Abstract
This study assesses when symmetric dual-core phase-shifting transformers improve distribution-network loadability under matched connection topology and installed rating. A tap-dependent circuit model is evaluated using AC power flow, finite configuration searches and an independently specified operating benchmark. In the retained 33-bus planning case, scheduled taps increase weighted loadability by 3.16%, while daily feeder-loss energy increases by 76.61%. A 64-combination rating audit and a 243-state restricted-tap benchmark quantify search errors; a source-capacity bound explains the infeasibility of the Extreme inputs. Additional resistance, core-loss, corridor, source and demand/PV tests yield both positive and negative effects. At an equal total installed rating of 5 MVA, five distributed devices reduce shedding relative to a single device, while the corresponding zero-tap tests show that tap control contributes negligible additional shedding relief. The original conservative 69-bus result remains unchanged. A separate fixed-source-phasor AC study gives a 7.15% improvement for one matched 1 MVA connection, with zero improvement in several other cases. Hard tap-operation budgets and dwell constraints quantify scheduling tradeoffs. Together, the matched comparisons identify the network and scheduling conditions that make DCPST phase control useful and quantify its tradeoffs in supply capability, losses and switching duty.
1. Introduction
Uneven demand and distributed generation can overload some distribution feeders while leaving spare capacity on adjacent feeders. Transferring power through additional interconnections can relieve these local constraints, but the added path and its controllable phase shift have different effects. The practical benefit depends on the constraint relieved, the receiving feeder’s spare capacity, and the accompanying losses and tap operations. This motivates a controlled study of symmetric dual-core phase-shifting transformers (DCPSTs), with identical equipment ratings and connection paths in the adjustable-tap and zero-tap comparisons.
We assess DCPST configuration and operation using established transformer models and optimization methods. IEC/IEEE 60076-57-1202 specifies the equipment framework [1]. Guo’s winding relations [2], together with the tap-dependent model of Yu et al. [3], provide the basis for the two-terminal branch representation used here. Generalized Benders decomposition [4] and two-block alternating direction method of multipliers (ADMM) [5] provide the methodological basis for a separate operating benchmark. Together, these methods support device-specific comparisons in which AC verification checks that the reported operating points are feasible.
Flexible interconnection and supply-capability-oriented planning respond to uneven feeder loading and limited transfer capacity [6,7]. Zhang et al. investigated temporal power-flow complementarity in AC/DC hybrid-network configuration [8], while Luo et al. developed event-triggered feeder balancing for a converter-based interconnection [9]. Their network and actuator settings differ from a mechanically tapped DCPST, so converter control capabilities cannot be assumed here. Multiple-transfer total supply capability [10] and probabilistic load-transfer capacity value [11] also depend on different security criteria and corrective actions. We evaluate balanced, steady-state N − 0 loadability. Post-contingency firm capacity and probabilistic reliability involve additional security criteria beyond this assessment.
Recent device studies clarify both the modeling basis and its application limits. Yuan et al. derived an equivalent model and parameter corrections for a symmetric dual-core PST with electromagnetic and transmission-network simulations [12]. Jin et al. developed a load-equivalent model and winding-turn design that accounts for internal impedance, with validation in a 500 kV network [13]. These studies support the importance of winding and impedance relationships but do not directly validate the ratings or performance of the distribution configurations tested here. Tap-changer step-voltage analysis [14] and dual-core impedance calculation [15] further inform the device model. Applying the per-unit model at a new voltage level still requires equipment design and test data for that application.
At the system level, Hrgović and Pavić integrated AC power flow, substation space, economics, and normal/N − 1 operating requirements into PST sizing and allocation for the Croatian transmission grid [16]. Their congestion-management problem differs from assessing simultaneous distribution-network loadability with fixed transfer-path topology. Particle-swarm-based PST setting [17] and multiyear generation–transmission expansion planning with PSTs [18] likewise address distinct optimization decisions. These works provide relevant planning context. To distinguish added-path effects from phase-control effects in the distribution cases considered here, the assessment holds transfer-path topology and installed ratings fixed when comparing scheduled and zero taps.
Hardware scope is equally important. The independent fast PST in [19] uses power-electronic switching, and its switching capability cannot be assigned to the mechanically tapped device studied here. Topology comparisons [20] likewise caution against equating different actuators. Yang et al. [21] report a 10 kV, 5 MVA improved PST simulation with additional amplitude regulation; Xu et al. [22] discuss a symmetric dual-core PST-based distribution-network loop-closing device with a grounding winding. These studies support the relevance of medium-voltage applications but provide neither a complete manufacturer data sheet nor a type-test validation for the specific device assumed here. Laboratory efficiency work [23] further shows why feeder loss alone is insufficient to characterize complete-device efficiency.
Recent optimization studies address complementary decisions. Wadood et al. [24] use a fractional-order African vulture optimizer for reactive-power dispatch, including voltage, transformer-ratio and reactive-compensation controls. Wadood et al. [25] study distributed-energy-resource location and sizing using fractional and adaptive protozoa optimizers in 33- and 69-bus networks. These studies motivate comparative optimization and loss-aware assessment. Their actuators and decision spaces differ from DCPST location, rating and discrete phase control, so their reported gains cannot serve as direct benchmarks for this study. For the rating and tap subproblems that permit enumeration, exhaustive grid searches provide a direct measure of search error. We have not directly compared the proposed searches with established optimization algorithms under a common formulation and computational budget, so the results do not establish algorithmic superiority.
A credible network comparison must also retain the electrical assumptions that influence its outcome. Tap-dependent impedance correction [26] and the effect of line resistance [27] caution against treating phase angle as the only relevant parameter. For the configurations considered here, the unresolved assessment question is therefore specific: with device ratings and transfer paths held fixed, do scheduled taps improve jointly feasible loadability and at what feeder-loss cost? Regional maxima computed at different operating points cannot answer this question, and a comparison of unequal installed ratings alone cannot establish the benefit of phase control. Matched controls and a common feasibility test allow us to attribute the observed gains to changes in the DCPST operating state. The comparison is specific to the tested configurations and operating conditions.
The contribution is an assessment protocol that separates the effects of transfer paths, phase control and source boundary conditions. It combines matched zero-tap controls with nonlinear AC feasibility checks, quantifies the error of limited searches against tractable exhaustive benchmarks, and reports losses and mechanical scheduling constraints alongside loadability. The new scenario tests retain both beneficial and adverse outcomes, allowing the conditions for a useful phase setting to be identified. The device equations, Benders decomposition and ADMM follow established methods [2,3,4,5]. The contribution is the comparative evidence linking phase-control performance to network constraints, losses and tap-changing duty.
2. Materials and Methods
2.1. AC Configuration Method
2.1.1. Network and DCPST Model
The planning network contains two modified 33-bus supply areas. It is balanced and represented in positive sequence. Both upstream sources are synchronized, with fixed voltage magnitudes of 1.0 p.u. and zero reference angles. This ideal common-angle source assumption is part of the case definition and is not used in the independent operating study. The original feeder branches have nonzero resistance and reactance. Four additional intra-area DCPST-equipped branches form loops, and one inter-area device connects the two supplied areas. The inter-area bridge does not itself create a graph cycle; its phase-control effect in this case depends on the two fixed source angles. Figure 1 gives the network arrangement.
Figure 1.
Modified two-area planning network and five two-terminal DCPST-equipped transfer paths.
For a non-source PQ bus, the specified net injection and AC balance are
Here, voltages and the admittance matrix are in per unit on a 10 MVA, 10 kV base; specified active and reactive powers are converted consistently to this base. Source injections are solved rather than specified. The default storage injection is zero. A DCPST branch with series admittance y and complex off-nominal ratio a satisfies.
The orientation convention gives Vt = exp(jϕ)Vf at no load. The device does not provide independently controllable active or reactive injection. Its receiving-end power and reactive absorption follow from the same AC branch model. In the retained planning baseline, winding resistance, magnetizing current, and core losses are omitted; consequently, the real parts of the two terminal powers sum to zero for the DCPST itself, while the surrounding feeders retain their resistive losses.
The discrete tap k is an integer from −15 to 15. With K = 15 and maximum no-load phase shift ϕmax = 35.1°, the nonlinear phase law is
The reference device in [2] is rated 230 kV and 480 MVA. Its limiting leakage impedances are zmin = 0.0679 and zmax = 0.1038 on the device base. The winding ratios used in the reconstruction are nS = 272/(220/2) and nE = 354/160. Following the winding relations in [2], Equations (3)–(21), (3)–(25), (3)–(26), (3)–(29), and (3)–(30) and the tap-dependent correction in [3] define
The resulting even leakage-impedance map is
The impedance is transferred to the system base using each device’s rating. Both terminal apparent powers are checked, and feeder loading is based on the larger terminal magnitude:
For a DCPST, in (7) is its individual rating . Zero tap means zero phase shift with finite minimum leakage reactance; it is not a low-impedance bypass. The 230 kV reference-device data in [2] are used for a per-unit planning sensitivity, not as a verified 10 kV product nameplate. The retained baseline does not model added connecting-corridor impedance separately. The voltage range 0.93–1.05 p.u. is an explicit study constraint. GB/T 12325–2008 is a supply-voltage reference [28], not a source for every internal-node margin adopted here.
Per-unit conversion preserves the circuit equations but does not establish similarity of winding resistance, leakage paths, thermal loading or core loss across ratings. Consequently, the 230 kV reference is retained only as a parameterized circuit baseline. The additional medium-voltage studies [21,22] establish application context, not interchangeable nameplate values. Section 2.3 separately varies series resistance, no-load active loss and corridor impedance, and Section 3.5 reports the resulting AC comparisons. These tests quantify how the omitted terms affect the network results. Manufacturer design data and type tests were unavailable for the assumed medium-voltage DCPST. These network tests therefore assess the specified parameter scenarios rather than validate a medium-voltage product.
2.1.2. Candidate Screening
The normal-day no-interconnection AC solution supplies four node attributes: voltage weakness, peak net demand, electrical distance from the source, and peak incoming-feeder loading. These are respectively 1 minus the minimum daily voltage magnitude, maximum daily net active load, cumulative path-impedance magnitude, and maximum incoming-branch loading. Each attribute is min–max normalized separately within its supply area; a constant attribute is assigned zero. Receiving-node scores use declared weights (0.40, 0.25, 0.20, 0.15):
The complementary support-node score is
The first device in each area is screened from the four highest-scoring receiving nodes and the four highest-scoring support nodes whose local bus numbers do not exceed 12. Self-loops and existing feeder edges are removed; the remaining pairs are ranked by the sum of support and receiving scores, and at most, 12 pairs are retained. For the second device, the first device’s sending bus is fixed, both endpoints of the first device are excluded from the receiving pool, and up to five highest-scoring receiving nodes are considered before existing edges are removed. For the inter-area device, the four highest-scoring receiving nodes in each area form 16 cross-area pairs, ranked by the sum of the two receiving scores; both endpoints at this stage come from the receiving-node pools.
Devices are added sequentially and evaluated by actual AC power flow at four representative operating points. The search covers a screened subset of topologies, and its outcome depends on the order in which devices are added. We specify the attribute preferences and candidate pools as modeling choices; they were not derived from an independent expert survey.
2.1.3. Load-Balancing Metrics and Period Weights
Let Ea denote the 32 original feeder branches in area a, na = |Ea|, and denote the loading in (7). The within-area metric is the sample coefficient of variation (CV):
The between-source imbalance and reported multi-level load-balancing index are
These are nonlinear functions of AC voltage and power. They are evaluated directly; no equivalent linear variance reformulation is claimed. The 24 hourly reporting weights are fixed inputs, normalized as
The hourly weights are prescribed study inputs rather than estimates from an entropy-weighting procedure. Figure 2 illustrates the rank-one normalized matrix reconstructed from the same weights:
Figure 2.
Normalized matrix reconstructed from the prescribed hourly weights; omitted rows and columns follow the same rule.
Every column repeats the weight vector in Table 1, which makes the matrix consistent by construction. The choice of weights remains a separate modeling assumption.
Table 1.
Prescribed 24 h reporting weights.
2.1.4. Discrete-Tap Search
The operating score used for candidate selection differs from the reporting index LBI. Define the normalized voltage deviation and loss ratio by
In Equation (14), losses and net demand are in MW, and the 0.1 MW denominator floor is a numerical safeguard. The operating score is
The penalty Π is 103 times the sum of squared violations of voltage, feeder-loading, and DCPST-loading limits; a nonconverged AC solution receives a penalty of 109. A low score alone does not establish feasibility. Final feasibility reporting separately requires each summed squared inequality violation to be below 10−10 and the maximum active/reactive nodal mismatch to be below 10−8 p.u.
All 31 tap positions of one device are tested, while other taps are fixed. Representative-point screening uses at most two coordinate passes. Each independent scenario starts from zero tap, without a movement charge between scenarios. Chronological daily dispatch uses one pass per hour, initialized at the preceding hour’s taps, and minimizes
The first hour starts from zero tap. The five tap positions are independent; a shared group rating does not impose a shared tap. In this baseline study, movement is a soft regularizer, and no hard daily operation budget or minimum dwell time is imposed. Section 2.3 adds these restrictions in separate chronological tests. The search selects from the evaluated candidates. Establishing global optimality or stationarity would require further analysis.
2.1.5. Rating Selection
Each device rating is selected from {2.5, 5, 7.5, 10} MVA, with a common per-device rating within each intra-area group. The baseline starts from 5 MVA and evaluates four ratings for groups 1, 2 and 3 in that order, giving 12 trials. Section 2.3 supplements this with all 64 group–rating combinations and all six group orders. The normalized annual capacity term is
The discount rate, life, and operation-and-maintenance ratio are declared sensitivity assumptions. The sum counts all five devices, so group ratings S1, S2, and S3 correspond to an installed total of 2S1 + 2S2 + S3. The sizing score is
Here, ps = (0.55,0.20,0.15,0.10) are declared planning weights for the four deterministic scenarios. They express planning priorities rather than estimated historical frequencies. The main sequential search uses γ = 1. Sensitivity values 0.5, 0.75, …, 2.0 re-rank exactly the already tested rating vectors using their AC operating scores. This sensitivity analysis uses the same candidate set; Section 2.3 extends the check to all 64 rating combinations. Equation (18) is a dimensionless planning score. Tariff revenue, break-even coefficients, manufacturer quotations and TSC are excluded from its formulation, so a financial return in CNY requires a separate economic model. The selected locations remain fixed after sizing.
2.1.6. Common-Point Supply Capability
For each hour, all active and reactive demands are scaled by one multiplier, while PV injections and scheduled taps are held fixed:
The reported supply capability is the upper edge of the tested feasible high-voltage AC interval:
A 41-point scan, augmented by λ = 1, uses an upper bound derived from source-feeder capacity and fixed PV injection. The highest sampled feasible interval is refined by 20 bisection steps, maintaining a verified feasible lower endpoint and an infeasible upper endpoint. If the scan finds no feasible point, the result is recorded as undefined. A disconnected feasible interval may lie between samples, so the search establishes a sampled AC-feasible boundary without certifying the global maximum. N−1-secure firm capacity requires a separate contingency assessment.
Regional values are contributions at that same operating point:
The regional sets partition the load buses, so their contributions can legitimately be added. Independently maximized regional limits would not have this property. Scenario 1 is only a radial-network reference. Control C7 uses exactly the Scenario 5 branches and ratings but fixes every tap at zero, retaining leakage impedance. S5 versus C7 isolates the effect of the tested tap schedule on an otherwise matched model; S5 versus S1 combines added connectivity and control. Figure 3 summarizes the two independent computational studies.
Figure 3.
Baseline configuration and independent operating workflows. Additional verification tests are specified in Section 2.3. In each workflow, blue, red, and purple outlines mark the first, second, and third stages, respectively. Black arrows indicate the direction of execution.
2.2. Independent Operating Assessment
2.2.1. Linear-Network Benchmark
The operating benchmark is a separate two-area network, with its own locations, ratings, profiles, and source-angle convention. It uses five 1 MVA devices in three control groups; the two devices in either intra-area group share a tap state. Each hour has PV dispatch, source injections, branch powers, squared voltages, and load shedding. Storage is disabled. All power variables in this section are per unit on SB = 10 MVA unless converted explicitly.
With outgoing and incoming branch sets and , the nodal balances are
These are lossless incidence balances. The objective’s quadratic loss proxy is not included as consumed active power. Retaining both resistance and reactance, the nominal-voltage branch relations are
Neglecting reQe in the angle equation is not justified merely because the device regulates phase. It can be consequential in a distribution network with appreciable R/X. The approximation is nevertheless a linear surrogate and requires AC verification.
For group g, one-hot variables select one of 31 energized taps or an open-circuit state:
An energized state uses Equations (3)–(6) with the operating benchmark’s leakage split R/X = 0.1, namely and rm = 0.1xm. This differs explicitly from the pure-reactance planning model. Disaggregated branch powers satisfy
The open-state slacks relax the voltage and angle relations only when the device is disconnected. Conservative thermal constraints are
Here, am is one for an energized state and zero for the open state, and ξ is a common optimization headroom factor determined by AC feedback. An open state models a disconnected branch with zero transferred power. A conducting bypass would require a different branch state. Ordinary lines and source injections have analogous diamond bounds |P| + |Q| ≤ ξSmax/SB. PV converters retain their forecast active-power bounds and physical apparent-power diamond limits; ξ does not reduce their converter ratings. Source active import is nonnegative. Each source magnitude is fixed at 1.05 p.u. The linear model fixes one angle per connected component of the candidate graph, including all candidate DCPST branches before their open states are selected; other source angles are free. The AC back-check instead assigns references from the actually energized graph. At each hour, a nonnegative voltage guard ΔV imposes (0.93+ΔV)2 ≤ vi ≤ (1.07−ΔV)2, with voltage angles bounded by |θi| ≤ π radians. Adjacent-hour group taps satisfy |kg,t − kg,t−1| ≤ 5; the open state is mapped to k = 0 for this ramp surrogate. Mechanical transition physics and minimum dwell times are not modeled.
Reactive shedding preserves the original load power factor:
At a zero-active-load bus, β is set to zero. Network-feasible PV reactive power is adjustable and participates in Equation (22). The PV converter rating is 1.05 times its full-day peak active-power forecast, and reactive support is assumed available throughout the day, including hours of zero PV generation. The benchmark assigns this reactive support to the PV converter throughout the day. Confirming nighttime operation would require manufacturer capability data and models of nighttime losses and auxiliary supply, which are outside the present formulation. The DCPST itself has no independent reactive-power control.
2.2.2. Operating Objective and Loadability
The daily benchmark minimizes a CNY-scaled operating objective:
Grid import, PV dispatch, and shedding costs are obtained from their respective CNY/MWh coefficients multiplied by SBΔt and the per-unit powers, with Δt = 1 h. The voltage term and small quadratic regularization are numerical penalties. The tap term penalizes the magnitude of each device’s position in each period; mechanical operation counts are treated separately. The full objective therefore combines monetary costs with numerical and control penalties. The loss-cost approximation is
All monetary quantities are expressed in CNY. The coefficients are benchmark assumptions rather than equipment quotations or an investment appraisal. The fixed-state maximum zero-shedding load multiplier is computed by a direct linear program:
This definition determines loadability from explicit feasibility constraints rather than an economic cut-off criterion. The resulting TSC equals α times the base active demand in MW. The peak solution needs its own AC check before the linear-network loadability estimate can be treated as AC feasible. The daily dispatch checks apply to their respective operating points.
2.2.3. Numerical and Physical Verification
The integer master selects tap/open states; fixed-state network subproblems are convex quadratic programs. Following the convex-subproblem decomposition principle of generalized Benders decomposition, the implementation constructs cuts from box-constrained QP dual bounds. A nonzero-gap integer master incumbent is an upper bound on its own minimization problem, so its solver-reported absolute gap is subtracted before it contributes a lower bound. The global lower bound combines valid master bounds and a globally valid continuous-relaxation bound:
The gap applies only to the mixed-integer linear-network QP surrogate. It is not an AC optimality gap. Fixed-tap distributed coordination uses a PV-owner block and a complete-network block, coupled only through PV active power. In scaled-dual notation, the standard two-block ADMM updates are
Here, x contains only the PV-owner active-power copies, so the PV subvector in Equation (32) is the complete owner vector, and z contains the corresponding network-feasible PV powers over all hours. The owner function f is the linear PV energy cost, with each per-unit power multiplied by its CNY/MWh coefficient and SBΔt, and includes the bounds from zero to the hourly forecast. The network function g is the minimum remaining operating objective over all network variables at the specified PV active-power vector z and fixed tap/open states. It includes grid import, shedding, the loss proxy, voltage penalties, all quadratic regularization, and all network and PV reactive-power constraints; it excludes the PV linear energy cost to avoid double counting. An infeasible z has infinite network cost. Thus, the z-update is implemented by a complete-network QP, not by independent node updates. The fixed-tap position charge is constant and omitted from both blocks. The scaled dual is u = λ/ρ, with ρ = 5000; the index in Equations (32)–(34) counts ADMM iterations, while the physical tap positions remain fixed.
The residuals and scaled-dual update are
Both standard norm tests and an additional physical-unit consensus test are required:
The absolute and relative tolerances are 10−7 and 10−5. The norm thresholds use the number of coupled PV-hour variables and the standard iterate and multiplier norms. Costs are evaluated at the network-feasible PV variable z, not at an inconsistent owner iterate, and compared with the centralized fixed-tap QP. This ADMM comparison excludes the constant fixed-tap position term from both objectives.
Each dispatch is then checked with nonlinear AC power flow, fixing served load and PV active/reactive injections. Source magnitudes remain 1.05 p.u. Connected components are recomputed after open branches have been removed. One source in each energized component sets the reference angle and balances the additional active losses; other source active injections remain scheduled, and source reactive injections are solved. Convergence alone is insufficient: voltages must satisfy 0.93–1.07 p.u., and actual circular apparent-power limits are checked at both ends of every branch and at each source.
Starting from ξ = 1, any worst observed loading L > 1 updates the common optimization headroom to ξ/(1.005L). A voltage guard is increased only by the measured voltage-limit violation plus 10−4 p.u. All compared configurations and zero-tap controls are re-optimized under the same margins before repeating the AC checks. Physical nameplate ratings are never changed. This feedback provides case-specific numerical feasibility, not a robust guarantee for untested conditions.
Peak loadability is checked separately. Starting from the final daily margins, a dedicated peak headroom factor and voltage guard are shared by the 33-bus and 69-bus cases with and without DCPST branches. Each iteration resolves Equation (30) with its device states held fixed and then recovers and AC checks a zero-shedding dispatch at that multiplier. The worst loading and voltage violation across these four peak cases update the common peak margins by the same rule. This procedure does not change the already validated daily dispatch or repeat the device-state search. A passing test establishes a conservative AC-feasible peak for the fixed device states. Since this check does not search for the global AC maximum, we report its peak margin separately from the daily operating margin.
Daily shedding and its full-system percentage are calculated on a consistent bus set:
If only selected regions are reported, both numerator and denominator are restricted to those same regions. This distinction is necessary because the operating benchmark also includes trunk-region loads not shown in the three regional panels.
2.3. Additional Verification Protocol
All additional comparisons retain their own explicit baseline. The 33-bus configuration audit fixes the five locations and evaluates all 64 combinations of the three group ratings. Every combination uses the same four representative points, zero-tap initialization, two coordinate passes and zero movement charge used in the rating search. All six group orders are replayed from the same 5 MVA starting vector using the cached scores. The gap is relative to this finite grid with a heuristic inner search, not a global siting-and-operation optimum. Separately, a normal peak-hour test enumerates all 243 combinations when each of the five taps is restricted to −1, 0 or +1, retaining K = 15 in the physical phase law. The coordinate method is compared over that identical restricted domain.
The configuration sensitivity study retains the original 32.5 MVA installed total and the normal peak hour. Device R/X is varied over 0, 0.05, 0.1 and 0.2 by adding resistance to the retained leakage reactance. No-load loss coefficients of 0, 0.05% and 0.1% of device rating define equal shunt conductances at the two terminals, giving voltage-squared-dependent real loss. A connecting corridor of 0.05 + j0.05 Ω is added in its own test. Further cases vary the second-source angle by ±2°, its magnitude to 0.98 or 1.02 p.u., the two source-feeder impedances by a factor of two, demand/PV by paired ±10% multipliers, and the loss weight from 0.2 to 0.1 or 0.4. These are declared sensitivity assumptions. The two-pass composite-score tap selection, including the retained 0.004/15 displacement penalty from zero tap, is repeated and then held fixed, while loadability is evaluated; a negative gain indicates that the schedule selected by the composite score yields a lower loadability than zero taps. It does not reduce the best loadability available over the full adjustable feasible set.
Chronological configuration tests apply per-device budgets of 8, 16 or 32 adjacent tap steps per day; maximum hourly travels of 2, 4 or 8 steps; and minimum dwell times of 2, 2 or 1 h, respectively. A change from −2 to +2 counts as four steps, and initial movement from zero is included. The normal-day schedule uses the original one-pass chronological search with its soft movement term, subject to these additional hard restrictions. Separate single-device operating tests use dynamic programming over the 31 energized tap states, with limits on both change events and total adjacent steps and a minimum dwell time. The 33-bus test obtains hourly costs from the original QP with optimized PV controls; the 69-bus test obtains them from nonlinear AC solutions. No open state is allowed in these mechanical schedules. The budgets specify the operating policies tested here. Manufacturer duty ratings and mechanical lifetime require equipment-specific data.
An equal-capacity 33-bus operating comparison gives O4 one 5 MVA device and O6 five 1 MVA devices. The original QP/Benders model, stressed profiles, prices, physical limits and common feedback factor 0.881 are retained. Each schedule is back-checked in AC. In addition, the 69-bus nonlinear experiment fixes both upstream source phasors, in contrast to the free nonreference source angle in the original operating benchmark. It uses the 12.66 kV, 10 MVA feeder base, one installed device at the reported endpoints, circular thermal limits and the original 0.93–1.07 p.u. voltage bounds. Available PV active power is fixed at unity power factor. This direct AC calculation does not apply the conservative linear-model headroom of the original benchmark; absolute capabilities across the two experiments are therefore not directly comparable. All 31 energized taps and an open reference are tested at each of 18 stated conditions; matched phase-control gains compare energized zero and adjustable taps only. The load multiplier is scanned from 0 to 2.5 in steps of 0.1, and the highest sampled feasible interval is refined with 16 bisection iterations and both-end and source-capacity checks. The scan can miss disconnected feasible intervals between samples. Cases without a feasible comparison retain an undefined percentage change.
The 69-bus scenario matrix changes source angle (−5°, −2°, 0°, +2°, +5°), source-2 voltage (1.03, 1.05, 1.07 p.u.), a source impedance of 0.005 + j0.05 p.u., an independent corridor of 0.1 Ω and 3 mH at 50 Hz, R/X of 0.05 or 0.2, a constant no-load demand of 0.2% of rating, area-2 demand (+20%), PV availability (−20%), connection endpoints and rating. Here, R/X splits the retained impedance magnitude, and the constant no-load active demand is applied at the sending terminal; these conventions differ from the configuration sensitivity and are recorded in the supplied code. All scenario values, including the corridor parameters, are prescribed inputs to the sensitivity study rather than field measurements. The daily 69-bus criterion contains source-specific energy prices plus an additional loss penalty. Cost decomposition separates actual energy terms from that penalty.
3. Results
3.1. Planning Inputs and Scenarios
The planning inputs are 24 h active/reactive demand and PV profiles. Figure 4 gives the normal-day regional overview; Figure 5 shows the four deterministic scenario families. Normal, HighLoad, LowPV, and Extreme use respective overall load/PV multipliers (1.00, 1.00), (1.15, 0.80), (1.05, 0.40), and (1.25, 0.30); additional industrial-load multipliers are 1.00, 1.05, 1.00, and 1.15. Active and reactive load scaling is consistent. These deterministic cases test sensitivity to prescribed inputs. They have no assigned occurrence probabilities and were constructed without historical clustering or a separate electric-vehicle charging model. The representative hour is the maximum-net-load hour within each scenario. Table 2 summarizes the planning configurations and their operating conditions.
Figure 4.
Normal-day regional demand and aggregate PV input profiles for the AC planning case.
Figure 5.
Deterministic scenario families: (a) industrial load, (b) residential load, (c) commercial load, and (d) PV generation.
Table 2.
Planning configurations and operating conditions.
Scenario labels S1–S6 belong to the AC planning case; the later operating-benchmark labels O4 and O6 are deliberately distinguished. S4 and S6 replay the corresponding layouts under the Extreme planning inputs and are not independently resized. C7 is the matched-topology zero-tap control. The final main-scheme per-device ratings are used throughout the layout comparison; rating selection is not repeated for each alternative. We used MATLAB R2025a (The MathWorks, Inc., Natick, MA, USA) for the numerical calculations. The planning search used base MATLAB, and the operating benchmark used solvers from Optimization Toolbox R2025a.
3.2. Siting, Ratings, and AC Supply Capability
Table 3 reports shortlisted node attributes and receiving-node scores. A larger node score indicates greater screening priority. Table 4 reports device-branch evaluations; a smaller AC operating score is better. Node scores guide screening, while operating scores evaluate the electrical performance of each candidate. Table 5 lists the final endpoints. The selected S5 branches are 2–32 and 2–16 in Area 1, 35–48 and 35–65 in Area 2, and 17–50 between the areas. Table 3 covers the first-stage receiving-node shortlist. Later searches extend the candidate set while excluding endpoints already used. The five winning intermediate branches in Table 4 satisfy 0, 0, 1, 2, and 3 of the four representative operating points, respectively. The scores compare alternatives within each search stage. Comparisons across stages would mix different partially reinforced networks.
Table 3.
Shortlisted node attributes and receiving-node scores.
Table 4.
Representative candidate-branch evaluations.
Table 5.
DCPST device endpoints by planning configuration.
Figure 6 compares the within-area CV and between-source imbalance. S5 has a weighted LBI of 0.319, compared with 0.494 for the matched zero-tap control C7, a reduction of 35.42%. S2 has a lower LBI of 0.276 than S5 but satisfies the daily constraints in only 21 of 24 h. S5 and C7 both satisfy all 24 h. The weighted LBI values of the radial reference S1 and voltage-based layout S3 are 0.282 and 0.340, with only 8 and 15 feasible hours, respectively. The weighted LBI summarizes load balance, whereas candidate selection uses the combined voltage, loss and balancing score. Improving that score can leave an individual metric above its minimum. Feasibility is reported separately, with all infeasible hours retained in the results.
Figure 6.
Planning-case balancing metrics for S1, S2, S3, and S5. A solid line denotes Area 1, and a dashed line denotes Area 2 in panel (a).
The selected ratings and installed totals are given in Table 6. The sequential search selects per-device group ratings of 5, 7.5, and 7.5 MVA. The corresponding group totals are 10, 15, and 7.5 MVA, giving 32.5 MVA across five devices and a normalized annual capacity term of 0.073. Re-ranking the recorded rating candidates for each tested cost weight from 0.5 to 2.0 retains this vector. The selected vector is therefore stable over the tested candidates and weights. Its exhaustive sizing optimality and monetary return remain unresolved. Figure 7 documents the illustrative regional tariff profiles; they do not enter the normalized sizing objective. The deterministic load increment in Figure 8 defines the Extreme planning input, with no separate optimization of load growth.
Table 6.
Per-device ratings, group totals, and normalized capacity term.
Figure 7.
Illustrative regional tariff profiles, which are not included in the normalized planning objective.
Figure 8.
Extreme-minus-normal regional demand increments in the AC planning case.
The supply-capability calculation uses a common load multiplier at each hour. Table 7 separates the regional contributions and their legitimate sum. Table 8 reports the matched control and associated feasibility checks. S5 yields a weighted simultaneous system capability of 22.376 MW, compared with 21.690 MW for C7, an increase of 0.686 MW or 3.16%. Its industrial, residential, and commercial contributions are 9.125, 10.667, and 2.583 MW. The scheduled taps improve capability in 20 of the 24 h. The benefit has a loss cost: weighted feeder losses increase from 0.211 MW in C7 to 0.351 MW in S5, or 66.83%, while the maximum original-feeder loading decreases from 0.876 to 0.855 p.u. The radial reference yields 11.824 MW, but its difference from S5 also includes added transfer paths. Under the Extreme planning inputs, S6 is feasible in 22 of 24 h and reaches a maximum feeder loading of 1.138 p.u.; the normal-day result therefore does not establish extreme-condition security.
Table 7.
Weighted simultaneous regional and system supply capability.
Table 8.
Matched-topology control and AC validation.
The capacity gain and loss increase concern different quantities. Loadability is determined at a scaled feasible boundary, whereas the losses in Table 8 are evaluated at the unscaled daily demand. The composite score in (15) weighs voltage and loading balance together with losses, so it need not select the lowest-loss or highest-loadability state. Redirecting power can therefore relieve a limiting feeder while increasing current in longer resistive paths. In the retained S5/C7 daily comparison, unweighted AC loss energy is 6.793 versus 3.846 MWh, an increase of 2.946 MWh (76.61%); this differs from the 66.83% increase in the weighted MW statistic. Branches 31–32 and 30–31 account for 18.59% of the additional daily loss. At an illustrative loss-energy valuation of 500 CNY/MWh, the increase is 1473.21 CNY/day. This estimates the extra daily cost of loss energy. A break-even appraisal would also need equipment prices, actual utilization and the value of avoided curtailment, since unused transfer capability generates no electricity sales.
Figure 9 shows the industrial, residential, and commercial contributions at each common feasible boundary. The radial reference and added-transfer-path cases do not have equal topology. Only C7 and S5 share both endpoints and ratings. Their difference measures the response to the scheduled taps, with impedance varying with tap position in the DCPST model. Figure 10 shows the incoming feeder of the first device’s receiving node in each intra-area group; the branch labels identify which feeder is being compared.
Figure 9.
Regional contributions to a simultaneous AC loadability boundary: (a) industrial, (b) residential, and (c) commercial.
Figure 10.
Selected receiving-node upstream-feeder loading in (a) S2 and (b) S5. The plotted branch identities differ between layouts.
3.3. Independent Stress-Operation Benchmark
The operating assessment uses a separate configuration of two modified 33-bus areas, with its own device locations and ratings. Devices are located at 5–23, 5–29, 43–56, 43–62, and 4–40, each rated 1 MVA. O4 includes only the inter-area device; O6 includes all five. The two configurations therefore have total installed ratings of 1 and 5 MVA and do not constitute an equal-budget comparison. The same stress inputs, objective coefficients, solvers, and AC feedback rule are used, and each configuration is optimized independently. Same-topology energized zero-tap controls are included.
The stressed day scales active and reactive demand by 1.15 and PV forecasts by 0.85 relative to the nominal inputs. Each upstream source is rated 11 MVA; the voltage limits are 0.93–1.07 p.u. Grid-energy prices range from 180 to 1500 CNY/MWh. The PV-energy coefficient, loss-proxy coefficient, and shedding penalty are 300, 500, and 20,000 CNY/MWh, respectively. The voltage-penalty coefficient is 200, and the tap-position coefficient is 0.05 CNY per absolute tap unit per device-hour. These are declared benchmark coefficients. Three common AC-feedback rounds give a final daily thermal factor of 0.881, without additional voltage tightening. All nine configurations and matched controls pass 216 daily case-hours of nonlinear AC checks; the largest actual branch loading is 0.995 p.u. Physical ratings remain unchanged.
The 4–40 branch is the sole bridge between otherwise separately supplied areas. Because the nonreference source angle is free in this benchmark, a phase shift on that bridge can be absorbed by a change in the area’s reference angle. Its phase shift alone therefore cannot be identified as a transfer-capability gain. Added connectivity, leakage impedance, loop-device settings, and possible branch opening must be distinguished.
Figure 11 shows the hourly served and shed loads in each area for O4, and Figure 12 shows the corresponding results for O6 on the same scales. O4 and O6 shed 2.135 and 1.514 MWh, corresponding to 0.60% and 0.43% of full-system demand. O6 sheds 29.09% less but uses five times the installed rating. Before AC feedback, the linear model yields shedding of 0.712 and 0.418 MWh, but the resulting dispatches violate AC limits. Enforcing AC feasibility through feedback therefore increases the required shedding. Against their respective same-topology, energized zero-tap controls, the final shedding differences are below 3 × 10−9 MWh. Adjustable taps reduce the operating surrogate objective by only 43.30 CNY/day in O4 and 25.01 CNY/day in O6. The shedding comparison across these configurations therefore combines differences in installed capacity, connection layout and tap settings. Exact AC loss energies are 7.829 and 7.386 MWh, and the corresponding grid-energy, PV-energy, and shedding-penalty totals are 200,083.66 and 187,836.64 CNY/day. Numerical penalties and the quadratic loss proxy are omitted from these AC-based totals. For the nominal five-device benchmark, Benders gives an upper bound of 131,277.24 CNY/day and a lower bound of 130,759.62 CNY/day, with a 0.39% surrogate gap; the upper bound includes 7.75 CNY/day of tap-position regularization. The O4 and O6 surrogate gaps are 0.19% and 0.40%. Fixed-tap ADMM converges in 69 iterations, with a maximum PV consensus error of 6.67 × 10−5 MW and a relative objective difference of 2.22 × 10−9 from the centralized fixed-tap QP. These numerical certificates do not imply global AC optimality.
Figure 11.
AC-checked O4 regional dispatch. Upper panels show served and shed load; lower panels magnify the shedding component without changing the data.
Figure 12.
AC-checked O6 regional dispatch with the same panel order and scales as Figure 11.
The three displayed regions contain 314.663 MWh of stressed demand, while the full-system denominator is 355.001 MWh. The full-system shedding percentages use the latter denominator. Separate lower panels use a scale suited to the small shedding values, keeping labels clear of the bars and preserving the distinction between served and shed load.
3.4. Two-Area 69-Bus Extension
The third study uses two copies of the 69-bus feeder in the official MATPOWER case69 data file [29], on a 12.66 kV, 10 MVA base, and the topology in Figure 13. The load and line-impedance data are taken from the public benchmark; the source file disables branch flow ratings. For this extension, each line’s study rating is the larger of 250 kVA and 1.25 times the apparent power formed from its aggregate downstream base active and reactive demand. The two source ratings are 1.05 and 1.35 times the aggregate base apparent demand of one area, respectively. The thermal and source-capacity limits are prescribed for this study. They supplement the MATPOWER load and impedance data and have not been validated against equipment nameplates.
Figure 13.
Baseline two-area 69-bus extension and five candidate DCPST branches. The additional single-device tests explicitly state their selected endpoints.
Each area’s demand follows the normalized aggregate profile of its corresponding 33-bus operating area. Four equal PV installations per area, at local buses 11, 21, 49, and 61, have a combined peak active forecast equal to 25% of that area’s base active demand. Their time shape is the normalized aggregate PV forecast of the 33-bus operating case, and their apparent-power ratings and nighttime reactive-support assumption follow Section 2.2.1. Five 1 MVA devices occupy the branches in Table 9, with per-device and group totals in Table 10. The device locations are specified independently of the planning study, and the demand and PV inputs are scenario profiles without field calibration.
Table 9.
Device locations in the two-area 69-bus extension.
Table 10.
Per-device and group ratings in the 69-bus extension.
The peak device states are selected by a deterministic coordinate search over all 31 energized taps and the open state, starting with all groups open and using at most three passes. Linear peak loadability is the primary score, with base-hour operating cost only breaking ties. The selected states are then held fixed during the separate common-margin peak AC checks described in Section 2.2.3. The open-device state is an out-of-service branch, not a conducting bypass. Table 11 gives the conservative AC-checked loadability reached with these fixed device states, together with branch loading. A deterministic coordinate search evaluates 192 candidates over two passes at the daily model margin. The resulting fixed state opens both intra-area groups and energizes the inter-area 2–72 device at zero tap. All five installed devices are rated 1 MVA, with group totals of 2, 2, and 1 MVA. Table 10 distinguishes these ratings from the 480 MVA literature reference. Its 0.529 MVA inter-area flow and 52.91% loading refer to the unscaled base-day peak-hour dispatch. Separate peak AC feedback uses the common peak-only thermal factor 0.865, without re-optimizing device states. Both extension configurations then give 5.893 MW at a load multiplier of 0.775, with zero capability increase. Their maximum AC branch loadings are 0.709 and 0.621 p.u., with and without devices, illustrating the conservatism of the surrogate constraints. Under the same peak-only rule, the independent 33-bus operating benchmark gives 17.487 and 17.038 MW with and without devices. These conservative fixed-state values establish AC-feasible operating levels under the common feedback rule; the global AC maximum remains undetermined.
Table 11.
Conservative peak loadability and AC validation in the 69-bus extension.
Open-state tap and phase values are state-encoding values, not energized settings.
Each group total appears on every device row in that group and is counted once when summing installed capacity. The 480 MVA entry identifies the literature reference device.
When the binding limit lies outside the paths affected by the PST, its installation can leave supply capability unchanged. Generation capacity and upstream bottlenecks remain unchanged by the added device. Daily feasibility and peak loadability are checked and reported separately. Because the three studies use different parameter sets, their numerical outcomes are interpreted within each study rather than ranked across studies.
3.5. Controlled Comparisons and Sensitivity Results
Table 12 summarizes the distinct comparison domains. The baseline results in Section 3.1, Section 3.2, Section 3.3 and Section 3.4 are retained so that changes in model assumptions are visible. Each added capacity, source or scheduling case is identified separately from the baseline. All input matrices; candidate scores; tap trajectories; and positive, zero and negative results are included in Supplementary Material.
Table 12.
Summary of the comparison domains and principal findings.
3.5.1. Search Error and an Infeasible Stress Condition
The 64-combination audit selects per-device group ratings of 10, 7.5 and 2.5 MVA, totaling 37.5 MVA, with the lowest penalty-augmented score 3.053. The original order returns 5, 7.5 and 7.5 MVA and score 3.143, a 2.94% gap. Across six orders, the largest gap is 4.74%. This is not an all-scenario feasible optimum: a total of 32 combinations pass three representative points, 32 pass two, and none passes all four. For the Extreme inputs at hours 13 and 14, the aggregate net apparent-demand lower bounds are 26.287 and 26.923 MVA, exceeding the two source-feeder ratings totaling 25 MVA even before losses. A passive phase shifter cannot close this upstream capacity deficit, leaving the tested configurations infeasible under the Extreme inputs. The separate 243-state tap benchmark gives a 4.00% coordinate-search score gap, confirming that even fixed-rating tap selection is heuristic.
3.5.2. Configuration Sensitivity and Mechanical Duty
Across the 17 peak-hour configuration sensitivities, the fixed selected schedule changes loadability relative to matched zero taps by −1.53% to +8.95%. The negative cases are source angle −2° (−1.53%), source-2 magnitude 0.98 p.u. (−1.05%) and demand/PV multipliers 0.9/1.1 (−0.64%). These outcomes measure the performance of schedules selected by the composite objective; global maximization of loadability is outside this search. In the reference test, the scheduled-tap boundary is set by feeder 16–17, whereas the zero-tap boundary is set by source feeder 34–35. In the −2° and 0.98 p.u. cases, feeder 34–35 binds both boundaries. The results also vary with resistance, shunt loss and corridor impedance. Applying the model to a specific device still requires its equipment data.
All five daily schedules in Table 13 satisfy AC limits for 24 h. The strict policy reduces maximum per-device travel from 11 to 8 steps but increases daily losses from 5.780 to 6.057 MWh; the peak capability remains 21.992 MW. The corresponding matched zero-tap capability is 21.956 MW. These peak values characterize the 37.5 MVA configuration, while the 32.5 MVA baseline retains its separate weighted results. Step budgets quantify the duty imposed on the tap changer; mechanical lifetime and wear costs require a separate model.
Table 13.
Mechanical constraints for the 37.5 MVA configuration on the normal day.
3.5.3. Equal Installed Capacity in the Operating Benchmark
All four cases pass the same nonlinear AC checks without further tightening. The maximum voltage difference between the linear schedule and AC verification is 5.04 × 10−3 p.u. for O4 and 4.58 × 10−3 p.u. for O6. The single-device Benders surrogate gap is 0.09%. At equal installed MVA, O6 still sheds less, but the zero/adjustable differences within either layout remain below 10−9 MWh; topology and allocation explain the inter-layout benefit. The corresponding exact AC energy/PV/shedding-penalty totals, excluding numerical and duplicated loss penalties, are 197,867.52 and 187,836.64 CNY/day for adjustable O4 and O6. For O4, a six-change, 24-step, two-hour-dwell policy remains AC-feasible and leaves shedding unchanged, with less than 1 CNY/day change in the operating objective. This scheduling result applies to the single 5 MVA device; joint scheduling of all five devices remains outside the test. Table 14 compares the two layouts at the same total installed capacity of 5 MVA.
Table 14.
Original operating model with equal total installed capacity of 5 MVA.
3.5.4. Conditional Phase-Control Benefits in the 69-Bus Network
The reference fixed-phasor case at branch 2–72 improves the AC load multiplier from 1.161 to 1.244 at tap −1, or 7.15%, with the same 1 MVA rating and physical limits. Both boundaries are source-capacity limited. At a common demand equal to 95% of the zero-tap loadability boundary, losses increase from 0.378 to 0.381 MW. For the ±5° cases, the scan finds no feasible zero-tap reference, leaving the percentage change undefined. The two intra-area placements and the matched 5 MVA case yield zero improvement. Increasing device rating or adding a loop is therefore insufficient, on its own, to ensure a loadability gain from phase control. A separate fsolve cross-check gives a maximum power-balance residual of 5.73 × 10−12 p.u. for the verified reference solution. Table 15 summarizes the 69-bus sensitivity results obtained with matched topology and device ratings.
Table 15.
Selected 69-bus AC sensitivity results with matched topology and rating.
Twenty-five 69-bus daily settings combine event budgets, dwell restrictions and loss/shedding weights. Both comparison arms use the same synthetic second-source trajectory of 2 sin [2π(t − 1)/24] degrees, while source 1 is the angle reference. The hourly movement limit is five adjacent steps, the initial tap is zero, and no terminal reset is imposed. The trajectory provides a controlled test of sensitivity to upstream angle variation. A six-event, 24-step, two-hour-dwell setting uses six events and seven adjacent steps. Its criterion decreases from 74,025.18 to 69,520.93 CNY/day, while loss energy rises from 3.597 to 3.641 MWh, and both schedules serve all load. The lower objective is driven mainly by source-specific energy prices and transfer allocation, despite the rise in loss energy. It measures a change in the stated operating criterion, which combines source-energy costs with an additional loss penalty; it does not establish investment profit. The supplied cost decomposition separates these components and includes every alternative setting tested. The scheduling dynamic program is also checked against an 81-sequence restricted exhaustive test and obtains the same optimum.
4. Discussion
The experiments link the value of phase control to its ability to relieve the binding network constraint under the chosen source model. The positive 69-bus results describe fixed-source phasors, while the free-angle baseline retains its zero-gain result. The composite objective also permits a tradeoff: a better score can coincide with lower loadability. Configuration decisions should therefore consider losses, source capacity and tap-changing duty together. Equal installed MVA provides a useful control for network comparisons, although capital costs still depend on device count, civil works, protection and winding design. Investment profitability remains unresolved.
The analysis concerns balanced steady-state networks under specified parameter scenarios. The medium-voltage DCPST parameters are study assumptions based on the literature model and declared sensitivity cases; manufacturer design data and type-test results were unavailable. The resistance, core-loss and corridor tests characterize model sensitivity, not the performance of validated equipment. The rating benchmark enumerates the capacity grid at fixed locations with heuristic inner tap searches, while the restricted tap benchmark tests three positions for each of five devices. We did not benchmark the searches against established optimization algorithms under a common formulation and computational budget. The 33-bus scheduling test imposes hard constraints on one 5 MVA device, leaving the five-device joint problem unevaluated. Three-phase unbalance, protection coordination, transients, contingency security, physical tap transitions and probabilistic forecasts require analyses beyond the present steady-state calculations.
5. Conclusions
Matched comparisons distinguish the contribution of phase control from the benefit of added connection paths. In the planning comparison with identical paths and ratings, scheduled taps raise weighted capability by 3.16% at the cost of a 76.61% increase in daily feeder-loss energy. Capacity-grid and restricted-tap benchmarks quantify the search gaps, while the source-capacity bound explains the infeasible Extreme case. At equal installed rating, the five-device layout sheds less load than the single-device layout. This benefit comes from topology and allocation: tap adjustment within either layout has essentially no effect on shedding. The 69-bus free-angle benchmark also retains its zero-gain result. With fixed-source phasors, one matched 1 MVA case gains 7.15%, whereas several other locations or ratings show no improvement. Topology, source boundary conditions, loss valuation and switching duty thus determine whether phase control adds value. These conditional network-level findings rely on assumed medium-voltage parameters and establish neither validated equipment performance nor superiority over other optimization algorithms.
Supplementary Materials
The following supporting information can be downloaded at: https://www.mdpi.com/article/10.3390/en19235731/s1.
Author Contributions
Conceptualization, W.S. and J.B.; methodology, S.G. and J.B.; software, S.G.; validation, S.Z. and X.C.; formal analysis, W.S. and S.G.; resources, W.S., S.Z., and X.C.; writing—original draft preparation, W.S. and S.G.; writing—review and editing, W.S., S.G., S.Z., X.C., and J.B.; supervision, J.B.; project administration, W.S.; funding acquisition, W.S. All authors have read and agreed to the published version of the manuscript.
Funding
This research was funded by the Science and Technology Project of State Grid Heilongjiang Electric Power Co., Ltd., entitled “Research and Application of Intelligent Devices for Online Load Transfer in Distribution Networks Adapted to Severely Cold Regions”, grant number 522413260001.
Data Availability Statement
Supplementary Material contains the modified network data, hourly load and PV inputs, parameter and scenario definitions, MATLAB source files, complete tested-candidate results and instructions for reproducing the additional analyses. Original baseline results and their inputs are retained separately from the new runs. The public 69-bus network data are also available from the MATPOWER repository [29].
Acknowledgments
An OpenAI generative-AI assistant was used to support manuscript drafting, translation, code-related assistance, figure preparation, and formatting.
Conflicts of Interest
The authors Wenjie Sun, Shubao Zheng and Xuefeng Cheng were employed by State Grid Qiqihar Power Supply Company. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest. The authors declare that this study received funding from Science and Technology Project of State Grid Heilongjiang Electric Power Co., Ltd. The funder was not involved in the study design, collection, analysis, interpretation of data, the writing of this article or the decision to submit it for publication.
References
- IEC/IEEE 60076-57-1202:2017; Power Transformers—Part 57-1202: Liquid Immersed Phase-Shifting Transformers. IEEE: New York, NY, USA, 2017.
- Guo, J. Research on Symmetrical Dual-Core Phase Shifter Applied to Power Flow Control. Master’s Thesis, Guizhou University, Guiyang, China, 2021. [Google Scholar]
- Yu, M.; Yuan, J.; Li, Z.; Li, F.; Yang, X.; Zhang, W.; Xu, S.; Mei, J. Power flow optimization and economic analysis based on high voltage phase shifting transformer. Energies 2022, 15, 2363. [Google Scholar] [CrossRef] [Scilit]
- Geoffrion, A.M. Generalized Benders decomposition. J. Optim. Theory Appl. 1972, 10, 237–260. [Google Scholar] [CrossRef] [Scilit]
- Boyd, S.; Parikh, N.; Chu, E.; Peleato, B.; Eckstein, J. Distributed optimization and statistical learning via the alternating direction method of multipliers. Found. Trends Mach. Learn. 2011, 3, 1–122. [Google Scholar] [CrossRef] [Scilit]
- Xu, Y.; Liu, H.; Xiong, X.; Ji, Y.; Shao, Y.; Zhang, H.; Sun, L.; Wu, M. Key technologies and development modes of flexible interconnection of low-voltage distribution station area. Proc. CSEE 2022, 42, 3986–4001. [Google Scholar] [CrossRef]
- Zhu, J.; Gao, H.; He, S.; Li, H.; Liu, J. Flexible interconnection planning of low-voltage distribution network considering power supply capability improvement. High Volt. Eng. 2024, 50, 3545–3554. [Google Scholar] [CrossRef]
- Zhang, L.; Tong, B.; Wang, Z.; Tang, W.; Shen, C. Optimal configuration of hybrid AC/DC distribution network considering the temporal power flow complementarity on lines. IEEE Trans. Smart Grid 2022, 13, 3857–3866. [Google Scholar] [CrossRef] [Scilit]
- Luo, J.; Fu, X.; Yuan, X.; Zhang, J.; Xiong, G.; Wong, M.C. Event-triggered dynamic consistency algorithm based feeder load balancing control strategy. Power Syst. Prot. Control 2025, 53, 123–132. (In Chinese) [Google Scholar] [CrossRef]
- Zhu, J.; Dong, S.; Xu, C.; Zhu, B.; Ni, Q.; Xu, Q. Evaluation model of total supply capability of distribution network considering multiple transfers. Power Syst. Technol. 2019, 43, 2275–2281. (In Chinese) [Google Scholar] [CrossRef]
- Sarantakos, I.; Greenwood, D.M.; Zografou-Barredo, N.-M.; Vahidinasab, V.; Taylor, P.C. A probabilistic method to quantify the capacity value of load transfer. Int. J. Electr. Power Energy Syst. 2020, 123, 106238. [Google Scholar] [CrossRef] [Scilit]
- Yuan, J.; Zhang, W.; Mei, J.; Ye, Z.; Gan, D.; Zheng, Y.; Peng, L. Application of double core symmetrical phase shifting transformer in power flow regulation of UHV power grid. Energy Rep. 2023, 9, 245–254. [Google Scholar] [CrossRef] [Scilit]
- Jin, W.; Liu, H.; Zhang, W.; Yuan, J. Power flow regulation effect and parameter design method of phase-shifting transformer. Energies 2024, 17, 1622. [Google Scholar] [CrossRef] [Scilit]
- Liang, G.; Wang, L.; Gao, F.; Liu, X. A new maximum step voltage calculation method of on-load tap-changer for symmetrical two-core phase-shifting transformer. IEEE Trans. Power Del. 2018, 33, 2718–2725. [Google Scholar] [CrossRef]
- Guo, J.; Hao, Z.; Chen, Z.; Deng, P. Research on impedance calculation and simulation modeling of symmetrical two-core phase-shifting transformer. High Volt. Appar. 2022, 58, 80–86. (In Chinese) [Google Scholar] [CrossRef]
- Hrgović, I.; Pavić, I. Sizing and implementation of phase-shifting transformer for congestion management in renewable-rich regions: A case study of the Croatian power grid. IEEE Trans. Power Syst. 2025, 40, 3465–3473. [Google Scholar] [CrossRef] [Scilit]
- Korab, R.; Połomski, M.; Owczarek, R. Application of particle swarm optimization for optimal setting of phase shifting transformers to minimize unscheduled active power flows. Appl. Soft Comput. 2021, 105, 107243, Corrigendum in Appl. Soft Comput. 2026, 159, 114303. https://doi.org/10.1016/j.asoc.2025.114303. [Google Scholar] [CrossRef] [Scilit]
- Nourizadeh, H.; Mosallanejad, A.; SetayeshNazar, M. Optimal placement of fixed series compensation and phase shifting transformer in the multi-year generation and transmission expansion planning problem at the pool-based market for maximizing social welfare and reducing the investment costs. IET Gener. Transm. Distrib. 2022, 16, 2959–2976. [Google Scholar] [CrossRef] [Scilit]
- Yuan, J.; Zhang, W.; Mei, J.; Gan, D.; Zhou, H.; Zheng, Y.; Liu, J. Independent fast phase shifting transformer: A flexible and high-precision power flow controller. IEEE Trans. Power Del. 2023, 38, 4410–4421. [Google Scholar] [CrossRef] [Scilit]
- Albrechtowicz, P.; Rozegnał, B.; Cisek, P. Comparison of phase-shifting transformers properties. Energies 2022, 15, 6224. [Google Scholar] [CrossRef] [Scilit]
- Yang, Y.; Du, X.; Tang, J.; Chen, X.; Zhao, C. Integrated voltage loop device and control strategy based on improved phase-shifting transformers. Trans. China Electrotech. Soc. 2025, 40, 2532–2546. (In Chinese) [Google Scholar] [CrossRef]
- Xu, Z.; Tang, J.; Jiang, Y.; Qin, R.; Ma, H.; Yang, Y.; Zhao, C. Analysis of fault characteristics of distribution network with PST loop closing device under small current grounding system. Energies 2022, 15, 2307. [Google Scholar] [CrossRef] [Scilit]
- Albrechtowicz, P. Phase-shifting transformer efficiency analysis based on low-voltage laboratory units. Energies 2021, 14, 5049. [Google Scholar] [CrossRef] [Scilit]
- Wadood, A.; Albalawi, H.; Khan, S.; Khan, B.M.; Alatwi, A.M. Fractional-Order African Vulture Optimization for Optimal Power Flow and Global Engineering Optimization. Fractal Fract. 2025, 9, 825. [Google Scholar] [CrossRef] [Scilit]
- Wadood, A.; Khan, B.M.; Albalawi, H.; Khan, B.S.; Park, H.; Kang, B.O. Fractional Calculus and Adaptive Balanced Artificial Protozoa Optimizers for Multi-Distributed Energy Resources Planning in Smart Distribution Networks. Fractal Fract. 2026, 10, 101. [Google Scholar] [CrossRef] [Scilit]
- Dehghanian, P.; Yeo, J.H.; Wert, J.; Li, H.; Shetye, K.; Overbye, T.J. Application of transformer impedance correction tables in power flow studies. In Proceedings of the 2020 52nd North American Power Symposium (NAPS), Tempe, AZ, USA, 11–13 April 2021; pp. 1–6. [Google Scholar] [CrossRef] [Scilit]
- Albrechtowicz, P.; Cisek, P. An impact of the line resistance on the power flow calculations with installed phase-shifting transformer in different voltage levels power systems. Electr. Power Syst. Res. 2022, 209, 107970. [Google Scholar] [CrossRef] [Scilit]
- GB/T 12325–2008; Power Quality—Deviation of Supply Voltage. Standards Press of China: Beijing, China, 2008. (In Chinese)
- MATPOWER. Case69.m: Power Flow Data for 69 Bus Distribution System. MATPOWER GitHub Repository, Master Branch. Available online: https://github.com/MATPOWER/matpower/blob/master/data/case69.m (accessed on 13 September 2026).
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |