Skip to Content
EnergiesEnergies
  • Article
  • Open Access

27 November 2026

35 Pages

A BIM-Based Collaborative Decision Support System with IoT Monitoring for Energy Retrofit of Existing Residential Buildings

,
,
,
and
Department of Architecture, University of Naples Federico II, 80134 Naples, Italy
*
Author to whom correspondence should be addressed.
Energies2026, 19(23), 5756;https://doi.org/10.3390/en19235756 
(registering DOI)
This article belongs to the Special Issue Renewable Energies and Building Decarbonization: Toward a Sustainable Built Environment

Abstract

The energy retrofit of existing residential buildings is central to decarbonizing the building stock, yet its effectiveness is often undermined by fragmented information flows, weak interoperability between design and operation tools, and limited feedback between predicted and measured energy performance. This paper presents IDROM-fit, a cloud-based Collaborative Decision Support System (CDSS) that links retrofit diagnosis, scenario comparison, and post-intervention monitoring in a single lifecycle-oriented workflow. The study combines a comparative review of eight CDSS-related platforms, the development of a cloud-native demo, and preliminary validation through controlled testing and a retrospective residential case study combining a prefabricated envelope retrofit with a heat pump and a photovoltaic system. The platform integrates a Common Data Environment, openBIM/IFC model federation, approval workflows, energy-performance assessment, a catalogue of industrialized dry retrofit solutions, and Internet of Things (IoT) data flows for monitoring indoor temperature and humidity after intervention. Testing confirmed demo-scale feasibility, including workflow traceability, IFC federation, and sensor data visualization. The results provide functional and methodological evidence: they demonstrate a BIM–IoT monitoring workflow and lay the basis for verifying combined efficiency, electrification, and renewable measures through a Digital Twin, while measured post-retrofit savings and multi-building scalability remain to be demonstrated through longer monitoring campaigns.

1. Introduction

The decarbonization of the existing building stock is one of the most urgent challenges for the architecture, engineering and construction (AEC) sector. At the European level, buildings account for a large share of final energy consumption and energy-related greenhouse-gas emissions, while a significant part of the building stock is still characterized by poor energy performance [1,2]. The recast Energy Performance of Buildings Directive, Directive (EU) 2024/1275, frames this challenge within the long-term objective of achieving a zero-emission building stock by 2050 [1]. The same Directive links the renovation of the worst-performing buildings with the progressive deployment of solar energy installations and the phase-out of fossil-fuel boilers, so that envelope efficiency, electrification of heat generation and on-site renewable energy are increasingly expected to be planned together [1]. Within this regulatory and environmental context, building renovation is no longer only a matter of improving envelope insulation or replacing inefficient systems. It increasingly requires integrated assessment, reliable information exchange, transparent decision-making and performance verification over time.
The Italian building stock makes this issue particularly relevant. National analyses highlight the need to determine the size, characteristics and average energy performance of the residential and tertiary building stock to define credible energy-saving and requalification scenarios [3]. A large share of this stock was built before the first national energy-efficiency regulations and, in most cases, has no digital model, so that retrofit processes must often start from incomplete drawings and on-site surveys [3,4]. Existing residential buildings are often heterogeneous in terms of construction period, typology, materials, systems, ownership and maintenance conditions. Such heterogeneity makes retrofit decisions technically complex and strongly dependent on the capacity to combine standardized datasets with context-specific knowledge.
Retrofit processes involve a wide range of actors, including public administrations, building owners, designers, energy consultants, construction companies, technology providers, facility managers and occupants. Each actor contributes different information and decision criteria: building surveys, energy bills, technical drawings, BIM models, regulatory constraints, cost assumptions, construction solutions, financing opportunities, sensor data and maintenance requirements. When these data remain separated across different software tools, documents and project phases, the decision process becomes slower, less transparent and more difficult to verify [5,6,7,8].
The digital transformation of the AEC sector offers several opportunities to address this fragmentation. Building Information Modeling (BIM) enables the structured representation of building geometry and semantics, while Common Data Environments (CDEs) provide shared spaces for managing project information in accordance with the information-management principles formalized by the ISO 19650 series [9,10]. OpenBIM standards such as Industry Foundation Classes (IFC) support information exchange between different applications and actors [11]. IoT sensors and Energy Management Systems (EMS) can provide dynamic operational data; Digital Twin approaches can connect static information models with real-time or near-real-time data streams; and collaborative BIM workflows can improve coordination and traceability across project teams [12,13,14,15]. However, the mere availability of these technologies does not automatically generate effective retrofit workflows. Their value depends on how they are integrated into decision-support processes that are understandable and usable by heterogeneous stakeholders. Recent reviews of BIM-enabled energy retrofitting confirm that many BIM-energy retrofit frameworks remain concentrated in design-stage analysis, while pre-retrofit information requirements, standardization, and post-retrofit feedback are less systematically operationalized [16].
Decision Support Systems (DSSs) and Collaborative Decision Support Systems (CDSSs) have long been discussed as tools for structuring complex building-performance decisions [5,6,7,8]. In retrofit processes, they are especially relevant because they can support the comparison of alternative measures, the assessment of energy and economic impacts, the management of uncertainty and the coordination of multiple actors. Nevertheless, the review carried out within the IDROM-fit project showed that many existing digital platforms remain vertically specialized. Some tools focus on energy simulation, others on smart-building automation, construction-site management, issue tracking, document management, or facility management. Few platforms provide continuity between survey, BIM modeling, energy assessment, prefabricated retrofit solutions, collaborative workflows, and post-retrofit monitoring. This interpretation is consistent with recent BIM-based and retrofit-specific decision-support studies, including RenoDSS, BIM-based green retrofit frameworks, and social-housing retrofit protocols that combine scenario comparison, energy assessment, cost estimation, and disruption reduction [17,18,19,20]. More recent contributions extend this line of work through a decision-support system for educational-building retrofit in hot, arid climates [21], a BIM-to-BEM (Building Energy Modeling) framework supporting industrial-building retrofit decisions through interactive dashboards [22], and a systematic review of financial and environmental assessment methods for retrofit interventions [23], confirming that retrofit-oriented decision support remains an active and still fragmented research field.
This gap is particularly critical for deep retrofit processes, where design-stage choices must relate to construction feasibility and to the verification of actual performance after implementation. Energy and technological renovation cannot be reduced to selecting a single technical measure. It requires the construction of a knowledge framework for the existing building, the definition of compatible intervention scenarios, the assessment of energy and economic implications, the coordination of stakeholders, and the measurement of performance during operation. This lifecycle-oriented understanding is consistent with retrofit methodologies and decision-support reviews that stress the need to combine performance, cost, lifecycle, and stakeholder criteria [5,6]. In deep renovation, envelope upgrades are also increasingly combined with heat pumps and photovoltaic systems, whose contribution to decarbonization can only be confirmed if their combined effect is assessed at the design stage and verified during operation. Therefore, a retrofit-oriented CDSS should operate not only as a repository or a calculation engine, but as a digital ecosystem that transforms heterogeneous data into shared knowledge and operational decisions.
The specific research problem addressed in this article is therefore not the generic availability of digital tools, but the lack of a structured decision environment capable of making retrofit alternatives comparable, traceable, and operationally actionable across the lifecycle. An information repository or CDE can improve document control, but it does not necessarily provide a decision logic for comparing alternatives, assigning responsibilities, recording assumptions, documenting trade-offs or preparing post-intervention verification. For this reason, the paper distinguishes between information integration, understood as the technical capacity to aggregate models, documents and sensor data, and decision support, understood as the capacity to transform this information into selectable scenarios, functional requirements, acceptance criteria, performance indicators and auditable workflow states.
IDROM-fit was developed to address this need. The platform was conceived as a cloud-based CDSS and CDE for the energy and technological retrofit of existing residential buildings. It integrates BIM/openBIM workflows, cloud collaboration, energy-performance assessment, industrialized dry retrofit solutions, IoT-based monitoring, and Digital Twin-oriented data flows. The project was developed through collaboration between UNINA-DiARC (Napoli, Italy), Blumatica SRL (Pontecagnano Faiano, Italy) and Irondom SRL (Avellino, Italy). UNINA contributed to the methodological framework, retrofit workflow, and knowledge contents: Irondom contributed to the development and digital integration of prefabricated retrofit kits; Blumatica designed and implemented the digital platform.
The study asks: how can a cloud-based Collaborative Decision Support System integrate BIM, CDE workflows, energy assessment, prefabricated retrofit solutions, and IoT monitoring to support decision-making in building energy retrofit processes? To answer this question, the study combines four methodological steps: first, a comparative analysis of existing CDSS-related platforms; second, the meta-design of the IDROM-fit workflow and platform requirements; third, the development of a cloud-native demo platform; and fourth, preliminary testing through controlled verification and application to a real residential case study.
The scope of application is defined accordingly. IDROM-fit addresses the energy and technological retrofit of existing, non-listed residential buildings, from single-family houses to small and medium multi-family buildings, whose load-bearing structure can receive external dry envelope systems; the case study presented here covers only the first of these categories (Section 4.4). An existing BIM model is not a prerequisite. When only measured drawings, photographs, or point clouds are available, which is the most frequent condition in the Italian stock, these data are uploaded to the CDE in the programming stage and used to produce the BIM model of the existing state before any scenario is assessed [4]. Historic masonry buildings and listed buildings are outside the current scope, because their knowledge process, information models and admissible interventions follow conservation criteria that require dedicated Historic BIM (HBIM) workflows [24]. Within this scope, the platform does not apply the same solution to all buildings: retrofit options are filtered according to the structural system, typology, envelope condition, and site constraints of each building (Section 2.4).
The paper first provides a critical interpretation of current digital tools and their limitations in supporting retrofit decision-making. Second, it proposes an integrated CDSS architecture that connects BIM, CDE, Digital Twin, and IoT workflows with retrofit-specific technological solutions. Third, it describes the functional implementation of the IDROM-fit Demo and its main modules. Finally, it discusses the preliminary testing results, highlighting both the platform’s strengths and the development needs that must be addressed before large-scale deployment.
Section 2 describes the materials and methods, including the review of CDSSs, the meta-design workflow, the case study selection, BIM modeling, sensor integration, and the testing procedure. Section 3 presents the main results, focusing on the functional modules of the IDROM-fit Demo and the outcomes of the preliminary validation. Section 4 discusses the platform’s contribution in relation to the state of the art, its implications for building decarbonization and renewable energy integration, and its interoperability, scalability, transferability, and current limitations. Finally, Section 5 concludes the paper by summarizing its scientific contributions and outlining directions for future research.

2. Materials and Methods

2.1. Research Design

The research adopted a design-science approach, in which the investigation of an applied problem is combined with the development and preliminary evaluation of a digital artefact [25,26]. The applied problem concerns the fragmentation of information and decision-making in building retrofit processes. The artefact is the IDROM-fit platform, conceived as a CDSS capable of integrating knowledge production, BIM modeling, energy assessment, collaborative data management, industrialized retrofit alternatives and operational monitoring. This methodological choice is consistent with recent applications of design-science research in BIM- and Digital-Twin-oriented construction studies, where the approach is used to structure the transition from problem identification to artefact demonstration in technically complex, lifecycle-oriented workflows [27].
More specifically, the study operationalizes design science through the following sequence: identification of the applied problem and its relevance for retrofit practice; definition of the objectives of a solution through literature, platform review and partner requirements; design and development of the IDROM-fit artefact as a cloud-based CDSS; demonstration through a real residential case study and controlled platform tasks; and preliminary evaluation through functional testing, user navigation checks and corrective maintenance. This sequence is consistent with design-science guidance in information-systems research, where the contribution is assessed through the utility, traceability and evaluability of the artefact rather than through statistical generalization from a large sample [25]. Accordingly, the validation reported in this article is framed as demo-scale artefact evaluation, not as proof of market robustness or building-stock-scale energy impact. The adopted process also follows the Design Science Research Methodology sequence of problem identification, objectives of a solution, design and development, demonstration, evaluation and communication [26].
The work was structured into four sequential but iterative phases. The first phase established the knowledge framework through a comparative review of CDSS-oriented platforms and digital tools relevant to retrofit. The second phase translated the review results into the meta-design of the platform, including requirements, user groups, functional modules, interoperability principles, and information flows. The third phase implemented the demo platform in a cloud-native environment. The fourth phase tested the platform through a controlled technical validation and through operational application to a real case study. Feedback from the testing phase was then used to define corrective actions and future developments.
The methodological workflow was organized to maintain continuity between the analytical, design, and validation stages. The CDSS review was not treated as a stand-alone literature exercise, but as an input for defining platform requirements. Similarly, the meta-design phase was not limited to conceptual diagrams but was translated into software modules and data structures. Finally, the testing phase focused not only on software performance, but also on the consistency of information flows across the retrofit lifecycle.
The four methodological phases are expanded into six operational steps in Figure 1. Case-study data collection and testing/refinement detail the demonstration and evaluation phase, while the final demo release represents the subsequent communication of the developed artefact.
Figure 1. Research workflow adopted for the development and preliminary validation of the IDROM-fit platform. The workflow connects the CDSS knowledge framework, platform meta-design, cloud-based prototyping, case-study data collection, testing and corrective refinement, and demo release. Image edited with the assistance of ChatGPT Edu (OpenAI; model GPT-6.1).

2.2. Review Framework for CDSS-Related Platforms

The first phase consisted of a comparative analysis of eight digital platforms and tools considered relevant to the broader field of CDSSs for building retrofit and building-process management: myGEKKO, IESVE, PlanRadar, Lookthrough, INFINITE, Zutec, ReSys and Procore. The selection covered different orientations, including smart-building automation, building-performance simulation, construction management, document and issue management, integrated renovation workflows, and lifecycle information management. This choice was coherent with previous studies that identify energy assessment, lifecycle evaluation, BIM integration, and collaborative decision support as key requirements for sustainable retrofit processes [5,6,7,8]. The comparison was also informed by the recent shift from generic refurbishment tools toward BIM-based renovation decision-support systems and green-retrofitting frameworks [17,18,19].
The sample was delimited through purposive maximum-variation sampling rather than through a market ranking. Platforms were included when they satisfied at least two of the following conditions: relevance to retrofit or building-process management; support for BIM/model-based information; use in collaborative workflows; connection with energy, operation, or monitoring data; availability of technical documentation or project outputs; and capacity to represent at least one lifecycle phase from design to operation. Platforms were excluded when they were limited to generic file storage, single-purpose calculation tools with no workflow component, closed products with no accessible functional documentation, or resident-oriented applications without professional retrofit-management functions. To reduce selection bias, the eight cases were intentionally distributed across commercial platforms, building-automation environments, simulation tools, and EU research initiatives, so that IDROM-fit could be positioned against both mature software functions and experimental integrated retrofit workflows. Table 1 summarizes the selection rationale and the lifecycle coverage of the eight platforms.
Table 1. Platform-selection rationale and comparative coverage used to identify the retrofit CDSS gap.
The reviewed platforms were grouped according to their documented contributions to the retrofit workflow. Procore and PlanRadar informed the construction and field-management dimension, while Zutec and Lookthrough contributed to the identification of structured asset and lifecycle information-management functions. Their inclusion does not imply that all these platforms operate as complete Common Data Environments. Similarly, ReSys was considered as an example of a retrofit/renovation support environment, without attributing to it weighting, automated ranking, or optimization functions not documented in the comparative review. The resulting functional domains should therefore be understood as analytical categories informed by the review, rather than as identical feature sets attributed to individual platforms. The functions attributed to each platform were taken from publicly available sources, namely official product documentation for commercial tools and project documentation for EU research initiatives, which are cited in Table 1 [28,29,30,31,32,33,34,35].
The review was structured through a common template, allowing the platforms to be compared across homogeneous dimensions: main functions, target users, process phases covered, scalability, portability, usability and interoperability. The process phases were grouped into four operational moments: design, tendering and procurement, construction, and operation and maintenance. This structure made it possible to identify which parts of the retrofit workflow were covered by existing platforms and where functional discontinuities emerged.
The evaluation criteria were selected because they are directly relevant to the practical adoption of a retrofit-oriented CDSS. Scalability refers to the capacity to operate across projects of different sizes, numbers of users, data volumes, and territorial contexts. Portability refers to the possibility of using the platform across devices and operational settings, including office and field work. Usability refers to the clarity of the interface and the ease with which different stakeholders can interact with the system. Interoperability refers to the ability to connect with external tools, open formats, BIM models, IoT systems and public or private datasets, which is a recurring requirement in information management, IFC-based exchange and BIM-DSS literature [8,9,10,11].
The review did not aim to rank the platforms in absolute terms. Instead, it aimed to identify recurrent strengths and limitations in relation to the specific needs of retrofit processes. This comparative reading was used to define the functional gaps that IDROM-fit should address: continuity between survey and BIM modeling, connection between energy simulation and monitoring, integration of prefabricated retrofit solutions, collaborative issue management, and support for post-retrofit performance assessment (Figure 2).
Figure 2. Review framework for CDSS-related platforms. The diagram summarizes the comparative analysis of eight digital platforms relevant to building retrofit decision support processes. Numbers 1–8 identify the eight platforms reviewed (Table 1). Graphic layout generated with the assistance of ChatGPT Edu (OpenAI; model GPT-6.1) from content defined by the authors.

2.3. Meta-Design of the IDROM-Fit Platform

The meta-design phase translated the findings of the review into a conceptual and functional model for IDROM-fit. The platform was defined as an integrated, interoperable, and territorially replicable CDSS for the retrofit of residential buildings. The meta-design specified the functional requirements, the information architecture, the user-interface logic, the data flows and the interoperability strategy. The work also defined the role of the three project partners in relation to methodological contents, software development and industrialized retrofit solutions.
The functional requirements reported in Table 2 were derived from the review, the retrofit workflow and the roles of the three project partners. They make explicit the basis of platform development and clarify how the CDSS differs from a simple information container. In methodological terms, requirements were treated as design inputs for the artefact rather than as a retrospective description, in line with design-science guidance and the need for explicit information requirements in BIM-enabled energy retrofitting [16,26].
Table 2. Key functional requirements of IDROM-fit and their relation to decision support.
UNINA contributed to defining the workflow for the platform’s architecture and development through collaboration with the other partners. Blumatica defined the platform functionalities, the general system architecture, and the user interface. The software requirements were organized around a BIM-oriented lifecycle structure, covering programming, design, production, and operation. The platform was required to support building definition, CDE initialization, user and role management, file upload and naming, model visualization, approval workflows, issue and markup management, integration with energy-modeling tools, Digital Twin creation, and sensor-data logging. Irondom contributed to the definition of a first kit of industrialized dry retrofit solutions for the building envelope. The solutions were designed according to principles of modularity, prefabrication, certifiable energy efficiency and typological adaptability. Their integration into the platform was intended to transform physical retrofit components into interoperable information objects that could be selected, compared, associated with BIM elements, and eventually connected to file-to-factory production processes.
The meta-design identified four main operational stages for the platform. In the programming stage, users define the building, collect survey and contextual data, upload point clouds or technical documents, and structure the CDE. In the design stage, users generate the BIM model from the survey data collected in the programming stage, or import it when it already exists, perform energy diagnosis, evaluate retrofit scenarios, and apply prefabricated retrofit solutions. In the production stage, users derive an as-built IFC model, organize construction-oriented information, and associate sensors with model objects. In the operation stage, the platform logs sensor data, monitors environmental and energy parameters, generates alerts, and supports maintenance or performance-verification activities. This staging is consistent with the information-management principles of the ISO 19650 series [9,10].

2.4. Platform Architecture and Information Workflow

The IDROM-fit Demo was developed based on the Blumatica BIM Platform, adapted and extended to meet the specific requirements of retrofit decision support. The architecture follows a cloud-native and service-oriented model. This choice was motivated by the need for scalability, remote accessibility, centralized data management, and the possibility of integrating multiple services and modules without imposing a monolithic structure.
The architecture is articulated into four functional layers. The front-end layer was developed as a responsive Progressive Web App (PWA), accessible from desktop and mobile devices through a browser. The application layer includes microservices dedicated to document management, authentication, permissions, workflows, issue and markup management, IFC and PDF visualization, notifications, and platform configuration. The data layer manages heterogeneous information, including IFC models, PDFs, point clouds, images, technical documents, sensor logs and metadata. The integration layer connects external tools and services, including BIM authoring tools, Blumatica BIM Energy, IoT devices and potential territorial or energy databases.
The CDE constitutes the core of the information workflow: it organizes files, models and documents according to structured folders, naming conventions and permissions. The system supports role-based access, multi-company management, workflow configuration, versioning, transmittals, review processes, issue management, markup tools and activity logs. The platform therefore aligns the digital environment with the collaborative logic required by complex retrofit projects, where multiple actors need to access and validate information at different levels of responsibility.
OpenBIM interoperability is supported primarily through the IFC format. The platform enables model import, visualization, federation, and property interrogation through the integrated viewer. The viewer is connected to the CDE, so that uploaded models and documents can be opened, checked, commented on, and linked to issues while respecting folder permissions and version control. This connection between CDE and model visualization is essential for maintaining traceability between decisions, model elements, documents, and responsibilities.
The Digital Twin workflow is developed by associating the BIM model with assets and sensor data, in line with built-environment Digital Twin frameworks that connect asset information with operational data and performance monitoring [12,13,14]. Sensors are treated as a specific category of assets within the model: each sensor can be linked to a physical location or a model object and can transmit data such as temperature, humidity, or energy use. Data are collected through a dedicated cloud channel and stored with configurable logging frequencies. The platform can display real-time dashboards, historical graphs, alerts, and reports. In this way, the model progressively evolves from a static design representation to a dynamic information environment for monitoring and operational decision support. Accordingly, the demo-scale BIM–IoT workflow should be distinguished from a fully mature Digital Twin, since recent DT literature emphasizes the need for interoperable data pipelines, sensor protocols, model synchronization and predictive or diagnostic services before stronger DT claims can be made [36,37].
The decision logic implemented at demo scale is therefore a structured comparison process rather than a fully automated recommendation algorithm. For each retrofit alternative, the platform supports the association of model components, technical retrofit kits, energy assumptions, workflow responsibilities, and future monitoring variables. Decision support is produced through three operations: filtering, by excluding options incompatible with available data or technical constraints according to the applicability criteria described below; comparison, by aligning alternatives against homogeneous criteria; and traceability, by recording who uploaded, reviewed, approved, or commented on each information object. At the present stage, IDROM-fit does not claim to replace expert judgement or to deliver an automatically optimized retrofit solution. Instead, it creates information and workflow conditions through which experts can compare scenarios, document assumptions, and prepare for later quantitative validation. This positions IDROM-fit close to decision-support environments based on scenario comparison and criteria-based evaluation, while leaving automated ranking and optimization for future development [17,18,19]. Table 3 summarizes this decision-support logic.
Table 3. Decision-support logic linking information inputs, criteria and outputs in the IDROM-fit demo.
Table 4 specifies what is meant by technical retrofit kits and how options are filtered. Retrofit options are organized in families (envelope systems, windows, heat-generation and domestic hot-water (DHW) systems, and on-site renewables), and each option enters the platform as an information object carrying a minimum data set. In the catalogue defined with Irondom SRL (Avellino, Italy), envelope solutions are grouped by category (solid or ventilated façade panels, panels with integrated windows, roofs, special panels for shafts and service nodes, and shading systems) and are matched to the project context through climatic and geographic variables such as climate zone, solar exposure, hygrothermal regime, altitude, orientation and seismic risk. The DUO SYSTEM (Irondom SRL, Avellino, Italy) is available in variants that differ in the second insulating layer (hemp, rock wool, glass wool or a thermo-reflective layer) and in the stiffening diaphragm (non-ventilated OSB panel or ventilated corrugated sheet), with versions for reinforced-concrete and load-bearing masonry buildings; each variant has a technical datasheet reporting thermal transmittance, periodic transmittance, phase shift, surface mass and acoustic, mechanical and fire performance. Applicability is checked against the data recorded in the existing-state model, such as structural system, construction period, envelope condition, available external space and heritage constraints, so that options that cannot be applied to a given building are excluded before comparison. At demo scale, these checks are performed by the project experts on the attributes stored in the model and documented in the CDE; they are not yet encoded as automatic rules.
Table 4. Retrofit option families, minimum data required to enter the comparison and applicability criteria used for filtering at demo scale.

2.5. Case-Study Selection and Data Collection

The preliminary validation included an operational test on a real residential building. The case study was selected in collaboration with the partner Irondom, an expert in the design and implementation of retrofit projects using prefabricated solutions, choosing a building that had already undergone a retrofit—given the research project’s limited duration of one year—and for which sufficiently complete project and documentation data on the pre- and post-retrofit conditions were available. The case study is a two-level single-family residential building located in the municipality of Benevento (Italy) (Figure 3). It was selected because it is representative of national recurring residential typologies and because it provided a sufficiently complete dataset for platform testing, including geometric information, technical documentation, energy-related data, and contextual information. Because the intervention had been designed and completed before the platform was available, the case study is a retrospective demonstration: the original choice of the DUO SYSTEM was made by the owner, the designers, and Irondom outside IDROM-fit, whereas the platform was used to reconstruct the existing state, re-run the comparison of retrofit packages, and record it in the CDE (Section 3.4). The case study therefore shows how a decision can be documented and traced in the platform, not that the original decision was informed by it.
Figure 3. Case-study building and retrofit intervention. The figure shows the location and photographic survey of the two-storey detached residential building “Villa D’Argenio” in Benevento (Italy), together with the DUO SYSTEM type I.DUO seismic–thermal cladding applied to the reinforced-concrete structure. Image edited with the assistance of ChatGPT Edu (OpenAI; model GPT-6.1).
The building is characterized by a reinforced-concrete frame with 300 mm hollow-brick infill walls. The pre-retrofit configuration included attic insulation made of a 50 mm glass-wool panel and a 150 mm layer of expanded clay, aluminum windows without thermal break, a ground floor used as a heated tavern with a fireplace and gas convector, an intermediate floor with a 30 mm insulation layer on the underside of the slab, and a traditional radiator heating system supplied by a gas boiler (24 kW, also used for DHW production). These characteristics make the building suitable for testing both energy-oriented and seismic-thermal retrofit strategies.
The retrofit intervention was based on the DUO SYSTEM, an external seismic-thermal envelope solution developed by Irondom. The system is designed to operate from the outside of the building, minimizing interference with internal activities. In the configuration tested for the case study, the system includes a first glass-wool insulation layer (45 mm, compressed to about 25 mm when installed), a cold-formed aluminum frame, aluminum brackets and fasteners for connection to the existing reinforced-concrete structure, a second 100 mm rock-wool insulation layer, a 15 mm OSB stiffening diaphragm and a 12.5 mm AQUAPANEL (Knauf Italia, Castellina Marittima, Italia) external cladding finished with plaster. This configuration corresponds to the catalogue variant I.DUO-R and was applied to about 280 m2 of façade. Installation followed nine steps: laser-scanner survey, pull-out tests, coding of the panels and assembly schedule, alignment of the brackets, first insulating layer, panels with the second insulating layer, stiffening diaphragms, window monoblocks and external finish. The project also replaced the existing windows with new windows installed in prefabricated insulated monoblocks (PVC-framed, double-glazed with low-emissive coatings; Uw = 1.5 W/m2K) and the gas boiler with a new heat pump system that also produces DHW through a 150 L storage tank, and integrated a 5 kWp photovoltaic system, so that the intervention combined envelope demand reduction, electrification of heat generation and on-site renewable energy production.
The data-collection activities included the acquisition of geometric and technical information, the development of executive survey drawings, the preparation of assembly schedules for fixing systems and panels, the definition of the retrofit kit configuration, and the creation of the information needed for CAD/CAM and file-to-factory workflows. The same dataset was used to populate the platform, import the IFC model, federate contextual information, and test the monitoring workflow.

2.6. BIM, Energy Modeling, IoT Deployment and Testing Protocol

The BIM and energy workflow began with the definition of the building within the platform and the organization of its information within the CDE. Existing survey data (a laser-scanner and total-station survey integrated with drone photographs), drawings. and technical documents were used to develop a BIM model and an energy model through Blumatica BIM Energy. The energy model included the main envelope components, heating and domestic hot-water systems, occupancy profiles and usage assumptions. In the existing state, the building had no mechanical ventilation or cooling system, as shown by the energy-performance assessment (Section 3.4). The existing-state model was checked against the energy bills of the building.
In the design stage, an archive of Irondom materials and stratigraphies was integrated into the energy-modeling workflow. Starting from the existing-state model, the user could select different retrofit solutions, apply the corresponding stratigraphies and recalculate energy-performance parameters. Additional measures, such as window replacement, heat-pump installation and photovoltaic integration, were considered in the modeling logic, so that scenarios could be compared as combinations of envelope, system and renewable measures rather than as isolated interventions. The resulting project model can be exported in IFC format with additional attributes related to the parameters to be monitored during operation.
The IoT strategy focused on low-cost and easy-to-use devices for the preliminary validation stage. The sensor categories identified in the meta-design included temperature and relative-humidity sensors, electricity meters or smart plugs, heat meters, and gas smart meters. Carbon dioxide (CO2) and occupancy sensors were not included in the demo, which focused on the thermal response of the envelope and on energy use; indoor air quality and ventilation performance were not monitored. These sensors can be added as further sensor-asset classes in the same architecture and would allow ventilation adequacy to be assessed against the indoor-air-quality criteria of EN 16798-1 (Section 2.7) and occupancy-based ventilation and lighting strategies to be evaluated. For the case-study testing, environmental monitoring focused primarily on temperature and humidity because one of the initially selected energy-consumption monitoring devices did not provide public application programming interfaces (APIs) and therefore could not be directly integrated into the platform. This issue was documented as a selection limitation and informed future criteria for device procurement. The selection of sensors was therefore assessed not only in terms of cost and availability, but also with regard to open data access and potential semantic interoperability with BIM and Building Management System (BMS) data structures [38].
In the case study, the deployment consisted of two wireless temperature and relative-humidity sensors, one on each floor. Each sensor was registered in the platform as a sensor asset with an identification code, the measured quantities and their units (°C and % RH), and was linked to the IfcSpace of the room in which it was installed, so that each observation is displayed in the spatial context of the model. The monitoring data displayed in the Demo (Section 3.6) cover the period from 10 October to 6 November 2025. The monitoring period is therefore too short, and the number of sensors too small, to support conclusions on seasonal thermal performance.
The testing protocol combined controlled technical tests and operational tests on the case study. Controlled tests verified the CDE, file upload, naming conventions, role and permission management, workflow approvals, IFC viewer, model federation, issue and markup tools, IoT data acquisition, performance under load, and user navigation. Operational tests adapted the same logic to real data and real workflows, including IFC import, territorial dataset federation, sensor integration, cloud-to-model data communication, CDE versioning, openBIM interoperability and user-experience assessment.
For traceability, each test was registered with an ID, functional area, description, result, notes, and corrective action. Outcomes were classified as positive, resolved issue, or open criticality. This classification allowed the project team to distinguish between functions already compliant with the requirements, malfunctions corrected within the testing cycle, and structural limitations to be addressed in future developments. Roles were assigned through a RACI matrix, objective evidence (screenshots, logs and short videos) was attached to the records, and weekly debriefing sessions were used to analyze the issues and plan corrections; the controlled tests were run in dedicated staging environments set up by the developer.
The usability tests summarized in Section 3.7 were carried out by a small group of internal users—designers, researchers and technicians from the project partners—with each test protocol executed once per testing cycle; corrective iterations were re-verified once after implementing fixes, rather than through repeated trials by independent users. The group comprised designers, researchers, and technicians, who performed a predefined set of tasks: uploading files with the required naming convention, federating IFC models, creating an issue on a model object, starting and completing an approval workflow, and configuring a sensor and viewing its dashboard. For each task, the recorded outcomes were task completion, the number of navigation steps (clicks) needed to reach the function, and any malfunction logged in the test register. Average execution times were among the aspects observed, but they were not recorded in a form that can be reported, and error rates were not measured. The operational tests summarized in Section 3.7 were conducted jointly by technical staff from the three project partners (UNINA-DiARC, Irondom and Blumatica), partly on-site at the case-study building and partly remotely. In parallel, broader and more heterogeneous usability feedback was collected during the dissemination activities described in Section 3.8 (seminars, a technical seminar for construction companies, producers and investors, and a co-design workshop in which users tested the platform on tablets); this broader feedback informed corrective maintenance but was not collected through a structured, repeatable sampling protocol. A documented usability study with tracked participant profiles, task repetition and quantitative metrics remains a priority for future validation (see Section 4.5).

2.7. Thermo-Energy Characterization and Monitoring Framework

The implementation of the IDROM-fit platform was complemented by an experimental monitoring framework designed to provide quantitative information on the thermal and energy performance of the case-study building after the retrofit intervention. The monitoring campaign was conceived as an integral part of the decision-support workflow, supplying measured data for the future validation of retrofit performance. Within this perspective, monitoring does not represent a standalone activity but contributes to the continuous updating of the building information model, enabling the transition towards a Digital Twin (DT) environment where geometric, semantic and operational information coexist within the same digital ecosystem.
Given the limited timeframe of the research, it was not possible to collect a complete pre- and post-renovation seasonal dataset, calculate an error index for the calibrated model, or measure energy savings. Consequently, the results should be interpreted as evidence of the platform’s ability to host and visualize monitoring data, not as evidence of the energy performance improvements achieved.
The monitoring strategy addressed both the building envelope and the energy systems. Particular attention was given to the acquisition of variables that directly influence building energy performance, namely the thermo-physical characteristics of the envelope, the indoor and outdoor environmental conditions, and the energy delivered by the technical systems. The selected monitoring architecture was intentionally modular, allowing additional sensors and measurement devices to be incorporated as the platform evolves.
A further activity planned within the monitoring framework concerns the in-situ characterization of the thermal performance of the opaque envelope. Existing buildings frequently exhibit thermo-physical properties that differ from nominal design values owing to construction tolerances, ageing, moisture content and modifications. For this reason, the heat flow meter method of ISO 9869-1 [39] was selected to evaluate the thermal transmittance of representative envelope components, using heat-flux sensors on selected wall elements together with indoor and outdoor temperature probes. This measurement set-up was defined but not carried out within the project timeframe, and no in-situ U-values are reported in this article. Because the case-study building had already been retrofitted, such measurements would now characterize the retrofitted envelope rather than the existing state; in future case studies, they should be performed before the intervention, so that they can support the calibration of the energy model used to evaluate retrofit scenarios.
The environmental monitoring campaign focused on air temperature and relative humidity, which were selected as the principal indicators of the building’s thermal response. Wireless sensors were selected and deployed with reference to the instrumentation principles reported in ISO 7726 [40], while the monitoring protocol followed the indoor-environmental assessment framework of EN 16798-1 [41], which identifies these variables as fundamental for the assessment of indoor environmental quality and thermal conditions. Besides supporting the evaluation of occupants’ comfort, continuous thermo-hygrometric monitoring allows the analysis of the dynamic behavior of the building envelope, identifying seasonal variations and detecting conditions that may favor surface or interstitial condensation. Mean radiant temperature and air velocity were not measured, so that comfort indices requiring these variables, such as PMV/PPD or operative temperature, cannot be computed from the current data set.
The monitoring infrastructure was also designed to incorporate building energy-use data. Thermal energy meters were considered for quantifying the useful energy supplied by heating, ventilation and air-conditioning (HVAC) systems, while smart electrical meters and Wi-Fi-enabled smart sockets were evaluated for monitoring electricity consumption associated with heating, cooling and auxiliary equipment. For buildings in which the retrofit includes a heat pump and photovoltaic generation, as in the case study, this component should also capture heat-pump electricity use for space heating and DHW production, photovoltaic production and grid exchange, which are required to assess the on-site renewable share and the operational carbon balance.
The future integration of these measurements would support the characterization of the building energy balance and the calibration of the dynamic energy model developed through the Blumatica BIM Platform in accordance with EN ISO 52016-1 [42].
Commercially available monitoring devices were selected to ensure ease of installation and facilitate future replication of the proposed methodology in residential buildings. The monitoring components, their integration status in the Demo, and their implications for the scope of validation are summarized in Table 5.
Table 5. Monitoring components, integration status and implications for the scope of validation.
Data acquisition was implemented through a distributed Internet of Things architecture in which each sensing device periodically transmits measurements to a cloud-based database. Once validated, the acquired information is associated with the corresponding BIM entities and stored within the Common Data Environment, where it becomes available for visualization, analysis, and long-term archiving. Linking sensor data directly to BIM objects allows monitored variables to be interpreted within their spatial and functional context, thereby transforming the information model into a dynamic representation of the building that can support operation as well as design activities. This information flow is consistent with other DT approaches for the built environment, where operational data continuously enhance the semantic model and improve the reliability of asset management and decision-support processes [43,44,45].
Sensor data from different devices differ in payload format, naming of measured quantities, units, timestamp conventions, and sampling frequency. In the current demo, this heterogeneity is handled at connector level: for each compatible device type, a dedicated connector maps the vendor payload to the sensor-asset structure of the platform, which stores the sensor identifier, measured quantity, unit, timestamp, sampling interval and the identifier of the linked asset or model object; values are converted to SI units before storage. Data are retrieved by periodically polling the cloud service of each device through its API, with local buffering to preserve continuity on unstable public networks (Section 3.8). This solution works for a small number of device types but requires a new connector for each new device. Arman et al. [46] address the same problem through automated data ingestion, in which incoming data are regularized at ingestion time, data models are identified automatically, and IoT device models are generated, so that dashboards can be configured with little manual effort. IDROM-fit does not yet provide this automation. Moving beyond device-specific connectors would require a common device and observation model applied at ingestion, automatic normalization of units and timestamps, and semantic mapping of sensor points to BIM entities, for example through graph-based approaches such as BIM-to-BRICK [38].
From a methodological perspective, the integration of monitoring data with the BIM-based workflow offers two main advantages. First, the environmental measurements currently available provide a preliminary evidence base for characterizing the building’s thermal response, while the future integration of energy-consumption data would support quantitative calibration of the numerical energy model.
Second, the monitoring infrastructure establishes the conditions for subsequent post-retrofit performance assessment through the comparison of predicted and measured data over time. At the current stage, however, the implemented workflow demonstrates BIM–IoT data integration rather than a fully calibrated or validated energy-performance Digital Twin.
The preliminary implementation also highlighted the importance of interoperability in the selection of monitoring devices. Although environmental sensors providing open communication interfaces were successfully integrated into the platform, some commercially available energy meters relied exclusively on proprietary cloud services and did not provide publicly accessible APIs. Such limitations prevented direct communication with the IDROM-fit platform and confirmed that interoperability should be regarded as a primary selection criterion together with measurement accuracy, reliability, and installation costs. This consideration is particularly relevant for future large-scale retrofit plans, where heterogeneous monitoring systems will need to exchange information efficiently within interoperable Digital Twin ecosystems. This limitation is aligned with recent work on BIM-to-BRICK workflows, which shows that the integration of BIM, spatial semantics, and BMS/IoT point data often requires graph-based or ontology-based mediation rather than direct file exchange alone [38].
Overall, the proposed monitoring framework establishes the experimental basis for linking measured building performance with digital information management. By connecting environmental sensor data with BIM-based information management and defining the integration requirements for future energy metering, the methodology establishes a basis for subsequent model calibration and post-retrofit performance assessment (Figure 4).
Figure 4. Monitoring components considered for post-retrofit environmental and energy monitoring in the case-study building. Temperature and humidity sensors were integrated into the IDROM-fit Demo, while direct energy-meter integration remained limited by the unavailability of public APIs.

3. Results

3.1. Implemented IDROM-Fit Demo

The main result of the development phase is a working cloud-based demo of the IDROM-fit platform. The Demo translates the meta-design outputs into an operational digital environment that can be accessed through a controlled registration procedure. It functions simultaneously as a CDSS and as a CDE, enabling users to manage retrofit information, navigate BIM models, coordinate stakeholders, evaluate technical alternatives, and monitor selected operational data.
The platform was implemented as an interoperable cloud environment capable of managing heterogeneous data. The implemented functions correspond to the requirements in Table 2 and are described in Section 3.2, Section 3.3, Section 3.4, Section 3.5 and Section 3.6; the main functionalities of the Demo are shown in Figure 5.
Figure 5. Main functionalities of the IDROM-fit Demo: (a) BIM model view of the case-study building; (b) energy-performance assessment; (c) energy diagnosis and thermal dispersion analysis; (d) IoT dashboard displaying temperature and relative humidity data for Villa D’Argenio.

3.2. Common Data Environment and Collaborative Workflows

The CDE is one of the core implemented modules. It provides a hierarchical and configurable structure for managing documents, models, and data according to project roles, company affiliations, and folder permissions. The system supports standardized naming conventions aligned with ISO 19650 principles, file versioning, transmittals, review workflows, and activity logs [9,10]. These functions are crucial in retrofit projects because they allow multiple stakeholders to work on shared information while preserving traceability and control. Role and permission management was implemented at several levels. Users can be associated with companies, roles, and teams. Predefined roles include CDE Manager, BIM Manager, Process Admin, ACDat Admin (ACDat being the Italian equivalent of the CDE under UNI 11337) and standard users, while permissions can be assigned to folders and propagated to subfolders. This structure supports multi-actor collaboration and allows project administrators to control who can view, upload, edit, review, or approve information.
The workflow module allows the Process Admin to define approval and review sequences. Workflows can include initiators, reviewers, validation states, file-copy actions, and final-review rules. This enables the platform to automate status changes, notify responsible users, and document the validation process. The integration of workflows into the CDE makes it possible to connect document management with decision governance, reducing the risk of uncontrolled information exchanges.
Issue and markup tools were also implemented as collaborative functions. Markups can be private or public, while issues can be created either from a dedicated issue section or directly from the viewer. Each issue can be assigned, categorized, and linked to model elements or documents. This function supports coordination by allowing users to identify problems, propose corrections, and track their resolution within the same environment in which the model and documents are managed.

3.3. BIM/openBIM Viewer and Model Federation

The integrated viewer constitutes the operational interface through which users can inspect and interact with BIM models and documents. The viewer supports IFC and PDF files and enables browser-based model navigation without additional plug-ins. It provides 3D navigation, dynamic sectioning, measurements, thematic filtering, visibility management, and property interrogation, using IFC-based exchange as the main openBIM mechanism [11]. These functions allow users to move from document-based consultation to model-based decision-making.
A key result is the ability to federate multiple IFC models. Model federation enables the simultaneous visualization of models produced by different actors or software environments, while maintaining the possibility of activating or deactivating layers, disciplines, and information subsets. This function is important for retrofit projects, where existing-state models, design models, structural information, energy parameters, and as-built information may come from different sources and need to be compared.
The viewer is integrated with the CDE, meaning that files uploaded into the shared data environment are immediately available for visualization according to the permissions and versions assigned to them. Users can pass from the document repository to the model environment while preserving information continuity. The system also supports comparison between versions of the same model, helping users identify design changes or variants during iterative retrofit processes.
The viewer was further connected to issue and markup functionalities. Users can create comments and issues directly on model objects, assign them to responsible parties, and follow their progress in the project workflow. This integration transforms the viewer from a passive visualization tool into a collaborative coordination environment, supporting both synchronous and asynchronous decision-making.

3.4. Energy Modeling and Retrofit Scenario Assessment

The energy-performance workflow is based on the integration of Blumatica BIM Energy within the IDROM-fit process. The workflow supports the creation of an existing-state BIM and energy model, the description of envelope components and systems, and the execution of preliminary energy diagnosis. The platform is therefore able to connect geometric information, technical properties, and energy assumptions within a BIM-based workflow, extending previous BIM-DSS approaches for selecting and comparing sustainable building components [8].
The retrofit scenario workflow enables users to apply alternative technical solutions to the existing-state model. Irondom materials and stratigraphies were organized as an archive of retrofit solutions that can be selected and applied to model components. Once a solution is applied, the model can be updated and energy parameters recalculated. This supports a comparative decision process, in which different strategies can be evaluated in relation to envelope performance, system upgrades and future monitoring requirements.
To show how a decision is traced through the platform, the retrofit of the Benevento building was reconstructed retrospectively as a comparison between two packages applied to the same existing-state model (Table 6). Package A combines a conventional external thermal insulation composite system (ETICS) with the same window, heat-pump, and photovoltaic measures; Package B is the configuration actually built, with the DUO SYSTEM seismic–thermal envelope. In the existing state, the energy assessment returned energy class G. The external walls had a thermal transmittance of 1.218 W/m2K, which the DUO SYSTEM stratigraphy of Package B reduces to 0.221 W/m2K.
Table 6. Retrospective comparison of two retrofit packages for the Benevento case study, as recorded in IDROM-fit. Existing-state values are taken from the energy assessment in Figure 5b.
The predicted performance of the two packages is reported in Table 6. The packages differ mainly in their practical constraints. Package B adds a seismic upgrade of the reinforced-concrete frame, is installed from the outside with limited disruption for the occupants, and uses dry, prefabricated components, but adds greater thickness to the façades and has a higher indicative cost; Package A is a widespread solution with many suppliers but leaves the seismic vulnerability of the structure unaddressed. In the platform, each package is stored as a scenario record that links the applied kits or stratigraphies to the model elements, the energy results, the applicability checks of Table 4, the documents supporting the cost assumptions and the decision recorded by the responsible user, with its rationale and approval state. Because the decision had been taken before the platform was used, the example demonstrates traceability and comparability, not an improvement of the original decision.
The project model can be exported in IFC format [11], with additional attributes associated with the energy parameters to be monitored. This is an important step because it connects the design-stage energy assessment with the future Digital Twin workflow [12,13,14]. Instead of treating energy simulation as an isolated calculation, the IDROM-fit workflow uses the model as a carrier of information that can later be compared with operational data collected through sensors.
At the current stage, the platform demonstrates the feasibility of BIM-based energy modeling and scenario assessment. However, the available validation does not yet include long-term measured energy savings after retrofit. The energy-related results should therefore be interpreted as functional and methodological results: the platform can structure and compare retrofit alternatives, but further monitoring campaigns will be needed to quantify actual post-intervention performance gaps. From this perspective, IDROM-fit should be interpreted as an interoperable monitoring and evaluation infrastructure whose next validation step should resemble field-demonstrated ontology-based energy-modeling frameworks for building Digital Twins [45].

3.5. Integration of Prefabricated Retrofit Solutions

The integration of industrialized retrofit solutions is one of the specific features that distinguishes IDROM-fit from more general-purpose CDE or BIM coordination platforms. The DUO SYSTEM developed by Irondom was formalized as a set of digital retrofit kits, including solutions for blind facades, facades with openings, corners and structural edges, integrated service channels and horizontal partitions. Each kit is conceived as a parametric and BIM-compatible information object that can be associated with building typologies and design requirements.
The digital integration of these kits supports the transition from generic retrofit recommendations to selectable and information-rich technical alternatives. In future developments, the same logic can be expanded into a retrofit marketplace, where components, systems, technical sheets, costs, performance data, maintenance information and production data can be classified and filtered according to building type, climate, regulatory constraints and available financing.
The decision logic does not depend on the Irondom catalogue. Any envelope system, whether from another supplier or a conventional solution such as ETICS, enters the comparison as an information object with the minimum data set of Table 4: layer sequence with thicknesses and thermal properties, resulting thermal transmittance, geometric and anchoring requirements, the corresponding IFC object and property set, and an indicative cost. Package A in Table 6 was entered in this way. When performance data are missing, the option is kept in the catalogue but flagged as incomplete and excluded from the quantitative comparison; when only cost data are missing, the option is compared on energy and technical criteria and the cost field is shown as a placeholder, consistent with requirement FR5 (Table 2). What is specific to the DUO SYSTEM is the level of digital detail, including assembly schedules, fixing systems and file-to-factory data, which supports production but is not required to compare alternatives. The archive of Irondom stratigraphies in the energy-modeling tool was designed to be extended with solutions from other manufacturers, and the marketplace defined in the project already maps Italian producers of off-site façade panels and seismic–thermal envelope systems, including those involved in the Energiesprong Italia pilots.

3.6. IoT Monitoring and Digital Twin Functions

The Digital Twin module extends the platform beyond static BIM representation. In IDROM-fit, the Digital Twin is conceived as an information environment that links IFC model objects, maintainable assets and sensor data, following the broader interpretation of Digital Twins as dynamic links between digital models, physical assets and operational information [12,13,14]. Asset structures can be organized hierarchically by technological-unit classes, technological units, maintainable elements and assets. Assets may correspond to single IFC objects, aggregated groups of objects, or sensor assets. Accordingly, the term Digital Twin is used here in a bounded sense: the demo establishes model-data linkage and dashboard visualization, whereas predictive analytics, continuous calibration, and automated actuation remain future capabilities [36,37,45].
At demo scale, the platform provides dashboards and graphs for real-time or near-real-time visualization of temperature and relative humidity data. The integration of additional energy-related parameters remains dependent on compatible monitoring devices and accessible communication interfaces. Threshold-based alerts and anomaly-detection functions have been defined at a conceptual level but are not yet validated at demo scale. These functions are relevant for post-retrofit monitoring because they enable the comparison of expected and observed behavior and can support maintenance actions before operational inefficiencies become severe.
Two further functions can be built on the data already acquired. Because only air temperature and relative humidity are measured, indices that require mean radiant temperature or air velocity, such as PMV/PPD, cannot be computed; temperature–humidity indices such as Thom’s Discomfort Index [47], DI = T − 0.55 (1 − 0.01 RH) (T − 14.5), with T in °C and RH in %, can instead be calculated directly from each sensor stream and displayed in the dashboard, mainly for the cooling season. This indicator is planned but not yet implemented in the demo. As regards maintenance, the asset hierarchy described above allows HVAC and DHW components, such as the heat pump, the DHW storage tank, the emitters and the photovoltaic inverter, to be registered as maintainable elements with their documentation, and the facility-management extension of the platform (visible in Figure 5d) provides asset registers, tickets and work orders through which maintenance activities can be recorded. Scheduled maintenance plans for these components were not configured in the demo, and the link between maintenance events and monitored performance is not implemented; both are part of future developments (Section 4.6).
The testing phase also confirmed the energy-meter limitation described in Section 2.7: the selected device communicated only through a proprietary application without public APIs and could not be integrated into IDROM-fit.

3.7. Controlled Testing Results

The controlled testing phase verified the behavior of the main platform modules before wider operational validation. The test plan covered CDE functions, viewer performance, BIM interoperability, IoT and Digital Twin integration, platform performance and user experience. Thirty individual tests were conducted in total, of which twenty-one were classified as positive, eight as resolved after corrective action, and one as an open criticality. Table 7 summarizes these results across eight functional test areas, reporting the corresponding requirements, acceptance criteria, observed evidence and outcomes. Because this was a demo-scale evaluation, the tests should be interpreted as internal artefact validation and not as statistically representative field validation.
Table 7. Controlled validation summary linking requirements, acceptance criteria and observed results.
The CDE tests confirmed the correct behavior of file upload, naming conventions, versioning and permission management. Upload and naming convention tests were positive, and versioning was considered consistent with ISO 19650 principles [9,10]. The viewer tests confirmed that IFC/PDF visualization and model federation were feasible; temporary slowdowns in the federation of large models were mitigated through progressive loading. BIM interoperability tests confirmed the capacity to manage IFC-based workflows, although some issues required correction during the cycle.
The IoT and Digital Twin tests produced both positive and critical results. Temperature and humidity sensor data were correctly visualized in the Digital Twin, and dashboard updates met the acceptance threshold of five minutes. However, the energy sensor test remained critical because the selected device lacked public APIs. Workflow tests showed that review and publication processes were operational after correcting permission inheritance. User-experience (UX) tests indicated that the main functions could be accessed through short navigation paths and that terminology was generally coherent.
Performance tests included massive uploads of IFC and PDF files. A test involving the bulk upload of fifty IFC and PDF files was initially problematic but was resolved by optimizing indexing routines in a dedicated staging environment of the developer. The test register records the outcome of this test and an indicative improvement in loading time, but not the absolute loading times, file sizes, or hardware and network conditions; no loading-time figure is therefore reported here. Similarly, the five-minute value in Table 7 and Table 8 is the acceptance threshold for dashboard updates, which was met in functional checks; acquisition and display timestamps were not logged, so that mean and maximum latency cannot be reported. Because the funded project has ended and the pre-optimization build is no longer available, these tests could not be repeated; the results establish functionality, not performance consistency. These results indicate that the platform architecture was sufficiently robust for demo-scale testing, while also identifying areas where further performance monitoring and advanced loading strategies are needed for larger-scale deployment.

3.8. Operational Case-Study Testing and Demo Release

Operational testing applied the platform to the real residential case study. Twenty-two individual tests were conducted across import and BIM federation, Digital Twin and IoT, territorial datasets, IFC viewer, CDE and workflow, openBIM interoperability, UX and sensor configuration, and performance. Fourteen tests were classified as positive and eight as resolved through corrective actions. No open criticalities were recorded among the twenty-two operational test outcomes. However, the energy-meter API limitation identified during controlled testing remained unresolved and is reported as a residual interoperability constraint. Table 8 summarizes the operational testing evidence across six main test clusters, highlighting the observed results, corrective actions and remaining validation limits rather than reporting each individual test separately.
Table 8. Operational testing evidence from the Benevento case study and remaining validation limits.
The platform imported the real IFC model and federated it with territorial datasets, maintaining coherent georeferencing and property reading. Temperature and humidity sensors were integrated into the Digital Twin, and dashboards were updated correctly, within the five-minute acceptance threshold. Synchronization issues on public networks were resolved through local buffering.
The IFC viewer was tested with complex models larger than 300 MB. Initial slowdowns were mitigated through dynamic levels of detail, caching, and progressive loading. CDE workflow tests confirmed coherent upload, versioning, and naming conventions. OpenBIM interoperability tests showed no significant information loss when federating IFC models from different software environments and confirmed correct reading of IFC properties.
User-experience testing showed that the average path to access main functions was below four clicks. Technical users without BIM expertise among the internal testers also found the interface understandable. Initial difficulties in sensor configuration were resolved by simplifying the interface and introducing a guided step-by-step procedure. These results support the conclusion that the platform can manage real cases with multi-source and dynamic information flows, although larger and longer validation campaigns are required.
A structured before–after comparison with the workflow previously used for the case study was not possible, but a qualitative comparison can be made. In the original retrofit project, survey drawings, energy calculations, kit configurations, and construction documents were exchanged as separate files among the owner, the designers, Irondom, and the contractor, and post-retrofit sensor data were not connected to the project documentation. In IDROM-fit, the same information is stored in a single CDE with roles, versions and approval states, and sensor data are linked to model objects. Time savings and avoided errors were not measured; a structured comparison with external users is part of future validation (Section 4.5).
The Demo was published online as the first public release of the IDROM-fit CDSS. Access is based on registration, allowing controlled exploration of the platform and collection of feedback from qualified users. Dissemination activities included a seminar/webinar focused on BIM, Digital Twin, and IoT for retrofit processes, an online technical seminar for construction companies, producers, and investors, and a co-design workshop in which users tested the platform. Participants included students, doctoral candidates and academics, construction companies, manufacturers of prefabricated systems, software companies, investors and representatives of public bodies. Feedback from these activities informed corrective maintenance and the preparation of the official user manual.

4. Discussion

4.1. Contribution to Digital Transformation in AEC Retrofit Processes

The IDROM-fit experience demonstrates how digital transformation in the AEC sector can be operationalized in the specific field of building retrofit. The platform does not introduce a single isolated tool, but combines different digital components into a continuous workflow: knowledge collection, BIM modeling, cloud-based collaboration, energy assessment, selection of prefabricated solutions, Digital Twin creation, and IoT monitoring. This integration is relevant because retrofit decisions depend on the interaction between multiple forms of knowledge and not only on energy calculation, as also highlighted by retrofit and decision-support literature [5,6,7,8].
The main contribution of the platform is the creation of a shared decision environment in which information produced by different actors can be managed and connected. The CDE provides the governance structure for documents, models, roles and workflows; the viewer provides a model-based interface for collaboration; the energy module supports scenario assessment; the retrofit-kit catalogue connects technical solutions with BIM objects; and the IoT/Digital Twin module supports post-intervention monitoring. Together, these modules address the fragmentation identified in the CDSS review.
The platform also contributes to the transition from design-centered retrofit to lifecycle-oriented retrofit. Many renovation processes end their digital workflow at the design or construction stage. IDROM-fit extends the process to operation by treating sensors as assets and by linking monitoring data to the model. This enables the possibility of comparing predicted and actual performance and of supporting maintenance or corrective actions. Although long-term measured performance data are not yet available, the workflow provides the digital structure needed for such analyses.

4.2. Comparison with Existing CDSS-Related Tools

The CDSS review showed that existing tools often cover only part of the retrofit process. Building automation platforms can be effective for operational control and consumption monitoring, but they are usually weak in early-stage retrofit planning and BIM-based design coordination. Energy simulation tools provide advanced performance analysis, but they may not manage collaborative workflows, construction-oriented issues, or post-intervention monitoring within the same environment. Construction-management platforms provide strong issue tracking and document control, but they are not necessarily designed around energy retrofit, typological analysis, or Digital Twin-based monitoring. Compared with the literature on RenoDSS, BIM-based green retrofit frameworks and social-housing retrofit protocols, this limitation confirms that decision support in retrofit is still distributed across specialized tools rather than consolidated into a single lifecycle workflow [17,18,19,20].
IDROM-fit positions itself in the gap between these specialized tools. Its objective is not to replace advanced simulation software, building automation systems, or construction management platforms. Rather, it provides a collaborative framework in which such functions can be connected through open formats, shared workflows and retrofit-specific decision criteria. In this sense, the platform acts as an integrator and coordinator of data, models, components, and stakeholders.
This positioning also clarifies the differences between IDROM-fit and both recent decision-support platforms that focus primarily on expert-driven criteria weighting and retrofit-option ranking, such as Farid et al. [48], and BIM-based renovation frameworks focused on scenario evaluation, client decision-making, cost, disruption, and performance [17,18,19,20]. Compared with such approaches, the present contribution is less mature in algorithmic ranking, because weighting and automated recommendation are not yet implemented as full Multi-Criteria Decision Analysis (MCDA) functions. Its contribution is instead located in lifecycle integration: the same environment connects CDE governance, IFC-based model federation, prefabricated retrofit kits, workflow traceability and the preliminary BIM-IoT monitoring structure needed for post-retrofit verification. IDROM-fit should therefore be evaluated as a socio-technical integration framework and demo platform, not as a standalone optimization engine.
Among the reviewed platforms and the related literature, the closest alternatives are RenoDSS [17], the e-DSS developed in the e-SAFE project [49] and the INFINITE industrialized renovation environment [32]. RenoDSS generates renovation scenarios automatically from the IFC model of the existing building and compares them through energy, financial, and sustainability indicators [17]; it is focused on scenario generation and assessment rather than on CDE governance or post-retrofit monitoring. The e-DSS supports the preliminary design of combined energy and seismic renovation of reinforced-concrete framed buildings with prefabricated timber-based envelope solutions [49], which makes it the closest analogue to the DUO SYSTEM case; it is oriented to early-stage assessment of a specific solution portfolio rather than to collaborative information management and operation. INFINITE couples industrialized envelope kits with digital tools for the renovation value chain [32]. The practical advantage of IDROM-fit lies in keeping these steps in one environment: the scenario selected in the design stage, the documents and approvals that justify it, the as-built model, and the sensors installed after the intervention refer to the same model objects, so that monitoring data can later be compared with the assumptions under which the decision was taken. Its main disadvantage, compared with RenoDSS and the e-DSS, is the absence of automatic scenario generation and ranking.
The five functional domains used in Table 9 represent an analytical synthesis of the main functional orientations identified in the platform review presented in Section 2.2 (Table 1), rather than a one-to-one classification of individual tools.
Table 9. Comparative positioning of IDROM-fit against functional approaches identified in the platform review and related DSS literature.
Energy simulation is represented by IESVE; collaborative construction and lifecycle information management emerge from the complementary contributions of Procore and PlanRadar to project coordination and field management, and of Zutec and Lookthrough to asset and lifecycle information management. Building automation and operational monitoring are represented by myGEKKO, retrofit-process support by ReSys, and industrialized renovation by INFINITE.
These domains were subsequently aligned with the functional requirements of IDROM-fit (Table 2) and its implemented decision-support workflow (Table 3). This analytical synthesis does not imply that individual platforms provide all the functions associated with a given domain. In particular, the review does not establish that ReSys implements explicit criteria weighting or automated retrofit-option ranking.
Table 9 therefore compares the functional orientations identified in the reviewed platforms with the integrated lifecycle configuration proposed by IDROM-fit, rather than attributing identical capabilities to individual tools.
The integration of prefabricated retrofit kits represents an additional differentiating feature. While many platforms manage generic product libraries or documents, IDROM-fit aims to connect industrialized retrofit components with typological adaptability, energy performance, BIM modeling and potential file-to-factory workflows. This link between digital decision support and physical production is especially relevant for mass retrofit strategies, where scalability depends on repeatable, configurable and information-rich solutions.

4.3. Implications for Building Decarbonization and Renewable Energy Integration

Although IDROM-fit was developed as a decision-support and information-management environment, its relevance for building decarbonization lies in the way it connects the three levers that deep renovation increasingly combines: demand reduction through the envelope, electrification of heat generation, and on-site renewable energy production. Recent reviews group Digital Twin applications for building energy efficiency into design optimization, occupant comfort, operation and maintenance, and energy consumption simulation [50], which suggests that support for renovation decisions across the lifecycle is still a less consolidated application. Dynamic simulations of typical Italian dwellings also indicate that replacing gas boilers with heat pumps, combined with mechanical ventilation with heat recovery, provides the largest national reductions in non-renewable primary energy among the measures compared, with priorities that depend on the climate zone [51]. Retrofit strategies should therefore be compared as combinations of envelope, system and renewable measures rather than as isolated interventions.
The case study reflects this logic: the DUO SYSTEM envelope retrofit was combined with a new heat pump and a photovoltaic system (Section 2.5), and these measures were represented in the energy-modeling workflow (Section 2.6). Within the platform, each measure can be linked to model objects, technical attributes and the variables to be monitored during operation. This is relevant because the decarbonization effect of a deep retrofit depends not only on the design-stage energy balance but also on how the envelope, the heat pump and the photovoltaic system perform together. Field studies on retrofitted dwellings have shown that the measured performance of envelope components can deviate from calculated values even when whole-building heat loss is close to the theoretical value [52], and Digital Twin-based platforms have been proposed to monitor building energy use during operation and to support its control [53]. Linking design-stage predictions to such operational data is what makes deviations visible.
At the present stage, IDROM-fit does not yet quantify the post-retrofit reduction in energy use or emissions, nor does it monitor photovoltaic production or heat-pump consumption. The energy-metering components defined in the monitoring framework (Table 5), extended to photovoltaic production and grid exchange, would close this loop. Their integration through open interfaces would allow the platform to compute indicators directly relevant to decarbonization, such as non-renewable primary energy use, on-site renewable share, self-consumption and operational CO2 emissions, and to compare them with design-stage predictions. In this sense, the contribution of the CDSS to decarbonization is enabling rather than direct: it provides the information infrastructure through which the performance of combined efficiency, electrification and renewable measures can be planned, documented and verified.

4.4. Interoperability, Scalability and Transferability

Interoperability is one of the most important conditions for the practical adoption of retrofit-oriented CDSSs. IDROM-fit addresses interoperability at several levels. At the model level, IFC is used to exchange and federate BIM information. At the process level, CDE workflows and naming conventions provide structured information governance. At the service level, the architecture includes APIs and microservices. At the monitoring level, sensors are intended to communicate through cloud channels and open protocols where available.
The testing results confirm that this strategy is feasible, especially for CDE management, IFC visualization, model federation, and temperature/humidity data integration. However, the energy-sensor criticality shows that interoperability cannot be assumed merely because a device is commercially available or cloud-connected. In future implementations, sensor selection should be guided by explicit technical requirements, including API availability, data-export formats, protocol transparency, authentication methods, data ownership and long-term support. The next development should therefore move from device-specific connectors toward documented semantic mappings and ontology-based exchange strategies, as suggested by recent BIM-to-BRICK and Digital Twin energy-modeling research [38,45]. Automated ingestion approaches that regularize heterogeneous IoT data before visualization point in the same direction [46] (Section 2.7).
Scalability is addressed through the cloud-native and microservice architecture, through the responsive PWA interface, and through the modular organization of platform functions. The controlled and operational tests show that the platform can manage demo-scale data, federated models, and real case-study workflows. Nevertheless, large-scale deployment will require stress testing with multiple buildings, larger point clouds, more sensor streams, more users and longer monitoring periods. Scalability should therefore be understood as a demonstrated design principle and a preliminary technical capability, not yet as full operational validation at district scale.
Transferability depends not only on software architecture, but also on the capacity to adapt the knowledge framework to different territories and building typologies. The meta-design phase addressed this issue by including territorial planning information, typological analysis, financing mechanisms, and retrofit kits. This structure makes the platform potentially transferable to other contexts, provided that local datasets, regulatory constraints, incentive schemes and building archetypes are properly mapped and integrated. Transfer to multi-family buildings raises additional requirements that were not tested in this study: more dwellings and sensors, shared heating and DHW systems, and decision-making among several owners. The role and permission structure of the CDE can represent multiple owners and their representatives, but scenario comparison would need indicators at both building and dwelling level. The DUO SYSTEM has variants for both reinforced-concrete and load-bearing masonry buildings; where it cannot be applied, for instance where the added façade thickness is not permitted, where façades are subject to heritage constraints, or where external access is limited, other envelope options enter the comparison with the minimum data set of Table 4 (Section 3.5).

4.5. Limitations of the Current Study

The study has several limitations that must be considered when interpreting the results. First, validation remains preliminary and demo-based. The platform was tested through controlled technical checks and one operational residential case study, but not through a statistically significant sample of buildings, climatic contexts, public administrations, or construction projects. The results therefore demonstrate feasibility and workflow coherence at demo scale, rather than generalizable impact. The case study was also retrospective: the retrofit decision preceded the platform, so the study shows how a decision can be documented and traced, not that the platform improved it.
Second, energy-performance validation is not yet based on long-term measured post-retrofit data. The platform supports energy modeling, retrofit-scenario comparison, sensor-data association, and dashboard visualization; however, measured energy savings, rebound effects, occupant behavior, and performance gaps require seasonal monitoring after retrofit and comparison between simulated and measured data. Accordingly, the current evidence supports the BIM–IoT monitoring workflow and Digital Twin readiness, but not a validated energy-performance Digital Twin.
Finally, the current version of the platform remains a Demo at Technology Readiness Level (TRL) 6. Corrective maintenance improved loading times, file interchange, IoT synchronization, and interface navigation, but further development is required before product-scale deployment. Open issues include robust sensor procurement rules, automated data-quality checks, cybersecurity assessment, larger-model stress testing, long-term maintenance procedures, user-support protocols, and integration with external public databases and procurement systems. In particular, the platform has not yet been characterized in terms of performance: upload and model-loading times and sensor-to-dashboard latency were verified only through functional checks, and the tests could not be repeated after the end of the project. Future validation should include repeated upload tests with documented file sizes, hardware and network conditions, and absolute loading times, and latency measurements based on acquisition and display timestamps, reporting mean and maximum values.
The main practical strengths and remaining limitations of the IDROM-fit Demo are summarized in Table 10.
Table 10. Specific advantages and limitations of the proposed IDROM-fit system.

4.6. Future Developments

Future research should extend platform validation across multiple case studies representing different building typologies, construction periods, climatic conditions, and ownership models. This would allow the research team to evaluate the adaptability of the CDSS workflow and the scalability of the data architecture beyond the initial case study.
A second development concerns the integration of a structured retrofit marketplace. Such a marketplace could classify prefabricated envelope systems, plant technologies, IoT devices, technical sheets, financing instruments, and certified suppliers. Search and filtering functions could allow users to select solutions according to building type, climate zone, regulatory constraints, available budget, and performance targets. This would strengthen the connection between decision support and industrialized production.
A third development concerns advanced analytics and artificial intelligence. Once sufficient monitoring data are available, the platform could support anomaly detection, predictive maintenance, energy-consumption forecasting, and comparison between simulated and measured performance. However, these functions should be developed on the basis of transparent data governance, reliable sensors, and clear responsibility for decision outcomes. Such developments should be accompanied by interoperable ontologies and calibration procedures to ensure that analytics are based on reliable sensor-model relationships rather than isolated dashboards [36,37,38,44,45]. Future versions should also include scheduled maintenance plans for HVAC and DHW components, CO2 and occupancy sensing for the assessment of ventilation, and comfort indicators derived from the monitored variables.
A fourth development concerns user engagement. Retrofit performance depends partly on occupant behavior and facility-management practices. Future versions of IDROM-fit could include simplified dashboards and storytelling tools for non-technical users, translating sensor data and energy indicators into actionable recommendations. This would extend the CDSS from a professional decision-support tool to a broader engagement environment supporting awareness and behavioral change.

5. Conclusions

This paper presented the development and preliminary validation of IDROM-fit, a cloud-based Collaborative Decision Support System designed to support energy and technological retrofit processes for existing residential buildings. The research addressed the fragmentation of digital workflows by proposing an integrated environment that connects BIM/openBIM modeling, CDE workflows, energy assessment, prefabricated retrofit solutions, IoT monitoring, and Digital Twin-oriented data organization. The intended users are primarily professional and institutional actors involved in retrofit planning, delivery and operation. In the case study, the platform supported a deep retrofit that combined a prefabricated envelope with a heat pump and a photovoltaic system, showing how efficiency, electrification and renewable measures can be managed within one information workflow.
The first contribution is methodological: the paper frames retrofit decision support as a design-science artefact and derives platform requirements from a comparative review of eight CDSS-related platforms. The review indicates that many tools remain specialized by lifecycle phase or function, while retrofit requires continuity between diagnosis, scenario definition, design coordination, industrialized implementation and post-intervention monitoring. This methodological position is consistent with design-science research and recent calls for more explicit BIM-enabled retrofit information requirements [16,25,26].
The second contribution is technical and operational: the IDROM-fit Demo integrates a CDE, IFC viewer, issue and markup tools, approval workflows, energy-modeling functions, Digital Twin assets, IoT data connectors and a catalogue of industrialized dry retrofit kits. These modules support the construction of comparable retrofit scenarios and make assumptions, files, model objects, workflow states and responsibilities more traceable. Compared with recent DSS-oriented studies, its contribution lies in connecting scenario assessment with CDE governance, prefabricated kit selection, workflow traceability and monitoring preparation [17,18,19,20].
The third contribution is evaluative, although preliminary. Controlled testing confirmed the feasibility of CDE functions, IFC visualization and federation, workflow traceability, issue/markup tools and temperature/humidity data visualization. Operational testing on the Benevento case study confirmed that real BIM models, territorial datasets, sensor dashboards and collaborative workflows can be managed within a single cloud environment. A retrospective comparison of two retrofit packages showed how the platform records the evidence and rationale of a decision, although the decision itself preceded the platform. At the same time, testing revealed clear development needs related to energy-sensor interoperability, model-loading optimization, dataset normalization, and structured user evaluation. The validation also clarifies the present maturity of the Digital Twin component, which should be further developed through interoperable sensor semantics, calibration, and longitudinal energy-performance verification [36,37,38,45].
Overall, the study supports the claim that a cloud-based CDSS can make retrofit processes more transparent and traceable when it is designed as a continuous information workflow rather than as a set of isolated tools. From the perspective of building decarbonization, it provides the information infrastructure needed to plan and verify combined efficiency, electrification, and renewable measures. It does not yet demonstrate quantified energy savings or emission reductions, long-term operational robustness, or district-scale scalability. Its main scientific value lies in the meta-design and demonstration of a lifecycle-oriented integration framework that can be further tested, measured, and refined.
Future work should therefore focus on extended validation across multiple buildings and territorial contexts, long-term post-retrofit monitoring including heat-pump consumption and photovoltaic production, explicit MCDA/ranking functions, stronger integration of open IoT protocols, further development of the retrofit marketplace, cybersecurity and data-governance assessment, and improved interfaces for non-technical stakeholders. These steps are necessary to move from a demo-scale prototype to a deployable platform capable of supporting evidence-based renovation strategies.

Author Contributions

Conceptualization, S.R.E., E.T. and M.B. (Marina Block); methodology, S.R.E., G.M.M., E.T. and M.B. (Marina Block); validation, S.R.E., E.T. and M.B. (Marina Block); investigation, S.R.E., M.B. (Mariangela Bellomo), G.M.M., E.T. and M.B. (Marina Block); resources, S.R.E., G.M.M., E.T. and M.B. (Marina Block); data curation, S.R.E., G.M.M., E.T. and M.B. (Marina Block); writing—original draft preparation, S.R.E., M.B. (Mariangela Bellomo), G.M.M., E.T. and M.B. (Marina Block); writing—review and editing, S.R.E., E.T. and M.B. (Marina Block); visualization, E.T. and M.B. (Marina Block); supervision, S.R.E., E.T. and M.B. (Marina Block); project administration, S.R.E. and M.B. (Mariangela Bellomo); funding acquisition, S.R.E. and M.B. (Mariangela Bellomo). All authors have read and agreed to the published version of the manuscript.

Funding

This research was developed within the iNEST project, funded under the MUR—Mission 4, Component 2, Investment 1.5—Creation and Strengthening of Innovation Ecosystems, PNRR, funded by the European Union—NextGenerationEU, grant agreement no. ECS00000043.

Data Availability Statement

The data supporting the preliminary validation are partly reported in the tables included in this article. Additional technical test logs, platform documentation and case-study materials are available from the corresponding author upon reasonable request, subject to confidentiality constraints related to partner software, proprietary device interfaces and building documentation.

Acknowledgments

The findings of the IDROM-fit research project presented in this paper are the result of a joint effort by an interdisciplinary research team from the Department of Architecture at the University of Naples Federico II (M. Bellomo, S. Russo Ermolli, G. M. Mauro, E. Tersigni, M. Block, F. De Rossi, A. Arena, M. R. Santangelo, S. Riccardi, M. Galterisi, M. Cerreta, and B. Grieco), together with the company IRONDOM SRL (G. Maisto) and the company Blumatica SRL (R. Ciciriello, G. Botta, and L. Cocozza). In particular, the software development of the IDROM-fit Demo Platform was carried out by Blumatica. All the research activities have been carried out within the spaces of the Transitional Lab of the Department of Architecture. All images are taken from the IDROM-fit Technical Report. During the preparation of this manuscript, the authors used ChatGPT Edu (OpenAI; model GPT-6.1) to edit Figure 1 and Figure 3 and to generate the graphic layout of Figure 2 from content defined by the authors. The authors have reviewed and edited the output and take full responsibility for the content of this publication.

Conflicts of Interest

The authors declare no conflicts of interest.

References

  1. European Parliament; Council of the European Union. Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the Energy Performance of Buildings (Recast). Off. J. Eur. Union 2024, L 2024/1275. Available online: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L_202401275 (accessed on 23 June 2026).
  2. European Commission. EU Building Stock Observatory. Available online: https://energy.ec.europa.eu/topics/energy-efficiency/energy-performance-buildings/eu-building-stock-observatory_en (accessed on 23 June 2026).
  3. Caffari, F.; Calabrese, N.; Murano, G.; Signoretti, P. (Eds.) La Consistenza del Parco Immobiliare Nazionale; ENEA: Rome, Italy, 2024; ISBN 978-88-8286-482-8. Available online: https://www.pubblicazioni.enea.it/le-pubblicazioni-enea/edizioni-enea/anno-2024/la-consistenza-del-parco-immobiliare-nazionale.html (accessed on 23 June 2026).
  4. Volk, R.; Stengel, J.; Schultmann, F. Building Information Modeling (BIM) for existing buildings—Literature review and future needs. Autom. Constr. 2014, 38, 109–127. [Google Scholar] [CrossRef] [Scilit]
  5. Ma, Z.; Cooper, P.; Daly, D.; Ledo, L. Existing building retrofits: Methodology and state-of-the-art. Energy Build. 2012, 55, 889–902. [Google Scholar] [CrossRef] [Scilit]
  6. Ferreira, J.; Pinheiro, M.D.; de Brito, J. Refurbishment decision support tools review-Energy and life cycle as key aspects to sustainable refurbishment projects. Energy Policy 2013, 62, 1453–1460. [Google Scholar] [CrossRef] [Scilit]
  7. Kolokotsa, D.; Diakaki, C.; Grigoroudis, E.; Stavrakakis, G.; Kalaitzakis, K. Decision support methodologies on the energy efficiency and energy management in buildings. Adv. Build. Energy Res. 2009, 3, 121–146. [Google Scholar] [CrossRef] [Scilit]
  8. Jalaei, F.; Jrade, A.; Nassiri, M. Integrating decision support system (DSS) and Building Information Modeling (BIM) to optimize the selection of sustainable building components. J. Inf. Technol. Constr. 2015, 20, 399–420. Available online: https://www.itcon.org/2015/25 (accessed on 23 June 2026).
  9. ISO 19650-1:2018; Organization and Digitization of Information About Buildings and Civil Engineering Works, Including Building Information Modelling (BIM)-Information Management Using Building Information Modelling-Part 1: Concepts and Principles. International Organization for Standardization: Geneva, Switzerland, 2018.
  10. ISO 19650-2:2018; Organization and Digitization of Information About Buildings and Civil Engineering Works, Including Building Information Modelling (BIM)-Information Management Using Building Information Modelling-Part 2: Delivery Phase of the Assets. International Organization for Standardization: Geneva, Switzerland, 2018.
  11. ISO 16739-1:2024; Industry Foundation Classes (IFC) for Data Sharing in the Construction and Facility Management Industries-Part 1: Data Schema. International Organization for Standardization: Geneva, Switzerland, 2024.
  12. Shahzad, M.; Shafiq, M.T.; Douglas, D.; Kassem, M. Digital twins in built environments: An investigation of the characteristics, applications, and challenges. Buildings 2022, 12, 120. [Google Scholar] [CrossRef] [Scilit]
  13. Clausen, A.; Arendt, K.; Johansen, A.; Sangogboye, F.C.; Kjaergaard, M.B.; Veje, C.T.; Jorgensen, B.N. A digital twin framework for improving energy efficiency and occupant comfort in public and commercial buildings. Energy Inform. 2021, 4, 40. [Google Scholar] [CrossRef] [Scilit]
  14. Omrany, H.; Al-Obaidi, K.M.; Husain, A.; Ghaffarianhoseini, A. Digital twins in the construction industry: A comprehensive review of current implementations, enabling technologies, and future directions. Sustainability 2023, 15, 10908. [Google Scholar] [CrossRef] [Scilit]
  15. Shim, J.-H.; Ham, N.-H.; Kim, J.-J. Collaborative BIM-based construction coordination progress modeling using extended collaborative process modeling (exCPM). Buildings 2024, 14, 358. [Google Scholar] [CrossRef] [Scilit]
  16. Ahmed, W.; Heywood, C.A.; Holzer, D. BIM-enabled energy retrofitting: A critical review of current status and future prospects. Energy Build. 2025, 348, 116478. [Google Scholar] [CrossRef] [Scilit]
  17. Fenz, S.; Giannakis, G.; Bergmayr, J.; Iousef, S. RenoDSS: A BIM-based building renovation decision support system. Energy Build. 2023, 288, 112999. [Google Scholar] [CrossRef] [Scilit]
  18. Kaashi, S.; Vilventhan, A. Development of a building information modelling based decision-making framework for green retrofitting of existing buildings. J. Build. Eng. 2023, 78, 107735. [Google Scholar] [CrossRef] [Scilit]
  19. Tzortzopoulos, P.; Ma, L.; Soliman-Junior, J.; Koskela, L. Evaluating social housing retrofit options to support clients’ decision making: SIMPLER BIM protocol. Sustainability 2019, 11, 2507. [Google Scholar] [CrossRef] [Scilit]
  20. Chaves, F.J.; Tzortzopoulos, P.; Formoso, C.T.; Biotto, C.N. Building information modelling to cut disruption in housing retrofit. Proc. Inst. Civ. Eng. Eng. Sustain. 2017, 170, 322–331. [Google Scholar] [CrossRef] [Scilit]
  21. ElTahan, R.; Hosny, O.; Tarabieh, K.; Dorra, E.M.; Elamawy, S. Energy Retrofit Decision-Support System for Existing Educational Buildings in Egypt. Buildings 2026, 16, 346. [Google Scholar] [CrossRef] [Scilit]
  22. Del Giudice, M.; Donato, A.J.; Loffa, M.A.; Rando Mazzarino, P.; Bottaccioli, L.; Patti, E.; Osello, A. BIM-to-BEM Framework for Energy Retrofit in Industrial Buildings: From Simulation Scenarios to Decision Support Dashboards. Sustainability 2026, 18, 1023. [Google Scholar] [CrossRef] [Scilit]
  23. Papangelopoulou, M.D.; Alexakis, K.; Askounis, D. Assessment Methods for Building Energy Retrofits with Emphasis on Financial Evaluation: A Systematic Literature Review. Buildings 2025, 15, 2562. [Google Scholar] [CrossRef] [Scilit]
  24. Bruno, S.; De Fino, M.; Fatiguso, F. Historic Building Information Modelling: Performance assessment for diagnosis-aided information modelling and management. Autom. Constr. 2018, 86, 256–276. [Google Scholar] [CrossRef] [Scilit]
  25. Hevner, A.R.; March, S.T.; Park, J.; Ram, S. Design science in information systems research. MIS Q. 2004, 28, 75–105. [Google Scholar] [CrossRef] [Scilit]
  26. Peffers, K.; Tuunanen, T.; Rothenberger, M.A.; Chatterjee, S. A design science research methodology for information systems research. J. Manag. Inf. Syst. 2007, 24, 45–77. [Google Scholar] [CrossRef] [Scilit]
  27. Li, X.; Gan, W.; Liu, X.; Yang, J. Rule-Based Digital Twin: An Integrated Parametric-BIM Workflow for Life-Cycle Delivery of Free-Form, Special-Shaped Envelopes in Large-Scale Public Buildings. Buildings 2026, 16, 778. [Google Scholar] [CrossRef] [Scilit]
  28. myGEKKO. Smart Energy Management. Available online: https://www.my-gekko.com/en/smart-energy-management/10-0.html (accessed on 9 November 2026).
  29. IESVE. Integrated Environmental Solutions. Available online: https://www.iesve.com (accessed on 9 November 2026).
  30. PlanRadar. Construction and Real Estate Management Software. Available online: https://www.planradar.com (accessed on 9 November 2026).
  31. Lookthrough, A.G. Lookthrough Platform. Available online: https://lookthrough.com (accessed on 9 November 2026).
  32. European Commission; CORDIS. INFINITE—Industrialised Durable Building Envelope Retrofitting by All-in-One Interconnected Technology Solutions, Grant Agreement No. 958397. Available online: https://cordis.europa.eu/project/id/958397 (accessed on 9 November 2026).
  33. Zutec. Building Information Management Platform. Available online: https://www.zutec.com (accessed on 9 November 2026).
  34. Softime, S.R.L. ReSys. Available online: https://resys.it/ (accessed on 10 November 2026).
  35. Procore Technologies. Procore Construction Management Software. Available online: https://www.procore.com (accessed on 9 November 2026).
  36. Zhang, X.; Zheng, J.; Li, P.; Yang, Y.; Ye, Y.; Causone, F.; Shi, X. A review of building digital twins: Framework and enabling technologies. J. Build. Eng. 2025, 111, 113117. [Google Scholar] [CrossRef] [Scilit]
  37. Revolti, A.; Gualtieri, L.; Pauwels, P.; Dallasega, P. From building information modeling to construction digital twin: A conceptual framework. Prod. Manuf. Res. 2024, 12, 2387679. [Google Scholar] [CrossRef] [Scilit]
  38. Vittori, F.; Tan, C.F.; Pisello, A.L.; Chong, A.; Piselli, C.; Miller, C. BIM-to-BRICK: Using graph modeling for IoT/BMS and spatial semantic data interoperability within digital data models of buildings. Energy Build. 2025, 348, 116368. [Google Scholar] [CrossRef] [Scilit]
  39. ISO 9869-1; Thermal Insulation—Building Elements—In-Situ Measurement of Thermal Resistance and Thermal Transmittance—Part 1: Heat Flow Meter Method. International Organization for Standardization: Geneva, Switzerland, 2014.
  40. ISO 7726; Ergonomics of the Thermal Environment—Instruments for Measuring Physical Quantities. International Organization for Standardization: Geneva, Switzerland, 1998.
  41. EN 16798-1; Energy Performance of Buildings—Ventilation for Buildings—Part 1: Indoor Environmental Input Parameters for Design and Assessment of Energy Performance of Buildings Addressing Indoor Air Quality, Thermal Environment, Lighting and Acoustics. European Committee for Standardization: Brussels, Belgium, 2019.
  42. EN ISO 52016-1; Energy Performance of Buildings—Energy Needs for Heating and Cooling, Internal Temperatures and Sensible and Latent Heat Loads—Part 1: Calculation Procedures. European Committee for Standardization: Brussels, Belgium, 2017.
  43. Boje, C.; Guerriero, A.; Kubicki, S.; Rezgui, Y. Towards a Semantic Construction Digital Twin: Directions for Future Research. Autom. Constr. 2020, 114, 103179. [Google Scholar] [CrossRef] [Scilit]
  44. Lu, Q.; Xie, X.; Parlikad, A.K.; Schooling, J.M. Digital Twin-Enabled Anomaly Detection for Built Asset Monitoring in Operation and Maintenance. Autom. Constr. 2020, 118, 103277. [Google Scholar] [CrossRef] [Scilit]
  45. Bjørnskov, J.; Thomsen, A.; Jradi, M. Large-scale field demonstration of an interoperable and ontology-based energy modeling framework for building digital twins. Appl. Energy 2025, 387, 125597. [Google Scholar] [CrossRef] [Scilit]
  46. Arman, A.; Bellini, P.; Bologna, D.; Nesi, P.; Pantaleo, G.; Paolucci, M. Automating IoT Data Ingestion Enabling Visual Representation. Sensors 2021, 21, 8429. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  47. Thom, E.C. The Discomfort Index. Weatherwise 1959, 12, 57–61. [Google Scholar] [CrossRef] [Scilit]
  48. Farid, H.M.A.; Iram, S.; Shakeel, H.M.; Hill, R.; Simic, V. An expert-driven digital platform for decision support in sustainable building retrofitting. Energy Build. 2026, 352, 116770. [Google Scholar] [CrossRef] [Scilit]
  49. Evola, G.; Torrisi, M.; Costanzo, V.; Lazzaro, M.; Arnone, D.; Margani, G. A Decision Support Tool to Assess the Energy Renovation Performance Through a Timber-Based Solution for Concrete-Framed Buildings. Energies 2025, 18, 2839. [Google Scholar] [CrossRef] [Scilit]
  50. Bortolini, R.; Rodrigues, R.; Alavi, H.; Dalla Vecchia, L.F.; Forcada, N. Digital Twins’ Applications for Building Energy Efficiency: A Review. Energies 2022, 15, 7002. [Google Scholar] [CrossRef] [Scilit]
  51. Noro, M.; Busato, F. Energy Saving, Energy Efficiency or Renewable Energy: Which Is Better for the Decarbonization of the Residential Sector in Italy? Energies 2023, 16, 3556. [Google Scholar] [CrossRef] [Scilit]
  52. Lambie, E.; Saelens, D. Identification of the Building Envelope Performance of a Residential Building: A Case Study. Energies 2020, 13, 2469. [Google Scholar] [CrossRef] [Scilit]
  53. Li, C.; Lu, P.; Zhu, W.; Zhu, H.; Zhang, X. Intelligent Monitoring Platform and Application for Building Energy Using Information Based on Digital Twin. Energies 2023, 16, 6839. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Article metric data becomes available approximately 24 hours after publication online.