Discharge Characteristics and Configuration of Electrical Clearances in the ±500 kV Valve Hall of Offshore Platforms

,
,
,
,
and
1
Power China Group, Huadong Engineering Corporation Ltd., Hangzhou 311122, China
2
China Electric Power Research Institute, Wuhan 430074, China
3
State Key Laboratory of Power Grid Environmental Protection, Wuhan 430074, China
*
Author to whom correspondence should be addressed.

Abstract

The ±500 kV valve halls of wind farm offshore platforms are integrated through a high-voltage direct current (HVDC) transmission system and constructed in deep-sea conditions, making the design of net air clearance distances particularly critical. This paper investigates key factors influencing air clearance distances associated with the impulse overvoltage characteristics of the main equipment in the valve hall. Based on the preliminary design of a ±500 kV offshore converter valve hall, critical air gaps were determined. The full-scale samples were employed to conduct standard switching impulse overvoltage tests. In this way, the overvoltage discharge characteristics of air gaps in the offshore converter valve hall were obtained. Finally, based on the air gap configuration method and the obtained discharge characteristic data, a recommended net air clearance distance range is proposed for the ±500 kV valve hall of the offshore platform, providing a vital reference for the compact design of offshore wind farm valve halls.

1. Introduction

Wind energy conversion systems (WECS) can consist of a single turbine or large offshore wind farms ranging from a few units to over 150 turbines, with modern offshore individual turbines rated 8–18 MW and total farm capacities typically between 300 MW and 1.5 GW. Two main drivetrain configurations exist: geared systems using a gearbox to increase rotational speed for smaller generators, and gearless direct-drive setups that couple the rotor directly to low-speed generators for improved offshore reliability. Common electric machinery includes doubly fed induction generators (DFIGs) with partial-scale converters, once widely adopted but now less common for new offshore deployments, and permanent-magnet synchronous generators (PMSGs) with full-scale power converters, which dominate contemporary offshore projects due to full speed variability and strong grid decoupling. In a typical offshore WECS schematic, wind drives turbine rotors, and generated power passes through generators and converters before being stepped up by local transformers. Subsea medium-voltage collection cables aggregate power to an offshore substation, where voltage is further raised for transmission via HVAC or HVDC submarine export cables to an on-shore substation, before final delivery to the main electrical grid.
Typical WECS configurations shown in Figure 1 include wind power generators (DFIG or PMSG), collection system, off-shore power-electronic converters and step-up transformers for grid interfacing. Power-electronic converters usually use Modular Multilevel Converters (MMCs). This class of power-electronic converters are needed in order to achieve high-voltage operation and low current distortion (THD). Most utility-scale units are grid-connected, feeding variable wind-generated power into public electrical networks via medium-voltage collection cables within wind farms. Stand-alone off-grid WECS rely on battery storage for remote loads. Power converters regulate voltage, frequency and power quality to satisfy grid-code requirements. Insulation systems must withstand electrical, environmental and salt-laden coastal operating conditions for reliable network integration.
Figure 1. Typical WECS configuration topology.
Harsh North Sea marine conditions bring unique challenges for air gap design inside offshore-wind converter valve halls. Persistent salt spray, high humidity and occasional condensation risk surface contamination, which reduces dielectric strength and may trigger flashover. Limited platform topside space restricts physical clearances, conflicting with insulation safety requirements. Designers must balance compact layout, anti-salt-fog protection and sufficient air clearance to secure reliable HVDC valve operation under offshore stresses.
The configuration of net air clearance distance for the main equipment in a wind farm offshore platform is a key factor determining the volume and weight of the platform. According to some high-voltage direct current (HVDC) transmission projects in China, typical air gap factors used in calculating air clearances are 1.15, 1.3, and 1.4, with 1.15 commonly adopted, resulting in relatively large air clearance margins. This calculation method is suitable for onshore HVDC projects. However, offshore platforms require highly compact designs, making this approach unsuitable [1,2,3,4,5]. Excessively large air clearance margins impose significant burdens on offshore platforms. On the one hand, it may lead to excessively hollow upper modules with high centers of gravity, and may even exceed the transport capability of existing domestic transport vessels. On the other hand, oversized upper modules increase the difficulty of steel structure manufacturing and significantly raise costs [6,7,8,9].
High-voltage insulation materials find wide use in electrical engineering, spacecraft and other fields. There are also applications in power-network high-voltage engineering, justified by the sector’s social importance for the renewable-energy transition and diverse insulators including solids, liquids, gases and composites under complex service conditions.
Due to space limitations in the valve halls of offshore platforms, many optimized valve hall design methods have been proposed. Reference [10] summarized and incorporated the experience of European offshore platforms and proposed fundamental design requirements for offshore platform characteristics in China. Reference [11] proposed an electrical equipment arrangement scheme for valve halls of offshore platforms based on electrical equipment types and main electrical connections. In this method, positive and negative arms are arranged in different valve halls, while converter valve towers of the same pole are arranged adjacent to each other to meet offshore platform structural design requirements. A method for calculating valve hall dimensions was also proposed. This arrangement and dimension calculation method can significantly reduce the structural span of the valve halls of offshore platforms and lower project costs, which is of great significance for promoting the development of offshore wind farms’ grid-integration in China. Existing studies [12,13] mainly focus on onshore converter stations and investigate the arrangement of open-type electrical equipment on the ac side of valve halls. Research on air clearance distances in valve halls of offshore platforms remains insufficient. Offshore platform engineering research in China started relatively late, and currently research and design institutions lack mature design and configuration experience for offshore platforms, particularly regarding valve hall layouts.
Based on the environmental conditions of offshore platforms and relying on ±500 kV offshore wind farm projects through HVDC transmission, this paper investigates typical phase-to-ground air gaps in valve halls of offshore platforms. Considering the protection level of the switching impulse, the switching impulse withstands voltage level and the environmental conditions of the offshore platform, and referring to existing global standards, experimental tests were carried out. Recommended reference values for phase-to-ground clearance distances suitable for wind farm offshore platforms are provided [14,15,16,17,18,19].

2. Research Conditions

2.1. Test Method

2.1.1. Phase-to-Ground Test Method

According to previous design experience, the switching impulse used for overvoltage tests of the main equipment inside valve halls is the standard 250/2500 μs switching impulse. Based on GB/T 16927.1-2012, the up-and-down method is adopted for the test, which is mainly carried out as follows [20,21,22,23,24,25,26,27,28,29]:
Apply n groups of voltages Ui (i = 1, …, n). The applied voltage in each group is a basically constant value. This voltage is determined by increasing or decreasing ΔU according to the previous test result.
In the voltage withstand test program, if no voltage discharge occurs during one test (the air gap has not been broken down), the applied voltage level is increased by ΔU; otherwise, it is decreased by ΔU. In the voltage discharge test program, if voltage withstand occurs during one test, the applied voltage level is increased by ΔU; otherwise, it is decreased by ΔU. Both programs are equivalent to the up-and-down test method under 50% disruptive voltage discharge.
During this experiment, 30 switching impulse tests were conducted. The value of U50 was obtained by statistically summarizing the withstand voltage levels in each test. The U50 can be calculated as follows:
U 50 = ∑ i = 1 n k i U
where U50 represents 50% discharge voltage, n stands for the applied voltage levels in the test, and ki is the withstand voltage cycles at each voltage level.
σ = ∑ 1 n i ( U i − U 50 ) 2 n
σ is the standard deviation.
The impulse voltage amplitude is measured using a peak voltmeter, and the waveform is recorded by an oscilloscope, whose bandwidth and sampling rate are 200 MHz and 500 MS/s, respectively.

2.1.2. Phase-to-Phase Test Method

As shown in Figure 2 and Figure 3, in the simulated interphase operation impulse voltage test circuit, the positive and negative impulse voltages applied between the interphase wires are generated by two sets of impulse voltage generation devices, 7500 kV/750 kJ and 3600 kV/360 kJ, respectively. To ensure the synchronization effect of positive and negative voltages, two optical fibers are used to transmit the same trigger signal, so that the trigger voltage reaches both sets of generator ignition devices synchronously.
Figure 2. Phase-to-phase operation impulse voltage test circuit. Rf: wave head resistance, Rt: wave tail resistance, C0: main capacitor, C: voltage divider capacitor, G: ignition ball gap, CRO: measure voltage.
Figure 3. Wiring diagram of experimental equipment and test samples.
In this high-voltage impulse experiment, two sets of impulse voltage generators with rated capacities of 7500 kV and 3600 kV were adopted and triggered synchronously to realize coordinated voltage output. To simulate the actual complex electric field environment of two-phase power conductors under extreme impulse voltage conditions, positive and negative impulse voltages were simultaneously applied to the two-phase conductors respectively, forming a typical bipolar coupled voltage test state. During the whole experimental process, standard full-wave impulse withstand voltage tests and flashover voltage tests were carried out repeatedly to acquire authentic and valid electrical waveform data. A high-precision voltage divider matched with a professional signal measurement and acquisition system was deployed as the core testing device. This measurement system accurately captured and recorded the complete full-wave waveforms of impulse withstand voltage without dielectric breakdown, as well as the characteristic flashover voltage waveforms generated when insulation flashover occurred on the conductor surface. The synchronous triggering and bipolar voltage loading mode ensured the test condition was close to the actual operating scenario, while the high-sensitivity measurement system guaranteed the accuracy and integrity of all experimental waveform data for subsequent data analysis and insulation performance evaluation.
Phase-to-phase air gap impulse voltage tests were conducted, with each test voltage being the sum of positive and negative polarity voltages triggered at the same time, U = U+ + U− (U stands for phase-to-phase voltage, U+ stands for positive polarity voltage, U− stands for negative polarity voltage). The pressurization method adopts the voltage up-and-down test method, as described in Section 2.1.1.

2.2. Test Samples and Test Contents

2.2.1. Reference Electrode Arrangement of ±500 kV Valve on Offshore Platform

The preliminary layout of the ±500 kV bipolar HVDC valve on offshore platforms is shown in Figure 4.
Figure 4. Equipment layout of ±500 kV bipolar HVDC valve on offshore platforms. (a) Top view. (b) Front view.
According to the layout, the main influencing factors of phase-to-ground air clearance design include the air gaps between the valve tower ring and wall, bushing ring and wall, simulated conductor and wall, and busbar and wall, respectively. The main spacing that affects the design of the net distance between phase and phase air gaps includes the valve tower ring to the valve tower ring, the bushing ring to the bushing ring, the simulated conductor to the simulated conductor, and the busbar to the busbar. Based on the valve hall design drawings, the valve tower rings, conductor rings, double-bundle conductors, four-bundle conductors, busbars and simulated walls of test samples can be determined. Furthermore, on the basis of the valve hall design drawings, electrode type and spatial distribution, the test configurations of different electrode structures can also be decided. The test results can comprehensively reflect the discharge characteristics of the air gap electrodes in the valve hall [30,31,32].

2.2.2. Test Sample Types

According to the design drawings, the main test samples fabricated include the valve tower ring, the bushing ring, the double-bundle conductor, the four-bundle conductor, and the simulated wall. The design drawings of these samples are shown in Figure 5.
Figure 5. Structural design of the test sample. (a) Valve tower ring. (b) Bushing ring. (c) Double-bundle conductor. (d) Four-bundle conductor. (e) Main body of the simulated wall. (f) Central pillar.

2.2.3. Test Contents

Based on the preliminary design dimensions for the air clearance layout in the ±500 kV valve hall of the offshore platform and former air gap design data, the outdoor test phase-to-ground air clearances under standard switching impulses are set to 2.0 m~4.0 m. Indoor tests are conducted to verify two air clearances. The phase-to-ground air clearance test items for the four types of electrodes are listed in Table 1.
Table 1. Parameters of phase-to-ground air clearance tests under standard switching impulse in valve hall of the offshore platform.
The air gap distances for phase-to-phase tests are set at 3.5 m~6.0 m. The contents of the air gap tests for four types of electrodes are shown in Table 2.
Table 2. Parameters of phase-to-phase air clearance tests under standard switching impulse in valve hall of the offshore platform.

2.3. Test Conditions

Considering that the air clearance configuration of the offshore platform is inside the valve hall, i.e., indoor configuration, extensive studies associated with air gaps in switching impulse voltage tests have proved that under equivalent environmental conditions including the temperature, there are no significant difference between indoor and outdoor test results, and no proximity effects. Therefore, the main tests are implemented outdoors accompanied with certain data points verified indoors.
The outdoor road gap discharge tests for the offshore platform are carried out in the outdoor impulse field of the ultra-high voltage alternating current (UHVAC) test base, where a voltage source applied standard switching impulse voltages to test samples. The UHVAC outdoor impulse field features a 70 m wide test portal tower supporting hanging UHV-level test samples, and it is equipped with a state-of-the-art 7500 kV long-front-wave impulse voltage generator. This generator can provide lighting impulse voltage and long-front-wave switching impulse voltage where the duration time of the front wave can reach 2500 μs. The voltage utilization factor of this generator is up to 60%, and it has the largest capacity, the highest output efficiency, and the widest front wave range in China.
The outdoor phase-to-phase test is conducted using a 7500 kV long wavefront impulse voltage generator and a CDYH3600 kV/360 kJ quick installation impulse voltage generator test system. The CDYH3600 kV/360 kJ impulse voltage generator test system mainly consists of the following parts: CDYH3600 kV/360 kJ impulse voltage generator body, 3600 kV weak damping capacitor voltage divider, ZD ±100 kV DC charging device, control system, measurement system and accessories, etc.
The CDYH3600 kV/360 kJ impulse voltage generator body adopts a design of 6 levels per module, which can carry out horizontal transportation. The 3600 kV weak damping capacitive voltage divider is mainly used for measuring the waveform generated by the impulse voltage generator. The control system adopts CCK2511-C computer control, and the measurement system adopts a BFS1000-T impulse voltage generator measurement system, mainly used for measuring waveforms such as standard lightning waves, standard cutoff waves, operation waves, steep waves, and damage indication currents.
The indoor road gap discharge tests for the offshore platform are conducted in the State Key Laboratory of Power Grid Environmental Protection at the UHVAC test base. The samples are hung on the overhead crane of the valve hall via composite insulators, and their distances can be adjusted by moving the crane. The indoor test voltage source consists of a CDYH 3600 kV/360 kJ fast-installation impulse voltage generator system, including the CDYH 3600 kV/360 kJ impulse voltage generator, the 3600 kV weakly damped capacitor divider, the ZD ±100 kV DC charging device, the control system, the measurement system, and associated accessories.
Temperature, humidity, and atmospheric pressure are monitored during each test, since these parameters directly affect the accuracy of the U50 meteorological correction results. Using an online temperature, humidity, and air pressure measurement device, temperature, humidity, and air pressure are measured once per test. Then, the discharge voltage is corrected to standard weather conditions based on each weather condition, and the average value is taken as the corrected U50, and their average values are used as the final meteorological parameter in this test. According to the meteorological correction formula of GB/T 16927.1-2012, all test voltages were corrected to the standard meteorological condition pressure of 101.325 kPa, temperature of 20 °C, and absolute humidity of 11 g/m3. All voltages were performed with their corrected values with atmospheric conditions in the text.
The impulse power supply has been compared with the standard source, and the meteorological parameter measurement device has been calibrated. In the overvoltage test under the same electrode and air gap, the standard deviation of 30 tests is within 7%, which meets the standard requirements.
The real-time monitoring device for meteorological conditions is placed under the gantry tower where the test sample is suspended, which can fully reflect the meteorological environment during the test of the test sample.

3. Outdoor Experiment Results and Analysis of Typical Phase-to-Ground Clearance Switching Impulse Discharge Characteristics

3.1. Bushing Ring–Simulated Wall Impulse Voltage Test Results

3.1.1. Sample Arrangement

The phase-to-ground standard switching impulse voltage tests for the bushing ring–simulated wall is conducted in the UHV outdoor impulse field. The samples are installed on an outdoor portal frame. Considering the real arrangement between the bushing ring and the simulated wall, the simulated wall is placed on the ground, while the bushing ring is supported by bushing at 4.0 m above ground. The test setup is depicted in Figure 6.
Figure 6. Schematic of the switching impulse voltage test setup of the bushing ring–simulated wall.

3.1.2. Discharge Paths of Phase-to-Ground Outdoor Test with Different Gaps of the Bushing Ring

In the phase-to-ground switching impulse tests of the bushing ring–simulated wall, the discharge paths of 2.0 m and 2.5 m gap distances appear between the bushing ring and the simulated wall. However, at 3.0 m and 4.0 m gap distances, since the distance from the bushing to the ground is similar to that to the simulated wall, multiple discharge paths appeared including bushing–simulated wall and bushing–ground.

3.1.3. Results of Bushing Ring–Simulated Wall Switching Impulse Tests

Figure 7 shows the relationship between U50 and the gap distance under the bushing ring–simulated wall switching impulse voltage tests. When the bushing ring is at 4 m height above the ground, the discharge paths, bushing ring–ground and bushing ring–simulated wall appear with the increasing of the gap distance between the bushing ring and the simulated wall. Therefore, the gap clearance of the bushing ring–ground should be taken into account during the configuration of the bushing ring–simulated wall gap.
Figure 7. The relationship of U50 and the gap distance under the bushing ring–simulated wall switching impulse voltage tests.

3.2. Comparison Analysis

Besides the bushing ring, the phase-to-ground standard switching impulse voltage test of the other four samples (valve tower ring, double-bundle conductor, four-bundle conductor, and busbar) against the simulated tower should be considered, where the heights of the simulated wall–ground and the sample–ground are 5.0 m and 10.0 m, respectively. In these tests, discharge paths occur from the valve tower ring, double-bundle conductor, four-bundle conductor, and busbar toward the simulated tower.
Figure 8 shows U50 at different gap distances for phase-to-ground switching impulses under five electrode configurations. It indicates that the phase-to-ground discharge voltage increases with the gap distance for each sample; however, the increasing rate diminishes following a logarithmic trend. Since the bushing ring is installed at a relatively low height by design, its discharge to ground occurs in the 3.0 m and 4.0 m gap distances. Consequently, the bushing ring phase-to-ground discharge voltages are lower than those of the other samples (valve tower ring, four-bundle conductor, double-bundle conductor, and busbar), whose voltages are comparable to each other.
Figure 8. Phase-to-ground switching impulse U50 for five electrode configurations at varying gap distances.

4. Indoor Experiment Results and Analysis of Typical Phase-to-Ground Clearance Switching Impulse Discharge Characteristics

4.1. Comparison Analysis of the Bushing Ring Test

Considering the influence of different electrode structures on discharge voltage, additional bushing ring discharge tests and their comparison under a 2.0 m gap distance against both simulated wall and simulated pillar are conducted.

4.1.1. Sample Setups

The test setups for the three conditions are shown in Figure 9.
Figure 9. Indoor test setups of the bushing ring. (a) Bushing ring–simulated pillar. (b) Bushing ring–simulated wall. (c) Bushing ring–simulated wall and simulated pillar.
The impulse voltage test of the offshore wind power valve hall was conducted at the State Key Laboratory of Power Grid Environmental Protection, co-built by China Electric Power Research Institute and Wuhan University, which targets key environmental challenges of modern power grids. Its core research covers electromagnetic environment effects, noise control, electromagnetic interference protection and eco-friendly transmission equipment, including environmental-resistant high-voltage insulation materials equipped with advanced UHV test facilities, and it undertakes national-level projects to coordinate grid development with ecological protection and supports clean-energy transition in China.

4.1.2. Discharge Paths of Phase-to-Ground Indoor Test Under Three Different Arrangements of Bushing Ring

Under 2.0 m gap setups, the discharge path of the bushing ring–simulated pillar is from the bushing to the simulated pillar, and the discharge path of the bushing ring–simulated wall is from the bushing to the simulated wall, and the discharge path, where the distances of the bushing ring–simulated pillar and the bushing ring–simulated wall are equal, is from the bushing to the simulated wall.

4.1.3. U50 Comparison Analysis

The U50 of the bushing ring–simulated wall indoor phase-to-ground switching impulse voltage tests under the three configurations is shown in Figure 10. It can be seen that when the bushing ring is equidistant between the simulated pillar and wall, the bushing ring tends to discharge to the simulated wall. The bushing-to-simulated wall discharge voltage is lower by 3.8% and 2.5% compared to the bushing-to-simulated pillar and the equidistant case, respectively.
Figure 10. U50 of the bushing ring–simulated wall indoor phase-to-ground switching impulse voltage tests under the three configurations.

4.2. Indoor and Outdoor Experiment Result Comparison

Figure 11 shows the comparison of indoor and outdoor test data for valve tower ring–simulated wall, bushing ring–simulated wall, double-bundle conductor–simulated wall, four-bundle conductor–simulated wall, and busbar–simulated wall.
Figure 11. Indoor and outdoor phase-to-ground switching impulse test results for five electrode configurations.
The comparison of indoor and outdoor test results for five different electrodes is shown in Table 3.
Table 3. Comparison of indoor and outdoor test results for five different electrodes.
The comparison of indoor and outdoor test data shows that the proximity effect has a small impact at a gap distance of 2.0 m, and the indoor test results are close to the outdoor test results. The proximity effect has a large impact at a gap distance of 3.0 m, and the indoor test results are 3.48% lower than the outdoor average. To eliminate the influence of indoor proximity effect, it is recommended to use outdoor test data for the configuration of air gap distance in offshore wind power.

5. Test Results and Analysis of Impact Discharge Characteristics of Typical Phase-to-Phase Gap Operation in Valve Hall of ±500 kV Offshore Converter Station

Figure 12 shows the voltage waveforms of switching impulse withstand and flashover tests for air gaps between valve corona rings.
Figure 12. Voltage waveforms of switching impulse withstand and flashover tests for air gaps between valve corona rings. (a) Voltage waveform of valve-corona-ring-to-valve-corona-ring 6.0 m switching impulse withstand test. (b) Voltage waveform of valve-corona-ring-to-valve-corona-ring 6.0 m switching impulse flashover test.
Figure 13 shows the U50 under different gap distances of the phase-to-phase operation impulse voltage for five electrode structures.
Figure 13. U50 under different gap distances for phase-to-phase operation impulse voltage under five electrode structure arrangements.
The discharge voltage during the phase-to-phase tests of different samples increases with the increase in gap distance, but the amplitude has a non-linear rise, showing a logarithmic variation pattern. The discharge voltage during phase-to-phase operation of different samples increases with the increase in gap distance, and the increase amplitude decreases. Due to the actual design and layout of the bushing ring, the installation height is relatively low, and the inter phase gap distance is 5.0 m. Under the arrangement condition of 6.0 m, there is a ground discharge, and the phase-to-phase operation impulse discharge voltage is higher than other test samples. The discharge voltage difference between the valve tower ring, double-bundle conductor, four-bundle conductor, and busbar is minimal.
Figure 14 shows the U50 of the phase-to-phase operating impulse voltage for four-bundle and double-bundle conductors under different gap distances for parallel and intersecting 90° working conditions.
Figure 14. U50 under different gap distances for phase-to-phase operation impulse voltage under two different arrangements. (a) Four-bundle conductor. (b) Double-bundle conductor.
The impact electric field values of the double-bundle and four-bundle conductors under two different arrangements are shown in Table 4.
Table 4. The impact electric field values of the double-bundle and four-bundle conductors under two different arrangements.
Under the phase-to-phase test, the impact electric field values (kV/m) of double-bundle and four-bundle arranged intersecting 90° are generally higher than those arranged in parallel. The discharge voltage values of double-bundle and four-bundle conductors arranged intersecting 90° are 7.7% and 8.6% higher than those arranged in parallel, respectively. The main reason for this difference is the difference in electrode structure, where the impact electric field is lower in parallel arrangements compared to cross arrangements.

6. Analysis of Typical Phase-to-Ground Insulation Gap Clearance Configuration

6.1. Calculation of Required 50% Discharge Voltage

According to the required withstand voltage of the ±500 kV valve hall during the phase-to-ground switching impulse tests, and the test standard deviation, the required 50% discharge voltage is expressed as follows:
U 50 , c = U 1 − x σ
where U50,c stands for the required 50% discharge voltage, U represents the required switching impulse withstand voltage, σ denotes the experimental standard deviation, and x is the multiple of the standard deviation.

6.2. Analysis of Phase-to-Ground Gap Configuration

Based on the full-scale and real-layout of the samples in the ±500 kV valve hall, full-scale air gap discharge experiments are implemented at various gap distances. The data can be directly utilized in clearance configuration. Thus, the curves of the measured discharge voltage versus air gap distance can be directly applied to determine the required discharge voltage of a given electrode structure. In this way, the air gap distance can be computed. The configuration procedure is listed as follows:
(a)
According to the test data, derive curves of switching impulse voltage versus gap distance under various electrode structures.
(b)
Compute the atmospheric correction factor according to Section 2.3 .
(c)
Determine the required 50% discharge voltage by Equation (2), and apply atmospheric correction factor K1 to obtain the final design voltage.
(d)
Using the final design voltage and the curve to calculate the required gap distance.
On the basis of the phase-to-ground switching impulse test results of valve tower ring, bushing ring, conductors and busbars, the required net clearances for the ±500 kV valve hall can be configured by applying the derived curves.
The required phase-to-ground switching impulse withstand voltage is 1175 kV, and the required U50 is yielded as 1335 kV. The air gap distance of the valve hall on an offshore platform is indoors, and the valve hall operating conditions are set as: dry temperature 25 °C, relative humidity (RH) 10%, and atmospheric pressure 101.3 kPa. The standard deviation σ is 6% and its multiple x is 2. As a result, the recommended phase-to-ground clearances of the different electrode configurations can be calculated, which is in the range of 4040 mm to 4440 mm.

6.3. Analysis of Phase-to-Phase Gap Configuration

According to the standard operating impulse voltage test results of different test samples such as valve tower rings, bushing rings, conductors, and busbars in offshore converter stations, a ±500 kV offshore valve hall phase-to-phase clearance distance configuration is adopted using test curves.
The required withstand value for phase-to-phase operation impulse voltage is 1250 kV, and the calculated 50% discharge voltage requirement value is 1420 kV. The environmental conditions are 25 °C, 10% humidity, 101.3 kPa, with a standard deviation of 6% and twice the standard deviation. The recommended phase-to-phase configuration result is 3570 mm–4250 mm.

7. Conclusions

(a)
For different samples, the phase-to-ground breakdown voltage increases with the gap distance, while its increasing rate diminishes as a logarithmic trend. Since the bushing ring is installed at a relatively low height in the design, the discharge phenomenon occurs at 3.0 m and 4.0 m air gaps during the phase-to-ground tests, resulting in lower breakdown voltages of the phase-to-ground switching impulse for the bushing ring than for the other samples. The breakdown voltages for the valve tower ring, four-bundle conductor, double-bundle conductor, and busbar are similar.
(b)
The test results under the three arrangements among the bushing ring, the simulated wall and the simulated pillar show that when the distance between the bushing ring and the simulated wall is the same as that between the bushing ring and the simulated pillar, the discharge voltage of the bushing ring–simulated wall is lower and the discharge phenomenon appears between the bushing ring and the simulated wall. The bushing ring-to-simulated wall breakdown voltage is lower by 3.8% and 2.5% compared to the bushing ring-to-simulated pillar and equidistant configurations, respectively.
(c)
The proximity effect is minor at a 2.0 m air gap so that the indoor results are close to the outdoor results. However, the proximity effect is significant at a 3.0 m air gap, where the indoor results are 3.48% lower than outdoor results. Therefore, the switching impulse tests should eliminate proximity effects, and the clearance configuration should use the outdoor data.
(d)
Under the test conditions, i.e., 25 °C, 10%RH, 101.3 kPa, the recommended phase-to-ground net air clearance distance of various electrode configurations for the ±500 kV valve hall is calculated to be in the range of 4040 mm to 4440 mm, and the recommended phase-to-phase net air clearance distance of various electrode configurations for the ±500 kV valve hall is calculated to be in the range of 3570 mm to 4250 mm.

Author Contributions

Conceptualization, Q.C.; methodology, Q.C.; software, J.N.; validation, F.H., J.N. and Y.M.; formal analysis, Q.L.; investigation, Y.M.; data curation, F.H.; writing—original draft preparation, Q.L.; writing—review and editing, X.C.; visualization, X.C.; funding acquisition, Q.C. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by Huadong Engineering Corporation Ltd. Science and Technology Project grant number [GYW11202202822].

Data Availability Statement

The original contributions presented in this study are included in the article. Further inquiries can be directed to the corresponding author.

Conflicts of Interest

Qing Chen and Xiaofei Chang were employed by Huadong Engineering Corporation Ltd. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as potential conflicts of interest. The authors declare that this study received funding from Huadong Engineering Corporation Ltd. Science and Technology Project. The funder was involved in the study design, collection, analysis, interpretation of data, the writing of this article, and the decision to submit it for publication.

References

  1. Dallaire, R.D.; Maruvada, P.S. Evaluation of the effectiveness of shielding and filtering of HVDC converter stations. IEEE Trans. Power Deliv. 1989, 4, 1469–1475. [Google Scholar] [CrossRef]
  2. DeVore, R.V.; Kimball, D.F.; Kasten, D.G.; Caldecott, R. RF analysis of a 12-pulse HVDC convertor. IEEE Proc. C Gener. Transm. Distrib. 1988, 135, 210–218. [Google Scholar] [CrossRef]
  3. Luo, L.; Dai, L. Numerical assessment of nonlinear electric field of HVDC wall bushing. In Proceedings of the ASME 2005 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference, Long Beach, CA, USA, 24–28 September 2005; 1, pp. 249–253. [Google Scholar] [CrossRef]
  4. Janischewskyj, W.; Cela, G. Finite element solution for electric fields of coronating DC transmission lines. IEEE Trans. Power Appar. Syst. 1979, PAS-98, 1000–1012. [Google Scholar] [CrossRef]
  5. Gao, C.; Li, L.; Zhao, Z.; Liu, Y. Electromagnetic interference and shielding of valve hall in HVDC converter station. Front. Electr. Electron. Eng. China 2010, 5, 100–105. [Google Scholar] [CrossRef]
  6. Sakurai, T.; Miirotani, K.; Oonishi, K. Suppression of temporary overvoltage caused by transformer and ac filter inrush currents at the shin-shinano frequency converter station. IEEE Trans. Power Appar. Syst. 1981, PAS-100, 1608–1613. [Google Scholar] [CrossRef]
  7. Imai, K.; Kobayashi, S.; Sen, T. Behavior of HVDC thyristor valve on the critical turn-off condition and optimized gate firing system. IEEE Trans. Power Appar. Syst. 1982, PAS-101, 4419–4427. [Google Scholar] [CrossRef]
  8. Kobayashi, S.; Takahashi, T.; Yoshino, T.; Sukehara, M. A unit arrester application for HVDC thyristor valve. IEEE Trans. Power Appar. Syst. 1984, PAS-103, 3080–3088. [Google Scholar] [CrossRef]
  9. Geng, J.; Qin, Y.; Lv, F.; Yao, X.; Ding, Y. Electric field distribution and switching impulse discharge under shield ball surface scratch defect in an UHVDC hall. Energies 2018, 11, 1408. [Google Scholar] [CrossRef]
  10. Zhang, Y.; Sang, Z.; Yu, J. Design key points of flexible DC transmission converter station for offshore wind farm. China Equip. Eng. 2020, 1, 201–203. (In Chinese) [Google Scholar] [CrossRef]
  11. Chen, P.; Zhou, G.; Ma, L.; Yang, J.; Liang, Y. Electrical equipment layout and size calculation method of valve hall for the offshore VSC-HVDC converter station. South. Power Syst. Technol. 2021, 15, 62–66. [Google Scholar] [CrossRef]
  12. Huang, Y.; Li, F.; He, Q.; Mao, W.; Fang, K. Research on converter station insulation coordination of ±800 kv ultra-high voltage direct current power transmission system. High Volt. Appar. 2015, 51, 81–86. [Google Scholar] [CrossRef]
  13. Han, Y.; Li, L.; Chen, H.; Zhang, J.; Lu, Y. Simulation analysis of influence of DC protection on the overvoltage and insulation coordination of ±800 kV UHVDC converter stations. High Volt. Eng. 2012, 38, 316–321. [Google Scholar]
  14. Zhou, H.; Zhao, B.; Wang, D.; Jia, Z.; Wang, S.; Wu, J. Lightning Performance of Quadruple-circuit Transmission Line with Dual Voltage500/220kV on the Same Tower. High Volt. Eng. 2008, 10, 2075–2080. (In Chinese) [Google Scholar]
  15. Yang, Q.; Sima, W.; Sun, Y.; Sun, C. Lightning Protection Performance of Back-flashover for Quadruple-circuit Transmission Lines with Dual Voltage 1000 kV/500 kV on the Same Tower. High Volt. Eng. 2012, 38, 132–139. (In Chinese) [Google Scholar]
  16. Zhang, L.; Hao, Y.; Zhang, X.; Wen, F.; Zang, G.; Wei, P. Study on tower types for 1000 kV and 500 kV four-circuit AC transmission lines on same tower. Electr. Power 2013, 46, 32–36. [Google Scholar] [CrossRef]
  17. Shu, S.; Ruan, J.; Huang, D.; Pu, Z.; Qiu, Z. A New Calculation Method for the Breakdown Voltage of Air Gap in Slightly Uneven Electric Field. High Volt. Eng. 2015, 41, 662–668. [Google Scholar] [CrossRef]
  18. Chen, W.; Zeng, R.; He, H. Research progress of long air gap discharges. High Volt. Eng. 2013, 39, 1281–1295. (In Chinese) [Google Scholar] [CrossRef]
  19. Wang, Y.; Wen, X.; Lan, L.; An, Y.; Dai, M.; Gu, D. Breakdown characteristics of long air gap with negative polarity switching impulse. IEEE Trans. Dielectr. Electr. Insul. 2014, 21, 603–611. [Google Scholar] [CrossRef]
  20. GB/T 16927.1-2012; High-Voltage Test Techniques—Part 1: General Definitions and Test Requirements. Standardization Administration of China: Beijing, China, 2012.
  21. IEC 60060-1:2010; High-Voltage Test Techniques—Part 1: General Definitions and Test Requirements. International Electrotechnical Commission (IEC): Geneva, Switzerland, 2010.
  22. Chen, X.; Xia, C.; Ding, Y.; Zhang, C. Optimization of air gap clearance in 750 kV converter station area on AC side of ±800 kV UHVDC project. Power Syst. Technol. 2015, 39, 2935–2940. [Google Scholar] [CrossRef]
  23. Liu, Q.; Huo, F.; Zhou, K.; Li, J.; Ye, Q.; Li, Y. Analysis on air-gaps discharge and pollution flashover characteristics of Y-type insulator strings for ±1100 kV transmission lines. High Volt. Eng. 2017, 43, 3182–3188. (In Chinese) [Google Scholar] [CrossRef]
  24. Ma, W. The Insulation Coordination of 500kV SHIYANG to GUIISHAN Transmission Project With Four-Circuit Lines on Same Tower. Master’s Thesis, South China University of Technology, Guangzhou, China, 2010. [Google Scholar]
  25. Fang, S.; Li, M.; Zhang, X.; Zhang, G. Overvoltage Calculation and Selection of Switching Impulse Minimum Airgap for 500 kV Double-Circuit Transmission Line on Same Tower. Insul. Surge Arresters 2016, 2016, 106–110. (In Chinese) [Google Scholar] [CrossRef]
  26. Ding, Y.; Li, Q.; Liao, W.; Zeng, R.; Su, Z. Switching impulse discharge characteristics and altitude corrections for typical long air gaps at high altitude areas. High Volt. Eng. 2013, 39, 1441–1446. (In Chinese) [Google Scholar] [CrossRef]
  27. Zhou, A.; Li, Z.; He, C. Overvoltage Calculation and Selection of Switching Impulse Minimum Air Gap for 500kV Double-Circuit Transmission Line on Same Tower. Power Constr. 2011, 32, 38–40. (In Chinese) [Google Scholar] [CrossRef]
  28. Wang, G.; Zhang, F.; Guan, Z.; Liao, Y.; Gao, C. Experimental research of DC external insulation in high altitude area. High Volt. Eng. 2016, 42, 1109–1123. [Google Scholar] [CrossRef]
  29. Zhuang, Z.; Zhu, W. Study on air gap selection for Guangdong 500 kV Quadruple-circuit transmission lines on the Same Tower. Guangdong Electr. Power 2013, 26, 53–56. (In Chinese) [Google Scholar] [CrossRef]
  30. Wang, S.; Deng, C.; Wang, X.; Chen, W.; Yang, G.; Wang, H.; Lv, F.; Liu, Y.; Zhou, J.; Ding, Y. Experimental study on effects of rain on short air gaps discharge with switching impulse voltage. Power Syst. Technol. 2019, 43, 1092–1098. (In Chinese) [Google Scholar] [CrossRef]
  31. Hu, J.; Shi, B.; Yang, X.; Yang, H.; Zhong, R.; Li, Y. Discharge characteristics of air gap subject to long wavefront switching impulse voltage under heavy rain condition. High Volt. Eng. 2018, 44, 3888–3895. (In Chinese) [Google Scholar] [CrossRef]
  32. Zhao, F.; Zhang, F.; Yang, H.; Guan, Z. DC pollution flashover and rain flashover performance for composite post insulators at high altitudes. J. Tsinghua Univ. (Sci. Technol.) 2009, 49, 1581–1584. [Google Scholar]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.