Occurrence of a Large Temporary Overvoltage Due to a Phase Interruption in a 220 kV Line

,
,
,
,
,
,
,
,
and
1
Terna S.p.A., 00138 Rome, Italy
2
e-distribuzione S.p.A., 00198 Roma, Italy
3
Department of Electrical and Energy Engineering, “Sapienza” University of Rome, 00184 Rome, Italy
4
Huawei, 40549 Düsseldorf, Germany

Abstract

The paper details the occurrence of a severe temporary overvoltage (TOV) in an existing Italian HV/MV system where a radially operated 180 km, 220 kV overhead line experienced an asymmetrical phase conductor break. The recorded TOV reached 1.43 p.u. (256 kV peak line-to-ground) and 1.41 p.u. (440–445 kV peak line-to-line) at the 220 kV level, transferring a 1.38 p.u. (45 kV peak) overvoltage to the underlying 23 kV MV network and causing customer equipment damage, exceeding standard EHV/HV insulation coordination duration limits. Series faults, liable to cause overvoltages in radial systems, are not uncommon at MV level and have been extensively investigated in the past. Such radial configurations, although much less frequently, can occur also at HV level due to contingencies, maintenance or both. An approximate linear circuit model is presented to explain the underlying series resonance mechanism with the transformer zero-sequence magnetizing impedance. Furthermore, a detailed nonlinear ATP-EMTP system model was developed. Simulation results show excellent quantitative agreement with field recordings (peak error < 2.0%), confirming that transformer core saturation limits the theoretical resonant peak and that local generation restoration effectively suppresses the TOV.

1. Introduction

Several events might result in a “series fault”, i.e., the asymmetrical interruption of a line (one- or two-phase), such as a stuck circuit breaker pole, loosened or broken jumper connections at a dead end tower, or simply a conductor breakage in overhead lines (OHLs) equipped with single conductors. If the interruption also involves a ground fault, the detection of this condition becomes a high-impedance ground fault (HIF) problem. This can be quite troublesome in MV distribution systems operated with multi-grounded neutral [1,2], whereas at HV level modern digital relays include dedicated HIF protection algorithms [3,4]. Generally speaking, “pure” series faults involving only the phase interruption can be less easy to detect, especially with older line relays. Modern protective HV line relays normally also include a broken conductor detection function, but the attendant output signal is usually just an alarm. The open circuit fault causes the appearance of zero- and negative-sequence currents in the steady state [5] and the extent of the ensuing perturbation strongly depends on the network configuration. A meshed system hosting several synchronous generators presents a very low impedance to negative-sequence currents, resulting in a small voltage unbalance often not exceeding (2–3)% [6,7], which can persist for a relatively long time without causing damage.
However, open-phase faults in radial systems cause very large voltage unbalances that endanger rotating machines and might even result in temporary overvoltages on one or two phases [8,9,10]. Ferroresonance cannot be ruled out if the affected line terminates on an unloaded or lightly loaded transformer [11]. Since open-phasing is not uncommon in MV distribution systems using fuses for line and/or transformer protection [12,13], the possible occurrence of ferroresonance in such systems has been extensively studied: in fact, in radial MV networks operated with solidly earthed neutral and having Delta-Wye connected MV/LV distribution transformers, the open phase may cause ferroresonance between the interrupted phase conductor capacitance and the positive-sequence magnetizing impedance of the transformer [14].
The open-phase fault of a radial line is very unlikely at EHV level given the meshed topology of the transmission system, except at early developing stages [15]. On the other hand, HV subtransmission networks are often scarcely meshed (e.g., with simple loop lines) so that radial configurations may occur due to a single contingency or maintenance switching. Under such conditions, a series fault might result in unacceptable voltage unbalance and even large temporary overvoltages (TOVs) [16]. For instance, if the radial HV line supplies an HV/MV three-leg core transformer with solidly grounded neutral, the open phase may engender series resonance/ferroresonance between the self-capacitance of the interrupted phase conductor and the zero sequence magnetizing impedance of the transformer. This circumstance is quite different from the well-known, distribution-related ferroresonant configuration reported in [14], because the star point of the HV windings of the HV/MV transformer is solidly grounded rather than isolated. Recent literature has further investigated temporary overvoltages and ferroresonant phenomena triggered by open-phase conditions, asymmetrical pole switching, and core saturation in HV/MV networks using electromagnetic transient simulations [17,18,19,20].
This paper presents and analyzes such a severe TOV occurrence caused by a series fault in a long radialized 220 kV OHL supplying a large 23 kV distribution system in Italy. Firstly, a linear steady-state circuit analysis of the system was carried out with the aim of evidencing the possible occurrence of TOVs due to a series fault and highlighting the main parameters and system conditions governing the phenomenon. A detailed ATP-EMTP model of the system has been subsequently set up, and time-domain simulation results are in very good agreement with actual recordings of the incident. A preliminary linear steady-state formulation of open-phase conditions was outlined by the authors in [21]. However, linear analysis cannot quantify actual TOV peak values under transformer core saturation, nor does it reproduce transient dynamics. Building upon [21], this paper provides a comprehensive investigation of the real-world incident. The main novel contributions of this work are: (i) the presentation and detailed breakdown of actual digital field disturbance recordings from the 220 kV grid incident; (ii) the development and field-validation of a detailed nonlinear ATP-EMTP model that accurately incorporates transformer saturation dynamics; (iii) a systematic parametric investigation evaluating peak TOVs as a function of fault location; and (iv) an analysis of local generation impacts on TOV suppression along with practical protection recommendations.
The remainder of the paper is structured as follows. Section 2 describes the 220/23 kV system and shows the recordings of the event. Section 3 presents the linear circuit study and Section 4 shows the nonlinear analysis by means of the detailed ATP-EMTP model of the system. Conclusions are reported in Section 5.

2. System Description and Recorded TOV

The standard HV subtransmission voltage is 150 kV in Central and Southern Italy and 132 kV in the North. At present, part of the country’s 220 kV network also fulfills a subtransmission role, with 220 kV lines directly supplying HV/MV primary substations (PSs) [22]. As a rule, Italian 132 or 150 kV subtransmission networks are operated in a simple meshed arrangement, consisting of two to four HV lines supplied by two EHV/HV substations, which in case of permanent line faults leads to radial operation of the affected backbone. There are substantial exceptions, however: in Central Italy the 150 kV subtransmission system is fully meshed, whereas many 150 kV lines in the Southern countryside are operated radially, with backbones intentionally opened to control the active power flow in the presence of very large power injections from HV-connected wind farms. The structure of the 220 kV system is meshed especially in the North of the country, so that 220 kV lines acting in a subtransmission capacity operate radially only due to contingencies (line tripouts due to permanent faults) or maintenance.
The actual case occurred in Northern Italy in the system schematized in Figure 1, which consists of a 400/220 kV Station, three 220 kV single conductor per phase OHLs, namely L1, L2 and L3, the 220 kV PS “A” hosting the hydroelectric power station G2 and supplying a 23 kV distribution network. The faulted 220 kV overhead line L1 originates from the 400/220 kV EHV/HV station B (for the purposes of the present study a short-circuit power of 12,000 MVA has been assumed, with unity X0/X1 ratio) and is a 180 km long single circuit, transposed and equipped with one 29.3 mm aluminum conductor steel reinforced (ACSR) conductor per phase (509 mm2, of which 416 mm2 aluminum). The main electrical parameters are reported in Table 1.
Figure 1. Single-line diagram of the HV/MV system at TOV inception. Circuit breaker (CB) state: dark squares are closed CBs, white squares are open CBs. “X” marks the series fault location.
Table 1. Main electrical constants of the 220 kV OHL L1.
The 220 kV/23 kV PS A at the receiving end of the OHL hosts a couple of 25 MVA, 220 kV ± (8 × 1.25%)/23 kV transformers; these are wye-wye connected, with the primary neutral solidly grounded and the secondary isolated from ground (YNy connection), and have a three-limb core-type construction [23]. It should be pointed out that the standard practice in Italy is to keep ungrounded the HV winding neutral of HV/MV transformers with 132 kV or 150 kV primary voltage; in the case under study a different practice is followed because the subsystem dates back to the 1960s, when 220 kV lines formed the transmission network operated with solidly earthed neutral, so that transformer neutrals were earthed on the 220 kV side. Main transformer data are reported in Table 2. The ATP-EMTP model used for time-domain simulations includes the nonlinear voltage-current magnetizing characteristic of the HV/MV transformer, shown in Figure 2.
Table 2. HV/MV transformer data.
Figure 2. Nonlinear voltage-current magnetizing characteristic of PS 220/23 kV transformer (Vbase = 220/√3 kV, Ibase = IratedTR).
In normal operation, line L2 is open and lines L1 and L3 supply the PS. At the time of the event, the total load supplied by the 23 kV busbars of the PS was 8 MW and 4 Mvar (capacitive load). The recorded sequence of events is as follows: after a line-to-line fault occurred in line L1 (recordings of which are available [24] but not reported in this paper), circuit breakers CB1 and CB2 tripped L1, leaving the PS disconnected from the EHV grid and supplied in an island by the hydropower plants G1 and G2; moreover, the fault caused the loosening of a phase jumper at a dead-end tower along L1, 140 km from station “A” as indicated in Figure 1 (hereafter in the paper, dips identifies the distance of the series fault position from the PS A, so that dips = 140 km in the recorded events). Due to the large excess of generation in the resulting islanded area, G1 tripped on over frequency. The subsequent manual reclosure of L1 was interdicted due to lack of synchronism across CB1, leaving L1 energized only through CB2; L1 could be reconnected only after dropping G2, i.e., opening CB3. Immediately after closing CB1, abnormal overvoltages occurred both at 220 kV and 23 kV side of station A lasting until L2 was reconnected.
Figure 3a shows line-to-ground voltages recorded by the digital protection relay installed at the CB1 line end. Before the reclosure of CB1, L1 was energized only at the CB2 end, the healthy phase voltages have the same maximum value (about 199 kV peak, i.e., 140.7 kV rms—1.1 p.u., Vbase = 220/√3 kV) whereas the voltage of the interrupted phase is very low, about 30.8 kV, being only due to the capacitive coupling with the healthy phases [25]. After the reclosure of CB1 (at time tcI in Figure 3a), the interrupted phase conductor is connected to the HV primary winding of the transformer. Because the HV neutral is solidly grounded and the MV neutral is ungrounded, a zero-sequence circuit is formed through the line-to-ground capacitance and the transformer zero-sequence magnetizing impedance. This series combination experiences series resonance/near-resonance, causing a sudden shift in the system neutral point. Consequently, a sustained 1.43 p.u. (Vbase = 220/√3 kV) TOV, i.e., 256 kV peak line-to-ground, in the interrupted phase is recorded at CB1 for a duration of about 4 min, causing severe line-to-line voltage dissymmetry, which transfers proportionally to the underlying 23 kV MV distribution network. Line-to-line voltages subsequent to time tcI elaborated from recordings of line-to-ground voltages are reported in Figure 3b: one of voltages reaches 440 kV, i.e., about 1.41 p.u. (Vbase = 220 kV), with the other two line-to-line voltages remaining below 1.11 p.u. (Vbase = 220 kV). The visible peak flattening and waveform distortion present in the B-C line-to-line voltage waveform of Figure 3b are a direct consequence of the deep magnetic saturation of the 3-leg transformer core under high TOV levels. The nonlinear saturation characteristic introduces significant odd harmonics, dominated by the third harmonic, which deform the fundamental power frequency voltage shape.
Figure 3. Voltages at station A 220 kV busbars, vs. time. (a) Recorded line-to-ground voltages; (b) calculated line-to-line voltages.
Figure 4 shows the highest line-to-line voltage at the 23 kV busbars of station A, as measured by the distribution system operator (DSO) after the reclosing of CB1. The temporary overvoltage, about 45 kV peak (i.e., 1.38 p.u., Vbase = √2·23 kV), is in good agreement with the one registered at 220 kV side.
Figure 4. Largest recorded line-to-line voltage at station “A” 23 kV busbars after reclosure of CB1.
To quantify the severity of the event against international standards, the observed TOV parameters are benchmarked against IEC 60071-1 [26] withstand limits for HV equipment in effectively grounded networks. Standard IEC 60071-1 limits temporary power-frequency overvoltages to 1.40 p.u. for a 1 s duration and 1.25 p.u. for 10 s. The recorded incident at station A exhibited a phase-to-ground peak voltage of 256 kV (about 1.43 p.u., Vbase = √2·220/√3 kV) on the open phase and a phase-to-phase peak voltage of 440–445 kV (1.41–1.43 p.u., Vbase = √2·220 kV). The TOV started upon closing CB1 and lasted for approximately 4 min (until line L2 was manually reconnected by grid operators). On the 23 kV distribution side, the line-to-line peak voltage reached 45 kV (1.38 p.u., Vbase = √2·23 kV), exceeding the +10% continuous operation band defined by EN 50160 [27]. Therefore, the TOV exceeded both the magnitude, 1.43 p.u. vs. 1.40 p.u., and the standard allowable duration, 240 s vs. 1–10 s.
An in-depth linear study of the insurgence of the TOV based on a detailed three-phase equivalent circuit of the system was given in [21], highlighting the parameters and the system conditions governing the phenomenon and including an extensive discussion of the different configurations and parameter combinations. The explanation is recalled in the following Section 3.

3. Approximate Equivalent Circuit of the Radial HV/MV System in Open-Phase Condition

Figure 5 shows the three-phase equivalent circuit of a radial HV OHL originating from an EHV/HV station and supplying a passive MV distribution network. If phase “A” of the line is interrupted at some point, the open portion downstream of the interruption is supplied by the energized phases via the equivalent impedance seen between the HV terminals of the HV/MV transformer. The combination of neutral grounding switches (S1, S2) and impedances (ZnHV, ZnMV) allows to represent all different combinations of HV and MV neutral grounding.
Figure 5. Three-phase equivalent circuit of a radial HV system (only phase “A” of the OHL is represented in detail, “X” marks the series fault location) (from [21], © IEEE 2021).
The three-phase system of Figure 5 can be reduced to the Thévenin equivalent circuit seen between node A (phase “A” of the PS transformer terminals) and ground shown in Figure 6: ZTh and ETh are respectively the internal impedance and emf; the impedances of the supply system and those of the energized line phases are neglected. Note that Figure 6 also includes, outlined in red, the equivalent circuit of an additional source connected to the HV busbars of the primary substation, not considered in Figure 5.
Figure 6. Simplified equivalent circuit of Figure 5 system as seen from the HV transformer terminal connected to the open phase “A” (from [21], © IEEE 2021). “X” marks the series fault location.
In Figure 6, zsOH and c0OH are respectively the longitudinal self-impedance and shunt capacitance per unit length of phase “A”. ZnHV and ZnMV are the HV and MV neutral grounding impedances; C1MV and C0MV are the positive and zero sequence MV network capacitances, whereas Z1L and Z2L are respectively the equivalent MV positive sequence and negative sequence load impedances (all MV quantities are reported to the HV side of the PS transformer). Zm1TR and Zm0TR are the positive and zero sequence transformer magnetizing impedances. Zth0 is three-times the equivalent zero-sequence impedance seen to the right of point A. The equivalent positive- and negative-sequence impedances seen to right of point A, ZTh1 and ZTh2, are given by
Z Th 1 = 3 ⋅ Z 1 L / / Z m 1 TR / / 1 j ω C 1 MV
Z Th 2 = 3 ⋅ Z 2 L / / Z m 1 TR / / 1 j ω C 1 MV
The 3× multiplier in all impedance expressions originates by the analytical treatment of the three-phase circuit in Figure 5, neglecting source and line impedances. ZTh1//2 is the parallel combination of the positive- and negative-sequence Thévenin impedances ZTh1 and ZTh2 in Figure 6. Lastly, under the same assumptions used for the equivalent impedances, the Thévenin-equivalent voltage source ETh at point A is given by:
E Th = Z Th 1 Z Th 2 + Z Th 1 Z Th 0 − 2 Z Th 2 Z Th 0 Z Th 1 Z Th 0 + Z Th 2 Z Th 0 + Z Th 1 Z Th 2 E n
where En is the HV phase-to-ground rated voltage.
The Figure 6 circuit also allows to take into account the different neutral grounding practices of the primary and secondary windings of the HV/MV transformer: in the following, reference will be made to the actual system in Figure 1, which is also representative of the relevant Italian practice. Since the 220 kV/MV transformer in Figure 1 has the HV winding neutral solidly grounded, ZnHV in Figure 6 is zero. ZnMV in Figure 6 is an open circuit because the MV neutral of Figure 1 system is ungrounded, even if most Italian MV public distribution networks have their neutral grounded via the parallel of the Petersen coil with a resistor [28]. As a consequence, ZTh0 practically equals 3Zm0TR. It follows that, when the MV network is at no-load (Z1L and Z2L are removed from the circuit) or at low load, there can be a series resonance between the inductive impedance zsOH·dPS + 3Zm0TR and the capacitive impedance 1/(jωc0OH·dPS), which potentially raises the voltage at fault location (and hence the voltage at node A) to high values depending on the position of the phase interruption. The active power load plays a damping role which increases with the amount of load. However, if another supply source is present (such as the hydropower plant G1 or line L2 in Figure 1) voltage at bus A is practically fixed, suppressing the overvoltage.
The linear circuit in Figure 6 can help in the identification of radial configurations potentially liable to incur open-phase overvoltages; however, the quantitative assessment of such overvoltages requires detailed time-domain simulations with an EMT software.

4. Time Domain ATP Simulations

4.1. Original System Configuration

An ATP model of the system has been implemented, also including the actual nonlinear positive sequence magnetizing characteristic of 220/23 kV transformers, reported in Figure 2 and the zero sequence magnetizing impedance value in Table 2. Line model is a distributed-parameter Clarke/Bergeron model; transformer model is a three-phase, three-limb core-type saturable transformer model with HV neutral solidly grounded and MV neutral isolated from ground (ZnHV = 0 Ω, ZnMV→∞). MV load is represented as a constant R–C parallel impedance evaluated at 23 kV for (8 − j4) MVA complex load power. MV network overall equivalent positive- (C1MV) and zero-sequence (C0MV) capacitances are both equal to 27,406 nF (all-cable MV network). ATP time step (Deltat) is 1 μs.
The ATP-EMTP model was benchmarked directly against the real field disturbance recordings acquired by the substation digital relays during the actual grid event. As shown in the side-by-side comparison between the measured waveforms (Figure 7a and Figure 8a) and the simulated results (Figure 7b and Figure 8b), an excellent agreement is achieved, validating both the high-frequency and steady-state saturation representation of the system components. After the successful validation, a systematic investigation of the open-phase overvoltages has been carried out by varying the location of the phase interruption. Subsequently, some simulations have been carried out with a different system configuration, now including the generating station G1.
Figure 7. Line L1 phase “A” interruption at dPS = 140 km: 220 kV PS busbars line-to-line voltages, vs. time. (a) event recordings; (b) ATP-EMTP simulation results.
Figure 8. Line L1 phase “A” interruption at dPS = 140 km: 23 kV PS busbars line-to-line voltages, vs. time. (a) event recordings; (b) ATP-EMTP simulation results.
The main case simulated refers to the actual system conditions of the event described in Section 2, i.e., the network reported in Figure 1, with G1 and L2 out of service, line L3 energized from PS A and open in C, and a total 23 kV load of 8 MW and −4 MVAR.
Firstly, the interruption of phase “A” conductor of line L1 at dPS = 140 km has been simulated in ATP-EMTP. Figure 7 shows the comparison between the resulting line-to-line voltage waveforms at the 220 kV PS busbars and actual recordings, evidencing a very satisfactory match: the plots practically coincide. Similar considerations can be made for the simulated and recorded 23 kV voltage waveforms, shown in Figure 8. A quantitative comparison between the field recordings and the ATP-EMTP simulation results demonstrates high accuracy. For the 220 kV busbar line-to-line voltage (Figure 7), the measured peak value of 440–445 kV compares with a simulated peak of 446 kV, corresponding to a relative peak error of 0.22–1.36%. For the 23 kV distribution busbars (Figure 8), the recorded peak of 45 kV compares to the simulated peak of 45.8 kV (relative peak error of 1.78%). These small deviations (<2.0%) validate the capability of the nonlinear ATP model to capture both fundamental amplitude and harmonic distortions caused by core saturation.
Having validated the ATP-EMTP simulation model, a systematic investigation of the open-phase overvoltages has been carried out, taking into account the location of the phase interruption as a parameter; all other quantities are left unchanged. Figure 9 reports the resulting maximum line-to-line TOV values evaluated at the 220 kV PS busbars, as a function of dPS. The largest overvoltage reaches 1.5 p.u. base 220 kV for the phase interruption occurring at dPS = 180 km, i.e., nearby the 400/220 kV substation, while the minimum value (1.34 p.u.) is due to the phase interruption at dPS = 50 km. It should be pointed out that the distribution of maximum overvoltages along the line, yielded by the transient simulations and summarized in Figure 9, differs from the one obtained by means of the linear analysis in [21], since the linear analysis does not allow to evaluate the actual overvoltages especially when the resonance or near resonant condition occurs. In fact, in this case the saturation of the transformer core significantly limits the TOV.
Figure 9. Maximum simulated line-to-line voltage (p.u. of 220 kV) at 220 kV PS busbars versus dPS.
Simulations carried out with the PS transformers at no load yield significantly larger overvoltages, up to 388 kV line-to-line (i.e., 1.76 p.u. base 220 kV). The latter is found when the phase interruption occurs at dPS = 120 km. Finally, simulations also show that, as predicted by the equivalent circuit of Figure 6, no TOV arises when the HV neutral of the PS transformer is kept ungrounded. By way of example, Figure 10 reports the line-to-line voltages calculated at the 220 kV PS busbars for the same phase interruption and MV load of Figure 7, but with the HV neutral of the 220 kV/23 kV transformers isolated from ground. The maximum line-to-line voltage in Figure 10 is 1.12 p.u. (Vbase = √2·220 kV), while the other two are 0.65 p.u. and 0.54 p.u.
Figure 10. Line L1 phase “A” interruption at dPS = 140 km: 220 kV PS busbars line-to-line voltages, vs. time. PS transformers operated with the HV neutral ungrounded.

4.2. Station G1 Connected

Simulations have also been carried out for the same conditions of the original accident but with a different network configuration, i.e., with the generator G1 connected to the system via line L3. As shown in Figure 11a, the presence of generator G1 operating at no load largely fixes the busbar “A” voltage, keeping the three-phase voltage system practically symmetrical and suppressing the temporary overvoltage. On the other hand, when G1 injects 100 MW into the network, the power flow over the unsymmetrical faulted line L1 back towards the EHV/HV substation causes a non-negligible dissymmetry; the ensuing overvoltage; however, is still smaller than the TOV found with G1 out of service, as shown in Figure 11b.
Figure 11. Line L1 phase “A” interruption at dPS = 140 km, generator G1 in operation: 220 kV PS busbars line-to-line voltages, vs. time. (a) G1 at no load; (b) G1 injecting 100 MW.
Lastly, Table 3 reports the maximum line-to-line voltage at 220 kV PS busbars (in p.u. base 220 kV) for different dPS values with G1 both at no load and injecting 100 MW: results confirm that the presence of G1 suppresses the TOV occurrence for any phase interruption location along the line when at no load, as well as strongly limits the TOV when injecting power into the network.
Table 3. Maximum line-to-line voltages at 220 kV PS busbars with G1 connected, for different phase interruption locations.

5. Conclusions

The paper presents the recordings of a severe temporary overvoltage affecting an HV/MV substation. Due to a previous contingency the HV/MV substation was radially supplied by a 220 kV, 180 km long overhead line which then incurred a series fault (a phase interruption). The resulting configuration is liable to power-frequency resonance, as shown in a previous paper by the authors. Due to the presence of large saturated cores, time-domain simulation is required and to this purpose a complete ATP-EMTP model of the faulted system was set up. Simulation results are shown to closely match recordings of the incident, and allow to clarify the following circumstances:
  • If the radially supplied HV/MV transformer is YNy-connected and has a three-leg core, a phase interruption in the OHL can cause TOVs in excess of 1.4 p.u., i.e., the reference for insulation coordination in networks with effectively grounded neutral.
  • The restoration of at least another supply path to the HV/MV substation suppresses the TOV.
  • During radial operation of such a configuration, a broken conductor relaying function might be useful, possibly to speed up the suppression of the radial topology.
  • In case of phase interruption, opening the CB on the MV side of the HV/MV transformer installed in the PS preserves MV customers from TOVs, but not the transformer itself. To this purpose, a protective function should be developed, able to detect TOVs due to a HV phase interruption and subsequently trip the CBs on both sides of the HV/MV transformer.

Author Contributions

Conceptualization, E.M.C., L.C., G.P., A.C., L.D., T.B., F.M.G., A.G., S.L. and M.M.; methodology, F.M.G. and A.G.; software, S.L., and M.M.; validation, E.M.C., L.C., G.P., A.C., L.D., T.B., F.M.G., A.G., S.L. and M.M.; investigation, E.M.C., L.C., G.P., A.C., L.D., T.B., F.M.G., A.G., S.L. and M.M.; data curation, E.M.C., L.C., G.P., A.C. and L.D.; writing—original draft preparation, T.B., F.M.G., A.G., S.L. and M.M.; writing—review and editing, T.B., E.M.C., L.C., G.P., A.C., L.D., F.M.G., A.G., S.L. and M.M.; supervision, E.M.C., A.C., F.M.G. and A.G. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

The data presented in this study are available on request from the corresponding author due to legal restrictions.

Conflicts of Interest

Authors Enrico Maria Carlini, Leandro Caciolli and Gaetano Pecoraro were employed by the company Italian Transmission System Operator, Terna S.p.A. Author Luigi D’Orazio was employed by the company e-distribuzione S.p.A. Author Alberto Cerretti was employed by the company Huawei Technologies (Germany). The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

References

  1. Blackburn, L.; Domin, T. Protective Relaying, Principles and Applications, 3rd ed.; CRC Press: Boca Raton, FL, USA, 2006. [Google Scholar]
  2. Hou, D.; Hayes, S.; Fischer, N. Understanding Ground Fault Detection Sensitivity and Ways to Mitigate Safety Hazards in Power Distribution Systems. In Proceedings of the 46th Annual Western Protective Relay Conference (WPRC), Spokane, WA, USA, 21–24 October 2019. Report No. TP6934. [Google Scholar]
  3. O’Brien, W.; Udren, E.; Garg, K.; Haes, D.; Sridharan, B. Catching Falling Conductors in Midair—Detecting and Tripping Broken Distribution Circuit Conductors at Protection Speeds. In Proceedings of the 69th Annual Conference for Protective Relay Engineers (CPRE), College Station, TX, USA, 4–7 April 2016. [Google Scholar]
  4. Dase, K.; Harmukh, S.; Chatterjee, A. Detecting and Locating Broken Conductor Faults on High-Voltage Lines to Prevent Autoreclosing onto Permanent Faults. In Proceedings of the 46th Annual Western Protective Relay Conference, Spokane, WA, USA, 22–24 October 2019. [Google Scholar]
  5. Anderson, P.M. Analysis of Faulted Power Systems; Wiley-IEEE: New York, NY, USA, 1995. [Google Scholar]
  6. CENELEC EN 50160; Voltage Characteristics in Public Distribution Systems. European Committee for Electrotechnical Standardization (CENELEC): Brussels, Belgium, 2010.
  7. Caratteristiche di Tensione Sulla RTN: Criteri di Misura. Available online: https://download.terna.it/terna/0000/0105/71.PDF (accessed on 29 August 2026). (In Italian)
  8. CIGRÉ WG 33.10; IEEE TF on TOV. Temporary Overvoltages: Causes, Effects and Evaluation. In Proceedings of the CIGRÉ 1990 Plenary Session, Paris, France, 27 August 1990. [Google Scholar]
  9. Wahlstrom, B.H.E. Temporary Overvoltages—System Aspects (Part 1). Electra 1999, 185, 88–100. [Google Scholar]
  10. Kalyuzhny, A. Analysis of Temporary Overvoltages During Open-Phase Faults in Distribution Networks with Resonant Grounding. IEEE Trans. Power Deliv. 2014, 30, 420–427. [Google Scholar] [CrossRef] [Scilit]
  11. Clarke, E.; Peterson, H.A.; Light, P.H. Abnormal Voltage Conditions in Three-Phase Systems Produced by Single-Phase Switching. Trans. Am. Inst. Electr. 1941, 60, 329–339. [Google Scholar] [CrossRef] [Scilit]
  12. Jacobson, D.A.N. Examples of Ferroresonance in a High Voltage Power System. In Proceedings of the IEEE PES General Meeting, Toronto, ON, Canada, 13–17 July 2003. [Google Scholar]
  13. Slow Transients TF of the IEEE WG on Modelling and Analysis of System Transients Using Digital Programs. Modelling and Analysis Guidelines for Slow Transients—Part III: The Study of Ferroresonance. IEEE Trans. Power Deliv. 2000, 15, 255–265.
  14. CIGRÉ WG C4.307. Resonance and Ferroresonance in Power Networks; CIGRÉ Technical Brochure TB569; CIGRÉ: Paris, France, 2014. [Google Scholar]
  15. Dolan, E.; Gillies, D.; Kimbark, E.W. Ferroresonance in a Transformer Switched with an EHV Line. IEEE Trans. Power Appar. Syst. 1972, 91, 1273–1280. [Google Scholar] [CrossRef] [Scilit]
  16. Gustavsen, B.; Walseth, J.A. A Case of Abnormal Overvoltages in a Petersen Grounded 132-kV System Caused by Broken Conductor. IEEE Trans. Power Deliv. 2003, 18, 195–200. [Google Scholar] [CrossRef]
  17. Tarko, R.; Nowak, W.; Gajdzica, J.; Czapp, S. Analysis of Ferroresonance Mitigation Effectiveness in Auxiliary Power Systems of High-Voltage Substations. Energies 2024, 17, 2423. [Google Scholar] [CrossRef] [Scilit]
  18. Kraszewski, W.; Syrek, P.; Mitoraj, M. Methods of Ferroresonance Mitigation in Voltage Transformers in a 30 kV Power Supply Network. Energies 2022, 15, 9516. [Google Scholar] [CrossRef] [Scilit]
  19. Chen, X.; He, Z.; Wu, H.; Lu, H.; Wang, Y.; Lan, L.; Wen, X. Open-phase temporary overvoltage before and after an intermediate substation accessing a long distance transmission line. IET Gener. Transm. Distrib. 2021, 15, 694–703. [Google Scholar] [CrossRef] [Scilit]
  20. Akinrinde, A.; Swanson, A.; Davidson, I. Investigation and Mitigation of Temporary Overvoltage Caused by De-Energization on an Offshore Wind Farm. Energies 2020, 13, 4439. [Google Scholar] [CrossRef] [Scilit]
  21. Gatta, F.M.; Geri, A.; Lauria, S.; Maccioni, M.; Cerretti, A.; D’Orazio, L. Large Temporary Overvoltages in MV Network due to a Series Fault in the HV Subtransmission System. In Proceedings of the IEEE PowerTech, Madrid, Spain, 28 June–2 July 2021. [Google Scholar]
  22. Terna, Rete Elettrica. Available online: https://download.terna.it/terna/0000/1089/75.PDF (accessed on 29 August 2026). (In Italian)
  23. Terna, Requisiti e Caratteristiche di Riferimento di Stazioni e Linee Elettriche Della RTN. Available online: https://download.terna.it/terna/0000/0105/20.pdf (accessed on 29 August 2026). (In Italian)
  24. Gatta, F.M.; Geri, A. Analisi Dell’evento Verificatosi Nelle Rete in MT Di E-Distribuzione Sottesa Alla CP Interconnessa Alla RTN a 220 KV Di Terna Rete Italia; Confidential Report, commissioned by e-distribuzione S.p.A. to the Department. of Electrical and Energy Engineering; “Sapienza” University of Rome: Rome, Italy, 2017. (In Italian) [Google Scholar]
  25. Kimbark, E.W. Suppression of Ground-Fault Arcs on Single-Pole-Switched EHV Lines by Shunt Reactors. IEEE Trans. Power Appar. Syst. 1964, 83, 285–290. [Google Scholar] [CrossRef] [Scilit]
  26. IEC 60071-1; Insulation Co-Ordination—Part 1: Definitions, Principles and Rules. IEC International Standard: Geneva, Switzerland, 2019.
  27. EN 50160; Voltage Characteristics of Electricity Supplied by Public Electricity Networks, EN European Standard. European Committee for Electrotechnical Standardization (CENELEC): Brussels, Belgium, 2022.
  28. Cerretti, A.; Gatta, F.M.; Geri, A.; Lauria, S.; Maccioni, M.; Valtorta, G. Ground Fault Temporary Overvoltages in MV Networks: Evaluation and Experimental Tests. IEEE Trans. Power Deliv. 2012, 27, 1592–1600. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.