Abstract

The Melan system, pioneered by Austrian engineer Josef Melan in the late 19th century, revolutionised concrete arch bridge construction by using steel I-beams as both formwork and reinforcement. The first applications began immediately, but with falsework still needed for arch construction. Later improvements enabled construction without falsework. After the Second World War the Melan method was forgotten, until it was rediscovered in Japan and China in the late 20th century. Over fifty large-span concrete true arch bridges were constructed in China by utilising concrete-filled steel tubes (CFSTs) as stiff reinforcement, including the Tian’e Longtan Bridge with the world record span of 600 m. Most important concrete arch bridges constructed by the Melan system over time are presented in the paper.

1. Introduction

The arch is a quintessential bridge form, widely regarded as the most aesthetically pleasing. Even those untrained in engineering seem to intuitively appreciate that the form of a true arch bridge expresses fully its load-carrying ability. Once a true concrete arch bridge is properly designed and built, it requires the least maintenance during its service life. The biggest difficulty is how to construct a concrete arch bridge. Obvious choice is centring, but it is expensive and complicated.
Josef Melan realised that efficient erection of concrete true arch bridges can be greatly facilitated by the combined use of steel and concrete. Already in 1892, he patented the Melan system, which used curved steel I-beams embedded in concrete, serving simultaneously as formwork and as rigid reinforcement. This construction method was faster and more economical than other contemporary techniques, gaining rapid adoption in Europe, the USA and beyond [1,2,3,4].
Although largely phased out after the 1940s in the West, the Melan method experienced a revival in the late 20th century in China with the use of concrete-filled steel tubes (CFSTs) as embedded frameworks [5,6]. This improvement reduced steel consumption and improved construction efficiency. Over the past two decades, approximately 60 Melan arch bridges have been built in China, including five with spans exceeding 400 m. The Tian’e Longtan Bridge is currently the true concrete arch bridge with the world record span of 600 m, which is unlikely to be surpassed in the near future [7].
The development of the Melan method from early applications to the record span arch bridges in China is presented in the paper.

2. Melan Method with Rigid Reinforcement Comprising Steel Sections

2.1. Original Melan Method

In 1892, Josef Melan patented the Melan method, which employed steel profiles as rigid reinforcement embedded in concrete. By combining the tensile strength of steel with the compressive strength of concrete, this method significantly enhanced the efficiency and reliability of arch bridge construction. Figure 1 illustrates the Melan method as depicted in his 1893 patent diagrams, where rolled steel sections served as the primary structural components of the embedded frameworks [8].
Figure 1. Illustration of the Melan system of concrete arches, from Melan’s 1893 patent diagrams [8].
The Melan system’s development was supported by a series of full-scale experiments on unreinforced and reinforced concrete arches, with spans ranging from 1.35 m to 4.05 m.
Melan himself explained the detailing of his arches [9]: “The reinforcement beams, curved along the arch axis, are laid at intervals of 0.7 to 1.20 m, with an average of about 1.0 m, and encased with concrete on all sides, so that even the flanges are covered by at least 2.5 to 4 cm of concrete. To prevent the risk of the lower concrete shell detaching in wide flanges, the lower beam flanges are also covered with a thin wire mesh (Rabitz mesh). For arch depths under 25 cm and steel beam heights up to 18 to 20 cm, rolled beams can be used. Although they do not offer as favourable a material arrangement as riveted lattice girders, they are cheaper in terms of unit price.”
The Melan system was originally utilised because of its high load-carrying capacity, an appealing structural/constructional criterion. Originally, one-third to one-half of the concreting load was permanently taken up by the rigid reinforcement, so that falsework was still needed.
The composite response of the steel frameworks and concrete was considered in Melan’s original calculations. He adopted ideal cross-sections assuming bond between steel sections and concrete, without proving this or securing it with structural means. Many engineers at the time (including Robert Maillart and later Christian Menn) had concerns about the combined action of steel sections and concrete, instead preferring to utilise centring in the construction of their arch bridges.

2.2. Melan Bridges in Europe

In Austria, Hungary, Germany, Italy and Switzerland, the Melan system was just one of several rigid reinforcement systems competing for a share of the market. No fewer than five different arch bridge systems with rigid reinforcement existed, named after their inventors: Wünsch, Melan, Ribera, Emperger and Möller [10].
In 1898, the Schwimmschul Bridge was completed in Steyr, Austria (Figure 2a). Designed by Melan and constructed by Brausewetter, who held the rights to use the Melan method in Austria, Hungary and Germany, the bridge had a 42.4 m span and a rise of only 2.67 m, resulting in a very shallow rise-to-span ratio of 1/16 [1]. It used six steel truss arch frames as the embedded framework, with hinges at the springing points and at the crown [8]. The frames were erected using the cantilever method with temporary pylons and stay cables. The bridge remained in service for over 60 years before being dismantled in 1959 [11].
Figure 2. Schwimschul Bridge in Austria: (a) original bridge; (b) rebuilt new bridge [1,5,6].
The Schwimmschul Bridge represents a milestone in the history of concrete arch bridge construction in Austria, and its technical legacy remains widely discussed to this day. Unfortunately, the original bridge no longer exists, and it is regrettable that the reconstructed bridge shown in Figure 2b differs significantly from the original in both technology and appearance [3].
The Dragon Bridge, completed in 1901 in Ljubljana, Slovenia (Figure 3), represents a significant development in early 20th century bridge engineering. Designed by civil engineer Jurij Zaninović and built by a Viennese construction firm, it was among the first large-scale concrete bridges in Europe to adopt the Melan system [12,13]. The main span measures 33.34 m, and the rise is 4.37 m. It features a three-hinged arch, exemplifying the articulated arch design popular in that era. Iron truss arches were positioned 1.0 m apart, and the concreting of the arch was then finished in a little over 10 days [5]. The Dragon Bridge has remained durable with minimal structural intervention for over a century, illustrating the long-term reliability of early concrete technologies when properly designed and executed [14].
Figure 3. Dragon Bridge in Ljubljana, Slovenia.
The Chauderon Bridge (Figure 4), with six equal arch spans of 28.75 m, built at the beginning of the 20th century employing the Melan system, is one of the symbols of Lausanne City in Switzerland; the total steel quantity of arches is about 87 kg/m2 [15].
Figure 4. Chauderon Bridge in Lausanne, Switzerland.
Both the Dragon Bridge and the Chauderon Bridge are still in full use.
The Melan system was also used in constructing some bridges in Italy: the bridge over the Polcevera River near Genoa with five 21 m spans and the bridge over the Tagliamento River near Pinzano with three 48 m spans [10].
One of the few through arch bridges built by the Melan method is the Melan arch bridge across the Sieg River in Germany with 60 m span (Figure 5). This bridge, built in 1929, is considered an important monument of German engineering at the time.
Figure 5. Melan bridge across the Sieg River in Germany.
Large-span Melan arches are prone to deformation and stress differences between steel and concrete. The steel frameworks tend to deform during concrete pouring, while early-cast concrete must bear the weight of subsequent segments, often leading to cracking [16,17]. To mitigate these issues, Heinrich Spangenberg in the construction of the Echelsbacher Bridge (Figure 6) with a 183 m span, completed in 1929, ballasted the steel arch with gravel during casting, a technique now known as the Melan–Spangenberg method [18]. Although effective, this method is rarely used today due to its construction complexity (Figure 7).
Figure 6. Echelsbacher Bridge in Germany.
Figure 7. Cross-section of the embedded framework in Echelsbacher Bridge [14].
A comprehensive replacement project of this bridge began in 2017, and a new bridge adjacent to the historic structure was completed in 2020 [19]. The reconstruction of the bridge, shown in Figure 8, preserved the visual character of the original bridge while incorporating modern high-performance concrete, improved reinforcement detailing and used integral construction techniques to enhance durability [20].
Figure 8. Reconstructed Echelsbacher Bridge: (a) elevation; (b) after completion.
The last Melan bridge to be built in Germany before World War 2 was the Ludwig Bridge over the River Isar in Munich [21], completed in 1935 (Figure 9).
Figure 9. Ludwig Bridge in Munich, Germany.
It took José Eugenio Ribera’s Spanish patent in 1902 introducing double steel trusses and dividing the encased concrete into several transverse rings and multiple longitudinal segments to more consistently utilise the Melan system technological advantages by assigning the concreting load entirely to the rigid reinforcement [22]. The composite response of the steel frameworks and concrete was not considered in the design of Melan arch bridges in Ribera calculations, as opposed to Melan himself. With his system, Ribera built the first reinforced concrete bridge with rigid reinforcement without falsework in 1904: the Chorro Aqueduct near Malaga. The Ribera system soon became established in Spain. Ribera was responsible for approximately 300 bridges of this type.
One well-known example is the San Telmo Bridge in Seville (Figure 10), completed in 1931. The main bridge has spans of 44 + 50 + 44 m, with the two side spans constructed as arch structures and the middle span as a movable cantilever beam structure. The two side spans of concrete arches were built using the Melan system, where the steel truss arch frameworks were erected using a combination of cantilever cable-stayed techniques and heavy-lift floating transportation.
Figure 10. San Telmo Bridge in Seville, Spain.
Known as the Melan–Ribera system, the multi-point balanced casting method was later perfected by Eduardo Torroja during the construction of Spain’s Martín Gil Railway Viaduct (Figure 11a, where the cross-section of the single-box three-cell structure was transversely cast in eight rings, as shown in Figure 11b). The Martín Gil Railway Viaduct (Figure 11c) is amongst the most impressive historic Melan arch bridges. The bridge spans the Esla River in Zamora, Spain. The original design by Martín Gil envisaged a concrete arch with a span of 209.84 m and a rise of 64.75 m, to be built on timber centring. Eduardo Torroja later adopted the Melan method, replacing the already-constructed timber centring, which had been compromised due to construction suspension during the Spanish Civil War. By employing the Melan–Ribera System, concrete of the preceding segments was in composite action with rigid reinforcement. Thus, the approximately 210 m span arch could be constructed with a very light truss weighing less than 500 kg/m for the 4.5 m deep concrete arch [1].
Figure 11. Viaduct Martín Gil: (a) arch construction; (b) arch cross-section with the concreting order; (c) after completion.
After World War II, the Melan system fell out of use due to steel shortages, and its potential economic advantages were subsequently overlooked. In Europe, only a few arch bridges were constructed using the Melan system, such as Switzerland’s New Hundwilertobel Bridge (1992, 143 m arch span) and Austria’s Stampfgraben Bridge (2003, 70 m arch span) [16]. Both bridges employed the vertical erection method for assembling the embedded frameworks [1].

2.3. Melan Bridges in the USA

The Melan system was introduced to the United States by Fritz von Emperger. In 1894, he built two Melan arch bridges in the USA: the one at Rock Rapids, Iowa (Figure 12) [23], spanning 9.1 m, reinforced with five 10.2 cm I-beams; and the other the Eden Park Bridge in Cincinnati, with a span of 21.3 m, as shown in Figure 13. The bridge is still extant, in very good condition and remains in service.
Figure 12. Melan bridge in Emma Sater Park, Rock Rapids.
Figure 13. Eden Park bridge in Walnut Hills, Cincinnati, Ohio.
In 1897, Fritz von Emperger advanced the methodology by obtaining two patents for modifications to the Melan system (Figure 14): one introduced horizontal I-beams as reinforcement within the deck slab, and the other specified radial bars embedded in spandrel walls to structurally connect the arch and deck beams. These innovations were pivotal in establishing the technical feasibility of reinforced concrete arch bridge construction in the United States, effectively laying the groundwork for widespread adoption across North American civil engineering projects.
Figure 14. Reinforcing method patented by von Emperger in 1897.
Another engineer who made significant contributions to the advancement of the Melan system in the United States was Edwin Thacher. After adopting the Melan method, he quickly produced notable and innovative designs. In the autumn of 1895 and the spring of 1896, he created the first Melan railway bridge, the crossing of the Michigan Central Railroad over Southern Boulevard in Detroit, Michigan. This bridge featured a skew span of 14.6 m and was reinforced with 41 “ribs” spaced 76.2 cm apart, as shown in Figure 15 [23].
Figure 15. Melan arch for railroad bridge over Southern Blvd., Detroit.
In 1912, the Larimer Avenue Bridge (Figure 16) was constructed in Pittsburgh, Pennsylvania, USA. The bridge features a span of 91.4 m and a total length of 204.2 m. It contains two arch ribs with a centre-to-centre distance of 9.0 m. Each rib is 2.4 m wide with variable depth, ranging from 3.3 m at the springing to 1.95 m at the crown. The arch ribs are reinforced by eight large steel angles, one at each corner and two back-to-back angles in the middle of the 2.4 m side, all arranged longitudinally along the length of each rib. The arch ribs were cast simultaneously [1].
Figure 16. Larimer Avenue Bridge.
The Third Avenue Bridge (Figure 17) is a landmark structure of Minneapolis, Minnesota, USA The seven-span open-spandrel Melan system arch bridge was opened to traffic in 1918.
Figure 17. Third Avenue Bridge in Minneapolis.
The F.W. Cappelen Memorial Bridge (Figure 18) across the Mississippi River in Minneapolis, Minnesota, USA, was completed in 1923 with a central span of 122.0 m. However, wooden falsework was still used, apparently because the “shallow stream and firm subsoil presented highly favourable support conditions” [24]. The arch ribs were reinforced with steel trusses composed of double-angle chords connected with riveted steel gusset plates and diagonal cross braces. The relatively high water–cement ratio (w/c) of about 0.50 was required to facilitate concrete placement.
Figure 18. F.W. Cappelen Memorial Bridge.
There were almost 300 Melan arch bridges in the United States within about ten years after the first two Melan arch bridges built in 1894. By 1924, the number of arch bridges with rigid reinforcement was estimated to be over 5000. Owing to its construction simplicity and aesthetic charm, the Melan arch persisted as a favoured bridge design in the USA until the 1930s [25].

2.4. Melan Arch Bridges in Japan

The Melan method was introduced to Japan in the early 20th century. The first Melan arch bridge was built in Kyoto in 1903, but real development occurred in the second half of the century, mainly by combining the Melan method with other construction techniques.
During and after World War II, due to the scarcity of steel, the building systems with rigid reinforcement (Melan, Ribera and others) disappeared. Actually, it appeared that the Melan system, and its potential economic benefits, had faded into oblivion. Only after composite steel-concrete construction finally divorced itself from reinforced concrete construction in the 1980s was the Melan system rediscovered. It was the principles of composite construction that enabled the technological development potential of the Melan system to be fully realised for the building of arch bridges. This creative adaptation of the Melan system to composite bridge construction was first used in Japan in the late 1970s and became established there for the building of arch bridges some 10 years later, and at about the same time in China, too.
Seven long-span concrete arch bridges were built in Japan from 1974 to 1989 by combined procedures utilising both temporary cable stays and the Melan method [26]. In the construction of the Beppu Myouban Bridge (completed in 1989 with a 235 m arch span, the longest among them), the two one-third segments from each abutment were constructed using the cantilever method with temporary cable stays to form a Pratt-type truss. The middle one-third segment featured a truss composed of rolled sections, which was erected and later embedded in concrete. The Pratt-type truss consisted of the arch (temporarily prestressed by tendons), columns and additional temporary steel horizontal beams and diagonals. Of the 38 long-span concrete arch bridges surveyed, 10 employed cantilever cable-stayed in situ casting for the arch springing segments, 4 used cantilever truss in-situ casting, and 1 was built with falsework casting—a total of 15 bridges [27].

2.5. Melan Arch Bridges in China

The Melan method was introduced to China at the end of 20th century [3]. The first Melan arch bridge was the Mayisha Bridge, a 60 m span structure completed in 1980. In its construction, less steel material was consumed for the embedded frameworks to achieve a cost-effective solution because at that time China had low steel production and high steel unit prices. Thus, the framework had low stiffness, which is prone to significant deformation during the concreting process to encase the frameworks. In some bridges, the configuration of the completed arch was not controlled as intended, resulting in structural performance and design life failing to meet design requirements. By 1990, total of four Melan arch bridges using weak frameworks had been built. Among them, the Mayisha Bridge had problems such as concrete cracks and exposed angle steel at the arch springings and the arch crown, and it was reinforced in 1998. The other bridge, the Shahekou Bridge in Dandong, Liaoning Province, with a span of 156 m, was demolished and has been rebuilt in 2001.

3. Melan Method with Rigid Reinforcement Comprising Concrete-Filled Steel Tubes (CFSTs)

3.1. Original Melan Method

The rolled steel profiles comprising truss skeleton in the traditional Melan arches were replaced by concrete-filled steel tubes (CFSTs). The application of CFSTs transformed the structural efficiency of the traditional Melan method [3,4,5,6,28]. In conventional Melan arches, the embedded steel I-beams or trusses primarily provided early-stage rigidity but contributed less efficiently to the final composite section due to insufficient concrete confinement and susceptibility to local buckling. By replacing traditional steel sections with thin-walled steel tubes, the CFST framework provides a continuous confining boundary for the core concrete, placing it into triaxial stress state and thus significantly improving its compressive strength and ductility. Furthermore, the steel tubes function as exceptionally rigid, lightweight and stay-in-place formwork, effectively eliminating the risk of concrete spalling at the steel–concrete interface that frequently plagued early Melan arches.
Additionally, the CFST–Melan system offers substantial performance and economy advantages. Compared with the traditional heavy Melan frameworks, the CFST applications typically reduce steel consumption by 30% to 50%, while attaining equivalent or superior global stiffness. The small self-weight of the unfilled steel skeleton drastically reduces the required lifting capacity of cable crane systems in cantilever erection.

3.2. CFST–Melan Bridges in Japan

In the late 1980s, a new erection method, called concrete lapping with pre-erected composite arch (CLCA), was developed in Japan. In this method, steel arches with rectangular (box) sections were first erected, then filled with concrete to form composite arches or rectangular concrete-filled steel tube (CFST) arches, serving as a framework. Concrete was then cast from the springing to the crown, encasing the CFST arches with moving formworks.
This method was first applied in the construction of the Asahi Bridge, which had a span of 58 m [29], as shown in Figure 19c. In this case, four thin-wall steel tube arches were erected by the lowering method, one of the vertical swing techniques, where two arch halves were assembled upright and rotated downward to the closure position [30]. Concrete was then placed inside the box arches, followed by casting concrete with moving form travellers from the springing, as shown in Figure 19a. Once the arch was complete, spandrel structures and other works were built with the support of the arch (Figure 19b).
Figure 19. Asahi Bridge in Japan: (a) concrete casting of the arch on the embedded CFST arches; (b) construction of the spandrel structure; (c) completed bridge.
The concrete-filled steel box improves the stiffness of the embedded framework, but the method entails relatively high steel consumption. At least 18 bridges in Japan have been constructed with this approach. Moreover, its practical span limit is approximately 200 m, as longer spans would result in prohibitively high construction costs.
To simplify construction, a new approach was proposed for the Melan method. In this technique, the embedded steel box arches are placed only inside the outer concrete webs and are not filled with concrete.
The Kashirajima Bridge was also constructed using this method. It has an arch span of 218 m, with a rise-to-span ratio of only 1/8. The main arch was erected using a combination method. The two side halves of the arch were cast in place using moving form travellers (Figure 20a). The central segment of the arch was constructed using the Melan method. The twin-box steel arch girder, 130.4 m long (about 60% of the arch span) and weighing 383 t, was hoisted in a single lift from a barge, connecting the two side halves of the completed concrete arch and rapidly closing the arch (Figure 20b, just like Ribera did in Seville. The bridge was completed in 2004, as seen in Figure 20c [31].
Figure 20. Kashijarima Bridge, Japan: (a) casting of side segments; (b) erection of twin box type steel framework; (c) completed bridge.
The highest and longest concrete arch bridge in Japan is the Tensho Bridge (Figure 21), which has a span of 260 m and a rise-to-span ratio of 1/8. The bridge was constructed by the Melan combination method, in which the two side halves of the arch were cast-in-place on the moving form traveller by the cantilever truss method using temporary diagonal cable stays to form the Pratt-type truss. The central segment of the arch was constructed by the Melan method, and the bridge was completed in 2000 [32].
Figure 21. Tensho Bridge, Japan: (a) casting the side segments; (b) completed bridge.

3.3. CFST–Melan Bridges in China

In the last four decades, we are witnessing an incredible revival of the Melan method for the construction of long-span concrete arch bridges in China. It was made possible by extensive research and development on concrete-filled-steel-tubes (CFSTs) and its practical application to the construction of concrete arch bridges (CFST–Melan method). Numerous papers have been written on CFST arch bridges [2,4,5,6,28,33,34,35,36], to list just a few.
The classical Melan method utilising rolled steel profiles as stiff reinforcement was still used in the construction of the Yibin Jinshajiang Bridge, a concrete arch bridge of 240 m span, completed in the Sichuan Province of China in 1990, but it was found out that large amount of steel was needed, which is not economically justifiable. Already in the same year, the first CFST arch bridge, the Wangcang Donhe Bridge, was constructed in China, and significant advantages of the CFST–Melan method have been established.
These advantages have been utilised in the construction of long-span concrete arch bridges, such as the Yongjiang Bridge built in 1996; and the Wanxian Yangtze River Bridge (Figure 22), at the time having a world-record 420 m span, completed in 1997, by replacing rolled steel profiles by steel tubes filled with concrete [37,38]. This great improvement of the Melan method resulted in large savings of steel, simplified construction and improved resistance of the arch cross-section.
Figure 22. Wanxian Yangtze River Bridge: (a) completed bridge; (b) CFST-embedded scaffolding construction.
The main axis shape is adopted as catenary in 95% of concrete arch bridges, and the rise-to-span ratio is mostly 1/6 for bridges built before and 1/5 for bridges built after the year 2007 [5].
The construction steps are in principle, as follows:
(a)
A trussed arch consisting of steel tubes is erected by a cantilever procedure using temporary cable stays. Since 2012, the stiff CFST steel skeleton method is utilised to allow reduction of the number of steps for concrete casting to three or less, whereas four or more steps were needed before. The installation method for the CFST arch truss skeleton is thereby similar to that used for the CFST arch except that to facilitate its adhesion with the encasing concrete, the web members are often H-sections [6].
(b)
Concrete of minimum shrinkage is pumped into steel tubes so that adequate adhesion between concrete and steel tube walls is established. The continuous pouring of concrete inside the steel tubes is the fundamental requirement to ensure the structural integrity and construction efficiency of CFST arch ribs. Recently, a multi-level lifting and pouring method has been developed, introducing the vacuum-assisted pressure pumping, that involves the vacuum equipment installed at the tops of arch ribs to reduce the internal pressure to 0.01–0.03 MPa, thus significantly enhancing the compaction and the pouring rate of in-tube concrete [6].
(c)
The arch is concreted on formwork, which is suspended on the CFST arch, and the CFST trussed arch acts as stiff reinforcement in the completed arch. The encasing concrete is poured layer by layer, platform by platform, and segment by segment, supported by formwork suspended from the CFST skeleton. The bottom plate is concreted first, then webs and finally the top plate. To prevent cracking, due to large differences in the curing times between bottom plate and webs concrete layers, expansion agents containing retarding components are added to the web concrete to induce volume expansion [6]. During pouring of the encasing concrete, subsequent dead loads are carried by the composite section comprising the CFST arch truss skeleton and the already hardened encasing concrete, much like in the construction of the Martin Gil Viaduct.
(d)
After completion of the arch, spandrel columns and the deck are constructed.
The core concrete in 54% of the CFST–Melan arch bridges is C50/60 to C60/75, while the encasing concrete is from C30/37 to C60/75 [5].
According to [6], the weight of the arch ribs accounts for approximately 60% of the total weight of the whole superstructure, and stresses in the arch rib caused by permanent load constitute 91.7–96.6% of the total stresses caused by the combined permanent and live loads.
The following presents photos and basic data on a few concrete arch bridges in China with spans exceeding 300 m in the order of their service date.
The Zhaohua Jialing River Bridge (Figure 23) on the Guangnan Expressway in Sichuan Province has an arch span of 364 m. The construction period of the Zhaohua Jialing River Bridge from the year 2012 was 3 years and cost 27 million EUR, while the construction of the Mike O’Callaghan-Pat Tillman Memorial Bridge with an arch span of 323 m in the USA from the year 2010 last 5 years and cost 216 million EUR [28].
Figure 23. Zhaohua Jialing River Bridge: (a) completed bridge; (b) CFST-embedded scaffolding construction.
The Beipanjiang Railway Bridge (Figure 24) on the HSR Shanghai–Kunming railway line with an arch span of 445 m was built in 2016. The arch axis is a catenary with a 100 m rise, giving a rise-to span ratio of 1/4.45. The arch has a single three-cell cross-section of constant 9.0 m depth and variable width from 28 m at abutments to 18 m at the crown [39,40]. The embedded steel tube trussed arch framework weighs only 6.5% of the total concrete weight in the arch rib [5].
Figure 24. Beipanjiang Railway Bridge: (a) completed bridge; (b) CFST-embedded scaffolding construction. The arch of Nanpanjiang Railway Bridge (Figure 25) on the HSR Yunnan–Guangxi railway line, crossing a deep V-shaped canyon, has a span of 416 m and a rise of 99 m (f/L = 1/4.2). The single three-cell box type arch rib cross-section has constant depth of 8.5 m and variable width from 18.0 m at the crown to 28.0 m at arch springings [6,28,41,42].
Figure 25. Nanpanjiang Railway Bridge: (a) completed bridge; (b) CFST-embedded scaffolding construction.
The Yelang Lake Railway Bridge (Figure 26) on the HSR railway line between Guijang and Chongqing cities with an arch span of 370 m was completed in 2018.
Figure 26. Yelang Lake Railway Bridge: (a) completed bridge; (b) CFST-embedded scaffolding construction.
The Lancang River Railway Bridge (Figure 27) with an arch span of 342 m was completed in 2022. The arch comprises two ribs of a single box section each. While in all other long-span bridges constructed by the CFST–Melan method, the steel tubes framework had been erected by the cantilever method using temporary pylons and cable stays, in this bridge, it was erected by double rotation due to limitations of transport and the site [43].
Figure 27. Lancang River Railway Bridge: (a) completed bridge; (b) CFST-embedded scaffolding construction.
The Suba Bridge is the largest and the highest bridge crossing along the Leshan to Hichang Expressway in Sichuan Province (Figure 28). The concrete arch bridge of 350 m span was completed in 2024, utilising the CFST–Melan method.
Figure 28. Suba Bridge: (a) completed bridge; (b) CFST-embedded scaffolding construction.
In China, only 9 of 41 concrete arch bridges, with spans longer than 200 m, have been constructed by the free cantilever method using temporary pylons and cable stays [7]. Of these, the Shuiluo River Bridge situated on the Luzhou–Gulin Expressway has the longest span of 335 m (Figure 29). This bridge arch comprises four ribs. The Shuiluo River Bridge was completed in 2024.
Figure 29. Shuiluo River Bridge: (a) completed bridge; (b) free cantilever construction using temporary cable stays.
The second longest concrete arch span of 510 m belongs to Xining River Grand Bridge in Sichuan, which will be opened to traffic in December 2026. The arch closure is depicted in Figure 30.
Figure 30. Xining River Grand Bridge—arch closure.
The Tian’e Longtan Bridge (Figure 31) has a world record clear arch span of 600 m and a rise of 125 m, resulting in a rise-to-span ratio of 1/4.8. It comprises two parallel arch ribs with a constant width of 6.5 m and variable depth from 12.0 m at springings to 8 m at the crown. The bottom flange depth varies from 130 cm at springings to 65 cm at the crown and the webs depth varies from 95 cm at springings to 45 cm at the crown, while the depth of the top flange is constant equal to 65 cm. All previous concrete arch bridges have constant depth and much larger dimensions. For example, the total volume of encasing concrete in the Tian’s Longtan bridge arch amounts to 28,100 m3, which is only 6% more than in the Beipanjiang Railway Bridge arch with a 35% smaller span of 445 m. Four steel tubes in the corners of the rib box have a 900 mm diameter and a 30–35 mm thickness. The twin arch ribs are spaced at 16.5 m transversely and inter-connected at the spandrel column positions, while all concrete arch bridges with spans longer than 400 m adopted a one-box section with three cells. The chord tubes are filled with C80/95 self-compacting slightly expansive concrete, and the encasing concrete of arch ribs and the transverse connections is C60/75. The weight ratio of the encasing concrete to the steel stiff truss skeleton of arch ribs is 8.6, while it is approximately 13.0–15.0 in all other long-span arch bridges [6,28].
Figure 31. Asahi Bridge in Japan: (a) completed bridge; (b,c) CFST erection stages.
The construction began in June 2020, and the bridge was opened to traffic on 1 February 2024.
In the preliminary design phase, it was established that a CFST concrete arch bridge compared to a cable-stayed bridge costs 14 million EUR less in construction and 60 million EUR less in maintenance over a 100-year service period, while increasing structural stiffness by a factor of seven [7].

4. Conclusions

A review of the development of the Melan system for construction of concrete arch bridges has been attempted in this paper.
The Melan system, with rigid reinforcement comprising steel sections, was originally utilised because of its high load-carrying capacity, an appealing structural/constructional criterion. Originally, one-third to one-half of the concreting load was permanently taken up by the rigid reinforcement, so that falsework was still needed. It took José Eugenio Ribera’s Spanish patent in 1902 introducing double steel trusses and dividing the encased concrete into several transverse rings and multiple longitudinal segments to more consistently utilise the Melan system technological advantages by assigning the concreting load entirely to the rigid reinforcement. The Melan system was especially popular in the USA, owing to its construction simplicity and aesthetic charm. By 1924, the number of arch bridges with rigid reinforcement was estimated to be over 5000. Many Melan arch bridges constructed in the early days have been abandoned or reconstructed, but the most important city arch bridges, constructed by the Melan method, still fulfil their function after more than 100 years since their completion.
It appeared that the Melan system, and its potential economic benefits, had faded into oblivion after World War II. It was the principles of composite construction that enabled the technological development potential of the Melan system to be fully realised for the construction of arch bridges. This creative adaptation of the Melan system to composite bridge construction was applied in Japan with the construction of seven long-span concrete arch bridges built in Japan from 1974 to 1989 by combined procedures utilising both temporary cable stays and the Melan method with rigid reinforcement of steel rolled sections.
But the real breakthrough came with the replacement of rolled steel profiles comprising a truss skeleton in the traditional Melan arches with concrete-filled steel tubes (CFSTs). The CFST–Melan system offers substantial performance and economy advantages. Compared with the traditional heavy Melan frameworks, the CFST applications typically reduce steel consumption by 30% to 50%, while attaining equivalent or superior global stiffness. In the last four decades, we are witnessing an incredible revival of the Melan method for the construction of long-span concrete arch bridges in China. It culminated with the Tian’e Longtan Bridge of an incredible clear arch span of 600 m, which will hold the world record for a long time.
Basic data of concrete arch bridges exceeding 300 m span, built worldwide, are given in Table 1.
Table 1. Concrete arch bridges with spans longer than 300 m, built worldwide.

Funding

This research received no external funding.

Institutional Review Board Statement

Not applicable.

Data Availability Statement

Data are available in this manuscript.

Conflicts of Interest

The author declares no conflict of interest.

References

  1. Šavor, Z.; Bleiziffer, J. From Melan patent to arch bridges of 400 m spans. In Proceedings of the Chinese-Croatian Joint Colloquium on Long Span Arch Bridges, Brijuni Islands, Croatia, 10–14 July 2008; pp. 349–356. [Google Scholar]
  2. Chen, B.C.; He, F.Y.; Li, C.; Liu, J.P.; Šavor, Z. Development of Melan Method in the Last 20 Years. In Proceedings of Arch’23; Structural Integrity; Springer: Berlin/Heidelberg, Germany, 2025; Volume 32, pp. 3–11. [Google Scholar]
  3. Chen, B.C.; Šavor, Z.; Chen, S.J.; Li, C.; Shrestha, K.; Sennah, K.; Nakamura, S. Historic Melan Arch Bridges—Experiences and lessons. J. Highw. Transp. Res. Dev. 2026, 20, 30–42. [Google Scholar] [CrossRef] [Scilit]
  4. Chen, B.C.; He, F.Y.; Li, C.; Liu, J.; Zlatko, Š.; Mou, T.; Chen, C.; Yao, H.; Zhang, M. Review on technical development of Melan Method and Melan arch bridges. J. Traffic Transp. Eng. 2022, 22, 1–24. (In Chinese) [Google Scholar]
  5. Liu, J.P.; Chen, B.C.; Li, C.; Zhang, M.J.; Mou, T.; Tabatabai, H. Recent Application of and Research on Concrete Arch Bridges in China. Struct. Eng. Int. 2022, 33, 394–398. [Google Scholar] [CrossRef] [Scilit]
  6. Zheng, J.L. Recent Construction Technology Innovations and Practices for Large-Span Arch Bridges in China. Engineering 2024, 41, 110–129. [Google Scholar] [CrossRef] [Scilit]
  7. Zheng, J.L.; Zheng, C. Key innovations in the construction of Tian’e Longtan Bridge. Adv. Bridge Eng. 2026, 7, 34. [Google Scholar] [CrossRef] [Scilit]
  8. Bernabeu Larena, J.; Eggemann, H.; Kurrer, K.E. Puentes arco con armadura rígida portante/Concrete arch bridges with rigid reinforcement. Rev. Obras Públicas 2005, 152, 47–56. (In Spanish) [Google Scholar]
  9. Melan, J. Der Brückenbau. II. Band. Steinerne Brücken und Brücken aus Beton-Eisen; Franz Deuticke: Leipzig, Germany; Wien, Austria, 1911. (In German) [Google Scholar]
  10. Spitzer, J.A.; Nowak, A. Bogenbrücken und Überwölbungen. In Handbuch für Eisenbeton. Dritter Band: Bauausführungen aus dem Ingenieurwesen. Dritter Teil: Brückenbau und Eisenbahnbau; Wilhelm Ernst & Sohn: Berlin, Germany, 1908. (In German) [Google Scholar]
  11. Schwimmschulbrücke. Available online: https://structurae.net/en/structures/schwimmschulbrucke (accessed on 11 February 2025).
  12. Humar, G. The Dragon Bridge, The Bridges of Ljubljana in the Mirror of Time; Založništvo Pontis: Nova Gorica, Slovenia, 1999. [Google Scholar]
  13. Eggemann, H.; Kurrer, K.E. Puentes de arco del sistema Melan. In Actas del Cuarto Congreso Nacional de Historia de la Construcción; Instituto Juan de Herrera: Madrid, Spain, 2005; pp. 378–388. (In Spanish) [Google Scholar]
  14. Foerster, M. Die Grundzüge der geschichtlichen Entwicklung des Eisenbetonbaus. In Handbuch für Eisenbetonbau; Wilhelm Ernst & Sohn: Berlin, Germany, 1908. (In German) [Google Scholar]
  15. Melan, J. Die Beton-Eisen-Brücke Chauderon-Montbenon in Lausanne; Wilhelm Ernst & Sohn: Berlin, Germany, 1906. (In German) [Google Scholar]
  16. Schallaschek, P. Die Stampfgrabenbrücke im Lesachtal/Kärnteneine Melan-Bogenbrücke. Stahlbau 2003, 72, 196–199. (In German) [Google Scholar] [CrossRef] [Scilit]
  17. Arenas de Pablo, J.J. Caminos en el Aire: Los Puentes; Colegio de Ingenieros de Caminos, Canales y Puertos: Madrid, Spain, 2002. (In Spanish) [Google Scholar]
  18. Goj, K.; Hennecke, M. Restoration of the Echelsbacher Bridge in Germany. Proc. Inst. Civ. Eng.–Eng. Hist. Herit. 2017, 170, 152–161. [Google Scholar] [CrossRef] [Scilit]
  19. Leonhardt, A. Neue Entwicklungen im Betonbrückenbau. Beton-Und Stahlbetonbau 2021, 116, 547–556. (In German) [Google Scholar]
  20. Zimmermann, W. Die neue Echelsbacher Brücke⎼ein Spannbetonbogenbauwerk in historischer Umgebung. Stahlbau 2020, 89, 761–767. (In German) [Google Scholar]
  21. Eggemann, H.; Kurrer, K.E. On the International Propagation of the Melan Arch System since 1892. In Proceedings of the Third International Congress on Construction History, Cottbus, Germany, 20–24 May 2009. [Google Scholar]
  22. Eggemann, H.; Kurrer, K.E. Zur internationalen Verbreitung des Systems Melan seit 1892: Konstruktion und Brückenbau. Beton-Und Stahlbetonbau 2006, 101, 911–922. (In German) [Google Scholar] [CrossRef] [Scilit]
  23. Gasparini, D.A. Development of Reinforced Concrete Arch Bridges in the U.S.: 1894–1904. In Proceedings of the Fourth National Congress on Civil Engineering History and Heritage, Washington, DC, USA, 2–6 November 2002. [Google Scholar]
  24. Johnson, A.P.; Lawler, J.S.; Enser, D.; Konda, T.; Backer, P. The Franklin Avenue Bridge Part 1: History investigation and rehabilitation. Concr. Int. 2017, 39, 33–42. [Google Scholar]
  25. The Melan Arch Historical Marker. Available online: https://www.hmdb.org/m.asp?m=241850 (accessed on 16 November 2026).
  26. Sato, K.; Apai, H. Construction technology of long span concrete arch bridges. In Proceedings of the IABSE Symposium, Bridges: Interaction between Construction, Technology and Design, Leningrad, Russia, 11⎼14 September 1991; pp. 443–448. [Google Scholar]
  27. Japan Society of Civil Engineers. Design and Construction of 600m-Class Long-Span Concrete Arch Bridges; Japan Society of Civil Engineers: Tokyo, Japan, 2003. [Google Scholar]
  28. Zheng, J.L.; Wang, J.J. Concrete-filled Steel Tube Arch Bridges in China. Engineering 2018, 4, 143–155, Correction in Engineering 2021, 7, 542.. [Google Scholar] [CrossRef] [Scilit]
  29. Kawamura, T.; Fujimoto, Y.; Palmer, W.J., Jr. New construction method for arch bridges: Tubular steel arches filled with concrete act as falsework and structure. Concr. Constr. 1991, 36, 11–12. [Google Scholar]
  30. Kaminaga, Y.; Nakagawa, T.; Hosono, H.; Ichikawa, H.; Kajiura, M. Construction of an arch Bridge by lowering method. In Proceedings of the fib Symposium-High Tech Concrete: Where Technology and Engineering Meet; Springer: Cham, Switzerland, 2018; pp. 2629–2637. [Google Scholar]
  31. Tanabe, T. Using steel arches to construct large concrete arch bridges: Kashirajima Bridge on a Town Roadway, Hinase Kashirajima Route. In Proceedings of the Fourth Civil Engineering Conference in the Asian Region, Taipei, Taiwan, 25–28 June 2007; pp. 1–6. [Google Scholar]
  32. Kamimura, K.; Kouno, M.; Okada, K.; Tsuka, T. Design and construction of the Tensho concrete arch bridge. In ARCH’01: Troisième Conference Internationale sur les Ponts en Arc; Presses de l’Ecole Nationale des Ponts et Chaussées: Paris, France, 2001; pp. 857–864. [Google Scholar]
  33. Chen, B.C.; Su, J.Z.; Lin, S.S.; Chen, G.; Zhuang, Y.; Tabatabai, H. Development and application of concrete arch bridges in China. J. Asian Concr. Fed. 2017, 3, 12–19. [Google Scholar] [CrossRef] [Scilit]
  34. Chen, B.C.; Liu, J.P.; Tatabai, H. Recent Research and Application of Arch Bridges in China. In Proceedings of the ARCH 2019, 9th International Conference on Arch Bridges, Porto, Portugal, 2–4 October 2019; pp. 536–544. [Google Scholar]
  35. Chen, B.C.; Liu, J.P.; Wei, J.G. Concrete-Filled Steel Tubular Arch Bridges; China Communications Press: Beijing, China; Springer: Berlin/Heidelberg, Germany, 2023. [Google Scholar]
  36. Zheng, J.L.; Chen, Z.; Tu, B.; Wang, J.; Du, H.; Qin, D.; Huang, D. Recent development of long-span arch bridge in China. In Proceedings of the 11th International Conference on Bridge Maintenance, Safety and Management (IABMAS 2022), Barcelona, Spain, 11–17 July 2022; pp. 3–19. [Google Scholar]
  37. Li, W.; Fan, W.; Sun, Y.; Liu, J.P. The Wanxian Bridge: The World’s Longest Concrete Arch Span. In Proceedings of ARCH’01, 3rd International Conference on Arch Bridges; Presses de l’École Nationale des Ponts et Chaussées: Paris, France, 2001; pp. 673–676. [Google Scholar]
  38. Xie, B. Wanxian long span concrete arch bridge over Yangtze River in China. In Proceedings of the Chinese-Croatian Joint Colloquium ‘Long Arch Bridges’, Brijuni Islands, Croatia, 10–14 July 2008; pp. 181–187. [Google Scholar]
  39. Xu, Y.; Chen, L.; Xie, H.Q.; Hu, J.T. Design of the Beipanjiang Bridge on high-speed railway between Shanghai and Kunming. In Proceedings of the Chinese-Croatian Joint Colloquium ‘Sustainable Arch Bridges’, Zagreb, Croatia, 15–16 July 2011; pp. 71–82. [Google Scholar]
  40. Zhu, Y.; Xu, Y.; Chen, L.; Xie, H.Q.; He, T.G.; Hu, J.T.; You, L.H. Scheme Comparison of Beipan River Bridge Site, Line Height and Bridge Type on Shanghai-Kunming Passenger dedicated Railway. In Proceedings of the ARCH’13, Seventh International Conference on Arch Bridges, Trogir-Split, Croatia, 2–4 October 2013; pp. 383–393. [Google Scholar]
  41. Xu, Y.; Chen, K.J.; Ren, W.; Hu, J.T. Design of Nanpanjiang Grand Bridge on high-speed railway from Kunming to Nanning. In Proceedings of the Chinese-Croatian Joint Colloquium ‘Sustainable Arch Bridges’, Zagreb, Croatia, 15–16 July 2011; pp. 83–90. [Google Scholar]
  42. Xu, Y.; Chen, K.J.; Ren, W.; Hu, J.T.; He, T.G.; You, L.H. Scheme Comparisons of Nanpan River Grand Bridge on Railway from Yunnan to Guangxi. In Proceedings of the ARCH’13, Seventh International Conference on Arch Bridges, Trogir-Split, Croatia, 2–4 October 2013; pp. 395–407. [Google Scholar]
  43. Su, M.; Wang, J.; Peng, H.; Cai, C.S.; Dai, G. State-of-the-art review of the development and application of bridge rotation construction methods in China. Sci. China Technol. Sci. 2020, 64, 1137–1152. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.