE framework is established by embedding the proposed constraint reduction methods into FME, thereby effectively suppressing the constraint growth during column elimination while maintaining the geometric characteristics of the original feasible region.
The remainder of this paper is organized as follows. Section 2 introduces the original LEM model. Section 3 presents the proposed constraint reduction methods, including redundant constraint identification and constraint merging. Section 4 develops the proposed C&CE framework and its application to LEM model simplification. Section 5 presents numerical case studies. Finally, Section 6 concludes the paper.

2. The Original Model of LEM

To participate in wholesale electricity markets, an LEM must first establish an operational model and submit it to the ISO. This model serves as the basis for market clearing and is used to determine the power exchange schedule between the LEM and the upstream transmission system. Since the LEM aggregates large numbers of heterogeneous DERs while simultaneously considering the operational constraints of the distribution network, the resulting model typically exhibits high dimensionality and strong coupling characteristics. Therefore, constructing an accurate yet tractable operational model is a prerequisite for efficient market participation. This section introduces the original LEM model considered in this paper, including the DER flexibility models and the distribution network power flow model.

2.1. DER Power Flexibility Model

Different types of DERs possess distinct operational characteristics and flexibility mechanisms. To demonstrate the modeling process of general DERs, DGs and ESSs are taken as representative examples in this subsection.
For DGs, the operational flexibility is mainly constrained by generation capacity limits and ramping capabilities. Accordingly, the flexibility region of a DG can be described by the following linear constraints:
P _ DG ≤ P t DG ≤ P ¯ DG
− δ _ DG ≤ P t − 1 DG − P t DG ≤ δ ¯ DG
where PDG is the output power of DG; δ is the ramping rate; overline and underline represent the upper and lower boundaries; t is the time index.
Since the DG model only involves interface power variables and does not contain internal state variables, its feasible operating region can be directly represented as a polytope in the interface power space:
A DG P DG ≤ b DG
Compared with DGs, some DERs involve more complicated dynamic behaviors and coupled operating modes. ESSs, for example, contain an internal dynamic state variable, namely the state of charge (SOC), and simultaneously involve charging and discharging operating modes. The operational constraints of ESSs can therefore be modeled as [20]:
P t ESS = P t ESS , out − P t ESS , in
P _ ESS , in / out ≤ P t ESS , in / out ≤ P ¯ ESS , in / out
E t ESS = η ESS E t − 1 ESS + Δ T α ESS , in P t ESS , in − α ESS , out P t ESS , out
E _ ESS ≤ E t ESS ≤ E ¯ ESS
where PESS and EESS denote the power and SOC of ESS, respectively; η denotes the self-discharge coefficient; α represents the charging and discharging efficiencies; superscripts in and out denote charging and discharging modes, respectively; and ΔT denotes the scheduling interval.
Different from the DG model, model (3) contains equality constraints and internal state variables E t ESS , which increase the dimensionality and coupling complexity of the feasible region. By adopting the method proposed in [21], the equality constraints and internal state variables can be eliminated, thereby transforming the original high-dimensional feasible region into a lower-dimensional polytope in the interface power space, denoted as:
A ESS P ESS ≤ b ESS
In general, through appropriate variable elimination and model transformation procedures, the feasible regions of most commonly used DERs can ultimately be represented as polytopes in the interface power space, similar to (1) and (3). This unified polytope representation provides the foundation for the subsequent modeling and simplification of the LEM model.

2.2. System Power Flow Model

In addition to the operational constraints of individual DERs, the aggregated flexibility of an LEM is also restricted by the security constraints of the underlying distribution network. Since most distribution systems exhibit radial topologies, the LinDistFlow model is adopted in this paper to characterize the network power-flow constraints [22]:
p j = ∑ k : j → k P jk − ∑ i : i → j P ij ,   ∀ j ∈ N
q j = ∑ k : j → k Q jk − ∑ i : i → j Q ij ,   ∀ j ∈ N
v j = v i − 2 r ij P ij + x ij Q ij ,   ∀ ( i , j ) ∈ E
v _ j ≤ v j ≤ v j ¯ ,   ∀ j ∈ N
where r and x denote the branch resistance and reactance, respectively; v denotes the squared magnitude of the nodal voltage; N and E denote the sets of buses and branches, respectively; and the time index t is omitted for simplicity.
The above model describes the power balance and voltage security constraints of the distribution network. Since the LEM only interacts with the wholesale electricity market through the PCC, many internal network variables are irrelevant to external market clearing. According to the formulation proposed in [19], these irrelevant variables can be eliminated, thereby transforming the original network model into a compact polytope in the interface node power space:
… A n sys   … ⋮ P n ⋮ ≤ b sys  
where n ∈ N is the node index; and Pn is the power vector at node n.
By integrating the DER flexibility models with the distribution network constraints, the overall LEM model can be formulated as follows:
min P k , Q k ∑ k ∈ K z k P k
s . t . :   A k P k ≤ b k , Q k = P k tan ϕ , ∀ k ∈ K
P n = ∑ k ∈ K n P k , ∀ n ∈ N  
Constraint ( 6 )
where zk denotes the operational cost for DERk; K denotes the set of DERs; K n denotes the set of DERs connected to node n; and all DERs are assumed to operate under a constant power factor ϕ.
Since the nodal power injection is linear combination of the DER power, and the power-flow constraints are linear constraints on the power injection, (6), the power-flow constraints are likewise linear constraints on the DER power. Consequently, only the active power of the DERs need to be retained as decision variables, which is precisely the form of model (7). Nevertheless, the numbers of both variables and constraints still grow with the number of DERs and the number of scheduling periods, so that for a large population of DERs and a long horizon the model remains high-dimensional and strongly coupled. Directly submitting such a large-scale model to the ISO would significantly increase the computational burden of wholesale market clearing. Therefore, efficient model simplification methods are required to reduce the model scale while preserving the essential flexibility characteristics of the original feasible region.

3. Constraint Reduction Methods

As shown in (7), the LEM model can become highly complex when coordinating large numbers of heterogeneous DERs over multiple time periods. The resulting optimization problem may contain massive numbers of variables and constraints, which significantly increases the computational burden when integrating the model into wholesale market clearing. Therefore, before developing the overall model simplification framework, this section first presents two constraint reduction methods, namely redundant constraint identification and constraint merging. These methods will subsequently be embedded into the proposed C&CE framework to improve the tractability of large-scale LEM models.

3.1. Redundant Constraint Identification

A large number of constraints can substantially increase the computational burden of optimization problems. Fortunately, for highly complex models, many constraints may in fact be redundant. A constraint is considered redundant if its removal does not alter the feasible region of the original polytope. Therefore, redundancy identification provides an effective approach for reducing model complexity while preserving exact feasibility characteristics.
Given a polytope represented by Ax ≤ b, the redundancy of each constraint can be checked by repeatedly solving the following LP problem [23]:
min s i , x i s i , i ∈ I
s . t . :   A x i ≤ b
a i x i + s i ≥ b i
s i ≥ 0
where Axi ≤ b denotes the original polytope containing potentially redundant constraints; ai denotes the normalized row vector corresponding to the i-th constraint; I denotes the index set of constraints; and si is a slack variable whose geometric interpretation corresponds to the minimum distance required to shift the target constraint so that it becomes non-redundant. Figure 2 illustrates the principle of this redundancy identification.
Figure 2. An illustration of the redundant constraint identification. The closed area formed by the red lines represents the minimal representation of the polytope. The blue lines indicate the redundant constraints, which are at a distance of si from the green dotted lines passing through an extreme vertex of the minimally represented polytope.
The LP problem in (8) must be solved repeatedly for all I constraints. Specifically, si = 0 indicates that the corresponding constraint is non-redundant, whereas si > 0 implies redundancy. Although LP problems can generally be solved efficiently, the computational burden still grows significantly with the scale of the original model. In practice, the overall complexity of redundancy identification exhibits an approximately quadratic relationship with the number of constraints. Consequently, directly performing exhaustive redundancy checks becomes computationally inefficient for large-scale models.
To improve computational efficiency, the proposed method further exploits the active-constraint information obtained during the optimization process. Specifically, after solving (8) for a given constraint, the optimal solution shifts the target constraint onto an extreme point of the feasible region. This extreme point is determined by a set of active tight constraints, which can be identified from the optimal value of constraints Axi ≤ b. When an equality holds, the corresponding constraint is active at the optimal solution, and retaining it preserves the completeness of the feasible region. It is therefore retained in the constraint set and marked, so that (8) is not solved again for it in the subsequent checks. A redundant constraint may survive at a degenerate vertex, but no non-redundant row is discarded and the feasible region is unaffected. By utilizing this information, many constraints can be directly accepted without explicitly solving additional redundancy-checking LPs. As a result, the overall computational burden can be substantially reduced.
The overall procedure of the proposed redundant constraint identification method is summarized in Algorithm 1. If |aix* − bi| falls below a prescribed tightness tolerance ϵ = 10−8, constraint i is active at the optimal solution x* of (8) and is retained in the constraint set.
Algorithm 1 Redundant Constraint Identification
1:Input: Original polytope (A, b);
2:Normalize the polytope (A, b);
3:Remove rows in (A, b) with b i = ∞ , i ∈ I ;
4:Remove duplicate rows in (A, b);
5: M ← ∅
6:for i = m,m − 1,…,1 do
7: if  i ∈ M  then
8:  continue;
9: end if
10: x* ← solve problem (8)
11:  M ← M ∪ i | a i x * − b i < ϵ }
12: if |aix* − bi| > ϵ then
13:  Delete constraint row i from (A, b);
14: end if
15:end for
16:return (A, b).

3.2. Constraint Merging

In practical LEM applications, even after redundant constraints are removed, the remaining constraint set may still be excessively large due to the aggregation of numerous DERs. Moreover, many constraints may exhibit highly similar geometric characteristics. Preserving all such constraints often provides only marginal improvements in approximation accuracy while significantly increasing computational complexity. Therefore, a constraint merging method is further proposed to control the constraint scale.
From a geometric perspective, each constraint corresponds to a facet of the polytope. The proposed method first applies K-means clustering to the set of facet normal vectors and then replaces each cluster with a representative facet corresponding to the cluster center. The number of clusters is set equal to the target constraint scale M of Algorithm 2, so that the number of merged facets after replacement approximates the prescribed constraint budget. A cluster containing a single constraint is kept unchanged, whereas a cluster with two or more constraints is merged into a single representative constraint. In this way, multiple geometrically similar constraints can be merged into a smaller number of representative constraints, thereby reducing the overall facet scale.
Different from conventional methods that rely on predefined facet directions, the proposed method directly exploits the geometric information embedded in the original polytope by identifying and merging similar facets. To ensure that the resulting polytope remains an inner approximation of the original feasible region, the right-hand-side (RHS) values of the new facets must be carefully determined so that all newly generated facets remain inside the original polytope. For each merged facet, the corresponding RHS value bm is determined through the following two-level optimization problem:
max b m  
s . t . :   max x j ∈ Ω j c j ⊤ x j ≤ d j , j ∈ J
Ω j = x j | a m ⊤ x j ≤ b m A ′ x j ≤ b ′
where am and bm denote the normal vector and RHS value of the merged facet determined by the cluster center; J denotes the set of original facets being replaced; and A′ and b′ denote the remaining facets retained in the polytope.
The inner maximization in (9) guarantees that every feasible point in the reduced polytope also satisfies the original constraints. Therefore, the resulting reduced polytope always forms an inner approximation of the original feasible region.
To solve (9), the inner optimization problem can be replaced by its dual according to LP duality theory, yielding:
max b m
  s . t . :   ω j ⊤ b ′ + v j b m ≤ d j , j ∈ J
ω j ⊤ A ′ + v j a m ⊤ = c j ⊤ , j ∈ J
ω j ≥ 0 , v j ≥ 0 , j ∈ J
Although (10) is a bilinear optimization problem, its geometric structure can be further exploited to avoid expensive global optimization procedures. Figure 3 illustrates the basic idea of the proposed facet-merging process, where similar facets in the original polytope are replaced by a single merged facet.
Figure 3. Illustration of the original polytope (red) and the reduced polytope after constraint merging (blue).
The optimization problem in (10) is bilinear and generally requires iterative solution procedures based on spatial branch-and-bound algorithms. Although commercial solvers can handle such problems, the repeated branching process may still incur considerable computational burden when the number of constraints is large. Fortunately, the optimization problem admits a clear geometric interpretation. Specifically, the newly generated facet is expected to be located near the original facets being merged. This geometric property can be further exploited to avoid expensive global branching procedures.
Moreover, the constraints in (10) are naturally separable with respect to each j ∈ J . Therefore, a divide-and-conquer strategy can be adopted to decompose the original problem into a series of smaller and more tractable subproblems. Consider the following equivalent reformulation of (10):
max b m
s . t . :   ω j ⊤ b ′ + v j b mj ≤ d j ,   j ∈ J
ω j ⊤ A ′ + v j a m ⊤ = c j ⊤ ,   j ∈ J
ω j ≥ 0 , v j ≥ 0 ,   j ∈ J
b m ≤ b mj ,   j ∈ J
Since the constraints associated with different j are decoupled, the above problem can be further decomposed into independent subproblems:
b m = min j ∈ J b mj
min − b mj
s . t . :   ω j ⊤ b ′ + v j b mj ≤ d j
ω j ⊤ A ′ + v j a m ⊤ = c j ⊤
ω j ≥ 0 , v j ≥ 0
The decomposed formulation in (12) indicates that the original optimization problem can be solved by independently analyzing each facet to be replaced and subsequently selecting the most restrictive result. This decomposition substantially reduces the complexity of the original bilinear optimization problem.
Although the subproblem (12) remains bilinear, its structure is significantly easier to analyze. To further derive an efficient solution method, the Karush–Kuhn–Tucker (KKT) conditions of the subproblem are studied:
∇ − b m − r d − ω ⊤ b ′ − v b m − s ⊤ c − A ′ ⊤ ω − v a m − r ′ ⊤ ω − r ″ v = 0
r d − ω ⊤ b ′ − v b m = 0 , r ′ ⊤ ω = 0 , r ″ v = 0
d − ω ⊤ b ′ − v b m ≥ 0 , ω ≥ 0 , v ≥ 0
c − A ′ ⊤ ω − v a m = 0
r ≥ 0 , r ′ ≥ 0 , r ″ ≥ 0
where the subscript j is omitted for simplicity.
From the KKT conditions in (13), the following necessary conditions for the optimal solution can be obtained:
b m = d − ω ⊤ b ′ v
A ′ ⊤ a m ω v = c
ω ≥ 0 , v > 0
Equation (14) reveals that the optimal bm depends solely on ω and v. More importantly, (14) admits a direct geometric interpretation. Since ω > 0 and v > 0, vector c can be interpreted as a conical combination of the columns in A ′ ⊤ a m . The corresponding combination coefficients then determine the optimal bm according to (14).
In general, many feasible conical combinations may exist, making it difficult to directly identify the globally optimal solution while avoiding local optima. However, the geometric characteristics of the problem can be further utilized to significantly narrow the search space.
In (14), ω corresponds to the dual variables of the inner LP problem in (9), implying that nonzero coefficients correspond to active constraints. Since am is generated from clustering neighboring facets, vectors am and c are typically close to each other in Euclidean space. Intuitively, facets whose normal vectors are geometrically close to c are more likely to become active in the optimal solution. Based on this observation, (14) can be reformulated as the following LP problem:
min 1 ⊤ w + v
s . t . :   A ′ ⊤ a m ω v = c
The objective of (15) is to identify a sparse conical combination composed of neighboring facets. Geometrically, when all participating vectors are perfectly aligned with c, the objective achieves its minimum value of 1. As the participating vectors become increasingly diverse, the objective value correspondingly increases. Therefore, the LP naturally favors nearby facets with similar geometric orientations.
In practice, (15) can be solved very efficiently and directly provides the values of ω and v associated with the optimal merged facet. Consequently, (14) together with (15) provides a computationally efficient surrogate for the bilinear problem (12). Note that (15) is a heuristic, since minimizing the sum of the coefficients does not guarantee the maximum feasible RHS of (12). As a result, the entire constraint merging process is transformed into a sequence of LP problems. Furthermore, the trade-off between approximation accuracy and computational efficiency can be flexibly controlled by adjusting the target number of merged constraints.
The complete procedure of the proposed constraint merging method is summarized in Algorithm 2.
Algorithm 2 Constraint Merging
1:Input: Original polytope (A, b), target constraint scale M ;
2:Normalize the polytope (A, b);
3:Perform K-means clustering on the row vectors of A to divide constraints into M clusters;
4:Normalize cluster centers a m , m ∈ M ;
5:for  m ∈ M  do
6: Solve (15) to obtain optimal dual variables ωj and vj;
7: Calculate bm according to (12) and (14);
8:end for
9: A ′ ← ⋯ , a m , ⋯ ⊤ ;
10: b ′ ← ⋯ , b m , ⋯ ′ ;
11:return (A’, b’).

4. C&CE Method for LEM Model Simplification

In addition to reducing the number of constraints, another important approach for simplifying the LEM model in (7) is to reduce the number of decision variables. From the perspective of the ISO, the LEM is generally treated as an aggregated entity, and the primary concern is its external characteristics, namely the feasible region of interface power exchange at the PCC. Therefore, the original optimization model can be significantly simplified by eliminating part of the internal state variables while retaining the interface power variables relevant to market interaction.
Since the number of interface power variables is typically proportional only to the number of scheduling periods, whereas the number of internal variables scales with the number of DERs and network states, substantial model reduction can potentially be achieved. When only the interface power variables are preserved, the original feasible region in (7) can be reformulated as the following projection problem:
A k P k ≤ b k   P agg … A n sys … ⋮ P n ⋮ ≤ b sys P n = ∑ k ∈ K n P k , P agg = ∑ k ∈ K P k  
Note that due to the high computational burden of projection calculations, only a subset of internal variables may be eliminated in practice to achieve a balanced computational complexity.
Geometrically, eliminating internal variables corresponds to projecting a high-dimensional polytope onto a lower-dimensional space. To achieve this projection, FME, which is a classical projection algorithm, can be adopted. However, the computational complexity of FME increases exponentially with the projection dimension. Specifically, each application of FME eliminates one variable dimension while simultaneously generating a large number of new constraints. As the elimination process proceeds iteratively, the number of constraints grows exponentially, quickly rendering the computation intractable for large-scale problems. Fortunately, a substantial portion of the newly generated constraints are redundant. Therefore, the redundant constraint identification method proposed in Section 3.1 (Algorithm 1), which tests redundancy by maximizing the slack in the LP (8) and reuses the active-constraint information of each solution to avoid solving one LP per row, can be embedded after each FME operation to remove unnecessary constraints and improve computational tractability. In particular, the proposed acceleration strategy can significantly reduce the computational burden associated with repeated redundancy checking.
Nevertheless, even after redundancy elimination, the projected feasible region may still contain a very large number of non-redundant constraints. This phenomenon is mainly caused by the existence of numerous locally similar facets in the exact projection result. Although these facets capture detailed geometric structures of the original polytope, preserving all such details often yields only marginal improvements in approximation accuracy while substantially increasing computational complexity. Therefore, the proposed constraint merging method (Algorithm 2), which is formulated as the optimization problem (9) and solved as the sequence of LPs given by (12)–(15), is further embedded after each FME iteration to explicitly control the number of constraints during the projection process. The merging is an inner approximation chosen deliberately, so the simplified model never admits a dispatch the original LEM cannot deliver. It bounds the number of constraints while preserving the essential geometry of the original feasible region. The complete procedure of the proposed framework is summarized in Algorithm 3 and illustrated in Figure 4.
Figure 4. Illustration of the proposed C&CE framework.
Since the proposed framework embeds constraint elimination into the process of column elimination (variable elimination), it is referred to as the column-and-constraint elimination (C&CE) method. By jointly integrating FME, redundant constraint identification, and constraint merging into a unified iterative framework, the proposed method enables efficient projection and simplification of large-scale feasible regions. Compared with existing projection-based methods, the proposed approach does not rely on predefined geometric assumptions regarding the projected feasible region. Instead, it directly exploits the structural and geometric information embedded in the original high-dimensional model, thereby enabling more accurate approximation of aggregated flexibility. Moreover, by explicitly controlling the constraint scale during the projection process, the proposed framework achieves a better balance between approximation accuracy and computational efficiency.
Algorithm 3 C&CE
1:Input: Original polytope (A, b), number of dimensions to be eliminated D, target constraint scale M ;
2:Normalize the polytope (A, b);
3:d ← 1;
4:while d ≤ D do
5: Perform FME to eliminate one dimension;
6: Perform Algorithm 1 to remove redundant constraints;
7: Perform Algorithm 2 to control the constraint scale to M ;
8: d ← d + 1
9:end while

5. Case Study

5.1. Simulation Setup

To evaluate the effectiveness of the proposed C&CE method, numerical experiments are conducted on a modified IEEE 33-bus radial distribution system [24]. The test system contains multiple DGs and ESSs, with detailed parameters summarized in Table 1. The topology of the distribution network is illustrated in Figure 5. The scheduling horizon is set to 24 h with a time resolution of 1 h.
Table 1. DER Parameter Specifications.
Figure 5. Modified IEEE 33-bus distribution system.
All algorithms are implemented in MATLAB R2023a and solved using GUROBI 13.0 on a computer equipped with an Intel i5 CPU and 16 GB of memory.

5.2. Evaluation Metrics

To quantify the approximation error introduced by model simplification, appropriate metrics are required to measure the discrepancy between the approximated and original feasible regions. However, for high-dimensional cases such as the 24 h scheduling horizon considered in this study, traditional geometric measures such as polytope volume become computationally intractable.
To address this issue, the feasible region is interpreted from a classification perspective, where points inside and outside the polytope are regarded as two classes. Accordingly, precision and recall are adopted as comprehensive evaluation metrics:
P = T P T P + F P , R = T P T P + F N
Specifically, precision measures the proportion of feasible dispatches in the simplified model that are also feasible in the original model. To generate representative samples from the high-dimensional feasible region, a polytope uniform sampling method based on the Hit-and-Run algorithm [25,26] is adopted. Samples are first generated within the approximated polytope and then checked for feasibility with respect to the original polytope, which leads to a set of feasibility problems:
min x ′ 1
s . t . :   A 1 x ′ ≤ b 1 − A 2 y i
where ([A1 A2],b1) represents the original polytope; x′ denotes the eliminated variables; and yi is the i-th sampled point.
Similarly, recall measures the coverage ratio of feasible points in the original model that are preserved by the approximation. The same Hit-and-Run sampling procedure is applied to the original polytope, and each sampled point is subsequently checked to determine whether it lies within the approximated feasible region. In the following numerical experiments, 100,000 sample points are used for the evaluation of both precision and recall. The sampler starts from the Chebyshev center of the polytope and discards an initial burn-in of 35(n + 1) samples for an n-dimensional polytope, following the default setting of the sampling routine in [26]. The large sample size ensures the stability of the reported estimates. Precision and recall are then combined into the F-score:
F = 2 PR P + R

5.3. Evaluation of Redundant Constraint Identification

This subsection evaluates the effectiveness of the proposed redundant constraint identification method. Redundancy identification is first performed on the LEM model in (7) using the parameter settings described above. The proposed method is compared with the conventional umbrella-constraint method in [5], with both methods implemented under identical LP solvers and tolerance settings.
Table 2 summarizes the results. It can be observed that even in the original LEM formulation, a considerable number of redundant constraints exist due to the coupling structure between DER models and network constraints. Both methods achieve an F-score of 100% with respect to the original polyhedron, indicating that both identify the redundant constraints correctly and that the resulting simplified models preserve the original feasible region. The two methods identify the same non-redundant constraint set, both retaining 660 constraints. The difference lies in the computational cost: the proposed method reduces the computation time from 6.78 s to 3.28 s, a 51.6% reduction in runtime. In other words, the proposed method exploits active-constraint information to screen out inactive constraints at an early stage, so that the same redundant constraint set is identified at lower computational cost without sacrificing accuracy.
Table 2. Performance Comparison of Redundant Constraint Identification on Original LEM Models.
To further investigate the necessity of redundancy elimination during column elimination, FME is applied to the original LEM model to eliminate 1 to 35 internal variables. The redundancy of the resulting polytopes is then evaluated using both methods. Figure 6 summarizes the results. It can be further observed that after eliminating up to 35 internal variables, the number of constraints increases rapidly, doubling compared with the initial reduced model despite redundancy removal. This confirms that redundancy elimination alone is insufficient to suppress the combinatorial growth induced by FME. Moreover, the proposed method consistently achieves lower computation time across all elimination stages, reducing the computation time by approximately half compared with the conventional redundancy detection method under dense constraint regimes.
Figure 6. Constraint growth under FME with redundancy removal for increasing elimination dimensions.

5.4. Evaluation of Constraint Merging

This subsection evaluates the effectiveness of the proposed constraint merging algorithm in controlling the number of constraints. It presents an illustrative example based on randomly generated polytopes with dimensions ranging from 2 to 6, rather than the actual distribution network and DER models. Even for a single time period, the LEM model involves 9 decision variables corresponding to the 9 DERs, and the full 24 h model is far too high-dimensional to be illustrated directly. High-dimensional polytopes with dimensions ranging from 2 to 6 are generated, and the proposed algorithm is applied to reduce the constraint set to predefined target levels. Table 3 summarizes the results, while two- and three-dimensional cases are illustrated in Figure 7.
Table 3. Performance of Constraint Merging on Polytopes of Different Dimensions.
Figure 7. Visualization of original and merged feasible regions in low-dimensional spaces. Black lines represent the original feasible regions, and the colored areas represent the merged feasible regions.
Since the proposed method produces an inner approximation of the original polytope, the precision remains 100% in all cases, meaning that any point inside the approximated feasible region is also feasible for the original model. When the target constraint number is reduced aggressively, the F-score decreases gradually from near-perfect accuracy (98.16% at 60 constraints in 4-D) to 79.87% when only 40 constraints are retained, indicating a clear trade-off between compression ratio and geometric fidelity. Similar trends are observed in higher dimensions. For instance, in the 6-dimensional case, reducing constraints from 300 to 200 leads to an F-score drop from 98.98% to 82.53%, while retaining 59% of constraints still preserves most of the geometric structure. Overall, the method enables up to 40% constraint reduction while maintaining F-score around 80%, demonstrating strong controllability over the approximation–complexity trade-off. These results confirm that the proposed constraint merging algorithm provides an effective mechanism for explicitly controlling model complexity. This capability is particularly important for mitigating the exponential constraint growth induced by FME, which is further demonstrated in the next subsection through the proposed C&CE framework.
The merging algorithm is further applied to the redundancy-reduced LEM model obtained in Section 5.3, which retains 660 constraints. As shown in Table 4, precision remains 100% in all cases, consistent with the intended inner approximation, and the accuracy loss appears entirely in the recall as the target constraint number decreases. Compressing to 600 constraints preserves 95.01% of the original feasible region with an F-score of 97.44%, whereas retaining only 400 constraints lowers the recall to 65.24%, exhibiting the same compression–fidelity trade-off as in the low-dimensional cases of Table 3.
Table 4. Performance of Constraint Merging on the Redundancy-Reduced LEM Model.

5.5. Evaluation of the C&CE Algorithm

This subsection evaluates the effectiveness of the proposed C&CE framework for LEM model simplification. 50 internal variables are eliminated and the following methods are compared:
(1)
Proposed C&CE method (Constraint scale set to 700);
(2)
FME with redundant constraint check Algorithm 1;
(3)
Predefined-shape-based projection in [17] (Virtual Battery as predefined shape).
Table 5 reports the number of variables and constraints of the original model and simplified models. Note that eliminating variables inherently increases the number of constraints, making the reported reduction meaningful. Since normalization may make some coefficients very small, they are kept at full precision rather than rounded to a fixed number of decimals throughout the elimination. Otherwise, the accumulated rounding would slightly displace the boundary and reduce the recall of the exact reference method below 100%. Compared with the FME-based method with redundancy removal, C&CE reduces the number of constraints from 1842 to 671, corresponding to a 63.6% reduction, while also reducing computation time by 17.3%. This is achieved at a slight accuracy cost, with the F-score decreasing from 100.00% to 97.80%, i.e., a 2.20 percentage point difference as the accuracy price for the constraint reduction. The results demonstrate that FME combined with redundancy removal still suffers from severe constraint growth during column elimination. In contrast, the proposed C&CE framework embeds constraint merging after redundancy removal, enabling explicit control of the constraint scale at each elimination step. Compared with the predefined-shape projection method in [17], the proposed method improves accuracy significantly, increasing F-score from 83.82% to 97.80%, which corresponds to a 13.98 percentage point improvement, while maintaining a comparable constraint scale. This improvement costs additional computation time, which is well justified by the significant accuracy gain. The results demonstrate that unlike shape-assumed approaches, the proposed method preserves structural information of the original polytope while still controlling complexity, achieving a near-exact projection with bounded constraint growth. Overall, the proposed C&CE framework effectively integrates the advantages of exact projection and approximate simplification.
Table 5. Comparison of C&CE with FME-Based and Shape-Assumed Projection Methods.
Table 6 examines the impact of the elimination order and the target constraint scale. The elimination order has only a marginal influence on accuracy, since the F-score deviates by no more than about two percentage points. A larger target scale requires less merging at each elimination step, thereby shortening the computation time. A smaller target scale yields a more compact model that alleviates the clearing burden of the main grid, at the price of a gradual loss of flexibility reflected by the decreasing recall and F-score.
Table 6. Impact of the elimination order and the target constraint scale on the C&CE performance.

5.6. Market Clearing Validation

To evaluate the market-clearing performance, a simulation is set up on the IEEE 30-bus system [27,28], which serves as the main grid, with the local distribution network connected at bus 29. The main-grid loads are first scaled down by a factor of 0.01 relative to their original values so as to match the scale of the DERs. The load factor of each time period is set as shown in Figure 8.
Figure 8. Load factor of each time period.
The original LEM model and the simplified model obtained by the proposed method are separately embedded into the clearing of the main grid. The cleared power of all DERs over the 24 h is compared in Figure 9. The two cleared-power profiles almost coincide, yielding a power Mean Absolute Percentage Error (MAPE) of only 2.97%, confirming that the simplified model preserves the market-clearing behavior of the original model with high accuracy. Accordingly, the cost paid by the main grid to the DERs is $1522.66 in both cases, indicating that the model simplification does not alter the settlement outcome.
Figure 9. Cleared power of all DERs over 24 time periods.

5.7. Discussion

The results confirm that both redundancy removal and constraint merging are effective. Redundancy identification reduces the computation time by 40–60% while identifying the same non-redundant set, and constraint merging provides monotone control over the constraint scale, as shown in Table 4. By embedding redundancy identification and constraint merging inside the elimination loop, the proposed framework bounds the constraint scale at every step. In all tested trials, no point was found that is feasible in the simplified model but infeasible in the original model (precision of 100.00%), which is consistent with the inner-approximation intent of the merging step. Compared with the predefined-shape projection in [17], the proposed method raises the F-score from 83.82% to 97.80% at a comparable constraint scale, as it does not restrict the projected region to a prescribed geometry. Practically, the model simplification takes about 2 min, which is shorter than a typical market clearing interval (e.g., 15 min or 1 h), so the simplification can be completed before the ISO carries out the centralized clearing. In addition, the target constraint scale is user-defined, allowing the ISO to trade accuracy against model size as required.

6. Conclusions

This paper proposed a C&CE framework for simplifying LEM models by integrating FME with redundancy removal and geometric constraint merging. The key advantage of the framework lies in its ability to control the exponential constraint growth inherent in classical projection methods while preserving the essential geometric structure of the original model. Numerical results on a modified IEEE 33-bus system demonstrate that the proposed approach reduces the number of constraints by 63.6% while maintaining an F-score above 97%. In the tested IEEE 30-bus market-clearing scenario, the simplified model matches the cleared power of the original model with a MAPE of 2.97%. Moreover, since the model submitted to the ISO consists of linear constraints consistent with the market clearing model, it can be directly incorporated into the existing clearing framework. Only the aggregated feasible region is submitted rather than the raw data of individual DERs, which inherently satisfies data confidentiality.
Despite these advantages, several limitations remain. Although the proposed method improves scalability, the computational burden of LEM model simplification remains non-negligible for very large-scale systems. Future work will therefore focus on reducing this burden, for example, through parallel implementation of the redundancy checks and the merging step as well as validation on larger systems with more DERs.

Author Contributions

Conceptualization, Y.C.; Writing—original draft preparation, Z.Z.; methodology, Y.L.; software and investigation, S.H.; validation, Z.C.; formal analysis, N.L.; data curation, W.W.; writing—review and editing, C.L. and Y.C.; supervision and project administration, Y.C. All authors have read and agreed to the published version of the manuscript.

Funding

This work is funded by the Science and Technology Program of China Southern Power Grid Co., Ltd. [Grant No. 000005KC24010038].

Institutional Review Board Statement

Not applicable.

Data Availability Statement

The parameters of IEEE 33-bus radial distribution system are provided by Ref. [24]. The parameters of IEEE 30-bus system are provided by Ref. [28]. The data underlying all the figures are provided by Ref. [29].

Conflicts of Interest

Authors Zhe Zhai, Yanjie Liang, Shizhi He, Ziyu Chen, Nan Lou, and Wenzu Wu were employed by the company China Southern Power Grid Co., Ltd. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest. The authors declare that this study received funding from China Southern Power Grid Co., Ltd. The funder was not involved in the study design, collection, analysis, interpretation of data, the writing of this article, or the decision to submit it for publication.

References

  1. Li, Y.; Han, M.; Shahidehpour, M.; Li, J.; Long, C. Data-driven distributionally robust scheduling of community integrated energy systems with uncertain renewable generations considering integrated demand response. Appl. Energy 2023, 335, 120749. [Google Scholar] [CrossRef] [Scilit]
  2. Cui, Y.; Xu, Y.; Li, Y.; Wang, Y.; Zou, X. Deep reinforcement learning based optimal energy management of multi-energy microgrids with uncertainties. CSEE J. Power Energy Syst. 2026, 12, 1002–1014. [Google Scholar] [CrossRef] [Scilit]
  3. Barot, S.; Taylor, J.A. A concise, approximate representation of a collection of loads described by polytopes. Int. J. Electr. Power Energy Syst. 2017, 84, 55–63. [Google Scholar] [CrossRef] [Scilit]
  4. Ardakani, A.J.; Bouffard, F. Identification of umbrella constraints in DC-based security-constrained optimal power flow. IEEE Trans. Power Syst. 2013, 28, 3924–3934. [Google Scholar] [CrossRef] [Scilit]
  5. Ardakani, A.J.; Bouffard, F. Acceleration of umbrella constraint discovery in generation scheduling problems. IEEE Trans. Power Syst. 2014, 30, 2100–2109. [Google Scholar] [CrossRef] [Scilit]
  6. Capitanescu, F.; Glavic, M.; Ernst, D.; Wehenkel, L. Contingency filtering techniques for preventive security-constrained optimal power flow. IEEE Trans. Power Syst. 2007, 22, 1690–1697. [Google Scholar] [CrossRef]
  7. Weinhold, R.; Mieth, R. Fast security-constrained optimal power flow through low-impact and redundancy screening. IEEE Trans. Power Syst. 2020, 35, 4574–4584. [Google Scholar] [CrossRef] [Scilit]
  8. Zhai, Q.; Guan, X.; Cheng, J.; Wu, H. Fast identification of inactive security constraints in SCUC problems. IEEE Trans. Power Syst. 2010, 25, 1946–1954. [Google Scholar] [CrossRef] [Scilit]
  9. Ma, Q.; Zhao, Z.; Han, R.; Lin, S. Risk-preference-aware optimal scheduling and profit allocation of load aggregators and charging operators. Appl. Energy 2026, 409, 127494. [Google Scholar] [CrossRef] [Scilit]
  10. Zhao, Z.; Ma, Q.; Wei, C.; Han, R. Stackelberg game optimization method for virtual power plant and electric vehicle considering coupled green certificates and spot markets. Expert Syst. Appl. 2026, 299, 130202. [Google Scholar] [CrossRef] [Scilit]
  11. Misra, S.; Roald, L.; Ng, Y. Learning for constrained optimization: Identifying optimal active constraint sets. INFORMS J. Comput. 2022, 34, 463–480. [Google Scholar] [CrossRef] [Scilit]
  12. Park, S.; Van Hentenryck, P. Self-supervised learning for large-scale preventive security constrained DC optimal power flow. IEEE Trans. Power Syst. 2024, 40, 2205–2216. [Google Scholar] [CrossRef] [Scilit]
  13. Chen, Y.; Zhang, L.; Zhang, B. Learning to solve DCOPF: A duality approach. Electr. Power Syst. Res. 2022, 213, 108595. [Google Scholar] [CrossRef] [Scilit]
  14. Chen, X.; Dall’Anese, E.; Zhao, C.; Li, N. Aggregate power flexibility in unbalanced distribution systems. IEEE Trans. Smart Grid 2019, 11, 258–269. [Google Scholar] [CrossRef]
  15. Yang, Y.; Wang, W.; Qin, J.; Wang, M.; Ma, Q.; Zhong, Y. Review of vehicle to grid integration to support power grid security. Energy Rep. 2024, 12, 2786–2800. [Google Scholar] [CrossRef] [Scilit]
  16. Müller, F.L.; Szabó, J.; Sundström, O.; Lygeros, J. Aggregation and disaggregation of energetic flexibility from distributed energy resources. IEEE Trans. Smart Grid 2017, 10, 1205–1214. [Google Scholar] [CrossRef] [Scilit]
  17. Wang, S.; Wu, W. Aggregate flexibility of virtual power plants with temporal coupling constraints. IEEE Trans. Smart Grid 2021, 12, 5043–5051. [Google Scholar] [CrossRef] [Scilit]
  18. Wen, Y.; Hu, Z.; Liu, L. Aggregate temporally coupled power flexibility of DERs considering distribution system security constraints. IEEE Trans. Power Syst. 2022, 38, 3884–3896. [Google Scholar] [CrossRef] [Scilit]
  19. Li, C.; Zheng, K.; Vergara, P.P.; Zhang, N.; Guo, H. A projection method for aggregating large-scale DERs with heterogeneity. IEEE Trans. Smart Grid 2026, 17, 2092–2104. [Google Scholar] [CrossRef] [Scilit]
  20. Li, Q.; Vittal, V. Non-iterative enhanced SDP relaxations for optimal scheduling of distributed energy storage in distribution systems. IEEE Trans. Power Syst. 2016, 32, 1721–1732. [Google Scholar] [CrossRef] [Scilit]
  21. Li, C.; Zheng, K.; Feng, C.; Chen, Q.; Vergara, P.P. Modeling and aggregating DER flexibility region in VPPs: An elimination and projection approach. In Proceedings of the 2024 IEEE Power & Energy Society General Meeting (PESGM), Seattle, WA, USA, 21–25 July 2024. [Google Scholar]
  22. Baran, M.; Wu, F.F. Optimal sizing of capacitors placed on a radial distribution system. IEEE Trans. Power Deliv. 1989, 4, 735–743. [Google Scholar] [CrossRef] [Scilit]
  23. Jia, H.; Ding, Y.; Song, Y.; Singh, C.; Li, M. Operating reliability evaluation of power systems considering flexible reserve provider in demand side. IEEE Trans. Smart Grid 2019, 10, 3452–3464. [Google Scholar] [CrossRef] [Scilit]
  24. Baran, M.E.; Wu, F.F. Network reconfiguration in distribution systems for loss reduction and load balancing. IEEE Trans. Power Deliv. 1989, 4, 1401–1407. [Google Scholar] [CrossRef] [Scilit]
  25. Kaufman, D.E.; Smith, R.L. Direction choice for accelerated convergence in hit-and-run sampling. Oper. Res. 1998, 46, 84–95. [Google Scholar] [CrossRef] [Scilit]
  26. Benham, T. Uniform Distribution Over a Convex Polytope. Available online: https://www.mathworks.com/matlabcentral/fileexchange/34208-uniform-distribution-over-a-convex-polytope#version_history_tab (accessed on 24 October 2026).
  27. Zimmerman, R.D.; Murillo-Sánchez, C.E.; Thomas, R.J. MATPOWER: Steady-state operations, planning and analysis tools for power systems research and education. IEEE Trans. Power Syst. 2011, 26, 12–19. [Google Scholar] [CrossRef] [Scilit]
  28. Zimmerman, R.D.; Murillo-Sánchez, C.E. MATPOWER User’s Manual, Version 8.1. 2025. Available online: https://matpower.org/docs/MATPOWER-manual-8.1.pdf (accessed on 12 November 2026).
  29. Zhai, Z.; Liang, Y.; He, S.; Chen, Z.; Lou, N.; Wu, W.; Li, C.; Cai, Y. Data for A Column-and-Constraint Elimination Method for Model Simplification of Local Energy Markets; Figshare: London, UK. [Google Scholar] [CrossRef]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.