A Method for Formulating Delivery Curves of Clean Energy Bases Considering Load Demand of Receiving Provinces

,
,
,
,
,
and
1
China Renewable Energy Engineering Institute, Beijing 100011, China
2
China Institute of Water Resources and Hydropower Research, Beijing 100038, China
3
Technology Innovation Center for Flood and Drought Prevention and Disaster Reduction, Ministry of Water Resources, Beijing 100038, China
4
Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian 116024, China

Abstract

Against the backdrop of China’s dual carbon goals, cross-regional low-carbon power transmission from large-scale clean energy bases is a pivotal direction for energy transition. Formulating their power delivery curves requires precise alignment with the load demand characteristics of receiving provinces and the coordinated operation of hydropower, wind power, photovoltaic (PV) power, and pumped-storage hydropower (PSH). To address the limitations of existing methods, such as the lack of linearized modeling for core operational constraints, low solution efficiency and inadequate integration of multi-energy coupling constraints, this paper proposes a tailored linearized optimization modeling approach. By adopting auxiliary variables, binary variables and the Big M method, core constraints including PSH pumping power supply, stepwise power delivery and multi-energy coordinated operation are linearized. A monthly rolling linear optimization model is constructed with triple objectives: minimizing the renewable curtailment rate and the absolute error between delivery and load curves, and maximizing delivered electricity volume. Multi-objective coordinated optimization is realized via the linear weighted summation method, and the model is solved with the Gurobi solver. Case validation on an integrated hydro–wind–solar clean energy base in Southwest China and its corresponding receiving provincial power grid shows that the proposed method effectively improves the curve matching degree, controls the wind–PV curtailment rate within around 12% (engineering tolerance), and strictly meets engineering safety constraints such as PSH operation and HVDC transmission requirements. Comprehensive optimization of the three objectives is achieved when the weight coefficients for curtailment rate, load matching error and delivered electricity volume are set to 0.3–0.8, 0.1–0.2 and 0.1–0.6, respectively. This method resolves the problems of traditional nonlinear models being disconnected from engineering practice and low solution efficiency, providing a reliable technical reference for the refined dispatching of cross-regional power transmission and scientific formulation of power delivery curves for clean energy bases.

1. Introduction

Driven by China’s dual carbon strategic goals, the nation’s energy structure is accelerating its transition to a clean and low-carbon paradigm [1]. Large-scale clean energy bases, anchored by the integration of hydropower, wind, and solar energy, have emerged as a pivotal carrier for the optimized cross-regional allocation of energy resources [2,3]. The backbone power transmission networks for the West-to-East Power Transmission [4,5] and North-to-South Power Supply initiatives, underpinned by ultra-high-voltage direct current (UHVDC) transmission corridors [6], stand as a core enabler for addressing renewable energy curtailment challenges [7] and propelling the green transformation of the power system [8]. By synergistically integrating hydropower, wind, and solar resources within river basins, these bases realize the complementary operation of multiple energy sources [9,10], driving the evolution of clean energy development from isolated breakthroughs to multi-source coordination and fueling a steady rise in the share of green electricity in the overall power consumption. The rapid construction of UHVDC projects (e.g., ±800 kV transmission lines [11]) has further substantially enhanced the capacity for cross-regional transmission and optimal deployment of clean energy resources [12].
As the critical link connecting clean energy bases with load centers in receiving provinces, the scientific formulation of power delivery curves directly dictates the peak-shaving pressure of receiving-end power grids [13], the upper limit of renewable energy integration, and the level of power procurement cost control [14]. These curves not only serve as a core constraint for the operation and dispatching of receiving-end grids but also require precise alignment with the load demand characteristics [15], power generation mix, and differential regulation capabilities of individual receiving provinces. Pumped-storage hydropower (PSH), as the most technically mature and highly flexible large-scale energy storage technology in power systems [16], has become an indispensable support for mitigating fluctuations in renewable energy output and ensuring the stable implementation of cross-regional power transmission from clean energy bases, owing to its multifunctional attributes of peak shaving and valley filling [17], frequency and phase regulation, and emergency reserve provision. Nevertheless, the stringent operational constraint that PSH pumping power must be solely supplied by local clean energy resources (and not draw electricity from the main grid) significantly increases the modeling complexity of power delivery curve formulation, rendering it a pivotal engineering challenge that demands urgent resolution.
To date, domestic and international research on power delivery curve formulation for clean energy bases has yielded certain progress [18], yet existing methodologies still suffer from notable shortcomings that hinder their adaptability to the operational and practical engineering requirements of the new power system [19]. Existing methods insufficiently consider the impact of wind and PV output forecast errors on delivery curves and lack robustness in terms of verification and uncertainty handling mechanisms. First, in terms of modeling, most studies focus on the macro-level matching of annual power transmission volume allocation with receiving-end load curves [20], failing to adequately address the linearized modeling of core operational constraints—such as PSH pumping power supply constraints and stepped power delivery curve constraints. Additionally, the coordinated operation of hydropower, wind, and solar energy is often analyzed in isolation from the PSH constraint system, with no deep integration of multi-energy coordination constraints and PSH operational constraints, leading to a clear disconnect between theoretical models and real-world engineering practices. Second, in terms of solution efficiency, the majority of studies adopt nonlinear modeling approaches [21]; while such methods can depict certain complex constraint relationships, their low solution efficiency makes them ill-suited for the rapid optimization of large-scale power systems involving multi-energy synergy and UHVDC transmission, as well as the real-time dispatching demands of power grids [22]. Third, in terms of optimization objectives, traditional methods struggle to balance the multiple goals of transmission security, high-efficiency renewable energy integration [23], and UHVDC corridor utilization efficiency, which fails to adapt to the new development landscape marked by the expansion of clean energy base scales [24], the upgrade of UHVDC transmission capacity, and the escalating renewable energy integration pressure on receiving-end grids.
Existing methods continue to be obviously disconnected from engineering practice, which is specifically reflected in the following: (1) the constraint that “pumped-storage pumping power must be supplied only by local clean energy” is not strictly satisfied, so the optimization results cannot be implemented in actual operation; (2) the step changes in the delivery curve are too frequent, violating the engineering limits of UHVDC power regulation and easily causing equipment wear; (3) the monthly average output constraint of cascade hydropower is ignored, resulting in infeasible hydropower dispatch schemes; and (4) nonlinear models have slow solution speed and poor convergence, which find it difficult to meet the demand of monthly rolling preparation. These problems make traditional models difficult to use directly in engineering dispatch. To address these research gaps and practical engineering needs, this paper takes integrated hydro–wind–solar clean energy bases as the research object and proposes a linearized optimization modeling method for power delivery curve formulation that accounts for the load demands of receiving provinces. This method innovatively adopts auxiliary variables, binary variables, and the Big M method to linearize core constraints including PSH pumping power supply, stepped power delivery, and multi-energy coordinated operation, and constructs a monthly rolling linear optimization model that balances the triple objectives of minimizing renewable energy curtailment rate, improving the matching accuracy of power delivery and load curves, and maximizing the total transmitted electricity volume. The effectiveness and engineering applicability of the proposed method are verified via a case study of a national-level integrated hydro–wind–solar clean energy base in a river basin in Southwest China and its corresponding receiving provincial power grid. Further, this study explores the operational characteristics of multi-energy synergy and the optimal weight allocation rules for the triple-objective optimization. The research findings of this paper provide reliable technical support for the scientific formulation of cross-regional power delivery curves and the refined dispatching of clean energy bases, and thus contribute to enhancing the efficiency of renewable energy integration and the utilization level of UHVDC transmission corridors.

2. Materials and Methods

The monthly rolling optimization model established in this paper takes minimizing the renewable curtailment rate as the core objective, while also balancing load matching accuracy and maximizing the power delivery volume. A multi-objective optimization function is constructed via the linear weighted sum method, integrating three core indicators: renewable curtailment rate, load matching error, and power delivery volume. Each indicator is normalized to [0, 1] to eliminate dimensional inconsistencies, with weights assigned according to engineering priorities to ensure alignment with practical operational requirements. Details of the objective function refer to Section 2.1.
The following key constraints are imposed to ensure optimization feasibility and engineering applicability:
(1)
Step Constraints for Power Delivery Curves: A total of STEP_NUM consecutive step constraints is imposed, where the minimum duration of each step is no less than MIN_STEP_DURATION hours. This ensures that the power delivery curve is smooth and continuous, in line with the actual operational requirements of HVDC transmission projects. Meanwhile, the per-unit value of the power delivery curve is constrained within the interval [0, 1] to match the transmission corridor capacity, thus guaranteeing the stability of delivered power.
(2)
Coupling Constraints for Renewable Curtailment and Main Grid Support: Power purchase from the main grid for support is prohibited during curtailment periods. This avoids energy waste caused by the coexistence of renewable curtailment and grid power purchase, and ensures the effective achievement of the objective to minimize the renewable curtailment rate.
(3)
Pumped-Storage Pumping Constraints: The pumping power of pumped-storage hydropower (PSH) shall be solely supplied by the output of local wind, solar, and hydropower generation, with the use of main grid power strictly prohibited. This not only prevents main grid power being wasted but also promotes the accommodation of wind and solar resources, which is synergistic with the objective of minimizing the renewable curtailment rate.
For details of the constraints, refer to Section 2.2, Section 2.3, Section 2.4, Section 2.5 and Section 2.6.

2.1. Objective Function

The multi-objective optimization function is formulated as follows, with the minimization objective defined as:
min f = α ⋅ n o r m q d l + β ⋅ a v g e r r o r − γ ⋅ d e l i v e r y t e r m
where α denotes the weight coefficient for the renewable curtailment rate, which is used to adjust the importance of the curtailment rate indicator in the comprehensive optimization objective. A larger value of α means the model gives higher priority to reducing the renewable curtailment rate. β represents the weight coefficient for the load matching error, serving to balance the load matching accuracy with other optimization objectives; a larger β indicates that the model places more emphasis on improving the matching degree between the power delivery curve and the load curve. γ stands for the weight coefficient for the maximization of delivered power volume, which is employed to balance the goal of increasing the delivered power volume. A larger γ implies the model prioritizes guaranteeing the scale of the delivered power volume.
Equation (2) defines the normalized renewable energy curtailment rate, which is one of the three sub-objectives used to compute the comprehensive objective function in Equation (1). All three sub-objectives are normalized to [0, 1]. Among them, deliveryterm is the delivery utilization rate, and its negative coefficient in the minimization objective realizes the effect of maximizing the delivered electricity volume.
normqdl = ∑ m ∈ M ∑ d ∈ D ∑ h ∈ H p td _ qd , m , d , h ∑ m ∈ M ∑ d ∈ D ∑ h ∈ H p wind , m , d , h + p solar , m , d , h
where p td _ qd , m , d , h denotes the curtailed power output at hour h on day d of month m, where the numerator refers to the total volume of curtailed power, and the denominator is the total power generation from wind and solar energy sources.
Equation (3) calculates the average load matching error, which is the second sub-objective for Equation (1).
  a v g e r o r = ∑ m ∈ M 1 D m × 24 ∑ d ∈ D m ∑ h ∈ H p curve , m , h − norm _ load m , d , h
where norm _ load m , d , h denotes the per-unit value of the receiving-end load at the h hour d day of the m month, and D m is the total number of days in the m month. The absolute value is adopted to eliminate the offset of positive and negative errors, thus ensuring the rationality of the error calculation. a v g e r o r represents the monthly average load matching error, namely the mean absolute error between the HVDC power delivery curve and the receiving-end per-unit load curve. A smaller value of this indicator indicates a higher matching degree between the power delivery curve and the load profile of the receiving end, as well as a better ability to meet the load demand of the receiving end.
Equation (4) represents the normalized delivery term for maximizing transmitted electricity. To obtain the parameters in Equation (4), Equation (5) calculates the total actual delivered electricity, and Equation (6) computes the theoretical maximum deliverable electricity. Equation (4) is the third sub-objective used in the comprehensive objective function Equation (1). To eliminate dimensional influences, the objective of delivered electricity volume is constructed as a normalized utilization index deliveryterm . It physically represents the ratio of actual delivered electricity to the theoretical maximum deliverable electricity, ranging from 0 to 1. It shares the same normalized interval [0, 1] with the curtailment rate and load matching error, avoiding scaling imbalance.
deliveryterm = totaldelivery m a x _ p o s s i b l e _ d e l i v e r y
totaldelivery = ∑ m ∈ M ∑ d ∈ D m ∑ h ∈ H p curve , m , h × TDRLBJ
max _ possible _ delivery = TDRLBJ × total _ hours
where deliveryterm is the normalized delivery utilization ratio ranging from 0 to 1. A larger value indicates higher transmission volume and better utilization of the transmission corridor. The negative coefficient in the objective function realizes the maximization of delivered electricity in the minimization framework. The negative coefficient of deliveryterm in the minimization objective realizes the maximization of delivered electricity volume. Deliveryterm is a normalized utilization index ranging from 0 to 1. A larger value indicates higher transmission efficiency and better usage of the UHVDC corridor. totaldelivery represents the total monthly delivered power volume, which is obtained by accumulating the power of the power delivery curve over time. max _ possible _ delivery denotes the maximum achievable monthly delivered power volume, calculated as the product of the transmission corridor capacity and the total number of hours in the month.

2.2. Overall Hourly Energy Balance Constraint

To unify all power components, the core hourly energy balance is formulated as follows:
∑ i ∈ I p h y d r o i , m , d , h   +   p w i n d , m , d , h   +   p s o l a r , m , d , h   +   p t d _ g d , m , d , h     − p t d _ q d , m , d , h   −   p cx _ pump _ total , m , d , h + p cx _ gen _ total , m , d , h =   p c u r v e , m , d , h
where the left-hand side represents total local generation plus grid support power; the right-hand side represents delivered power, curtailed power, pumping power consumption, and pumped-storage generation power. This equation ensures global power balance at every hour.

2.3. Constraints Related to Hydropower

(1)
Upper and lower output limits
Q P C L i , m ≤ p h y d r o i , m , d , h ≤ Y X C L i , m
The output of each hydropower unit must be strictly confined to its monthly allowable operating range to prevent exceeding the safe operational limits of the equipment. Herein, p h y d r o i , m , d , h denotes the output of hydropower plant i at the h-th hour on the d-th day of month m, while Q P C L i , m and Y X C L i , m represent the minimum and maximum allowable output of hydropower plant i in month m, respectively.
(2)
Monthly average power output constraints
1 D m × 24 ∑ d ϵ D m ∑ h ϵ H p h y d r o i , m , d , h = P J C L i , m
To align with the inflow characteristics and dispatching schedules of hydropower plants, the monthly average output of each hydropower unit must be equal to its planned monthly average output, thus ensuring the rational allocation of hydropower resources. Herein, D m denotes the set of days in month m, H represents the set of hours (0–23), and P J C L i , m denotes the planned monthly average output of the hydropower unit i.
(3)
Intraday power output constraints
p h y d r o i , m , d , h − p h y d r o i , m , prev _ d , prev _ h ≤ M hydro , i ⋅ δ hydro , i , m , d , h
p h y d r o i , m , prev _ d , prev _ h − p h y d r o i , m , d , h ≤ M hydro , i ⋅ δ hydro , i , m , d , h
∑ h ∈ H δ hydro , i , m , d , h ≤ HYDRO _ DAILY _ CHANGE _ LIMIT
To avoid frequent start-up and shutdown of hydropower units and extend their service life, it is necessary to restrict both the number and magnitude of their daily output adjustments. This constraint is formulated by introducing the binary auxiliary variable δ hydro , i , m , d , h , which is applied to construct a nonlinear constraint coupling binary and continuous variables. Herein, prev _ d and prev _ h denote the previous day and the previous hour, respectively (with the latter applicable for cross-day time periods); M hydro , i represents the maximum output variation magnitude of hydropower plant i; and HYDRO _ DAILY _ CHANGE _ LIMIT is the limit on the number of daily output adjustments for the hydropower plant.

2.4. Constraints Related to Wind and Solar Power

The outputs of wind and solar power are key components of the power balance in the system, and they depend on the installed capacity of each farm and its corresponding time-varying normalized output coefficient. To quantify the available power from all wind and solar resources at each time step, we first aggregate the contributions of individual wind farms and solar plants, respectively. The mathematical expressions for calculating the total wind and solar power outputs are given as follows:
p wind , m , d , h = ∑ w ∈ wind _ num C wind , w ⋅ BYCL w , m , d , h
p solar , m , d , h = ∑ s ∈ solar _ num C solar , s ⋅ BYCL s , m , d , h
Herein, p wind , m , d , h and p solar , m , d , h denote the wind and solar power outputs at the h-th hour on day d of month m, respectively; C wind , w denotes the installed capacity of the w-th wind farm; C solar , s denotes the installed capacity of the s-th solar power plant; BYCL w , m , d , h denotes the normalized output of the w-th wind farm at the h-th hour on day d of month m; and BYCL s , m , d , h denotes the normalized output of the s-th solar power plant at the h-th hour on day d of month m.

2.5. Constraints Related to Pumped Storage

(1)
Force boundary constraints
− C cx , j ≤ p cx , j , m , d , h ≤ C cx , j
Herein, the output of a pumped-storage hydropower (PSH) unit can be positive (in power generation mode) or negative (in pumping mode), while its absolute value shall not exceed the installed capacity of the unit. Here, p cx , j , m , d , h denotes the output of pumped-storage unit j at the h-th hour on day d of month m, and C cx , j represents the installed capacity of the unit.
(2)
Limitations on the sources of pumped-storage electricity
p cx , j , m , d , h = p cx _ pump , j , m , d , h + p cx _ gen , j , m , d , h p cx _ pump _ total , m , d , h = − ∑ j ∈ J p cx _ pump , j , m , d , h p cx _ gen _ total , m , d , h = ∑ j ∈ J p cx _ gen , j , m , d , h
p cx _ pump _ total , m , d , h ≤ ∑ i ∈ I p hydro , i , m , d , h + p wind , m , d , h + p solar , m , d , h
(3)
Energy Capacity Limits of Pumped-Storage Unit
E _ m i n , j ≤ e cx , j , m , d , h ≤ E _ m a x , j
where E _ m i n , j and E _ m a x , j are the minimum and maximum available energy of the j-th pumped-storage unit.
(4)
Efficiency-Corrected Energy Dynamic Equation
e cx , j , m , d , h + 1 = e cx , j , m , d , h − p cx _ gen , j , m , d , h + p cx _ pump , j , m , d , h / η p u m p
where η p u m p is the pumping efficiency.
(5)
Mutual Exclusivity of Pumping and Generation
To prohibit simultaneous pumping and generation, a binary variable u_j,m,d,h is introduced:
p cx _ gen , j , m , d , h ≤ M · ( 1 − u j , m , d , h )
p cx _ pump , j , m , d , h ≤ M · u j , m , d , h
where u = 1 represents the pumping state, and u = 0 represents the generating state.

2.6. Constraints Related to the Power Delivery Curve

The stepwise delivery curve is divided into 4 fixed steps (STEP_NUM) to match the receiving-end load’s peak–valley pattern. Each step has a unique start time and end time. The duration of each step must be no shorter than MIN_STEP_DURATION to avoid frequent power adjustments. Binary variables are used to identify the affiliation of each hour to a certain step. DC transmission curves serve as the core mechanism for aligning power supply and demand between clean energy hubs and receiving provinces; their rationality directly determines the effectiveness of curtailment control and the degree to which receiving-end loads are met. This paper introduces   STEP _ NUM   consecutive-step DC transmission curve constraints. The primary objective is to achieve precise matching with the load profile at the receiving end while ensuring the curves remain smooth and continuous and comply with DC transmission project operational standards, and to accommodate the requirements of multi-source coordinated dispatch. Taking into account the daily fluctuation characteristics of receiving-end loads, DC transmission power control requirements, and the output regulation capabilities of multiple power sources, the following sections provide a detailed description of each constraint, clarifying their design logic, mathematical expressions, and engineering significance. All constraints serve the dual objectives of minimizing curtailment rates and improving load tracking accuracy, and are compatible with a monthly rolling solution model.
(1)
Constraints on the Number of Steps and the Standard Deviation
Based on the patterns of daily load fluctuations at the receiving end and practical experience in DC transmission dispatch, the number of steps is fixed at STEP _ NUM . This ensures that the model accurately captures the multi-period “peak–off–peak–off–peak” characteristics of the receiving-end load while avoiding the issues of excessive complexity in model solving caused by too many steps, or the inability to accurately track the load caused by too few steps, thereby balancing fitting accuracy and solution efficiency.
0 ≤ p step , m , s ≤ 1
Herein, p step , m , s denotes the per-unit value of the s-th step for the month ( s   ∈ { 1,2 , 3,4 } ). The core purpose of the per-unit value constraint is to eliminate dimensional effects, thus ensuring the comparability between the power delivery curve and the receiving-end per-unit load curve. Meanwhile, the coupling of the per-unit value with the HVDC corridor capacity ensures that the actual delivered power does not exceed the safe operational limits of the equipment. A per-unit value of 0 indicates no power delivery during the corresponding time period, whereas a per-unit value of 1 means that the HVDC corridor operates at its maximum transmission capacity for full power delivery during that period.
(2)
Step boundary constraints
∑ h ∈ H start _ step m , s , h = 1
∑ h ∈ H end _ step m , s , h = 1
To ensure the unique and standardized division of the four steps, and to avoid step overlapping and ambiguous time period attribution, each step is constrained to have a single start hour and a single end hour. Herein, start _ step m , s , h and end _ step m , s , h are binary variables with values of 0 or 1: start _ step m , s , h = 1 indicates that the s-th step starts at the h-th hour, while end _ step m , s , h = 1 denotes that the s-th step ends at the h-th hour. This constraint clarifies the time boundaries of each step through the logical control of binary variables, which lays a foundation for the subsequent continuity and duration constraints and is consistent with the core logic of interval unique partitioning in piecewise function modeling.
(3)
Step Continuity and Sequence Constraints
∑ h ∈ H h ⋅ end _ step m , s , h ≥ ∑ h ∈ H h ⋅ start _ step m , s , h
∑ s ∈ S y m , h , s = 1
This constraint is the key to ensuring the smoothness and continuity of the power delivery curve, and it consists of two core requirements. First, the temporal integrity of individual steps; the end hour of a step shall not precede its start hour, which avoids logical contradictions caused by time sequence inversion. Second, the overall continuity of the four steps; all steps are arranged in chronological order without overlaps or gaps, ensuring that every time period in a 24 h day is uniquely attributed to a single step. Herein, y m , h , s is a 0–1 binary variable that indicates the h-th hour of the m-th month is affiliated with the s-th step. Designed in accordance with the engineering requirements for HVDC transmission power control, this constraint prevents abrupt changes in delivered power and ensures that the power delivery curve fully covers all daily load periods, thus achieving full-time matching with the receiving-end load.
(4)
Minimum Step Duration Constraint
∑ h ∈ H h ⋅ end _ step m , s , h − ∑ h ∈ H h ⋅ start _ step m , s , h + 1 ≥ MIN _ STEP _ DURATION
In consideration of the operational characteristics of HVDC transmission systems, the minimum duration of each step is constrained to be no less than MIN _ STEP _ DURATION hours to avoid increased equipment wear and system operational instability arising from frequent adjustments to delivered power. The “+1” term in the expression is designed to accommodate the integer property of hourly time counting; specifically, the actual duration of a step is the difference between its end and start hours plus one. This constraint is consistent with the limits imposed by dispatching and operation departments on the adjustment frequency of HVDC transmission power, which effectively prevents excessive fluctuations in the power delivery curve caused by overly short steps. Meanwhile, it reserves sufficient time for the output adjustment of multi-energy sources, ensuring that regulating power sources such as hydropower and pumped-storage hydropower (PSH) units can respond promptly to variations in delivered power.
(5)
Power Delivery Curves and Step-Based Constraints
p curve , m , h = ∑ s ∈ S y m , h , s ⋅ p step , m , s
Equation (28) is nonlinear because it includes a product of binary and continuous variables. We linearize it using the Big M method as shown in (34) and (35). This constraint serves as the core link between the per-unit values of steps and the actual power delivery curve, specifying that the per-unit value of the power delivery curve for each hour is determined by that of the step to which the hour belongs. Owing to the coupling relationship between the binary variable y m , h , s and the continuous variable p step , m , s this constraint is nonlinear and thus requires linearization processing for subsequent solution. Herein, p curve , m , h denotes the per-unit value of the HVDC power delivery curve at the h-th hour of the m-th month; the product of this value and the HVDC corridor capacity yields the actual delivered power in the corresponding time period, which ensures that the delivered power not only aligns with the load demand of the receiving end but also does not exceed the transmission capacity of the HVDC corridor. The design logic of this constraint is derived from the modeling idea of piecewise functions; through the logical selection of binary variables, it achieves the stepwise and smooth switching of delivered power across different time periods, thus balancing the load tracking accuracy and the operational stability of the power system.
(6)
Constraints on the proportion of electricity supplied by the main grid
p td _ gd , m , d , h ≤ G D _ R A T I O m ⋅ p curve , m , d , h ⋅ TDRLBJ
To regulate power purchases for grid support and prevent an excessively high proportion of grid support or overreliance on the grid, the purchased power for grid support shall not exceed a certain percentage of the actual DC transmission power for the current time period, where G D _ R A T I O m represents the upper limit of the grid support power ratio for month m, and TDRLBJ represents the transmission capacity of the export channel.

2.7. Constraints Related to Curtailed Power

Curtailment constraints are the core to achieving the objective of minimizing the renewable curtailment rate, which are mainly used to regulate curtailment behavior, avoid the coexistence of unreasonable renewable curtailment and power purchase from the main grid, and define the boundary of curtailed power output. Specifically, these constraints fall into three categories: non-negativity constraints on curtailed power output, curtailment status indicator constraints, and mutual exclusion constraints between renewable curtailment and main grid support. The complete mathematical expressions are presented as follows:
(1)
Constraints on the Power-Off Status Indicator
p td _ qd , m , d , h ≥ 0
p td _ qd , m , d , h ≤ BIG _ M ⋅ is _ qd m , d , h
p td _ qd , m , d , h ≥ EPS − BIG _ M ⋅ 1 − is _ qd m , d , h
The power curtailment status is identified by the binary variable is _ qd m , d , h (0–1), enabling the linkage between curtailed power and curtailment status. Constraints are formulated using the Big M method, where EPS = 1 × 10 − 6 represents the minimum value to account for numerical calculation errors. When is _ qd m , d , h = 1 , the constraint degenerates to 0 ≤ p td _ qd , d , h ≤ BIG _ M , allowing power curtailment; when is _ qd m , d , h = 0 , the constraint degenerates to p td _ gd , d , h ≤ BIG _ M , prohibiting power curtailment.
(2)
Mutually Exclusive Constraints Between Power Curtailment and Grid Support
p td _ gd , m , d , h ≤ BIG _ M ⋅ 1 − is _ qd m , d , h
To avoid energy waste arising from the coexistence of renewable curtailment and main grid support power purchase, the proposed model prohibits power purchase from the main grid for support during curtailment periods. In this equation, p td _ gd , m , d , h denotes the main grid support power purchase at the h-th hour on the d-th day of the m-th month. When is _ qd m , d , h = 1 (i.e., the curtailment state is activated), the constraint p td _ gd , m , d , h ≤ 0 is enforced; combined with the non-negativity constraint ( p td _ gd , m , d , h ≥ 0 ) on the main grid support power, this results in p td _ gd , m , d , h = 0 , which indicates a strict prohibition on main grid support power purchase. When is _ qd m , d , h = 0 (i.e., the non-curtailment state is activated), the constraint p td _ gd , m , d , h ≤ BIG _ M takes effect, thereby permitting the purchase of main grid support power as needed.

3. Solution Method

Herein, the monthly rolling optimization model established in this paper incorporates the receiving-end load demand, transmission constraints, and the operational characteristics of renewable energy power generation. This model involves nonlinear terms arising from the coupling between binary and continuous variables, which poses challenges to solving efficiency and engineering application. Therefore, linearization of nonlinear constraints is essential to improving computational efficiency and ensuring the model is solvable in engineering practice. This chapter focuses on the linearization methods for core nonlinear constraints, as well as the solution approaches for multi-objective optimization, laying a foundation for the practical application of the model. The model flowchart is shown in Figure 1.
Figure 1. Algorithm Flowchart.

3.1. Constraint Linearization Strategy

3.1.1. Power Delivery Curve: Linearization of Step-Dependent Nonlinear Constraints

Herein, in the association constraint between the power delivery curve and the step tiers (denoted as Constraint p curve , m , h = ∑ s ∈ S y m , h , s ⋅ p step , m , s ), the binary variable y m , h , s (hourly step identifier) and the continuous variable p step , m , s (step reference value) exhibit a product coupling relationship, which constitutes a typical nonlinear constraint. This nonlinear constraint cannot be directly solved and requires linearization processing. To address this issue, this study leverages the 0–1 logical characteristics of binary variables and combines them with the Big M method to construct a set of linear inequality constraints, thereby realizing the equivalent linear transformation of the nonlinear relationship. The Big M value is set as the upper bound of the continuous variable p step , m , s ; in this model p step , m , s ϵ [ 0 , 1 ] , so the Big M value is set to 1. For each hour h and each step s, two linear inequality constraints are constructed as follows:
p curve , m , h − p step , m , s ≤ M · 1 − y m , h , s
p step , m , s − p curve , m , h ≤ M · 1 − y m , h , s
Since the per-unit value p step , m , s ∈ [0, 1], setting Big M = 1 provides the tightest feasible upper bound, avoiding numerical ill-conditioning and convergence issues caused by an overlarge M value. The model has been tested in three mainstream commercial solvers: Gurobi, CPLEX, and XPRESS. All tests show stable convergence, no numerical instability, no infeasibility, and no degeneracy, fully meeting engineering solution requirements.
At the same time, by incorporating the existing hourly level uniqueness constraint ∑ s ∈ S y m , h , s = 1 in the model, we achieve full linearization of the nonlinear constraints.

3.1.2. Linearization of Nonlinear Constraints for Hydropower Output Variations

Constraints on hydropower output variations must simultaneously limit both the magnitude of intraday output changes and the number of adjustments. In the original constraints, there exists a nonlinear relationship between the output change and the binary auxiliary variable δ hydro , i , m , d , h , which denotes whether the hydropower unit i undergoes an output adjustment at time slot h on day d of month m. To address this nonlinearity, the Large M method is adopted for system linearization, and the maximum output variation amplitude M hydro , i for hydropower unit i is introduced. For each hydropower unit and each time slot, a pair of linear inequality constraints is constructed.
p h y d r o i , m , d , h − p h y d r o i , m , p r e v _ d , p r e v _ h ≤ M hydro , i ⋅ δ hydro , i , m , d , h
p h y d r o i , m , p r e v _ d , p r e v _ h − p h y d r o i , m , d , h ≤ M hydro , i ⋅ δ hydro , i , m , d , h
Implementing precise linear constraints on fluctuations in hydroelectric power output ensures compliance with the physical limitations of equipment operation while avoiding frequent starts and stops of the units.

3.1.3. Linearization of Nonlinear Constraints in Pumped-Storage Operation Coupling System

Pumped-storage units typically operate in two distinct modes: power generation (with positive output) and water pumping (with negative output). The polarity switching of the original output variable p cx , j , m , d , h introduces a nonlinear coupling associated with the constraint that “pumping power must be supplied solely by local clean energy.” To resolve this nonlinearity, a variable decomposition strategy is adopted in this study. The unipolar pumped-storage output variable is decomposed into two nonnegative continuous variables: pumped-storage generation power p cxgen , j , m , d , h and pumped-storage pumping power p cxpump , j , m , d , h . A linear equality constraint is then formulated as p cx , j , m , d , h = p cxgen , j , m , d , h − p cxpump , j , m , d , h . This approach converts the nonlinear logical relationship of output polarity switching into linear operations between two nonnegative variables, enabling a linearized representation of pumped-storage operating states.
To enforce the critical engineering requirement that “pumping power shall not be sourced from the external power grid,” a linear inequality constraint is directly constructed as follows:
p cx _ pump _ total , m , d , h ≤ ∑ i ∈ I p hydro , i , m , d , h + p wind , m , d , h + p solar , m , d , h
By establishing a linear relationship between the total pumping power and the total local clean energy output, the power supply for pumping is strictly constrained, thus completely eliminating the nonlinear modeling issues inherent in pumped-storage operation.

3.2. Multi-Objective Optimization

The three objectives (curtailment rate, load matching error, delivered electricity) are normalized into the range [0, 1] to eliminate dimensional differences. Then, the linear weighted sum method is used to combine Equations (2)–(4) into the comprehensive objective Equation (1). The weight coefficients α, β, and γ satisfy α + β + γ = 1, reflecting the engineering priority of each objective. The multi-objective integration strategy adopts a linear weighted summation approach to construct a comprehensive objective function. First, the three optimization objectives are individually normalized and mapped to the [0, 1] interval to fully eliminate the influence of dimensional discrepancies on model solution. The curtailment rate is directly normalized using the ratio of total curtailed energy to total wind and solar power generation. The load matching error is normalized via the mean absolute error between the DC transmission curve and the nominal load curve at the receiving end. The delivered electricity is normalized as deliveryterm = totaldelivery/max_possible_delivery, which is a benefit term (a higher value means better performance). It is combined with curtailment rate and load matching error through linear weighting. Subsequently, weight coefficients α (for curtailment rate), β (for load matching error), and γ (for transmitted power) are determined according to engineering priorities, subject to the constraint α + β + γ = 1. Through flexible adjustment of these weights, the model enables targeted regulation of optimization objectives, which is highly consistent with the practical engineering principles of prioritizing local consumption, precise load matching, and efficient outward power delivery.

3.2.1. Solver and Parameter Settings

The Gurobi solver is employed as the core optimization engine, which provides high-performance solution capabilities for mixed-integer linear programming (MILP) problems and is well compatible with the linear programming structure of the proposed model involving both binary and continuous variables. Other widely used solvers for MILP problems in power system optimization include CPLEX, XPRESS, GLPK, SCIP, BARON, and Bonmin. Among them, Gurobi is chosen for its high solution efficiency and stability. To satisfy the engineering demand for monthly rolling optimization, key solution parameters are configured as follows: MipGap = 0.05, which balances solution accuracy and computational efficiency; TimeLimit = 1800 s for single-month optimization, meeting the real-time scheduling requirements of power systems; multi-thread parallel computing is activated (Threads = number of CPU cores) to fully exploit hardware resources; and Presolve = 2 is adopted to automatically simplify redundant constraints and reduce solution complexity. Corresponding convergence tolerance (ratioGap = 0.05) and time parameters are also configured to ensure stable and robust model solving.

3.2.2. Monthly Rolling Solution Framework

The model adopts a monthly rolling solution strategy, in which the annual optimization problem is decomposed into 12 sequential monthly subproblems with the month as the basic time scale. The pumped-storage energy state at the end of the preceding month is set as the initial condition for the next month, ensuring the continuity of pumped-storage operation and the temporal consistency of multi-energy coordinated operation. After each monthly solution, key results including DC transmission curves, multi-energy output profiles, curtailment rates, and load matching errors are exported for visualization and data analysis. The solution results are further verified against critical engineering constraints such as pumped-storage operational limits, DC transmission constraints, and main grid support ratio requirements. If any constraint violation occurs, the weight coefficients or constraint parameters are adjusted iteratively until all engineering specifications are satisfied.
After linearization modeling and multi-objective optimization configuration, the proposed model can accomplish the annual monthly rolling optimization within an acceptable computation time. The solution not only satisfies all engineering constraints and optimization objectives but also exhibits favorable computational efficiency and engineering practicability, thus providing quantitative support for the scientific formulation of cross-regional power transmission schemes for large-scale clean energy bases.

3.3. Uncertainty Handling and Robustness Analysis

The monthly rolling optimization framework adopted in this paper can update forecast data of wind and PV output month by month, dynamically correcting forecast bias from the previous period and reducing the impact of long-term error accumulation on optimization results. To further verify the robustness of the model under the uncertainty of renewable generation, three typical forecast error scenarios ±5%, ±10%, and ±15% are designed for sensitivity analysis. The results show that within the ±10% error range, the curtailment rate fluctuates by less than 1.2%, the load matching error fluctuates within 0.05, and the power delivery curve remains stable and feasible. The proposed linearized model structure can be directly extended to stochastic linear programming or robust optimization models. By introducing a probabilistic scenario set of wind and PV output or robust constraints, stronger adaptability to uncertainty can be achieved to meet scheduling requirements under nonideal forecast conditions in engineering practice.
The detailed robustness test results based on the actual case are presented in Section 4.3.4.

4. Case Study

4.1. Engineering Background

Driven by the “dual carbon” targets and the construction of a new-type power system, integrated clean energy bases featuring hydro–wind–solar complementation in river basins have become core carriers for the optimal cross-regional allocation of energy resources in China. This paper takes a national-level integrated hydro–solar–wind clean energy base in a river basin in southwest China as a case study. As a core power source for the southern corridor of the West-to-East Power Transmission project, this base represents a typical demonstration of the coordinated development of cascade hydropower, photovoltaic power, and pumped-storage hydropower within the basin, as shown in Figure 2. The formulation of its power transmission curve directly affects the power supply reliability of receiving-end load centers and the consumption efficiency of clean energy, thus rendering it highly representative for relevant research.
Figure 2. Geographical map of cascade basin.
The base is endowed with high-quality hydropower and solar energy resources, as well as favorable topographic and geological conditions for the construction of pumped-storage power plants. It has formed a multi-energy complementary system characterized by “hydropower as the foundation, photovoltaics as the main body, and pumped-storage as the regulation core”. The system mainly consists of two cascade hydropower stations with a total installed capacity of 2160 MW, three pumped-storage power plants with a total installed capacity of 3600 MW, and 17 photovoltaic power stations with a total installed capacity of 24,000 MW.
Power is delivered from the base to a provincial power grid in a major load center through a ±800 kV ultra-high-voltage direct current (UHVDC) transmission line with a rated transmission capacity of 8000 MW. The receiving-end region features a large electricity demand and a prominent peak regulation shortage, with a daily peak–valley load difference exceeding 35%, which imposes stringent requirements on the matching degree and smoothness of the transmission power curve. At present, the traditional method for determining the transmission curve of the base is plagued by problems including weak load matching performance, inadequate consideration of pumped-storage operational constraints, and low solving efficiency, creating an urgent need to upgrade the optimization approach. This paper adopts the above case to verify the engineering applicability of the proposed model and provide a technical reference for the planning and operation of similar integrated clean energy bases. The specific parameters are shown in the table below.

4.2. Results of the Three-Objective Optimization Implementation

To investigate the interactions among the three optimization objectives and guide rational weight selection, Figure 2 presents heatmaps illustrating the pairwise relationships between the renewable curtailment rate, load matching error, and power delivery volume across varying weight combinations. The results reveal both synergistic effects and trade-offs among the three objectives, which are analyzed in detail below from the perspective of each individual weight parameter.
Figure 3 is a heatmap that illustrates the mutual relationships and variation trends among the three optimization objectives under different weight combinations. It intuitively reflects the trade-offs and coordination between the renewable curtailment rate, load matching error, and power delivery volume, and supports the determination of the optimal weight range proposed in this paper.
Figure 3. Heatmap of Relationships Among Three Targets.

4.2.1. The Effect of the Weight α on the Power Curtailment Rate

When α = 0, the curtailment rate increases steadily from 9.74% to 20.36% with the increase in β. Without the optimization constraint on the curtailment rate, the curtailment rate peaks at over 20%, leading to a significant decrease in the utilization efficiency of wind and solar resources. When α ≥ 0.3, the curtailment rate remains relatively stable within the range of 9.15% to 9.48%. Even as the weight of β increases, the curtailment rate does not rise significantly, indicating that effective control of the curtailment rate can be achieved when α ≥ 0.3. This keeps the wind and solar curtailment rate below 10% and ensures the efficient integration of clean energy. When α = 1, the curtailment rate decreases to 9.16%, the optimal value among all experimental runs, which verifies the central regulatory role of the α weight in curtailment rate control.

4.2.2. The Effect of the Weight β on the Load-Matching Error

The load matching error demonstrates a strong negative correlation with the weight β and a positive correlation with the weight α. Specifically, β is identified as the key determinant governing the alignment between the transmission curve and the receiving-end load profile. When β = 0, the load matching error is fixed at 1, indicating that the model completely neglects load matching requirements. Consequently, the generated transmission curve is entirely decoupled from the receiving-end load characteristics, failing to meet the dispatch demands of the grid. In contrast, when β ≥ 0.1, the load matching error drops sharply to approximately 0.26 and continues to decrease with increasing β. Once β ≥ 0.6, the load matching error stabilizes within a narrow range of 0.09 to 0.10. Under this condition, the mean absolute error between the delivered power curve and the receiving-end load is less than 0.1, which satisfies the matching precision required for practical engineering applications. Furthermore, when α ≥ 0.8, the load matching error can still be constrained within 0.2473 even when β is increased to 0.2. This result validates that a favorable balance between curtailment rate control and load matching accuracy can be achieved under such parameter combinations.

4.2.3. The Effect of the Weight γ for Maximizing Power Output

The transmitted electricity volume exhibits a positive correlation with the weight γ and negative correlations with the weights α and β. The weight γ directly determines the utilization efficiency of the UHV transmission line. When γ = 1 (i.e., α = β = 0), the total transmitted electricity reaches 470,669 × 104 kWh, approaching its theoretical optimum. Under this condition, the model prioritizes full-capacity power transmission at the expense of curtailment rate control and load matching accuracy.
When γ ≥ 0.7 and α ≥ 0.3, the transmitted power remains stable above 470,000 × 104 kWh, maintaining high utilization efficiency of the transmission line.
When β ≥ 0.5 and γ ≤ 0.5, the transmitted electricity volume gradually decreases to approximately 430,000 × 104 kWh with increasing β. This indicates that excessive emphasis on load matching accuracy reduces the utilization efficiency of the UHV transmission line, highlighting the necessity of a balanced weight allocation strategy.

4.2.4. Synergy and Trade-Offs Among the Three Major Objectives

The test results indicate a significant trade-off among the three key objectives, namely the curtailment rate, load matching error, and power export, while coordinated optimization can be achieved within a reasonable weighting range. The core principles are summarized as follows:
(1)
Trade-off between curtailment rate and load matching error: Overly prioritizing the curtailment rate (α → 1) results in a fixed load matching error of 1, meaning the model loses the ability to track the receiving-end load profile. Conversely, excessively emphasizing load matching accuracy (β → 1) causes the curtailment rate to exceed 20%, significantly degrading the integration efficiency of wind and solar energy. Since the two objectives cannot be fully optimized simultaneously, a reasonable balance must be established by adjusting the weights α and β.
(2)
Synergy and trade-off between power export and the other two objectives: When γ ≥ 0.7 and α ≥ 0.3, power export remains above 470,000 × 104 kWh while the curtailment rate is controlled within 9.5%, realizing the synergistic optimization of high outward power transmission and low renewable energy curtailment. When β ≥ 0.3, the transmitted power gradually declines with increasing β, showing a clear trade-off that improved load matching is accompanied by reduced transmission volume. This phenomenon arises because the transmission power needs to be regulated adaptively to match the peak–valley characteristics of the receiving-end load, at the cost of certain transmission line utilization efficiency.
(3)
Three-objective collaborative interval: When α ∈ [0.3, 0.8], β ∈ [0.1, 0.2], and γ ∈ [0.1, 0.6], the three objectives achieve favorable collaborative optimization, with the curtailment rate ≤ 9.61%, the load matching error ≤ 0.2678, and the transmitted power ≥ 470,074.321 × 104 kWh. This weighting scheme ensures efficient accommodation of wind and solar energy, satisfies the basic load matching demand of the receiving-end grid, and maintains high-efficiency utilization of UHV transmission lines at the same time.
The above relationships are clearly exhibited in Figure 2, which provides a direct reference for weight selection in practical engineering applications.
To clearly show the trade-offs and coordination among the three objectives, a summary under different weight intervals is listed in Table 1.
Table 1. Case Study Basic Parameters.

4.3. Analysis of Multi-Energy System Coordination Characteristics

Table 2 intuitively presents the performance of the three objectives under different weight preferences, which can clearly guide weight selection in practical engineering.
Table 2. Summary of three objectives under different weight intervals.
Based on the analysis in Section 4.2, the parameters α = 0.5, β = 0.15, and γ = 0.35 were selected to analyze the characteristics of multi-energy coordinated operation.

4.3.1. Characteristics of Multi-Energy Coordinated Operation During the August Flood Season

As a typical month during the flood season, August is characterized by abundant hydropower inflows and sufficient photovoltaic resources. Meanwhile, the receiving-end power grid faces summer peak electricity demand, with a pronounced difference between daily peak and valley loads and extended peak load duration, as shown in Figure 4 and Figure 5. The total monthly wind and solar power generation amounts to 306,717.74 × 104 kWh, with a curtailment rate of 12.09% and an average load matching error of 0.2754. The total electricity delivered to external regions reaches 438,710.33 × 104 kWh. The multi-energy coordinated operation demonstrates the core features of “full-capacity hydropower support, photovoltaic-dominated output, efficient absorption by pumped-storage units, and full-capacity transmission through power corridors.”
Figure 4. Typical daily power generation profile in August (flood season).
Figure 5. Delivery curve and load curve in August.
(1)
Early morning off-peak period (00:00–07:00)
No photovoltaic generation is available. Hydropower maintains a stable baseload output of 2160 MW. Pumped-storage units operate flexibly according to transmission requirements. During 00:00–03:00, pumped-storage remains in standby mode, and hydropower alone delivers 2160 MW. From 04:00 to 07:00, pumped-storage units consume power for water pumping at 1259.9 MW, coordinating with hydropower to achieve a total transmission capacity of 3419.9 MW. This arrangement precisely matches the low-load demand of the receiving-end grid in early summer mornings, with no external power purchased from the main grid and no energy curtailment.
(2)
Daytime peak period (08:00–19:00)
Photovoltaic output rises to its peak range of 5791.2 MW to 9604.5 MW, acting as the dominant power source. Hydropower maintains a steady output of 2160 MW, while pumped-storage units operate at full pumping capacity to absorb surplus renewable energy. The pumping power varies synchronously with photovoltaic generation, ranging from 474.6 MW to 3764.5 MW, effectively absorbing excess PV power. Meanwhile, the combined output of hydropower, photovoltaics, and pumped-storage regulation precisely meets the full-capacity transmission requirement of 8000 MW for the UHV DC line. This period accounts for the majority of energy curtailment in August, mainly because the peak photovoltaic output of 9604 MW exceeds the total accommodating capacity of the transmission line and pumped-storage absorption, leading to a total curtailed energy volume of 37,074.28 × 104 kWh.
(3)
Nighttime off-peak period (20:00–23:00)
Photovoltaic output drops rapidly to zero, while the receiving-end load remains at a medium-to-high level. Hydropower continues to generate at full capacity of 2160 MW, and pumped-storage units switch from pumping to generating mode, providing an output of 3600 MW to 4080 MW. The two sources jointly achieve a stable power transmission of 6240 MW, with no main-grid power purchase and no energy curtailment. This operation effectively fills the gap caused by the disappearance of PV output and matches the summer nighttime load characteristics of the receiving-end system.
(4)
The Core Regulatory Role of Pumped-Storage Units
Throughout August, pumped-storage units strictly complied with the constraint that “pumping power is supplied exclusively by local clean energy”, with the entire pumping power derived from hydropower and photovoltaic (PV) output, and no electricity consumed from the main grid. During daytime peak periods, the pumping power of pumped-storage units exhibited a strong positive correlation with PV output, maximizing the absorption of surplus PV power and effectively reducing renewable energy curtailment. During nighttime off-peak periods, the units rapidly switched to power generation mode, acting as the primary power source to fill the gap left by the absence of PV output and ensuring no sudden drops in the power transmission curve. The bidirectional regulatory function of pumped-storage units in August—“pumping to absorb surplus PV power and generating to fill output gaps”—was the key to maintaining a smooth power transmission curve despite the high PV output during the flood season.
(5)
Transmission Curve and Load Matching Characteristics at the Receiving End
The stepped transmission curve proposed for August is divided into three core segments, which fully align with the fluctuation characteristics of the receiving-end summer load: “early morning trough, daytime peak, and nighttime flat period”. Specifically, the transmission levels are 2160 MW to 3412 MW from 00:00 to 07:00, 8000 MW from 08:00 to 19:00, and 6240 MW from 20:00 to 23:00. The duration of each segment meets the minimum duration constraint of the project, avoiding the need for frequent power adjustments. The full-power transmission period at 8000 MW accounts for 50% of the total time, which closely matches the duration of the receiving-end summer peak load. The average load matching error is 0.2754, lower than the annual average, achieving precise matching of the power transmission curve under the peak load conditions of the flood season.

4.3.2. Characteristics of Multi-Energy Coordinated Operation During the Dry Season in December

December represents a typical month in the dry season, featured by limited hydropower inflow and lowered peak photovoltaic output under winter solar conditions, as shown in Figure 6 and Figure 7. Correspondingly, the receiving-end power grid confronts winter peak load demand, exhibiting a typical diurnal pattern of “high daytime peaks and deep nighttime troughs”. The total monthly wind and solar power generation amounts to 326,345.49 × 104 kWh, with a curtailment rate of 11.84% and an average load matching error of 0.3066. The total electricity delivered to external regions reaches 330,153.64 × 104 kWh. The multi-energy coordinated operation demonstrates the core characteristics of “on-demand hydropower generation, photovoltaic-dominated power supply, precise regulation by pumped-storage units, and small reserve capacity support from the main grid”.
Figure 6. Typical daily power generation profile in December (dry season).
Figure 7. Typical daily delivery curve and load curve in December.
(1)
Early morning off-peak period (00:00–08:00)
Photovoltaic generation is absent. Hydropower output is constrained within 173 MW to 127.98 × 104 kW, and pumped-storage units act as the core regulation resource. During 00:00–03:00, hydropower provides 1279.8 MW while pumped-storage operates in pumping mode at 682.2 MW, jointly realizing a transmission level of 1962 MW. From 04:00 to 08:00, hydropower output decreases to 173 MW, whereas pumped-storage switches to generation mode with an output of 2250 MW, delivering a combined power of 2423 MW. This configuration accurately matches the deep off-peak load demand of the receiving-end grid in early winter mornings, with no power purchase from the main grid and no energy curtailment.
(2)
Daytime peak period (09:00–17:00)
Photovoltaic output rises to its peak range of 5228.3 MW to 12,564.3 MW, becoming the absolute main power source for outward transmission. Hydropower maintains a low output of 173 MW, and pumped-storage units mainly absorb surplus renewable energy through pumping. The pumping power increases synchronously with PV output up to 4737.3 MW to accommodate excess photovoltaic generation. The coordinated output of hydropower, photovoltaics and pumped storage precisely satisfies the full-capacity transmission requirement of 800 × 104 kW for the UHV transmission line. This period witnesses the only energy curtailment in December, since the peak PV output of 1256.43 × 104 kW far exceeds the transmission capacity of the line, leading to a total curtailed energy volume of 386.4088 × 104 kWh.
(3)
Nighttime off-peak period (18:00–23:00)
Photovoltaic output drops rapidly to zero. As the receiving-end load enters the deep winter off-peak stage, hydropower output recovers to 1279.8 MW, and pumped-storage plants switch from pumping to standby or low-power generation mode. The combined output of the two sources achieves a transmission level of 2423 MW, which fully matches the deep off-peak load profile at the receiving end on winter nights, with no external power support from the main grid and no energy curtailment.
➢
The Core Regulatory Role of Pumped-Storage Units
In December, the regulatory role of pumped-storage units was characterized by “precise adaptation.” With hydropower output constrained during the dry season, pumped-storage units became the primary power source during the early morning off-peak hours and the primary power absorption source during daytime peak hours. The power required for pumping throughout the process was still supplied by local hydropower and solar power, with no consumption of electricity from the main grid. During daytime peak hours, pumped-storage units operated at full pumping capacity to absorb surplus photovoltaic output, alleviating the pressure of renewable energy curtailment; during early morning off-peak hours, they switched to power generation mode to compensate for insufficient hydropower output, ensuring a baseline transmission capacity and achieving the optimal allocation of energy resources during the dry season.
➢
Transmission Curve and Load Matching Characteristics at the Receiving End
The tiered transmission curve proposed for December aligns with the winter load characteristics at the receiving end, which feature a “large peak-to-valley difference and deep nighttime troughs.” It is divided into three core tiers: 1962 MW to 2423 MW from 00:00 to 08:00, 800 × 104 kW from 09:00 to 17:00, and 2423 MW from 18:00 to 23:00. The full-power transmission period at 8000 MW is concentrated during the overlap between the daytime peak of photovoltaic output and the daytime peak of the receiving-end load, while nighttime transmission drops to a low level of 2423 MW, precisely matching the deep trough of the winter nighttime load. Although the average load matching error of 0.3066 is slightly higher than that in August, this represents the optimal result given the constraints on hydropower output during the dry season and the greater peak-to-trough load difference, and it meets the actual operational dispatch requirements.

4.3.3. A Comparative Analysis of Multi-Energy Coordination During the Flood and Dry Seasons

  • Key differentiating features During the Flood and Dry Seasons
We summarize the core differences in hydropower operation, pumped storage regulation focus, transmission line characteristics, load matching strategies, and energy support structures between the flood season and dry season in Table 3.
Table 3. Key differentiating features.
2.
Common Operational Patterns During the Flood and Dry Seasons
(1)
Photovoltaic power serves as the primary daytime generation source: Regardless of flood or dry season, photovoltaic (PV) output peaks between 08:00 and 17:00, acting as the core support for full-capacity transmission via ultra-high-voltage (UHV) lines. The pumping and absorption operations of pumped-storage units are synchronized with PV output peaks, maximizing the integration efficiency of wind and solar energy.
(2)
Pumped-storage constitutes the core of cross-time-slot power balancing: In both flood and dry seasons, pumped-storage operations strictly comply with the constraint that “pumping power is supplied exclusively by local clean energy.” By switching between pumping and generating modes, pumped-storage units mitigate PV output fluctuations and fill gaps in PV generation, serving as the sole core regulatory mechanism for realizing a smooth power transmission curve.
(3)
Power transmission curves align with the peak–valley patterns of receiving-end loads: The step divisions and power levels of the stepped power transmission curves in both flood and dry seasons are highly consistent with the seasonal load characteristics of the receiving end. Frequent power adjustments are eliminated, complying with the operational standards of DC transmission projects, and the load matching errors remain within ranges acceptable for practical engineering applications.
(4)
Curtailment is concentrated during periods of peak photovoltaic output: In both flood and dry seasons, energy curtailment occurs exclusively during daytime PV output peaks. The primary cause is that peak PV output exceeds the 800 × 104 kW transmission capacity of the UHV corridor, while pumped-storage facilities have already reached full-load absorption capacity with no additional margin available. The curtailment rate is consistently controlled below 12%, achieving efficient utilization of wind and solar resources.

4.3.4. Robustness Test Under Renewable Output Forecast Errors

To verify the robustness of the proposed method under uncertain wind and PV output, three forecast error scenarios (±5%, ±10%, ±15%) are tested based on the actual case data. The results show that when the forecast error is within ±10%, the renewable curtailment rate changes by less than 1.2%, the average load matching error changes by less than 0.05, and the power delivery curve still meets all UHVDC operation constraints and pumped-storage constraints. The delivery curve remains stable and feasible, which proves that the proposed method has strong robustness against forecast uncertainty and can meet the requirements of practical engineering scheduling.

4.4. Comparative Analysis of Solution Performance of Different Optimization Methods

To verify the advantages of the proposed linearized method in solution efficiency and optimization performance, the proposed model solved by Gurobi is compared with a traditional nonlinear model solved by IPOPT and a genetic algorithm (GA). Indicators include solution time, optimality gap, and constraint satisfaction rate. The results show that the single-month solution time of the linear method is approximately 120 s, 86% shorter than IPOPT and 92% shorter than GA. The optimality gap is less than 5%, and the constraint satisfaction rate is 100%. In contrast, the nonlinear model often suffers from slow convergence and constraint violations, while heuristic algorithms can hardly guarantee global optimality. Case results clearly demonstrate that the proposed linearized method is significantly superior to traditional methods in computational efficiency and engineering feasibility. The relevant comparisons are shown in Table 4.
Table 4. Baseline Comparison.

4.5. Model Scalability Analysis

The monthly rolling linear optimization model established in this paper has favorable scalability. The model uses a modular structure: adding a new clean energy base only requires inserting constraint modules for hydropower, wind, PV, and pumped-storage; adding a new receiving province only requires introducing load matching and tie-line power constraints. Computational complexity increases linearly without dimensional disaster. The monthly rolling framework and linearized structure can be directly adapted to a nationwide cross-regional transmission system with multiple bases, multiple receiving provinces, and multiple DC corridors, providing a unified technical framework for delivery curve formulation of large-scale clean energy base groups.

5. Conclusions

The method proposed in this paper for deriving power transmission curves for clean energy bases, which accounts for the load demand of receiving-end provinces, has been validated through engineering case studies and proven to be practical and effective. The key conclusions are summarized as follows:
(1)
The proposed linearized optimization modeling method is well-adapted to practical engineering applications. By linearizing core constraints and adopting a monthly rolling optimization framework, this method resolves the issues of low solution efficiency and disconnection from real-world operation inherent in traditional models. It effectively improves the alignment between power transmission and load demand, reduces the curtailment rate of renewable energy, and simultaneously satisfies various operational safety constraints (e.g., pumped-storage operation limits and DC transmission requirements), thereby providing robust technical support for the scientific formulation of cross-regional power transmission curves. Compared with nonlinear models and heuristic methods, the solution efficiency is improved by more than 85%, and the constraint satisfaction rate reaches 100%.
(2)
Clear trade-offs and synergies exist among the three objectives: curtailment rate, load matching error, and power export volume. When the weight parameters fall within the range of α ∈ [0.3, 0.8], β ∈ [0.1, 0.2], and γ ∈ [0.1, 0.6], a comprehensive optimization of curtailment rate control, load matching accuracy, and UHV transmission line utilization efficiency can be achieved.
(3)
Multi-energy coordinated operation exhibits distinct seasonal characteristics while following core common patterns. During the flood season, hydropower and photovoltaic (PV) power act as dual core sources, with pumped storage providing bidirectional balancing regulation. During the dry season, PV serves as the sole core, and pumped-storage prioritizes load compensation over power absorption. In both seasons, PV remains the primary daytime power source, pumped storage functions as the core mechanism for power balancing, and energy curtailment is concentrated during PV output peaks, with the curtailment rate controlled within 12%.
(4)
Coordinated regulation between pumped-storage and cascade hydropower is the key to formulating precise power delivery curves. Together, they form a multi-energy complementary system that mitigates fluctuations in wind and solar power output and adapts precisely to the peak–valley load variations in the receiving-end grid. This approach not only adheres to the constraint of local clean energy supply for pumped-storage operations but also alleviates the peak-shaving pressure on the receiving-end grid and enhances the efficiency of clean energy consumption.
(5)
The step-wise power transmission curve design aligns with engineering dispatch requirements. It balances the accuracy of load tracking at the receiving end with the computational efficiency of model solving, while avoiding equipment wear caused by frequent adjustments to transmission power. The normalization design ensures precise matching with the receiving-end load profile, while guaranteeing that the transmission power does not exceed the capacity limit of the DC transmission corridor. The model has favorable scalability and can support large-scale engineering applications with multiple clean energy bases and multiple receiving provinces.

Author Contributions

Conceptualization, X.H. and J.Z.; methodology, X.H., X.Q. and Y.Z.; formal analysis, X.H., X.Q., J.G. and Y.Z.; resources, Z.Z., J.G. and X.Q.; data curation, X.H. and J.Z.; writing—original draft preparation, X.H.; writing—review and editing, X.H. and C.C.; visualization, X.H. and J.Z. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the Science and Technology Strategy Consulting Project of Chinese Academy of Engineering (Research on Development Technology and Development Strategy of Hydro-Wind-Solar-Storage Bases), grant number 2025-XZ-89; the Science and Technology Project of HYDROCHINA Engineering Consulting, grant number ZX-KJGH-20250003; and the China Water Resources and Hydropower Engineering Consulting Co., Ltd. Independent R&D Project, grant number ZX-KJGH-20250011.

Data Availability Statement

Dataset available on request from the authors.

Conflicts of Interest

Authors Xu Han, Xiao Qin, Jie Gao, Yue Zhao, and Zenghai Zhao were employed by the China Renewable Energy Engineering Institute. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as potential conflicts of interest. The funding sponsors had no role in the design of the study; in the collection, analyses, or interpretation of data; in the writing of the manuscript, and in the decision to publish the results.

References

  1. Othman, M.E.F.; Sidek, L.M.; Basri, H.; El-Shafie, A.; Ahmed, A.N. Climate challenges for sustainable hydropower development and operational resilience: A review. Renew. Sustain. Energy Rev. 2025, 209, 115108. [Google Scholar] [CrossRef] [Scilit]
  2. Wu, B.; Wang, X.; Wang, B.; Qi, S.; Sun, W.; Huang, Q.; Ma, X.; Xie, Y. Advancing scenario generation in large-scale clean energy bases via enhanced hyperparameter optimization techniques. Int. J. Electr. Power Energy Syst. 2025, 166, 110563. [Google Scholar] [CrossRef] [Scilit]
  3. Liu, M.; Zhang, B.; Wang, J.; Liu, H.; Wang, J.; Liu, C.; Zhao, J.; Sun, Y.; Zhai, R.; Zhu, Y. Optimal Configuration of Wind-PV and Energy Storage in Large Clean Energy Bases. Sustainability 2023, 15, 12895. [Google Scholar] [CrossRef] [Scilit]
  4. Wang, H.; Jiang, C.; Mu, F.; Liu, K.; Mao, R.; Yin, X. Climatological characterisation and trends of extreme winds and their application to power transmission lines in China. Nat. Hazards 2026, 122, 167. [Google Scholar] [CrossRef] [Scilit]
  5. Zheng, W.; Da, S.; Shi, D.; Cheng, C. Intelligent Algorithms and Big Data Technology in Power Transmission Systems: Efficient, Reliable, and Sustainable Energy Transmission. In Proceedings of the 2024 International Conference on Power Electronics and Artificial Intelligence, Xiamen, China, 19–21 January 2024; pp. 401–405. [Google Scholar]
  6. Sun, J.; Su, C.; Song, J.; Yao, C.; Ren, Z.; Sui, Q. Capacity planning for large-scale wind-photovoltaic-pumped hydro storage energy bases based on ultra-high voltage direct current power transmission. Energy 2025, 320, 135224. [Google Scholar] [CrossRef] [Scilit]
  7. Migliari, L.; Micheletto, D.; Cocco, D. A hydrogen-fuelled compressed air energy storage system for flexibility reinforcement and variable renewable energy integration in grids with high generation curtailment. Energy Convers. Manag. 2024, 306, 118308. [Google Scholar] [CrossRef] [Scilit]
  8. Xiao, S.; Song, X. Environmental value co-creation in the power system: The role of green transformation on both power supply and demand sides. Renew. Energy 2025, 256, 124483. [Google Scholar] [CrossRef] [Scilit]
  9. Liu, X.; Huang, B.; Zheng, Y. Control strategy for dynamic operation of multiple chillers under random load constraints. Energy 2023, 270, 126932. [Google Scholar] [CrossRef] [Scilit]
  10. Yang, M.; Wang, J.; Zhou, Y.; Han, G.; Kang, J. Optimal configuration of integrated energy system based on multiple energy storage considering source-load uncertainties under different risk tendencies. J. Energy Storage 2025, 109, 115220. [Google Scholar] [CrossRef] [Scilit]
  11. Li, Z.H.; Cui, J.X.; Wei, Y.K.; Huang, Y.H.; Xie, H.C.; Yao, W.F. Calculation study of ion flow field in ±800 kV transmission lines under the effects of air pressure, temperature, humidity and improvement measures. Electr. Power Syst. Res. 2024, 234, 110574. [Google Scholar] [CrossRef] [Scilit]
  12. Li, Y.; Wang, T.; Chen, S.; Hu, X.; Yin, R.; Yan, J. Prediction method for power fluctuations in cross regional consumption and transportation under the integration of new energy. RAIRO Oper. Res. 2024, 58, 3501–3519. [Google Scholar] [CrossRef] [Scilit]
  13. Wang, S.; Liu, C.; Chen, F. Evaluation of Peak Shaving and Valley Filling Efficiency of Electric Vehicle Charging Piles in Power Grids. Energies 2025, 18, 5284. [Google Scholar] [CrossRef] [Scilit]
  14. Acosta, M.N.; Gonzalez-Longatt, F.; Andrade, M.A.; Torres, J.L.R.; Chamorro, H.R. Assessment of Daily Cost of Re-active Power Procurement by Smart Inverters. Energies 2021, 14, 4834. [Google Scholar] [CrossRef] [Scilit]
  15. Zhou, Y.; Wei, F.; Li, S.; Wang, Z.; Liu, J.; Yu, D. Data center load modeling through optimal energy consumption characteristics: A path to simultaneously enhance energy efficiency and demand response quality. Appl. Energy 2025, 393, 126095. [Google Scholar] [CrossRef] [Scilit]
  16. Xie, Z.; Wang, Y.; Chang, J.; Guo, A.; Niu, C.; Zheng, Y.; Tian, Z. Optimal scheduling and benefit sharing of hybrid pumped storage hydropower plants with multiple operators. Energy 2025, 333, 137242. [Google Scholar] [CrossRef] [Scilit]
  17. Dong, Y.; Li, X.; Yao, L. Optimal Scheduling of Mobile Energy Storage Systems for Peak Shaving and Valley Filling Based on Wave Search Algorithm. In Proceedings of the 2025 8th International Conference on Power and Energy Applications (ICPEA), Shanghai, China, 23–25 October 2025; IEEE: New York, NY, USA, 2025; pp. 604–608. [Google Scholar]
  18. Bian, J.; Zhou, Z.; Yu, Z.; Chen, H.; Yuan, X. Characterization of Multi-Energy Synergistic Outward Transmission for Clean Energy Bases. In Proceedings of the 2025 10th Asia Conference on Power and Electrical Engineering (ACPEE), Beijing, China, 15–19 April 2025; IEEE: New York, NY, USA, 2025; pp. 432–438. [Google Scholar]
  19. Sorensen, B. Renewable Energy; Elsevier: Amsterdam, The Netherlands, 2004. [Google Scholar]
  20. Sun, F.; Li, Q.; Wang, W. Frequency Regulation Reserve Allocation for Integrated Hydropower Plant and Energy Storage Systems via the Marginal Substitution. Electronics 2025, 14, 1582. [Google Scholar] [CrossRef] [Scilit]
  21. Baratgin, L.; Polcher, J.; Dumas, P.; Quirion, P. Modeling hydropower operations at the scale of a power grid: A demand-based approach. Hydrol. Earth Syst. Sci. 2024, 28, 5479–5509. [Google Scholar] [CrossRef] [Scilit]
  22. Cao, P.; Deng, C.; Zhang, X.; Zhang, Y.; Feng, L.; Wang, K. Real-Time Optimal Dispatching Strategy for Wind–Thermal–Storage Integrated System with Adaptive Time Division and Variable Objectives. Electronics 2025, 14, 2842. [Google Scholar] [CrossRef] [Scilit]
  23. Hussain, A.; Huseynova, A.; Hakimova, Y.; Nassani, A.A.; Bo, B. Energy efficiency and emission flexibility: Management and economic insights for renewable energy integration. Energy Strat. Rev. 2025, 57, 101631. [Google Scholar] [CrossRef] [Scilit]
  24. Liang, Y.; Xie, Y.; Dai, S.; Liang, Y.; Chen, K.; Li, Q. Configuration Optimization of Dispatchable Sources of Large Clean Energy Base. In Proceedings of the 2024 7th International Conference on Power and Energy Applications (ICPEA), Taiyuan, China, 18–20 October 2024; pp. 690–697. [Google Scholar]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.