Musella, C.; Serra, M.; Salzano, A.; Menna, C.; Asprone, D.
Open BIM Standards: A Review of the Processes for Managing Existing Structures in the Pre- and Post-Earthquake Phases. CivilEng 2020, 1, 291-309.
https://doi.org/10.3390/civileng1030019
AMA Style
Musella C, Serra M, Salzano A, Menna C, Asprone D.
Open BIM Standards: A Review of the Processes for Managing Existing Structures in the Pre- and Post-Earthquake Phases. CivilEng. 2020; 1(3):291-309.
https://doi.org/10.3390/civileng1030019
Chicago/Turabian Style
Musella, Christian, Milena Serra, Antonio Salzano, Costantino Menna, and Domenico Asprone.
2020. "Open BIM Standards: A Review of the Processes for Managing Existing Structures in the Pre- and Post-Earthquake Phases" CivilEng 1, no. 3: 291-309.
https://doi.org/10.3390/civileng1030019
APA Style
Musella, C., Serra, M., Salzano, A., Menna, C., & Asprone, D.
(2020). Open BIM Standards: A Review of the Processes for Managing Existing Structures in the Pre- and Post-Earthquake Phases. CivilEng, 1(3), 291-309.
https://doi.org/10.3390/civileng1030019