Abstract

With the ongoing global energy transition, large-scale wind power integration has posed new challenges to power system frequency security. Frequency regulation based on rotor kinetic energy release offers improved economic performance. However, the frequency regulation capability of wind farms depends on wind speed, and wind speed forecast errors may lead to inaccurate capability assessment, thereby threatening system frequency security. To address this issue, a frequency-constrained robust unit commitment (UC) method considering uncertainty in wind power frequency regulation capability is proposed. First, a wind turbine frequency regulation model based on rotor kinetic energy release is established. The effects of wind speed forecast errors on rotor kinetic energy reserves and power output are analyzed, and uncertainty constraints on wind farm virtual inertia and frequency regulation power are formulated. Accordingly, the system equivalent inertia and frequency regulation power are adjusted, and an aggregated system frequency response model is established to derive the corresponding frequency security constraints. Subsequently, a two-stage robust UC model is formulated. In the first stage, the UC schedule of thermal power units is determined, while in the second stage, the scheduling decisions are adjusted under the worst-case scenario. The model is solved using the column-and-constraint generation (C&CG) algorithm. Case studies demonstrate that the proposed method accounts for the limitations imposed by wind speed forecast errors on wind turbine frequency regulation capability and optimizes the allocation of frequency regulation resources, thereby ensuring system frequency security. Results obtained from the modified IEEE 39-bus system show that, compared with the robust UC method considering only wind power output uncertainty, the proposed method limits the increase in total operating cost to 0.38%, reduces the maximum system frequency deviation from 1.0685 Hz to 0.8000 Hz, and decreases the number of scheduling periods with frequency deviation violations from 32 to zero, thereby significantly improving system frequency security.

1. Introduction

With the global energy transition, renewable energy sources, particularly wind power, have experienced rapid development [1]. However, renewable energy generation facilities, such as wind farms, are typically connected to the power grid through power electronic interfaces, which decouple rotor speed from grid frequency and prevent the inherent provision of inertial response under conventional control modes, unlike synchronous generators. Meanwhile, the stochastic and fluctuating nature of wind power output has led to continuous reductions in system equivalent inertia and frequency regulation capability, posing significant challenges to power system frequency security [2]. Therefore, accurate characterization of wind farm frequency regulation capability under different operating conditions and its optimal utilization in the scheduling stage have become important research topics for the secure and economic operation of power systems with high renewable energy penetration.
With advances in control technologies, wind farms have become capable of providing frequency support [3,4], and their participation has been incorporated into frequency-constrained UC [5,6]. In [5], rotor overspeed de-loading control was adopted to reserve active power capacity for wind farms during scheduling. Based on this approach, ref. [6] coordinated the optimization of wind farm generation schedules and reserve capacity using known wind speed forecast intervals. Although this frequency regulation approach can mitigate frequency disturbances to some extent, it requires wind turbines to operate away from the maximum power point tracking (MPPT) condition, resulting in reduced power output [7] and deteriorated economic performance [8]. To balance system frequency security and operating economy, rotor kinetic energy has been utilized to provide frequency support in [9,10]. Under normal operating conditions, wind farms operate at the MPPT point. Following a system frequency decline, additional control is activated to release the rotor kinetic energy of individual wind turbines, thereby temporarily increasing active power output for frequency regulation [9]. This approach requires only short-term frequency support following a disturbance, avoiding sustained reductions in power output and improving economic performance. In [11], rotor kinetic energy-based frequency regulation was considered, and frequency security constraints were formulated by incorporating the virtual inertia of wind farms. However, virtual inertia was assumed to be constant, without further refinement in the characterization of wind turbine frequency regulation capability. Although these studies have progressively improved the modeling of wind turbine frequency regulation, fixed reserve ratios or constant virtual inertia values are generally adopted to represent wind turbine frequency regulation capability.
To further account for the influence of wind turbine operating conditions on frequency regulation capability, the available rotor kinetic energy was determined in [12] based on the initial rotor speed, minimum permissible rotor speed, and wind farm capacity, providing a basis for evaluating wind turbine frequency regulation capability. However, the evaluation was primarily conducted under given operating conditions, without further accounting for the effects of operating condition variations on the available frequency regulation capability. In [13], the available active power reserve under rotor overspeed de-loading control was considered, and wind farm virtual inertia was optimized during scheduling. Nevertheless, this approach relied on the active power reserve obtained by operating wind turbines away from the MPPT point. In [14], wind farm virtual inertia allocation was optimized using a predefined set of candidate virtual inertia values. However, virtual inertia was restricted to a finite number of candidate values, limiting its flexible allocation within a continuous feasible range. These studies have facilitated the transition from treating virtual inertia as a fixed parameter to incorporating it as a decision variable, thereby improving scheduling flexibility. Nevertheless, the upper limits of virtual inertia and frequency regulation power are generally determined based on prescribed values, while virtual inertia and primary frequency regulation (PFR) power are modeled separately. Consequently, the effects of wind speed uncertainty on the upper limits of wind farm virtual inertia and PFR power have not been adequately characterized, preventing an accurate assessment of the actual frequency regulation capability of wind turbines.
Furthermore, wind speed uncertainty introduces significant fluctuations and stochastic variations in wind farm operating conditions and frequency regulation capability. To mitigate the impact of wind power uncertainty on system operation, robust optimization has been widely applied to unit commitment (UC) problems involving wind power generation [15,16]. In [15], an uncertainty set was employed to characterize wind power forecast errors, and unit commitment decisions and reserve allocation were optimized under worst-case wind power output scenarios. In [16], a two-stage robust UC model was further developed to improve the adaptability of scheduling decisions to wind power uncertainty. In [17], a two-stage adaptive robust UC model was formulated using a polyhedral uncertainty set. In [18], a multistate uncertainty set was further employed to characterize wind power output fluctuations and reduce the conservatism of robust scheduling. Building upon these studies, frequency security constraints, including the rate of change in frequency (RoCoF) and frequency nadir, were incorporated into robust UC in [19,20], enabling the optimization of unit commitment and frequency regulation resource allocation under uncertain scenarios. In [21], a linearization method for nonlinear frequency nadir constraints in UC was investigated. However, the uncertainty considered in these studies was primarily associated with variations in wind power output. Existing studies generally construct uncertainty scenarios based solely on wind power output [19], while neglecting the effects of wind speed variations on wind turbine virtual inertia and PFR capability. When actual wind speed deviates from its forecast value, the frequency regulation capability determined in the day-ahead scheduling stage may exceed the actual feasible range, thereby compromising the satisfaction of frequency security constraints established under worst-case scenarios. In addition, data-driven and machine learning methods have increasingly been applied to UC problems under uncertainty. In [22], machine learning was integrated with mixed-integer optimization to construct uncertainty sets conditioned on forecast information using historical data. In [23], a robust UC method integrating prediction and optimization was proposed, and a neural network surrogate model was employed to improve computational efficiency. In [24], a smart grid communication framework based on software-defined mobile sinks and wireless sensor networks was proposed to improve real-time monitoring and data acquisition capabilities. These studies provide new approaches for characterizing wind power uncertainty and solving complex UC models. However, their application still requires integration with the physical operating constraints governing wind turbine frequency regulation.
In summary, although extensive research has been conducted on wind turbine participation in frequency-constrained robust UC, the following two limitations remain:
(1) Existing studies have not adequately characterized how wind speed uncertainty simultaneously affects the upper limits of wind farm virtual inertia and PFR power. Furthermore, constraints relating rotor speed security, virtual inertia, and frequency regulation power have not been sufficiently established. This may result in excessive rotor kinetic energy release and subsequent withdrawal from frequency regulation due to parameter mismatch, further aggravating system frequency security risks.
(2) Existing frequency-constrained scheduling methods considering wind turbine frequency regulation capability predominantly account for wind power output uncertainty, while neglecting variations in rotor speed and frequency regulation capability limits induced by wind speed uncertainty. When actual wind speed deviates from its forecast value, the wind turbine frequency regulation capability allocated in the day-ahead scheduling stage may exceed the actual feasible range, potentially invalidating frequency security constraints under worst-case scenarios.
To address these limitations, this paper focuses on the inaccurate assessment of wind turbine frequency regulation capability and inappropriate allocation of frequency regulation resources caused by wind speed uncertainty. First, a wind turbine frequency regulation model based on rotor kinetic energy release is established to analyze the effects of wind speed forecast errors on wind farm frequency regulation capability. Wind speed-dependent upper-limit constraints on virtual inertia and PFR power are then formulated separately according to wind turbine operating conditions. Second, the RoCoF and maximum frequency deviation constraints are derived based on an aggregated system frequency response model. Finally, a two-stage robust UC model considering uncertainty in wind turbine frequency regulation capability is formulated and solved using the column-and-constraint generation (C&CG) algorithm to achieve economic optimality while ensuring system frequency security.

2. Frequency Regulation Constraints of Wind Farms and System Frequency Security Constraints

2.1. Inertial Control Modeling of Wind Turbines Considering Uncertainty

With the large-scale development of renewable energy, the room for committing conventional thermal units keeps shrinking, and wind farms are increasingly required to participate in system frequency regulation. When a power disturbance occurs, wind turbines can release rotor kinetic energy and increase their power output to provide short-term frequency support [4,25]. Since wind turbines mostly operate in the MPPT mode, their dynamics can be expressed as:
J w ω r d ω r d t = P w m − P w e = 2 H w d f d t
P w m = 0.5 ρ air π R 2 C p λ v w 3
C p = 0.22 116 v w ω r R − 1 − 9.06 e − 12.5 v w ω r R − 0.035
∂ C p λ ∂ λ | λ = λ opt = 0 ,         λ = R ω r v w − 1
where Jw is the moment of inertia of the wind turbine; P w m and P w e are the mechanical power and electromagnetic power of the wind turbine, respectively; Hw is the virtual inertia of the wind turbine; ωr is the rotor speed; ρair is the air density; Cp(λ) is the power coefficient, defined as the ratio of the mechanical power extracted by the wind turbine to the wind power passing through the rotor swept area, reflecting the wind energy conversion efficiency; λ is the tip-speed ratio, defined as the ratio of the rotor blade tip speed to the wind speed; vw is the wind speed; and R is the rotor radius. The rotor speed ωr can be determined from the optimal tip-speed ratio λopt and wind speed v. The proposed wind turbine model is applicable to wind speeds between the cut-in and rated wind speeds. Within this operating region, the blade pitch angle is assumed to be zero, and the power coefficient depends only on the tip-speed ratio.
When rotor kinetic energy is released for frequency regulation, the reduction in rotor speed causes the tip-speed ratio to deviate from its optimal value, resulting in a decrease in aerodynamic power. Following [26], the minimum permissible rotor speed during frequency regulation is determined based on the relationship between aerodynamic power and rotor speed at different wind speeds, as expressed in (5), to limit the reduction in aerodynamic power caused by excessive rotor deceleration.
∂ P w m ω r , v w ∂ ω r ≤ S P max
∂ P w m ω r , v w ∂ ω r | ω r = ω min S = S P max
ω min v w = max ω lim , ω min S
where S P max is the limit on the rate of change in mechanical power with respect to rotor speed, typically set to 1.0; ω min S is the minimum permissible rotor speed determined from the relationship between aerodynamic power and rotor speed at different wind speeds; ωlim is the minimum permissible mechanical rotor speed, set to 0.7 p.u. [27]; and ωmin is the rotor speed limit.
The virtual inertia that a wind farm can provide during frequency regulation is constrained by the rotor kinetic energy of wind turbines, and its upper limit is closely related to rotor speed. Accordingly, the relationship between rotor speed and the upper limit of virtual inertia is established as follows:
H w max = J w ω 0 2 − ω min 2 / 2 f 0 0 ≤ H w ≤ H w max
where H w max is the upper limit of wind turbine virtual inertia, expressed in MW·s/Hz; ω0 is the initial rotor speed under MPPT operation; and f0 is the nominal system frequency, expressed in Hz. In this paper, the available rotor kinetic energy is determined based on the initial rotor speed and the rotor speed limit, and is used to constrain virtual inertia to prevent excessive rotor kinetic energy release.
According to ω0 = vwλopt/R, the instantaneous wind speed determines the current rotor speed, thereby affecting the upper limit of wind farm virtual inertia and frequency regulation capability. For a given wind speed vw, the upper limit of wind turbine virtual inertia during frequency regulation can be expressed as a function of wind speed (9). The wind speed forecast error is defined as the maximum permissible relative deviation of the actual wind speed from the forecast wind speed.
H w max = J w v w λ opt / R 2 − ω min 2 / 2 f 0
Existing studies have shown that substantial discrepancies often exist between forecast and actual wind speeds. Such discrepancies may lead to underestimation or overestimation of wind farm frequency regulation capability, resulting in inappropriate frequency regulation resource allocation and posing risks to power system frequency security. Figure 1 illustrates the effects of wind speed forecast errors on the assessment of wind farm frequency regulation capability. The occurrence of overestimation or underestimation does not follow a fixed temporal pattern but depends on the deviation between actual and forecast wind speeds. At t1, the actual wind speed is lower than the forecast value, resulting in an initial rotor speed and available rotor kinetic energy below their forecast levels and, consequently, an overestimation of the upper limit of virtual inertia. Conversely, at t2, the upper limit of virtual inertia may be underestimated, potentially resulting in excessive scheduling of conventional generating units and reduced economic performance.
Figure 1. Impact of wind speed forecast errors on the assessment of wind farm frequency regulation capability.
Considering the wind speed forecast error between the day-ahead forecast and actual wind speeds, the upper limit of wind turbine virtual inertia is modeled as follows:
H w max , u = J w v u λ opt / R 2 − ω min 2 / 2 f 0
v u = v 0 + Δ v
where v0 is the day-ahead forecast wind speed; vu is the actual wind speed; Δv is the wind speed forecast error; H w max , u is the upper limit of wind turbine virtual inertia considering wind speed forecast errors; and the superscripts “0” and “u” denote the day-ahead forecast and actual values of the variables, respectively.
Considering the wind speed forecast error between the day-ahead and intraday stages, the deviations in the upper limit of wind turbine virtual inertia are expressed as follows:
Δ H NL , w + = H w max , u − H w max , 0         v u ≥ v 0 Δ H NL , w − = H w max , 0 − H w max , u         v u < v 0
where Δ H NL , w + and Δ H NL , w − denote the deviations in the upper limit of wind turbine virtual inertia considering wind speed forecast errors.
An uncertainty set is further employed to characterize wind speed forecast errors in (13), and the uncertainty constraints on wind farm virtual inertia are formulated in (14).
S = ∑ w ∈ WT z w , t + + z w , t − ≤ Γ t , z w , t + + z w , t − ≤ 1 ,                               0 ≤ z w , t + , z w , t − ≤ 1
H w , t max , u = H w , t max , 0 + z w , t + Δ H NL , w , t + , max − z w , t − Δ H NL , w , t − , max 0 ≤ H w , t u ≤ H w , t max , u
where S is the set of wind speed uncertainty scenarios; Γt is the uncertainty budget for period t, representing the number of wind farms whose upper limits of virtual inertia deviate from their forecast values during period t, with Γt∈(0, Nw]; Nw is the total number of wind farms; z w , t + and z w , t − represent the degrees of upward and downward deviations, respectively, in the upper limit of wind farm virtual inertia from its forecast value, both ranging from 0 to 1; Δ H NL , w , t + , max and Δ H NL , w , t − , max are the upper and lower bounds of the virtual inertia limit deviations, respectively; and H w , t max , u is the upper limit of virtual inertia of wind farm w during period t under an uncertainty scenario.
It should be noted that wind speed uncertainty affects not only the upper limit of wind farm virtual inertia but also the power output under MPPT operation, thereby changing the upper limit of PFR power available from wind farms. Under the operating conditions considered in this study, the upper limits of virtual inertia and PFR power exhibit opposite trends with respect to wind speed variations. Therefore, the worst-case wind speed realization cannot be determined by considering either frequency regulation capability independently, but should be identified by accounting for their combined effects on system frequency response. Specifically, a lower wind speed generally reduces the available virtual inertia, resulting in a more adverse impact on RoCoF, whereas a higher wind speed may reduce the available PFR power, potentially leading to a larger frequency deviation. Consequently, different frequency security constraints may correspond to different worst-case wind speed realizations. Accordingly, the same set of wind speed uncertainty variables is employed to characterize the variations in wind power output, virtual inertia, and PFR capability. The RoCoF and frequency nadir constraints are evaluated under consistent wind speed realizations, and the corresponding adverse scenarios are identified through the robust optimization subproblem to ensure consistent uncertainty modeling and system frequency security. Based on wind speed forecast errors, the mathematical expression for the upper limit of frequency regulation power is established in (15)–(17). Furthermore, the uncertainty constraints on frequency regulation power are formulated in (18) and (19).
P w , t ref = k opt ω 0 3 + Δ P OP , k opt = ρ air π R 5 C P , opt 2 λ opt 3
P w , t pfr , max = P rated − P w , t ref = P rated − k opt v u λ opt / R 3 + Δ P OP
0 ≤ P w , t ref ≤ P w conv , max
Δ P NL pfr , + , max = P w , t pfr , max , 0 − P w , t pfr , max , u             v u ≥ v 0 Δ P NL pfr , − , max = P w , t pfr , max , u − P w , t pfr , max , 0             v u < v 0
P w , t pfr , max , u = P w , t pfr , max , 0 − z w , t + Δ P NL pfr , + , max + z w , t − Δ P NL pfr , − , max
where P w , t pfr is the active power reference of wind turbine w at time t under constant power control for frequency regulation, determined by the pre-disturbance MPPT power output and a fixed power increment, as defined in [28]; ΔPOP is the fixed power increment; Prated is the rated power of the wind turbine; kopt is the proportional coefficient of the MPPT curve; CP,opt is the power coefficient at the optimal tip-speed ratio; P w , t pfr , max is the upper limit of frequency regulation power of wind turbine w at time t; P w , t pfr , max , 0 and P w , t pfr , max , u are its day-ahead forecast and intraday actual values, respectively; PMPPT is the wind turbine power output under normal operating conditions; Δ P NL pfr , + , max and Δ P NL pfr , − , max are the upper and lower deviations in the frequency regulation power limit considering wind speed forecast errors, respectively; and P w , t conv , max is the maximum permissible active power output of the wind turbine converter.

2.2. Formulation of System Frequency Security Constraints

The system frequency dynamics following a sudden power disturbance can be described by the swing equation, and the dynamic frequency response characteristics are illustrated in Figure 2.
2 H sys , t d f t d t + D ⋅ P L , t Δ f t = P t pfr − P t dis
where Hsys,t is the system equivalent inertia; P t pfr is the system frequency regulation power during period t; P t dis is the active power disturbance in period t; Δft is the frequency deviation after the disturbance; and D and PL,t are the load damping rate and the load level, respectively.
Figure 2. Dynamic frequency response characteristics of power systems.
Wind speed forecast errors affect the virtual inertia level and frequency regulation power of wind farms and thus change their frequency regulation capability. Ultimately, this appears as a mismatch between the actual and scheduled values of the equivalent inertia and frequency regulation power of the various frequency regulation resources. The frequency regulation resources, consisting of thermal units, wind farms, and energy storage, can be expressed as
P pfr = ∑ g ∈ G δ g , t P g , t pfr + ∑ e ∈ ES P e , t pfr + ∑ w ∈ WT P w , t pfr
H sys , t u = ∑ g ∈ G δ g , t H g , t u + ∑ e ∈ ES H e , t u + ∑ w ∈ WT H w , t u
H g , t u = h g , t P g , max f 0
where H sys , t u is the system equivalent inertia considering wind speed forecast errors; H g , t u , H e , t u , and H w , t u are the inertia of thermal units, energy storage, and wind farms, respectively; δg,t is the on/off status of thermal units; P g pfr , P w , t pfr , and P e pfr are the frequency regulation power of thermal units, wind farms, and energy storage, respectively; P t dis is the power disturbance; g, w, e, and l are the indices of thermal units, wind farms, energy storage units, and loads, respectively; G, WT, ES, and L are the corresponding sets of thermal units, wind farms, energy storage units, and loads, respectively; hg,t is the inertia constant of thermal power unit g during period t, the inertia constant is defined as the ratio of the kinetic energy stored in the generator rotor at rated speed to the rated power base of the generator, expressed in seconds; Pg,max is the maximum technical power output of thermal power unit g.
Two indices characterizing dynamic frequency security are extracted from the frequency response process as follows.
(1)
Rate of frequency decline at the initial instant
In the initial stage after a disturbance, the maximum RoCoF is determined by the system equivalent inertia. From the system frequency response equation, it follows that
d Δ f t d t = P t dis 2 H sys ≤ RoCoF max
H sys ≥ P t dis 2 RoCoF max
where RoCoFmax is the maximum allowable RoCoF. Constraint (25) indicates that, for a given disturbance, the system equivalent inertia must be kept above a certain level so that the RoCoF does not exceed the security threshold.
(2)
Maximum frequency deviation
During the frequency regulation process following a disturbance, the system frequency drops transiently until it reaches its lowest point. Considering load damping and the dynamic frequency regulation response, the maximum frequency deviation can be expressed analytically as follows, with the derivation detailed in Appendix A:
Δ f nadir , t = Δ f DB + P t 1 , dis D t 1 + 2 R t F H sys T d ( D t 1 ) 2 log 2 R t F H sys T d D t 1 P t 1 , dis + 2 R t F H sys
where ΔfDB is the frequency regulation dead band; R t F is the system frequency regulation capacity during period t; Td is the frequency regulation response time constant; D t 1 is the load damping, with D t 1 = D∙PL,t; and P t 1 , dis = P t dis − D t 1 ΔfDB is the disturbance power corrected for the dead band.
The maximum frequency deviation constraint of the system is thus obtained as
Δ f nadir , t ≤ Δ f max
where Δfnadir,t is the maximum frequency deviation in period t, and Δfmax is the maximum allowable frequency deviation.
Equation (26) contains the product of two continuous variables and is therefore nonlinear. Its right-hand side is monotonically decreasing with respect to R t F and Hsys. Accordingly, an auxiliary parameter kt can be introduced to transform (27) into (28).
2 k t T d log 2 k t T d D t 1 P t 1 , dis + 2 k t = ( D t 1 ) 2 Δ f max − D t 1 P t dis R t F ⋅ H sys , t ≥ k t
where R g , t F , R w , t F , and R e , t F are the PFR capacities of thermal power units, wind farms, and energy storage systems, respectively; and kt is an auxiliary parameter for period t. For each scheduling period, the first line of (28) is formulated as a univariate nonlinear equation in kt, based on the power disturbance, load damping, frequency response time, and maximum permissible frequency deviation. The equation is solved using a numerical root-finding method. The resulting kt is then substituted as a known parameter into the second line of (28), thereby establishing a constraint relationship between system equivalent inertia and PFR capacity.
It should be noted that (28) contains the product of two continuous variables and is therefore nonlinear. Following [29], the McCormick envelope method is adopted, and an auxiliary variable Zt is introduced to represent this product:
Z t = R t F ⋅ H sys , t
where Zt is an auxiliary variable representing the product of the total system PFR capacity and system equivalent inertia.
Given R t F in [ R L , t F , R U , t F ] and H sys , t in [ H sys , t L , H sys , t U ], the following four linear envelope constraints can be constructed:
Z t ≥ R L , t F ⋅ H sys , t + H sys , t L ⋅ R t F − R L , t F ⋅ H sys , t L Z t ≥ R U , t F ⋅ H sys , t + H sys , t U ⋅ R t F − R U , t F ⋅ H sys , t U Z t ≤ R U , t F ⋅ H sys , t + H sys , t L ⋅ R t F − R U , t F ⋅ H sys , t L Z t ≤ R L , t F ⋅ H sys , t + H sys , t U ⋅ R t F − R L , t F ⋅ H sys , t U
where R L , t F and R U , t F are the lower and upper bounds of the total system PFR capacity, respectively; and H sys , t L and H sys , t U are the lower and upper bounds of system equivalent inertia, respectively.
Consequently, (28) can be further linearized as follows:
2 k t T d log 2 k t T d D t 1 P t 1 , dis + 2 k t = ( D t 1 ) 2 Δ f max − D t 1 P t dis Z t ≥ k t
It should be noted that the McCormick envelope provides a convex relaxation rather than an exact linearization of the original bilinear term. Therefore, satisfying the relaxed constraint Zt ≥ kt does not necessarily guarantee that the original constraint R t · F ∙ H sys , t ≥ kt is satisfied. To assess the feasibility of the obtained solutions, an ex-post verification is conducted by substituting the optimized PFR capacity and equivalent inertia into the original nonlinear constraint.

3. Frequency-Security-Constrained Robust UC Model Considering Uncertainty in Wind Power Frequency Regulation Capability

3.1. Model Formulation

In this section, a frequency-constrained robust unit commitment (UC) model considering uncertainty in wind power frequency regulation capability is formulated. The model consists of two stages. In the first stage, the commitment status, scheduled power output, and reserve capacity of thermal power units are determined based on day-ahead forecast information. In the second stage, based on the first-stage decisions, variations in wind power output and frequency regulation capability caused by wind speed uncertainty are considered, and the power outputs and frequency regulation capacities of various resources are adjusted while satisfying power balance, network operating, and frequency security constraints. The scheduling time resolution adopted in this paper is 15 min. Within each scheduling interval, frequency regulation resources satisfying the frequency security requirements are allocated in advance, and variations in wind power frequency regulation capability are captured using a wind speed uncertainty set.
In practical power system scheduling, the proposed method can be implemented by incorporating actual wind farm measurements and operational forecast data. First, wind speed, rotor speed, actual power output, and wind turbine operating parameters can be obtained from wind farm monitoring systems. Historical wind speed forecast errors can then be used to construct the wind speed uncertainty set and determine the corresponding uncertainty budget. In the day-ahead scheduling stage, wind speed and load forecast data are used to evaluate the upper limits of wind farm virtual inertia and PFR power under different wind speeds. The two-stage robust UC model is then solved to determine the commitment status of thermal power units and the frequency regulation resource allocation. During intraday operation, updated wind speed forecasts and actual operating data can be used to refine the assessment of wind farm frequency regulation capability, while rolling scheduling can be further incorporated to adjust the power outputs and frequency regulation capacities of different resources. It should be noted that the proposed method is currently validated using a standard test system, and its engineering applicability will be further investigated using actual wind farm operating data. Furthermore, this study focuses primarily on frequency security at the scheduling timescale and does not consider the transient dynamic processes of wind turbines caused by rapid wind speed variations within each scheduling interval. Further investigation may incorporate rolling scheduling at shorter timescales.
The model aims to minimize the total system operating cost over the scheduling horizon, including the startup and shutdown costs, fuel costs, and reserve costs of thermal power units, the frequency regulation costs of various resources, and the costs of wind power curtailment and load shedding. The objective function F is expressed as follows:
min F = min ∑ t = 1 T ∑ g = 1 G s u g u g , t + s d g v g , t + a g P g , t 2 + b g P g , t + c g + e g R g , t up + R g , t dn + max s ∈ S min ∑ t = 1 T ∑ g = 1 G c g pfr P g , t pfr + ∑ t = 1 T ∑ l = 1 L c l cut P l , t cut + ∑ t = 1 T ∑ w = 1 WT c w pfr P w , t pfr + c w P w , t 0 − P w , t u + ∑ t = 1 T ∑ e = 1 ES c e P e , t D + P e , t C + c e pfr P e , t pfr
where F is the constant-term vector in the second-stage constraints; T is the set of scheduling periods; sug and sdg are the start-up and shut-down cost coefficients of thermal unit g; ug,t and vg,t are the start-up and shut-down action variables of thermal unit g, respectively; ag, bg, and cg are the fuel cost coefficients of thermal unit g; eg is the reserve cost coefficient of thermal unit g; c g pfr , c w pfr , and c e pfr are the frequency regulation reserve cost coefficients of thermal unit g, wind farm w, and energy storage e, respectively; Pg,t is the output of thermal unit g; P e , t D and P e , t C are the charging and discharging power of energy storage e in period t, respectively; ce is the operation and maintenance cost coefficient of energy storage; P w , t 0 is the forecast power of the wind turbine; and P w , t u is the actual intraday output of the wind turbine; P w , t 0 is the MPPT power output of wind farm w under the actual wind speed; P w , t u is the actual intraday power output of wind turbine w; and cw is the penalty cost coefficient for wind power curtailment.

3.1.1. First-Stage Constraints

The first-stage constraints include the power balance constraint (33), network constraints (34) and (35), thermal unit reserve and output constraints (36) and (37), the load shedding constraint (38), and wind farm output constraints (39) and (40). In addition, the first stage includes the RoCoF constraint (41) and the maximum frequency deviation constraint (42). The start-up/shut-down and ramping constraints of thermal units can be found in [25].
∑ g ∈ G P g , t 0 + ∑ w ∈ WT P w , t 0 + ∑ e ∈ ES P e , t D , 0 − P e , t C , 0 = ∑ l ∈ L P l , t 0 − P l , t cut , 0
P Line , t 0 = θ m , t 0 − θ n , t 0 / x Line , θ ref , t 0 = 0
− P Line max ≤ P Line , t 0 ≤ P Line max
δ g , t 0 P g , min ≤ P g , t 0 , P g , t 0 + Δ P g , t R , 0 ≤ δ g , t 0 P g , max
0 ≤ Δ P g , t R , 0 ≤ R g max
0 ≤ ∑ l ∈ L P l , t cut , 0 ≤ η ∑ l ∈ L P l , t
P w min ≤ P w , t 0 ≤ P w max
0 ≤ P w , t pfr , 0 ≤ P w , t pfr , max , 0
H sys 0 ≥ P t dis 2 RoCoF max
Z t 0 ≥ k t
where θ m , t 0 and θ n , t 0 are the voltage phase angles of buses m and n in the first stage, respectively; xLine is the line reactance; θ r e f , t 0 is the initial phase angle of the reference bus in period t, which is set to 0; P Lin max is the active power flow limit of the line; Δ P g , t R , 0 is the frequency regulation reserve capacity of thermal units scheduled at the day-ahead stage; Pg,min is the minimum stable output of thermal unit g; R g max is the reserve scheduled for thermal units; ΔP is the additional active power output of wind turbines during frequency regulation; η is the maximum load shedding ratio; and P w , t pfr is the frequency regulation power of the wind farm; and P L , t cut , 0 is the load shedding power at load bus l during period t in the day-ahead stage.

3.1.2. Second-Stage Constraints

The second stage adjusts the first-stage schedule to accommodate the fluctuations of wind power and load. The constraints include the power balance constraint (43), network constraints (44) and (45), thermal unit redispatch constraints (46) and (47), intraday wind farm operation constraints (48) and (49), and frequency security constraints (50) and (51). In addition, the model includes the wind speed uncertainty constraint (13) and the uncertainty constraints on wind farm frequency regulation capability (18) and (19).
∑ g ∈ G P g , t u + ∑ w ∈ WT P w , t u + ∑ e ∈ ES P e , t D , u − P e , t C , u = ∑ l ∈ L P l , t u − P l , t cut , u
P Line , t u = θ m , t u − θ n , t u / x Line
− P Line max ≤ P Line , t u ≤ P Line max
P g , t u − P g , t − 1 u ≤ r g + 1 − u g , t 0 + P g , min u g , t P g , t − 1 u − P g , t u ≤ r g − 1 − v g , t 0 + P g , min v g , t
P g , t u = Δ P g , t u + P g , t 0 , − R g max ≤ Δ P g , t u ≤ R g max
R g , t F , u ≤ R g max − Δ P g , t u , 0 ≤ R g , t F , u ≤ R g max
0 ≤ P w , t pfr ≤ P w , t pfr , max , u
P w min ≤ P w , t u ≤ P w , t MPPT , u
H sys u ≥ P t dis 2 RoCoF max
Z t u ≥ k t
where P Line , t u is the active power flow of the line; θ m , t u and θ n , t u are the phase angles of the two terminal buses of the line in the second stage, respectively; R g , t + and R g , t − are the upward and downward reserve capacities of thermal units, respectively; r g , t + and r g , t − are the ramp-up and ramp-down limits of thermal units, respectively; Δ P g , t u is the intraday power adjustment of thermal units; P e , t D , u and P e , t C , u are the actual intraday charging and discharging powers of energy storage system e, respectively; H sys u is the system equivalent inertia under an uncertainty scenario; P g , t u , P e , t u , and P l , t u are the actual intraday power outputs of thermal power units, energy storage systems, and loads, respectively; P Line max is the transmission capacity limit of the line; ΔP is generally specified as a constant or a function of grid frequency; and P l , t cut , u is the actual load shedding power at load bus l during period t under an uncertainty scenario.
In addition, the model includes the frequency response constraints of individual resources in (53)–(56). Considering the dynamic response characteristics of different types of frequency regulation resources, their PFR power responses are approximated using piecewise linear functions, following existing studies on frequency response modeling [30,31]. Specifically, thermal power units gradually increase their mechanical power through the governor system; wind turbines provide short-term frequency support by releasing rotor kinetic energy and withdraw from frequency regulation after the frequency nadir; and energy storage systems rapidly regulate active power through power electronic converters. Assuming that thermal power units, wind turbines, and energy storage systems can provide their full frequency regulation response within Td, the frequency regulation power of each resource is expressed as follows:
P g pfr τ = 0       0 ≤ τ ≤ t DB δ g , t R g , t F τ − t DB / T d t DB ≤ τ ≤ t nad δ g , t R g , t F t nad ≤ τ ≤ t ∞
P w pfr τ = 0       0 ≤ τ ≤ t DB R w , t F τ − t DB / T d   t DB ≤ τ ≤ t nad   0 t nad ≤ τ ≤ t ∞
P e pfr τ = 0       0 ≤ τ ≤ t DB R e , t F τ − t DB / T d t DB ≤ τ ≤ t ∞
where tDB, tnad, and t∞ denote the dead-band time, frequency nadir time, and time to reach the quasi-steady state, respectively; τ is the time-state variable for frequency regulation; and R g , t F is the PFR capacity of unit g. According to [32,33], the secondary frequency dip during the rotor speed recovery stage can be mitigated or avoided through appropriate control strategies. Therefore, the secondary frequency dip is neglected in (54).

3.2. Solution Methodology

For convenience, the above scheduling model is written in the following compact form:
min x a T x + max z min y ∈ Ω x , z b T y
s . t .         A 1 x ≤ d
By ≤ F − A 2 x − Cz , 0 ≤ z ≤ 1
where x represents the binary and continuous decision variables in the first stage; y and z represent the continuous decision variables and uncertainty variables in the second stage, respectively; a and b are the cost coefficient vectors of the first-stage and second-stage objective functions, respectively; d is the constant-term vector of the first-stage constraints; A1 is the coefficient matrix of the first-stage constraints; A2 is the coefficient matrix associated with the first-stage decision variables in the second-stage constraints; B is the coefficient matrix of the second-stage decision variables; C is the coefficient matrix of the uncertainty variables; F is the constant-term vector of the second-stage constraints; x = [δg,t, ug,t, vg,t, Pg,t, Δ P g , t R , P w , t 0 , P e , t D , 0 , P e , t C , 0 , P L , t cut , 0 , P L , t 0 , θ i , t 0 , R g max ]T; y = [ P g , t u , Δ P g , t u , P w , t u , P e , t D , u , P e , t C , u , P l , t cut , u , R g , t F , u , R w , t F , u , R e , t F , u , H w , t u , P g , t pfr , P w , t pfr , P e , t pfr , θ i , t u ]T; z = [ z w , t + , z w , t − ]; and Ω(x, z) denotes the feasible region of y for given x and z.
The C&CG algorithm decomposes the model into a master problem and a subproblem, which are solved iteratively. The master problem determines the first-stage variables, while the subproblem identifies the worst-case scenario that maximizes the minimum operating cost. The solution procedure is shown in Figure 3.
Figure 3. Flow chart of the solution process.

4. Case Studies

4.1. Case Setup

The effectiveness of the proposed method is validated using a modified IEEE 39-bus system. The test system consists of 10 thermal power units with a total installed capacity of 5560 MW, seven wind farms with a total installed capacity of 2400 MW, and two energy storage systems with a total energy capacity of 500 MWh. The wind speed and load forecast profiles are shown in Figure 4.
Figure 4. Wind speed and load forecasting curves.
A 400 MW power deficit is imposed at bus 39. In the aggregated system frequency response model, this disturbance is represented as a total system active power deficit, with P t dis set to 400 MW to simulate the system frequency dynamics following an active power deficit event. According to the frequency security requirements of the British Security and Quality of Supply Standard (SQSS) [34], the maximum frequency deviation limit Δfmax is set to 0.80 Hz. Based on the operational requirements for RoCoF in the Irish power system [35], the maximum RoCoF limit RoCoFmax is set to 0.5 Hz/s. f0 is 50 Hz, and the uncertainty budget Γ is set to 3. The convergence tolerance of the C&CG algorithm is set to 1%. All simulations are performed on a computer equipped with an Intel(R) Core(TM) i7-14650HX processor (2.2 GHz, 8 GB RAM). The optimization model is implemented in MATLAB R2022b using YALMIP and solved with GUROBI 12.0.2.
To validate the effectiveness of the proposed method, four alternative scheduling methods are considered for comparison, with particular emphasis on the effects of wind farm participation in frequency regulation, frequency regulation capability modeling, and wind speed uncertainty on system operating economy and frequency security. Method 1 considers frequency-constrained robust UC with wind power output uncertainty but without wind farm participation in frequency regulation, and is formulated based on [31]. Method 2 considers wind farm participation in frequency regulation through deloading control for reserve provision, with fixed upper limits of virtual inertia and PFR power, and solves a robust UC model based on [20]. Method 3 considers frequency-constrained stochastic UC with wind power output uncertainty, based on [10]. Method 4 considers frequency-constrained robust UC with wind power output uncertainty only, in which the upper limits of wind farm frequency regulation capability are fixed at the values corresponding to the forecast wind speed, and is formulated based on [19] and the proposed model. Method 5 is the proposed frequency-constrained robust UC method considering uncertainty in both wind power output and frequency regulation capability.

4.2. Comparison of Optimization Results

Table 1 presents the economic results for the five scheduling methods, where the wind power curtailment rate is defined as the ratio of curtailed wind energy to available wind energy over the scheduling horizon, and the load shedding rate is defined as the ratio of unserved energy to forecast load energy. In Table 1, Cfuel is the fuel cost of thermal power units; q w curt is the wind power curtailment rate; q d shed is the load shedding rate; C g su + C g sd represents the startup and shutdown costs of thermal power units; C g R is the reserve cost of thermal power units; C E PFR , C G PFR , C W PFR are the PFR costs of thermal power units, wind farms, and energy storage systems, respectively; C w curt is the wind power curtailment cost; C d shed is the load shedding cost.
Table 1. Economic comparison of different methods (×104$).
Method 1 does not consider wind farm participation in frequency regulation; system frequency support is primarily provided by thermal power units and energy storage systems. The thermal power unit reserve cost and PFR cost are 57.5385 × 104$ and 9.4040 × 104$, respectively, substantially higher than those of the other methods. Method 2 reserves frequency regulation capacity through wind power de-loading, reducing the frequency regulation demand on thermal power units. Accordingly, the reserve cost and PFR cost of thermal power units decrease to 43.0857 × 104$ and 2.6538 × 104$, respectively. However, because fixed upper limits of virtual inertia and PFR power are adopted, variations in wind farm frequency regulation capability under different wind speed conditions cannot be adequately captured. The wind farm frequency regulation cost reaches 11.7930 × 104$, while the wind power curtailment rate and load shedding rate are 6.174% and 3.39%, respectively. The total operating cost is the highest, at 191.1696 × 104$. Method 3 employs stochastic UC considering wind power output uncertainty and yields the lowest total operating cost and best economic performance. However, its thermal power frequency regulation reserve cost is relatively low, and its frequency security requires further examination. Method 4 provides frequency regulation using rotor kinetic energy, reducing dependence on thermal power unit frequency regulation reserves and decreasing total operating cost by 4.01% compared with Method 2. Nevertheless, its upper limits of wind farm virtual inertia and PFR capability are determined using the day-ahead forecast wind speed. When actual wind speed deviates from the forecast value, the resulting schedule may fail to satisfy frequency security requirements. The proposed method accounts for the effects of wind speed forecast errors on wind farm frequency regulation capability, appropriately adjusts wind farm frequency regulation allocations under certain adverse wind speed conditions, and increases the frequency regulation resources reserved by thermal power units. Compared with Method 4, the reserve cost of thermal power units increases slightly, and the total operating cost increases by 0.38%. These results indicate that accounting for uncertainty in wind farm frequency regulation capability entails a certain increase in operating cost.
The frequency security performance of the five scheduling methods is further compared. Figure 5 presents fnadir and RoCoF following active power deficits in 96 scheduling periods. As shown in Figure 5, the maximum RoCoF of all five methods remains below 0.5 Hz/s; however, Methods 1, 3, and 4 exhibit frequency deviation limit violations to varying degrees.
Figure 5. Frequency security indicators of different methods.
As shown in Figure 5a, the frequency nadir of Method 1 falls below 49.2 Hz in some periods. Its maximum frequency deviation reaches 1.0129 Hz, with frequency deviation limit violations in 43 periods. These results indicate that relying solely on thermal power units and energy storage systems for frequency support is insufficient to satisfy system frequency security requirements. Compared with Method 1, wind farms in Method 2 provide additional frequency support, with Δfnadir = 0.8000 Hz and a maximum RoCoF of 0.3381 Hz/s, satisfying the frequency security requirements in all scenarios. However, the fixed upper limits of virtual inertia and PFR power make its scheduling scheme overly conservative and economically inefficient. Method 3 adopts frequency-constrained stochastic UC considering wind power output uncertainty. Its maximum frequency deviation reaches 1.0950 Hz, with a maximum RoCoF of 0.4650 Hz/s and frequency deviation limit violations in 40 periods. This is because stochastic UC focuses on minimizing the expected operating cost under a given probability distribution, and its scheduling scheme does not adequately cover low-probability adverse wind speed scenarios. Compared with Method 3, Method 4 achieves a maximum frequency deviation of 1.0685 Hz and a maximum RoCoF of 0.4280 Hz/s across all scenarios, reducing the number of periods with frequency deviation limit violations to 32. Thus, robust optimization can improve the ability of a scheduling scheme to withstand adverse wind power output scenarios to some extent. However, since its upper limits of virtual inertia and PFR power are determined solely from forecast wind speed, the effects of wind speed forecast errors on actual frequency regulation capability are neglected. Under more adverse actual wind speed conditions, the frequency regulation power available from wind farms may be insufficient to meet the scheduled frequency regulation allocations. The proposed method considers uncertainty in wind farm frequency regulation capability caused by wind speed variations and correspondingly increases frequency regulation power from other resources. Its maximum frequency deviation is 0.8000 Hz, and its maximum RoCoF is 0.3315 Hz/s, satisfying the frequency security requirements under adverse wind speed scenarios. Furthermore, an ex-post feasibility verification of the original nonlinear frequency nadir constraint is conducted for the proposed method over all 96 scheduling periods. The verification results confirm that the original constraint is satisfied in all scheduling periods. The detailed results for periods 1–20 are presented in Table A4 of Appendix C.

4.3. Impact of Wind Speed Forecast Errors on Frequency Regulation Capability and Economy

To evaluate the adaptability of the proposed method to different wind speed forecast errors, error limits of 0, 5%, and 10% are considered and compared with Method 4. Table 2 presents the proportion of wind farm frequency regulation power, frequency security indicators, and operating costs for Method 4 and the proposed method. Both RoCoF and Δfnadir are obtained for period 24.
Table 2. Comparison of frequency regulation capacity and economic efficiency.
As shown in Table 2, as the wind speed forecast error increases from 0 to 10%, the proportion of frequency regulation power provided by wind farms decreases under both methods, indicating a reduction in the available wind farm frequency regulation capability and a gradual shift in frequency regulation tasks toward thermal power units and energy storage systems. Under the three scenarios, the RoCoF values obtained by the proposed method are 0.3193, 0.3193, and 0.3252 Hz/s, respectively, while the corresponding Δfnadir values are 0.7545, 0.7998, and 0.8000 Hz; all satisfy the frequency security constraints. As wind speed forecast errors increase, uncertainty in wind farm frequency regulation capability rises. The proposed method therefore adjusts unit commitment decisions and frequency regulation resource allocation, increasing frequency support from thermal power units, energy storage systems, and other resources to compensate for insufficient wind farm frequency regulation capability under worst-case scenarios, which increases system operating cost. Method 4 determines the upper limits of wind farm virtual inertia and frequency regulation power based on forecast wind speed; however, when the forecast error increases to 10%, Δfnadir reaches 0.8740 Hz, exceeding the security limit of 0.8 Hz. Further analysis shows that, under forecast errors of 5% and 10%, the operating cost of the proposed method is 0.38% and 0.96% higher than that of Method 4, respectively. This is because additional conventional frequency regulation resources must be allocated when uncertainty in wind farm frequency regulation capability is considered. Under all three uncertainty scenarios, the RoCoF and Δfnadir values obtained by the proposed method satisfy the frequency security constraints, effectively avoiding frequency limit violations.
To further validate the frequency security of the proposed method under adverse wind speed scenarios, the wind speed forecast error is set to 10%, and 1000 independent wind speed samples are generated for out-of-sample Monte Carlo testing of Method 4 and the proposed method. The system Δfnadir, RoCoF, and frequency limit violations are recorded.
As shown in Table 3, Method 4 exhibits frequency limit violations under some adverse wind speed scenarios, with a maximum frequency deviation of 0.8936 Hz. Among the 1000 Monte Carlo samples, 60 violate the frequency limit, corresponding to a violation rate of 6.00%. The proposed method achieves a maximum frequency deviation of 0.8000 Hz and satisfies the frequency security constraints in all 1000 test samples. The maximum RoCoF values of the two methods are 0.4804 Hz/s and 0.4751 Hz/s, respectively, both below the security limit of 0.5 Hz/s. These results indicate that accounting for uncertainty in wind farm frequency regulation capability helps reduce the risk of frequency limit violations under adverse wind speed scenarios and improves the frequency security of scheduling decisions.
Table 3. Out-of-sample Monte Carlo frequency security validation.

4.4. Convergence Analysis

The model is solved using the C&CG algorithm to verify the convergence of the proposed robust model. The objective function value and changes in its upper and lower bounds are used as convergence criteria. Results of the master problem and subproblem are recorded during each iteration to analyze the convergence process.
Figure 6 illustrates the changes in the objective function upper and lower bounds and the optimality gap (Gap) over iterations. As shown in Figure 6a, the upper bound gradually decreases and the lower bound increases with the number of iterations, progressively narrowing the difference between them. As shown in Figure 6b, Gap rapidly decreases from an initial value of 0.9625 to 0.4215 at the third iteration. The reduction subsequently slows down, with Gap falling below 0.01 by the 15th iteration. These convergence results demonstrate that the C&CG algorithm progressively tightens the objective function bounds through iteration, effectively reducing the optimality gap and confirming the favorable convergence performance of the proposed robust model.
Figure 6. Evolution of the objective function upper bound, lower bound, and Gap versus iteration number.

4.5. Simulation Validation

To validate the accuracy of the analytical frequency security constraints proposed in this paper, a simulation model is developed in MATLAB/Simulink using the optimization results for period 24 as inputs. Figure 7 illustrates the third-order system frequency dynamic model. The thermal power unit model consists of a frequency regulation droop control loop with a governor droop coefficient R_G and a reheat steam turbine response characterized by the time constant TR and reheater power fraction FH. The frequency responses of wind turbines and energy storage systems are represented by first-order lag elements characterized by the inverter time constants TW and TE and droop coefficients RW and RE, respectively. Each unit is equipped with a PFR rate limiter. The parameter tW denotes the time at which wind turbines withdraw from frequency regulation, after which no additional frequency regulation power is provided by the wind turbines. Since this paper primarily focuses on system frequency response within the PFR timescale, the fast dynamics of internal converter control loops are neglected, and the frequency responses of wind turbines and energy storage systems are approximated by first-order lag elements, with TW = TE = 10 s adopted in the case study. The frequency dead-band characteristics introduced by governor and inverter controls are also incorporated into the model. In this case study, RG, TR, FH, TW, TE, RW, and RE are set to 0.02129, 10 s, 0.2, 10 s, 10 s, 0.01729, and 0.01729, respectively. Here, RG, RW, and RE are the frequency regulation droop coefficients of thermal power units, wind farms, and energy storage systems, respectively. The rated frequency of 50 Hz is adopted as the frequency base for all three types of resources, while their respective rated capacities are used as the power bases.
Figure 7. Framework of the third-order PFR model.
The calculated and simulated results are compared in Figure 8. As shown, the proposed model provides high accuracy in estimating RoCoF during the initial stage of the power disturbance. The simulated Δfnadir is 0.7915 Hz, whereas the calculated value is 0.7998 Hz, corresponding to a relative error of approximately 1.05%. The calculated result is slightly conservative, consistent with the security requirements of practical scheduling. After the fnadir is reached, the discrepancy gradually increases because the dynamic characteristics of the frequency control system are not considered in the proposed model. Since this paper focuses on Δfnadir and RoCoF constraints on a timescale of seconds, the discrepancy does not affect the frequency security assessment. These results demonstrate that the proposed model can adequately characterize the system dynamic response to frequency disturbances and that the frequency security constraints can be effectively satisfied.
Figure 8. Comparison between calculated results and simulation results.

4.6. Sensitivity Analysis

To analyze the effects of the uncertainty budget and the frequency regulation cost of conventional generating units on system operating economy and frequency regulation resource allocation, sensitivity analyses are conducted. For the uncertainty budget analysis, all other system parameters are held constant, and Γ is set to 0, 1, 2, 3, 4, 5, and 7. The proposed method is used to solve the model, and the results are reported in Table 4. For the frequency regulation cost coefficient analysis, a multiplier λF is introduced to scale the frequency regulation cost coefficient of thermal power units by λF. The values λF = 0.5, 0.75, 1.0, 1.25, and 1.5 are considered, while the cost coefficients of wind farms and energy storage systems and all other system parameters are held constant. The proposed method is applied, and the results are presented in Table 5.
Table 4. Scheduling results under different uncertainty budgets.
Table 5. Scheduling Results Under Different Frequency Regulation Cost Coefficients.
As shown in Table 4, as the uncertainty budget increases from 0 to 7, the total system operating cost increases from 182.7500 × 104$ to 186.7200 × 104$. This increase occurs because more wind farms must be considered as simultaneously experiencing adverse wind speed forecast errors under a larger uncertainty budget. Meanwhile, as uncertainty in wind power output and frequency regulation capability increases, the proportion of frequency regulation power provided by wind farms decreases by 22.36%, and the system frequency regulation cost increases from 12.5000 × 104$ to 15.2300 × 104$. Additional frequency regulation reserves are required to satisfy the frequency security constraints under worst-case scenarios. These results indicate that the uncertainty budget can control the conservatism of the robust UC model. A moderate increase in the uncertainty budget improves the ability of scheduling decisions to withstand adverse wind speed scenarios but also increases system operating cost; thus, the uncertainty budget should be selected appropriately.
As shown in Table 5, when the frequency regulation cost coefficient of thermal power units is relatively low, their participation in frequency regulation is economically advantageous, and the system tends to allocate more frequency regulation tasks to thermal power units. At λF = 0.5, thermal power units account for 60.8% of the total frequency regulation capacity, and the total system operating cost is 182.4394 × 104$. When λF increases to 1.5, the share of thermal power unit frequency regulation capacity decreases by 25.33%, whereas total system operating cost and frequency regulation cost increase by 1.72% and 28.59%, respectively. As the thermal power unit frequency regulation cost coefficient increases, the economic cost of frequency regulation supplied by thermal power units also increases. Therefore, the scheduling model appropriately reduces their frequency regulation capacity while increasing the frequency regulation allocations to wind farms and energy storage systems, subject to frequency security constraints. In addition, Δfnadir and RoCoF satisfy the frequency security requirements under all frequency regulation cost coefficients. These results indicate that the proposed method can coordinate frequency regulation resources from thermal power units, wind farms, and energy storage systems in response to variations in frequency regulation costs, achieving operating economy while ensuring system frequency security.

5. Conclusions

To address the potential invalidation of frequency security constraints caused by wind speed-dependent wind farm frequency regulation capability under high wind power penetration, this paper proposes a frequency-constrained robust UC method considering uncertainty in wind power frequency regulation capability. Case studies on a modified IEEE 39-bus system yield the following conclusions:
(1) Wind turbine participation in system frequency regulation through rotor kinetic energy release is considered. Based on wind turbine operating conditions, including wind-speed-dependent upper-bound constraints on virtual inertia and PFR power are formulated separately. Compared with methods that use fixed ratios to determine the upper limits of virtual inertia and PFR power, the proposed method evaluates the available frequency regulation capability based on actual wind turbine operating conditions at different wind speeds, enabling appropriate frequency regulation resource allocation while reducing total operating cost.
(2) The effects of wind speed forecast errors on wind farm virtual inertia and PFR capability are considered, and a frequency-constrained robust UC model incorporating uncertainty in wind power frequency regulation capability is formulated. Compared with methods considering only wind power output uncertainty, the proposed method adjusts wind farm frequency regulation allocations according to wind speed forecast errors and coordinates frequency regulation resources from thermal power units, wind farms, and energy storage systems, reducing Δfnadir from 1.0685 Hz to 0.8000 Hz and improving system frequency security under adverse wind speed scenarios.
(3) Simulation results indicate that the relative error between the maximum frequency deviation calculated by the proposed frequency response model and the simulated value is approximately 1.05%, satisfying the frequency security assessment requirements of the scheduling model. Sensitivity analyses of the uncertainty budget and frequency regulation cost coefficients further demonstrate that the proposed method can coordinate the allocation of frequency regulation capacities among different resources according to the degree of wind speed uncertainty and changes in frequency regulation costs, balancing operating economy and system frequency security.
Although the effects of wind speed uncertainty on the upper limits of virtual inertia and PFR power are considered through separate constraints, the proposed model does not explicitly formulate a joint kinetic energy constraint to account for the shared finite rotor kinetic energy reserve used by the inertial response and PFR. In addition, the time-domain rotor-speed dynamics during frequency regulation are not explicitly modeled. Future work will further refine the physical model by incorporating the joint kinetic energy constraint and rotor-speed dynamics, account for multi-timescale frequency response characteristics, and explore the application of machine learning and artificial intelligence methods to wind speed uncertainty modeling and unit commitment solution, thereby improving model fidelity and computational efficiency.

Author Contributions

Conceptualization, H.C., W.S., F.Z. and S.X.; methodology, H.C., W.S., F.Z. and S.X.; software, Y.W.; resources, H.C., W.S., F.Z. and S.X.; data curation, Y.W.; writing—original draft preparation, Y.W.; writing—review and editing, X.W.; supervision, X.W.; project administration, H.C., W.S., F.Z. and S.X.; funding acquisition, H.C., W.S., F.Z. and S.X. All authors have read and agreed to the published version of the manuscript.

Funding

This work was supported by the Science and Technology Project of State Grid Jiangsu Electric Power Co., Ltd., “Research on the Evolution Mechanisms and Improvement Measures of Multiple Stability Forms in AC/DC Hybrid Power Systems” (J2025029).

Data Availability Statement

The original contributions presented in this study are included in the article. Further inquiries can be directed to the corresponding author.

Conflicts of Interest

Authors Hui Cai, Wentao Sun, Feifei Zhao and Sixuan Xu were employed by the company State Grid Jiangsu Electric Power Co., Ltd. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as potential conflicts of interest.

Appendix A. Derivation of the Analytical Expression for the Maximum Frequency Deviation

Considering system load damping and the dynamic response characteristics of PFR, analytical expressions for the frequency deviation during different frequency regulation stages following a disturbance can be derived from the system frequency response equation, as shown in (A1).
Δ f ( τ ) = P t dis D 1 − e − Dt 2 H sys , t t ≤ t DB T d D P t dis + 2 R t F H sys , t − R t F D t − t DB T d D 2 − T d D P t dis − T d D 2 Δ f t DB T d D 2 e − D t − t DB 2 H sys , t + 2 R t F H sys , t   T d D 2 e − D t − t DB 2 H sys , t T d + t DB ≥ t ≥ t DB P t dis − R t F D − P t dis − R t F D e − D 2 H sys , t t − T d − t DB − Δ f T d + t DB e − D 2 H sys , t t − T d − t DB t ≥ T d + t DB
where Δf(τ) is the frequency deviation at time t following the power disturbance; D is the load damping coefficient; P t dis is the power disturbance; R t F is the system frequency regulation capacity during period t; tDB is the dead-band time; Hsys,t is the system equivalent inertia; and Td is the frequency response time constant.
Considering the dead-band time of PFR, no PFR power is provided by the frequency regulation resources during the interval [0, tDB] following the disturbance. During this interval, the system frequency is primarily affected by the power deficit and system equivalent inertia. Taking the disturbance occurrence as the time origin and assuming zero initial frequency deviation, the frequency response during the dead-band interval is first obtained to determine the frequency deviation at tDB. After the dead-band interval, wind turbines rapidly provide additional active power by releasing rotor kinetic energy, while thermal power units and energy storage systems progressively increase their PFR power to jointly mitigate the system frequency decline. Taking the frequency deviation at tDB as the initial condition for the PFR response stage, the system frequency dynamic equation is integrated piecewise. Based on these frequency response characteristics, existing studies [36,37] have determined the frequency nadir during the PFR power ramping stage (t∈[tDB, Td + tDB]) and established the corresponding frequency security constraints. This paper adopts the same frequency response modeling approach. According to (A1), the frequency deviation during the PFR power ramping stage can be expressed as (A2).
Δ f ( τ ) = Δ f DB − R t F ( t − t DB ) T d D t 1 + P t 1 , dis D t 1 + 2 R t F H sys T d ( D t 1 ) 2 · 1 − e − D t 1 ( t − t DB ) 2 H sys
where D t 1 is the load damping coefficient, and P t 1 , dis is the power disturbance adjusted for the dead-band interval. Different power disturbance magnitudes affect the system frequency response through the power disturbance term, whereas different frequency regulation response characteristics influence the frequency dynamics through parameters such as system frequency regulation capacity and response time. Under the assumptions adopted in this paper, variations in these parameters do not alter the mathematical form of the analytical expression for frequency deviation.
When the frequency deviation reaches its maximum value, the rate of change in frequency satisfies (A3). By jointly solving (A2) and (A3), the time tnadir at which the system frequency reaches its nadir can be obtained.
d Δ f ( t ) d t = 0
t nadir = t DB − 2 H sys D t 1 log 2 R t F H sys T d D t 1 P t 1 , dis + 2 R t F H sys
where log denotes the natural logarithm.
Substituting tnadir into (A1) gives the expression of the frequency nadir in (A5).
Δ f nadir , t = Δ f DB + P t 1 , dis D t 1 + 2 R t F H sys T d ( D t 1 ) 2 log 2 R t F H sys T d D t 1 P t 1 , dis + 2 R t F H sys
where Δfnadir,t is the maximum frequency deviation in period t. The applicability of the analytical expression for the frequency nadir is verified using the time-domain simulation results. The occurrence times of the frequency nadir under the investigated operating conditions fall within the applicable time interval ([tDB, Td + tDB]), confirming the applicability of the analytical expression to the case studies considered in this paper.

Appendix B. Model Parameters

The detailed parameters of different types of generating units are provided in Table A1, Table A2 and Table A4 of Appendix B. The system power disturbance is set to 400 MW to simulate a typical power deficit event. The system load damping coefficient is set to 1%. The wind turbine parameters are specified as follows: a total rotor mass of 45 t, a rotor radius of 58.5 m [29], and a rated rotor speed of 1.135 rad/s. The PFR cost of generating units is determined based on marginal costs and is set to 5–15 $/(MW·h).
Table A1. Parameters of thermal power units.
Table A2. Parameters of wind turbine unit.
Table A3. Parameters of energy storage power station.

Appendix C. Ex-Post Feasibility Verification of the Original Frequency Nadir Constraint

Table A4. Ex-Post verification results of the original frequency nadir constraint.

References

  1. Al Kez, D.; Foley, A.M.; Ahmed, F.; Morrow, D.J. Overview of frequency control techniques in power systems with high inverter-based resources: Challenges and mitigation measures. IET Smart Grid 2023, 6, 447–469. [Google Scholar] [CrossRef] [Scilit]
  2. Jiang, Y.; Zhao, S. Voltage and Frequency Stability Constrained Unit Commitment for Power Systems with Heterogeneous Regulation Resources. IEEE Trans. Sustain. Energy 2025, 16, 2874–2887. [Google Scholar] [CrossRef] [Scilit]
  3. Yao, Y.; Yao, W.; Xiong, Y.; Lin, S.; Zhou, H.; Wen, J.; Cheng, S. Distributed Adaptive Leaderless Consensus Control of Wind Farm for Fast Frequency Support. IEEE Trans. Ind. Electron. 2024, 71, 12255–12266. [Google Scholar] [CrossRef] [Scilit]
  4. Shen, Y.; Wu, W.; Sun, S.; Wang, B. Optimal Allocation of Virtual Inertia and Droop Control for Renewable Energy in Stochastic Look-Ahead Power Dispatch. IEEE Trans. Sustain. Energy 2023, 14, 1881–1894. [Google Scholar] [CrossRef] [Scilit]
  5. Qin, C.; Shi, H.; Ren, J. Coordinated integration of wind turbine rotor speed safety and overspeed de-loading in frequency-constrained unit commitment. Sustain. Energy Grids Netw. 2026, 46, 102315. [Google Scholar] [CrossRef] [Scilit]
  6. Jiang, B.; Guo, C.; Chen, Z. Frequency constrained unit commitment considering reserve provision of wind power. Appl. Energy 2024, 361, 122898. [Google Scholar] [CrossRef] [Scilit]
  7. Pan, C.; Shao, C.; Hu, B.; Xie, K.; Li, C.; Ding, J. Modeling the Reserve Capacity of Wind Power and the Inherent Decision-Dependent Uncertainty in the Power System Economic Dispatch. IEEE Trans. Power Syst. 2023, 38, 4404–4417. [Google Scholar] [CrossRef] [Scilit]
  8. Huang, J.; Xu, Y. Multi-Timescale Coordinated Control of Wind Power Plant for Supporting Power System Operation. IEEE Trans. Power Syst. 2025, 40, 355–367. [Google Scholar] [CrossRef] [Scilit]
  9. Heidari, M.; Ding, L.; Kheshti, M.; Zhao, X.; Terzija, V. Adaptive Inertial Control for Wind Turbine Generators in Fast Frequency Response Based on the Power Reduction Period Assessment. IEEE Trans. Sustain. Energy 2025, 16, 377–391. [Google Scholar] [CrossRef] [Scilit]
  10. Zare, M.; Malekpour, M.; Azizipanah-Abarghooee, R.; Terzija, V. Stochastic unit commitment to determine frequency response ramp rate including wind turbines with synthetic inertia and virtual synchronous generator. Int. J. Electr. Power Energy Syst. 2023, 152, 109272. [Google Scholar] [CrossRef] [Scilit]
  11. Zhang, Z.; Du, E.; Teng, F.; Zhang, N.; Kang, C. Modeling frequency dynamics in unit commitment with a high share of renewable energy. IEEE Trans. Power Syst. 2020, 35, 4383–4395. [Google Scholar] [CrossRef] [Scilit]
  12. Zhang, Z.; Zhou, M.; Wu, Z.; Liu, S.; Guo, Z.; Li, G. A Frequency Security Constrained Scheduling Approach Considering Wind Farm Providing Frequency Support and Reserve. IEEE Trans. Sustain. Energy 2022, 13, 1086–1100. [Google Scholar] [CrossRef] [Scilit]
  13. Jiang, B.; Guo, C.; Chen, Z. Frequency Constrained Dispatch with Energy Reserve and Virtual Inertia from Wind Turbines. IEEE Trans. Sustain. Energy 2025, 16, 1340–1355. [Google Scholar] [CrossRef] [Scilit]
  14. Chu, Z.; Markovic, U.; Hug, G.; Teng, F. Towards Optimal System Scheduling with Synthetic Inertia Provision from Wind Turbines. IEEE Trans. Power Syst. 2020, 35, 4056–4066. [Google Scholar] [CrossRef] [Scilit]
  15. Ma, Y.; Liu, C.; Yang, H.; Zhang, D. Robust optimization of unit commitment with wind power considering composite flexibility constraints. Int. J. Electr. Power Energy Syst. 2023, 151, 109146. [Google Scholar] [CrossRef] [Scilit]
  16. Liu, Y.; Ding, T.; Ding, Y.; Zhang, B.; Wang, S.; Wang, X. Two-Stage Robust Security-Constrained Unit Commitment for Wind Power Reserve Provision Optimisation Under Decision-Dependent Uncertainty. IET Gener. Transm. Distrib. 2026, 20, e70251. [Google Scholar] [CrossRef] [Scilit]
  17. Wang, S.; Zhang, X.; Du, M.; Pei, W. Two-Stage Adaptive Robust Model for AC Network-Constrained Unit Commitment in Power Systems with Uncertain Wind Power. IEEE Trans. Sustain. Energy 2025, 16, 1977–1989. [Google Scholar] [CrossRef] [Scilit]
  18. Lin, J.; Zeng, Z.; Liu, L.; Zhu, G.; Wen, F. Robust Unit Commitment with Multi-State Uncertainty: A Novel Formulation and Scalable Solution Method. IEEE Trans. Sustain. Energy 2026, 17, 576–589. [Google Scholar] [CrossRef] [Scilit]
  19. Zhang, R.; Chen, Y.; Yan, K.; Li, Z.; Jiang, T.; Li, G.; Li, X. Incorporating Frequency Security Constraints in Two-Stage Robust Unit Commitment of Integrated Transmission and Distribution System. IEEE Trans. Sustain. Energy 2026, 17, 70–86. [Google Scholar] [CrossRef] [Scilit]
  20. Han, R.; Hu, Q.; Fang, X.; Qian, T.; Zhang, Y. Frequency security-constrained unit commitment with fast frequency support of DFIG-based wind power plants. Int. J. Electr. Power Energy Syst. 2024, 160, 110119. [Google Scholar] [CrossRef] [Scilit]
  21. Shi, Q.; Zhu, Y.; Fan, K.; Cheng, R.; Shen, J.; Liu, W. Two-Stage Linearization of Frequency Nadir Constraint for Unit Commitment. IEEE Trans. Power Syst. 2025, 40, 3584–3587. [Google Scholar] [CrossRef] [Scilit]
  22. Bertsimas, D.; Koukouvinos, T.; Koulouras, A.G. Constructing Uncertainty Sets from Covariates in Power Systems. IEEE Trans. Power Syst. 2025, 40, 3943–3954. [Google Scholar] [CrossRef] [Scilit]
  23. Xie, R.; Chen, Y.; Pinson, P. Predict-and-Optimize Robust Unit Commitment with Statistical Guarantees via Weight Combination. IEEE Trans. Power Syst. 2026, 41, 1163–1177. [Google Scholar] [CrossRef] [Scilit]
  24. Faheem, M.; Umar, M.; Butt, R.A.; Raza, B.; Ngadi, M.A.; Gungor, V.C. Software Defined Communication Framework for Smart Grid to Meet Energy Demands in Smart Cities. In Proceedings of the 2019 7th International Istanbul Smart Grids and Cities Congress and Fair (ICSG), Istanbul, Turkey, 25–26 April 2019; pp. 51–55. [Google Scholar] [CrossRef] [Scilit]
  25. Liu, L.; Hu, Z.; Wen, Y.; Ma, Y. Modeling of Frequency Security Constraints and Quantification of Frequency Control Reserve Capacities for Unit Commitment. IEEE Trans. Power Syst. 2024, 39, 2080–2092. [Google Scholar] [CrossRef] [Scilit]
  26. Xu, G.; Xu, L. Improved Use of WT Kinetic Energy for System Frequency Support. IET Renew. Power Gener. 2017, 11, 1094–1100. [Google Scholar] [CrossRef] [Scilit]
  27. Lee, J.; Muljadi, E.; Sørensen, P.; Kang, Y.C. Releasable Kinetic Energy-Based Inertial Control of a DFIG Wind Power Plant. IEEE Trans. Sustain. Energy 2016, 7, 279–288. [Google Scholar] [CrossRef] [Scilit]
  28. Yang, D.; Gao, H.C.; Zhang, L.; Zheng, T.; Hua, L.; Zhang, X. Short-Term Frequency Support of a Doubly-Fed Induction Generator Based on an Adaptive Power Reference Function. Int. J. Electr. Power Energy Syst. 2020, 119, 105955. [Google Scholar] [CrossRef] [Scilit]
  29. Jiang, B.; Guo, C.; Chen, Z. Modeling the Coupling of Rotor Speed, Primary Frequency Reserve and Virtual Inertia of Wind Turbines in Frequency Constrained Look-Ahead Dispatch. IEEE Trans. Sustain. Energy 2024, 15, 1885–1899. [Google Scholar] [CrossRef] [Scilit]
  30. Yuan, Y.; Zhang, Y.; Wang, J.; Liu, Z.; Chen, Z. Enhanced Frequency-Constrained Unit Commitment Considering Variable-Droop Frequency Control From Converter-Based Generator. IEEE Trans. Power Syst. 2023, 38, 1094–1110. [Google Scholar] [CrossRef] [Scilit]
  31. Li, K.; Ai, X.; Fang, J.; Cui, S.; Feng, Y.; Liu, D.; Gu, P.; Qiu, W.; Wen, J. Frequency Security Constrained Robust Unit Commitment for Sufficient Deployment of Diversified Frequency Support Resources. IEEE Trans. Ind. Appl. 2024, 60, 1725–1737. [Google Scholar] [CrossRef] [Scilit]
  32. Huang, Z.; Wu, W.; Lin, C.; Guo, Z. Cooperative Strategies for Frequency Control of Wind Turbines to Mitigate Secondary Frequency Dip: Coefficient Allocation and Exit Techniques. IEEE Trans. Sustain. Energy 2025, 16, 1056–1067. [Google Scholar] [CrossRef] [Scilit]
  33. Zhou, Y.; Zhu, D.; Zou, X.; He, C.; Hu, J.; Kang, Y. Adaptive Temporary Frequency Support for DFIG-Based Wind Turbines. IEEE Trans. Energy Convers. 2023, 38, 1937–1949. [Google Scholar] [CrossRef] [Scilit]
  34. National Energy System Operator. Management of Frequency During Extreme Weather (Week Commencing 22 June). 2026. Available online: https://www.neso.energy/news/management-frequency-during-extreme-weather-week-commencing-22-june (accessed on 14 November 2026).
  35. EirGrid; SONI. DS3: Rate of Change of Frequency (RoCoF) Workstream Plan; EirGrid: Dublin, Ireland, 2011; Available online: https://cms.eirgrid.ie/ds3-rate-change-frequency-rocofworkstream-plan-2011 (accessed on 14 November 2026).
  36. Li, Z.; Liu, J.; Liu, S.; Guo, Z.; Zhang, Z.; Rong, J.; Zhou, M. Quantifying Spatial-Related Inertia Value for High Share of Wind Power Integration. IEEE Access 2022, 10, 113100–113112. [Google Scholar] [CrossRef] [Scilit]
  37. Liu, Y.; Zeng, W.; Chen, M.; He, Z.; Yuan, Y.; Ding, T. Chance-Constrained Scheduling Considering Frequency Support from Electric Vehicles Under Multiple Uncertainties. IET Renew. Power Gener. 2024, 18, 4348–4359. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.